Loading...
HomeMy WebLinkAboutI. Orchards Traffic Operations Report, dated November 10, 2025Bishop Ranch Orchards Traffic Operations Report Prepared for: Submitted on: Bishop Ranch November 10, 2025 P Table of Contents Executive Summary ........................................................................................................................ 1 1.0 Introduction .............................................................................................................................. 3 Project Description ................................................................................................................................................... 3 2.0 Intersection Analysis Methodology ....................................................................................... 4 Study Area ................................................................................................................................................................... 4 Analysis Scenarios ..................................................................................................................................................... 4 Signalized Intersections ........................................................................................................................................... 5 City Evaluation Criteria ............................................................................................................................................ 5 3.0 Existing Traffic Conditions .....................................................................................................7 Context ......................................................................................................................................................................... 7 Existing Intersection Level of Service .................................................................................................................. 7 Existing Queues ......................................................................................................................................................... 8 4.0 Project Travel Demand........................................................................................................... 11 Project Trip Generation ........................................................................................................................................... 11 Project Trip Distribution and Assignment .........................................................................................................14 5.0 Existing with Project Conditions .......................................................................................... 16 Existing with Project Intersection Level of Service ......................................................................................... 16 Existing with Project with Mitigations Intersection Level of Service ......................................................... 17 Existing with Project Queues ................................................................................................................................ 19 Existing with Project with Mitigations Queues ...............................................................................................22 Potential Pedestrian Improvements .................................................................................................................. 24 6.0 Cumulative (Year 2040) Conditions .................................................................................. 26 Cumulative Conditions Traffic Volumes ...........................................................................................................26 Cumulative with Project Intersection Level of Service ................................................................................. 27 Cumulative with Project Queues ....................................................................................................................... 30 List of Figures Figure 1. Project Site Plan ............................................................................................................................................ 34 Figure 2. Project Site Vicinity and Study Intersections ....................................................................................... 35 Figure 3. Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control ........................................................................................................................................................ 36 P Figure 4. Existing Conditions 95th Percentile Queues .........................................................................................37 Figure 5. Project Trip Distribution ............................................................................................................................ 38 Figure 6. Project Trip Assignment ............................................................................................................................ 39 Figure 7. Existing with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configuration, and Traffic Control .................................................................................................................................. 40 Figure 8. Existing with Project Conditions 95th Percentile Queues ................................................................. 41 Figure 9. Cumulative with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configuration, and Traffic Control ..................................................................................................... 42 List of Tables Table 1. Signalized Intersection LOS Definitions ...................................................................................................... 5 Table 2. Existing Conditions Peak Hour Intersection LOS Summary ................................................................. 8 Table 3. Existing Conditions Peak Hour Intersection Queue Summary .......................................................... 10 Table 4. Estimated Project Vehicle Trip Generation ............................................................................................. 13 Table 5. Vehicle Trip Generation Comparison ....................................................................................................... 14 Table 6. Existing with Project Conditions Peak Hour Intersection LOS Summary ........................................ 17 Table 7. Existing with Project Conditions with Mitigations Peak Hour Intersection LOS Summary ......... 19 Table 8. Existing with Project Conditions Peak Hour Intersection Average Queue Summary ................ 20 Table 9. Existing with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary ......21 Table 10. Existing with Project Conditions Peak Hour Intersection Average Queue Summary ............... 22 Table 11. Existing with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary .... 23 Table 12. Cumulative with Project Conditions Peak Hour Intersection LOS Summary .............................. 30 Table 13. Cumulative with Project Conditions Peak Hour Intersection Average Queue Summary .......... 31 Table 14. Cumulative with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary ...................................................................................................................................................................... 32 Appendices Appendix A. Traffic Counts Appendix B: Intersection LOS Worksheet Appendix C: Intersection Queue Worksheet Appendix D: Mixed-Use Trip Generation Model Recalibration and Validation Appendix E: Pass-by Volumes Appendix F: Trip Distribution Appendix G: Cumulative Volumes P Bishop Ranch Orchards Traffic Operations Report | 1 Executive Summary This memo documents the effect of the Bishop Ranch Orchards Mixed-Use Development Project trips on traffic. The Project would be located at 6001 Bollinger Canyon Road in San Ramon. There is currently a vacated 1,398 thousand square feet (KSF) corporate headquarters at the Project site. The Project proposes to construct a mixed-use development with 2,084 multi-family housing units, 138 single-family attached housing units, 230 single-family detached housing units, 58 accessory dwelling units, and 125 KSF of retail uses. The Project is designed to support a walkable environment with direct access to stores, parks, and regional trails. Increased housing density would provide a stronger customer base for retail and amenities, improving overall access and convenience for residents, and its proximity to the freeway helps reduce impacts to surrounding local roadways. The Project would generate more automobile trips than a fully occupied corporate headquarters for a typical weekday, although fewer in the AM and PM peak hours. The directionality of the Project trips would be more aligned with the prevailing travel which is toward I-680 in the morning, and away from it in the afternoon, whereas the corporate headquarters use generated travel demand that more generally counterbalances prevailing traffic flows. The Project’s trip generation in this memo accounts for internal capture and for walking, biking, and transit use, noting that the residential trip generation is conservatively high as it has not been adjusted for higher levels of work-from-home occurring post-pandemic. Currently, traffic at intersections moves reasonably well during rush hours with almost all drivers clearing within one signal cycle, although there are occasional times when the turn lanes get backed up beyond their designated space. Existing intersection levels of service in the Project vicinity are all LOS D or better, which is within the City’s standard of LOS E or better. The addition of project trips would result in average delay worsening to LOS E during some periods at the main project driveway intersection at Chevron Drive-Sunset Drive/Bollinger Canyon Road, and to the adjacent east at Bollinger Canyon Road/Bishop Ranch 1-Camino Ramon, although this would remain within the city's standard. At rare cases in the peak hours, drivers may experience long queues but they would still be served by the first green light that they experience. As such, the Project’s traffic would generally be adequately accommodated under existing capacity. Three mitigation measures to accompany the project are proposed that would generally reduce queues and automobile delay: •To increase the northbound left-turning storage capacity at Chevron Drive-Sunset Drive/Bollinger Canyon Road, restripe the northbound approach from Left, Left-Through, Right to Left, Left, Through-Right. •To improve traffic progression mainly in the westbound direction along Bollinger Canyon Road, in the AM peak hour, add I-680 SB Ramps/Bollinger Canyon Road and I-680 NB Ramps/Bollinger Canyon Road to the adaptive signal system. •To reduce delays and queuing at the I-680 southbound off-ramp intersection, improving throughput of westbound traffic, adjust traffic signal’s vehicle detection settings for the westbound approach at San Ramon Valley Boulevard/Bollinger Canyon Road. Each studied mitigation measure would be effective in reducing delay and queuing at its immediate location. However, taken together they would only slightly reduce average delay and queuing across Bishop Ranch Orchards Traffic Operations Report | 2 the network. This is because each mitigation tends to have the effect of releasing more traffic to the downstream location, shifting queues and delay to that downstream location. Therefore, because they reduce delay at some locations at the expense of other locations, the combined benefits of the mitigation measures are marginal. Mitigation measures that were not considered are road expansions such as lane additions nor intersection widenings, as these would worsen the experience for pedestrians and bicyclists while inducing more driving. Buildout of the City's 2040 General Plan may result in an annualized 1.3% growth rate for traffic between 2025 and 2040. Under these year 2040 cumulative conditions, and including the Project, intersection levels of service in the Project vicinity would generally be similar to existing with project conditions with the exception of LOS F conditions (exceeding capacity) at Chevron Drive-Sunset Drive/Bollinger Canyon Road, and Bollinger Canyon Road/Bishop Ranch 1-Camino Ramon, with extensive vehicular queuing spilling back to upstream intersections. With the adaptive signal system designed to preserve vehicular progression along Bollinger Canyon Road, much of the delay would be experienced by side-street drivers. Under no modeled scenarios would traffic spill back along the freeway off-ramps onto the I-680 freeway mainline. The cumulative scenario represents traffic demand under a set of simplistic growth assumptions and does not capture the large degree of uncertainty inherent in potential travel changes over the next 15 years. While future trends are uncertain, some trends indicate that traffic levels may not grow at the trajectory seen in the past. In this scenario, a couple intersections along Bollinger Canyon Road would become bottlenecks where drivers experience long waits and slow-moving traffic, with queues exceeding capacity in several locations. Because conditions in the Existing Plus Project scenario are comparably much better, any worsening shown here would be due to general increases in driving, not the Project’s effect. Furthermore, some drivers would adapt where and when they drive when faced with this amount of congestion; the model does not capture this behavior change, thereby overstating peak hour delay and queuing. Mitigations such as lane restriping and signal retiming would have marginal overall effect in the Cumulative scenario, although the City should periodically optimize signal timings under future conditions. Furthermore, investments in sustainable modes of transportation such as walking, biking, and transit will improve their respective appeal and lead to reductions in driving as people switch over to them. Bishop Ranch Orchards Traffic Operations Report | 3 1.0 Introduction The Orchards Mixed-Use Development (“Project”) is located at 6001 Bollinger Canyon Road in San Ramon, California. Per Senate Bill 763, automobile delay as measured by congestion-based metrics such as Level of Service (LOS) no longer constitutes a significant impact under the California Environmental Quality Act (CEQA). However, many agencies like San Ramon continue to require intersection operations analyses to assess a project’s effects on the circulation system versus General Plan goals and policies related to the operations of the circulation system. This report assesses the impact of the Project on traffic operations at seven intersections and evaluates the nearby traffic conditions against City evaluation criteria contained within the San Ramon 2040 General Plan. All figures are presented at the end of the report. Project Description The Project proposes a mix of single-family housing, multi-family housing, and retail uses to replace a corporate headquarters campus. The Project includes construction of 230 single-family detached residences, 138 single-family attached residences, 58 accessory dwelling units (ADU), 2,084-units of multi-family housing units, and 125,000 square feet of retail. There is an existing 1,397,520 square foot corporate headquarters campus onsite that was vacated in late Summer 2024 and will be demolished as part of the Project. The proposed site plan for the Project is shown on Figure 1. The project is a mixed-use development that is supported by a walkable environment with direct access to stores, parks, and regional trails. Increased housing density would provide a stronger customer base for retail and amenities, improving overall access and convenience for residents. Its proximity to the freeway largely contains traffic increases to near the freeway, instead of to surrounding local roadways. Bishop Ranch Orchards Traffic Operations Report | 4 2.0 Intersection Analysis Methodology The operations of roadway facilities are described with the term level of service (“LOS”), a qualitative description of traffic flow based on such factors as speed, travel time, delay, and freedom to maneuver. Six levels are defined from LOS A, as free flow operating conditions, to LOS F, or the most congested operating conditions. LOS E represents “at-capacity” operations. When traffic volumes exceed intersection capacity, stop-and-go conditions result, and operations are designated as LOS F. Study Area The operations of the study intersections are evaluated for the highest one-hour volume during the weekday morning (7:00 to 9:00 AM), and weekday evening (4:00 to 6:00 PM) peak periods. Traffic counts were collected in May, June, and October 2024, and February 2025 on clear days with area schools in-session. Turning movement counts were collected for automobiles, pedestrians, bicyclists, and heavy trucks. At the time of May and June counts, the Corporate Headquarters campus was still partially occupied (by Chevron Corporation), and entering and exiting traffic occurred at the Chevron Drive driveway. The counts collected in October 2024 and February 2025 occurred when the headquarters campus was fully vacant. The counts collected in May and June 2024 were zeroed out at the Chevron Driveway for purposes of the analysis. A summary of the count data is included in Appendix A. A total of seven signalized intersections, shown on Figure 2, were selected as study locations. Existing lane configurations, intersection control devices, and queue lengths were confirmed through field observations. Two intersections have no-right-turn-on-red “blank-out” signs (I-680 Northbound Ramps/Bollinger Canyon Road and Sunset Drive/Shops at Bishop Ranch-City Center). Field observations indicated that right-turns-on-red are prohibited at all times at I-680 Northbound Ramps/Bollinger Canyon Road, while they are prohibited when there is a conflicting pedestrian call at Sunset Drive/Shops at Bishop Ranch-City Center. For the purposes of this analysis, the Project site is assumed to be vacant under Existing Conditions, as is the case at the time of writing of this memo. Figure 3 presents the existing weekday morning and weekday evening peak hour turning movement volumes, lane configurations, and traffic control devices. Analysis Scenarios The peak hour intersection operations are evaluated for the following scenarios: •Existing Conditions: Existing conditions based on traffic counts at the study locations. •Existing with Project Conditions: Existing conditions with the addition of project-generated traffic and transportation network infrastructure proposed by the project. •Existing with Project with Mitigations Conditions: Existing with Project conditions with the addition of transportation operations mitigations proposed in this report. •Cumulative with Project Conditions: Year 2040 traffic forecasts with the addition of project- generated traffic and transportation network infrastructure proposed by the project. Bishop Ranch Orchards Traffic Operations Report | 5 Signalized Intersections The method described in Chapter 19 of the Transportation Research Board’s Highway Capacity Manual, 7th Edition (HCM 7th Edition) was used to conduct the level of service calculations for the signalized study intersections. This method is used to estimate the control delay experienced by motorists at an intersection. Control delay includes the initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. The average control delay for signalized intersections was calculated using the SimTraffic traffic analysis software and correlated to a LOS designation as shown in Table 1. Table 1. Signalized Intersection LOS Definitions Level of Service Description Average Control Delay per Vehicle (seconds) A Operations with very low delay occurring with favorable progression and/or short cycle lengths. < 10.0 B Operations with low delay occurring with good progression and/or short cycle lengths. > 10.0 to 20.0 C Operations with average delays resulting from fair progression and/or longer cycle lengths. Individual cycle failures begin to appear. > 20.0 to 35.0 D Operations with longer delays due to a combination of unfavorable progression, long cycle lengths, and high volume-to-capacity (V/C) ratios. Many vehicles stop and individual cycle failures are noticeable. >35.0 to 55.0 E Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences. > 55.0 to 80.0 F Operations with delays unacceptable to most drivers occurring due to over-saturation, poor progression, or very long cycle lengths. > 80.0 Source: Highway Capacity Manual, 7th Edition. City Evaluation Criteria The applicable LOS standard at study intersections 1, 2, 3, 6, and 7 (i.e. along Bollinger Canyon Road, an arterial bounded by non-residential uses) is LOS E or better during the AM and PM peak periods, per the City of San Ramon 2040 General Plan. The applicable standard at study intersections 4 and 5 along Sunset Drive north of Bollinger Canyon Road is LOS D or better, while striving to maintain LOS C, during the AM and PM peak periods. These standards are taken from the supportive policy for guiding policy 5.1-G-1 of the General Plan 2040 Transportation and Circulation Element, which is to “Maintain acceptable LOS and ensure that future land uses and the circulation system are in balance”, as excerpted below: Bishop Ranch Orchards Traffic Operations Report | 6 Bishop Ranch Orchards Traffic Operations Report | 7 3.0 Existing Traffic Conditions Context Traffic levels along the Bollinger Canyon Road corridor adjacent to the Project site have two major drivers: people driving to/from employment and shopping at office and commercial uses within the Bishop Ranch campus generally to the north of the Project site, and residents driving to/from their homes generally to the east of the Project site. There are also some residential uses within Bishop Ranch, and commercial uses to the east, but these are less prominent. According to Bishop Ranch, the 5.7 million square feet (MSF) of office uses within the Bishop Ranch campus is 66% occupied currently. 1 Furthermore, peak parking occupancy for Bishop Ranch office use was recently measured as 0.88 spaces per thousand square feet (KSF) of occupied uses for Bishop Ranch 32 and 1.09 for Bishop Ranch 15.3 This is much lower than what is typical for office uses, which is around 2 for weekday peak parking demand for general office buildings, per ITE Parking Generation Manual. The primary reason for this lower-than-typical parking occupancy (which translates to reduced associated automobile trips) is the increase in remote work since the Covid pandemic. Currently, the proportion of days spent remote work by Bay Area employees is slowly declining year-on-year, with employers reporting that they expect this decline to continue in the foreseeable future.4 Future traffic levels associated with office uses are dependent on both occupancy levels and remote work levels and may go up or down. One potential future is an increase in traffic levels due to either Bishop Ranch office occupancy increasing and/or remote work levels continue to decline. Another uncertainty is that the 5.7 MSF of office uses within the Bishop Ranch campus includes some office that will be demolished and converted to residential, and residential trip generation density could be expected to be lower than the office it is replacing. Existing Intersection Level of Service Based on the existing lane configurations, peak hour traffic volumes, pedestrian and bicycle activity, and existing traffic signal timing parameters, operations of the study intersections were evaluated. Bollinger Canyon Road functions under an adaptive signal system designed to fine tune signal timings in real-time in a coordinated way along the corridor to preserve vehicular progression along Bollinger Canyon Road. Signal timing parameters provided by the city indicated different offsets for the coordinated phases at some locations. The analysis software (Synchro/Simtraffic) currently does not have the capability of having multiple offsets at single intersection, therefore the adaptive nature of the signals is not able to be modeled. Based on the calculated movement V/C and visual inspection of the model, offsets were modified to reflect the progression found during the field observations, to represent adaptive conditions as best as possible. 1 Email from Stephanie Hill, Senior Vice President, Development and Construction at Bishop Ranch, dated 6/13/25 2 Gibson Transportation Consulting, Inc., December 10, 2024. Parking Analysis for the Bishop Ranch 7 Residential Development, San Ramon, California 3 Gibson Transportation Consulting, Inc., October 18, 2023. Parking Analysis for the Bishop Ranch 15 Medical Office Conversion, San Ramon, California 4 Bay Area Council, May 2025. Bay Area Return to Office – Final Report Bishop Ranch Orchards Traffic Operations Report | 8 All intersections are operating within their respective standard. Intersection average LOS results are presented in Table 2. The detailed intersection LOS calculation worksheets are included in Appendix B. Right now, traffic at intersections is moving reasonably well during the morning and afternoon rush. A driver might have to wait a bit at traffic lights, but won't be stuck there for a long time. Most drivers can get through without any frustration. Table 2. Existing Conditions Peak Hour Intersection LOS Summary Intersection Peak Hour Delay LOS 1 San Ramon Valley Boulevard/Bollinger Canyon Road AM PM 41 50 D D 2 I-680 SB Ramps/Bollinger Canyon Road AM PM 14 35 B D 3 I-680 NB Ramps/Bollinger Canyon Road AM PM 22 25 C C 4 Sunset Drive/Bishop Drive AM PM 11 16 B B 5 Sunset Drive/Shops at Bishop Ranch-City Center AM PM 11 29 B C 6 Chevron Drive-Sunset Drive/Bollinger AM PM 22 29 C C 7 Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road AM PM 26 25 C C Bold indicates potentially unacceptable operations. Source: Fehr & Peers, 2025. Existing Queues Figure 4 shows the length of the average and 95th percentile queues per lane from the SimTraffic simulation software. The 95th percentile queue represents a queue length of vehicles (in feet) that has only a 5% probability of being exceeded during the analysis period, which would be met once or twice during the rush hour but is not typical of what an average driver would experience. The 95th percentile queue lengths can be used to determine the length of a left or right turn lane when seeking to meet the objective of minimizing queues spilling back into the through lanes. The average queue would most accurately represent a typical queue experienced by a driver during the peak hour. The detailed intersection queue calculation worksheets which present average, 95th percentile, and maximum queue lengths per lane group are included in Appendix C. Right now, there are occasional Bishop Ranch Orchards Traffic Operations Report | 9 times when the turn lanes get backed up beyond their designated space. But even during the busiest times of day, almost all drivers can still fit in the turn lane and make it through the intersection in a reasonable amount of time. Table 3 shows only the movements that have an average or 95th percentile queue that exceed their existing storage lengths. Several intersections experience spillback across all time periods. Neither the northbound nor southbound freeway off-ramps experience a spillback to the freeway mainline. Right now, there are occasional times when the turn lanes get backed up beyond their designated space. But even during the busiest times of day, almost all drivers can still fit in the turn lane and make it through the intersection in a reasonable amount of time. Bishop Ranch Orchards Traffic Operations Report | 10 Table 3. Existing Conditions Peak Hour Intersection Queue Summary Intersection Movement Storage Length (ft) Average Queue Length (ft) 95th Percentile Queue Length (ft) AM PM AM PM 1 San Ramon Valley Boulevard/Bollinger Canyon Road EBR WBL WBT NBL SBL 200 200 225 150 300 100 200 75 125 150 75 225 250 100 275 225 250 150 200 225 175 275 475 175 400 2 I-680 SB Ramps/Bollinger Canyon Road EBT EBT/R 200 100 75 100 175 150 175 150 275 275 4 Sunset Drive/Bishop Drive NBL/T 225 125 50 250 100 5 Sunset Drive/Shops at Bishop Ranch-City Center EBR WBL WBT/R NBL SBL SBT 100 100 100 175 100 250 50 25 50 75 25 25 100 100 75 125 50 175 75 75 75 150 50 75 150 200 125 225 150 275 6 Chevron Drive-Sunset Drive/Bollinger Canyon Road WBR 250 25 150 100 350 Bold indicates queue potentially extends beyond available storage. Notes: •Only the movements that have an average or 95th percentile queue that exceed their storage lengths are shown in this table. •An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane, which is not reflected in the storage length above. Source: Fehr & Peers, 2025. Bishop Ranch Orchards Traffic Operations Report | 11 4.0 Project Travel Demand The amount of traffic expected to be generated by the Project is estimated using a three-step process: (1) project trip generation, (2) trip distribution, and (3) trip assignment. The first step estimates the amount of project-generated traffic that would be added to the roadway network. The second step estimates the direction of travel to and from the Project site. During the third step, the new trips are assigned to specific street segments and intersection turning movements. This process is described in more detail in the following sections. Project Trip Generation Trip generation refers to the process of estimating the amount of vehicular traffic a project would add to the surrounding roadway system. Estimates are created for the peak one-hour period in the weekday morning and weekday evening when traffic volumes on adjacent streets are the highest. The trip generation analysis follows the methodology outlined in the City of San Ramon’s General Plan 2040. The General Plan states that a transportation analysis must be prepared for a project that generates 50 or more new peak hour vehicle trips. The existing trip generation rates, along with the Project’s anticipated trip generation, were developed using the Institute of Transportation Engineers (ITE) Trip Generation Manual 11th Edition and are shown below. The ITE Trip Generation Manual, 11th Edition was developed with data collected pre-pandemic. A newer edition, ITE Trip Generation Manual, 12th Edition, includes post-pandemic data, and the average trip rates for residential uses in the 12th Edition are generally lower than the 11th Edition due to increased work-from-home rates post- pandemic. Post-pandemic residential trip rates are up to 30% lower than pre-pandemic.5 Our study uses 11th Edition rates because 12th Edition rates were not available at the time of analysis, thus our trip rates are conservatively high. Another reason for why trip generation rates used in the study may be conservatively high is that ITE Trip Generation Manual data is national in nature with some data collected in areas with lower levels of congestion than San Ramon, which may overstate peak hour travel as there is less deterrence due to congestion for traveling during the peak hour. The Project’s trip generation was estimated using the MXD+ methodology for the weekday daily, weekday AM peak hour and weekday PM peak hour. This methodology is more precise than conventional methods for estimating the number of trips generated by mixed-use projects, such as use of the ITE Trip Generation Manual 11th Edition, which is based on data derived primarily from single-use and freestanding sites. The MXD+ trip generation methodology, based on Environmental Protection Agency (EPA) and National Cooperative Highway Research Program (NCHRP) research, more precisely estimates trip generation of mixed-use projects by accounting for the travel within the Project (i.e., between uses), trips made by non-automobile modes, and the Project’s land use context. Appendix D is a memorandum called Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions, by Fehr & Peers. In this resource, Chart 3 shows reduced model error (measuring difference between estimate trip generation and counted trip generation) for validation sites for MXD+ vs ITE, showing MXD+ is substantially more accurate than the ITE internalization method for mixed use development trip generation. This approach has been successfully applied and defended throughout Northern California to more precisely estimate external trip generation for mixed-use projects. While this approach accounts for a variety of factors noted 5 Varies per residential use type; a study conducted by Fehr & Peers comparing rates between the ITE Trip Generation Manual, 11th Edition to the ITE Trip Generation Manual 12th Edition. Bishop Ranch Orchards Traffic Operations Report | 12 above, it does not account for transportation demand management (TDM) measures, such as a constrained parking supply, subsidized transit passes, or other incentives to travel by non-auto modes. The Project’s trip generation accounts for internal capture (where residents use the on-site retail) and for walking, biking, and transit use. The Project’s residential trip generation is conservatively high as it has not been adjusted for higher levels of work-from-home that are occurring post- pandemic. Table 4 presents the estimates of the trip generation for the Project, developed using the ITE Trip Generation Manual 11th Edition. The reasonableness of reductions in the 18-22% range is justified by: •Internalization: complementary nature of the land uses (local-serving and regional-serving retail; park and open space), and •External walk/bike/transit: complete sidewalk and crosswalk network; availability of County Connection routes; excellent trail connection with Iron Horse Trail, with nearby complementary land uses that include grocery store, retail, jobs, parks, and community center. Furthermore, our total reductions are comparable to what would be expected from stacking the suggested reductions from the CCTA Technical Procedures for different components. Within the Technical Procedures, the "3-6%" reduction for Mixed Residential/Commercial Use Projects is limited to the specific effect of the Mix of Uses component and can be stacked (see Table 3 of the Technical Procedures) with additional considerations for Transit Usage (≤3%), Surrounding Uses (≤5%), and Multi-Use (≤25% applied to the half of the project trips that are retail is ≤12.5%). When summing these, our reductions are within the expected range. Bishop Ranch Orchards Traffic Operations Report | 13 Table 4. Estimated Project Vehicle Trip Generation Land Use Units Quantity Daily AM PM In Out Total In Out Total Single-Family Detached Housing DU 230 2,171 40 119 159 137 80 217 Single-Family Attached Housing DU 138 1,001 17 49 66 46 33 79 Accessory Dwelling Units DU 58 391 6 17 23 19 11 30 Multifamily Housing (Mid- Rise) DU 2,084 9,461 208 697 905 496 317 813 Shopping Plaza (40-150ksf) KSF 125 11,811 274 168 441 517 560 1,078 Total Raw Trip Generation (ITE Results) 24,835 545 1,050 1,595 1,215 1,002 2,216 Internal Capture Reduction -1,580 -44 -84 -128 -126 -104 -230 External Walk, Bike, Transit Reductions -2,953 -71 -136 -207 -136 -113 -249 Total Reductions -4,533 -115 -220 -335 -262 -217 -479 Total Reductions as a Percent of Total Raw Trip