HomeMy WebLinkAboutI. Orchards Traffic Operations Report, dated November 10, 2025Bishop Ranch
Orchards
Traffic Operations Report
Prepared for: Submitted on:
Bishop Ranch November 10, 2025
P
Table of Contents
Executive Summary ........................................................................................................................ 1
1.0 Introduction .............................................................................................................................. 3
Project Description ................................................................................................................................................... 3
2.0 Intersection Analysis Methodology ....................................................................................... 4
Study Area ................................................................................................................................................................... 4
Analysis Scenarios ..................................................................................................................................................... 4
Signalized Intersections ........................................................................................................................................... 5
City Evaluation Criteria ............................................................................................................................................ 5
3.0 Existing Traffic Conditions .....................................................................................................7
Context ......................................................................................................................................................................... 7
Existing Intersection Level of Service .................................................................................................................. 7
Existing Queues ......................................................................................................................................................... 8
4.0 Project Travel Demand........................................................................................................... 11
Project Trip Generation ........................................................................................................................................... 11
Project Trip Distribution and Assignment .........................................................................................................14
5.0 Existing with Project Conditions .......................................................................................... 16
Existing with Project Intersection Level of Service ......................................................................................... 16
Existing with Project with Mitigations Intersection Level of Service ......................................................... 17
Existing with Project Queues ................................................................................................................................ 19
Existing with Project with Mitigations Queues ...............................................................................................22
Potential Pedestrian Improvements .................................................................................................................. 24
6.0 Cumulative (Year 2040) Conditions .................................................................................. 26
Cumulative Conditions Traffic Volumes ...........................................................................................................26
Cumulative with Project Intersection Level of Service ................................................................................. 27
Cumulative with Project Queues ....................................................................................................................... 30
List of Figures
Figure 1. Project Site Plan ............................................................................................................................................ 34
Figure 2. Project Site Vicinity and Study Intersections ....................................................................................... 35
Figure 3. Existing Conditions Peak Hour Intersection Traffic Volumes, Lane Configurations, and Traffic
Control ........................................................................................................................................................ 36
P
Figure 4. Existing Conditions 95th Percentile Queues .........................................................................................37
Figure 5. Project Trip Distribution ............................................................................................................................ 38
Figure 6. Project Trip Assignment ............................................................................................................................ 39
Figure 7. Existing with Project Conditions Peak Hour Intersection Traffic Volumes, Lane Configuration,
and Traffic Control .................................................................................................................................. 40
Figure 8. Existing with Project Conditions 95th Percentile Queues ................................................................. 41
Figure 9. Cumulative with Project Conditions Peak Hour Intersection Traffic Volumes, Lane
Configuration, and Traffic Control ..................................................................................................... 42
List of Tables
Table 1. Signalized Intersection LOS Definitions ...................................................................................................... 5
Table 2. Existing Conditions Peak Hour Intersection LOS Summary ................................................................. 8
Table 3. Existing Conditions Peak Hour Intersection Queue Summary .......................................................... 10
Table 4. Estimated Project Vehicle Trip Generation ............................................................................................. 13
Table 5. Vehicle Trip Generation Comparison ....................................................................................................... 14
Table 6. Existing with Project Conditions Peak Hour Intersection LOS Summary ........................................ 17
Table 7. Existing with Project Conditions with Mitigations Peak Hour Intersection LOS Summary ......... 19
Table 8. Existing with Project Conditions Peak Hour Intersection Average Queue Summary ................ 20
Table 9. Existing with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary ......21
Table 10. Existing with Project Conditions Peak Hour Intersection Average Queue Summary ............... 22
Table 11. Existing with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary .... 23
Table 12. Cumulative with Project Conditions Peak Hour Intersection LOS Summary .............................. 30
Table 13. Cumulative with Project Conditions Peak Hour Intersection Average Queue Summary .......... 31
Table 14. Cumulative with Project Conditions Peak Hour Intersection 95th Percentile Queue Summary
...................................................................................................................................................................... 32
Appendices
Appendix A. Traffic Counts
Appendix B: Intersection LOS Worksheet
Appendix C: Intersection Queue Worksheet
Appendix D: Mixed-Use Trip Generation Model Recalibration and Validation
Appendix E: Pass-by Volumes
Appendix F: Trip Distribution
Appendix G: Cumulative Volumes
P
Bishop Ranch Orchards Traffic Operations Report | 1
Executive Summary
This memo documents the effect of the Bishop Ranch Orchards Mixed-Use Development Project
trips on traffic. The Project would be located at 6001 Bollinger Canyon Road in San Ramon.