Generation 18%21%22% Final Trip Generation 20,302 430 830 1,260 953 785 1,737 Retail Pass-By Trip Reductions -2,897 -43 -27 -70 -162 -176 -338 Final Trip Generation after Pass-By Reductions 17,405 387 803 1,190 790 609 1,399 Notes: •1 DU = 1 dwelling unit; 1 KSF = 1,000 square feet gross leasable area; Qnty = Quantity; •Rounding differences may cause slight discrepancies in totals. •Single-Family home trip generation based on Land Use Code 210 (Single-Family Detached Housing) and Land Use Code 215 (Single-Family Attached Housing) •Accessory Dwelling Units based on Land Use Code 220 (Low-Rise Multifamily Housing) •Multifamily (apartments) trip generation based on Land Use Code 221 (Mid-Rise Multifamily Housing) •Retail trip generation based on Land Use Code 821 (Shopping Plaza [40-150 ksf]). •PM retail pass-by calculated using the ITE Trip Generation Manual, 11th Edition Pass-By Tables Appendix (shown in Appendix E), and the average rate of 40% for Shopping Plaza land use (LU 821). As no data is available for AM, we conservatively reduced the pass-by rate by half to account for morning commuters typically exhibiting more direct, time-constrained travel patterns focused on reaching work destinations efficiently. Daily retail pass-by percentage is the average of AM and PM. Source: Institute of Transportation Engineers, Trip Generation, 11th Edition; Fehr & Peers, 2025. As summarized in Table 4, the Project would generate approximately 17,405 weekday daily, 1,190 weekday morning peak hour, and 1,399 weekday evening peak hour trips. The existing use is a vacant 1.398 KSF corporate headquarters. As shown in Table 5, the Project is anticipated to generate 6,295 more daily vehicle trips compared to the existing use when fully occupied. During the weekday AM peak hour, the Project is anticipated to generate 836 fewer vehicle trips and during the PM peak hour, the Project is anticipated to generate 418 fewer vehicle trips than the existing use when occupied. Bishop Ranch Orchards Traffic Operations Report | 14 Table 5. Vehicle Trip Generation Comparison Land Use Daily AM PM In Out Total In Out Total Corporate Headquarters 11,110 1,885 141 2,026 164 1,653 1,817 Project 17,405 387 803 1,190 790 609 1,399 Net New Trips 6,295 -1,498 662 -836 626 -1,044 -418 Source: Institute of Transportation Engineers, Trip Generation, 11th Edition; Fehr & Peers, 2025. Notably, the directionality of the Project’s vehicle trips is inverted to that of the existing use for the weekday AM peak hour. The existing use overwhelmingly features inbound traffic in the morning, whereas the Project features mostly outbound traffic in the morning. In the PM peak hour, Project trips are skewed slightly towards inbound trips. The directionality of the Project is more aligned with prevailing traffic, which features higher amounts of travel towards the I-680 freeway in the morning, and away from it in the evening. The Project would generate far fewer vehicle trips in the AM and PM peak hours than the Chevron headquarters that it is replacing (when the HQ is assumed to be fully occupied). However, the Project would add more traffic in the prevailing traffic directions (westbound towards I-680 in the morning and eastbound from I-680 in the evening) than a fully occupied Chevron HQ would. Project Trip Distribution and Assignment Project trip distribution refers to the directions of approach and departure that vehicles would take to access and leave the site. The project trip distribution was estimated based on project site access, existing traffic count data, existing travel patterns, and the location of complementary land uses. Select zone analysis was performed using the Contra Costa Transportation Authority (CCTA) travel demand model to calculate the resulting trip distribution, which is shown on Figure 5. Detailed descriptions of trip distribution assumptions can be found in Appendix D. While Project trip distribution provides information regarding larger-scale trip patterns, Project trip assignment refers to project trip loading on specific roadway segments and intersection turning movements in the study area. The project trip assignment for the Project is presented on Figure 6. Furthermore, our total reductions are comparable to what would be expected from stacking the suggested reductions from the CCTA Technical Procedures for different components. Within the Technical Procedures, the "3-6%" reduction for Mixed Residential/Commercial Use Projects is limited Bishop Ranch Orchards Traffic Operations Report | 15 to the specific effect of the Mix of Uses component and can be stacked (see Table 3 of the Technical Procedures) with additional considerations for Transit Usage (≤3%), Surrounding Uses (≤5%), and Multi-Use (≤25% applied to the half of the project trips that are retail is ≤12.5%). When summing these, our reductions are within the expected range. Table 4 includes a reduction for “pass-by” trips. The ITE Trip Generation Manual defines pass-by trips as an intermediate stop on the way from an origin to a primary trip destination without a route diversion. These trips are attracted by traffic passing the site on an adjacent roadway that offers direct access to the generator, in this case, the retail portion of the Project. These pass-by trips were then re-routed to enter (by adding to the southbound through, eastbound right, and westbound left movements) and exiting the project site (by adding to the northbound left, through, and right movements). These trips are reflected as negative values shown at Bollinger Canyon Road/Sunset Drive—Chevron Drive and Bollinger Canyon Road/Camino Ramon—Bishop Ranch 1 intersections in the eastbound left and through, southbound right and left, and westbound through and right directions, shown on Figure 6, as a reflection that some of current drivers will turn off into the project site to stop by the new retail uses in the future. Calculation of pass-by volumes is provided in Appendix E. Bishop Ranch Orchards Traffic Operations Report | 16 5.0 Existing with Project Conditions The Existing with Project Conditions is the expected traffic volumes based on adding project traffic assignment to existing counts. As mentioned previously, the site was partially occupied when some of the counts were taken. Because the existing Corporate Headquarters is the only use accessible via Chevron Drive in the existing condition, the Existing with Project scenario volumes were determined by first zeroing out turning movements into and out of Chevron Drive (to represent the demolition of the existing uses) before layering on Project trips. The peak hour volumes are summarized on Figure 7. Existing with Project Intersection Level of Service Level of service calculations were conducted to evaluate intersection operations under the Existing with Project conditions. Based on the signal timing sheets provided by the city, some of the signalized intersections along Bollinger Canyon Road are under adaptive timing: •AM peak period: intersections at San Ramon Valley Boulevard, Sunset Drive-Chevron Driveway, and Camino Ramon-Bishop Ranch 1 •PM peak period: intersections at San Ramon Valley Boulevard, I-680 Southbound Ramps, I-680 Northbound Ramps, Sunset Drive-Chevron Driveway, and Camino Ramon-Bishop Ranch 1 Therefore, under the Existing with Project conditions, the adaptive coordinated signals’ phase lengths and offsets were optimized while maintaining a cycle length of 150 seconds from the Existing condition timing settings based on the additional project traffic. The optimizations were calibrated based on balancing the V/C ratios across all movements and visually inspecting the microsimulation to get a reasonable progression along Bollinger Canyon Road – its results are reflected in Table 6. Results of the Existing with Project analysis indicate that several intersections operate below the threshold. Most notably, Chevron Drive-Sunset Drive/Bollinger Canyon Road expects an increase in delay with the Project traffic, even with the signal optimizations. The detailed intersection LOS calculation worksheets are included in Appendix B. While Saturday midday conditions analysis results are not presented, we would expect the Project to add substantial traffic to the nearby intersections during this period. Because prevailing traffic volumes are much lower than during the weekday peak hours, we would expect traffic operations to remain typical for a retail-heavy area and would not anticipate any significant effects to automobile delay or queuing near to the Project site. With the Project, most drivers would experience longer wait times on Bollinger Canyon Road. However, traffic wouldn’t become severely congested—drivers would still be able to get through, though it may take a minute-or-two longer during busy periods if you travel in the direction that most people are going. Bishop Ranch Orchards Traffic Operations Report | 17 Table 6. Existing with Project Conditions Peak Hour Intersection LOS Summary Intersection Peak Hour Existing Existing with Project Delay LOS Delay LOS 1 San Ramon Valley Boulevard/Bollinger Canyon Road AM PM 41 50 D D 46 54 D D 2 I-680 SB Ramps/Bollinger Canyon Road AM PM 14 35 B D 18 35 B D 3 I-680 NB Ramps/Bollinger Canyon Road AM PM 22 25 C C 23 28 C C 4 Sunset Drive/Bishop Drive AM PM 11 16 B B 13 19 B B 5 Sunset Drive/Shops at Bishop Ranch-City Center AM PM 11 29 B C 11 30 B C 6 Chevron Drive-Sunset Drive/Bollinger Canyon Road AM PM 22 29 C C 71 74 E E 7 Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road AM PM 26 25 C C 69 74 E E Bold indicates potentially unacceptable operations. Source: Fehr & Peers, 2025. Existing with Project with Mitigations Intersection Level of Service While all study intersections operate at acceptable LOS standards under existing with project conditions, queueing spillback occurs (discussion presented in the following section) and mitigation measures were applied. The following measures were implemented in the mitigated scenario: •To increase the northbound left-turning storage capacity at Chevron Drive-Sunset Drive/Bollinger Canyon Road, restripe the northbound approach from Left, Left-Through, Right to Left, Left, Through-Right. •To improve traffic progression mainly in the westbound direction along Bollinger Canyon Road, in the AM peak hour, add I-680 SB Ramps/Bollinger Canyon Road and I-680 NB Ramps/Bollinger Canyon Road to the adaptive signal system. •To reduce delays and queuing at the I-680 southbound off-ramp intersection, improving throughput of westbound traffic, adjust detector settings for the westbound approach at San Ramon Valley Boulevard/Bollinger Canyon Road. The adaptive signal system extends eastward to Alcosta Boulevard; however, our study area ends at Camino Ramon 1. Therefore, further work would be needed to understand the effect of the adaptive signal mitigation on intersections east of Camino Ramon. Since the AM peak hour mitigation measure is to introduce two new intersections to the coordination system, we recommend that the entire Bollinger Canyon Road coordination settings should be revisited – for now, we have applied similar parameters to the newly folded-in intersections as apply in the PM period. The results of the Bishop Ranch Orchards Traffic Operations Report | 18 mitigations are presented in Table 7. At Chevron Drive-Sunset Drive/Bollinger Canyon Road and Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road, delays generally decreased for both the AM and PM peak hours. However, the mitigations result in increases in delay at some downstream intersections. The reason that mitigations don’t appear to solve all traffic issues is due to network effects: vehicles initially accumulate at an upstream bottleneck, and once released through implementation of a mitigation, those vehicles now accumulate more quickly downstream at the next constraint and so the delay shifts there instead. All study intersections within the mitigated scenario remain at acceptable LOS standards. We considered lane restriping and signal retiming among potential mitigations, although did not consider road expansions such as lane additions nor intersection widenings, as these would worsen the experience for pedestrians and bicyclists, and induce more driving. Each mitigation measure studied would be effective in reducing delay and queuing at its immediate location. However, taken together they would only slightly reduce average delay and queuing across the network. This is because each mitigation tends to have the effect of releasing more traffic to the downstream location, shifting queues and delay to that downstream location. Therefore, because they reduce delay at some locations at the expense of other locations, the combined benefits of the mitigation measures are marginal. We recommend that the need for mitigation measures is re-assessed after occupation of each phase of development. Bishop Ranch Orchards Traffic Operations Report | 19 Table 7. Existing with Project Conditions with Mitigations Peak Hour Intersection LOS Summary Intersection Peak Hour Existing with Project Existing with Project and Mitigations Delay LOS Delay LOS 1 San Ramon Valley Boulevard/Bollinger Canyon Road AM PM 46 54 D D 45 57 D E 2 I-680 SB Ramps/Bollinger Canyon Road AM PM 18 35 B D 25 30 C C 3 I-680 NB Ramps/Bollinger Canyon Road AM PM 23 28 C C 29 32 C C 4 Sunset Drive/Bishop Drive AM PM 13 19 B B 12 17 B B 5 Sunset Drive/Shops at Bishop Ranch-City Center AM PM 11 30 B C 12 29 B C 6 Chevron Drive-Sunset Drive/Bollinger Canyon Road AM PM 71 74 E E 71 67 E E 7 Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road AM PM 69 74 E E 58 49 E D Bold indicates potentially unacceptable operations. Source: Fehr & Peers, 2025. Existing with Project Queues Figure 8 shows the length of the 95th percentile queues per lane for a single selected run from the SimTraffic simulation software. The detailed intersection queue calculation worksheets which present average, 95th percentile, and maximum queue lengths per lane group are included in Appendix C. Table 8 summarizes the average queue results and Table 9 summarizes 95th percentile queue results, showing movements where queues that exceed their storage lengths. No queues at the freeway off- ramps would extend to the freeway mainline. Drivers would experience occasional queueing spillback beyond turn pocket capacity with the Project traffic. At rare cases in the peak hours, drivers may experience long queues but they would still be served by the first green light that they experience. As such, the Project’s traffic can generally be adequately accommodated by existing capacity. Bishop Ranch Orchards Traffic Operations Report | 20 Table 8. Existing with Project Conditions Peak Hour Intersection Average Queue Summary Intersection Movement Storage Length (ft) Average Queue Length (ft) Existing Existing with Project AM PM AM PM 1 San Ramon Valley Boulevard/Bollinger Canyon Road WBL 200 200 225 200 225 WBT 225 75 250 150 250 2 I-680 SB Ramps/Bollinger Canyon Road EBT/R 100 100 150 100 125 Bold indicates queue potentially extends beyond available storage. Notes: •Only the movements that have an average percentile queue that exceed their storage lengths are shown in this table. •An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane, which is not reflected in the storage length above. Source: Fehr & Peers, 2025. Bishop Ranch Orchards Traffic Operations Report | 21 Table 9. Existing with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary Intersection Movement Storage Length (ft) 95th Percentile Queue Length (ft) Existing Existing with Project AM PM AM PM 1 San Ramon Valley Boulevard/Bollinger Canyon Road EBR WBL WBT NBL SBL 200 200 225 150 300 225 250 150 200 225 175 275 475 175 400 250 250 150 200 300 300 275 225 175 350 2 I-680 SB Ramps/Bollinger Canyon Road EBT EBT/R SBL 200 100 475 175 150 150 275 275 450 200 200 200 250 225 575 4 Sunset Drive/Bishop Drive NBL/T SBL/T 225 175 250 50 100 175 250 50 125 200 5 Sunset Drive/Shops at Bishop Ranch-City Center EBR WBL WBT/R NBL SBL SBT 100 100 100 175 100 250 75 75 75 150 50 75 150 200 125 225 150 275 75 75 75 175 50 75 150 175 125 200 125 275 6 Chevron Drive-Sunset Drive/Bollinger WBL WBT WBR NBL NBL/T NBR SBL 225 875 250 350 350 150 175 0 350 100 0 0 0 75 0 575 350 0 0 0 175 300 1,000 450 325 325 175 75 225 1,025 475 450 400 225 200 7 Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road EBR WBL WBT SBT/R 200 150 575 700 75 75 450 150 75 25 300 250 100 275 725 200 300 225 475 725 Bold indicates queue potentially extends beyond available storage. Notes: •Only the movements that have a 95th percentile queue that exceed their storage lengths are shown in this table. •An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane, which is not reflected in the storage length above. Source: Fehr & Peers, 2025. Bishop Ranch Orchards Traffic Operations Report | 22 Existing with Project with Mitigations Queues The average and 95th percentile queuing under the mitigated scenario is shown in Table 10 and Table 11, respectively. Some queue lengths either were maintained or decreased between the Existing with Project and Existing with Project with Mitigation scenarios, although some increased. This is because each mitigation tends to have the effect of releasing more traffic to the downstream location, shifting queues and delay to that downstream location. The 95th percentile queues for several approaches exceed storage limits. No queues at the freeway off-ramps would extend to the freeway mainline. Increasing turn bay lengths (as proposed in the mitigation measure) or widening the intersection to add lanes (which is not proposed) can reduce queues in that location; however, at scale these capacity-increasing interventions adversely degrade bicycle and pedestrian safety and comfort, which compromises the appeal for people to shift from driving to walking/biking as a way of reducing traffic. The objective of the mitigation measures was to primarily improve on the bottleneck found at the project driveways, and as a result, resulted in increases in some queues elsewhere. For example, the westbound through queue decreases from the Existing with Project to the Existing with Project and Mitigations scenario at Chevron Drive-Sunset Drive/Bollinger and Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road intersections (presented in Table 11). Instead, queuing now occurs downstream instead at San Ramon Valley Boulevard/Bollinger Canyon Road and I-680 SB Ramps/Bollinger Canyon Road. Table 10. Existing with Project Conditions Peak Hour Intersection Average Queue Summary Intersection Movement Storage Length (ft) Average Queue Length (ft) Existing with Project Existing with Project and Mitigations AM PM AM PM 1 San Ramon Valley Boulevard/Bollinger Canyon Road WBL 200 200 225 200 225 WBT 225 75 250 150 350 2 I-680 SB Ramps/Bollinger Canyon Road EBT/R 100 100 125 100 150 Bold indicates queue potentially extends beyond available storage. Notes: •Only the movements that have an average percentile queue that exceed their storage lengths are shown in this table. •An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane, which is not reflected in the storage length above. Source: Fehr & Peers, 2025. Bishop Ranch Orchards Traffic Operations Report | 23 Table 11. Existing with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary Intersection Movement Storage Length (ft) 95th Percentile Queue Length (ft) Existing with Project Existing with Project and Mitigations AM PM AM PM 1 San Ramon Valley Boulevard/Bollinger Canyon Road EBR 200 250 300 325 300 WBL 200 250 275 250 250 WBT 225 150 225 300 675 NBL 150 200 175 200 175 SBL 300 300 350 225 300 2 I-680 SB Ramps/Bollinger Canyon Road EBT 200 200 250 225 275 EBT/R 100 200 225 200 250 SBL 475 200 575 425 500 4 Sunset Drive/Bishop Drive NBL/T 225 250 125 250 125 SBL/T 175 50 200 50 175 5 Sunset Drive/Shops at Bishop Ranch-City Center EBR 100 75 150 75 150 WBL 100 75 175 75 175 WBT/R 100 75 125 75 125 NBL 175 175 200 150 200 SBL 100 50 125 50 125 SBT 250 75 275 75 275 6 Chevron Drive-Sunset Drive/Bollinger WBL 225 300 225 250 150 WBT 875 1,000 1,025 1,000 975 WBR 250 450 475 450 450 NBL 350 325 450 300 425 NBL/T 350 325 400 200 225 NBR 150 175 225 75 200 SBL 175 75 200 250 150 7 Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road EBR 200 100 300 75 150 WBL 150 275 225 250 225 WBT 575 725 475 650 500 SBT/R 700 200 725 200 425 Bold indicates queue potentially extends beyond available storage. Notes: •Only the movements that have an average or 95th percentile queue that exceed their storage lengths are shown in this table. •An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane, which is not reflected in the storage length above. Source: Fehr & Peers, 2025. Bishop Ranch Orchards Traffic Operations Report | 24 Potential Pedestrian Improvements Given the proximity of the City Center Bishop Ranch and the Shops at Bishop Ranch shopping centers, as well as the business park to the north, it is reasonable to expect that the Project would generate and attract walking trips. The Project is planned to connect to Bollinger Canyon Road/Sunset Drive-Chevron Drive and Bollinger Canyon Road/Bishop Ranch 1 intersections with sidewalks and a crosswalk. Bollinger Canyon Road is classified as a principal arterial with a posted speed limit of 40 miles per hour. Based on aerial imagery, the crossing distance at both intersections would be approximately 130 feet, with crossings prohibited across some intersection legs. Across the three study scenarios, the cycle lengths for these intersections are 150 seconds. The characteristics of these intersections indicate a low comfort environment for those walking across Bollinger Canyon Road. Some additional recommendations to reduce characteristics that may increase the likelihood of collisions featuring pedestrians and bicyclists: •Separate turning conflicts with protected phases •Protected left-turn phases provide drivers with a dedicated green arrow so they do not have to wait for a gap in either oncoming traffic or conflicting pedestrian crossings while they are making a left-turn. This simplifies decision-making and reduces conflicts. Prohibiting right-turn-on-red separates users in time and space, reducing the possibility for pedestrians, bicyclists, and drivers to interact in the crossing at the same time. •Increase the pedestrian walk and flashing don’t walk times •Increasing the pedestrian walk and flashing don’t walk time allows those who need extra time such as seniors, children, and those with disabilities extra time to cross the street. This reduces the likelihood that conflicting vehicles will be given a green light before pedestrians have finished crossing the street. •Introduce leading pedestrian intervals (LPIs) •At busy intersections, such as our study intersections along Bollinger Canyon Road, an LPI gives pedestrians a head start of a few seconds to begin crossing so that pedestrians are more visible within the crosswalk before drivers receive a green light, increasing the likelihood that a crossing pedestrian is noticed by the driver. •Stripe high-visibility crosswalks •High-visibility crosswalks use bold, striped patterns – often called “ladder markings” – made from durable, reflective materials like thermoplastic instead of traffic paint. These markings make crosswalks easier for drivers to see, especially at night or in bad weather, and serve as a clearer signal that pedestrians may be present crossing the street. •Paint green high-visibility bicycle extension striping through the intersection •Solid green paint across an intersection signifies the bicycle crossing and serves as a clearer signal that bicyclists may be present crossing the street while pointing out their anticipated path of travel. Green conflict striping, often green dashed markings across an intersection, driveway, or merging area, is used to alert bicyclists and drivers to a location where their paths may cross or conflict. •Signalize the eastbound right slip lane at Bollinger Canyon Road/Chevron Drive Bishop Ranch Orchards Traffic Operations Report | 25 •Signalizing the right slip lane requires motorists to stop and wait for a green light before turning. The signal slows turning vehicles also providing protected crossing times for pedestrians and bicyclists (i.e. reducing the likelihood of conflict). These measures are not coded into the traffic models for project conditions to provide a clean comparison of the effect of Project trips on current infrastructure. The inclusion of these measures would benefit pedestrian safety and convenience and may result in delay increases and queue increases for some automobile turning movements. These measures should be considered in the design phase. Pedestrian improvements would help improve the experience for people walking, biking, and taking transit; increasing the appeal to switching from driving for some trips, which would reduce congestion. Bishop Ranch Orchards Traffic Operations Report | 26 6.0 Cumulative (Year 2040) Conditions The Cumulative condition represents conditions at the buildout of the City’s General Plan and other regional planning documents such as Plan Bay Area. To evaluate the potential effect of traffic generated by the Project on the surrounding street system, volume estimates representing Cumulative without Project Conditions were prepared using the Contra Costa Transportation Authority (CCTA) travel demand model. Traffic conditions without the Project under this future scenario reflect traffic increases due to nearby and regional development along with background roadway network changes and street improvements. Project trips were added to the forecasted Cumulative without Project Conditions traffic volumes to identify if the study intersections would operate within the City’s LOS standards. This chapter presents the results of the LOS calculations under Cumulative Conditions with the Project. Cumulative Conditions Traffic Volumes Traffic volumes for Cumulative Conditions are comprised of Existing Conditions volumes plus traffic generated by anticipated local and regional land use growth. After reviewing the structure of the model traffic analysis zone (TAZ) system and roadway network detail in and around the Project site and study intersections, it was determined that the Contra Costa Transportation Authority (CCTA, or Countywide) travel demand model would be a suitable tool for the estimation of future year demand volumes. The following presents the specific steps used to develop Year 2040 forecasts from the model: •Step 1 – Run the Base Year (2025) model to estimate AM and PM peak hour traffic volumes. •Step 2 – Run the Year 2040 model to estimate AM and PM peak hour traffic volumes. •Step 3 – Compare total entering volumes at study intersections to develop growth rates •Step 4 – Check for reasonableness (e.g., ensure that volumes do not drop below Existing levels, or grow exponentially unless there is a valid reason). As an additional check, the cumulative model land use growth was reviewed to provide context for the traffic growth rates. This review of the larger influence area showed substantial new residential growth east of I-680 and west of Alcosta Boulevard, where existing uses are mostly non-residential, while west of I-680 remains largely built out and therefore shows lower land use growth. At the city level, the CCTA travel demand model (2040 General Plan) reflects annual growth of about 2.2% for households, 0.8% for employment, and 1.3% for service population (comparing raw outputs from 2025 to 2040). Cumulative forecasts are largely based on existing and planned developments and the traffic volumes presented in this analysis do not account for other factors that could influence future demand. New transportation technologies, such as autonomous vehicles (AVs), are expected to proliferate over the next 15 years. AVs may increase vehicular throughput if connected (i.e. enabled by technologies allowing vehicles to communicate with each other), but they may also induce additional travel demand. Additionally, the project has a 20 year buildout period and there will be opportunities to adapt its Travel Demand Management (TDM) measures in later phases to respond to effectiveness of TDM in the early phases of buildout. Other uncertainties that could affect traffic levels are potential changes to road pricing (e.g. shift to a per-mile charge from gas taxes, or congestion pricing), Bishop Ranch Orchards Traffic Operations Report | 27 potential expansions or reductions in transit service, further evolving work-from-home trends, and changes to last-mile logistics. The cumulative scenario represents traffic demand under a set of simplistic growth assumptions and does not capture the large degree of uncertainty inherent in potential travel changes over the next 15 years. While future trends are uncertain, some trends indicate that traffic levels may not grow at the trajectory seen in the past. Cumulative volume development is documented in Appendix G. Cumulative with Project Intersection Level of Service Net new trips from the Project were added to the Cumulative without Project Conditions traffic projections to develop traffic volumes for Cumulative with Project Conditions. The resulting volumes are presented on Figure 9. Intersection LOS was calculated for Cumulative with Project Conditions. The results of the analyses are used to identify potential deficiencies within the operations of the roadway system. The coordinated adaptive signals timings were optimized based on the forecasted traffic volumes and Project traffic. Similarly to the Existing with Project scenario, the optimizations were done to the respective adaptive signals in their time periods, while maintaining its original cycle length of 150 seconds. The phase splits and offsets were optimized for the freeway off-ramp phases to ensure that queues do not spill back to the freeway mainline, while maintaining a moderate amount of progression through Bollinger Canyon Road. Given the amount of traffic growth anticipated in the cumulative with project scenario, a comprehensive re-evaluation of adaptive signal timings and coordination in the long-term would be merited, which may result in an ability to increase vehicular capacity along the corridor. Newer signal controller technologies (such as machine learning, computer vision, real-time detection, and coordination with connected vehicles) should be considered as the City progresses into the future. Additionally, the traffic model does not consider how drivers react to peak hour congestion. Typically, drivers who incur significant peak hour congestion for their working commute, may choose to leave at an alternative schedule to avoid the congestion. Similarly, drivers tend to find the fastest route to their destination, the traffic model does not consider drivers choosing an alternative route, and delay imposed to the driver does not affect their routing decisions. Bishop Ranch Orchards Traffic Operations Report | 28 The Cumulative scenario represents a future with much higher levels of driving than today. In this scenario, a couple intersections along Bollinger Canyon Road would become bottlenecks where drivers experience long waits and slow- moving traffic. Because conditions in the Existing Plus Project scenario are much better, any worsening shown here would be entirely due to general increases in driving, not the Project’s effect. Furthermore, some drivers would adapt where and when they drive when faced with this amount of congestion; the model doesn’t capture this behavior change, thereby overstating peak hour delay and queuing. Because it is based on a set of growth assumptions, these conditions may not materialize. In any case the City should continuously monitor traffic conditions and adapt signal timings in response. Investments in sustainable modes of transportation such as walking, biking, and transit will improve their respective appeal and lead to reductions in driving as people switch over to them. Table 12 provides the results of the intersection LOS calculations, while Appendix B contains the corresponding calculation sheets. The Cumulative with Project Conditions expect all intersections to operate below the City Standard, with some intersections operating at LOS F. The following intersections would operate at LOS F in at least one time period: •San Ramon Valley Boulevard/Bollinger Canyon Road during the PM peak hour •Chevron Drive-Sunset Drive/Bollinger Canyon Road during the AM and PM peak hours •Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road during the AM and PM peak hours These signals were optimized based on the timing settings provided by the City for the adaptive signals. The freeway off-ramp signals were optimized in attempt to prevent queues to spillback to the mainline. In the AM peak hour, the intersections operating at LOS F are a result of bottlenecks6 generally in the westbound direction along Bollinger Canyon Road. The most notable bottleneck was found on the westbound traffic along Bollinger Canyon Road to access the I-680 on-ramps. Both the I-680 6 A bottleneck is a localized section of a road or highway where traffic flow is significantly reduced. Bishop Ranch Orchards Traffic Operations Report | 29 northbound and southbound on-ramps have one travel lane to enter the freeway. When platoons arrive at the fork to enter either the northbound or southbound ramps, field observations found that drivers may change lanes. Due to this behavior, it is reasonable to see that a high growth of traffic (such as an annualized 1.3% growth rate over a 15 year period) would exacerbate the delays caused by the on-ramp diverge, that causes queue spillback to the upstream intersections. Westbound drivers along Bollinger Canyon Road would have to wait multiple cycles at an intersection to progress to the on-ramps. In general, the signals are optimized to prioritize the progression along Bollinger Canyon Road, which would cause higher delays to the minor cross-streets. As a result of optimizing the freeway off-ramp movements, a bottleneck forms in the PM peak hour. The intersections operating at an LOS F are caused by heavy left-turning traffic that originate from either the southbound or northbound off-ramp. The likely cause of the high delays at San Ramon Valley Boulevard/Bollinger Canyon Road (Intersection #1) is the proximity to the I-680 Southbound Off-Ramp intersection. Progression for the eastbound movement is bottlenecked in attempt to provide adequate green time for the southbound off-ramp, as queues would spill back onto the freeway mainline otherwise. The likely cause of the high delays at Chevron Drive-Sunset Drive/Bollinger (Intersection #6) and Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road (Intersection #7) are due to the eastbound left-turning traffic originating from the off-ramps. The eastbound left-turning phase conflicts with the westbound direction. Both movements would need a large proportion of green time, however, the eastbound left-turn phase is favored to prevent the off- ramps from spilling back to the mainline. Given the amount of traffic growth anticipated in the cumulative with project scenario, a comprehensive re-evaluation of adaptive signal timings and coordination in the long-term would be merited, which may result in an ability to increase vehicular capacity along the corridor. Newer signal controller technologies (such as machine learning, computer vision, real-time detection, and coordination with connected vehicles) should be considered as the City progresses into the future. Additionally, the traffic model does not consider how drivers react to peak hour congestion. Typically, drivers who incur significant peak hour congestion for their working commute, may choose to leave at an alternative schedule to avoid the congestion. Similarly, drivers tend to find the fastest route to their destination, the traffic model does not consider drivers choosing an alternative route, and delay imposed to the driver does not affect their routing decisions. Bishop Ranch Orchards Traffic Operations Report | 30 Table 12. Cumulative with Project Conditions Peak Hour Intersection LOS Summary Intersection Peak Hour Delay LOS 1 San Ramon Valley Boulevard/Bollinger Canyon Road AM PM 62 107 E F 2 I-680 SB Ramps/Bollinger Canyon Road AM PM 29 36 C D 3 I-680 NB Ramps/Bollinger Canyon Road AM PM 35 36 C D 4 Sunset Drive/Bishop Drive AM PM 13 24 B C 5 Sunset Drive/Shops at Bishop Ranch-City Center AM PM 14 36 B D 6 Chevron Drive-Sunset Drive/Bollinger AM PM 96 80 F F 7 Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road AM PM >120 >120 F F Bold indicates potentially unacceptable operations. Source: Fehr & Peers, 2025. Cumulative with Project Queues The detailed intersection queue calculation worksheets which present average, 95th percentile, and maximum queue lengths per lane group are included in Appendix C. Table 13 shows the movements that have an average queue that exceed the storage length, while Table 14 shows the 95th percentile queue that exceed their storage lengths. The freeway off-ramp signals were optimized in attempt to prevent queues to spillback to the mainline. Similar to the intersection operations results, Cumulative with Project scenario queue lengths are a conservative representation of a future with much higher general driving levels. Because conditions in the Existing Plus Project scenario are much better, any worsening shown here would be entirely due to general increases in driving, not the Project itself. Mitigations such as lane restriping and signal retiming would have marginal effect in this scenario, although the City should periodically optimize signal timings under future conditions. Bishop Ranch Orchards Traffic Operations Report | 31 Table 13. Cumulative with Project Conditions Peak Hour Intersection Average Queue Summary Intersection Movement Storage Length (ft) Queue Length (ft) Average AM PM 1 San Ramon Valley Boulevard/Bollinger Canyon Road EBT 700 475 775 EBR 200 200 225 WBL 200 225 175 NBT 750 375 1,400 SBL 300 250 400 2 I-680 SB Ramps/Bollinger Canyon Road EBT/R 100 150 175 5 Sunset Drive/Shops at Bishop Ranch-City Center EBR 100 50 125 WBL 100 50 125 6 Chevron Drive-Sunset Drive/Bollinger WBT 875 875 900 7 Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road WBL 150 150 225 WBT 575 1,175 1,075 NBT 425 450 350 Bold indicates queue potentially extends beyond available storage. Notes: •Only the movements that have an average queue that exceed their storage lengths are shown in this table. •An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane, which is not reflected in the storage length above. Source: Fehr & Peers, 2025. Bishop Ranch Orchards Traffic Operations Report | 32 Table 14. Cumulative with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary Intersection Movement Storage Length (ft) Queue Length (ft) 95th Percentile AM PM 1 San Ramon Valley Boulevard/Bollinger Canyon Road EBL 150 75 225 EBT 700 775 800 EBR 200 350 350 WBL 200 250 275 WBT 225 425 425 NBL 150 225 225 NBT 750 700 1,500 SBL 300 375 425 2 I-680 SB Ramps/Bollinger Canyon Road EBT 200 250 225 EBT/R 100 225 225 SBL 475 350 550 3 I-680 NB Ramps/Bollinger Canyon Road EBR 175 75 350 NBL 550 375 650 4 Sunset Drive/Bishop Drive NBL 225 275 125 SBL 175 75 225 5 Sunset Drive/Shops at Bishop Ranch-City Center EBL 200 75 325 EBR 100 100 150 WBL 100 75 225 WBT/R 100 100 150 NBL 175 175 200 SBL 100 50 150 SBT 250 75 275 SBT/R 250 75 275 6 Chevron Drive-Sunset Drive/Bollinger WBL 225 400 425 WBT 875 975 950 WBR 250 475 475 NBL 350 500 425 NBL/T 350 500 400 NBR 150 275 250 SBL 175 150 225 7 Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road EBL 475 625 200 EBT 850 975 275 Bishop Ranch Orchards Traffic Operations Report | 33 WBL 150 300 325 WBT 575 1,875 1,850 WBR 575 900 800 NBL 425 525 525 NBT 425 675 625 SBL 700 275 800 SBT/R 700 425 825 SBR 700 400 800 Bold indicates queue potentially extends beyond available storage. Notes: •Only the movements that have a95th percentile queue that exceed their storage lengths are shown in this table. •An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane, which is not reflected in the storage length above. Source: Fehr & Peers, 2025. 12INTRODUCTION FIGURE 1.6.1:  1.6 ILLUSTRATIVE PLAN + PROGRAM   Bollinger Canyon RoadBollinger Canyon Road Su n s e t D r i v e Su n s e t D r i v e (f o r m e r l y C h e v r o n D r i v e ) (f o r m e r l y C h e v r o n D r i v e ) Site Plan Source: Bishop Ranch, November 2024. Project Site Plan FIGURE 1 S a n R a m o n V a ll e y B l v d S a n R a m o n V a ll e y B l v d No rris Cany on Rd No rris Cany on Rd S a n R a m o n V a ll e y B l v d S a n R a m o n V a ll e y B l v d Alcosta Blvd Alcosta Blvd Bollin ger Ca n y on Rd Bollin ger Ca n y on Rd T a la v e r a D r T a la v e r a D r C a m in o R a m o n C a m in o R a m o n M o r g a n D r M o r g a n D r Bollinger Cany o n R dBollinger Cany o n R d C h e v r o n D r C h e v r o n D r Bi s h o p R a n c h 1 Bi s h o p R a n c h 1 Execut i v e P k w y Execut i v e P k w yBishop DrBishop DrShopsDrivewayShopsDriveway S u n s e t D r S u n s e t D r 280680 1 2 3 4 5 6 7 0 0.25 0.50.125 Miles Project Site Vicinity and Study Intersections FIGURE 2 Project Site Study Intersection# Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 3 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 3 ( 4 1 9 ) 17 (23)510 (449)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 17 4 ( 2 3 4 ) 275 (334)318 (596)407 (657) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,164 (1,093)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 60 6 ( 7 5 2 ) 762 (953) 28 8 ( 3 5 1 ) 96 1 ( 7 3 2 ) 1,053 (1,381) 721 (443)1,263 (1,672) 22 8 ( 5 5 ) 22 9 ( 2 7 ) 65 ( 1 3 1 ) 21 (4)55 (95)46 (208) 3 ( 2 9 ) 10 ( 1 9 2 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 47 9 ( 1 5 0 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 65 ( 3 9 7 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 660 (479)1,354 (1,634)0 (0) 15 9 ( 6 5 7 ) 0 ( 0 ) 50 ( 2 1 2 ) 88 (145)1,825 (1,458)0 (0) 23 ( 9 4 ) 15 ( 2 9 ) 3 ( 2 4 ) 348 (119)955 (1,701)101 (26) 12 5 ( 4 5 7 ) 22 ( 6 ) 13 3 ( 4 4 0 ) 372 (284)1,765 (1,052)28 (1) 1,416 (1,582)371 (303) 789 (1,070)762 (953) 1,053 (1,381)363 (201) 1,551 (2,023) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San R a m on V a lley B l v d Bollinger Canyon Rd I-68 0 N B O n - R a m p s I-68 0 N B Off -R a m p s Bishop Dr Sun se t D r Shops Sun se t D r Bollinger Canyon Rd Sun se t Chevron D r Bollinger Canyon Rd Camino R a m o n Bis h o p R anch 1 Bollinger Canyon Rd I-68 0 SB O n-R a m p I-68 0 NB O n-R a m p 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -R a m p s Dri ve w a y I-6 8 0 N B O n - R a m p 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San R a m on V a lley B l v d Bollinger Canyon Rd I-68 0 N B O n - R a m p s I-68 0 N B Off -R a m p s Bishop Dr Sun se t D r Shops Sun se t D r Bollinger Canyon Rd Sun se t Chevron D r Bollinger Canyon Rd Camino R a m o n Bis h o p R anch 1 Bollinger Canyon Rd I-68 0 SB O n-R a m p 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -R a m p s Dri ve w a y Project Trip Assignment (Pre-Pass-By) FIGURE 6A 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)42 (39)8 (8) 31 (71) 12 6 ( 2 6 3 ) 58 (59) 10 1 ( 2 4 0 ) 157 (334) 212 (228)286 (242) 23 ( 1 5 ) 24 ( 1 6 ) 8 (17) 8 ( 1 9 ) 47 ( 3 1 ) 16 ( 3 6 ) 37 6 ( 4 0 8 ) 47 ( 3 1 ) 87 ( 4 4 ) 53 (125)205 (449) 16 ( 3 6 ) 122 (62)54 (120) 12 2 ( 6 2 ) 78 ( 8 7 ) 12 0 ( 1 5 3 ) 87 (44)53 (125) 47 ( 1 0 3 ) 54 (120)55 (119) 157 (334) 228 (183)58 (59) 157 (334) 286 (242) F C A AC F C A C F C CF AC F C C C ACF CF C AC ACF CF C AC C CF C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. Total pass-by ins differ from total pass-by outs (because retail in/out split is not 50:50) resulting in non-zero net pass-by volumes that are propogated out from the project site to maintain balanced volumes between intersections. * ** ** * ** 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San R a m on V a lley B l v d Bollinger Canyon Rd I-68 0 N B O n - R a m p s I-68 0 N B Off -R a m p s Bishop Dr Sun se t D r Shops Sun se t D r Bollinger Canyon Rd Sun se t Chevron D r Bollinger Canyon Rd Camino R a m o n Bis h o p R anch 1 Bollinger Canyon Rd I-68 0 SB O n-R a m p 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -R a m p s Dri ve w a y Project Pass-By Assignment FIGURE 6B -8 (7)-8 (7)-8 (7) -4 ( - 2 ) -4 ( - 2 ) 8 ( 4 9 ) 3 ( 1 5 ) 6 ( 4 2 ) -6 (-15)-12 (-52)18 (67) -1 ( - 1 4 ) 1 ( 1 9 ) 0 ( - 5 ) -1 (-2)-15 (-28)10 (28) 5 ( 2 6 ) 2 ( 7 ) 3 ( 3 7 ) -7 (-22)1 (7) -1 ( - 7 ) 1 ( 1 4 ) 0 ( - 7 ) -2 (-6)-10 (-21)12 (27)-8 (7)-8 (7) C C C C C ACFAC F ACF AC F ACF CF ACF AC F C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San R a m on V a lley B l v d Bollinger Canyon Rd I-68 0 N B O n - R a m p s I-68 0 N B Off -R a m p s Bishop Dr Sun se t D r Shops Sun se t D r Bollinger Canyon Rd Sun se t Chevron D r Bollinger Canyon Rd Camino R a m o n Bis h o p R anch 1 Bollinger Canyon Rd I-68 0 SB O n-R a m p 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -R a m p s Dri ve w a y Project Trip Assignment FIGURE 6C 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)34 (46)8 (8) 32 (71) 12 6 ( 2 6 3 ) 50 (66) 10 1 ( 2 4 0 ) 157 (334) 212 (228)278 (249) 23 ( 1 5 ) 20 ( 1 4 ) 8 (17) 8 ( 1 9 ) 43 ( 2 9 ) 16 ( 3 6 ) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) -6 (-15)41 (73)223 (516) -1 ( - 1 4 ) 17 ( 5 5 ) -1 (-2)107 (34)64 (148) 12 7 ( 8 8 ) 80 ( 9 4 ) 12 3 ( 1 9 0 ) 80 (22)54 (132) -1 ( - 7 ) 48 ( 1 1 7 ) 0 ( - 7 ) -2 (-6)44 (99)67 (146) 157 (334) 228 (183)50 (66) 157 (334) 278 (249) F C A AC F C A C F C CF AC F C C C ACFAC F CF AC F ACF CF ACF AC F C CF C C Existing with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 7 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San R a m on V a lley B l v d Bollinger Canyon Rd I-68 0 N B O n - R a m p s I-68 0 N B Off -R a m p s Bishop Dr Sun se t D r Shops Sun se t D r Bollinger Canyon Rd Sun se t Chevron D r Bollinger Canyon Rd Camino R a m o n Bis h o p R anch 1 Bollinger Canyon Rd I-68 0 SB O n-R a m p 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -R a m p s Dri ve w a y I-68 0 NB O n-R a m p 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 7 ( 4 2 9 ) 17 (23)531 (498)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 18 0 ( 2 4 6 ) 283 (346)352 (642)415 (665) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,195 (1,164)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 73 2 ( 1 , 0 1 5 ) 812 (1,019) 28 8 ( 3 5 1 ) 1, 0 6 2 ( 9 7 2 ) 1,210 (1,715) 933 (671)1,541 (1,921) 25 1 ( 7 0 ) 24 9 ( 4 1 ) 65 ( 1 3 1 ) 21 (4)55 (95)54 (225) 3 ( 2 9 ) 18 ( 2 1 1 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 52 2 ( 1 7 9 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 81 ( 4 3 3 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 654 (464)1,395 (1,707)223 (516) 15 8 ( 6 4 3 ) 17 ( 5 5 ) 50 ( 2 0 7 ) 87 (143)1,932 (1,492)64 (148) 15 0 ( 1 8 2 ) 95 ( 1 2 3 ) 12 6 ( 2 1 4 ) 348 (119)1,035 (1,723)155 (158) 12 4 ( 4 5 0 ) 70 ( 1 2 3 ) 13 3 ( 4 3 3 ) 370 (278)1,809 (1,151)95 (147) 1,573 (1,916)371 (303) 1,017 (1,253)812 (1,019) 1,210 (1,715)363 (201) 1,829 (2,272) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C Cumulative with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 9 20 0 ( 1 7 0 ) 36 0 ( 3 7 0 ) 54 4 ( 5 0 0 ) 20 (30)581 (639)280 (200) 10 ( 3 0 ) 31 0 ( 4 5 0 ) 18 6 ( 2 7 2 ) 328 (392)414 (776)478 (768) 0 ( 1 0 ) 0 ( 0 ) 20 ( 5 0 ) 1,291 (1,401)20 (10) 34 0 ( 8 1 0 ) 20 ( 2 0 ) 1, 0 0 6 ( 1 , 1 6 3 ) 880 (1,116) 39 0 ( 7 8 0 ) 1, 2 3 1 ( 1 , 1 6 0 ) 1,367 (1,854) 1,132 (1,048)1,598 (1,959) 27 3 ( 7 5 ) 27 0 ( 4 4 ) 80 ( 1 4 0 ) 30 (10)60 (100)68 (257) 10 ( 3 0 ) 18 ( 2 3 9 ) 10 ( 3 0 ) 30 (10)60 (110)30 (80) 19 0 ( 3 1 0 ) 56 3 ( 1 8 9 ) 12 0 ( 2 2 0 ) 20 (30)10 (20)130 (370) 10 ( 5 0 ) 96 ( 4 8 6 ) 10 ( 4 0 ) 40 (40)20 (30)60 (170) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 724 (515)1,651 (1,983)223 (516) 20 9 ( 7 4 6 ) 17 ( 5 5 ) 60 ( 2 2 5 ) 99 (158)2,137 (1,804)64 (148) 15 7 ( 2 0 8 ) 11 0 ( 1 5 4 ) 13 3 ( 2 2 0 ) 380 (140)1,250 (1,982)174 (172) 14 9 ( 5 3 3 ) 98 ( 1 3 7 ) 17 0 ( 4 8 3 ) 408 (324)1,994 (1,369)107 (156) 1,887 (2,124)430 (490) 1,108 (1,623)880 (1,116) 1,367 (1,854)520 (270) 1,988 (2,739) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San R a m on V a lley B l v d Bollinger Canyon Rd I-68 0 N B O n - R a m p s I-68 0 N B Off -R a m p s Bishop Dr Sun se t D r Shops Sun se t D r Bollinger Canyon Rd Sun se t Chevron D r Bollinger Canyon Rd Camino R a m o n Bis hop R anch 1 Bollinger Canyon Rd I-68 0 SB O n-R a m p 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -R a m p s Dri ve w a y I-68 0 NB O n-R a m p 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San R a m on V a lley B l v d Bollinger Canyon Rd I-68 0 N B O n - R a m p s I-68 0 N B Off -R a m p s Bishop Dr Sun se t D r Shops Sun se t D r Bollinger Canyon Rd Sun se t Chevron D r Bollinger Canyon Rd Camino R a m o n Bis h o p R anch 1 Bollinger Canyon Rd I-68 0 SB O n-R a m p 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -R a m p s Dri ve w a y I-68 0 NB O n-R a m p S a n R a m o n V a l l e y B l v d S a n R a m o n V a l l e y B l v d NorrisCan y o n R d NorrisCan y o n R d S a n R a m o n V a l l e y B l v d S a n R a m o n V a l l e y B l v d Alcosta Blvd Alcosta Blvd Bol l i n g e r C a n y o n R d Bol l i n g e r C a n y o n R d T ala v e r a D r T ala v e r a D r C a m i n o R a m o n C a m i n o R a m o n M o r g a n D r M o r g a n D r BollingerCanyon R dBollingerCanyonRd C h e v r o n D r C h e v r o n D r džĞĐƵƟǀ Ğ  W Ŭ ǁ LJ džĞĐƵƟǀ Ğ  W Ŭ ǁ LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi s h o p R a n c h 1 Bi s h o p R a n c h 1 S u n s e t D r S u n s e t D r 280680 1 2 3 4 5 6 7 8 9 0 0.1 0.2 Miles Project Site Study Intersection# AM (PM) Peak Hour Traffic Volumes XX (YY) Signalized Intersection S a n R a m o n V a l l e y B l v d S a n R a m o n V a l l e y B l v d San R a m o n V a l l e y B l v d San R a m o n V a l l e y B l v d C a m i n o R a m o n C a m i n o R a m o n Ir o n H o r s e T r a i l Ir o n H o r s e T r a i l C h e v r o n D r C h e v r o n D r B i s h o p R a n c h 1 B i s h o p R a n c h 1 S u n s e t D r S u n s e t D r T a l a v e r a D r T a l a v e r a D r Bollinger C a n y o n R d Bollinger C a n y o n R d Bishop D r Bishop D r 280680 95th Percentile Queue AM Existing Conditions 95th Percentile QueuesFIGURE 4APM Existing Conditions 95th Percentile QueuesFIGURE 4B S a n R a m o n V a l l e y B l v d S a n R a m o n V a l l e y B l v d San R a m o n V a l l e y B l v d San R a m o n V a l l e y B l v d C a m i n o R a m o n C a m i n o R a m o n Ir o n H o r s e T r a i l Ir o n H o r s e T r a i l C h e v r o n D r C h e v r o n D r B i s h o p R a n c h 1 B i s h o p R a n c h 1 S u n s e t D r S u n s e t D r T a l a v e r a D r T a l a v e r a D r Bollinger C a n y o n R d Bollinger C a n y o n R d Bishop D r Bishop D r 280680 95th Percentile Queue AM Existing Conditions 95th Percentile QueuesFIGURE 4APM Existing Conditions 95th Percentile QueuesFIGURE 4B S a n R a m o n V all e y Blv d S a n R a m o n V all e y Blv d N o rris C a n y on R d N o rris C a n y on R d S a n R a m o n V all e y Bl v d S a n R a m o n V all e y Bl v d Alcosta Blvd Alcosta Blvd Bollin ger Canyon Rd Bollin ger Canyon Rd T a la v e r a D r T a la v e r a D r C a m in o R a m o n C a m in o R a m o n M o r g a n D r M o r g a n D r Bollinger Cany o n R dBollinger Cany o n R d Bi s h o p R a n c h 1 Bi s h o p R a n c h 1 C h e v r o n D r C h e v r o n D r S u n s e t D r S u n s e t D r Execut i v e P k w y Execut i v e P k w yBishop DrBishop DrShopsDrivewayShopsDriveway 280680 25%( 2 5 % ) 3 0 % ( 3 5 % ) 2 5 % ( 2 0 % ) 5%(5%) 15%(15%) Trip Distribution Residential (Retail) 0 0.25 0.50.125 Miles Project Trip Distribution FIGURE 5 Project Site XX%(YY%) Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 3 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 3 ( 4 1 9 ) 17 (23)510 (449)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 17 4 ( 2 3 4 ) 275 (334)318 (596)407 (657) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,164 (1,093)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 60 6 ( 7 5 2 ) 762 (953) 28 8 ( 3 5 1 ) 96 1 ( 7 3 2 ) 1,053 (1,381) 721 (443)1,263 (1,672) 22 8 ( 5 5 ) 22 9 ( 2 7 ) 65 ( 1 3 1 ) 21 (4)55 (95)46 (208) 3 ( 2 9 ) 10 ( 1 9 2 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 47 9 ( 1 5 0 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 65 ( 3 9 7 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 660 (479)1,354 (1,634)0 (0) 15 9 ( 6 5 7 ) 0 ( 0 ) 50 ( 2 1 2 ) 88 (145)1,825 (1,458)0 (0) 23 ( 9 4 ) 15 ( 2 9 ) 3 ( 2 4 ) 348 (119)955 (1,701)101 (26) 12 5 ( 4 5 7 ) 22 ( 6 ) 13 3 ( 4 4 0 ) 372 (284)1,765 (1,052)28 (1) 1,416 (1,582)371 (303) 789 (1,070)762 (953) 1,053 (1,381)363 (201) 1,551 (2,023) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp I-68 0 NB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-6 8 0 N B O n - R a m p 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment (Pre-Pass-By) FIGURE 6A 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)42 (39)8 (8) 31 (71) 12 6 ( 2 6 3 ) 58 (59) 10 1 ( 2 4 0 ) 157 (334) 212 (228)286 (242) 23 ( 1 5 ) 24 ( 1 6 ) 8 (17) 8 ( 1 9 ) 47 ( 3 1 ) 16 ( 3 6 ) 37 6 ( 4 0 8 ) 47 ( 3 1 ) 87 ( 4 4 ) 53 (125)205 (449) 16 ( 3 6 ) 122 (62)54 (120) 12 2 ( 6 2 ) 78 ( 8 7 ) 12 0 ( 1 5 3 ) 87 (44)53 (125) 47 ( 1 0 3 ) 54 (120)55 (119) 157 (334) 228 (183)58 (59) 157 (334) 286 (242) F C A AC F C A C F C CF AC F C C C ACF CF C AC ACF CF C AC C CF C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. Total pass-by ins differ from total pass-by outs (because retail in/out split is not 50:50) resulting in non-zero net pass-by volumes that are propogated out from the project site to maintain balanced volumes between intersections. * ** ** * ** 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Pass-By Assignment FIGURE 6B -8 (7)-8 (7)-8 (7) -4 ( - 2 ) -4 ( - 2 ) 8 ( 4 9 ) 3 ( 1 5 ) 6 ( 4 2 ) -6 (-15)-12 (-52)18 (67) -1 ( - 1 4 ) 1 ( 1 9 ) 0 ( - 5 ) -1 (-2)-15 (-28)10 (28) 5 ( 2 6 ) 2 ( 7 ) 3 ( 3 7 ) -7 (-22)1 (7) -1 ( - 7 ) 1 ( 1 4 ) 0 ( - 7 ) -2 (-6)-10 (-21)12 (27)-8 (7)-8 (7) C C C C C ACFAC F ACF AC F ACF CF ACF AC F C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment FIGURE 6C 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)34 (46)8 (8) 32 (71) 12 6 ( 2 6 3 ) 50 (66) 10 1 ( 2 4 0 ) 157 (334) 212 (228)278 (249) 23 ( 1 5 ) 20 ( 1 4 ) 8 (17) 8 ( 1 9 ) 43 ( 2 9 ) 16 ( 3 6 ) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) -6 (-15)41 (73)223 (516) -1 ( - 1 4 ) 17 ( 5 5 ) -1 (-2)107 (34)64 (148) 12 7 ( 8 8 ) 80 ( 9 4 ) 12 3 ( 1 9 0 ) 80 (22)54 (132) -1 ( - 7 ) 48 ( 1 1 7 ) 0 ( - 7 ) -2 (-6)44 (99)67 (146) 157 (334) 228 (183)50 (66) 157 (334) 278 (249) F C A AC F C A C F C CF AC F C C C ACFAC F CF AC F ACF CF ACF AC F C CF C C Existing with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 7 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 7 ( 4 2 9 ) 17 (23)531 (498)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 18 0 ( 2 4 6 ) 283 (346)352 (642)415 (665) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,195 (1,164)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 73 2 ( 1 , 0 1 5 ) 812 (1,019) 28 8 ( 3 5 1 ) 1, 0 6 2 ( 9 7 2 ) 1,210 (1,715) 933 (671)1,541 (1,921) 25 1 ( 7 0 ) 24 9 ( 4 1 ) 65 ( 1 3 1 ) 21 (4)55 (95)54 (225) 3 ( 2 9 ) 18 ( 2 1 1 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 52 2 ( 1 7 9 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 81 ( 4 3 3 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 654 (464)1,395 (1,707)223 (516) 15 8 ( 6 4 3 ) 17 ( 5 5 ) 50 ( 2 0 7 ) 87 (143)1,932 (1,492)64 (148) 15 0 ( 1 8 2 ) 95 ( 1 2 3 ) 12 6 ( 2 1 4 ) 348 (119)1,035 (1,723)155 (158) 12 4 ( 4 5 0 ) 70 ( 1 2 3 ) 13 3 ( 4 3 3 ) 370 (278)1,809 (1,151)95 (147) 1,573 (1,916)371 (303) 1,017 (1,253)812 (1,019) 1,210 (1,715)363 (201) 1,829 (2,272) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C Cumulative with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 9 20 0 ( 1 7 0 ) 36 0 ( 3 7 0 ) 54 4 ( 5 0 0 ) 20 (30)581 (639)280 (200) 10 ( 3 0 ) 31 0 ( 4 5 0 ) 18 6 ( 2 7 2 ) 328 (392)414 (776)478 (768) 0 ( 1 0 ) 0 ( 0 ) 20 ( 5 0 ) 1,291 (1,401)20 (10) 34 0 ( 8 1 0 ) 20 ( 2 0 ) 1, 0 0 6 ( 1 , 1 6 3 ) 880 (1,116) 39 0 ( 7 8 0 ) 1, 2 3 1 ( 1 , 1 6 0 ) 1,367 (1,854) 1,132 (1,048)1,598 (1,959) 27 3 ( 7 5 ) 27 0 ( 4 4 ) 80 ( 1 4 0 ) 30 (10)60 (100)68 (257) 10 ( 3 0 ) 18 ( 2 3 9 ) 10 ( 3 0 ) 30 (10)60 (110)30 (80) 19 0 ( 3 1 0 ) 56 3 ( 1 8 9 ) 12 0 ( 2 2 0 ) 20 (30)10 (20)130 (370) 10 ( 5 0 ) 96 ( 4 8 6 ) 10 ( 4 0 ) 40 (40)20 (30)60 (170) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 724 (515)1,651 (1,983)223 (516) 20 9 ( 7 4 6 ) 17 ( 5 5 ) 60 ( 2 2 5 ) 99 (158)2,137 (1,804)64 (148) 15 7 ( 2 0 8 ) 11 0 ( 1 5 4 ) 13 3 ( 2 2 0 ) 380 (140)1,250 (1,982)174 (172) 14 9 ( 5 3 3 ) 98 ( 1 3 7 ) 17 0 ( 4 8 3 ) 408 (324)1,994 (1,369)107 (156) 1,887 (2,124)430 (490) 1,108 (1,623)880 (1,116) 1,367 (1,854)520 (270) 1,988 (2,739) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp S a n R a m o n V all e y Blv d S a n R a m o n V all e y Blv d Norris C a n y on R d Norris C a n y on R d S a n R a m o n V a ll e y Blv d S a n R a m o n V a ll e y Blv d Alcosta Blvd Alcosta Blvd Bollin ger Canyon Rd Bollin ger Canyon Rd T ala v e r a D r T ala v e r a D r C a m in o R a m o n C a m in o R a m o n M o r g a n D r M o r g a n D r Bollinger Canyon R dBollinger Canyon R d C h e v r o n D r C h e v r o n D r džĞĐƵƟǀ Ğ  W Ŭ ǁ LJ džĞĐƵƟǀ Ğ  W Ŭ ǁ LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi s h o p R a n c h 1 Bi s h o p R a n c h 1 S u n s e t D r S u n s e t D r 280680 1 2 3 4 5 6 7 8 9 0 0.1 0.2 Miles Project Site Study Intersection# AM (PM) Peak Hour Traffic Volumes XX (YY) Signalized Intersection Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 3 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 3 ( 4 1 9 ) 17 (23)510 (449)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 17 4 ( 2 3 4 ) 275 (334)318 (596)407 (657) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,164 (1,093)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 60 6 ( 7 5 2 ) 762 (953) 28 8 ( 3 5 1 ) 96 1 ( 7 3 2 ) 1,053 (1,381) 721 (443)1,263 (1,672) 22 8 ( 5 5 ) 22 9 ( 2 7 ) 65 ( 1 3 1 ) 21 (4)55 (95)46 (208) 3 ( 2 9 ) 10 ( 1 9 2 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 47 9 ( 1 5 0 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 65 ( 3 9 7 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 660 (479)1,354 (1,634)0 (0) 15 9 ( 6 5 7 ) 0 ( 0 ) 50 ( 2 1 2 ) 88 (145)1,825 (1,458)0 (0) 23 ( 9 4 ) 15 ( 2 9 ) 3 ( 2 4 ) 348 (119)955 (1,701)101 (26) 12 5 ( 4 5 7 ) 22 ( 6 ) 13 3 ( 4 4 0 ) 372 (284)1,765 (1,052)28 (1) 1,416 (1,582)371 (303) 789 (1,070)762 (953) 1,053 (1,381)363 (201) 1,551 (2,023) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp I-68 0 NB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-6 8 0 N B O n - R a m p 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment (Pre-Pass-By) FIGURE 6A 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)42 (39)8 (8) 31 (71) 12 6 ( 2 6 3 ) 58 (59) 10 1 ( 2 4 0 ) 157 (334) 212 (228)286 (242) 23 ( 1 5 ) 24 ( 1 6 ) 8 (17) 8 ( 1 9 ) 47 ( 3 1 ) 16 ( 3 6 ) 37 6 ( 4 0 8 ) 47 ( 3 1 ) 87 ( 4 4 ) 53 (125)205 (449) 16 ( 3 6 ) 122 (62)54 (120) 12 2 ( 6 2 ) 78 ( 8 7 ) 12 0 ( 1 5 3 ) 87 (44)53 (125) 47 ( 1 0 3 ) 54 (120)55 (119) 157 (334) 228 (183)58 (59) 157 (334) 286 (242) F C A AC F C A C F C CF AC F C C C ACF CF C AC ACF CF C AC C CF C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. Total pass-by ins differ from total pass-by outs (because retail in/out split is not 50:50) resulting in non-zero net pass-by volumes that are propogated out from the project site to maintain balanced volumes between intersections. * ** ** * ** 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Pass-By Assignment FIGURE 6B -8 (7)-8 (7)-8 (7) -4 ( - 2 ) -4 ( - 2 ) 8 ( 4 9 ) 3 ( 1 5 ) 6 ( 4 2 ) -6 (-15)-12 (-52)18 (67) -1 ( - 1 4 ) 1 ( 1 9 ) 0 ( - 5 ) -1 (-2)-15 (-28)10 (28) 5 ( 2 6 ) 2 ( 7 ) 3 ( 3 7 ) -7 (-22)1 (7) -1 ( - 7 ) 1 ( 1 4 ) 0 ( - 7 ) -2 (-6)-10 (-21)12 (27)-8 (7)-8 (7) C C C C C ACFAC F ACF AC F ACF CF ACF AC F C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment FIGURE 6C 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)34 (46)8 (8) 32 (71) 12 6 ( 2 6 3 ) 50 (66) 10 1 ( 2 4 0 ) 157 (334) 212 (228)278 (249) 23 ( 1 5 ) 20 ( 1 4 ) 8 (17) 8 ( 1 9 ) 43 ( 2 9 ) 16 ( 3 6 ) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) -6 (-15)41 (73)223 (516) -1 ( - 1 4 ) 17 ( 5 5 ) -1 (-2)107 (34)64 (148) 12 7 ( 8 8 ) 80 ( 9 4 ) 12 3 ( 1 9 0 ) 80 (22)54 (132) -1 ( - 7 ) 48 ( 1 1 7 ) 0 ( - 7 ) -2 (-6)44 (99)67 (146) 157 (334) 228 (183)50 (66) 157 (334) 278 (249) F C A AC F C A C F C CF AC F C C C ACFAC F CF AC F ACF CF ACF AC F C CF C C Existing with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 7 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 7 ( 4 2 9 ) 17 (23)531 (498)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 18 0 ( 2 4 6 ) 283 (346)352 (642)415 (665) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,195 (1,164)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 73 2 ( 1 , 0 1 5 ) 812 (1,019) 28 8 ( 3 5 1 ) 1, 0 6 2 ( 9 7 2 ) 1,210 (1,715) 933 (671)1,541 (1,921) 25 1 ( 7 0 ) 24 9 ( 4 1 ) 65 ( 1 3 1 ) 21 (4)55 (95)54 (225) 3 ( 2 9 ) 18 ( 2 1 1 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 52 2 ( 1 7 9 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 81 ( 4 3 3 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 654 (464)1,395 (1,707)223 (516) 15 8 ( 6 4 3 ) 17 ( 5 5 ) 50 ( 2 0 7 ) 87 (143)1,932 (1,492)64 (148) 15 0 ( 1 8 2 ) 95 ( 1 2 3 ) 12 6 ( 2 1 4 ) 348 (119)1,035 (1,723)155 (158) 12 4 ( 4 5 0 ) 70 ( 1 2 3 ) 13 3 ( 4 3 3 ) 370 (278)1,809 (1,151)95 (147) 1,573 (1,916)371 (303) 1,017 (1,253)812 (1,019) 1,210 (1,715)363 (201) 1,829 (2,272) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C Cumulative with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 9 20 0 ( 1 7 0 ) 36 0 ( 3 7 0 ) 54 4 ( 5 0 0 ) 20 (30)581 (639)280 (200) 10 ( 3 0 ) 31 0 ( 4 5 0 ) 18 6 ( 2 7 2 ) 328 (392)414 (776)478 (768) 0 ( 1 0 ) 0 ( 0 ) 20 ( 5 0 ) 1,291 (1,401)20 (10) 34 0 ( 8 1 0 ) 20 ( 2 0 ) 1, 0 0 6 ( 1 , 1 6 3 ) 880 (1,116) 39 0 ( 7 8 0 ) 1, 2 3 1 ( 1 , 1 6 0 ) 1,367 (1,854) 1,132 (1,048)1,598 (1,959) 27 3 ( 7 5 ) 27 0 ( 4 4 ) 80 ( 1 4 0 ) 30 (10)60 (100)68 (257) 10 ( 3 0 ) 18 ( 2 3 9 ) 10 ( 3 0 ) 30 (10)60 (110)30 (80) 19 0 ( 3 1 0 ) 56 3 ( 1 8 9 ) 12 0 ( 2 2 0 ) 20 (30)10 (20)130 (370) 10 ( 5 0 ) 96 ( 4 8 6 ) 10 ( 4 0 ) 40 (40)20 (30)60 (170) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 724 (515)1,651 (1,983)223 (516) 20 9 ( 7 4 6 ) 17 ( 5 5 ) 60 ( 2 2 5 ) 99 (158)2,137 (1,804)64 (148) 15 7 ( 2 0 8 ) 11 0 ( 1 5 4 ) 13 3 ( 2 2 0 ) 380 (140)1,250 (1,982)174 (172) 14 9 ( 5 3 3 ) 98 ( 1 3 7 ) 17 0 ( 4 8 3 ) 408 (324)1,994 (1,369)107 (156) 1,887 (2,124)430 (490) 1,108 (1,623)880 (1,116) 1,367 (1,854)520 (270) 1,988 (2,739) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp S a n R a m o n V all e y Blv d S a n R a m o n V all e y Blv d Norris C a n y on R d Norris C a n y on R d S a n R a m o n V a ll e y Blv d S a n R a m o n V a ll e y Blv d Alcosta Blvd Alcosta Blvd Bollin ger Canyon Rd Bollin ger Canyon Rd T ala v e r a D r T ala v e r a D r C a m in o R a m o n C a m in o R a m o n M o r g a n D r M o r g a n D r Bollinger Canyon R dBollinger Canyon R d C h e v r o n D r C h e v r o n D r džĞĐƵƟǀ Ğ  W Ŭ ǁ LJ džĞĐƵƟǀ Ğ  W Ŭ ǁ LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi s h o p R a n c h 1 Bi s h o p R a n c h 1 S u n s e t D r S u n s e t D r 280680 1 2 3 4 5 6 7 8 9 0 0.1 0.2 Miles Project Site Study Intersection# AM (PM) Peak Hour Traffic Volumes XX (YY) Signalized Intersection Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 3 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 3 ( 4 1 9 ) 17 (23)510 (449)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 17 4 ( 2 3 4 ) 275 (334)318 (596)407 (657) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,164 (1,093)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 60 6 ( 7 5 2 ) 762 (953) 28 8 ( 3 5 1 ) 96 1 ( 7 3 2 ) 1,053 (1,381) 721 (443)1,263 (1,672) 22 8 ( 5 5 ) 22 9 ( 2 7 ) 65 ( 1 3 1 ) 21 (4)55 (95)46 (208) 3 ( 2 9 ) 10 ( 1 9 2 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 47 9 ( 1 5 0 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 65 ( 3 9 7 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 660 (479)1,354 (1,634)0 (0) 15 9 ( 6 5 7 ) 0 ( 0 ) 50 ( 2 1 2 ) 88 (145)1,825 (1,458)0 (0) 23 ( 9 4 ) 15 ( 2 9 ) 3 ( 2 4 ) 348 (119)955 (1,701)101 (26) 12 5 ( 4 5 7 ) 22 ( 6 ) 13 3 ( 4 4 0 ) 372 (284)1,765 (1,052)28 (1) 1,416 (1,582)371 (303) 789 (1,070)762 (953) 1,053 (1,381)363 (201) 1,551 (2,023) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp I-68 0 NB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-6 8 0 N B O n - R a m p 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment (Pre-Pass-By) FIGURE 6A 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)42 (39)8 (8) 31 (71) 12 6 ( 2 6 3 ) 58 (59) 10 1 ( 2 4 0 ) 157 (334) 212 (228)286 (242) 23 ( 1 5 ) 24 ( 1 6 ) 8 (17) 8 ( 1 9 ) 47 ( 3 1 ) 16 ( 3 6 ) 37 6 ( 4 0 8 ) 47 ( 3 1 ) 87 ( 4 4 ) 53 (125)205 (449) 16 ( 3 6 ) 122 (62)54 (120) 12 2 ( 6 2 ) 78 ( 8 7 ) 12 0 ( 1 5 3 ) 87 (44)53 (125) 47 ( 1 0 3 ) 54 (120)55 (119) 157 (334) 228 (183)58 (59) 157 (334) 286 (242) F C A AC F C A C F C CF AC F C C C ACF CF C AC ACF CF C AC C CF C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. Total pass-by ins differ from total pass-by outs (because retail in/out split is not 50:50) resulting in non-zero net pass-by volumes that are propogated out from the project site to maintain balanced volumes between intersections. * ** ** * ** 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Pass-By Assignment FIGURE 6B -8 (7)-8 (7)-8 (7) -4 ( - 2 ) -4 ( - 2 ) 8 ( 4 9 ) 3 ( 1 5 ) 6 ( 4 2 ) -6 (-15)-12 (-52)18 (67) -1 ( - 1 4 ) 1 ( 1 9 ) 0 ( - 5 ) -1 (-2)-15 (-28)10 (28) 5 ( 2 6 ) 2 ( 7 ) 3 ( 3 7 ) -7 (-22)1 (7) -1 ( - 7 ) 1 ( 1 4 ) 0 ( - 7 ) -2 (-6)-10 (-21)12 (27)-8 (7)-8 (7) C C C C C ACFAC F ACF AC F ACF CF ACF AC F C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment FIGURE 6C 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)34 (46)8 (8) 32 (71) 12 6 ( 2 6 3 ) 50 (66) 10 1 ( 2 4 0 ) 157 (334) 212 (228)278 (249) 23 ( 1 5 ) 20 ( 1 4 ) 8 (17) 8 ( 1 9 ) 43 ( 2 9 ) 16 ( 3 6 ) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) -6 (-15)41 (73)223 (516) -1 ( - 1 4 ) 17 ( 5 5 ) -1 (-2)107 (34)64 (148) 12 7 ( 8 8 ) 80 ( 9 4 ) 12 3 ( 1 9 0 ) 80 (22)54 (132) -1 ( - 7 ) 48 ( 1 1 7 ) 0 ( - 7 ) -2 (-6)44 (99)67 (146) 157 (334) 228 (183)50 (66) 157 (334) 278 (249) F C A AC F C A C F C CF AC F C C C ACFAC F CF AC F ACF CF ACF AC F C CF C C Existing with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 7 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 7 ( 4 2 9 ) 17 (23)531 (498)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 18 0 ( 2 4 6 ) 283 (346)352 (642)415 (665) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,195 (1,164)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 73 2 ( 1 , 0 1 5 ) 812 (1,019) 28 8 ( 3 5 1 ) 1, 0 6 2 ( 9 7 2 ) 1,210 (1,715) 933 (671)1,541 (1,921) 25 1 ( 7 0 ) 24 9 ( 4 1 ) 65 ( 1 3 1 ) 21 (4)55 (95)54 (225) 3 ( 2 9 ) 18 ( 2 1 1 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 52 2 ( 1 7 9 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 81 ( 4 3 3 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 654 (464)1,395 (1,707)223 (516) 15 8 ( 6 4 3 ) 17 ( 5 5 ) 50 ( 2 0 7 ) 87 (143)1,932 (1,492)64 (148) 15 0 ( 1 8 2 ) 95 ( 1 2 3 ) 12 6 ( 2 1 4 ) 348 (119)1,035 (1,723)155 (158) 12 4 ( 4 5 0 ) 70 ( 1 2 3 ) 13 3 ( 4 3 3 ) 370 (278)1,809 (1,151)95 (147) 1,573 (1,916)371 (303) 1,017 (1,253)812 (1,019) 1,210 (1,715)363 (201) 1,829 (2,272) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C Cumulative with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 9 20 0 ( 1 7 0 ) 36 0 ( 3 7 0 ) 54 4 ( 5 0 0 ) 20 (30)581 (639)280 (200) 10 ( 3 0 ) 31 0 ( 4 5 0 ) 18 6 ( 2 7 2 ) 328 (392)414 (776)478 (768) 0 ( 1 0 ) 0 ( 0 ) 20 ( 5 0 ) 1,291 (1,401)20 (10) 34 0 ( 8 1 0 ) 20 ( 2 0 ) 1, 0 0 6 ( 1 , 1 6 3 ) 880 (1,116) 39 0 ( 7 8 0 ) 1, 2 3 1 ( 1 , 1 6 0 ) 1,367 (1,854) 1,132 (1,048)1,598 (1,959) 27 3 ( 7 5 ) 27 0 ( 4 4 ) 80 ( 1 4 0 ) 30 (10)60 (100)68 (257) 10 ( 3 0 ) 18 ( 2 3 9 ) 10 ( 3 0 ) 30 (10)60 (110)30 (80) 19 0 ( 3 1 0 ) 56 3 ( 1 8 9 ) 12 0 ( 2 2 0 ) 20 (30)10 (20)130 (370) 10 ( 5 0 ) 96 ( 4 8 6 ) 10 ( 4 0 ) 40 (40)20 (30)60 (170) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 724 (515)1,651 (1,983)223 (516) 20 9 ( 7 4 6 ) 17 ( 5 5 ) 60 ( 2 2 5 ) 99 (158)2,137 (1,804)64 (148) 15 7 ( 2 0 8 ) 11 0 ( 1 5 4 ) 13 3 ( 2 2 0 ) 380 (140)1,250 (1,982)174 (172) 14 9 ( 5 3 3 ) 98 ( 1 3 7 ) 17 0 ( 4 8 3 ) 408 (324)1,994 (1,369)107 (156) 1,887 (2,124)430 (490) 1,108 (1,623)880 (1,116) 1,367 (1,854)520 (270) 1,988 (2,739) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp S a n R a m o n V all e y Blv d S a n R a m o n V all e y Blv d Norris C a n y on R d Norris C a n y on R d S a n R a m o n V a ll e y Blv d S a n R a m o n V a ll e y Blv d Alcosta Blvd Alcosta Blvd Bollin ger Canyon Rd Bollin ger Canyon Rd T ala v e r a D r T ala v e r a D r C a m in o R a m o n C a m in o R a m o n M o r g a n D r M o r g a n D r Bollinger Canyon R dBollinger Canyon R d C h e v r o n D r C h e v r o n D r džĞĐƵƟǀ Ğ  W Ŭ ǁ LJ džĞĐƵƟǀ Ğ  W Ŭ ǁ LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi s h o p R a n c h 1 Bi s h o p R a n c h 1 S u n s e t D r S u n s e t D r 280680 1 2 3 4 5 6 7 8 9 0 0.1 0.2 Miles Project Site Study Intersection# AM (PM) Peak Hour Traffic Volumes XX (YY) Signalized Intersection Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 3 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 3 ( 4 1 9 ) 17 (23)510 (449)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 17 4 ( 2 3 4 ) 275 (334)318 (596)407 (657) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,164 (1,093)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 60 6 ( 7 5 2 ) 762 (953) 28 8 ( 3 5 1 ) 96 1 ( 7 3 2 ) 1,053 (1,381) 721 (443)1,263 (1,672) 22 8 ( 5 5 ) 22 9 ( 2 7 ) 65 ( 1 3 1 ) 21 (4)55 (95)46 (208) 3 ( 2 9 ) 10 ( 1 9 2 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 47 9 ( 1 5 0 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 65 ( 3 9 7 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 660 (479)1,354 (1,634)0 (0) 15 9 ( 6 5 7 ) 0 ( 0 ) 50 ( 2 1 2 ) 88 (145)1,825 (1,458)0 (0) 23 ( 9 4 ) 15 ( 2 9 ) 3 ( 2 4 ) 348 (119)955 (1,701)101 (26) 12 5 ( 