There is currently a vacated 1,398 thousand square feet (KSF) corporate headquarters at the Project
site. The Project proposes to construct a mixed-use development with 2,084 multi-family housing
units, 138 single-family attached housing units, 230 single-family detached housing units, 58
accessory dwelling units, and 125 KSF of retail uses. The Project is designed to support a walkable
environment with direct access to stores, parks, and regional trails. Increased housing density would
provide a stronger customer base for retail and amenities, improving overall access and convenience
for residents, and its proximity to the freeway helps reduce impacts to surrounding local roadways.
The Project would generate more automobile trips than a fully occupied corporate headquarters for a
typical weekday, although fewer in the AM and PM peak hours. The directionality of the Project trips
would be more aligned with the prevailing travel which is toward I-680 in the morning, and away from
it in the afternoon, whereas the corporate headquarters use generated travel demand that more
generally counterbalances prevailing traffic flows. The Project’s trip generation in this memo accounts
for internal capture and for walking, biking, and transit use, noting that the residential trip generation
is conservatively high as it has not been adjusted for higher levels of work-from-home occurring
post-pandemic.
Currently, traffic at intersections moves reasonably well during rush hours with almost all drivers
clearing within one signal cycle, although there are occasional times when the turn lanes get backed
up beyond their designated space. Existing intersection levels of service in the Project vicinity are all
LOS D or better, which is within the City’s standard of LOS E or better.
The addition of project trips would result in average delay worsening to LOS E during some periods at
the main project driveway intersection at Chevron Drive-Sunset Drive/Bollinger Canyon Road, and to
the adjacent east at Bollinger Canyon Road/Bishop Ranch 1-Camino Ramon, although this would
remain within the city's standard. At rare cases in the peak hours, drivers may experience long queues
but they would still be served by the first green light that they experience. As such, the Project’s
traffic would generally be adequately accommodated under existing capacity.
Three mitigation measures to accompany the project are proposed that would generally reduce
queues and automobile delay:
•To increase the northbound left-turning storage capacity at Chevron Drive-Sunset
Drive/Bollinger Canyon Road, restripe the northbound approach from Left, Left-Through,
Right to Left, Left, Through-Right.
•To improve traffic progression mainly in the westbound direction along Bollinger Canyon
Road, in the AM peak hour, add I-680 SB Ramps/Bollinger Canyon Road and I-680 NB
Ramps/Bollinger Canyon Road to the adaptive signal system.
•To reduce delays and queuing at the I-680 southbound off-ramp intersection, improving
throughput of westbound traffic, adjust traffic signal’s vehicle detection settings for the
westbound approach at San Ramon Valley Boulevard/Bollinger Canyon Road.
Each studied mitigation measure would be effective in reducing delay and queuing at its immediate
location. However, taken together they would only slightly reduce average delay and queuing across
Bishop Ranch Orchards Traffic Operations Report | 2
the network. This is because each mitigation tends to have the effect of releasing more traffic to the
downstream location, shifting queues and delay to that downstream location. Therefore, because they
reduce delay at some locations at the expense of other locations, the combined benefits of the
mitigation measures are marginal.
Mitigation measures that were not considered are road expansions such as lane additions nor
intersection widenings, as these would worsen the experience for pedestrians and bicyclists while
inducing more driving.
Buildout of the City's 2040 General Plan may result in an annualized 1.3% growth rate for traffic
between 2025 and 2040. Under these year 2040 cumulative conditions, and including the Project,
intersection levels of service in the Project vicinity would generally be similar to existing with project
conditions with the exception of LOS F conditions (exceeding capacity) at Chevron Drive-Sunset
Drive/Bollinger Canyon Road, and Bollinger Canyon Road/Bishop Ranch 1-Camino Ramon, with
extensive vehicular queuing spilling back to upstream intersections. With the adaptive signal system
designed to preserve vehicular progression along Bollinger Canyon Road, much of the delay would be
experienced by side-street drivers. Under no modeled scenarios would traffic spill back along the
freeway off-ramps onto the I-680 freeway mainline.