4 5 7 ) 22 ( 6 ) 13 3 ( 4 4 0 ) 372 (284)1,765 (1,052)28 (1) 1,416 (1,582)371 (303) 789 (1,070)762 (953) 1,053 (1,381)363 (201) 1,551 (2,023) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp I-68 0 NB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-6 8 0 N B O n - R a m p 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment (Pre-Pass-By) FIGURE 6A 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)42 (39)8 (8) 31 (71) 12 6 ( 2 6 3 ) 58 (59) 10 1 ( 2 4 0 ) 157 (334) 212 (228)286 (242) 23 ( 1 5 ) 24 ( 1 6 ) 8 (17) 8 ( 1 9 ) 47 ( 3 1 ) 16 ( 3 6 ) 37 6 ( 4 0 8 ) 47 ( 3 1 ) 87 ( 4 4 ) 53 (125)205 (449) 16 ( 3 6 ) 122 (62)54 (120) 12 2 ( 6 2 ) 78 ( 8 7 ) 12 0 ( 1 5 3 ) 87 (44)53 (125) 47 ( 1 0 3 ) 54 (120)55 (119) 157 (334) 228 (183)58 (59) 157 (334) 286 (242) F C A AC F C A C F C CF AC F C C C ACF CF C AC ACF CF C AC C CF C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. Total pass-by ins differ from total pass-by outs (because retail in/out split is not 50:50) resulting in non-zero net pass-by volumes that are propogated out from the project site to maintain balanced volumes between intersections. * ** ** * ** 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Pass-By Assignment FIGURE 6B -8 (7)-8 (7)-8 (7) -4 ( - 2 ) -4 ( - 2 ) 8 ( 4 9 ) 3 ( 1 5 ) 6 ( 4 2 ) -6 (-15)-12 (-52)18 (67) -1 ( - 1 4 ) 1 ( 1 9 ) 0 ( - 5 ) -1 (-2)-15 (-28)10 (28) 5 ( 2 6 ) 2 ( 7 ) 3 ( 3 7 ) -7 (-22)1 (7) -1 ( - 7 ) 1 ( 1 4 ) 0 ( - 7 ) -2 (-6)-10 (-21)12 (27)-8 (7)-8 (7) C C C C C ACFAC F ACF AC F ACF CF ACF AC F C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment FIGURE 6C 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)34 (46)8 (8) 32 (71) 12 6 ( 2 6 3 ) 50 (66) 10 1 ( 2 4 0 ) 157 (334) 212 (228)278 (249) 23 ( 1 5 ) 20 ( 1 4 ) 8 (17) 8 ( 1 9 ) 43 ( 2 9 ) 16 ( 3 6 ) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) -6 (-15)41 (73)223 (516) -1 ( - 1 4 ) 17 ( 5 5 ) -1 (-2)107 (34)64 (148) 12 7 ( 8 8 ) 80 ( 9 4 ) 12 3 ( 1 9 0 ) 80 (22)54 (132) -1 ( - 7 ) 48 ( 1 1 7 ) 0 ( - 7 ) -2 (-6)44 (99)67 (146) 157 (334) 228 (183)50 (66) 157 (334) 278 (249) F C A AC F C A C F C CF AC F C C C ACFAC F CF AC F ACF CF ACF AC F C CF C C Existing with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 7 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 7 ( 4 2 9 ) 17 (23)531 (498)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 18 0 ( 2 4 6 ) 283 (346)352 (642)415 (665) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,195 (1,164)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 73 2 ( 1 , 0 1 5 ) 812 (1,019) 28 8 ( 3 5 1 ) 1, 0 6 2 ( 9 7 2 ) 1,210 (1,715) 933 (671)1,541 (1,921) 25 1 ( 7 0 ) 24 9 ( 4 1 ) 65 ( 1 3 1 ) 21 (4)55 (95)54 (225) 3 ( 2 9 ) 18 ( 2 1 1 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 52 2 ( 1 7 9 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 81 ( 4 3 3 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 654 (464)1,395 (1,707)223 (516) 15 8 ( 6 4 3 ) 17 ( 5 5 ) 50 ( 2 0 7 ) 87 (143)1,932 (1,492)64 (148) 15 0 ( 1 8 2 ) 95 ( 1 2 3 ) 12 6 ( 2 1 4 ) 348 (119)1,035 (1,723)155 (158) 12 4 ( 4 5 0 ) 70 ( 1 2 3 ) 13 3 ( 4 3 3 ) 370 (278)1,809 (1,151)95 (147) 1,573 (1,916)371 (303) 1,017 (1,253)812 (1,019) 1,210 (1,715)363 (201) 1,829 (2,272) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C Cumulative with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 9 20 0 ( 1 7 0 ) 36 0 ( 3 7 0 ) 54 4 ( 5 0 0 ) 20 (30)581 (639)280 (200) 10 ( 3 0 ) 31 0 ( 4 5 0 ) 18 6 ( 2 7 2 ) 328 (392)414 (776)478 (768) 0 ( 1 0 ) 0 ( 0 ) 20 ( 5 0 ) 1,291 (1,401)20 (10) 34 0 ( 8 1 0 ) 20 ( 2 0 ) 1, 0 0 6 ( 1 , 1 6 3 ) 880 (1,116) 39 0 ( 7 8 0 ) 1, 2 3 1 ( 1 , 1 6 0 ) 1,367 (1,854) 1,132 (1,048)1,598 (1,959) 27 3 ( 7 5 ) 27 0 ( 4 4 ) 80 ( 1 4 0 ) 30 (10)60 (100)68 (257) 10 ( 3 0 ) 18 ( 2 3 9 ) 10 ( 3 0 ) 30 (10)60 (110)30 (80) 19 0 ( 3 1 0 ) 56 3 ( 1 8 9 ) 12 0 ( 2 2 0 ) 20 (30)10 (20)130 (370) 10 ( 5 0 ) 96 ( 4 8 6 ) 10 ( 4 0 ) 40 (40)20 (30)60 (170) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 724 (515)1,651 (1,983)223 (516) 20 9 ( 7 4 6 ) 17 ( 5 5 ) 60 ( 2 2 5 ) 99 (158)2,137 (1,804)64 (148) 15 7 ( 2 0 8 ) 11 0 ( 1 5 4 ) 13 3 ( 2 2 0 ) 380 (140)1,250 (1,982)174 (172) 14 9 ( 5 3 3 ) 98 ( 1 3 7 ) 17 0 ( 4 8 3 ) 408 (324)1,994 (1,369)107 (156) 1,887 (2,124)430 (490) 1,108 (1,623)880 (1,116) 1,367 (1,854)520 (270) 1,988 (2,739) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp S a n R a m o n V all e y Blv d S a n R a m o n V all e y Blv d Norris C a n y on R d Norris C a n y on R d S a n R a m o n V a ll e y Blv d S a n R a m o n V a ll e y Blv d Alcosta Blvd Alcosta Blvd Bollin ger Canyon Rd Bollin ger Canyon Rd T ala v e r a D r T ala v e r a D r C a m in o R a m o n C a m in o R a m o n M o r g a n D r M o r g a n D r Bollinger Canyon R dBollinger Canyon R d C h e v r o n D r C h e v r o n D r džĞĐƵƟǀ Ğ  W Ŭ ǁ LJ džĞĐƵƟǀ Ğ  W Ŭ ǁ LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi s h o p R a n c h 1 Bi s h o p R a n c h 1 S u n s e t D r S u n s e t D r 280680 1 2 3 4 5 6 7 8 9 0 0.1 0.2 Miles Project Site Study Intersection# AM (PM) Peak Hour Traffic Volumes XX (YY) Signalized Intersection S a n R a m o n V a l l e y B l v d S a n R a m o n V a l l e y B l v d San R a m o n V a l l e y B l v d San R a m o n V a l l e y B l v d C a m i n o R a m o n C a m i n o R a m o n Ir o n H o r s e T r a i l Ir o n H o r s e T r a i l C h e v r o n D r C h e v r o n D r B i s h o p R a n c h 1 B i s h o p R a n c h 1 S u n s e t D r S u n s e t D r T a l a v e r a D r T a l a v e r a D r Bollinger C a n y o n R d Bollinger C a n y o n R d Bishop D r Bishop D r 280680 95th Percentile Queue AM Existing with Project Conditions 95th Percentile QueuesFIGURE 8APM Existing with Project Conditions 95th Percentile QueuesFIGURE 8B This queue extends beyond the model S a n R a m o n V a l l e y B l v d S a n R a m o n V a l l e y B l v d San R a m o n V a l l e y B l v d San R a m o n V a l l e y B l v d C a m i n o R a m o n C a m i n o R a m o n Ir o n H o r s e T r a i l Ir o n H o r s e T r a i l C h e v r o n D r C h e v r o n D r B i s h o p R a n c h 1 B i s h o p R a n c h 1 S u n s e t D r S u n s e t D r T a l a v e r a D r T a l a v e r a D r Bollinger C a n y o n R d Bollinger C a n y o n R d Bishop D r Bishop D r 280680 95th Percentile Queue AM Existing with Project Conditions 95th Percentile QueuesFIGURE 8APM Existing with Project Conditions 95th Percentile QueuesFIGURE 8B This queue extends beyond the model Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 3 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 3 ( 4 1 9 ) 17 (23)510 (449)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 17 4 ( 2 3 4 ) 275 (334)318 (596)407 (657) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,164 (1,093)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 60 6 ( 7 5 2 ) 762 (953) 28 8 ( 3 5 1 ) 96 1 ( 7 3 2 ) 1,053 (1,381) 721 (443)1,263 (1,672) 22 8 ( 5 5 ) 22 9 ( 2 7 ) 65 ( 1 3 1 ) 21 (4)55 (95)46 (208) 3 ( 2 9 ) 10 ( 1 9 2 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 47 9 ( 1 5 0 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 65 ( 3 9 7 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 0 ( 0 ) 0 ( 0 ) 0 ( 0 ) 660 (479)1,354 (1,634)0 (0) 15 9 ( 6 5 7 ) 0 ( 0 ) 50 ( 2 1 2 ) 88 (145)1,825 (1,458)0 (0) 23 ( 9 4 ) 15 ( 2 9 ) 3 ( 2 4 ) 348 (119)955 (1,701)101 (26) 12 5 ( 4 5 7 ) 22 ( 6 ) 13 3 ( 4 4 0 ) 372 (284)1,765 (1,052)28 (1) 1,416 (1,582)371 (303) 789 (1,070)762 (953) 1,053 (1,381)363 (201) 1,551 (2,023) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp I-68 0 NB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-6 8 0 N B O n - R a m p 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment (Pre-Pass-By) FIGURE 6A 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)42 (39)8 (8) 31 (71) 12 6 ( 2 6 3 ) 58 (59) 10 1 ( 2 4 0 ) 157 (334) 212 (228)286 (242) 23 ( 1 5 ) 24 ( 1 6 ) 8 (17) 8 ( 1 9 ) 47 ( 3 1 ) 16 ( 3 6 ) 37 6 ( 4 0 8 ) 47 ( 3 1 ) 87 ( 4 4 ) 53 (125)205 (449) 16 ( 3 6 ) 122 (62)54 (120) 12 2 ( 6 2 ) 78 ( 8 7 ) 12 0 ( 1 5 3 ) 87 (44)53 (125) 47 ( 1 0 3 ) 54 (120)55 (119) 157 (334) 228 (183)58 (59) 157 (334) 286 (242) F C A AC F C A C F C CF AC F C C C ACF CF C AC ACF CF C AC C CF C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. Total pass-by ins differ from total pass-by outs (because retail in/out split is not 50:50) resulting in non-zero net pass-by volumes that are propogated out from the project site to maintain balanced volumes between intersections. * ** ** * ** 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Pass-By Assignment FIGURE 6B -8 (7)-8 (7)-8 (7) -4 ( - 2 ) -4 ( - 2 ) 8 ( 4 9 ) 3 ( 1 5 ) 6 ( 4 2 ) -6 (-15)-12 (-52)18 (67) -1 ( - 1 4 ) 1 ( 1 9 ) 0 ( - 5 ) -1 (-2)-15 (-28)10 (28) 5 ( 2 6 ) 2 ( 7 ) 3 ( 3 7 ) -7 (-22)1 (7) -1 ( - 7 ) 1 ( 1 4 ) 0 ( - 7 ) -2 (-6)-10 (-21)12 (27)-8 (7)-8 (7) C C C C C ACFAC F ACF AC F ACF CF ACF AC F C C I-6 8 0 N B O n - R a m p Note: Negative values are diverted retail pass-by trips. 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway Project Trip Assignment FIGURE 6C 4 ( 1 0 ) 21 (49) 6 ( 1 2 ) 8 (12)34 (46)8 (8) 32 (71) 12 6 ( 2 6 3 ) 50 (66) 10 1 ( 2 4 0 ) 157 (334) 212 (228)278 (249) 23 ( 1 5 ) 20 ( 1 4 ) 8 (17) 8 ( 1 9 ) 43 ( 2 9 ) 16 ( 3 6 ) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) -6 (-15)41 (73)223 (516) -1 ( - 1 4 ) 17 ( 5 5 ) -1 (-2)107 (34)64 (148) 12 7 ( 8 8 ) 80 ( 9 4 ) 12 3 ( 1 9 0 ) 80 (22)54 (132) -1 ( - 7 ) 48 ( 1 1 7 ) 0 ( - 7 ) -2 (-6)44 (99)67 (146) 157 (334) 228 (183)50 (66) 157 (334) 278 (249) F C A AC F C A C F C CF AC F C C C ACFAC F CF AC F ACF CF ACF AC F C CF C C Existing with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 7 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 17 6 ( 1 1 0 ) 31 5 ( 2 9 0 ) 49 7 ( 4 2 9 ) 17 (23)531 (498)250 (154) 9 ( 1 5 ) 25 6 ( 3 3 3 ) 18 0 ( 2 4 6 ) 283 (346)352 (642)415 (665) 0 ( 1 ) 0 ( 0 ) 17 ( 4 0 ) 1,195 (1,164)13 (9) 23 8 ( 6 3 3 ) 12 ( 2 0 ) 73 2 ( 1 , 0 1 5 ) 812 (1,019) 28 8 ( 3 5 1 ) 1, 0 6 2 ( 9 7 2 ) 1,210 (1,715) 933 (671)1,541 (1,921) 25 1 ( 7 0 ) 24 9 ( 4 1 ) 65 ( 1 3 1 ) 21 (4)55 (95)54 (225) 3 ( 2 9 ) 18 ( 2 1 1 ) 4 ( 2 5 ) 30 (9)56 (103)28 (73) 16 7 ( 2 8 3 ) 52 2 ( 1 7 9 ) 10 2 ( 1 9 1 ) 12 (24)3 (16)99 (324) 9 ( 4 3 ) 81 ( 4 3 3 ) 10 ( 3 3 ) 31 (39)14 (22)45 (148) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 654 (464)1,395 (1,707)223 (516) 15 8 ( 6 4 3 ) 17 ( 5 5 ) 50 ( 2 0 7 ) 87 (143)1,932 (1,492)64 (148) 15 0 ( 1 8 2 ) 95 ( 1 2 3 ) 12 6 ( 2 1 4 ) 348 (119)1,035 (1,723)155 (158) 12 4 ( 4 5 0 ) 70 ( 1 2 3 ) 13 3 ( 4 3 3 ) 370 (278)1,809 (1,151)95 (147) 1,573 (1,916)371 (303) 1,017 (1,253)812 (1,019) 1,210 (1,715)363 (201) 1,829 (2,272) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C Cumulative with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic Control FIGURE 9 20 0 ( 1 7 0 ) 36 0 ( 3 7 0 ) 54 4 ( 5 0 0 ) 20 (30)581 (639)280 (200) 10 ( 3 0 ) 31 0 ( 4 5 0 ) 18 6 ( 2 7 2 ) 328 (392)414 (776)478 (768) 0 ( 1 0 ) 0 ( 0 ) 20 ( 5 0 ) 1,291 (1,401)20 (10) 34 0 ( 8 1 0 ) 20 ( 2 0 ) 1, 0 0 6 ( 1 , 1 6 3 ) 880 (1,116) 39 0 ( 7 8 0 ) 1, 2 3 1 ( 1 , 1 6 0 ) 1,367 (1,854) 1,132 (1,048)1,598 (1,959) 27 3 ( 7 5 ) 27 0 ( 4 4 ) 80 ( 1 4 0 ) 30 (10)60 (100)68 (257) 10 ( 3 0 ) 18 ( 2 3 9 ) 10 ( 3 0 ) 30 (10)60 (110)30 (80) 19 0 ( 3 1 0 ) 56 3 ( 1 8 9 ) 12 0 ( 2 2 0 ) 20 (30)10 (20)130 (370) 10 ( 5 0 ) 96 ( 4 8 6 ) 10 ( 4 0 ) 40 (40)20 (30)60 (170) 38 4 ( 4 5 7 ) 50 ( 4 6 ) 93 ( 8 6 ) 724 (515)1,651 (1,983)223 (516) 20 9 ( 7 4 6 ) 17 ( 5 5 ) 60 ( 2 2 5 ) 99 (158)2,137 (1,804)64 (148) 15 7 ( 2 0 8 ) 11 0 ( 1 5 4 ) 13 3 ( 2 2 0 ) 380 (140)1,250 (1,982)174 (172) 14 9 ( 5 3 3 ) 98 ( 1 3 7 ) 17 0 ( 4 8 3 ) 408 (324)1,994 (1,369)107 (156) 1,887 (2,124)430 (490) 1,108 (1,623)880 (1,116) 1,367 (1,854)520 (270) 1,988 (2,739) AACCFAC C F AACE AA C C F DCC C E ABFF CC C AFFFCC C CC C F BCFAC F BE AE AACCEBF ACE AA E ABFAA C C C C F ABFF AA C C C C F ACFAA C C C C F AAEF AA C C C C F CC C F CC F CC E CC C 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp 1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd 4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd 7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd Bollinger Canyon Rd I-68 0 NB On-Ramps I-68 0 NB Off -Ramps Bishop Dr Sun set Dr Shops Sun set Dr Bollinger Canyon Rd Sun set Chevron Dr Bollinger Canyon Rd Camino Ramon Bishop Ranch 1 Bollinger Canyon Rd I-68 0 SB O n-Ramp 9. I-680 NB On-Ramp/Bollinger Canyon Rd Bollinger Canyon Rd Bollinger Canyon Rd I-680 SB Off -Ramps Dri veway I-68 0 NB O n-Ramp S a n R a m o n V all e y Blv d S a n R a m o n V all e y Blv d Norris C a n y on R d Norris C a n y on R d S a n R a m o n V a ll e y Blv d S a n R a m o n V a ll e y Blv d Alcosta Blvd Alcosta Blvd Bollin ger Canyon Rd Bollin ger Canyon Rd T ala v e r a D r T ala v e r a D r C a m in o R a m o n C a m in o R a m o n M o r g a n D r M o r g a n D r Bollinger Canyon R dBollinger Canyon R d C h e v r o n D r C h e v r o n D r džĞĐƵƟǀ Ğ  W Ŭ ǁ LJ džĞĐƵƟǀ Ğ  W Ŭ ǁ LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi s h o p R a n c h 1 Bi s h o p R a n c h 1 S u n s e t D r S u n s e t D r 280680 1 2 3 4 5 6 7 8 9 0 0.1 0.2 Miles Project Site Study Intersection# AM (PM) Peak Hour Traffic Volumes XX (YY) Signalized Intersection P Appendix A. Traffic Counts www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 1 3 4 2 2 1 1 3 17 6 Date: 02/20/2025Peak Hour Count Period: 7:00 AM 9:00 AM SB 1.9%0.72 TOTAL 2.1%0.86 TH RT WB 3.2%0.86 NB 2.0%0.97 Peak Hour: 7:45 AM 8:45 AM HV %:PHF EB 1.1%0.80 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min TotalUTLTTHRT 4 57 27 24 1 12 26 22 1 302 0 7:15 AM 0 3 70 17 27 0 6 20 72 07:00 AM 0 3 56 5 4 36 24 21 35 2 505 0 7:45 AM 0 3 135 84 40 1 20 42 81 0 364 0 7:30 AM 0 2 98 40 3 73 47 27 81 0 15 26 0 768 1,939 8:00 AM 0 7 124 97 4 96 77 70 107 0 30 83 31807749046 5 87 60 75 0 45 44 98 4 855 2,492 8:15 AM 0 2 106 49 70 0 35 79 120 0 30 30 1 592 2,936 8:45 AM 0 1 77 23 40 0 50 79 112 0 721 2,849 8:30 AM 0 5 95 20 8 65 57 87 106 0 53 45 1 505 2,673641050242558565544018 Count Total 0 26 761 335 37 550 424 243 364 17 4,612 0 Peak Hour All 0 17 460 369 2 232 468 784 0 0 4 4 0 62 051102107 9 2,936 0 HV 0 0 4 4 0 11 176 315 445 0 157 256250183282712340 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 2%-3%2%0%2%3%2%5%-1%3%HV%-0%1%2%0% 0 0 7:15 AM 3 8 4 2 17 0 0 0 0 0 0 1 0 West North South 7:00 AM 0 8 4 2 14 0 EB WB NB SB Total East 7:45 AM 3 6 4 2 15 0 0 0 0 0 4 1 7:30 AM 0 7 4 1 12 0 0 0 0 0 0 1 1 0 0 1 8:15 AM 2 11 4 0 17 0 0 0 0 0 0 0 1 0 0 2 8:00 AM 2 4 3 4 13 0 0 0 0 0 0 0 8:45 AM 2 7 12 6 27 0 0 1 0 0 0 1 8:30 AM 1 6 8 2 17 0 0 0 0 0 0 0 0 0 0 2 1001010 2 10 Peak Hour 8 27 19 8 62 0 0 0 1 0 1 3 2Count Total 13 57 43 19 132 0 4000110 0 0 0 0 0 0 000 0 0 0 0 4 1 1 N San Ramon Valley Blvd Bollinger Canyon Rd Bollinger Canyon Rd Sa n R a m o n Va l l e y B l v d Bollinger Canyon Rd Sa n R a m o n Va l l e y B l v d 2,936TEV:0.86PHF: 9 25 6 15 7 42 2 56 6 0 234 271 328 851 1,08018 44 5 31 5 17 6 93 6 83 4 0 250 460 17 727 456 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. SouthboundNorthboundWestboundEastbound Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min Total Rolling One HourEastboundWestbound 1 1 0 14 0 7:15 AM 0 0 0 3 4 0 0 0 4 0 TH RT 7:00 AM 0 0 0 0 0 4 0 UT LT TH RT UT LT 17 0 7:30 AM 0 0 0 0 0 3 3 0 4 0 2 0 0070100 0 2 1 3 0 0 0 1 0 12 0 7:45 AM 0 0 2 1 1 0 1 0 3 0 2 2 0 13 57 8:15 AM 0 0 1 1 1 0 0 1 2 0 15 58 8:00 AM 0 0 0 2 0 1 2 1 3 0 1 1 0 17 57 8:30 AM 0 0 1 0 0 5 0 1 2 0 0 0 0032601 0 4 1 2 0 0 1 1 0 17 62 8:45 AM 0 0 2 0 1 0 1 7 0 0 27 740120240 9 10 0 132 0 Peak Hour 0 0 4 4 19 0 3 10 30 0Count Total 0 0 6 7 0 29 9 0 07:00 AM RT 62 0 Interval Start Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min Total Rolling One Hour 10 7 0 4 4 001151102 RTTHLT RTTHLTRT 0 8:00 AM 0000 0 0 7:45 AM 0 0 0 0 0 7:30 AM 00000007:15 AM 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 8:30 AM 0000000 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 110010000 Peak Hour 0 0Count Total 0 THLT 0000000 1 00010 0 0 0 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 0 0 0 0 0 0 000 0 0 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 2 0 0 0 1 0 1 2 6 4 Date: 02/20/2025Peak Hour Count Period: 4:00 PM 6:00 PM SB 0.0%0.88 TOTAL 1.3%0.97 TH RT WB 2.5%0.84 NB 1.3%0.92 Peak Hour: 5:00 PM 6:00 PM HV %:PHF EB 0.4%0.88 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min TotalUTLTTHRT 0 117 85 52 0 20 42 55 3 606 0 4:15 PM 0 4 91 23 48 0 37 87 46 04:00 PM 0 2 88 22 3 74 99 36 45 2 565 0 4:45 PM 0 5 77 33 53 0 23 63 78 1 644 0 4:30 PM 0 4 93 20 1 63 83 70 86 0 45 48 3 624 2,439 5:00 PM 0 2 101 44 4 100 99 60 83 0 52 61 40829455018 2 109 86 55 0 19 35 91 5 707 2,540 5:15 PM 0 8 102 38 44 0 26 71 85 0 48 83 4 722 2,787 5:45 PM 0 8 67 22 53 0 47 79 83 0 734 2,630 5:30 PM 1 7 79 39 2 107 90 80 84 0 51 98 2 746 2,9099096147681210913868029 Count Total 1 40 698 241 14 761 774 356 549 24 5,348 0 Peak Hour All 1 25 349 428 0 219 600 641 2 0 0 0 0 39 02210163 12 2,909 0 HV 0 0 2 0 0 4 121 320 348 1 181 340143104254132200 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 1%0%0%0%0%1%1%0%10%-1%2%HV%0%0%1%0%0% 1 0 4:15 PM 0 2 0 0 2 0 0 0 0 0 0 1 0 West North South 4:00 PM 0 0 0 2 2 0 EB WB NB SB Total East 4:45 PM 0 3 1 0 4 0 0 0 0 0 0 0 4:30 PM 0 6 0 1 7 0 0 0 0 0 0 0 0 0 0 1 5:15 PM 1 6 3 0 10 1 0 0 0 0 0 0 0 0 0 0 5:00 PM 1 5 2 0 8 0 0 0 0 0 0 0 5:45 PM 0 8 2 0 10 0 1 0 0 0 1 0 5:30 PM 0 8 3 0 11 0 0 1 1 0 2 0 0 0 0 1 1000000 2 3 Peak Hour 2 27 10 0 39 1 0 0 2 0 3 1 0Count Total 2 38 11 3 54 1 3203001 0 1 0 0 0 0 020 0 0 0 1 3 0 0 N San Ramon Valley Blvd Bollinger Canyon Rd Bollinger Canyon Rd Sa n R a m o n Va l l e y B l v d Bollinger Canyon Rd Sa n R a m o n Va l l e y B l v d 2,909TEV:0.97PHF: 12 34 0 18 1 53 4 56 6 1 220 413 425 1,068 88810 34 8 32 0 12 1 78 9 90 8 0 143 349 25 518 547 1 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. SouthboundNorthboundWestboundEastbound Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min Total Rolling One HourEastboundWestbound 1 1 0 2 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 TH RT 4:00 PM 0 0 0 0 0 0 0 UT LT TH RT UT LT 2 0 4:30 PM 0 0 0 0 0 1 0 0 0 0 0 0 0000200 0 2 0 1 0 1 1 0 0 7 0 4:45 PM 0 0 0 0 5 0 0 0 0 0 0 0 0 8 21 5:15 PM 0 0 1 0 4 0 0 1 1 0 4 15 5:00 PM 0 0 1 0 0 1 0 0 0 0 0 0 0 10 29 5:30 PM 0 0 0 0 0 0 1 1 1 0 0 0 0000601 0 3 1 4 0 0 0 0 0 11 33 5:45 PM 0 0 0 0 7 0 0 2 1 0 10 39200000 2 1 0 54 0 Peak Hour 0 0 2 0 29 0 2 6 3 0Count Total 0 0 2 0 0 7 2 0 04:00 PM RT 39 0 Interval Start Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min Total Rolling One Hour 6 3 0 0 0 00422101 RTTHLT RTTHLTRT 0 5:00 PM 0000 0 0 4:45 PM 0 0 0 0 0 4:30 PM 00000004:15 PM 0 0 0 0 0 0 1 3 5:45 PM 0 1 0 0 2 5:30 PM 2000001 0 0 5:15 PM 0 0 0 0 1 0 0 0 0 0 0 0 300000000 Peak Hour 0 0Count Total 0 THLT 3000002 3 00020 0 0 0 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 0 0 0 0 0 0 010 0 0 0 010 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com WB 2.6%0.90 NB 6.7%0.75 HV %:PHF EB 1.6%0.87 TOTAL 2.2%0.96 Peak Hour --Peak Hour: 7:45 AM to 8:45 AM Date: 10/24/2024SB2.5%0.88 Count Period: 7:00 AM to 9:00 AMNWB 3,165TEV: 0.96PHF: I-680 SB Ramps Bollinger Canyon Rd N 0 Bollinger Canyon Rd 1525 6 0 0 1140 0 Bollinger Canyon Rd 1,088 853 0715 0 0 13 360 0 I-68 0 S B R a m p s Pa r k & R i d e D w y 0 81 0 63 7 0 023 8 56 0 012 1,252 1,279 0 615 0 637 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries 0002,4482,8343,079 3,1653,047 0 0 0 0 Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. 13 6 0 1 4 1 5 0 0 2 I-680 SB On-Ramp 15-min Total Rolling Eastbound Westbound Northbound Southbound Northwestbound One RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps UT LT TH Hour 4 0 0 0 RT UT HL BL BR HRRTHRUTLTBLTHUTLTTHBRRTUTHLLTTH 7:15 AM 0 0 120 58 13 0 0 0 0 0 43120710335591200001005367:00 AM 0 0 87 49 146 63 2 0 0 6 43 0 0 00019095000701210 0 656 7:45 AM 0 0 218 92 2 0 0 3 76 0 0 0 000201320009513700 825 7:30 AM 0 0 4 0 0 0 82 0 0 0 0 0120148000134146000 8:15 AM 0 0 161 86 3 0 0 0 0 0 8175012604641891500000 0 0 781 8:00 AM 0 0 180 95 156 87 4 0 0 5 46 0 0 0002101290001841640 0 7428:45 AM 0 0 130 64 4 0 0 3 46 0 0 0 0013015700010817700 7078:30 AM 0 0 68 0 0 0 0 0330160030112160000Count Total 0 0 1,198 594 36 0 0 0 Peak Hour All 0 0 715 360 0 0 0 0 0 5,4952701,018 0 27 4609511,175 0 0 0 9 0 0 0 3,165HV008 560 0 12 238 0 0000411013000615637 0 0 71HV%--1%3%0%- 0 2 5 0 0 000010130001914090 SB NWBStartEBWBNBSBNWB -2% Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) 17%2%-----0%9%-2%---3%2%-- 7:15 AM 5 4 3 8 0 0 0 0 0 0 0 Total7:00 AM 3 5 2 21 0 31 0 0 Total East West North South SoutheastTotalEBWBNB 0 25 0 0 0 0 0 0 1 02000000000 19 0 0 0 0 0 0 2 2 7:45 AM 3 13 0 3 0 0 0 0 0 0 0 0 0 0 0 1 0 7:30 AM 5 9 1 10 8:15 AM 2 8 0 4 0 0 0 0 0 0 08:00 AM 5 6 0 5 0 16 0 0 0 22 0 0 0 0 0 0 0 01400000 0 5 0 27 0 0 0 0 0 0 0 0 8:45 AM 11 11 1 4 0 0 0 0 0 0 0 0 0 0 0 2 0 8:30 AM 7 6 1 8 0 11 2 Peak Hr 17 33 1 20 0 0 0 0 0 0 0Count Total 41 62 8 63 0 174 0 0 0 0 0 0 6 07100000 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles 000958074 71790 0 Two-Hour Count Summaries - Bikes 00 0 0 0 00 00 0 Westbound Northbound Southbound Northwestbound OneUTLTTHBRRTInterval Start Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps I-680 SB On-Ramp 15-min Total RollingEastboundBRHRHour7:00 AM 0 0 1 2 0 0 BL TH RT UT HL BLLTTHRTHRUTLTUTHLLTTHRTUT 7:15 AM 0 0 2 0 3130001800000020120004100200000200000030501004000 7:45 AM 0 0 3 0 0 0 0 0 0 0 25109001270000 0 0 19 7:30 AM 0 0 3 2 1 4 0 0 0 0 1 0 0 0000002000940 0 16 8:15 AM 0 0 1 1 0 0 0 0 2 0 0 0 0000030002400 14 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0000202053000 8:45 AM 0 0 8 3 0 0 0 0 0 0 22106002330000 0 0 27 8:30 AM 0 0 3 4 0 0 3 0 0 0000101000650Count Total 0 0 22 19 0 0 14 0 0 0 0 174Peak Hour 0 0 8 9 0 0 0 4 19 0 0 0 0008040000313100 LT RollingEastboundWestboundNorthboundSouthboundNorthwestboundOne 71 Interval Start Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps I-680 SB On-Ramp 15-min TotalUTLT 5 0 0 0 0 00101302019 7:00 AM 0 0 0 0 0 UT HL BL BR HR HourHRUTLTBLTHRTTHRTUTLTTHRT000THBRRTUTHL 0 0 0 0 0 0 0 0 0 0000000000000 0 07:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 07:15 AM 0 0 0 0 0 0 0 0 0 0 0 0000000000000 8:00 AM 0 0 0 0 0 0 0 0 0 0 0000000000000 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 000000000000000000 00000000000008:45 AM 0 0 0 0 Peak Hour 0 0 0 0 0 0 0 0 0 0 0 0000000000000Count Total 0 0 0 0 0 0 0000000000000000000 0 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com WB 2.3%0.92 NB 7.9%0.63 HV %:PHF EB 0.8%0.93 TOTAL 1.6%0.95 Peak Hour --Peak Hour: 4:45 PM to 5:45 PM Date: 10/24/2024SB0.8%0.94 Count Period: 4:00 PM to 6:00 PMNWB 3,664TEV: 0.95PHF: I-680 SB Ramps Bollinger Canyon Rd N 0 Bollinger Canyon Rd 3829 3 0 1 5320 0 Bollinger Canyon Rd 1,030 1,046 0730 0 0 9 291 0 I-68 0 S B R a m p s Pa r k & R i d e D w y 0 89 9 89 8 0 024 6 62 6 720 1,697 1,388 0 799 0 898 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries 0003,3163,4323,550 3,6643,633 0 0 0 0 Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. 14 7 1 0 0 0 0 2 5 6 I-680 SB On-Ramp 15-min Total Rolling Eastbound Westbound Northbound Southbound Northwestbound One RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps UT LT TH Hour 5 0 0 0 RT UT HL BL BR HRRTHRUTLTBLTHUTLTTHBRRTUTHLLTTH 4:15 PM 0 0 170 69 2 0 0 0 0 0 81650130010851611780002008504:00 PM 0 0 173 67 163 63 3 0 0 4 61 0 0 0104401360001732260 0 783 4:45 PM 0 0 181 83 1 0 0 4 49 0 0 0 0053014810018615800 867 4:30 PM 0 0 1 0 0 0 57 0 0 0 0 01220151070199173010 5:15 PM 0 0 201 74 2 0 0 0 0 0 9323015024582042520003 0 0 968 5:00 PM 0 0 185 70 163 64 5 0 2 8 58 0 0 0002001620002042550 0 8975:45 PM 0 0 159 59 2 0 0 1 73 0 0 0 00150016330019221800 8365:30 PM 0 0 67 0 0 0 0 0210147060212180010Count Total 0 0 1,395 549 21 0 0 0 Peak Hour All 0 0 730 291 0 0 0 0 0 6,9491801,187 8 44 5081,531 1,640 0 3 0 45 0 0 0 3,664HV006 626 7 20 246 0 001032509000799898 0 0 57HV%--1%1%0%- 3 0 1 0 0 0002103000327020 SB NWBStartEBWBNBSBNWB -2% Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) 0%0%-----6%20%-0%43%--4%1%-0% 4:15 PM 2 5 1 3 0 0 0 0 0 0 0 Total4:00 PM 3 5 0 1 0 9 0 0 Total East West North South SoutheastTotalEBWBNB 0 17 0 0 0 0 0 0 0 01100000010 15 0 0 0 0 0 0 0 0 4:45 PM 2 9 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 3 10 0 4 5:15 PM 3 9 0 2 0 0 0 0 0 0 05:00 PM 2 8 0 0 0 10 0 0 0 18 0 0 0 0 0 0 1 11400000 0 0 0 11 0 0 0 0 0 0 2 3 5:45 PM 4 6 0 1 0 0 0 0 0 0 0 0 0 0 0 3 3 5:30 PM 1 13 1 3 0 7 7 Peak Hr 8 39 3 7 0 0 0 0 0 0 0Count Total 20 65 4 16 0 105 0 0 0 0 0 0 3 45700000 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles 000525356 57530 0 Two-Hour Count Summaries - Bikes 00 0 0 0 00 00 0 Westbound Northbound Southbound Northwestbound OneUTLTTHBRRTInterval Start Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps I-680 SB On-Ramp 15-min Total RollingEastboundBRHRHour4:00 PM 0 0 3 0 0 0 BL TH RT UT HL BLLTTHRTHRUTLTUTHLLTTHRTUT 4:15 PM 0 0 1 0 91000000000000010002300110000000000000300032010 4:45 PM 0 0 2 0 0 0 0 0 0 0 17004000820000 0 0 15 4:30 PM 0 0 1 2 0 2 0 0 0 0 0 0 0 0001102000630 0 10 5:15 PM 0 0 3 0 0 0 0 0 0 0 0 0 0000000007100 14 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0000110072000 5:45 PM 0 0 2 2 0 0 0 0 0 0 180002011210001 0 0 11 5:30 PM 0 0 1 0 0 0 0 0 0 0000001000330Count Total 0 0 13 7 0 0 7 0 0 0 0 105Peak Hour 0 0 6 2 0 0 0 0 1 0 0 0 0021012300481701 LT RollingEastboundWestboundNorthboundSouthboundNorthwestboundOne 57 Interval Start Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps I-680 SB On-Ramp 15-min TotalUTLT 1 0 0 0 0 0210330032 4:00 PM 0 0 0 0 0 UT HL BL BR HR HourHRUTLTBLTHRTTHRTUTLTTHRT000THBRRTUTHL 0 0 0 0 0 0 0 0 0 0000000000000 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0000000000000 5:00 PM 0 0 0 0 0 0 0 0 0 0 0000000000000 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 000000000000000000 00000000000005:45 PM 0 0 0 0 Peak Hour 0 0 0 0 0 0 0 0 0 0 0 0000000000000Count Total 0 0 0 0 0 0 0000000000000000000 0 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 0 0 0 0 0 0 0 0 0 00000000 0 0 Peak Hour 27 38 35 0 100 0 0 0 0 0 0 0 0Count Total 51 64 66 0 181 0 0 0 00000008:45 AM 7 8 5 0 20 0 0 0 0 0 0 0 8:30 AM 5 11 7 0 23 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 10 9 7 0 26 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 4 11 10 0 25 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 6 10 11 0 27 0 0 0 0 0 0 0 0 0 0 18 0 EB WB NB SB Total East 7:45 AM 8 7 11 0 26 0 0 0 -5%-HV%--2%2%- 0 0 7:15 AM 3 5 8 0 16 0 0 0 0 0 0 0 0 West North South 7:00 AM 8 3 7 0 288 0 866 0 0 0363001,057 603 0 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 3%----2%-2%2% Peak Hour All 0 0 950 1,076 0 494 0 1,539 0 0 0 0 0 100 02513013022 0 4,127 0 HV 0 0 18 9 0 Count Total 1 0 1,631 670 0 0 1,807 0 0 0 7,218 0 992 4,0890239000000233127063 0 0 0 984 4,127 8:45 AM 0 0 259 71 157 0 49 0 224 0 1,037 3,998 8:30 AM 0 0 220 76 0 0 258 0 217 0 0 0 000270153086 0 0 0 1,076 3,674 8:15 AM 0 0 230 81 128 0 87 0 228 0 1,030 3,129 8:00 AM 0 0 261 100 0 0 272 0 197 0 0 0 000257165066 0 0 0 855 0 7:45 AM 0 0 239 106 137 0 58 0 168 0 713 0 7:30 AM 0 0 196 107 0 0 189 0 158 0 0 0 000181113050 0 0 0 531 0 7:15 AM 1 0 139 71 96 0 35 0 108 07:00 AM 0 0 87 58 0 0 147 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min TotalUTLTTHRT Date: 10/22/2024 Peak Hour Count Period: 7:00 AM 9:00 AM SB -- TOTAL 2.4%0.96 TH RT WB 2.3%0.98 NB 3.0%0.92 Peak Hour: 7:45 AM 8:45 AM HV %:PHF EB 2.1%0.91 0 0 0 0 0 0 000 0 0 0 0 0 0 0 N I-680 NB Ramps Bollinger Canyon Rd Bollinger Canyon Rd I-68 0 N B R a m p s Bollinger Canyon Rd I-68 0 N B R a m p s 4,127TEV: 0.96PHF: 0 0 0 0 60 3 0 603 1,057 0 1,660 1,8160 86 6 0 28 8 1, 1 5 4 36 3 0 363 950 0 1,313 1,345 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 0 0 000 0 0 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 0 0 0 0 0 0 THLT 0000000 0 00000 0 0 0 0 Peak Hour 0 0Count Total 0 000000000 0 0 8:45 AM 0 0 0 0 0 8:30 AM 0000000 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0000 0 0 7:45 AM 0 0 0 0 0 7:30 AM 00000007:15 AM 0 0 0 0 0 0 0 07:00 AM RT 100 0 Interval Start Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min Total Rolling One Hour 0 22 0 0 0 0002513013 RTTHLT RTTHLTRT 0 0 0 181 0 Peak Hour 0 0 18 9 27 0 26 0 40 0Count Total 0 0 36 15 0 0 37 20 94020000002603 0 0 0 23 100 8:45 AM 0 0 5 2 4 0 3 0 4 0 26 104 8:30 AM 0 0 4 1 0 0 7 0 6 0 0 0 0006301 0 0 0 25 94 8:15 AM 0 0 8 2 4 0 3 0 7 0 26 87 8:00 AM 0 0 2 2 0 0 7 0 5 0 0 0 0005206 0 0 0 27 0 7:45 AM 0 0 4 4 4 0 3 0 8 0 16 0 7:30 AM 0 0 6 0 0 0 6 0 4 0 0 0 0003204 0 0 0 18 0 7:15 AM 0 0 2 1 2 0 3 0 4 0 TH RT 7:00 AM 0 0 5 3 0 0 1 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min Total Rolling One HourEastboundWestbound SouthboundNorthboundWestboundEastbound Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 0 0 0 0 0 0 0 0 0 00001000 0 0 Peak Hour 6 15 39 0 60 0 1 1 0 0 1 0 0Count Total 16 35 51 0 102 0 0 0 00000005:45 PM 1 3 4 0 8 0 0 0 0 0 0 0 5:30 PM 1 3 14 0 18 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 3 3 12 0 18 0 0 1 0 0 1 0 0 0 0 0 5:00 PM 1 5 6 0 12 0 0 0 0 0 0 0 0 0 0 0 4:30 PM 1 5 4 0 10 0 0 0 0 0 0 0 0 0 0 16 0 EB WB NB SB Total East 4:45 PM 1 4 7 0 12 0 0 0 -9%-HV%--0%2%- 0 0 4:15 PM 2 3 3 0 8 0 0 0 0 0 0 0 0 West North South 4:00 PM 6 9 1 0 351 0 707 0 0 0201001,414 375 0 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 1%----1%-0%2% Peak Hour All 0 0 1,281 818 0 659 0 1,343 0 0 0 0 0 60 07803306 0 4,329 0 HV 0 0 2 4 0 Count Total 0 0 2,311 417 0 0 2,795 0 0 0 8,343 0 1,012 4,327018700000032989096 0 0 0 1,083 4,329 5:45 PM 0 0 267 44 81 0 88 0 197 0 1,117 4,297 5:30 PM 0 0 295 42 0 0 380 0 197 0 0 0 000347103092 0 0 0 1,115 4,161 5:15 PM 0 0 320 58 94 0 88 0 161 0 1,014 4,016 5:00 PM 0 0 339 56 0 0 377 0 152 0 0 0 00031097083 0 0 0 1,051 0 4:45 PM 0 0 327 45 110 0 76 0 156 0 981 0 4:30 PM 0 0 269 60 0 0 380 0 169 0 0 0 000316124075 0 0 0 970 0 4:15 PM 0 0 250 47 120 0 61 0 124 04:00 PM 0 0 244 65 0 0 356 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min TotalUTLTTHRT Date: 10/22/2024 Peak Hour Count Period: 4:00 PM 6:00 PM SB -- TOTAL 1.4%0.97 TH RT WB 0.8%0.95 NB 3.7%0.92 Peak Hour: 4:45 PM 5:45 PM HV %:PHF EB 0.4%0.94 0 0 0 0 0 0 000 0 1 0 0 0 0 0 N I-680 NB Ramps Bollinger Canyon Rd Bollinger Canyon Rd I-68 0 N B R a m p s Bollinger Canyon Rd I-68 0 N B R a m p s 4,329TEV: 0.97PHF: 0 0 0 0 37 5 0 375 1,414 0 1,789 1,9880 70 7 0 35 1 1, 0 5 8 20 1 0 201 1,281 0 1,482 1,765 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 1 0 000 0 1 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 1 0 0 0 0 0 THLT 1000000 1 00000 0 0 0 0 Peak Hour 0 0Count Total 0 100000000 0 1 5:45 PM 0 0 0 0 1 5:30 PM 0000000 1 1 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0000 0 0 4:45 PM 0 0 0 0 0 4:30 PM 00000004:15 PM 0 0 0 0 0 0 0 04:00 PM RT 60 0 Interval Start Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min Total Rolling One Hour 0 6 0 0 0 00078033 RTTHLT RTTHLTRT 0 0 0 102 0 Peak Hour 0 0 2 4 18 0 42 0 9 0Count Total 0 0 7 9 0 0 17 8 56010000001203 0 0 0 18 60 5:45 PM 0 0 1 0 1 0 13 0 1 0 18 52 5:30 PM 0 0 0 1 0 0 2 0 2 0 0 0 00012010 0 0 0 12 42 5:15 PM 0 0 1 2 3 0 5 0 1 0 12 46 5:00 PM 0 0 0 1 0 0 2 0 2 0 0 0 0002205 0 0 0 10 0 4:45 PM 0 0 1 0 1 0 4 0 0 0 8 0 4:30 PM 0 0 0 1 0 0 4 0 1 0 0 0 0000302 0 0 0 16 0 4:15 PM 0 0 2 0 4 0 0 0 1 0 TH RT 4:00 PM 0 0 2 4 0 0 5 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min Total Rolling One HourEastboundWestbound SouthboundNorthboundWestboundEastbound Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 10 3 6 14 4 7 4 2 50 17 Date: 02/20/2025Peak Hour Count Period: 7:00 AM 9:00 AM SB 11.1%0.56 TOTAL 1.3%0.95 TH RT WB 4.8%0.68 NB 0.5%0.91 Peak Hour: 8:00 AM 9:00 AM HV %:PHF EB 0.0%0.96 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Bishop Dr Bishop Dr Sunset Dr Driveway 15-min TotalUTLTTHRT 0 10 9 3 0 31 0 3 0 88 0 7:15 AM 0 1 6 7 1 0 28 23 9 07:00 AM 0 1 4 14 0 3 2 1 3 2 127 0 7:45 AM 0 5 8 9 1 0 45 29 12 0 103 0 7:30 AM 0 1 11 13 0 6 3 26 9 0 0 1 0 168 486 8:00 AM 0 7 13 15 0 8 12 55 15 0 1 2 10497052 0 12 24 10 0 59 1 2 0 211 609 8:15 AM 0 6 17 9 3 0 60 70 20 0 0 2 1 188 780 8:45 AM 0 4 13 16 10 0 57 53 14 0 213 719 8:30 AM 0 3 17 15 0 5 11 51 17 0 2 5 1 220 83266190040031711067 Count Total 0 28 89 98 0 51 87 5 22 5 1,318 0 Peak Hour All 0 20 60 46 0 399 373 115 0 0 2 0 0 11 0100111 2 832 0 HV 0 0 0 0 0 5 243 240 70 0 3 135502864340 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 1%-67%0%0%1%18%2%0%-0%0%HV%-0%0%0%- 3 0 7:15 AM 0 2 1 0 3 0 0 0 0 0 0 2 5 West North South 7:00 AM 1 0 1 0 2 0 EB WB NB SB Total East 7:45 AM 1 3 0 0 4 0 0 0 2 0 4 0 7:30 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 3 0 2 8:15 AM 0 2 1 2 5 0 0 0 0 0 0 0 2 2 6 4 8:00 AM 0 1 0 0 1 0 0 0 0 0 0 2 8:45 AM 0 0 1 0 1 0 0 1 0 1 2 2 8:30 AM 0 3 1 0 4 0 0 0 0 0 0 0 2 3 2 0 0000000 16 14 Peak Hour 0 6 3 2 11 0 0 0 0 0 0 5 15Count Total 2 12 5 2 21 0 6000164 0 0 0 0 0 0 000 0 0 0 4 6 6 1 N Sunset Dr Bishop Dr Bishop Dr Su n s e t D r Bishop Dr Dr i v e w a y 832TEV:0.95PHF: 2 13 3 18 29 4 0 34 64 28 126 1330 70 24 0 24 3 55 3 96 0 55 60 20 135 309 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. SouthboundNorthboundWestboundEastbound Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Bishop Dr Bishop Dr Sunset Dr Driveway 15-min Total Rolling One HourEastboundWestbound 0 0 0 2 0 7:15 AM 0 0 0 0 0 0 1 0 0 0 TH RT 7:00 AM 0 0 0 1 0 0 0 UT LT TH RT UT LT 3 0 7:30 AM 0 0 0 0 0 1 0 0 0 0 0 0 0020001 0 1 1 1 0 0 0 0 0 1 0 7:45 AM 0 0 1 0 0 0 0 0 0 0 0 0 0 1 9 8:15 AM 0 0 0 0 0 0 0 0 0 0 4 10 8:00 AM 0 0 0 0 0 1 0 0 0 0 0 0 0 5 11 8:30 AM 0 0 0 0 0 2 1 0 0 0 2 0 0020001 0 0 0 0 0 0 0 0 0 4 14 8:45 AM 0 0 0 0 0 0 0 1 0 0 1 11010000 2 0 0 21 0 Peak Hour 0 0 0 0 1 0 3 1 1 0Count Total 0 0 1 1 0 9 2 0 07:00 AM RT 11 0 Interval Start Bishop Dr Bishop Dr Sunset Dr Driveway 15-min Total Rolling One Hour 1 1 0 2 0 0051001 RTTHLT RTTHLTRT 0 8:00 AM 0000 0 0 7:45 AM 0 0 0 0 0 7:30 AM 00000007:15 AM 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 8:30 AM 0000000 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 000000000 Peak Hour 0 0Count Total 0 THLT 0000000 0 00000 0 0 0 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 0 0 0 0 0 0 000 0 0 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 11 14 18 17 12 26 11 28 137 66 Date: 02/20/2025Peak Hour Count Period: 4:00 PM 6:00 PM SB 0.0%0.64 TOTAL 0.7%0.86 TH RT WB 3.3%0.84 NB 0.5%0.78 Peak Hour: 4:45 PM 5:45 PM HV %:PHF EB 0.0%0.91 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Bishop Dr Bishop Dr Sunset Dr Driveway 15-min TotalUTLTTHRT 0 17 30 2 0 17 5 40 2 212 0 4:15 PM 0 1 25 55 0 0 10 9 29 04:00 PM 0 0 22 58 0 19 18 5 41 5 240 0 4:45 PM 0 0 14 48 1 0 7 2 27 0 210 0 4:30 PM 0 3 34 71 0 15 29 4 25 0 2 31 1 184 846 5:00 PM 0 1 29 51 0 12 25 8 15 0 5 34 8018202012 0 17 31 3 0 12 6 81 8 271 905 5:15 PM 0 3 25 56 1 0 13 6 38 0 5 44 7 254 937 5:45 PM 0 2 16 36 3 0 14 8 43 0 228 923 5:30 PM 0 0 27 51 0 25 27 5 30 0 9 31 6 173 92652807224015231014 Count Total 0 10 192 426 0 138 203 44 324 41 1,772 0 Peak Hour All 0 4 95 13 0 99 47 235 0 0 0 0 0 7 0000100 29 937 0 HV 0 0 0 0 0 6 51 27 126 0 25 19020607210390 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 0%-0%0%0%1%8%0%0%-2%0%HV%-0%0%0%- 4 1 4:15 PM 2 2 0 0 4 1 0 0 0 0 0 2 4 West North South 4:00 PM 0 2 2 1 5 0 EB WB NB SB Total East 4:45 PM 0 0 0 0 0 0 1 2 2 7 7 7 4:30 PM 1 2 1 1 5 1 0 0 0 0 1 0 3 4 4 2 5:15 PM 0 1 0 0 1 0 0 1 0 0 1 4 2 4 5 7 5:00 PM 0 2 0 0 2 0 0 0 0 0 0 1 5:45 PM 0 0 0 0 0 0 0 3 0 7 1 11 5:30 PM 0 3 1 0 4 0 0 0 0 0 0 7 2 6 1 7 17000003 44 53 Peak Hour 0 6 1 0 7 0 1 1 0 0 3 22 18Count Total 3 12 4 2 21 2 2100115822 0 0 0 0 0 0 000 0 0 1 22 21 8 15 N Sunset Dr Bishop Dr Bishop Dr Su n s e t D r Bishop Dr Dr i v e w a y 937TEV:0.86PHF: 29 19 0 25 24 4 40 0 9 103 72 184 2460 12 62751 20 4 46 8 0 206 95 4 305 183 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. SouthboundNorthboundWestboundEastbound Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Bishop Dr Bishop Dr Sunset Dr Driveway 15-min Total Rolling One HourEastboundWestbound 0 1 0 5 0 4:15 PM 0 0 1 1 0 0 0 1 1 0 TH RT 4:00 PM 0 0 0 0 0 2 0 UT LT TH RT UT LT 4 0 4:30 PM 0 0 1 0 0 2 0 0 0 0 0 0 0011000 0 0 0 0 0 0 0 0 1 5 0 4:45 PM 0 0 0 0 0 0 0 0 1 0 0 0 0 2 11 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 14 5:00 PM 0 0 0 0 0 2 0 0 0 0 0 0 0 1 8 5:30 PM 0 0 0 0 0 3 0 0 0 0 0 0 0010000 0 0 0 0 0 0 0 0 0 4 7 5:45 PM 0 0 0 0 0 0 1 0 0 0 0 7000000 0 1 1 21 0 Peak Hour 0 0 0 0 0 0 1 1 2 0Count Total 0 0 2 1 0 11 1 0 04:00 PM RT 7 0 Interval Start Bishop Dr Bishop Dr Sunset Dr Driveway 15-min Total Rolling One Hour 0 0 0 0 0 0060001 RTTHLT RTTHLTRT 2 5:00 PM 0000 1 0 4:45 PM 0 0 0 0 0 4:30 PM 10000004:15 PM 0 0 0 0 0 0 0 1 5:45 PM 0 0 0 0 2 5:30 PM 0000000 1 3 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 100000000 Peak Hour 0 0Count Total 0 THLT 1000000 3 00000 0 0 0 0 0000 0 0 0 01 1 THLT 00000000 0 00 0 0 1 0 0 0 0 0 0 000 1 0 0 020 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 1 4 3 2 4 6 1 4 25 15 Date: 02/20/2025Peak Hour Count Period: 7:00 AM 9:00 AM SB 5.1%0.85 TOTAL 1.7%0.96 TH RT WB 1.1%0.87 NB 1.0%0.95 Peak Hour: 8:00 AM 9:00 AM HV %:PHF EB 3.4%0.85 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min TotalUTLTTHRT 0 12 1 8 0 25 3 16 2 140 0 7:15 AM 0 1 0 15 8 0 21 51 13 07:00 AM 0 0 1 13 0 11 1 1 15 2 185 0 7:45 AM 0 2 0 15 3 0 25 84 17 0 144 0 7:30 AM 0 0 0 25 0 12 1 55 10 0 7 9 1 209 678 8:00 AM 0 7 0 22 0 10 3 114 15 0 1 12 101424029 0 9 3 12 0 39 5 21 3 287 825 8:15 AM 0 0 3 35 10 0 50 134 22 0 3 16 2 289 1,055 8:45 AM 0 1 1 41 5 0 50 118 37 0 270 951 8:30 AM 0 3 0 33 0 16 6 116 29 0 1 20 3 299 1,145138240419208111148 Count Total 0 14 5 199 0 92 18 25 128 16 1,823 0 Peak Hour All 0 11 4 61 1 287 810 167 0 0 0 5 0 19 0100125 10 1,145 0 HV 0 0 0 5 0 0 187 506 112 0 13 7613104313381 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 4%-0%7%0%2%0%8%0%0%1%0%HV%-0%0%4%- 0 1 7:15 AM 0 0 1 2 3 0 0 0 0 0 0 0 0 West North South 7:00 AM 3 0 3 2 8 0 EB WB NB SB Total East 7:45 AM 0 1 0 2 3 0 0 0 2 0 1 2 7:30 AM 2 1 1 0 4 0 0 0 0 0 0 0 0 2 4 0 8:15 AM 1 0 2 2 5 0 0 0 0 0 0 0 0 1 1 0 8:00 AM 0 0 1 1 2 0 0 0 0 0 0 0 8:45 AM 4 0 1 2 7 0 0 0 0 0 1 4 8:30 AM 0 1 4 0 5 0 0 0 0 0 0 0 2 0 0 2 0000002 9 9 Peak Hour 5 1 8 5 19 0 0 0 0 0 0 2 5Count Total 10 3 13 11 37 0 5000226 0 0 0 0 0 0 000 0 0 0 6 5 2 2 N Sunset Dr City Center Driveway City Center Driveway Su n s e t D r Shops at Bishop Ranch Su n s e t D r 1,145TEV:0.96PHF: 10 76 13 99 55 5 0 38 13 43 94 1290 11 2 50 6 18 7 80 6 25 1 1 131 4 11 146 210 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. SouthboundNorthboundWestboundEastbound Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min Total Rolling One HourEastboundWestbound 0 2 0 8 0 7:15 AM 0 0 0 0 0 0 2 1 0 0 TH RT 7:00 AM 0 0 0 3 0 0 0 UT LT TH RT UT LT 3 0 7:30 AM 0 0 0 2 0 1 0 1 0 0 0 2 0000000 0 1 0 0 0 0 0 0 0 4 0 7:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 0 2 12 8:15 AM 0 0 0 1 0 0 0 0 1 0 3 18 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 2 0 5 14 8:30 AM 0 0 0 0 0 0 1 0 1 0 0 2 0000001 0 0 0 0 0 0 0 0 0 5 15 8:45 AM 0 0 0 4 0 0 0 1 3 0 7 19100020 0 11 0 37 0 Peak Hour 0 0 0 5 0 0 3 5 5 0Count Total 0 0 0 10 0 2 1 0 07:00 AM RT 19 0 Interval Start Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min Total Rolling One Hour 2 5 0 0 5 0001001 RTTHLT RTTHLTRT 0 8:00 AM 0000 0 0 7:45 AM 0 0 0 0 0 7:30 AM 00000007:15 AM 0 0 0 0 0 0 0 0 8:45 AM 0 0 0 0 0 8:30 AM 0000000 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 000000000 Peak Hour 0 0Count Total 0 THLT 0000000 0 00000 0 0 0 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 0 0 0 0 0 0 000 0 0 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 11 22 15 13 21 15 16 21 134 65 Date: 02/20/2025Peak Hour Count Period: 4:00 PM 6:00 PM SB 1.3%0.86 TOTAL 0.5%0.94 TH RT WB 0.5%0.88 NB 0.0%0.94 Peak Hour: 4:45 PM 5:45 PM HV %:PHF EB 0.3%0.87 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min TotalUTLTTHRT 0 27 6 10 0 73 5 103 7 390 0 4:15 PM 0 4 3 92 5 0 67 38 42 14:00 PM 0 9 3 77 0 24 9 10 108 10 383 0 4:45 PM 0 3 5 84 5 0 58 23 30 0 395 0 4:30 PM 0 8 3 79 0 40 9 30 47 0 8 83 12 375 1,543 5:00 PM 1 7 3 69 0 37 7 27 46 0 11 80 1003743065 0 41 7 10 0 71 1 125 10 408 1,561 5:15 PM 0 7 5 92 9 0 64 37 38 0 9 96 12 407 1,621 5:45 PM 0 6 5 86 15 0 69 45 41 0 431 1,597 5:30 PM 0 5 3 77 0 31 4 28 57 1 11 90 11 373 1,619343624561103867082 Count Total 1 49 30 656 0 275 52 59 741 83 3,162 0 Peak Hour All 1 22 16 64 0 549 262 337 4 0 1 5 0 8 0010000 43 1,621 0 HV 0 0 0 1 0 0 269 137 182 1 32 391322014622370 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 0%0%3%1%0%0%0%0%3%-0%0%HV%0%0%0%0%- 7 4 4:15 PM 1 1 0 1 3 0 0 0 0 0 0 0 0 West North South 4:00 PM 1 1 2 3 7 0 EB WB NB SB Total East 4:45 PM 1 0 0 0 1 0 0 0 2 2 11 16 4:30 PM 0 1 1 3 5 0 0 0 0 0 0 0 2 4 5 13 5:15 PM 0 0 0 1 1 0 0 0 0 0 0 0 3 0 6 7 5:00 PM 0 0 0 2 2 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 2 7 7 13 5:30 PM 0 1 0 3 4 0 0 0 0 0 0 0 1 1 0 14 7000000 46 78 Peak Hour 1 1 0 6 8 0 0 0 0 0 0 0 10Count Total 3 4 3 13 23 0 400000619 0 0 0 0 0 0 000 0 0 0 19 40 6 0 N Sunset Dr City Center Driveway City Center Driveway Su n s e t D r Shops at Bishop Ranch Su n s e t D r 1,621TEV:0.94PHF: 43 39 1 32 46 7 19 7 1 37 22 146 205 2300 18 2 13 7 26 9 58 8 85 9 0 322 16 22 361 335 1 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. SouthboundNorthboundWestboundEastbound Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min Total Rolling One HourEastboundWestbound 0 3 0 7 0 4:15 PM 0 0 0 1 1 0 1 0 1 0 TH RT 4:00 PM 0 1 0 0 0 0 0 UT LT TH RT UT LT 3 0 4:30 PM 0 0 0 0 0 1 0 0 0 0 0 1 0010000 0 0 0 0 0 0 0 3 0 5 0 4:45 PM 0 0 0 1 0 0 0 1 0 0 0 2 0 2 11 5:15 PM 0 0 0 0 0 0 0 0 0 0 1 16 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 9 5:30 PM 0 0 0 0 0 0 0 0 0 0 1 0 0000000 0 0 0 0 0 0 0 3 0 4 8 5:45 PM 0 0 0 0 1 0 0 0 0 0 0 7000000 1 12 0 23 0 Peak Hour 0 0 0 1 2 0 1 1 1 0Count Total 0 1 0 2 0 2 0 0 04:00 PM RT 8 0 Interval Start Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min Total Rolling One Hour 0 0 0 1 5 0000100 RTTHLT RTTHLTRT 0 5:00 PM 0000 0 0 4:45 PM 0 0 0 0 0 4:30 PM 00000004:15 PM 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 5:30 PM 0000000 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 000000000 Peak Hour 0 0Count Total 0 THLT 0000000 0 00000 0 0 0 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 0 0 0 0 0 0 000 0 0 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com Prepared by National Data & Surveying Services ID:24-080149-001 Day: City:San Ramon Date: AM 159 17 50 0 AM NOON 0000 NOON PM 657 4 210 1 PM AM NOON PM PM NOON AM 2 0.5 1.5 0 1 144 0 82 4 1451 0 1825 000 026095 621 0 466 2 TEV 4508 0 4808 0 200 1354 0 1583 4 PHF 0.98 0.95 269 0 10 1 0 1.5 0.5 1 AM NOON PM PM NOON AM PM 0 172 21 81 PM NOON 0000NOON AM 019512AM 0 NONE 04:45 PM - 05:45 PM 632 Chevron Dr/ Sunset Dr & Bollinger Canyon Rd Peak Hour Turning Movement Count Chevron Dr/ Sunset Dr Tuesday SOUTHBOUND 5/21/2024 4:00 PM - 06:00 PMPE A K H O U R S 07:45 AM - 08:45 AM 708 7:00 AM - 09:00 AM CO U N T P E R I O D S NONE 1876 0 1416 Cars (AM)20 HT (AM) Bo l l i n g e r C a n y o n R d EA S T B O U N D WE S T B O U N D Bo l l i n g e r C a n y o n R d 2003 0 2280 CONTROL Signalized Pedestrians (Crosswalks) Cars (PM)HT (PM) 0 381 NORTHBOUND Chevron Dr/ Sunset Dr Cars (NOON) HT (NOON) NOONAM PM PM AM AM NOON PM PM NOON AM AM NOON PM NOON NO O N PM AM NO O N AM PM NO O N AM PMNO O N PM AM 00 0 00 0 4 0 1 40 1 170 1 60 3 20 000 0 0 10 00 6 0 4 0 3 000 0 0 00 0 0 0 0 0 000 0 34 10 44 12 9 0 3 100 144 1441 610 1577 466 65 3 4 20 7 812117 2 0 0 00 0 0 0 0 0 000 82 1791 94269 1310 609 15 0 17 47 11519 P Appendix B: Intersection LOS Worksheet SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Volume and Delay by Movement AM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 176 173 98.5%71 5.0 E Through 315 309 98.1%49 5.7 D Right Turn 493 483 97.9%33 17.6 C Subtotal 984 965 98.1%45 8.0 D Left Turn 174 170 97.5%79 13.9 E Through 256 246 96.0%44 4.9 D Right Turn 9 11 118.9%17 17.3 B Subtotal 439 426 97.1%57 7.8 E Left Turn 17 18 103.5%63 19.3 E Through 510 528 103.5%38 5.7 D Right Turn 250 253 101.2%11 2.8 B Subtotal 777 798 102.7%30 5.1 C Left Turn 407 403 98.9%67 8.7 E Through 318 318 100.1%27 3.6 C Right Turn 275 273 99.3%8 3.2 A Subtotal 1,000 994 99.4%38 5.1 D Total 3,200 3,183 99.5%41 3.6 D 79.1 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 0 0 0.0%0 0.0 A Right Turn 17 16 94.7%9 3.7 A Subtotal 17 16 94.7%9 3.7 A Left Turn 606 607 100.1%15 1.4 B Through 12 12 98.3%15 8.6 B Right Turn 238 238 100.1%11 3.4 B Subtotal 856 857 100.1%14 1.6 B Through 1,164 1,169 100.4%12 1.1 B Right Turn 13 15 112.3%8 3.9 A Subtotal 1,177 1,183 100.5%12 1.1 B Through 762 756 99.1%19 8.3 B Subtotal 762 756 99.1%19 8.3 B Total 2,812 2,812 100.0%14 2.7 B 13.8 NB SB EB WB Served Volume (vph) NB SB EB WB Served Volume (vph) Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Volume and Delay by Movement AM Peak Hour Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 288 291 101.1%15 2.7 B Right Turn 961 970 100.9%20 3.7 B Subtotal 1,249 1,261 101.0%19 3.4 B Through 1,053 1,063 100.9%22 4.4 C Subtotal 1,416 1,416 100.0%17 3.6 B Through 474 463 97.6%28 3.2 C Right Turn 1,510 1,516 100.4%27 2.6 C Subtotal 1,984 1,978 99.7%27 2.3 C Total 4,649 4,656 100.1%22 1.7 C 24.9 Intersection 4 Sunset Drive/Bishop Drive Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 228 227 99.7%14 3.3 B Through 229 228 99.6%14 3.4 B Right Turn 65 63 97.2%3 1.0 A Subtotal 522 519 99.3%13 3.0 B Left Turn 4 3 65.0%5 7.1 A Through 10 11 108.0%19 13.4 B Right Turn 3 4 140.0%4 2.7 A Subtotal 17 18 103.5%14 8.4 B Left Turn 21 22 104.8%20 5.2 B Through 55 60 108.9%7 2.2 A Right Turn 46 46 99.3%2 0.5 A Subtotal 122 128 104.6%7 1.2 A Left Turn 28 24 87.1%16 7.2 B Through 56 52 92.7%6 4.0 A Right Turn 30 29 97.7%3 1.2 A Subtotal 114 106 92.6%8 3.4 A Total 775 769 99.3%11 2.3 B 20.7 EB WB Served Volume (vph) NB SB Served Volume (vph) NB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Volume and Delay by Movement AM Peak Hour Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 167 174 103.9%28 7.1 C Through 479 475 99.1%6 2.7 A Right Turn 102 102 100.1%3 2.3 A Subtotal 748 750 100.3%11 2.0 B Left Turn 10 11 106.0%21 15.1 C Through 65 62 95.7%11 4.7 B Right Turn 9 9 101.1%4 2.5 A Subtotal 84 82 97.5%12 3.4 B Left Turn 12 13 110.0%19 13.1 B Through 3 3 96.7%5 9.2 A Right Turn 99 102 102.5%3 0.3 A Subtotal 114 118 103.2%5 0.6 A Left Turn 45 44 98.0%17 4.5 B Through 14 17 118.6%15 8.8 B Right Turn 31 31 101.3%18 5.0 B Subtotal 90 92 102.3%17 3.1 B Total 1,036 1,042 100.6%11 1.6 B 24.9 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 0 0 0.0%0 0.0 A Through 0 0 0.0%0 0.0 A Right Turn 0 0 0.0%0 0.0 A Subtotal 0 0 0.0%0 0.0 A Left Turn 50 48 96.4%71 10.2 E Through 0 0 0.0%0 0.0 A Right Turn 159 159 100.3%5 2.8 A Subtotal 209 208 99.3%22 4.9 C Left Turn 660 668 101.2%84 24.2 F Through 1,354 1,362 100.6%4 1.1 A Right Turn 0 0 0.0%0 0.0 A Subtotal 2,014 2,031 100.8%30 7.9 C Left Turn 0 0 0.0%0 0.0 A Through 1,825 1,819 99.7%14 3.8 B Right Turn 88 84 94.9%7 3.5 A Subtotal 1,913 1,903 99.5%14 3.7 B Total 4,136 4,141 100.1%22 4.0 C 74.6 WB Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Volume and Delay by Movement AM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 23 21 93.0%72 17.4 E Through 15 15 100.7%63 28.0 E Right Turn 3 4 143.3%2 2.8 A Subtotal 41 41 99.5%68 17.0 E Left Turn 133 133 99.7%55 9.2 E Through 22 25 111.4%50 18.4 D Right Turn 125 123 98.2%24 7.7 C Subtotal 280 280 100.0%41 7.6 D Left Turn 348 347 99.8%73 6.8 E Through 955 963 100.8%11 3.8 B Right Turn 101 98 97.1%3 1.2 A Subtotal 1,404 1,409 100.3%26 4.7 C Left Turn 28 27 97.9%82 18.3 F Through 1,765 1,763 99.9%26 5.2 C Right Turn 372 364 97.8%8 1.2 A Subtotal 2,165 2,154 99.5%24 4.4 C Total 3,890 3,883 99.8%26 4.2 C 79.3 Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Volume and Delay by Movement AM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 176 176 100.1%73 8.6 E Through 315 317 100.7%43 2.9 D Right Turn 497 500 100.6%29 5.0 C Subtotal 988 993 100.5%41 2.5 D Left Turn 180 183 101.8%115 32.1 F Through 256 261 101.8%41 4.4 D Right Turn 9 10 111.1%21 26.2 C Subtotal 445 454 102.0%73 15.9 E Left Turn 17 16 94.7%76 26.6 E Through 531 528 99.3%37 5.0 D Right Turn 250 248 99.1%10 2.3 B Subtotal 798 791 99.2%30 4.2 C Left Turn 415 407 98.0%82 30.9 F Through 352 347 98.6%37 22.7 D Right Turn 283 278 98.2%19 23.8 B Subtotal 1,050 1,032 98.3%50 26.2 D Total 3,281 3,270 99.7%46 9.2 D 90.1 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 0 0 0.0%0 0.0 A Right Turn 17 17 101.2%7 3.1 A Subtotal 17 17 101.2%7 3.1 A Left Turn 732 736 100.5%16 2.7 B Through 12 13 110.0%18 7.7 B Right Turn 238 238 100.1%17 8.3 B Subtotal 982 987 100.5%16 3.6 B Through 1,195 1,197 100.2%14 1.2 B Right Turn 13 15 114.6%8 3.4 A Subtotal 1,208 1,212 100.3%13 1.3 B Through 812 796 98.0%28 14.1 C Subtotal 812 796 98.0%28 14.1 C Total 3,019 3,012 99.8%18 5.2 B 17.1 Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Volume and Delay by Movement AM Peak Hour Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 288 293 101.7%14 3.2 B Right Turn 1,062 1,082 101.9%19 1.8 B Subtotal 1,350 1,375 101.9%18 1.6 B Through 1,210 1,218 100.6%23 2.8 C Subtotal 1,573 1,573 100.0%19 2.4 B Through 524 513 97.8%28 3.2 C Right Turn 1,950 1,889 96.9%28 3.8 C Subtotal 2,474 2,402 97.1%28 2.9 C Total 5,397 5,350 99.1%23 1.8 C 27.2 Intersection 4 Sunset Drive/Bishop Drive Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 251 248 99.0%17 3.9 B Through 249 242 97.0%14 3.7 B Right Turn 65 64 98.3%5 1.8 A Subtotal 565 554 98.0%15 3.5 B Left Turn 4 4 97.5%19 15.9 B Through 18 20 108.9%20 7.1 C Right Turn 3 3 106.7%3 3.1 A Subtotal 25 27 106.8%20 6.0 C Left Turn 21 20 94.8%20 6.4 B Through 55 59 107.1%8 2.2 A Right Turn 54 56 103.7%2 0.9 A Subtotal 130 135 103.7%8 2.2 A Left Turn 28 27 97.9%18 5.1 B Through 56 54 96.4%8 3.8 A Right Turn 30 29 95.7%3 0.9 A Subtotal 114 110 96.6%9 1.9 A Total 834 826 99.0%13 2.1 B 20.4 EB WB Served Volume (vph) NB SB Served Volume (vph) NB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Volume and Delay by Movement AM Peak Hour Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 167 161 96.5%24 3.4 C Through 522 508 97.3%9 2.3 A Right Turn 102 98 96.0%5 1.6 A Subtotal 791 767 97.0%11 2.0 B Left Turn 10 10 102.0%19 16.2 B Through 81 85 104.8%10 3.9 B Right Turn 9 11 116.7%7 8.1 A Subtotal 100 106 105.6%11 4.0 B Left Turn 12 12 99.2%25 11.0 C Through 3 3 90.0%7 10.0 A Right Turn 99 97 98.2%4 0.4 A Subtotal 114 112 98.1%6 2.1 A Left Turn 45 44 96.7%18 7.0 B Through 14 14 100.7%20 15.4 C Right Turn 31 33 106.5%16 4.5 B Subtotal 90 91 100.7%18 5.9 B Total 1,095 1,075 98.2%11 1.8 B 23.4 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 384 385 100.2%54 4.7 D Through 50 50 99.8%55 16.1 E Right Turn 93 91 97.4%12 6.3 B Subtotal 527 525 99.7%47 5.3 D Left Turn 50 48 95.2%67 14.3 E Through 17 17 99.4%79 28.0 E Right Turn 158 160 101.3%3 1.0 A Subtotal 225 225 99.8%22 7.8 C Left Turn 654 643 98.3%77 20.2 E Through 1,395 1,420 101.8%39 5.9 D Right Turn 223 224 100.6%4 0.6 A Subtotal 2,272 2,288 100.7%46 6.5 D Left Turn 64 61 95.5%84 25.5 F Through 1,932 1,865 96.5%117 23.7 F Right Turn 87 80 92.3%71 21.8 E Subtotal 2,083 2,006 96.3%114 23.7 F Total 5,107 5,044 98.8%71 8.6 E 72.2 WB Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Volume and Delay by Movement AM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 150 155 103.1%97 32.0 F Through 95 96 100.9%44 10.5 D Right Turn 126 124 98.3%7 1.8 A Subtotal 371 374 100.9%55 14.8 D Left Turn 133 132 98.9%66 7.3 E Through 70 72 102.7%52 11.9 D Right Turn 124 131 106.0%28 7.4 C Subtotal 327 335 102.4%48 4.9 D Left Turn 348 343 98.4%93 12.2 F Through 1,035 1,054 101.9%10 2.5 B Right Turn 155 154 99.5%6 1.2 A Subtotal 1,538 1,551 100.8%28 3.0 C Left Turn 95 93 97.6%121 33.9 F Through 1,809 1,765 97.6%113 44.1 F Right Turn 370 357 96.4%58 44.2 E Subtotal 2,274 2,215 97.4%105 43.1 F Total 4,510 4,475 99.2%69 20.3 E 81.8 Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Volume and Delay by Movement AM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 176 169 96.1%65 8.8 E Through 315 320 101.5%41 6.6 D Right Turn 497 502 101.0%37 18.9 D Subtotal 988 991 100.3%43 9.0 D Left Turn 180 173 96.1%84 22.2 F Through 256 261 101.8%37 6.4 D Right Turn 9 11 124.4%12 16.4 B Subtotal 445 445 99.9%56 10.4 E Left Turn 17 17 99.4%80 17.8 F Through 531 535 100.8%61 15.3 E Right Turn 250 258 103.0%28 24.6 C Subtotal 798 810 101.4%51 17.3 D Left Turn 415 407 98.1%60 13.9 E Through 352 351 99.6%34 15.6 C Right Turn 283 269 95.1%12 15.0 B Subtotal 1,050 1,027 97.8%38 15.2 D Total 3,281 3,272 99.7%45 8.2 D 74.3 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 0 0 0.0%0 0.0 A Right Turn 17 18 105.9%14 6.0 B Subtotal 17 18 105.9%14 6.0 B Left Turn 732 719 98.3%46 7.7 D Through 12 11 93.3%46 20.6 D Right Turn 238 235 98.7%18 5.7 B Subtotal 982 966 98.3%39 6.8 D Through 1,195 1,199 100.3%13 3.2 B Right Turn 13 11 83.8%9 9.9 A Subtotal 1,208 1,210 100.1%13 3.2 B Through 812 792 97.5%25 9.7 C Subtotal 812 792 97.5%25 9.7 C Total 3,019 2,985 98.9%25 4.1 C 57.2 NB SB EB WB Served Volume (vph) NB SB EB WB Served Volume (vph) Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Volume and Delay by Movement AM Peak Hour Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 288 288 99.9%34 9.2 C Right Turn 1,062 1,053 99.2%43 13.5 D Subtotal 1,350 1,341 99.3%41 12.1 D Through 1,210 1,192 98.5%28 5.4 C Subtotal 1,573 1,553 98.7%22 4.2 C Through 524 510 97.3%30 4.2 C Right Turn 1,950 1,872 96.0%24 1.7 C Subtotal 2,474 2,381 96.2%26 1.2 C Total 5,397 5,275 97.7%29 3.8 C 39.6 Intersection 4 Sunset Drive/Bishop Drive Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 251 242 96.3%16 3.6 B Through 249 242 97.3%14 2.9 B Right Turn 65 63 97.5%4 0.9 A Subtotal 565 548 96.9%14 2.8 B Left Turn 4 3 80.0%12 13.2 B Through 18 19 106.1%24 5.6 C Right Turn 3 4 146.7%4 4.0 A Subtotal 25 27 106.8%21 5.4 C Left Turn 21 21 97.6%21 7.5 C Through 55 56 102.2%8 3.1 A Right Turn 54 58 107.0%2 0.4 A Subtotal 130 135 103.5%7 1.8 A Left Turn 28 29 103.6%22 8.8 C Through 56 57 101.6%9 3.2 A Right Turn 30 28 94.3%4 2.1 A Subtotal 114 114 100.2%10 2.7 B Total 834 823 98.7%12 1.6 B 21.3 EB WB Served Volume (vph) NB SB Served Volume (vph) NB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Volume and Delay by Movement AM Peak Hour Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 167 165 98.9%26 10.7 C Through 522 507 97.0%8 4.2 A Right Turn 102 107 104.5%4 1.7 A Subtotal 791 778 98.4%11 4.4 B Left Turn 10 10 102.0%23 19.5 C Through 81 89 109.5%12 4.7 B Right Turn 9 9 98.9%6 10.2 A Subtotal 100 108 107.8%12 4.7 B Left Turn 12 13 104.2%19 12.8 B Through 3 3 96.7%10 13.7 A Right Turn 99 106 106.9%4 0.7 A Subtotal 114 121 106.3%6 1.8 A Left Turn 45 47 104.7%16 5.6 B Through 14 14 101.4%30 16.9 C Right Turn 31 29 93.5%14 8.0 B Subtotal 90 90 100.3%18 2.5 B Total 1,095 1,098 100.2%12 3.7 B 26.4 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 384 377 98.1%55 3.8 D Through 50 54 107.0%52 13.2 D Right Turn 93 92 98.8%29 10.0 C Subtotal 527 522 99.1%50 3.7 D Left Turn 50 50 99.2%68 15.2 E Through 17 18 107.6%93 17.0 F Right Turn 158 171 107.9%3 1.2 A Subtotal 225 238 106.0%24 3.4 C Left Turn 654 639 97.7%76 19.2 E Through 1,395 1,386 99.3%39 6.1 D Right Turn 223 214 96.0%4 0.5 A Subtotal 2,272 2,239 98.6%47 8.6 D Left Turn 64 63 97.8%62 23.8 E Through 1,932 1,843 95.4%113 22.5 F Right Turn 87 83 95.7%75 25.3 E Subtotal 2,083 1,988 95.5%109 22.4 F Total 5,107 4,988 97.7%71 10.4 E 83.3 WB Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Volume and Delay by Movement AM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 150 146 97.1%69 23.5 E Through 95 94 98.9%41 9.2 D Right Turn 126 132 104.5%8 2.8 A Subtotal 371 371 100.1%40 11.2 D Left Turn 133 135 101.7%72 10.3 E Through 70 65 93.4%50 13.1 D Right Turn 124 121 97.7%27 3.8 C Subtotal 327 322 98.4%51 8.1 D Left Turn 348 344 98.8%101 12.7 F Through 1,035 1,025 99.1%10 3.2 B Right Turn 155 154 99.0%7 1.3 A Subtotal 1,538 1,523 99.0%30 5.5 C Left Turn 95 90 95.1%114 47.9 F Through 1,809 1,761 97.3%90 49.3 F Right Turn 370 358 96.7%35 37.7 D Subtotal 2,274 2,209 97.1%82 46.4 F Total 4,510 4,424 98.1%58 22.0 E 87.1 Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Volume and Delay by Movement PM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 110 114 103.9%72 12.0 E Through 290 290 100.1%52 8.0 D Right Turn 419 407 97.2%54 49.0 D Subtotal 819 812 99.1%56 21.8 E Left Turn 234 228 97.3%87 22.4 F Through 333 342 102.7%40 6.7 D Right Turn 15 15 102.7%25 12.1 C Subtotal 582 585 100.5%58 8.9 E Left Turn 23 25 109.1%70 13.3 E Through 449 444 98.9%52 9.1 D Right Turn 154 159 103.2%9 1.7 A Subtotal 626 628 100.3%42 6.6 D Left Turn 657 621 94.5%64 35.0 E Through 596 589 98.8%42 24.8 D Right Turn 334 325 97.3%25 26.6 C Subtotal 1,587 1,535 96.7%48 29.0 D Total 3,614 3,560 98.5%50 11.8 D 95.5 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 1 1 50.0%8 19.2 A Right Turn 40 41 102.8%11 5.1 B Subtotal 41 42 101.5%11 5.8 B Left Turn 752 739 98.2%38 4.5 D Through 20 20 99.5%46 11.3 D Right Turn 633 618 97.6%40 23.8 D Subtotal 1,405 1,376 97.9%39 9.6 D Through 1,093 1,065 97.5%30 9.1 C Right Turn 9 9 95.6%14 18.1 B Subtotal 1,102 1,074 97.5%30 9.0 C Through 953 924 96.9%37 8.2 D Subtotal 953 924 96.9%37 8.2 D Total 3,501 3,415 97.6%35 6.4 D 42.5 Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Volume and Delay by Movement PM Peak Hour Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 351 344 97.9%47 20.1 D Right Turn 732 736 100.5%40 3.5 D Subtotal 1,083 1,079 99.7%41 4.9 D Through 1,381 1,347 97.5%10 5.5 A Subtotal 1,582 1,542 97.5%9 4.7 A Through 602 599 99.6%27 7.2 C Right Turn 1,513 1,489 98.4%29 4.2 C Subtotal 2,115 2,089 98.7%28 4.0 C Total 4,780 4,710 98.5%25 3.5 C 39.5 Intersection 4 Sunset Drive/Bishop Drive Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 55 55 100.7%25 3.8 C Through 27 29 107.0%19 6.9 B Right Turn 131 127 97.2%7 1.2 A Subtotal 213 212 99.3%13 1.9 B Left Turn 25 23 92.4%22 11.1 C Through 192 194 100.9%26 8.5 C Right Turn 29 30 103.1%9 5.1 A Subtotal 246 247 100.3%24 7.8 C Left Turn 4 3 75.0%18 20.2 B Through 95 95 100.1%16 3.3 B Right Turn 208 199 95.9%7 3.2 A Subtotal 307 298 96.9%10 2.6 A Left Turn 73 70 96.3%29 9.1 C Through 103 105 101.7%10 1.0 B Right Turn 9 8 85.6%6 5.1 A Subtotal 185 183 98.8%17 3.9 B Total 951 939 98.7%16 3.4 B 27.8 EB WB Served Volume (vph) NB SB Served Volume (vph) NB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Volume and Delay by Movement PM Peak Hour Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 283 288 101.8%41 13.6 D Through 150 151 100.9%26 9.6 C Right Turn 191 195 102.0%17 5.2 B Subtotal 624 634 101.7%30 8.9 C Left Turn 33 31 92.7%56 14.7 E Through 397 391 98.4%36 5.8 D Right Turn 43 42 98.4%19 4.4 B Subtotal 473 463 98.0%35 5.8 D Left Turn 24 22 92.9%31 14.4 C Through 16 16 100.0%26 15.0 C Right Turn 324 318 98.0%10 3.6 B Subtotal 364 356 97.8%12 3.8 B Left Turn 148 146 98.6%38 7.5 D Through 22 23 102.7%40 9.7 D Right Turn 39 38 97.2%34 8.1 C Subtotal 209 207 98.8%37 5.9 D Total 1,670 1,660 99.4%29 5.2 C 52.4 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 0 0 0.0%0 0.0 A Through 0 0 0.0%0 0.0 A Right Turn 0 0 0.0%0 0.0 A Subtotal 0 0 0.0%0 0.0 A Left Turn 212 213 100.6%55 5.5 D Through 0 0 0.0%0 0.0 A Right Turn 657 642 97.7%15 5.3 B Subtotal 869 855 98.4%25 3.2 C Left Turn 479 483 100.8%68 18.4 E Through 1,634 1,612 98.7%15 2.3 B Right Turn 0 0 0.0%0 0.0 A Subtotal 2,113 2,095 99.1%28 5.6 C Left Turn 0 0 0.0%0 0.0 A Through 1,458 1,455 99.8%36 6.2 D Right Turn 145 152 104.8%16 4.4 B Subtotal 1,603 1,607 100.2%34 5.9 C Total 4,585 4,556 99.4%29 3.6 C 59.9 WB Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Volume and Delay by Movement PM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 94 97 102.9%62 6.3 E Through 29 32 111.4%58 16.7 E Right Turn 24 26 109.6%7 3.7 A Subtotal 147 155 105.6%53 4.0 D Left Turn 440 442 100.5%48 4.3 D Through 6 5 83.3%34 28.2 C Right Turn 457 460 100.6%19 3.5 B Subtotal 903 907 100.5%33 2.2 C Left Turn 119 118 99.0%68 7.7 E Through 1,701 1,681 98.8%20 5.6 C Right Turn 26 25 96.9%5 2.1 A Subtotal 1,846 1,824 98.8%23 5.4 C Left Turn 1 1 80.0%2 5.4 A Through 1,052 1,040 98.9%24 2.9 C Right Turn 284 295 104.0%5 1.1 A Subtotal 1,337 1,336 100.0%20 2.2 B Total 4,233 4,223 99.8%25 2.9 C 70.9 Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Volume and Delay by Movement PM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 110 108 98.3%69 9.7 E Through 290 293 101.1%47 5.8 D Right Turn 429 434 101.0%50 31.2 D Subtotal 829 835 100.7%52 16.3 D Left Turn 246 241 98.0%106 37.9 F Through 333 329 98.7%40 5.4 D Right Turn 15 15 98.0%21 15.8 C Subtotal 594 585 98.4%69 20.7 E Left Turn 23 22 96.1%90 26.4 F Through 498 492 98.7%67 17.2 E Right Turn 154 157 101.8%28 29.2 C Subtotal 675 671 99.3%59 18.7 E Left Turn 665 658 98.9%63 11.8 E Through 642 650 101.3%41 13.4 D Right Turn 346 340 98.2%27 13.5 C Subtotal 1,653 1,648 99.7%47 12.6 D Total 3,751 3,738 99.6%54 8.7 D 81.5 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 1 0 30.0%16 39.7 B Right Turn 40 37 93.5%9 5.2 A Subtotal 41 38 92.0%9 7.1 A Left Turn 1,015 1,004 98.9%51 3.5 D Through 20 19 93.5%56 19.3 E Right Turn 633 659 104.1%36 3.6 D Subtotal 1,668 1,682 100.8%45 2.3 D Through 1,164 1,159 99.6%18 3.7 B Right Turn 9 10 107.8%8 7.8 A Subtotal 1,173 1,169 99.7%18 3.7 B Through 1,019 988 97.0%41 5.5 D Subtotal 1,019 988 97.0%41 5.5 D Total 3,901 3,877 99.4%35 2.5 D 62.8 NB SB EB WB Served Volume (vph) NB SB EB WB Served Volume (vph) Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Volume and Delay by Movement PM Peak Hour Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 351 338 96.3%50 8.5 D Right Turn 972 976 100.4%47 5.1 D Subtotal 1,323 1,314 99.3%48 5.2 D Through 1,715 1,694 98.8%18 2.4 B Subtotal 1,916 1,897 99.0%17 2.3 B Through 668 645 96.6%18 3.7 B Right Turn 1,924 1,806 93.8%28 4.9 C Subtotal 2,592 2,451 94.6%25 3.6 C Total 5,831 5,662 97.1%28 2.5 C 43.1 Intersection 4 Sunset Drive/Bishop Drive Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 70 72 103.4%26 3.6 C Through 41 41 100.0%27 3.6 C Right Turn 131 127 97.3%7 1.3 A Subtotal 242 241 99.5%16 1.8 B Left Turn 25 23 91.2%27 13.1 C Through 211 211 100.1%31 4.7 C Right Turn 29 30 102.1%7 3.3 A Subtotal 265 264 99.5%28 5.3 C Left Turn 4 3 75.0%9 23.4 A Through 95 94 99.1%16 2.8 B Right Turn 225 219 97.5%7 2.4 A Subtotal 324 316 97.7%10 2.1 A Left Turn 73 73 99.6%39 5.6 D Through 103 109 106.1%13 1.9 B Right Turn 9 9 102.2%6 5.6 A Subtotal 185 191 103.4%23 3.3 C Total 1,016 1,012 99.6%19 2.5 B 32.0 EB WB Served Volume (vph) NB SB Served Volume (vph) NB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Volume and Delay by Movement PM Peak Hour Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 283 265 93.6%44 4.7 D Through 179 176 98.1%26 6.8 C Right Turn 191 194 101.8%14 5.4 B Subtotal 653 635 97.2%30 4.6 C Left Turn 33 32 97.3%56 15.2 E Through 433 427 98.5%38 4.3 D Right Turn 43 45 104.9%22 5.2 C Subtotal 509 504 99.0%38 4.3 D Left Turn 24 27 110.4%36 16.5 D Through 16 16 98.1%27 11.6 C Right Turn 324 332 102.5%13 4.5 B Subtotal 364 374 102.9%15 4.3 B Left Turn 148 151 102.1%40 3.2 D Through 22 23 104.5%36 7.2 D Right Turn 39 39 99.2%34 8.8 C Subtotal 209 213 101.8%38 3.8 D Total 1,735 1,726 99.5%30 2.9 C 64.3 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 457 465 101.6%63 5.9 E Through 46 48 105.0%60 6.5 E Right Turn 86 88 102.4%14 3.3 B Subtotal 589 601 102.0%55 5.0 E Left Turn 207 203 98.2%49 5.1 D Through 55 58 105.1%56 10.1 E Right Turn 643 644 100.2%19 3.9 B Subtotal 905 905 100.0%28 2.7 C Left Turn 464 461 99.2%63 4.8 E Through 1,707 1,727 101.2%47 5.6 D Right Turn 516 516 100.0%7 1.1 A Subtotal 2,687 2,704 100.6%42 3.7 D Left Turn 148 134 90.8%76 21.4 E Through 1,492 1,355 90.8%176 28.7 F Right Turn 143 132 92.3%128 32.9 F Subtotal 1,783 1,622 91.0%164 28.1 F Total 5,964 5,832 97.8%74 6.3 E 75.2 WB Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Volume and Delay by Movement PM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 182 172 94.5%110 73.3 F Through 123 125 101.8%44 11.3 D Right Turn 214 205 95.9%17 4.2 B Subtotal 519 502 96.8%58 30.3 E Left Turn 433 405 93.5%104 29.4 F Through 123 106 86.0%248 79.4 F Right Turn 450 392 87.2%181 74.1 F Subtotal 1,006 903 89.8%155 54.4 F Left Turn 119 113 94.9%48 10.6 D Through 1,723 1,707 99.1%51 8.2 D Right Turn 158 157 99.1%21 3.2 C Subtotal 2,000 1,977 98.8%48 7.3 D Left Turn 147 141 95.9%100 13.8 F Through 1,151 1,128 98.0%82 44.7 F Right Turn 278 270 97.0%16 22.7 B Subtotal 1,576 1,538 97.6%73 36.1 E Total 5,101 4,920 96.5%74 20.7 E 93.0 Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Volume and Delay by Movement PM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 110 109 99.1%70 8.2 E Through 290 289 99.6%43 3.5 D Right Turn 429 418 97.5%62 22.3 E Subtotal 829 816 98.4%57 11.6 E Left Turn 246 244 99.1%81 13.5 F Through 333 332 99.5%38 5.5 D Right Turn 15 14 93.3%25 16.2 C Subtotal 594 589 99.2%55 6.4 E Left Turn 23 22 93.5%65 13.2 E Through 498 503 101.0%68 12.3 E Right Turn 154 150 97.7%28 25.6 C Subtotal 675 675 100.0%59 14.2 E Left Turn 665 635 95.5%67 18.8 E Through 642 667 103.9%54 22.6 D Right Turn 346 353 102.1%40 24.8 D Subtotal 1,653 1,656 100.2%56 21.7 E Total 3,751 3,736 99.6%57 8.9 E 77.9 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 1 1 80.0%22 44.8 C Right Turn 40 42 105.8%10 4.1 A Subtotal 41 43 105.1%11 5.7 B Left Turn 1,015 1,019 100.4%36 3.8 D Through 20 18 89.0%37 21.5 D Right Turn 633 650 102.6%24 3.5 C Subtotal 1,668 1,687 101.1%31 3.3 C Through 1,164 1,158 99.5%21 2.8 C Right Turn 9 10 112.2%12 10.7 B Subtotal 1,173 1,168 99.6%21 2.7 C Through 1,019 1,000 98.1%41 5.2 D Subtotal 1,019 1,000 98.1%41 5.2 D Total 3,901 3,898 99.9%30 1.9 C 40.4 Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Volume and Delay by Movement PM Peak Hour Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 351 352 100.2%43 7.6 D Right Turn 972 985 101.3%41 4.7 D Subtotal 1,323 1,337 101.0%41 3.1 D Through 1,715 1,721 100.3%19 7.0 B Subtotal 1,916 1,917 100.1%18 6.7 B Through 668 662 99.0%29 4.1 C Right Turn 1,924 1,854 96.4%40 14.5 D Subtotal 2,592 2,516 97.1%37 10.3 D Total 5,831 5,769 98.9%32 4.5 C 41.9 Intersection 4 Sunset Drive/Bishop Drive Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 70 72 102.7%22 3.4 C Through 41 42 102.4%22 6.3 C Right Turn 131 126 96.1%7 2.1 A Subtotal 242 240 99.1%14 1.5 B Left Turn 25 23 93.6%29 10.2 C Through 211 202 95.9%29 5.8 C Right Turn 29 30 102.1%8 5.4 A Subtotal 265 255 96.3%26 6.1 C Left Turn 4 3 67.5%22 23.8 C Through 95 98 102.7%16 4.8 B Right Turn 225 233 103.6%9 8.7 A Subtotal 324 333 102.9%11 6.9 B Left Turn 73 73 99.9%32 9.8 C Through 103 105 102.3%10 3.5 B Right Turn 9 10 115.6%4 4.4 A Subtotal 185 189 102.0%18 4.2 B Total 1,016 1,017 100.1%17 3.5 B 31.8 EB WB Served Volume (vph) NB SB Served Volume (vph) NB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Volume and Delay by Movement PM Peak Hour Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 283 277 98.0%40 7.7 D Through 179 178 99.4%25 7.8 C Right Turn 191 189 99.1%19 5.0 B Subtotal 653 644 98.7%30 6.6 C Left Turn 33 29 88.5%59 15.4 E Through 433 432 99.7%37 5.8 D Right Turn 43 48 112.6%23 11.5 C Subtotal 509 509 100.1%37 6.4 D Left Turn 24 24 101.7%31 8.0 C Through 16 16 101.9%28 12.4 C Right Turn 324 342 105.5%12 2.4 B Subtotal 364 383 105.1%14 2.4 B Left Turn 148 153 103.6%37 5.4 D Through 22 22 100.0%37 11.2 D Right Turn 39 40 102.1%35 17.0 C Subtotal 209 215 102.9%36 5.4 D Total 1,735 1,751 100.9%29 4.4 C 55.4 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 457 465 101.8%55 7.2 E Through 46 46 99.1%50 7.4 D Right Turn 86 88 102.3%29 6.1 C Subtotal 589 599 101.6%51 4.8 D Left Turn 207 212 102.4%50 6.0 D Through 55 55 100.4%46 11.3 D Right Turn 643 655 101.8%23 5.1 C Subtotal 905 922 101.8%31 2.8 C Left Turn 464 464 100.1%75 33.7 E Through 1,707 1,740 101.9%45 4.4 D Right Turn 516 517 100.2%8 0.9 A Subtotal 2,687 2,721 101.3%43 7.7 D Left Turn 148 151 102.1%42 8.2 D Through 1,492 1,414 94.8%147 42.9 F Right Turn 143 136 94.8%92 33.5 F Subtotal 1,783 1,701 95.4%132 37.3 F Total 5,964 5,942 99.6%67 11.5 E 77.2 WB Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Volume and Delay by Movement PM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 182 178 97.6%59 8.7 E Through 123 117 94.9%42 6.6 D Right Turn 214 216 100.8%16 3.9 B Subtotal 519 510 98.3%37 3.6 D Left Turn 433 424 98.0%57 7.3 E Through 123 125 101.5%62 14.1 E Right Turn 450 446 99.0%38 9.3 D Subtotal 1,006 995 98.9%49 7.6 D Left Turn 119 119 99.9%101 20.8 F Through 1,723 1,748 101.4%25 8.7 C Right Turn 158 158 99.8%12 2.4 B Subtotal 2,000 2,025 101.2%28 8.9 C Left Turn 147 146 99.0%90 14.2 F Through 1,151 1,118 97.2%98 53.5 F Right Turn 278 279 100.4%12 18.5 B Subtotal 1,576 1,543 97.9%82 41.7 F Total 5,101 5,073 99.4%49 14.6 D 90.4 Served Volume (vph) NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Volume and Delay by Movement AM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 200 203 101.7%72 12.4 E Through 360 360 100.0%37 4.9 D Right Turn 544 543 99.7%54 28.9 D Subtotal 1,104 1,106 100.2%52 15.3 D Left Turn 186 183 98.2%167 106.4 F Through 310 303 97.8%36 6.1 D Right Turn 10 10 97.0%25 36.8 C Subtotal 506 496 98.0%87 41.8 F Left Turn 20 20 98.0%68 15.3 E Through 581 574 98.8%75 33.7 E Right Turn 280 277 99.0%39 37.4 D Subtotal 881 871 98.9%63 34.5 E Left Turn 478 449 93.9%95 32.9 F Through 414 393 95.0%51 31.0 D Right Turn 328 303 92.4%29 30.1 C Subtotal 1,220 1,145 93.9%62 31.8 E Total 3,711 3,618 97.5%62 17.1 E 106.1 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 0 0 0.0%0 0.0 A Right Turn 20 21 105.0%12 5.6 B Subtotal 20 21 105.0%12 5.6 B Left Turn 1,006 1,000 99.4%37 31.1 D Through 20 20 100.0%33 8.2 C Right Turn 340 333 98.0%37 25.9 D Subtotal 1,366 1,353 99.0%37 25.5 D Through 1,291 1,275 98.8%19 4.8 B Right Turn 20 21 103.0%13 4.5 B Subtotal 1,311 1,296 98.8%19 4.7 B Through 880 810 92.0%34 14.5 C Subtotal 880 810 92.0%34 14.5 C Total 3,577 3,479 97.3%29 9.9 C 30.5 NB SB EB WB Served Volume (vph) NB SB EB WB Served Volume (vph) Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Volume and Delay by Movement AM Peak Hour Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 390 384 98.6%53 60.3 D Right Turn 1,231 1,206 98.0%55 56.5 E Subtotal 1,621 1,591 98.1%55 56.9 D Through 1,367 1,341 98.1%43 27.3 D Subtotal 1,887 1,866 98.9%32 19.4 C Through 490 431 88.0%31 5.4 C Right Turn 2,240 2,002 89.4%27 8.4 C Subtotal 2,730 2,433 89.1%27 7.7 C Total 6,238 5,889 94.4%35 20.4 C 30.0 Intersection 