The cumulative scenario represents traffic demand under a set of simplistic growth assumptions and
does not capture the large degree of uncertainty inherent in potential travel changes over the next 15
years. While future trends are uncertain, some trends indicate that traffic levels may not grow at the
trajectory seen in the past. In this scenario, a couple intersections along Bollinger Canyon Road would
become bottlenecks where drivers experience long waits and slow-moving traffic, with queues
exceeding capacity in several locations. Because conditions in the Existing Plus Project scenario are
comparably much better, any worsening shown here would be due to general increases in driving, not
the Project’s effect. Furthermore, some drivers would adapt where and when they drive when faced
with this amount of congestion; the model does not capture this behavior change, thereby
overstating peak hour delay and queuing.
Mitigations such as lane restriping and signal retiming would have marginal overall effect in the
Cumulative scenario, although the City should periodically optimize signal timings under future
conditions. Furthermore, investments in sustainable modes of transportation such as walking, biking,
and transit will improve their respective appeal and lead to reductions in driving as people switch
over to them.
Bishop Ranch Orchards Traffic Operations Report | 3
1.0 Introduction
The Orchards Mixed-Use Development (“Project”) is located at 6001 Bollinger Canyon Road in San
Ramon, California. Per Senate Bill 763, automobile delay as measured by congestion-based metrics
such as Level of Service (LOS) no longer constitutes a significant impact under the California
Environmental Quality Act (CEQA). However, many agencies like San Ramon continue to require
intersection operations analyses to assess a project’s effects on the circulation system versus General
Plan goals and policies related to the operations of the circulation system. This report assesses the
impact of the Project on traffic operations at seven intersections and evaluates the nearby traffic
conditions against City evaluation criteria contained within the San Ramon 2040 General Plan.
All figures are presented at the end of the report.
Project Description
The Project proposes a mix of single-family housing, multi-family housing, and retail uses to replace
a corporate headquarters campus. The Project includes construction of 230 single-family detached
residences, 138 single-family attached residences, 58 accessory dwelling units (ADU), 2,084-units of
multi-family housing units, and 125,000 square feet of retail. There is an existing 1,397,520 square
foot corporate headquarters campus onsite that was vacated in late Summer 2024 and will be
demolished as part of the Project. The proposed site plan for the Project is shown on Figure 1.
The project is a mixed-use development that is supported by
a walkable environment with direct access to stores, parks,
and regional trails. Increased housing density would provide
a stronger customer base for retail and amenities, improving
overall access and convenience for residents. Its proximity to
the freeway largely contains traffic increases to near the
freeway, instead of to surrounding local roadways.
Bishop Ranch Orchards Traffic Operations Report | 4
2.0 Intersection Analysis Methodology
The operations of roadway facilities are described with the term level of service (“LOS”), a qualitative
description of traffic flow based on such factors as speed, travel time, delay, and freedom to
maneuver. Six levels are defined from LOS A, as free flow operating conditions, to LOS F, or the most
congested operating conditions. LOS E represents “at-capacity” operations. When traffic volumes
exceed intersection capacity, stop-and-go conditions result, and operations are designated as LOS F.
Study Area
The operations of the study intersections are evaluated for the highest one-hour volume during the
weekday morning (7:00 to 9:00 AM), and weekday evening (4:00 to 6:00 PM) peak periods. Traffic
counts were collected in May, June, and October 2024, and February 2025 on clear days with area
schools in-session. Turning movement counts were collected for automobiles, pedestrians, bicyclists,
and heavy trucks. At the time of May and June counts, the Corporate Headquarters campus was still
partially occupied (by Chevron Corporation), and entering and exiting traffic occurred at the Chevron
Drive driveway. The counts collected in October 2024 and February 2025 occurred when the
headquarters campus was fully vacant. The counts collected in May and June 2024 were zeroed out
at the Chevron Driveway for purposes of the analysis. A summary of the count data is included in
Appendix A.
A total of seven signalized intersections, shown on Figure 2, were selected as study locations.
Existing lane configurations, intersection control devices, and queue lengths were confirmed through
field observations. Two intersections have no-right-turn-on-red “blank-out” signs (I-680 Northbound
Ramps/Bollinger Canyon Road and Sunset Drive/Shops at Bishop Ranch-City Center). Field
observations indicated that right-turns-on-red are prohibited at all times at I-680 Northbound
Ramps/Bollinger Canyon Road, while they are prohibited when there is a conflicting pedestrian call at
Sunset Drive/Shops at Bishop Ranch-City Center. For the purposes of this analysis, the Project site is
assumed to be vacant under Existing Conditions, as is the case at the time of writing of this memo.