4 Sunset Drive/Bishop Drive Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 273 256 93.6%17 3.1 B Through 270 255 94.6%15 2.3 B Right Turn 80 75 93.3%4 1.0 A Subtotal 623 585 94.0%14 2.3 B Left Turn 10 10 101.0%30 9.5 C Through 18 20 111.7%20 4.6 B Right Turn 10 10 104.0%6 2.3 A Subtotal 38 41 106.8%18 4.0 B Left Turn 30 30 101.0%22 7.1 C Through 60 63 105.2%9 4.0 A Right Turn 68 72 105.4%2 0.6 A Subtotal 158 165 104.5%8 2.0 A Left Turn 30 29 96.3%20 6.0 B Through 60 58 97.0%10 2.0 A Right Turn 30 30 100.3%5 3.7 A Subtotal 120 117 97.7%11 3.5 B Total 939 908 96.7%13 1.8 B 26.0 EB WB EB WB Served Volume (vph) NB SB Served Volume (vph) NB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Volume and Delay by Movement AM Peak Hour Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 190 179 94.3%27 9.9 C Through 563 526 93.4%12 4.4 B Right Turn 120 118 97.9%5 1.6 A Subtotal 873 822 94.2%14 4.9 B Left Turn 10 11 111.0%27 15.5 C Through 96 98 102.2%15 9.0 B Right Turn 10 13 126.0%6 5.7 A Subtotal 116 122 105.0%15 8.0 B Left Turn 20 16 79.0%22 9.6 C Through 10 9 92.0%22 14.2 C Right Turn 130 139 106.8%7 9.9 A Subtotal 160 164 102.4%9 8.8 A Left Turn 60 61 101.8%18 7.1 B Through 20 19 95.5%19 5.9 B Right Turn 40 42 104.5%21 6.3 C Subtotal 120 122 101.7%20 5.5 B Total 1,269 1,230 96.9%14 5.7 B 27.0 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 384 371 96.5%105 62.7 F Through 50 52 104.4%105 66.1 F Right Turn 93 90 97.2%90 89.1 F Subtotal 527 513 97.4%103 64.9 F Left Turn 60 61 101.2%200 144.4 F Through 17 18 105.3%169 103.7 F Right Turn 209 216 103.3%6 3.6 A Subtotal 286 295 103.0%57 47.0 E Left Turn 724 687 94.9%113 79.6 F Through 1,651 1,628 98.6%50 18.5 D Right Turn 223 215 96.5%4 0.5 A Subtotal 2,598 2,531 97.4%62 24.4 E Left Turn 64 52 81.6%132 31.3 F Through 2,137 1,848 86.5%151 26.0 F Right Turn 99 85 85.6%97 26.8 F Subtotal 2,300 1,985 86.3%148 26.0 F Total 5,711 5,323 93.2%96 16.3 F 132.3 WB Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Volume and Delay by Movement AM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 157 53 34.0%567 170.9 F Through 110 43 38.8%215 218.0 F Right Turn 133 55 41.4%125 178.2 F Subtotal 400 151 37.8%314 188.4 F Left Turn 170 168 99.0%103 26.3 F Through 98 93 94.5%169 60.9 F Right Turn 149 157 105.3%98 22.9 F Subtotal 417 418 100.2%118 26.6 F Left Turn 380 328 86.3%297 55.9 F Through 1,250 1,247 99.8%29 6.5 C Right Turn 174 177 101.5%7 1.6 A Subtotal 1,804 1,752 97.1%78 15.4 E Left Turn 107 90 83.9%278 49.3 F Through 1,994 1,785 89.5%228 84.2 F Right Turn 408 388 95.2%94 73.4 F Subtotal 2,509 2,263 90.2%207 80.5 F Total 5,130 4,583 89.3%148 35.9 F 295.9 Served Volume (vph) NB SB EB WB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Volume and Delay by Movement PM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 170 122 71.6%83 68.3 F Through 370 266 71.8%78 55.1 E Right Turn 500 325 65.1%338 33.2 F Subtotal 1,040 713 68.6%207 27.5 F Left Turn 272 113 41.7%534 122.9 F Through 450 196 43.5%113 24.1 F Right Turn 30 14 47.0%104 33.0 F Subtotal 752 323 43.0%266 61.4 F Left Turn 30 21 70.7%100 29.6 F Through 639 445 69.7%211 28.0 F Right Turn 200 152 76.2%189 38.2 F Subtotal 869 619 71.2%202 30.0 F Left Turn 768 746 97.1%27 8.4 C Through 776 764 98.5%19 4.7 B Right Turn 392 391 99.7%11 3.4 B Subtotal 1,936 1,901 98.2%20 5.5 C Total 4,597 3,556 77.4%107 9.3 F 564.8 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 10 11 111.0%57 34.4 E Right Turn 50 50 100.6%22 16.4 C Subtotal 60 61 102.3%29 20.5 C Left Turn 1,163 1,151 99.0%38 5.3 D Through 20 22 111.5%40 13.5 D Right Turn 810 808 99.8%30 4.0 C Subtotal 1,993 1,982 99.4%35 4.6 C Through 1,401 875 62.5%45 4.6 D Right Turn 10 6 61.0%34 38.6 C Subtotal 1,411 881 62.5%46 4.6 D Through 1,116 1,084 97.1%31 4.5 C Subtotal 1,116 1,084 97.1%31 4.5 C Total 4,580 4,008 87.5%36 3.1 D 57.1 NB SB EB WB Served Volume (vph) NB SB EB WB Served Volume (vph) Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Volume and Delay by Movement PM Peak Hour Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 780 776 99.5%48 19.1 D Right Turn 1,160 1,165 100.4%27 8.5 C Subtotal 1,940 1,941 100.0%36 12.4 D Through 1,854 1,531 82.6%43 9.8 D Subtotal 2,124 1,756 82.7%39 9.8 D Through 336 305 90.8%40 5.8 D Right Turn 2,671 2,389 89.4%32 6.2 C Subtotal 3,007 2,694 89.6%33 5.7 C Total 7,071 6,390 90.4%36 5.4 D 43.8 Intersection 4 Sunset Drive/Bishop Drive Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 75 71 94.8%27 7.1 C Through 44 44 100.2%26 9.2 C Right Turn 140 133 94.6%7 0.8 A Subtotal 259 248 95.6%16 2.9 B Left Turn 30 28 94.3%38 27.1 D Through 239 242 101.1%36 25.6 D Right Turn 30 33 108.3%17 12.0 B Subtotal 299 302 101.1%34 23.3 C Left Turn 10 10 98.0%39 18.8 D Through 100 99 98.8%22 10.6 C Right Turn 257 253 98.2%18 28.8 B Subtotal 367 361 98.4%19 22.2 B Left Turn 80 82 102.1%45 27.8 D Through 110 108 98.5%12 3.1 B Right Turn 10 10 97.0%6 6.0 A Subtotal 200 200 99.9%26 14.3 C Total 1,125 1,111 98.8%24 16.7 C 47.4 EB WB Served Volume (vph) NB SB Served Volume (vph) NB EB WB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Volume and Delay by Movement PM Peak Hour Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 310 269 86.9%47 6.8 D Through 189 176 93.1%27 8.8 C Right Turn 220 203 92.1%21 8.9 C Subtotal 719 648 90.1%34 6.1 C Left Turn 40 40 100.8%64 17.6 E Through 486 486 100.0%43 11.4 D Right Turn 50 51 101.8%35 14.5 C Subtotal 576 577 100.2%44 11.1 D Left Turn 30 29 97.0%43 19.0 D Through 20 19 94.0%43 24.1 D Right Turn 370 373 100.8%23 15.1 C Subtotal 420 421 100.2%26 14.7 C Left Turn 170 167 98.2%40 8.8 D Through 30 31 104.7%38 13.4 D Right Turn 40 42 105.0%44 13.5 D Subtotal 240 240 100.2%41 8.4 D Total 1,955 1,886 96.5%36 8.0 D 65.8 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 457 459 100.4%70 12.4 E Through 46 46 99.8%66 13.4 E Right Turn 86 90 104.9%12 4.9 B Subtotal 589 595 101.0%60 11.1 E Left Turn 225 228 101.4%56 5.1 E Through 55 51 92.2%66 10.0 E Right Turn 746 746 100.0%41 16.1 D Subtotal 1,026 1,025 99.9%46 11.7 D Left Turn 515 469 91.1%97 43.1 F Through 1,983 1,761 88.8%37 4.3 D Right Turn 516 466 90.3%6 1.1 A Subtotal 3,014 2,697 89.5%42 9.6 D Left Turn 148 124 83.9%131 48.4 F Through 1,804 1,495 82.9%174 14.5 F Right Turn 158 132 83.4%114 8.7 F Subtotal 2,110 1,751 83.0%167 15.9 F Total 6,739 6,067 90.0%80 6.4 F 161.2 WB Served Volume (vph) NB SB EB WB Served Volume (vph) NB SB EB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Volume and Delay by Movement PM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Demand Total Delay (sec/veh) Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS Left Turn 208 161 77.2%271 56.7 F Through 154 130 84.4%81 29.1 F Right Turn 220 195 88.8%24 12.9 C Subtotal 582 486 83.5%126 32.4 F Left Turn 483 369 76.4%222 49.1 F Through 137 100 73.2%300 75.7 F Right Turn 533 412 77.3%241 70.2 F Subtotal 1,153 882 76.5%241 58.6 F Left Turn 140 125 89.6%120 27.3 F Through 1,982 1,796 90.6%16 2.7 B Right Turn 172 156 90.6%7 1.3 A Subtotal 2,294 2,078 90.6%22 2.4 C Left Turn 156 127 81.3%387 62.8 F Through 1,369 1,199 87.6%323 60.0 F Right Turn 324 315 97.3%82 140.7 F Subtotal 1,849 1,641 88.7%283 68.5 F Total 5,878 5,086 86.5%148 15.5 F 140.6 Served Volume (vph) NB SB EB WB Fehr & Peers 9/18/2025 P Appendix C: Intersection Queue Worksheet SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Queue Length By Lane Group AM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 150 25 6 75 11 100 14 Through 700 200 27 350 63 425 108 Right Turn 200 100 20 225 40 275 0 Left Turn 200 200 7 250 4 225 4 Through 225 75 10 150 20 175 38 Right Turn 225 25 11 100 42 150 50 Left Turn 150 125 9 200 17 225 8 Through 750 175 37 375 88 475 105 Right Turn 750 175 14 275 5 250 0 Left Turn 300 150 19 225 34 250 38 Through 2,300 125 6 200 9 225 23 Through/Right 2,300 100 8 150 13 175 27 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 200 75 12 175 25 200 44 Through/Right 100 100 10 150 16 200 14 Through 800 125 25 250 34 275 62 Shared 200 25 3 50 6 75 13 Left Turn 475 100 8 150 14 200 37 Left/Through 1,300 125 8 200 17 250 38 Right Turn 1,300 75 7 125 22 175 53 Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 800 225 19 375 45 450 100 Through 1,025 275 47 550 62 575 129 Right Turn 1,025 400 42 625 39 650 72 Left Turn 550 100 9 175 25 250 56 Right Turn 1,300 225 16 350 31 400 62 NB SB EB WB NB EB WB NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Queue Length By Lane Group AM Peak Hour Intersection 4 Sunset Drive/Bishop Drive Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 200 25 4 50 6 75 13 Through 525 25 3 50 6 75 19 Right Turn 150 25 3 50 6 50 13 Left Turn 200 25 4 50 6 75 12 Through/Right 750 50 4 75 10 75 26 Left/Through 225 125 13 250 15 250 4 Through 225 100 10 200 14 225 17 Right Turn 225 50 5 75 9 75 19 Left/Through 175 25 2 50 5 50 14 Through/Right 175 25 3 50 7 50 10 Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left/Through 200 25 3 50 7 50 10 Right Turn 100 50 4 75 7 100 18 Left Turn 100 25 3 75 8 75 16 Through/Right 100 50 5 75 6 100 21 Left Turn 175 75 11 150 27 200 37 Through 375 75 15 175 44 250 49 Through/Right 375 50 10 100 38 175 75 Left Turn 100 25 2 50 5 50 12 Through 250 25 3 75 4 75 15 Through/Right 250 25 2 50 4 75 5 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 750 375 56 525 100 575 127 Through 1,050 50 21 150 111 300 312 Right Turn 300 0 0 0 0 0 0 Left Turn 225 0 0 0 0 0 0 Through 875 150 29 350 77 500 182 Right Turn 250 25 10 100 52 200 146 Left Turn 350 0 0 0 0 0 0 Left/Through 350 0 0 0 0 0 0 Right Turn 150 0 0 0 0 0 0 Left Turn 175 25 6 75 12 75 20 Left/Through 375 50 5 75 8 100 21 Right Turn 375 25 9 100 20 125 31 NB SB EB WB SB EB WB NB SB EB WB NB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Queue Length By Lane Group AM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 475 175 14 275 17 300 22 Through 850 75 8 150 14 175 29 Right Turn 200 25 5 75 7 75 12 Left Turn 150 50 16 75 46 150 90 Through 575 275 27 450 40 500 59 Right Turn 575 100 10 175 21 225 37 Left Turn 425 25 7 75 17 100 23 Through 425 25 3 50 9 75 21 Right Turn 425 25 1 25 2 25 0 Left Turn 700 100 11 175 23 200 25 Through/Right 700 75 7 150 16 175 42 Right Turn 700 25 5 75 23 125 45 EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Queue Length By Lane Group AM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 150 25 6 75 12 100 21 Through 700 225 16 400 43 500 85 Right Turn 200 125 21 250 36 275 0 Left Turn 200 200 8 250 6 225 3 Through 225 150 82 325 129 400 131 Right Turn 225 25 6 100 23 175 46 Left Turn 150 125 15 200 19 225 8 Through 750 225 42 450 67 525 88 Right Turn 750 200 10 275 7 250 0 Left Turn 300 175 24 300 54 325 65 Through 2,300 125 11 200 29 250 86 Through/Right 2,300 100 11 175 28 225 75 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 200 125 10 200 17 225 24 Through/Right 100 100 11 200 13 200 3 Through 800 175 40 300 47 275 46 Shared 200 25 3 50 5 75 16 Left Turn 475 125 11 200 19 275 37 Left/Through 1,300 175 12 275 17 325 27 Right Turn 1,300 100 17 200 25 275 41 Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 800 225 18 350 33 425 63 Through 1,025 400 28 725 45 750 149 Right Turn 1,025 500 31 750 56 825 151 Left Turn 550 100 13 200 30 225 62 Right Turn 1,300 250 15 375 24 400 59 NB SB EB WB NB EB WB NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Queue Length By Lane Group AM Peak Hour Intersection 4 Sunset Drive/Bishop Drive Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 200 25 3 50 6 75 12 Through 525 25 5 75 8 75 14 Right Turn 150 25 2 50 4 75 11 Left Turn 200 25 3 75 7 75 14 Through/Right 750 50 4 75 7 75 17 Left/Through 225 150 15 250 13 250 5 Through 225 100 15 200 22 250 14 Right Turn 225 50 4 75 6 100 24 Left/Through 175 25 3 50 6 75 16 Through/Right 175 25 4 50 9 50 18 Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left/Through 200 25 3 50 6 50 12 Right Turn 100 50 3 75 6 100 15 Left Turn 100 25 4 75 7 75 15 Through/Right 100 50 6 75 9 100 22 Left Turn 175 75 9 175 26 225 37 Through 375 100 17 225 38 275 51 Through/Right 375 50 6 125 23 175 49 Left Turn 100 25 3 50 8 50 15 Through 250 50 4 75 8 100 14 Through/Right 250 25 4 50 10 75 17 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 750 350 61 525 137 575 140 Through 1,050 325 34 525 117 625 184 Right Turn 300 25 7 75 55 125 168 Left Turn 225 100 21 300 42 300 18 Through 875 675 85 1,000 120 900 102 Right Turn 250 200 39 450 45 350 0 Left Turn 350 225 21 325 34 375 38 Left/Through 350 200 16 325 44 375 53 Right Turn 150 75 15 175 44 275 0 Left Turn 175 25 3 75 8 75 23 Left/Through 375 75 10 100 16 125 28 Right Turn 375 25 6 75 19 100 36 NB SB EB WB NB SB SB EB WB EB WB NB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Queue Length By Lane Group AM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 475 225 13 350 28 375 34 Through 850 75 19 175 46 250 90 Right Turn 200 50 11 100 35 150 77 Left Turn 150 150 23 275 38 250 33 Through 575 500 92 725 146 675 107 Right Turn 575 225 96 525 260 525 210 Left Turn 425 175 29 275 56 300 65 Through 425 75 10 150 18 175 46 Right Turn 425 50 4 75 9 100 15 Left Turn 700 125 6 175 14 200 19 Through/Right 700 125 7 200 14 225 42 Right Turn 700 50 8 125 20 175 32 EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Queue Length By Lane Group AM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 150 25 5 75 27 150 86 Through 700 350 68 600 137 700 149 Right Turn 200 175 13 325 13 275 0 Left Turn 200 200 11 250 8 225 5 Through 225 150 43 300 79 400 86 Right Turn 225 50 8 150 21 200 3 Left Turn 150 125 9 200 15 225 7 Through 750 200 43 450 105 525 155 Right Turn 750 175 10 275 8 250 0 Left Turn 300 150 23 225 46 250 56 Through 2,300 125 13 200 27 250 49 Through/Right 2,300 100 10 175 22 200 36 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 200 125 16 225 30 225 31 Through/Right 100 100 13 200 22 200 9 Through 800 175 31 300 38 275 12 Shared 200 25 5 50 8 75 29 Left Turn 475 275 22 425 45 500 72 Left/Through 1,300 325 17 500 60 575 118 Right Turn 1,300 175 27 350 79 500 83 Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 800 275 25 475 60 550 119 Through 1,025 250 34 500 64 550 137 Right Turn 1,025 425 40 650 54 675 122 Left Turn 550 200 30 350 80 550 88 Right Turn 1,300 400 51 575 134 650 218 EB WB NB SB EB WB NB SB EB WB NB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Queue Length By Lane Group AM Peak Hour Intersection 4 Sunset Drive/Bishop Drive Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 200 25 3 50 4 75 12 Through 525 25 3 50 6 75 9 Right Turn 150 25 3 50 5 75 8 Left Turn 200 25 3 75 9 75 17 Through/Right 750 50 6 75 12 100 28 Left/Through 225 150 9 250 12 250 5 Through 225 125 13 200 25 225 25 Right Turn 225 50 5 75 8 100 23 Left/Through 175 25 5 50 6 75 14 Through/Right 175 25 2 50 6 50 16 Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left/Through 200 25 3 50 6 50 13 Right Turn 100 50 4 75 8 100 14 Left Turn 100 25 6 75 10 75 20 Through/Right 100 50 5 75 9 100 15 Left Turn 175 75 8 150 18 200 51 Through 375 75 14 175 27 250 50 Through/Right 375 50 8 125 24 175 39 Left Turn 100 25 3 50 6 50 10 Through 250 50 5 75 11 100 19 Through/Right 250 25 3 50 7 75 13 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 750 425 142 625 206 650 151 Through 1,050 325 101 625 245 700 263 Right Turn 300 25 3 50 18 75 38 Left Turn 225 100 26 250 64 300 26 Through 875 675 77 1,000 125 900 77 Right Turn 250 200 30 450 30 350 0 Left Turn 350 200 17 300 19 325 47 Through/Right 350 125 21 200 41 250 40 Left Turn 175 25 7 75 14 100 26 Left/Through 375 75 7 125 14 150 23 Right Turn 375 25 6 75 15 125 29 EB WB NB SB EB WB NB SB EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Queue Length By Lane Group AM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 475 225 17 350 37 375 50 Through 850 50 15 125 33 175 39 Right Turn 200 25 5 75 10 125 17 Left Turn 150 125 26 250 49 250 30 Through 575 450 80 650 148 650 97 Right Turn 575 200 129 400 301 400 240 Left Turn 425 150 15 250 39 300 53 Through 425 75 10 150 19 200 40 Right Turn 425 50 5 100 12 125 26 Left Turn 700 125 11 200 18 225 24 Through/Right 700 100 9 200 15 225 19 Right Turn 700 50 8 125 20 200 16 EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Queue Length By Lane Group PM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 150 50 9 100 31 150 78 Through 700 200 18 300 36 350 55 Right Turn 200 75 15 175 39 250 3 Left Turn 200 225 12 275 8 250 13 Through 225 250 39 475 61 600 68 Right Turn 225 75 19 200 29 200 0 Left Turn 150 100 8 175 17 200 24 Through 750 275 95 625 247 725 289 Right Turn 750 200 19 275 13 250 0 Left Turn 300 275 42 400 55 375 22 Through 2,300 225 142 450 273 525 221 Through/Right 2,300 200 116 375 237 450 236 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 200 175 19 275 17 250 19 Through/Right 100 150 17 225 10 200 0 Through 800 250 22 325 16 300 16 Shared 200 50 4 75 7 100 21 Left Turn 475 300 35 450 103 525 109 Left/Through 1,300 450 233 750 542 775 452 Right Turn 1,300 400 266 725 570 775 447 Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 800 125 20 250 46 375 73 Through 1,025 125 23 275 46 375 50 Right Turn 1,025 325 54 625 48 600 68 Left Turn 550 250 18 375 46 450 77 Right Turn 1,300 275 18 400 32 450 80 NB SB EB WB NB EB WB NB SB EB WB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Queue Length By Lane Group PM Peak Hour Intersection 4 Sunset Drive/Bishop Drive Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 200 25 2 25 6 50 11 Through 525 50 4 100 6 125 17 Right Turn 150 50 8 100 19 150 36 Left Turn 200 75 10 100 16 150 34 Through/Right 750 50 8 100 10 100 7 Left/Through 225 50 5 100 13 125 37 Through 225 25 4 75 11 100 21 Right Turn 225 50 5 100 12 125 28 Left/Through 175 100 8 175 21 200 37 Through/Right 175 50 6 125 18 150 42 Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left/Through 200 75 12 175 32 250 44 Right Turn 100 100 6 150 4 150 0 Left Turn 100 100 11 200 23 250 45 Through/Right 100 75 9 125 14 125 8 Left Turn 175 125 11 225 20 225 21 Through 375 50 10 125 52 200 125 Through/Right 375 150 19 325 27 350 22 Left Turn 100 50 7 150 16 150 1 Through 250 175 15 275 10 250 3 Through/Right 250 125 10 225 19 250 16 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 750 250 28 375 57 425 69 Through 1,050 175 16 325 24 350 33 Right Turn 300 0 0 0 0 0 0 Left Turn 225 0 0 0 0 0 0 Through 875 350 27 575 62 575 111 Right Turn 250 150 24 350 42 350 0 Left Turn 350 0 0 0 0 0 0 Left/Through 350 0 0 0 0 0 0 Right Turn 150 0 0 0 0 0 0 Left Turn 175 100 9 175 18 200 4 Left/Through 375 125 10 200 25 250 54 Right Turn 375 225 18 325 27 350 42 NB SB EB WB NB SB SB EB WB EB WB NB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Queue Length By Lane Group PM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 475 75 9 125 15 150 23 Through 850 175 21 300 44 400 68 Right Turn 200 25 8 75 36 125 89 Left Turn 150 25 1 25 6 25 14 Through 575 200 11 300 20 325 59 Right Turn 575 75 5 125 16 150 34 Left Turn 425 100 9 175 18 200 37 Through 425 50 6 75 13 100 18 Right Turn 425 25 3 50 7 50 16 Left Turn 700 250 8 350 13 400 29 Through/Right 700 150 11 250 26 325 60 Right Turn 700 75 11 175 23 250 41 EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Queue Length By Lane Group PM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 150 50 10 125 43 200 82 Through 700 300 57 525 149 600 155 Right Turn 200 150 27 300 32 275 0 Left Turn 200 225 6 275 7 275 15 Through 225 250 78 500 117 600 108 Right Turn 225 75 18 200 30 200 2 Left Turn 150 100 9 175 22 200 30 Through 750 175 49 400 147 475 179 Right Turn 750 175 17 250 23 225 1 Left Turn 300 250 25 350 46 350 40 Through 2,300 175 40 300 128 425 181 Through/Right 2,300 150 37 275 122 350 194 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 200 175 15 250 28 225 38 Through/Right 100 125 14 225 10 200 0 Through 800 250 16 325 10 300 15 Shared 200 50 3 75 10 100 39 Left Turn 475 375 28 575 42 625 2 Left/Through 1,300 475 29 675 84 800 137 Right Turn 1,300 375 49 650 85 775 112 Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 800 275 34 450 60 525 81 Through 1,025 75 16 200 34 325 78 Right Turn 1,025 350 81 675 85 625 99 Left Turn 550 250 13 425 31 500 61 Right Turn 1,300 325 23 500 62 600 162 EB WB NB SB EB WB NB SB EB WB NB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Queue Length By Lane Group PM Peak Hour Intersection 4 Sunset Drive/Bishop Drive Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 200 25 2 25 5 50 1 Through 525 50 5 100 11 125 18 Right Turn 150 50 8 100 18 150 33 Left Turn 200 75 5 100 10 150 18 Through/Right 750 50 7 100 13 125 31 Left/Through 225 75 8 125 14 125 20 Through 225 50 3 75 7 100 20 Right Turn 225 75 4 100 13 125 43 Left/Through 175 125 14 200 26 225 39 Through/Right 175 75 8 125 22 175 36 Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left/Through 200 75 13 200 40 300 68 Right Turn 100 100 7 150 7 150 0 Left Turn 100 100 9 175 25 225 45 Through/Right 100 75 5 125 7 125 1 Left Turn 175 125 8 200 19 225 15 Through 375 50 9 100 28 125 74 Through/Right 375 150 17 275 31 300 37 Left Turn 100 50 6 125 16 150 1 Through 250 200 8 275 10 250 8 Through/Right 250 150 12 225 15 250 6 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 750 225 21 350 35 375 35 Through 1,050 325 16 500 31 550 57 Right Turn 300 75 9 200 21 250 44 Left Turn 225 100 24 225 77 275 56 Through 875 700 121 1,025 207 900 106 Right Turn 250 250 33 475 20 350 0 Left Turn 350 325 33 450 52 475 51 Left/Through 350 275 33 400 45 425 53 Right Turn 150 100 15 225 31 275 0 Left Turn 175 125 9 200 12 200 6 Left/Through 375 150 12 250 27 300 43 Right Turn 375 200 16 300 27 325 32 EB WB NB SB EB WB NB SB EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Queue Length By Lane Group PM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 475 100 25 225 111 375 218 Through 850 400 28 600 45 675 127 Right Turn 200 150 12 300 17 250 0 Left Turn 150 150 22 225 24 250 11 Through 575 325 63 475 146 525 153 Right Turn 575 100 32 175 139 250 218 Left Turn 425 200 35 325 65 375 52 Through 425 125 34 250 109 300 132 Right Turn 425 75 9 150 17 200 35 Left Turn 700 400 90 675 199 675 105 Through/Right 700 450 94 725 159 700 90 Right Turn 700 375 95 675 172 650 97 EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Queue Length By Lane Group PM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 150 50 10 100 43 175 92 Through 700 325 49 550 119 625 152 Right Turn 200 150 26 300 33 275 0 Left Turn 200 225 4 250 8 250 10 Through 225 350 80 675 103 725 91 Right Turn 225 50 16 200 31 200 0 Left Turn 150 100 10 175 17 200 30 Through 750 350 157 650 254 725 243 Right Turn 750 200 15 275 12 250 0 Left Turn 300 200 23 300 35 350 61 Through 2,300 150 8 225 13 275 74 Through/Right 2,300 125 10 200 12 250 34 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 200 200 11 275 20 225 52 Through/Right 100 150 15 250 11 200 0 Through 800 250 15 325 21 300 14 Shared 200 50 5 75 9 100 19 Left Turn 475 325 21 500 53 575 65 Left/Through 1,300 400 35 575 88 725 182 Right Turn 1,300 300 43 550 98 725 190 Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 800 275 27 500 60 600 91 Through 1,025 200 64 425 202 600 282 Right Turn 1,025 500 147 825 167 825 174 Left Turn 550 275 19 425 49 525 51 Right Turn 1,300 300 20 450 78 575 231 EB WB NB SB EB WB NB SB EB WB NB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Queue Length By Lane Group PM Peak Hour Intersection 4 Sunset Drive/Bishop Drive Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 200 25 2 25 6 50 6 Through 525 50 9 100 41 175 110 Right Turn 150 75 10 125 28 175 53 Left Turn 200 75 6 100 9 125 18 Through/Right 750 50 7 100 22 125 46 Left/Through 225 75 4 125 8 150 24 Through 225 50 5 75 7 100 11 Right Turn 225 75 4 100 11 150 31 Left/Through 175 125 11 175 24 225 30 Through/Right 175 75 7 125 18 175 20 Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left/Through 200 75 15 200 32 250 40 Right Turn 100 100 5 150 7 150 0 Left Turn 100 100 9 175 22 225 50 Through/Right 100 75 6 125 6 125 2 Left Turn 175 150 12 200 17 225 16 Through 375 50 7 100 30 125 71 Through/Right 375 150 17 275 26 325 30 Left Turn 100 50 8 125 14 150 0 Through 250 200 12 275 7 250 4 Through/Right 250 150 15 225 19 250 5 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 750 275 56 450 117 475 121 Through 1,050 375 18 500 32 575 88 Right Turn 300 100 13 200 38 275 119 Left Turn 225 75 17 150 44 250 62 Through 875 700 194 975 241 900 182 Right Turn 250 250 68 450 47 350 0 Left Turn 350 300 21 425 51 475 74 Through/Right 350 125 17 225 30 250 7 Left Turn 175 125 11 200 16 200 0 Left/Through 375 175 11 275 31 325 52 Right Turn 375 225 26 325 39 350 43 EB WB NB SB EB WB NB SB EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Existing Plus Project Plus Mitigations Queue Length By Lane Group PM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 475 75 9 125 18 150 28 Through 850 125 25 275 77 425 176 Right Turn 200 50 10 150 36 225 54 Left Turn 150 150 10 225 21 250 20 Through 575 325 79 500 173 575 158 Right Turn 575 100 48 225 165 325 251 Left Turn 425 175 10 275 15 300 26 Through 425 100 9 175 14 200 39 Right Turn 425 75 10 150 21 225 45 Left Turn 700 250 17 375 31 450 65 Through/Right 700 275 24 425 42 475 50 Right Turn 700 200 27 375 40 425 71 EB WB NB SB Fehr & Peers 9/17/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Queue Length By Lane Group AM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 150 25 11 75 43 150 75 Through 700 475 70 775 95 775 144 Right Turn 200 200 16 350 7 275 0 Left Turn 200 225 5 250 12 225 3 Through 225 200 124 425 161 500 145 Right Turn 225 50 15 150 32 200 21 Left Turn 150 150 9 225 12 225 2 Through 750 375 96 700 221 750 223 Right Turn 750 225 11 275 14 250 0 Left Turn 300 250 48 375 74 375 40 Through 2,300 200 98 425 247 525 211 Through/Right 2,300 150 69 350 203 475 228 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 200 175 15 250 25 225 21 Through/Right 100 150 11 225 10 200 0 Through 800 225 33 300 25 300 28 Shared 200 25 4 50 5 75 8 Left Turn 475 200 29 350 83 450 127 Left/Through 1,300 300 45 475 182 675 408 Right Turn 1,300 225 56 450 177 625 343 Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 800 325 51 525 123 550 137 Through 1,025 325 74 750 168 850 296 Right Turn 1,025 400 68 875 131 1,000 179 Left Turn 550 200 53 375 150 425 132 Right Turn 1,300 400 161 675 438 725 420 EB WB NB SB EB WB NB SB EB WB NB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Queue Length By Lane Group AM Peak Hour Intersection 4 Sunset Drive/Bishop Drive Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 200 25 5 75 7 75 14 Through 525 25 4 75 8 75 20 Right Turn 150 25 3 50 5 75 11 Left Turn 200 25 3 75 6 75 12 Through/Right 750 50 4 75 6 100 21 Left/Through 225 150 12 275 17 250 3 Through 225 125 11 225 17 250 5 Right Turn 225 50 4 75 6 125 17 Left/Through 175 25 3 75 6 75 14 Through/Right 175 25 3 50 4 50 11 Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left/Through 200 25 1 75 10 100 41 Right Turn 100 50 4 100 10 125 16 Left Turn 100 50 7 75 15 100 37 Through/Right 100 50 4 100 10 125 19 Left Turn 175 100 14 175 32 225 34 Through 375 100 22 225 54 325 63 Through/Right 375 50 9 150 31 225 64 Left Turn 100 25 2 50 4 50 11 Through 250 50 4 75 7 100 12 Through/Right 250 25 5 75 9 75 14 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 750 450 131 675 226 700 133 Through 1,050 450 153 825 307 825 205 Right Turn 300 25 11 75 79 175 231 Left Turn 225 175 28 400 26 325 26 Through 875 875 20 975 41 925 14 Right Turn 250 225 17 475 11 350 0 Left Turn 350 300 49 500 94 525 60 Left/Through 350 300 49 500 92 525 31 Right Turn 150 125 29 275 41 275 0 Left Turn 175 75 18 150 38 175 41 Left/Through 375 100 27 175 65 225 81 Right Turn 375 50 13 125 25 150 31 EB WB NB SB EB WB NB SB EB WB NB SB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Queue Length By Lane Group AM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 475 425 61 625 59 550 0 Through 850 475 179 975 271 850 152 Right Turn 200 75 15 150 50 275 108 Left Turn 150 150 13 300 24 250 24 Through 575 1,175 335 1,875 532 1,725 291 Right Turn 575 375 117 900 168 775 0 Left Turn 425 425 19 525 38 450 0 Through 425 450 41 675 52 525 16 Right Turn 425 25 13 100 68 200 167 Left Turn 700 175 27 275 43 275 53 Through/Right 700 275 51 425 103 450 108 Right Turn 700 200 55 400 104 400 109 EB WB NB SB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Queue Length By Lane Group PM Peak Hour Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 150 75 16 225 33 250 0 Through 700 775 48 800 39 800 13 Right Turn 200 225 6 350 5 275 0 Left Turn 200 175 9 275 16 250 5 Through 225 175 48 425 77 525 82 Right Turn 225 50 13 150 32 200 3 Left Turn 150 125 17 225 23 225 14 Through 750 1,400 136 1,500 160 1,450 25 Right Turn 750 225 0 250 2 250 0 Left Turn 300 400 46 425 44 400 0 Through 2,300 875 4 900 5 925 11 Through/Right 2,300 350 117 875 179 875 51 Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 200 200 12 225 16 250 9 Through/Right 100 175 8 225 8 200 0 Through 800 225 21 325 17 275 15 Shared 200 50 8 100 13 125 28 Left Turn 475 350 18 550 33 600 22 Left/Through 1,300 450 29 700 92 975 241 Right Turn 1,300 425 47 750 100 975 243 Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Through 800 375 40 600 52 650 69 Right Turn 175 150 23 350 22 275 0 Through 1,025 350 90 700 158 825 213 Right Turn 1,025 575 105 900 161 1,000 183 Left Turn 550 475 17 650 25 575 0 Right Turn 1,300 475 93 975 223 1,200 188 NB SB EB WB NB EB WB NB SB EB WB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Queue Length By Lane Group PM Peak Hour Intersection 4 Sunset Drive/Bishop Drive Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 200 25 3 50 6 50 14 Through 525 75 31 125 99 200 142 Right Turn 150 75 26 150 51 200 50 Left Turn 200 75 15 150 35 175 35 Through/Right 750 50 6 100 15 175 79 Left/Through 225 75 8 125 15 150 34 Through 225 50 3 75 5 75 8 Right Turn 225 75 4 100 5 125 14 Left/Through 175 150 25 225 53 300 76 Through/Right 175 75 14 175 40 225 75 Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left/Through 200 150 62 325 94 375 65 Right Turn 100 125 6 150 3 150 0 Left Turn 100 125 12 225 33 275 47 Through/Right 100 75 9 150 7 125 0 Left Turn 175 125 8 200 12 225 14 Through 375 50 8 100 25 150 66 Through/Right 375 150 16 300 24 300 27 Left Turn 100 75 15 150 21 150 1 Through 250 225 14 275 8 250 9 Through/Right 250 175 21 275 14 250 8 Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 750 325 80 500 147 500 152 Through 1,050 325 16 475 24 525 56 Right Turn 300 50 10 150 25 200 46 Left Turn 225 225 21 425 10 325 11 Through 875 900 49 950 31 925 25 Right Turn 250 250 29 475 9 350 0 Left Turn 350 300 25 425 55 475 50 Left/Through 350 275 30 400 68 425 75 Right Turn 150 100 15 250 29 275 0 Left Turn 175 125 9 225 11 200 1 Left/Through 375 175 14 275 31 300 50 Right Turn 375 275 37 375 31 375 19 NB SB EB WB NB SB SB EB WB EB WB NB Fehr & Peers 9/18/2025 SimTraffic Post-Processor Orchards Site Planning Average Results from 10 Runs Cumulative Plus Project Queue Length By Lane Group PM Peak Hour Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev. Left Turn 475 125 26 200 56 225 66 Through 850 125 29 275 73 325 104 Right Turn 200 50 8 125 36 225 95 Left Turn 150 225 25 325 17 250 0 Through 575 1,075 277 1,850 413 1,700 320 Right Turn 575 275 275 800 733 1,100 730 Left Turn 425 350 69 525 54 450 0 Through 425 350 111 625 109 550 14 Right Turn 425 75 15 175 34 250 91 Left Turn 700 550 118 800 94 725 11 Through/Right 700 550 105 825 76 725 11 Right Turn 700 500 116 800 86 725 12 EB WB NB SB Fehr & Peers 9/18/2025 P Appendix D: Mixed-Use Trip Generation Model Recalibration and Validation Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 1 This paper documents the recalibration and validation effort undertaken by Fehr & Peers in 2019- 2020 of the MXD+ Tool. This revalidation was necessary given the myriad changes in mobility, technology, and societal behavior that have occurred since MXD+ was originally formulated in the late-2000’s. This paper provides a straightforward “nuts and bolts” type description of this process. MXD+ Model Origin In the late-2000’s, two separate research studies improved the state of practice regarding prediction of trips from mixed-use projects. Studies sponsored by the US EPA (MXD) and the Transportation Research Board (NCHRP 684) developed separate tools for improving trip generation estimates for mixed-use developments. The MXD model was originally derived from 239 mixed-use sites across the country, and validated in 2009 against 22 sites. NCHRP 684: Enhancing Internal Trip Capture Estimation for Mixed-Use Developments (2011) was based on six well-known MXD sites. The principal authors of these original two methods (Reid Ewing at the University of Utah, Brian Bochner at Texas A&M, and Jerry Walters at Fehr & Peers) decided to collaborate on an integrated method that captured the best of both sets of research findings. And thus, MXD+ was created. They published a paper entitled Getting Trip Generation Right: Eliminating the Bias Against Mixed- Use Development (American Planning Association, 2013). According to that paper, MXD+ achieved average errors of 2%, 12%, and 4%, for daily, AM peak hour, and PM peak hour conditions, respectively. These values suggest a good fit between the model’s estimation and the counts. Purpose/Need of Revalidation and Calibration Excluding the unprecedented changes in travel and economic distress that have occurred in 2020 due to the COVID-19 Pandemic, there have been sweeping changes in travel behavior in the 10- plus years since MXD+ was originally validated. Some of the many examples include increased e- commerce activity, the introduction of ridehailing (i.e., Transportation Network Companies (TNCs), such as Uber and Lyft), increased telecommuting, micromobility (e.g., bikeshare, e-scooters, and microtransit), increased auto ownership, and decreased transit ridership. Additionally, in 2017, the Institute of Transportation Engineers (ITE) released the 10th Edition of the Trip Generation Manual. When compared to the 9th Edition (2012), the 10th Edition demonstrates sizeable decreases in vehicle trip rates for nearly all types of employment uses (due to the replacement of very old data with new data collected after 2010). It also includes several new land use categories (i.e., fast casual restaurant), more overall data, and better definitions for land uses often found in mixed-use sites Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 2 Model Recalibration Model recalibration involved site selection, data collection, and then calibration. Site Selection Fehr & Peers selected sites that were geographically diverse, both in terms of locations across the US, and as well as in their place type. They had varying levels of mode choice options, and their site trips were able to be accurately counted. The sites were well understood in terms of occupied land uses, available modes of travel, and other built environment characteristics. This diversity of use type, geographic placement, size allows for the model to be calibrated against a wider set of conditions versus an alternate approach where a more homogeneous set of sites were selected. Consistent with standard practice in statistical analysis, the selected sites were divided into separate “calibration” and “validation” datasets. Early analysis findings indicated that model accuracy could be improved for weekday AM and PM peak hour conditions through a set of minor adjustments, which are discussed in detail later. The calibration dataset (12 sites) was used to determine the best fit provided by the adjusted set of factors. The validation dataset (4 sites), which was not included in the calibration dataset, were specifically selected to provide a diverse range of geographic settings, modal opportunities, and project sizes, which could be used to test the accuracy of the model. Those results are presented in case study format at the end of this paper. Figure 1 shows the 12 calibration sites that were selected, as well as the four validation sites. Aside from the four case studies, individual site locations are not disclosed in this article because such information is not necessary to understand the data collection and analysis results. Case in point, transportation planners/engineers routinely use data from the Trip Generation Manual, which only discloses the states from which the data was collected. The traffic data collection did not require encroachment onto any private property to place cameras or hose tubes. Data Collection Table 1 provides an overview of the size, diversity of uses, and transit proximity of the sites that comprise the calibration database. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 3 Figure 1: MXD+ Calibration and Validation Sites Table 1 – Overview of MXD+ Calibration Sites Metric Range Average Median Total Acres 4 – 221 acres 50 acres 19 acres 603 acres Number of Dwelling Units 1 8 – 1,841 units 563 units 414 units 6,756 units Retail 0 – 753,000 sq. ft. 168,000 sq. ft. 38,000 sq. ft. 2,013,000 sq. ft. Office 0 – 1,084,000 sq. ft. 212,000 sq. ft. 41,000 sq. ft. 2,544,000 sq. ft. Range of Transit Services None, adjacent street bus stops, on-site transit centers, and nearby/on-site light rail Range of Land Uses  Grocery Store  Student Housing  Medical-Office Building  Restaurants  Health Club  Pharmacy  Hotel  Coffee Shop  Library  Schools  Museum  Movie Theater  Bowling Alley  Hospital Notes: 1 Over 95% of dwelling units are multi-family. Site with only 8 dwelling units also includes 315 student housing units. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 4 The average site was 50 acres and consisted of about 563 dwelling units (the vast majority being multi-family) and 380,000 square feet of non-residential space. The MXD+ tool includes queries from various sources (e.g., US Census, American Community Survey, local travel demand models, etc.) to enable easy importing of built environment and surrounding area travel characteristics and demographic variables. Some of the more important variables are: Employment within a one-mile walk, Percentage of regional employment within a 30 minute transit ride, and site/adjacent area intersection density (a proxy for site walkability and internal trip-making potential), and Average vehicle ownership per household. Measurement of vehicle trips generated by each site was a critical component of the data collection effort. It was important that the data collection was comprehensive in terms of collecting all types of vehicle trips generated by each site (including project-related vehicles parking on-site or on-street, persons being dropped-off or picked-up by a taxi, TNC, or friend/spouse/coworker, and truck/service deliveries. To overcome the considerable cost associated with data collection via video cameras, an innovative approach was undertaken whereby collection of a site’s travel during its busiest 14 hours can be used to accurately estimate its 24-hour traffic generation. Typically, these 14 hours represent about 90 percent of the land use’s total daily trip generation. A factoring process was then performed using the ITE hourly trip generation data (from the Trip Generation Manual) to convert the 14 hour counts into 24-hour observations. In several instances, site characteristics allowed for a multi-day hose tube count (i.e., a pneumatic tube placed across a road that would register a vehicle as it passes over) to be performed. But this was the exception and not the norm since the majority of sites were located in dense, urban environments where tube counts would have likely yielded inaccurate results. In several cases, site reconnaissance was necessary to better understand site-specific travel behavior. This led to conclusions that on-street parking on one side of the street is project-related, while the other side is not. Other situations involved motorists parking in nearby garages/lots and walking into the MXD. In those instances, pedestrian activity (both at intersections and mid- block) were observed and classified into groups to translate pedestrian groups into vehicle trips. Seven (7) of the 12 calibration data sites were counted in October 2019. The remaining five were counted as part of prior research efforts, in either 2015 or 2017. Table 2 shows the number of vehicle trips these sites were observed to generate on a weekday daily basis, and during the AM and PM peak hours. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 5 Table 2 – Trips Generated by MXD+ Calibration Sites Time Period External Vehicle Trips 1 Range Average Median Weekday (Daily) 2,383 – 35,825 12,461 9,495 Weekday AM Peak Hour 2 100 – 2,017 752 518 Weekday PM Peak Hour 3 181 – 3,381 1,161 712 Notes: 1 Includes trips to/from the site for all purposes including deliveries, TNC trips, pass-by trips (i.e., already on the adjacent street) in addition to the typical trip types. 2 AM peak hour represents the site’s busiest consecutive 60-minute period of travel between 7 and 9 AM. 3 PM peak hour represents the site’s busiest consecutive 60-minute period of travel between 4 and 6 PM. Recalibration of MXD+ The land use and built environment variables described above were input into MXD+ for each of the 12 calibration sites. MXD+ then processes that data in the following generalized steps: • Step 1 – Gross number of vehicle trips are estimated for land uses based on published rates contained in the Trip Generation Manual, 10th Edition.1 • Step 2 – Built environment and site characteristics variables are used to estimate the likelihood for internal trip-making, and external trips being made by transit and walking/biking. • Step 3 – The model estimates the number of internal trips made between complementary land uses within the site. • Step 4 – The model estimates the number of external trips made by transit and walking/biking. Nearly all data presented in the current Trip Generation Manual for the suburban/urban place type were collected at low-density, single-use, homogeneous developments with little or no public transit service, free parking, and little to no convenient pedestrian access. Hence, direct use of 1 MXD+ is programmed to include trip generation rates (both weighted averages and as derived from fitted curve equations) from the 10th Edition of the Trip Generation Manual. Data is input only for the “suburban/urban” land use category, and not for the “rural”, “multi-use urban”, or “center city core” categories because their corresponding datasets generally have insufficient numbers of sites from which reliable trip generation rates could be derived. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 6 those rates for projects not aligned with those built environment factors are likely to result in an overestimation of vehicle trips. This statement, while obvious, is intended to set the stage for why gross ITE trip generation estimates (without any adjustments) substantially overestimate trips observed at the MXD sites. The following guidance from Page 14 of the Trip Generation Handbook (Institute of Transportation Engineers, 2017) was used in the calibration process: “The trip generation estimate should reflect, to the extent possible, the specific uses within the known or assumed generalized (using zoning) classification.” Thus, individual uses such as grocery stores, banks, pharmacies, restaurants, health clubs, day-care centers, etc. present at each site were entered separately into MXD+ versus being aggregated into a single ‘retail shopping center’ category. In reviewing the preliminary MXD+ results, it was concluded that the daily results were sufficiently accurate so as to not require any adjustments. But for AM and PM peak hour conditions, it was observed that MXD+ tended to underestimate the observed count more often than desired. This was certainly an undesirable outcome because MXD+ applications should be reasonably conservative. If anything, they should err on the side of overestimating actual trips. The means by which internal trips and external non-auto trips were estimated for AM and PM peak hour conditions was quickly identified as a leading culprit. The following describes the steps for how internal trips and external walk/bike trips for AM and PM peak hour conditions are estimated: • Step 1 – Apply the MXD+ peak hour factors by trip purpose to the daily predicted probabilities of these trip reductions to obtain AM and PM peak hour percentages. • Step 2 – Apply the following weighting of the two methods that independently estimate these trip reductions: o AM Peak Hour: 10% NCHRP 684 and 90% MXD+ o PM Peak Hour: 37% NCHRP 684 and 63% MXD+ An iterative statistical analysis was performed to determine which set of peak hour factors for the MXD+ component of this calculation best fit the data from the calibration dataset. The best fit values are shown in Table 3. The NCHRP 684 procedure has been incorporated by ITE into its Trip Generation Handbook, and is hence known as the “ITE with Internalization”. Note that this procedure estimates internal trips only for AM and PM peak hours (and not daily conditions). Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 7 Table 3 – Updated MXD+ Peak Hour Factors by Trip Purpose 1 Predicted Probability 2 AM Peak Hour PM Peak Hour HBW 3 HBO 4 NHB 5 HBW 3 HBO 4 NHB 5 Internal Capture 1.10 1.80 1.00 1.00 1.00 1.00 Walking/Biking External 1.20 1.30 1.00 1.00 1.00 1.00 Transit External 1.40 1.10 1.00 1.40 1.00 1.00 Notes: 1 Source was analysis of data from the 2017 National Household Travel Survey, specifically analyzing the national dataset to understand the relative likelihood of each type of travel choice during weekday AM and PM peak hours, versus on a daily basis. 2 These factors are multiplicatively applied (by trip purpose) to the daily predicted possibilities for each type of vehicle trip reduction 3 HBW = Home-based work trip. 4 HBO = Home-based other trip (e.g., shopping, school, recreation, etc.). 5 NHB = Non-home-based trip (e.g., from office to deli). Transparency in calculations is one of the many objectives of MXD+. By virtue of displaying these values here, it is possible for others to replicate MXD+ results, albeit through a substantial amount of data collection and analysis. The original MXD model (from 2011) is available for download from EPA’s website (https://www.epa.gov/smartgrowth/mixed-use-trip-generation-model), though it is noted that model does not include the latest land use categories, trip generation rates, and equations from the 10th Edition of the Trip Generation Manual. However, that model does form the basis for the daily module of MXD+, but with these aforementioned adjustments added. The calibration tests focus on the following five specific areas (from least to most statistically complex): • Aggregate total trips • Proportion of cases where MXD+ underestimates the actual number of trips • Average absolute error • Correlation coefficient2 2 This statistic measures the relationship between variables. A measure close to 1 means that variables are highly positively correlated; a value of zero suggests no or weak correlation, and a value close to -1 represents strong negative correlation. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 8 • Percent RMSE3 Table 4 displays the five calibration statistics for daily, and AM and PM peak hour conditions, as well as the applicable statistical goal/objective for the given calibration statistic. Table 4 – MXD+ Calibration Results Calibration Statistic Goal/Objective Daily AM Peak Hour PM Peak Hour Aggregate Total of MXD+ Vehicle Trip Generation Estimates Versus Actual Counts As close to zero as possible + 7% - 0.9% +1.6% Proportion of Calibration Sites That Were Underestimated by MXD+ 1 Ideally none 0 of 12 4 of 12 3 of 12 Average Absolute Error As close to zero as possible 6% 11% 6% Correlation Coefficient > 0.88 2 1.00 0.99 1.00 Percent RMSE < 40% 2 12% 13% 7% Notes: 1 Estimates that were within five percent of the actual counts were not considered underestimations since traffic volumes themselves may fluctuate by five percent or more from one day to the next. 2 Based on statistical measures typically applied in travel demand model development. Table 4 indicates that MXD+ does an excellent job of fitting the data for all three time periods. Challenges did however arise more frequently during peak hours versus daily conditions. Unique site specific conditions, such as their specific temporal commute patterns, degree of retail tenant success, and presence of TNCs contributed to some of these challenges. Chart 1 orders the 12 calibration sites from least to greatest number of observed daily trips. Data is then presented for the MXD+ external vehicle trip estimate and the ITE gross trip estimate. At 3 This statistic is a measure of the model’s accuracy. It is the square root of the mean squared error between the predicted and observed count divided by the mean of the observed count. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 9 sites 1 – 6, MXD+ predictions are nearly identical to the observed counts. Slightly greater variation occurs at the larger sites (i.e., 7 – 12) for reasons discussed below. For the 12 sites, MXD+ estimated 160,696 daily external vehicle trips. This represents 7% more trips than the 149,527 daily trips that were counted. This implies that MXD+ is being reasonably conservative. If these sites had simply been analyzed using ITE gross daily trip estimates (i.e., without any reductions of internal trips or external non-auto trips), the resulting estimate would have been 192,905 daily trips, which is a 29% overestimation versus the counts. This reiterates prior research findings that the use of ITE rates for the suburban/urban place type without any adjustments for internal trips and external non-auto trips would result in a substantial overestimation of a mixed- use site’s vehicle trip generation. This is acknowledged on page 8 of the Trip Generation Handbook by the following statement: “The application of suburban data in dense or multimodal urban settings can in some cases overestimate motor vehicle demand.” For the 12 calibration sites, the reduction in daily trips caused by internal trip-making and external non-auto travel ranged from 10 to 50 percent, with average/median values near 20 percent. This 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 1 2 3 4 5 6 7 8 9 10 11 12 Ve h i c l e T r i p s P e r D a y Site Chart 1: MXD+ Calibration for Daily Conditions ITE Gross Trips MXD+ External Vehicle Trips Observed Count Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 10 large range is caused by a number of factors including: mix of land use, presence of transit, and site design, size, and geographic location. Validation of MXD+ Four case studies from across the US were selected for validation purposes. As noted previously, these sites were excluded from the calibration dataset in order to achieve the statistically desirable independent validation dataset. These sites were specifically chosen, as they are geographically diverse, are of widely varying sizes, and provide widely differing levels of modal travel options. • Safeway / Avalon, Bellevue, WA – This four-acre site is situated in downtown Bellevue, across Lake Washington from downtown Seattle. Despite being only 10 miles from downtown Seattle, a commute to downtown by auto can exceed over an hour. Sound Transit operates fixed-route bus service with stops immediately adjacent to the building. The site is located in a suburban downtown setting with good sidewalk connectivity and heavy pedestrian volumes, but also wide arterial streets, large blocks, and heavy traffic. There no bike routes/lanes nearby. Adjacent land uses include a variety of residential, retail, and employment centers as well as a large regional mall and the Downtown Park. Apartment residents pay $85 to $110 per month for a parking space. • Hazard Center, San Diego, CA – is situated on 16-acres and located five miles north of Downtown San Diego near the intersection of Interstate 8 and State Route 163. All land uses are situated within a ¼-mile walk to the Hazard Center Light Rail Station, which serves the San Diego Trolley Green Line light rail service. This station transports riders to downtown San Diego in about 20 minutes. A bus stop is also situated within ¼ mile of the site. A variety of uses are within a ½-mile walk of the site including Westfield Mission Valley Mall, grocers, employers, and restaurants. The San Diego River multi-use pathway is situated adjacent to this site. • Avalon, Alpharetta, GA – is a quintessential suburban mixed-use project now found in many communities across the country. At a considerable size of 79 acres, it features a vast array of land uses – all of the typical ones found in mixed-use sites plus some other atypical uses such as single-family residential. It is a food & beverage destination with numerous bars and restaurants ranging from fast-food, fast casual, high-turnover sit-down, to quality establishments. Avalon is located directly west of US Highway 19, about 25 miles north of downtown Atlanta. Adjacent transit is limited to a single local bus route that operates on 30 minute headways. Parking is not priced anywhere within Avalon with the exception of Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 11 the hotel. The site is anchored by Avalon Boulevard, a 1,200-foot long, walkable “Main Street” flanked by ground-floor retail and stacked residential on both sides. Lower density residential, office, and parking extends outwardly from the site’s hub, with vehicular access provided by 10 distinct driveways on two public streets. Adjacent land uses are suburban or rural in nature. • Southport, West Sacramento, CA – is a very large (3,000 developed acres), established community situated directly west of downtown Sacramento. It features a wide array of land use types (i.e., residential, jobs, shopping, schools, etc.) often found in self-contained communities. Fixed route bus service is provided on main arterials within the community, and downtown Sacramento can be reached via a five-mile trip. It is geographically isolated from adjacent communities by the Sacramento River and shipping channels, allowing for its trips to be accurately counted via four gateways. Table 5 displays the land uses present at each validation data site. Table 5 – Validation Sites Land Uses Site Single- Family Multi- Family Office General Retail 1 Sit-Down Restaurants Grocery Store Hotel Other/Note Safeway / Avalon Bellevue, WA - 368 du’s - 15 ksf 8 ksf 55 ksf - - Hazard Center, San Diego, CA - 120 du’s 256 ksf 111 ksf 23 ksf - 305 rooms 7-screen movie theater Avalon Alpharetta, GA 100 du’s 525 du’s 582 ksf 250 ksf 54 ksf 45 ksf 330 rooms 12-screen movie theater Southport, West Sacramento, CA 6,811 du’s 893 du’s 80 ksf 387 ksf 15 ksf 54 ksf - Elementary & High School, 600 ksf manufacturing Notes: 1 Includes wide array of uses such as: cleaners, dance studios, bookstore, financial office, salon, learning center, jewelers, salons, auto detailing, optometry, etc. Banks, gas stations, fast-food restaurants, coffee shops, and fitness studios were estimated separately (based on their specific uses) but included in this land use total for reporting purposes. du’s = dwelling units. ksf = thousand square feet. Table 6 presents the number of external vehicle trips measured at each validation site in October 2019 versus the estimated number it would generate using MXD+. Footnote 2 in the table Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 12 highlights an interesting phenomenon associated with the Southport validation case study. Because it is being validation at the gateways to entire community (versus essentially driveways for the other sites), it is necessary to subtract pass-by trips that would visit the retail uses, as those trips would not add traffic to the community gateways. Those values are shown in brackets. Table 6 – Validation Sites Trip Generation Comparison Site Size External Vehicle Trip Generation Daily AM Peak Hour PM Peak Hour October 2019 Count MXD+ 1 October 2019 Count MXD+ 1 October 2019 Count MXD+ 1 Safeway / Avalon Bellevue, WA 4 acres 5,505 5,968 (+8%) 239 254 (+6%) 512 497 (- 3%) Hazard Center San Diego, CA 16 acres 11,189 12,395 (+11%) 680 696 (+2%) 930 977 (+5%) Avalon Alpharetta, GA 79 acres 33,301 33,332 (0%) 1,685 1,894 (+12%) 2,543 2,674 (+5%) Southport West Sacramento, CA 3,000 acres 75,191 78,961 [74,138] 2 (-1.4%) 6,484 5,919 [5,672] 2 (-12.5%) 6,192 8,156 [7,480] 2 (+21%) Notes: 1 Values in parentheses represent the percent increase in trips estimated by MXD+ versus the 2019 field measurements. 2 Values in brackets represent the MXD+ external vehicle trips minus pass-by trips (see text below for explanation). The corresponding percentage (shown in parentheses) represents the percent change in trips estimated by MXD+ (after subtracting pass-by trips) versus the 2019 field measurements. du’s = dwelling units. ksf = thousand square feet. The following findings are derived from Table 6: • For the three smaller sites, MXD+ produces a desirable result in which each validation site’s external vehicle trips tend to be slightly overestimated. This is preferable to the converse in which MXD+ consistently underestimates actual trips. Accordingly, the results from MXD+ can be considered reasonably, but not overly, conservative. • The goodness of fit at the Avalon validation site was a particularly important outcome, as the calibration sites were not in that part of the US and also not “manufactured mixed- use” in an otherwise suburban setting. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 13 • Despite the calibration dataset consisting of a maximum site size of 221 acres and 1,840 units, the model’s estimate was within 1.4% of the actual count for daily conditions. But AM and PM peak hour validation results did not fare as well. We suspect the AM peak hour underestimation could be associated with the various schools (i.e., three K-8 public schools and a public high school) in the community and their district boundaries (i.e., more students being transported from outside the community to these schools). The PM peak hour overestimation likely stems from reliance on ITE trip rates for single-family and multi- family uses, which turned out to be substantially higher than was observed in one particular neighborhood4. The Southport validation site highlights how use of MXD+ may be considered for very large projects, but it would be prudent to perform spot checks of trip rates, understand school district boundaries, etc. Table 7 displays the internal trip percentage reductions, and external trips made by transit and walk/bike for each validation site. Table 7 – Percent Internal Trips and External Non-Auto Trips at Each Validation Site Site Percent Reduction in Daily Trips Due to Percent Reduction in AM Peak Hour Trips Due to Percent Reduction in PM Peak Hour Trips Due to Internal Trips External Trips Internal Trips External Trips Internal Trips External Trips Transit Bike/ Walk Transit Bike/ Walk Transit Bike/ Walk Safeway / Avalon Bellevue, WA 4.1% 6.4% 29.1% 9.2% 6.7% 35.0% 14.2% 6.5% 28.4% Hazard Center, San Diego, CA 4.7% 4.9% 11.6% 10.1% 5.6% 14.3% 14.1% 5.3% 11.6% Avalon Alpharetta, GA 5.4% 3.8% 2.3% 9.9% 4.1% 2.9% 12.0% 3.9% 2.3% Southport, West Sacramento, CA 26.8% 1.8% 0.3% 39.0% 2.0% 0.3% 23.7% 2.2% 0.2% 4 In one neighborhood consisting a combined 325 single-family and multi-family units, the measured vehicle trips entering/exiting the neighborhood during the PM peak hour trip was 51% below the unadjusted ITE trip rates for those uses. When translated to the 7,700 total units in Southport, this resulted in ITE gross trips beginning at a level much higher than was being generated. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 14 Notes: 1 Output from MXD+. The following conclusions are drawn from the results in Table 7: • It is not surprising that the Bellevue, WA site had a large bike/walk percentage given that is situated in Downtown Bellevue, where numerous jobs, retail, and recreation are situated close to the site. • At the San Diego, CA site, internalization was greatest during the PM peak hour given the full activation of the various retail offerings and conclusion of the office workday. • Despite the variety of complementary land uses at the Avalon Alpharetta, GA site, only modest levels of internalization were estimated. This is due to the amount of office space (over half a million square feet), which is disproportionately higher than the other uses. The site’s jobs-housing balance skews heavily toward non-residential. It should also be noted that about 4% of external trips were assumed to be transit. This would equate to about 140 riders during the PM peak hour, which seems a bit excessive for the fixed-route bus service present.5 • At the Southport, CA site, internalization was greatest during the AM peak hour, which is expected given the effects of travel between home and school (to drop off students or work). External travel by transit and walk/bike was modest (less than 2.5%) as expected given that most households are not within walking distance of a bus stop and nearby destinations cannot easily be accessed on foot or by bike. Charts 2 and 3 show results for AM and PM peak hours, respectively, of how MXD+ performed versus the ITE Internalization Method for the Bellevue, WA, San Diego, CA, and Alpharetta, GA validation sites. The Southport West Sacramento, CA site was excluded for the aforementioned 5 In situations like this, local knowledge of expected transit ridership could dictate that the analyst modify MXD+ to assume no transit service, with an “off model” approach followed to determine whether any transit reductions are warranted. The presence of transit is a binary choice in MXD+. The type of transit, headways, service duration, and geographic service area are not explicitly considered. Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 15 reasons regarding the effects of pass-by traffic, which equally influence results from MXD+ and the ITE Internalization Method. As shown, the MXD+ estimate was closer to the actual count value at all three locations during the AM peak hour, and at two of the three locations during the PM peak hour. During the AM peak hour, the average absolute error was 7% for MXD+ and 28% for the ITE Internalization method. During the PM peak hour, the average absolute error was 4% for MXD+ and 10% for the ITE Internalization method. This clearly indicates that MXD estimates were more accurate than the ITE Internalization Method at the validation data sites. 6% 2% 12% 59% -11%-13%-20% -10% 0% 10% 20% 30% 40% 50% 60% 70% Pe r c e n t I n c r e a s e / D e c r e a s e Ve r s u s A c t u a l C o u n t Chart 2: MXD+ Versus ITE Internalization Method Comparison - AM Peak Hour Conditions MXD+ Accuracy ITE Internalization Method Accuracy Safeway / Avalon Bellevue, WA Avalon Alpharetta, GA Hazard Center San Diego, CA Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 16 Conclusions This study has demonstrated that a minor recalibration of MXD+ has resulted in an analytical tool that accurately estimates the trip generation of mixed-use developments for weekday daily, AM peak hour, and PM peak hour conditions. By focusing the recalibration on 2019 conditions, the model was proven to develop accurate travel estimates despite the myriad changes in travel behavior that have occurred since the model was originally developed. The validation of the model against four mixed-use sites indicates that it may be applied across a wide range of geographies, project sizes, transportation mode availability, and land use mixes. -3% 5%5% 13% 3% -13%-15% -10% -5% 0% 5% 10% 15% Pe r c e n t I n c r e a s e / D e c r e a s e Ve r s u s A c t u a l C o u n t Chart 3: MXD+ Versus ITE Internalization Method Comparison - PM Peak Hour Conditions MXD+ Accuracy ITE Internalization Method Accuracy Safeway / Avalon Bellevue, WA Hazard Center San Diego, CA Avalon Alpharetta, GA Mixed-Use Trip Generation (MXD+) Model Recalibration and Validation to 2019 Conditions July 13, 2020 Page 17 Paper Contributors John Gard, T.E., is a Principal with 25 years of consulting experience at Fehr & Peers. John has applied MXD+ on numerous projects across the Western United States. He has a Bachelor’s degree in Applied Mathematics and a Master’s Degree in Civil Engineering from U.C. Davis. He can be reached at j.gard@fehrandpeers.com. Corwin Bell is a Transportation Planner at Fehr & Peers with a background in consulting and academic research. He has a Bachelor’s Degree in Urban Studies and a Master’s Degree in City Planning from U.C. Berkeley. He can be reached at c.bell@fehrandpeers.com. References Walters, Jerry, Bochner, Brian, and Ewing, Reid. 2013. Getting Trip Generation Right: Eliminating the Bias Against Mixed-Use Development (American Planning Association, 2013 PAS Memo. Bochner, Brian, Hooper, Kevin, Sperry, Benjamin, and Dunphy, Robert, 2011. NCHRP Report 684: Enhancing Internal Trip Capture Estimation for Mixed-Use Developments. Washington, DC: National Cooperative Highway Research Program, Transportation Research Board. Institute of Transportation Engineers, 2017 Trip Generation Manual, 10th Edition. Institute of Transportation Engineers, 2017 Trip Generation Handbook. P Appendix E: Pass-by Volumes Land Use Code Land Use Setting Time Period # Data Sites Average Pass-By Rate GLA (000)Primary (%)Diverted (%)Total (%)Source 45 Florida 1992 844 56 24 20 44 —30 50 Florida 1992 555 41 41 18 59 —30 52 Florida 1995 665 42 33 25 58 —30 53 Florida 1993 162 59 ——41 —30 57.23 Kentucky 1993 247 31 53 16 69 2659 34 60 Florida 1995 1583 40 38 22 60 —30 69.4 Kentucky 1993 109 25 42 33 75 1559 34 77 Florida 1992 365 46 ——54 —30 78 Florida 1991 702 55 23 22 45 —30 82 Florida 1992 336 34 ——66 —30 92.857 Kentucky 1993 133 22 50 28 78 3555 34 100.888 Kentucky 1993 281 28 50 22 72 2111 34 121.54 Kentucky 1993 210 53 30 17 47 2636 34 144 New Jersey 1990 176 32 44 24 68 —24 146.8 Kentucky 1993 —36 39 25 64 —34 General Urban/Suburban Vehicle Pass-By Rates by Land Use Source: ITE Trip Generation Manual , 11th Edition 821 Shopping Plaza (40 - 150k) Weekday PM Peak Period 15 40% Pass-By Characteristics for Individual Sites State or Province Survey Year # Interviews Pass-By Trip (%) Non-Pass-By Trips Adj Street Peak Hour Volume Orchards Pass By Trip Calculation 9/16/25 Copied from Orchards_TripGen_11-12-2024:Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 San Ramon Valley Boulevard Bollinger Canyon Road 176 315 493 174 256 9 17 510 250 407 318 275 110 290 419 234 333 15 23 449 154 657 596 334 Prevailing traffic volumes on Bollinger2I-680 SB Ramps Bollinger Canyon Road 17 606 12 238 1164 13 762 1 40 752 20 633 1093 9 953 AM PM SA3I-680 NB Ramps Bollinger Canyon Road 288 961 1053 1263 721 351 732 1381 1672 443 4 Sunset Drive Shops Driveway 228 229 65 4 10 3 21 55 46 28 56 30 55 27 131 25 192 29 4 95 208 73 103 9 49%44%39%5 Sunset Drive Bishop Drive 167 479 102 10 65 9 12 3 99 45 14 31 283 150 191 33 397 43 24 16 324 148 22 39 51%56%61%6 Chevron Drive-Sunset Drive Bollinger Canyon Road 50 159 660 1354 1825 88 212 657 479 1634 1458 145 7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 23 15 3 133 22 125 348 955 101 28 1765 372 94 29 24 440 6 457 119 1701 26 1 1052 2848I-680 SB On-Ramp Bollinger Canyon Road 1416 371 762 789 1582 303 953 10709I-680 NB On-Ramp Bollinger Canyon Road 1053 363 1551 1381 201 2023 Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR1San Ramon Valley Boulevard Bollinger Canyon Road2I-680 SB Ramps Bollinger Canyon Road3I-680 NB Ramps Bollinger Canyon Road4Sunset Drive Shops Driveway5Sunset Drive Bishop Drive 6 Chevron Drive-Sunset Drive Bollinger Canyon Road 48%18%34%5%-5%-16%-33%49%46%-44%-2%46%14%40%-5%19%-14%-10%-36%46%35%-32%-3%7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 51%19%29%7%-7%-9%-26%35%58%-48%-10%37%10%53%-11%22%-11%-3%-42%45%33%-26%-7%8 I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR1San Ramon Valley Boulevard Bollinger Canyon Road2I-680 SB Ramps Bollinger Canyon Road3I-680 NB Ramps Bollinger Canyon Road4Sunset Drive Shops Driveway5Sunset Drive Bishop Drive6Chevron Drive-Sunset Drive Bollinger Canyon Road 8 3 6 1 -1 -6 -12 18 10 -9 -1 49 15 42 -5 19 -14 -15 -52 67 28 -26 -2 7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 5 2 3 1 -1 0 -1 1 12 -10 -2 26 7 37 -7 14 -7 0 -7 7 27 -21 -68I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR1San Ramon Valley Boulevard Bollinger Canyon Road -2 92I-680 SB Ramps Bollinger Canyon Road -2 9 3 I-680 NB Ramps Bollinger Canyon Road -2 94Sunset Drive Shops Driveway -4 -25Sunset Drive Bishop Drive -4 -2 6 Chevron Drive-Sunset Drive Bollinger Canyon Road7Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road -6 -158I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR1San Ramon Valley Boulevard Bollinger Canyon Road -6 -2 2 I-680 SB Ramps Bollinger Canyon Road -6 -23I-680 NB Ramps Bollinger Canyon Road -6 -24Sunset Drive Shops Driveway5Sunset Drive Bishop Drive6Chevron Drive-Sunset Drive Bollinger Canyon Road -6 -27Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road8I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 San Ramon Valley Boulevard Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 02I-680 SB Ramps Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 03I-680 NB Ramps Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 0 4 Sunset Drive Shops Driveway 0 -4 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 0 0 0 0 0 0 0 05Sunset Drive Bishop Drive 0 -4 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 0 0 0 0 0 0 0 06Chevron Drive-Sunset Drive Bollinger Canyon Road 8 3 6 0 1 -1 -6 -12 18 10 -15 -1 49 15 42 -5 19 -14 -15 -52 67 28 -28 -2 7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 5 2 3 0 1 -1 0 -7 1 12 -10 -2 26 7 37 -7 14 -7 0 -22 7 27 -21 -68I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Project trip assignment for retail - Inbound Trips1San Ramon Valley Boulevard Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 0 2 I-680 SB Ramps Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 03I-680 NB Ramps Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 0 Int 1 Int 24Sunset Drive Shops Driveway 0 -4 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 0 0 0 0 0 0 0 0 50%50%5 Sunset Drive Bishop Drive 0 -4 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 0 0 0 0 0 0 0 0 6 Chevron Drive-Sunset Drive Bollinger Canyon Road 8 3 6 0 1 -1 -6 -12 18 10 -15 -1 49 15 42 -5 19 -14 -15 -52 67 28 -28 -27Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 5 2 3 0 1 -1 0 -7 1 12 -10 -2 26 7 37 -7 14 -7 0 -22 7 27 -21 -68I-680 SB On-Ramp Bollinger Canyon Road -8 79I-680 NB On-Ramp Bollinger Canyon Road -8 7 Int 1 Int 2Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 90%10%1 San Ramon Valley Boulevard Bollinger Canyon Road 0 0 4 6 0 0 0 21 0 8 42 8 0 0 10 12 0 0 0 49 0 8 39 122I-680 SB Ramps Bollinger Canyon Road 0 0 0 126 0 0 0 32 0 0 58 0 0 0 0 263 0 0 0 71 0 0 59 03I-680 NB Ramps Bollinger Canyon Road 0 0 101 0 0 0 0 157 0 0 286 212 0 0 240 0 0 0 0 334 0 0 242 228 4 Sunset Drive Shops Driveway 23 24 0 0 8 0 0 0 8 0 0 0 15 16 0 0 19 0 0 0 17 0 0 05Sunset Drive Bishop Drive 0 47 0 0 16 0 0 0 0 0 0 0 0 31 0 0 36 0 0 0 0 0 0 0 Project trip assignment for retail - Outbound Trips6Chevron Drive-Sunset Drive Bollinger Canyon Road 376 47 87 0 16 0 0 53 205 54 122 0 408 31 44 0 36 0 0 125 449 120 62 0 7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 122 78 120 0 47 0 0 87 53 55 54 0 62 87 153 0 103 0 0 44 125 119 120 08I-680 SB On-Ramp Bollinger Canyon Road 0 0 0 0 0 0 0 157 0 0 58 228 0 0 0 0 0 0 0 334 0 0 59 1839I-680 NB On-Ramp Bollinger Canyon Road 0 0 0 0 0 0 0 157 0 0 286 0 0 0 0 0 0 0 0 334 0 0 242 0 Int 1 Int 2Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 60%40%1 San Ramon Valley Boulevard Bollinger Canyon Road 176 315 497 180 256 9 17 531 250 415 360 283 110 290 429 246 333 15 23 498 154 665 635 3462I-680 SB Ramps Bollinger Canyon Road 0 0 17 732 12 238 0 1196 13 0 820 0 1 0 40 1015 20 633 0 1164 9 0 1012 0 3 I-680 NB Ramps Bollinger Canyon Road 288 0 1062 0 0 0 0 1210 0 0 1549 933 351 0 972 0 0 0 0 1715 0 0 1914 6714Sunset Drive Shops Driveway 251 253 65 4 18 3 21 55 54 28 56 30 70 43 131 25 211 29 4 95 225 73 103 95Sunset Drive Bishop Drive 167 526 102 10 81 9 12 3 99 45 14 31 283 181 191 33 433 43 24 16 324 148 22 39 6 Chevron Drive-Sunset Drive Bollinger Canyon Road 376 47 87 50 16 159 660 1407 205 54 1947 88 408 31 44 212 36 657 479 1759 449 120 1520 1457Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 145 93 123 133 69 125 348 1042 154 83 1819 372 156 116 177 440 109 457 119 1745 151 120 1172 2848I-680 SB On-Ramp Bollinger Canyon Road 0 0 0 0 0 0 0 1573 371 0 820 1017 0 0 0 0 0 0 0 1916 303 0 1012 1253 9 I-680 NB On-Ramp Bollinger Canyon Road 0 0 0 0 0 0 0 1210 363 0 1837 0 0 0 0 0 0 0 0 1715 201 0 2265 0 Pass-by trips In 43 In 162Out27Out176 A. Existing Volumes AM Peak PM Peak Existing Plus Project Plus Pass-by Volumes AM Peak PM Peak C. Final Pass-By Volumes with Network Balancing AM Peak PM Peak C.1 Pass-By Trip Volume Network Balance (Int 6)AM Peak PM Peak G. Primary Trip Volume Adjustment (Done with Vistro)AM Peak PM Peak Referenced Pass By Trips AM Peak PM Peak B. Pass By Pattern AM Peak PM Peak C. Pass-By Trip Volume Adjustment AM Peak PM Peak C.2 Pass-By Trip Volume Network Balance (Int 7)AM Peak PM Peak P Appendix F: Trip Distribution Bishop Ranch Orchards Trip Distribution | 1 Memo Date: June 16, 2025 To: Stephanie Hill, Senior VP of Development, Bishop Ranch From: Andy Kosinski, PE and Ashlee Takushi, RSP1, Fehr & Peers Subject: Bishop Ranch Orchards Trip Distribution Analysis This Technical Memorandum presents the trip distribution analysis and assumptions for the Orchards Mixed-Use Development (“Project”) at 6001 Bollinger Canyon Road in San Ramon, California. The Project proposes a mix of single-family housing, multi-family housing, and retail uses to replace a corporate headquarters campus. Project Description The Project includes construction of 230 single-family detached residences, 138 single-family attached residences, 58 accessory dwelling units (ADU), 2,084-units of multi-family housing units, and 125,000 square feet of retail. Methodology Select zone analysis was performed using the Contra Costa Transportation Authority (CCTA) travel model to assess the impact and distribution of Project trips on the surrounding area by isolating the trips that begin and end at the traffic analysis zone (TAZ) where the Project is to be located. As the project is a mix of residential and retail uses, the trip distribution of employees and residents were calculated separately. Employment Trip Distribution The employment component of the Project is 125,000 square feet of retail. For this analysis, a representative zone north of the actual project TAZ was selected, TAZ 40108, which falls on the north side of Bollinger Canyon Road, instead of TAZ 40109. TAZ 40108 was used for this analysis to be consistent with the employment trips vehicle-miles-travelled (VMT) analysis, in which it was the superior choice of TAZ, as it had an employed residents-to-workers ratio more aligned with the City average, resulting in more reasonable VMT results. This analysis was also conducted using TAZ 40109, with negligible effect, as both TAZs have only retail as their only land use (as the model can only return link volumes for all employment in aggregate for a selected TAZ). Figure 1 and Figure 2 Bishop Ranch Orchards Trip Distribution | 2 present the link volumes representing automobile trips generated by the selected zone for the retail component of the project. The resulting trip distribution is summarized in Table 1. Residential Trip Distribution The residential component of the Project is 230 single-family detached residences, 138 single-family attached residences, 58 accessory dwelling units (ADU), and 2,084-units of multi-family housing units. For this analysis, the actual project TAZ of 40109 was selected. Figure 3 and Figure 4 present the link volumes representing automobile trips generated by the selected zone for the residential component of the project. The resulting trip distribution is summarized in Table 2. Bishop Ranch Orchards Trip Distribution | 3 Figure 1. AM Automobile Trips Generated by TAZ 40108 from Select Zone Analysis for Model “Interim Year 2024” Baseline Plus Retail Component of Project Source: CCTA Travel Demand Model, Fehr & Peers, 2025. 40108 Representative Zone Internal Trips 1 2 3 4 5 Camino Ramon Alcosta Boulevard 40108 Bishop Ranch Orchards Trip Distribution | 4 Figure 2. PM Automobile Trips Generated by TAZ 40108 from Select Zone Analysis for Model “Interim Year 2024” Baseline Plus Retail Component of Project Source: CCTA Travel Demand Model, Fehr & Peers, 2025. Representative Zone Internal Trips 1 2 3 4 5 Camino Ramon Alcosta Boulevard Bishop Ranch Orchards Trip Distribution | 5 Table 1. Employment Trip Distribution Gate Model Segment Names AM Volume AM Volume Distribution PM Volume PM Volume Distribution Unrounded Average Distribution Rounded Average Distribution Proposed Trip Distribution 1 I-680 North1 127 28% 125 25% 28% 30% 30% San Ramon Valley Blvd North 2 0% 2 0% 0% 0% 2 Bollinger Canyon West 17 4% 19 4% 4% 5% 5% 3 San Ramon Valley Blvd South 22 5% 30 6% 6% 5% 25% I-680 South 102 22% 85 17% 20% 20% 4 Bollinger Canyon East2 121 26% 147 30% 29% 30% 25% 5 Sunset Drive 0 0% 0 0% 0% 0% 15% Bishop Drive West 12 3% 22 4% 4% 5% Camino Ramon 37 8% 45 9% 9% 10% Total of Gates 1-5 439 96% 473 96% 100% 105% 100% Internal Trips3 17 4% 22 4% Total Trips 457 100% 495 100% Notes: 1. Many residential areas that may serve as the labor pool for this area lie to the north, such as Central Contra Costa County and Lamorinda; thus, the proposed trip distribution to Gate 1 is greater than Gate 3. 2. The model may be overstating the access to workers who live to/from the east via local roads, such as Gate 4, rather than the freeway, so the proposed trip distribution for Gate 4 is slightly reduced. 3. The internal trips refer to Project trips that travel across Bollinger Canyon Road to the other side of the street, so they have not been included in the trip distribution for simplicity. Source: Fehr & Peers, 2025. Bishop Ranch Orchards Trip Distribution | 8 Figure 3. PM Automobile Trips Generated by TAZ 40109 from Select Zone Analysis for Model “Interim Year 2024” Baseline Plus Residential Component of Project Source: CCTA Travel Demand Model, Fehr & Peers, 2025. 1 2 3 4 5 Camino Ramon Alcosta Boulevard Project TAZ Bishop Ranch Orchards Trip Distribution | 9 Figure 4. PM Automobile Trips Generated by TAZ 40109 from Select Zone Analysis for Model “Interim Year 2024” Baseline Plus Residential Component of Project Source: CCTA Travel Demand Model, Fehr & Peers, 2025. 1 2 3 4 5 Camino Ramon Alcosta Boulevard Project TAZ Bishop Ranch Orchards Trip Distribution | 8 Table 2. Residential Trip Distribution Gate Model Segment Names AM Volume AM Volume Distribution PM Volume PM Volume Distribution Unrounded Average Distribution Rounded Average Distribution Proposed Trip Distribution 1 I-680 North1 273 20% 260 18% 19% 20% 25% San Ramon Valley Blvd North 5 0% 4 0% 0% 0% 2 Bollinger Canyon West 35 3% 38 3% 3% 5% 5% 3 San Ramon Valley Blvd South2 142 11% 133 9% 10% 10% 30% I-680 South 315 23% 287 20% 22% 20% 4 Bollinger Canyon East3 375 28% 452 32% 30% 30% 25% 5 Sunset Drive4 35 3% 39 3% 3% 5% 15% Bishop Drive West 38 3% 52 4% 3% 5% Camino Ramon 122 9% 144 10% 10% 10% Total of Gates 1-5 1341 100% 1410 100% 100% 105% 100% Notes: 1. The model may be understating the longer distance to and from the north using Gate 1, while overstating the local trips using Gate 5; therefore, the percentage using Gate 1 was slightly increased. 2. Much of the employment in the region lies to the south, in the Tri-Valley and Silicon Valley area. Trips travelling to job centers like San Francisco and Oakland would primarily use Gates 1 and 3; thus, the proposed trip distribution to Gate 3 is greater than Gate 1. 3. Job opportunities to the east are highly accessible using the freeway, so the model may overstate volumes using local roads such as Gate 4. The proposed trip distribution for Gate 4 is slightly reduced. 4. The model may be overstating longer distance trips to and from the north that are using the local roads of Gate 5, when freeway accessibility via Gate 1 is high for many. The proposed trip distribution for Gate 5 is slightly reduced. Source: Fehr & Peers, 2025. P Appendix G: Cumulative Volumes Use Cube or TransCAD?TransCAD TransCAD Intersection ID East/West North/South LinkIDs AB Direction. 1 = towards int 1. Bollinger Canyon Rd / San Ramon Valley Blvd 1 Bollinger Canyon Rd San Ramon Valley Blvd 29063 0 29061 44970 0 1 42185 1 2. Bollinger Canyon Rd / I-680 SB Off-Ramps 2 Bollinger Canyon Rd I-680 SB Off-Ramps 103230 1 3510 3507 0 0 104108 0 3. Bollinger Canyon Rd / I-680 NB Off-Ramps 3 Bollinger Canyon Rd I-680 NB Off-Ramps 43513 0 43506 43512 1 0 103228 1 4. Shops Driveway / Sunset Dr 4 Shops Driveway Sunset Dr 5. Bishop Dr / Sunset Dr 5 Bishop Dr Sunset Dr 6. Bollinger Canyon Rd / Chevon Driveway-Sunset Dr 6 Bollinger Canyon Rd Chevon Driveway-Sunset Dr 42183 1 34384 42182 0 0 42184 1 7. Bollinger Canyon Rd / BR1-Camino Ramon 7 Bollinger Canyon Rd BR1-Camino Ramon 42180 0 34388 3562 1 0 84117 1 8. Bollinger Canyon Rd / I-680 SB On-Ramp 8 Bollinger Canyon Rd I-680 SB On-Ramp 104107 0 3507 43509 1 0 9. Bollinger Canyon Rd / I-680 NB On-Ramp 9 Bollinger Canyon Rd I-680 NB On-Ramp 43509 43506 1 0 104109 0 Orchards Furness Setup_AM1Hr 9/16/25 Lookup Int. ID Description NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR ID NB SB EB WB NB SB EB WB TOTAL100111. Bollinger Canyon Rd / San Ramon Valley Blvd 176 315 493 174 256 9 17 510 250 407 318 275 1 984 439 777 1,000 607 913 1,177 503 3,200100222. Bollinger Canyon Rd / I-680 SB Off-Ramps 0 0 17 606 12 238 0 1,164 13 0 762 0 2 17 856 1,177 762 0 25 1,787 1,000 2,812100333. Bollinger Canyon Rd / I-680 NB Off-Ramps 288 0 961 0 0 0 0 1,053 0 0 1,263 721 3 1,249 0 1,053 1,984 721 0 2,014 1,551 4,286100444. Shops Driveway / Sunset Dr 228 229 65 4 10 3 21 55 46 28 56 30 4 522 17 122 114 280 84 124 287 775100555. Bishop Dr / Sunset Dr 167 479 102 10 65 9 12 3 99 45 14 31 5 748 84 114 90 522 209 115 190 1,036100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 0 0 0 50 0 159 660 1,354 0 0 1,825 88 6 0 209 2,014 1,913 748 0 1,404 1,984 4,136100777. Bollinger Canyon Rd / BR1-Camino Ramon 23 15 3 133 22 125 348 955 101 28 1,765 372 7 41 280 1,404 2,165 735 151 1,091 1,913 3,890100888. Bollinger Canyon Rd / I-680 SB On-Ramp 0 0 0 0 0 0 0 1,416 371 0 762 789 8 0 0 1,787 1,551 789 371 1,416 762 3,338100999. Bollinger Canyon Rd / I-680 NB On-Ramp 0 0 0 0 0 0 0 1,053 363 0 1,551 0 9 0 0 1,416 1,551 0 363 1,053 1,551 2,967 Initial Turning Movement Volumes Initial Entering Initial Exiting Orchards Furness Setup_AM1Hr 9/16/25 Lookup Int. ID Description100111. Bollinger Canyon Rd / San Ramon Valley Blvd100222. Bollinger Canyon Rd / I-680 SB Off-Ramps100333. Bollinger Canyon Rd / I-680 NB Off-Ramps100444. Shops Driveway / Sunset Dr100555. Bishop Dr / Sunset Dr100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 1007 7 7. Bollinger Canyon Rd / BR1-Camino Ramon100888. Bollinger Canyon Rd / I-680 SB On-Ramp100999. Bollinger Canyon Rd / I-680 NB On-Ramp Difference Method Approach/Departure ID NB SB EB WB NB SB EB WB Check11,533 804 887 1,094 962 1,408 1,403 545 3,2002179981,403 787 0 81 2,031 1,094 2,81231,263 0 1,217 1,667 380 0 2,190 1,576 4,2864#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A5#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A631981,697 1,603 737 40 1,550 2,160 5,1237544941,550 1,945 959 194 1,307 1,603 3,9108#N/A 0 2,031 1,576 789 #N/A 1,660 787 #N/A90#N/A 1,660 1,576 #N/A 443 1,217 1,576 #N/A Entering Exiting Orchards Furness Setup_AM1Hr 9/16/25 Lookup Int. ID Description100111. Bollinger Canyon Rd / San Ramon Valley Blvd100222. Bollinger Canyon Rd / I-680 SB Off-Ramps100333. Bollinger Canyon Rd / I-680 NB Off-Ramps100444. Shops Driveway / Sunset Dr100555. Bishop Dr / Sunset Dr100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 1007 7 7. Bollinger Canyon Rd / BR1-Camino Ramon100888. Bollinger Canyon Rd / I-680 SB On-Ramp100999. Bollinger Canyon Rd / I-680 NB On-Ramp TransCAD - Base Year TransCAD - Future Year ID NB SB EB WB NB SB EB WB Check ID NB SB EB WB NB SB EB WB Check18442358019742551,214 1,018 367 0 1 1,393 601 911 1,068 610 1,710 1,244 409 0201,200 1,018 385 0 215 1,414 974 0 2 0 1,343 1,244 410 0 271 1,658 1,068 031,485 0 995 2,152 1,604 0 2,330 698 0 3 1,500 0 1,159 1,834 1,264 0 2,505 724 04#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 4 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A5#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 5 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A656752,152 2,141 260 293 1,897 2,330 356 6 58 64 1,834 1,832 249 333 2,043 2,505 1,3437681,509 1,897 2,629 336 159 1,120 2,141 -2,346 7 81 1,723 2,043 2,409 560 202 1,336 1,832 -2,3268#N/A 0 1,414 698 313 #N/A 1,414 385 #N/A 8 #N/A 0 1,658 724 313 #N/A 1,658 410 #N/A90#N/A 1,414 698 #N/A 419 995 698 #N/A 9 0 #N/A 1,658 724 #N/A 499 1,159 724 #N/A Entering Exiting Entering Exiting Orchards Furness Setup_PM1Hr 9/16/25 Lookup Int. ID Description NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR ID NB SB EB WB NB SB EB WB TOTAL100111. Bollinger Canyon Rd / San Ramon Valley Blvd 110 290 419 234 333 15 23 449 154 657 596 334 1 819 582 626 1,587 647 1,144 1,102 721 3,614100222. Bollinger Canyon Rd / I-680 SB Off-Ramps 1 0 40 752 20 633 0 1,093 9 0 953 0 2 41 1,405 1,102 953 0 29 1,885 1,587 3,501100333. Bollinger Canyon Rd / I-680 NB Off-Ramps 351 0 732 0 0 0 0 1,381 0 0 1,672 443 3 1,083 0 1,381 2,115 443 0 2,113 2,023 4,579100444. Shops Driveway / Sunset Dr 55 27 131 25 192 29 4 95 208 73 103 9 4 213 246 307 185 40 473 251 187 951100555. Bishop Dr / Sunset Dr 283 150 191 33 397 43 24 16 324 148 22 39 5 624 473 364 209 213 869 240 348 1,670100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 0 0 0 212 0 657 479 1,634 0 0 1,458 145 6 0 869 2,113 1,603 624 0 1,846 2,115 4,585100777. Bollinger Canyon Rd / BR1-Camino Ramon 94 29 24 440 6 457 119 1,701 26 1 1,052 284 7 147 903 1,846 1,337 432 33 2,165 1,603 4,233100888. Bollinger Canyon Rd / I-680 SB On-Ramp 0 0 0 0 0 0 0 1,582 303 0 953 1,070 8 0 0 1,885 2,023 1,070 303 1,582 953 3,908100999. Bollinger Canyon Rd / I-680 NB On-Ramp 0 0 0 0 0 0 0 1,381 201 0 2,023 0 9 0 0 1,582 2,023 0 201 1,381 2,023 3,605 Initial Turning Movement Volumes Initial Entering Initial Exiting Orchards Furness Setup_PM1Hr 9/16/25 Lookup Int. ID Description100111. Bollinger Canyon Rd / San Ramon Valley Blvd100222. Bollinger Canyon Rd / I-680 SB Off-Ramps100333. Bollinger Canyon Rd / I-680 NB Off-Ramps100444. Shops Driveway / Sunset Dr100555. Bishop Dr / Sunset Dr100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 1007 7 7. Bollinger Canyon Rd / BR1-Camino Ramon100888. Bollinger Canyon Rd / I-680 SB On-Ramp100999. Bollinger Canyon Rd / I-680 NB On-Ramp Difference Method Approach/Departure ID NB SB EB WB NB SB EB WB Check11,676 1,150 664 1,704 953 2,123 1,222 896 3,6142411,300 1,222 939 0 -132 1,930 1,704 3,50131,059 0 1,551 1,995 667 0 1,982 1,956 4,5794#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A5#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A6318591,993 1,459 613 8 1,714 1,984 4,56371891,307 1,714 1,327 684 53 2,035 1,459 3,9278#N/A 0 1,930 1,956 1,017 #N/A 1,627 939 #N/A90#N/A 1,627 1,956 #N/A 76 1,551 1,956 #N/A Entering Exiting Orchards Furness Setup_PM1Hr 9/16/25 Lookup Int. ID Description100111. Bollinger Canyon Rd / San Ramon Valley Blvd100222. Bollinger Canyon Rd / I-680 SB Off-Ramps100333. Bollinger Canyon Rd / I-680 NB Off-Ramps100444. Shops Driveway / Sunset Dr100555. Bishop Dr / Sunset Dr100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 1007 7 7. Bollinger Canyon Rd / BR1-Camino Ramon100888. Bollinger Canyon Rd / I-680 SB On-Ramp100999. Bollinger Canyon Rd / I-680 NB On-Ramp TransCAD - Base Year TransCAD - Future Year ID NB SB EB WB NB SB EB WB Check ID NB SB EB WB NB SB EB WB Check19191974431,175 385 871 764 714 0 1 1,776 766 481 1,291 691 1,850 884 889 0201,776 764 680 0 235 1,810 1,175 0 2 0 1,670 884 666 0 74 1,855 1,291 0365401,671 2,041 755 0 2,006 1,606 0 3 630 0 1,841 1,921 978 0 1,874 1,539 04#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 4 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A5#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 5 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A62222202,041 1,737 106 83 1,954 2,006 -72 6 253 209 1,921 1,593 96 91 1,821 1,874 -9471765211,954 1,423 1,190 110 2,375 1,737 1,339 7 218 925 1,821 1,412 1,442 130 2,245 1,593 1,0348#N/A 0 1,810 1,606 926 #N/A 1,810 680 #N/A 8 #N/A 0 1,855 1,539 874 #N/A 1,855 666 #N/A90#N/A 1,810 1,606 #N/A 139 1,671 1,606 #N/A 9 0 #N/A 1,855 1,539 #N/A 14 1,841 1,539 #N/A Entering Exiting Entering Exiting Comparing existing counts with raw Furness volumes and balanced Furness volumes Existing AM Existing PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614 2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501 3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579 4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951 5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670 6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585 7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233 8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908 9 1053 363 1551 2,967 9 1381 201 2023 3,605 26,440 30,646 Cumulative Raw AM (from Furness)Cumulative Raw PM (from Furness) INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 260 620 670 250 550 20 30 510 370 500 320 330 4,430 1 330 690 670 240 900 30 30 450 320 920 600 340 5,520 2 0 0 20 660 40 310 0 1360 50 0 790 0 3,230 2 10 0 50 760 20 730 0 1270 10 0 980 0 3,830 3 300 0 970 0 0 0 0 1220 0 0 1290 730 4,510 3 610 0 740 0 0 0 0 1530 0 0 1680 670 5,230 4 230 230 70 10 10 10 30 60 50 30 60 30 820 4 60 30 140 30 200 30 10 100 210 80 110 10 1,010 5 170 480 110 10 70 10 20 10 100 50 20 40 1,090 5 290 150 200 40 400 50 30 20 330 150 30 40 1,730 6 0 0 0 60 0 200 660 1500 0 0 1970 90 4,480 6 0 0 0 220 0 660 480 1640 0 0 1460 150 4,610 7 30 30 10 280 50 180 430 1030 120 40 1770 510 4,480 7 100 60 30 630 20 580 180 1710 40 10 1060 450 4,870 8 0 0 0 0 0 0 0 1660 380 0 790 790 3,620 8 0 0 0 0 0 0 0 1630 310 0 960 1070 3,970 9 0 0 0 0 0 0 0 1220 450 0 1580 0 3,250 9 0 0 0 0 0 0 0 1560 210 0 2030 0 3,800 29,910 34,570 Cumulative Balanced AM Cumulative Balanced PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 260 620 670 250 550 20 30 510 370 500 320 330 4,430 1 330 690 670 240 900 30 30 450 320 920 600 340 5,520 2 20 660 40 310 1380 50 840 3,300 2 10 50 760 20 750 1350 10 1100 4,050 3 300 970 1220 1390 780 4,660 3 620 740 1610 1690 670 5,330 4 230 240 70 10 10 10 30 60 60 30 60 30 840 4 60 30 140 30 210 30 10 100 210 80 110 10 1,020 5 170 480 110 10 80 10 20 10 120 60 20 40 1,130 5 310 160 220 40 410 50 30 20 340 160 30 40 1,810 6 60 200 670 1520 1970 90 4,510 6 220 690 530 1820 1670 160 5,090 7 30 30 10 280 50 190 430 1030 120 40 1840 510 4,560 7 100 60 30 630 20 620 190 1810 40 10 1110 450 5,070 8 1670 390 840 850 3,750 8 1820 340 1100 1210 4,470 9 1220 450 1690 3,360 9 1610 210 2310 4,130 30,540 36,490 Percent Growth (Existing -> Cumulative Adj) AM Percent Growth (Existing -> Cumulative Adj) PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 3.0%6.1%2.2%2.7%7.2%7.6%4.8%0.0%3.0%1.4%0.0%1.3%2.4%1 12.5%8.6%3.7%0.2%10.6%6.3%1.9%0.0%6.7%2.5%0.0%0.1%3.3% 2 1.1%0.6%14.6%1.9%1.2%17.8%0.6%1.1%2 56.3%1.6%0.1%0.0%1.2%1.5%0.7%1.0%1.0% 3 0.3%0.1%1.0%0.6%0.5%0.5%3 4.8%0.1%1.0%0.1%3.2%1.0% 4 0.1%0.3%0.5%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.5%4 0.6%0.7%0.4%1.3%0.6%0.2%9.4%0.3%0.1%0.6%0.4%0.7%0.5% 5 0.1%0.0%0.5%0.0%1.4%0.7%4.2%14.6%1.3%2.1%2.7%1.8%0.6%5 0.6%0.4%0.9%1.3%0.2%1.0%1.6%1.6%0.3%0.5%2.3%0.2%0.5% 6 1.3%1.6%0.1%0.8%0.5%0.1%0.6%6 0.2%0.3%0.7%0.7%0.9%0.6%0.7% 7 1.9%6.3%14.6%6.9%8.0%3.3%1.5%0.5%1.2%2.7%0.3%2.3%1.1%7 0.4%6.7%1.6%2.7%14.6%2.2%3.7%0.4%3.4%56.3%0.3%3.7%1.2% 8 1.1%0.3%0.6%0.5%0.8%8 0.9%0.8%1.0%0.8%0.9% 9 1.0%1.5%0.6%0.8%9 1.0%0.3%0.9%0.9% 1.0%1.2% Orchards Cumulative Volume Development 9/16/25 Shifting growth for certain (possible cut-through) movements to use freeway instead Existing AM Existing PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614 2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501 3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579 4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951 5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670 6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585 7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233 8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908 9 1053 363 1551 2,967 9 1381 201 2023 3,605 26,440 30,646 Cumulative Adjustments AM Cumulative Adjustments PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 260 620 670 250 550 20 30 510 370 500 320 330 4,430 1 330 690 670 240 900 30 30 450 320 920 600 340 5,520 2 20 660 40 310 1380 50 840 3,300 2 10 50 760 20 750 1350 10 1100 4,050 3 300 970 1220 1390 780 4,660 3 620 740 1610 1690 670 5,330 4 230 240 70 10 10 10 30 60 60 30 60 30 840 4 60 30 140 30 210 30 10 100 210 80 110 10 1,020 5 170 480 110 10 80 10 20 10 120 60 20 40 1,130 5 310 160 220 40 410 50 30 20 340 160 30 40 1,810 6 60 200 670 1520 1970 90 4,510 6 220 690 530 1820 1670 160 5,090 7 30 30 10 280 50 190 430 1030 120 40 1840 510 4,560 7 100 60 30 630 20 620 190 1810 40 10 1110 450 5,070 8 1670 390 840 850 3,750 8 1820 340 1100 1210 4,470 9 1220 450 1690 3,360 9 1610 210 2310 4,130 30,540 36,490 Cumulative AM Shift Cumulative PM Shift INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 -60 -220 -130 -60 -210 -10 -10 -90 -70 -40 -900 1 -160 -280 -180 0 -400 0 0 -120 -190 0 -1,330 2 -20 -30 -50 2 0 0 0 3 0 3 0 4 0 4 0 5 0 5 0 6 0 6 0 7 -110 -50 -60 -100 -320 7 -140 -120 -50 -120 -430 8 0 8 0 9 0 9 0 -1,270 -1,760 Cumulative AM with Shift - Unbalanced Cumulative PM with Shift - Unbalanced INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 200 400 540 190 340 10 20 510 280 430 320 290 3,530 1 170 410 490 240 500 30 30 450 200 730 600 340 4,190 2 20 660 20 310 1380 20 840 3,250 2 10 50 760 20 750 1350 10 1100 4,050 3 300 970 1220 1390 780 4,660 3 620 740 1610 1690 670 5,330 4 230 240 70 10 10 10 30 60 60 30 60 30 840 4 60 30 140 30 210 30 10 100 210 80 110 10 1,020 5 170 480 110 10 80 10 20 10 120 60 20 40 1,130 5 310 160 220 40 410 50 30 20 340 160 30 40 1,810 6 60 200 670 1520 1970 90 4,510 6 220 690 530 1820 1670 160 5,090 7 30 30 10 170 50 140 370 1030 120 40 1840 410 4,240 7 100 60 30 490 20 500 140 1810 40 10 1110 330 4,640 8 1670 390 840 850 3,750 8 1820 340 1100 1210 4,470 9 1220 450 1690 3,360 9 1610 210 2310 4,130 29,270 34,730 Percent Growth (Estimated) AM Percent Growth (Estimated) PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 0.9%1.7%0.6%0.6%2.1%0.7%1.1%0.0%0.8%0.4%0.0%0.3%0.6%1 3.4%2.6%1.1%0.2%3.1%6.3%1.9%0.0%1.9%0.7%0.0%0.1%3.3% 2 1.1%0.6%4.2%1.9%1.2%3.4%0.6%1.1%2 56.3%1.6%0.1%0.0%1.2%1.5%0.7%1.0%1.0% 3 0.3%0.1%1.0%0.6%0.5%0.5%3 4.8%0.1%1.0%0.1%3.2%1.0% 4 0.1%0.3%0.5%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.5%4 0.6%0.7%0.4%1.3%0.6%0.2%9.4%0.3%0.1%0.6%0.4%0.7%0.5% 5 0.1%0.0%0.5%0.0%1.4%0.7%4.2%14.6%1.3%2.1%2.7%1.8%0.6%5 0.6%0.4%0.9%1.3%0.2%1.0%1.6%1.6%0.3%0.5%2.3%0.2%0.5% 6 1.3%1.6%0.1%0.8%0.5%0.1%0.6%6 0.2%0.3%0.7%0.7%0.9%0.6%0.7% 7 1.9%6.3%14.6%1.7%8.0%0.8%0.4%0.5%1.2%2.7%0.3%0.6%1.1%7 0.4%6.7%1.6%0.7%14.6%0.6%1.1%0.4%3.4%56.3%0.3%1.0%1.2% 8 1.1%0.3%0.6%0.5%0.8%8 0.9%0.8%1.0%0.8%0.9% 9 1.0%1.5%0.6%0.8%9 1.0%0.3%0.9%0.9% 0.7%0.8% Orchards Cumulative Volume Development 9/16/25 Adding growth for certain turning movements to be 0.5% at minimum Existing AM Existing PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614 2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501 3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579 4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951 5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670 6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585 7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233 8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908 9 1053 363 1551 2,967 9 1381 201 2023 3,605 26,440 30,646 Cumulative Adjustments with 70% Shift AM - Balanced Cumulative Adjustments with 70% Shift PM - Balanced INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 200 400 540 180 340 10 20 610 280 430 390 290 3,690 1 170 410 490 240 500 30 30 650 200 730 760 340 4,550 2 20 890 20 370 1290 20 740 3,350 2 10 50 900 20 870 1370 10 950 4,180 3 360 1100 1200 1300 920 4,880 3 780 920 1520 1570 820 5,610 4 230 240 70 10 10 10 30 60 60 30 60 30 840 4 60 30 140 30 210 30 10 100 210 80 110 10 1,020 5 170 480 110 10 80 10 20 10 120 60 20 40 1,130 5 310 160 220 40 410 50 30 20 340 160 30 40 1,810 6 60 200 670 1630 2020 90 4,670 6 220 690 530 1910 1700 160 5,210 7 30 30 10 170 50 140 370 1200 120 40 1940 410 4,510 7 100 60 30 490 20 500 140 1950 40 10 1260 330 4,930 8 1720 480 740 920 3,860 8 1780 540 950 1400 4,670 9 1200 520 1660 3,380 9 1520 260 2350 4,130 30,310 36,110 Minimum Growth AM Minimum Growth PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 190 440 300 930 1 260 370 630 2 830 830 2 0 3 0 3 1810 1810 4 250 250 80 580 4 230 230 5 190 520 120 830 5 220 430 350 1000 6 720 720 6 0 230 230 7 380 410 790 7 110 110 8 830 830 8 0 9 0 9 0 5510 4010 Cumulative AM with Growth - Unbalanced Cumulative PM with Growth - Unbalanced INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 200 400 540 190 340 10 20 610 280 440 390 300 3,720 1 170 410 490 260 500 30 30 650 200 730 760 370 4,600 2 0 0 20 890 20 370 0 1290 20 0 830 0 3,440 2 10 0 50 900 20 870 0 1370 10 0 950 0 4,180 3 360 0 1100 0 0 0 0 1200 0 0 1300 920 4,880 3 780 0 920 0 0 0 0 1520 0 0 1810 820 5,850 4 250 250 80 10 10 10 30 60 60 30 60 30 880 4 60 30 140 30 210 30 10 100 230 80 110 10 1,040 5 190 520 120 10 80 10 20 10 120 60 20 40 1,200 5 310 160 220 40 430 50 30 20 350 160 30 40 1,840 6 0 0 0 60 0 200 720 1630 0 0 2020 90 4,720 6 0 0 0 230 0 690 530 1910 0 0 1700 160 5,220 7 30 30 10 170 50 140 380 1200 120 40 1940 410 4,520 7 110 60 30 490 20 500 140 1950 40 10 1260 330 4,940 8 0 0 0 0 0 0 0 1720 480 0 830 920 3,950 8 0 0 0 0 0 0 0 1780 540 0 950 1400 4,670 9 0 0 0 0 0 0 0 1200 520 0 1660 0 3,380 9 0 0 0 0 0 0 0 1520 260 0 2350 0 4,130 30,690 36,470 Percent Growth (Estimated) AM Percent Growth (Estimated) PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 0.9%1.7%0.6%0.6%2.1%0.7%1.1%1.2%0.8%0.5%1.4%0.6%1.0%1 3.4%2.6%1.1%0.7%3.1%6.3%1.9%2.8%1.9%0.7%1.7%0.7%1.6% 2 1.1%2.9%4.2%3.5%0.7%3.4%0.6%1.2%2 56.3%1.6%1.2%0.0%2.3%1.6%0.7%0.0%1.2% 3 1.6%0.9%0.9%0.2%1.7%0.9%3 7.6%1.6%0.6%0.5%5.3%1.4% 4 0.6%0.6%1.4%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.5%4 0.6%0.7%0.4%1.3%0.6%0.2%9.4%0.3%0.7%0.6%0.4%0.7%0.5% 5 0.9%0.5%1.1%0.0%1.4%0.7%4.2%14.6%1.3%2.1%2.7%1.8%0.6%5 0.6%0.4%0.9%1.3%0.5%1.0%1.6%1.6%0.5%0.5%2.3%0.2%0.5% 6 1.3%1.6%0.6%1.3%0.7%0.1%0.8%6 0.5%0.3%0.7%1.1%1.0%0.6%0.9% 7 1.9%6.3%14.6%1.7%8.0%0.8%0.6%1.6%1.2%2.7%0.6%0.6%1.0%7 1.1%6.7%1.6%0.7%14.6%0.6%1.1%0.9%3.4%56.3%1.2%1.0%1.0% 8 1.3%1.8%0.6%1.0%1.0%8 0.8%4.9%0.0%1.9%1.2% 9 0.9%2.7%0.4%0.9%9 0.6%1.8%1.0%0.9% 1.0%1.2% Absolute Difference between Percent Growth Absolute Difference between Percent Growth INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 1 -9.1%-6.0%-2.7%0.5%-7.5%2.8%-4.9%-1.8%1.7%0.6% 2 2 1.2%1.2%0.1%-1.0% 3 3 2.8%1.5%-0.4%0.4%2.1% 4 4 0.6% 5 5 0.3%0.2% 6 6 0.3%0.3%0.1% 7 7 0.7%-2.0%-1.6%-2.6%0.5%0.9%-2.6% 8 8 -0.2%4.1%-1.0%1.1% 9 9 -0.4%1.6%0.1% Orchards Cumulative Volume Comparison with Existing 9/16/2025 Balanced Synchro volumes from final adjustments Existing AM Existing PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614 2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501 3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579 4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951 5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670 6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585 7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233 8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908 9 1053 363 1551 2,967 9 1381 201 2023 3,605 overall 26,440 overall 30,646 Cumulative AM - Final Cumulative PM - Final INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 200 360 540 180 310 10 20 560 280 470 380 320 3,630 1 170 370 490 260 450 30 30 590 200 760 730 380 4,460 2 20 880 20 340 1260 20 830 3,370 2 10 50 900 20 810 1330 10 1050 4,180 3 390 1130 1210 1320 920 4,970 3 780 920 1520 1710 820 5,750 4 250 250 80 10 10 10 30 60 60 30 60 30 880 4 60 30 140 30 220 30 10 100 240 80 110 10 1,060 5 190 520 120 10 80 10 20 10 130 60 20 40 1,210 5 310 160 220 40 450 50 30 20 370 170 30 40 1,890 6 60 210 730 1610 2030 100 4,740 6 230 760 530 1910 1770 160 5,360 7 30 30 10 170 50 150 380 1170 120 40 1950 410 4,510 7 120 60 30 490 20 540 140 1960 40 10 1270 330 5,010 8 1730 430 830 880 3,870 8 1790 490 1050 1440 4,770 9 1210 520 1710 3,440 9 1520 270 2490 4,280 overall 30,620 overall 36,760 Percent Annualized Growth AM Percent Annualized Growth PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 0.9%0.9%0.6%0.2%1.3%0.7%1.1%0.6%0.8%1.0%1.2%1.0%0.8%1 3.4%1.7%1.1%0.7%2.2%6.3%1.9%2.0%1.9%1.0%1.4%0.9%1.5% 2 1.1%2.8%4.2%2.7%0.5%3.4%0.6%1.2%2 56.3%1.6%1.2%0.0%1.7%1.4%0.7%0.6%1.2% 3 2.2%1.1%0.9%0.3%1.7%1.0%3 7.6%1.6%0.6%0.1%5.3%1.6% 4 0.6%0.6%1.4%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.8%4 0.6%0.7%0.4%1.3%0.9%0.2%9.4%0.3%1.0%0.6%0.4%0.7%0.7% 5 0.9%0.5%1.1%0.0%1.4%0.7%4.2%14.6%2.0%2.1%2.7%1.8%1.0%5 0.6%0.4%0.9%1.3%0.8%1.0%1.6%1.6%0.9%0.9%2.3%0.2%0.8% 6 1.3%2.0%0.7%1.2%0.7%0.9%0.9%6 0.5%1.0%0.7%1.1%1.3%0.6%1.1% 7 1.9%6.3%14.6%1.7%8.0%1.3%0.6%1.4%1.2%2.7%0.7%0.6%1.0%7 1.7%6.7%1.6%0.7%14.6%1.1%1.1%1.0%3.4%56.3%1.3%1.0%1.1% 8 1.4%1.0%0.6%0.7%1.0%8 0.8%3.9%0.6%2.2%1.4% 9 0.9%2.7%0.6%1.0%9 0.6%2.1%1.4%1.2% overall 1.0%overall 1.2% Absolute Annualized Growth AM Absolute Annualized Growth PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 24 45 47 6 54 1 3 50 30 63 62 45 430 10%1 60 80 71 26 117 15 7 141 46 103 134 46 846 2 0 0 3 274 8 102 0 96 7 0 68 0 558 13%2 9 0 10 148 0 177 0 237 1 0 97 0 679 3 102 0 169 0 0 0 0 157 0 0 57 199 684 16%3 429 0 188 0 0 0 0 139 0 0 38 377 1171 4 22 21 15 6 0 7 9 5 14 2 4 0 105 3%4 5 3 9 5 28 1 6 5 32 7 7 1 109 5 23 41 18 0 15 1 8 7 31 15 6 9 174 4%5 27 10 29 7 53 7 6 4 46 22 8 1 220 6 0 0 0 10 0 51 70 256 0 0 205 12 604 14%6 0 0 0 18 0 103 51 276 0 0 312 15 775 7 7 15 7 37 28 25 32 215 19 12 185 38 620 15%7 26 31 6 50 14 83 21 259 14 9 218 46 777 8 0 0 0 0 0 0 0 314 59 0 68 91 532 13%8 0 0 0 0 0 0 0 208 187 0 97 370 862 9 0 0 0 0 0 0 0 157 157 0 159 0 473 11%9 0 0 0 0 0 0 0 139 69 0 467 0 675 overall 4180 overall 6114 Orchards Cumulative Volume Comparison with Existing 9/16/2025 Existing AM Existing PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614 2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501 3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579 4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951 5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670 6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585 7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233 8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908 9 1053 363 1551 2,967 9 1381 201 2023 3,605 overall 26,440 overall 30,646 Cumulative AM Cumulative PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 200 360 540 180 310 10 20 560 280 470 380 320 3,630 1 170 370 490 260 450 30 30 590 200 760 730 380 4,460 2 20 880 20 340 1260 20 830 3,370 2 10 50 900 20 810 1330 10 1050 4,180 3 390 1130 1210 1320 920 4,970 3 780 920 1520 1710 820 5,750 4 250 250 80 10 10 10 30 60 60 30 60 30 880 4 60 30 140 30 220 30 10 100 240 80 110 10 1,060 5 190 520 120 10 80 10 20 10 130 60 20 40 1,210 5 310 160 220 40 450 50 30 20 370 170 30 40 1,890 6 60 210 730 1610 2030 100 4,740 6 230 760 530 1910 1770 160 5,360 7 30 30 10 170 50 150 380 1170 120 40 1950 410 4,510 7 120 60 30 490 20 540 140 1960 40 10 1270 330 5,010 8 1730 430 830 880 3,870 8 1790 490 1050 1440 4,770 9 1210 520 1710 3,440 9 1520 270 2490 4,280 overall 30,620 overall 36,760 Percent Growth AM Percent Growth PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 0.9%0.9%0.6%0.2%1.3%0.7%1.1%0.6%0.8%1.0%1.2%1.0%0.8%1 3.4%1.7%1.1%0.7%2.2%6.3%1.9%2.0%1.9%1.0%1.4%0.9%1.5% 2 1.1%2.8%4.2%2.7%0.5%3.4%0.6%1.2%2 56.3%1.6%1.2%0.0%1.7%1.4%0.7%0.6%1.2% 3 2.2%1.1%0.9%0.3%1.7%1.0%3 7.6%1.6%0.6%0.1%5.3%1.6% 4 0.6%0.6%1.4%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.8%4 0.6%0.7%0.4%1.3%0.9%0.2%9.4%0.3%1.0%0.6%0.4%0.7%0.7% 5 0.9%0.5%1.1%0.0%1.4%0.7%4.2%14.6%2.0%2.1%2.7%1.8%1.0%5 0.6%0.4%0.9%1.3%0.8%1.0%1.6%1.6%0.9%0.9%2.3%0.2%0.8% 6 1.3%2.0%0.7%1.2%0.7%0.9%0.9%6 0.5%1.0%0.7%1.1%1.3%0.6%1.1% 7 1.9%6.3%14.6%1.7%8.0%1.3%0.6%1.4%1.2%2.7%0.7%0.6%1.0%7 1.7%6.7%1.6%0.7%14.6%1.1%1.1%1.0%3.4%56.3%1.3%1.0%1.1% 8 1.4%1.0%0.6%0.7%1.0%8 0.8%3.9%0.6%2.2%1.4% 9 0.9%2.7%0.6%1.0%9 0.6%2.1%1.4%1.2% overall 1.0%overall 1.2% Absolute Growth AM Absolute Growth PM INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 24 45 47 6 54 1 3 50 30 63 62 45 430 10%1 60 80 71 26 117 15 7 141 46 103 134 46 846 2 0 0 3 274 8 102 0 96 7 0 68 0 558 13%2 9 0 10 148 0 177 0 237 1 0 97 0 679 3 102 0 169 0 0 0 0 157 0 0 57 199 684 16%3 429 0 188 0 0 0 0 139 0 0 38 377 1171 4 22 21 15 6 0 7 9 5 14 2 4 0 105 3%4 5 3 9 5 28 1 6 5 32 7 7 1 109 5 23 41 18 0 15 1 8 7 31 15 6 9 174 4%5 27 10 29 7 53 7 6 4 46 22 8 1 220 6 0 0 0 10 0 51 70 256 0 0 205 12 604 14%6 0 0 0 18 0 103 51 276 0 0 312 15 775 7 7 15 7 37 28 25 32 215 19 12 185 38 620 15%7 26 31 6 50 14 83 21 259 14 9 218 46 777 8 0 0 0 0 0 0 0 314 59 0 68 91 532 13%8 0 0 0 0 0 0 0 208 187 0 97 370 862 9 0 0 0 0 0 0 0 157 157 0 159 0 473 11%9 0 0 0 0 0 0 0 139 69 0 467 0 675 overall 4180 overall 6114