Figure 3 presents the existing weekday morning and weekday evening peak hour turning movement
volumes, lane configurations, and traffic control devices.
Analysis Scenarios
The peak hour intersection operations are evaluated for the following scenarios:
•Existing Conditions: Existing conditions based on traffic counts at the study locations.
•Existing with Project Conditions: Existing conditions with the addition of project-generated
traffic and transportation network infrastructure proposed by the project.
•Existing with Project with Mitigations Conditions: Existing with Project conditions with the
addition of transportation operations mitigations proposed in this report.
•Cumulative with Project Conditions: Year 2040 traffic forecasts with the addition of project-
generated traffic and transportation network infrastructure proposed by the project.
Bishop Ranch Orchards Traffic Operations Report | 5
Signalized Intersections
The method described in Chapter 19 of the Transportation Research Board’s Highway Capacity
Manual, 7th Edition (HCM 7th Edition) was used to conduct the level of service calculations for the
signalized study intersections. This method is used to estimate the control delay experienced by
motorists at an intersection. Control delay includes the initial deceleration delay, queue move-up
time, stopped delay, and final acceleration delay. The average control delay for signalized
intersections was calculated using the SimTraffic traffic analysis software and correlated to a LOS
designation as shown in Table 1.
Table 1. Signalized Intersection LOS Definitions
Level of Service Description Average Control Delay
per Vehicle (seconds)
A Operations with very low delay occurring with
favorable progression and/or short cycle lengths. < 10.0
B Operations with low delay occurring with good
progression and/or short cycle lengths. > 10.0 to 20.0
C
Operations with average delays resulting from fair
progression and/or longer cycle lengths. Individual
cycle failures begin to appear.
> 20.0 to 35.0
D
Operations with longer delays due to a combination of
unfavorable progression, long cycle lengths, and high
volume-to-capacity (V/C) ratios. Many vehicles stop
and individual cycle failures are noticeable.
>35.0 to 55.0
E
Operations with high delay values indicating poor
progression, long cycle lengths, and high V/C ratios.
Individual cycle failures are frequent occurrences.
> 55.0 to 80.0
F
Operations with delays unacceptable to most drivers
occurring due to over-saturation, poor progression, or
very long cycle lengths.
> 80.0
Source: Highway Capacity Manual, 7th Edition.
City Evaluation Criteria
The applicable LOS standard at study intersections 1, 2, 3, 6, and 7 (i.e. along Bollinger Canyon Road,
an arterial bounded by non-residential uses) is LOS E or better during the AM and PM peak periods,
per the City of San Ramon 2040 General Plan.
The applicable standard at study intersections 4 and 5 along Sunset Drive north of Bollinger Canyon
Road is LOS D or better, while striving to maintain LOS C, during the AM and PM peak periods.
These standards are taken from the supportive policy for guiding policy 5.1-G-1 of the General Plan
2040 Transportation and Circulation Element, which is to “Maintain acceptable LOS and ensure that
future land uses and the circulation system are in balance”, as excerpted below:
Bishop Ranch Orchards Traffic Operations Report | 6
Bishop Ranch Orchards Traffic Operations Report | 7
3.0 Existing Traffic Conditions
Context
Traffic levels along the Bollinger Canyon Road corridor adjacent to the Project site have two major
drivers: people driving to/from employment and shopping at office and commercial uses within the
Bishop Ranch campus generally to the north of the Project site, and residents driving to/from their
homes generally to the east of the Project site. There are also some residential uses within Bishop
Ranch, and commercial uses to the east, but these are less prominent. According to Bishop Ranch,
the 5.7 million square feet (MSF) of office uses within the Bishop Ranch campus is 66% occupied
currently. 1 Furthermore, peak parking occupancy for Bishop Ranch office use was recently measured
as 0.88 spaces per thousand square feet (KSF) of occupied uses for Bishop Ranch 32 and 1.09 for
Bishop Ranch 15.3 This is much lower than what is typical for office uses, which is around 2 for
weekday peak parking demand for general office buildings, per ITE Parking Generation Manual. The
primary reason for this lower-than-typical parking occupancy (which translates to reduced
associated automobile trips) is the increase in remote work since the Covid pandemic. Currently, the
proportion of days spent remote work by Bay Area employees is slowly declining year-on-year, with
employers reporting that they expect this decline to continue in the foreseeable future.4 Future traffic
levels associated with office uses are dependent on both occupancy levels and remote work levels
and may go up or down. One potential future is an increase in traffic levels due to either Bishop
Ranch office occupancy increasing and/or remote work levels continue to decline. Another
uncertainty is that the 5.7 MSF of office uses within the Bishop Ranch campus includes some office
that will be demolished and converted to residential, and residential trip generation density could be
expected to be lower than the office it is replacing.
Existing Intersection Level of Service
Based on the existing lane configurations, peak hour traffic volumes, pedestrian and bicycle activity,
and existing traffic signal timing parameters, operations of the study intersections were evaluated.
Bollinger Canyon Road functions under an adaptive signal system designed to fine tune signal timings
in real-time in a coordinated way along the corridor to preserve vehicular progression along Bollinger
Canyon Road. Signal timing parameters provided by the city indicated different offsets for the
coordinated phases at some locations. The analysis software (Synchro/Simtraffic) currently does not
have the capability of having multiple offsets at single intersection, therefore the adaptive nature of
the signals is not able to be modeled. Based on the calculated movement V/C and visual inspection
of the model, offsets were modified to reflect the progression found during the field observations, to
represent adaptive conditions as best as possible.
1 Email from Stephanie Hill, Senior Vice President, Development and Construction at Bishop Ranch, dated 6/13/25
2 Gibson Transportation Consulting, Inc., December 10, 2024. Parking Analysis for the Bishop Ranch 7 Residential
Development, San Ramon, California
3 Gibson Transportation Consulting, Inc., October 18, 2023. Parking Analysis for the Bishop Ranch 15 Medical
Office Conversion, San Ramon, California
4 Bay Area Council, May 2025. Bay Area Return to Office – Final Report
Bishop Ranch Orchards Traffic Operations Report | 8
All intersections are operating within their respective standard. Intersection average LOS results are
presented in Table 2. The detailed intersection LOS calculation worksheets are included in Appendix
B.
Right now, traffic at intersections is moving reasonably well
during the morning and afternoon rush. A driver might have
to wait a bit at traffic lights, but won't be stuck there for a
long time. Most drivers can get through without any
frustration.
Table 2. Existing Conditions Peak Hour Intersection LOS Summary
Intersection Peak Hour Delay LOS
1 San Ramon Valley Boulevard/Bollinger Canyon
Road
AM
PM
41
50
D
D
2 I-680 SB Ramps/Bollinger Canyon Road AM
PM
14
35
B
D
3 I-680 NB Ramps/Bollinger Canyon Road AM
PM
22
25
C
C
4 Sunset Drive/Bishop Drive AM
PM
11
16
B
B
5 Sunset Drive/Shops at Bishop Ranch-City
Center
AM
PM
11
29
B
C
6 Chevron Drive-Sunset Drive/Bollinger AM
PM
22
29
C
C
7 Bishop Ranch 1-Camino Ramon/Bollinger
Canyon Road
AM
PM
26
25
C
C
Bold indicates potentially unacceptable operations.
Source: Fehr & Peers, 2025.
Existing Queues
Figure 4 shows the length of the average and 95th percentile queues per lane from the SimTraffic
simulation software. The 95th percentile queue represents a queue length of vehicles (in feet) that has
only a 5% probability of being exceeded during the analysis period, which would be met once or
twice during the rush hour but is not typical of what an average driver would experience. The 95th
percentile queue lengths can be used to determine the length of a left or right turn lane when seeking
to meet the objective of minimizing queues spilling back into the through lanes. The average queue
would most accurately represent a typical queue experienced by a driver during the peak hour. The
detailed intersection queue calculation worksheets which present average, 95th percentile, and
maximum queue lengths per lane group are included in Appendix C. Right now, there are occasional
Bishop Ranch Orchards Traffic Operations Report | 9
times when the turn lanes get backed up beyond their designated space. But even during the busiest
times of day, almost all drivers can still fit in the turn lane and make it through the intersection in a
reasonable amount of time.
Table 3 shows only the movements that have an average or 95th percentile queue that exceed their
existing storage lengths. Several intersections experience spillback across all time periods. Neither
the northbound nor southbound freeway off-ramps experience a spillback to the freeway mainline.
Right now, there are occasional times when the turn lanes get
backed up beyond their designated space. But even during
the busiest times of day, almost all drivers can still fit in the
turn lane and make it through the intersection in a reasonable
amount of time.
Bishop Ranch Orchards Traffic Operations Report | 10
Table 3. Existing Conditions Peak Hour Intersection Queue Summary
Intersection Movement
Storage
Length
(ft)
Average Queue
Length (ft)
95th Percentile Queue
Length (ft)
AM PM AM PM
1
San Ramon Valley
Boulevard/Bollinger
Canyon Road
EBR
WBL
WBT
NBL
SBL
200
200
225
150
300
100
200
75
125
150
75
225
250
100
275
225
250
150
200
225
175
275
475
175
400
2
I-680 SB
Ramps/Bollinger Canyon
Road
EBT
EBT/R
200
100
75
100
175
150
175
150
275
275
4 Sunset Drive/Bishop
Drive NBL/T 225 125 50 250 100
5
Sunset Drive/Shops at
Bishop Ranch-City
Center
EBR
WBL
WBT/R
NBL
SBL
SBT
100
100
100
175
100
250
50
25
50
75
25
25
100
100
75
125
50
175
75
75
75
150
50
75
150
200
125
225
150
275
6
Chevron Drive-Sunset
Drive/Bollinger Canyon
Road
WBR 250 25 150 100 350
Bold indicates queue potentially extends beyond available storage.
Notes:
•Only the movements that have an average or 95th percentile queue that exceed their storage lengths are
shown in this table.
•An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane,
which is not reflected in the storage length above.
Source: Fehr & Peers, 2025.
Bishop Ranch Orchards Traffic Operations Report | 11
4.0 Project Travel Demand
The amount of traffic expected to be generated by the Project is estimated using a three-step
process: (1) project trip generation, (2) trip distribution, and (3) trip assignment. The first step
estimates the amount of project-generated traffic that would be added to the roadway network. The
second step estimates the direction of travel to and from the Project site. During the third step, the
new trips are assigned to specific street segments and intersection turning movements. This process
is described in more detail in the following sections.
Project Trip Generation
Trip generation refers to the process of estimating the amount of vehicular traffic a project would add
to the surrounding roadway system. Estimates are created for the peak one-hour period in the
weekday morning and weekday evening when traffic volumes on adjacent streets are the highest.
The trip generation analysis follows the methodology outlined in the City of San Ramon’s General Plan
2040. The General Plan states that a transportation analysis must be prepared for a project that
generates 50 or more new peak hour vehicle trips. The existing trip generation rates, along with the
Project’s anticipated trip generation, were developed using the Institute of Transportation Engineers
(ITE) Trip Generation Manual 11th Edition and are shown below. The ITE Trip Generation Manual, 11th
Edition was developed with data collected pre-pandemic. A newer edition, ITE Trip Generation
Manual, 12th Edition, includes post-pandemic data, and the average trip rates for residential uses in
the 12th Edition are generally lower than the 11th Edition due to increased work-from-home rates post-
pandemic. Post-pandemic residential trip rates are up to 30% lower than pre-pandemic.5 Our study
uses 11th Edition rates because 12th Edition rates were not available at the time of analysis, thus our trip
rates are conservatively high. Another reason for why trip generation rates used in the study may be
conservatively high is that ITE Trip Generation Manual data is national in nature with some data
collected in areas with lower levels of congestion than San Ramon, which may overstate peak hour
travel as there is less deterrence due to congestion for traveling during the peak hour.
The Project’s trip generation was estimated using the MXD+ methodology for the weekday daily,
weekday AM peak hour and weekday PM peak hour. This methodology is more precise than
conventional methods for estimating the number of trips generated by mixed-use projects, such as
use of the ITE Trip Generation Manual 11th Edition, which is based on data derived primarily from
single-use and freestanding sites. The MXD+ trip generation methodology, based on Environmental
Protection Agency (EPA) and National Cooperative Highway Research Program (NCHRP) research,
more precisely estimates trip generation of mixed-use projects by accounting for the travel within
the Project (i.e., between uses), trips made by non-automobile modes, and the Project’s land use
context. Appendix D is a memorandum called Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions, by Fehr & Peers. In this resource, Chart 3 shows
reduced model error (measuring difference between estimate trip generation and counted trip
generation) for validation sites for MXD+ vs ITE, showing MXD+ is substantially more accurate than
the ITE internalization method for mixed use development trip generation. This approach has been
successfully applied and defended throughout Northern California to more precisely estimate external
trip generation for mixed-use projects. While this approach accounts for a variety of factors noted
5 Varies per residential use type; a study conducted by Fehr & Peers comparing rates between the ITE Trip
Generation Manual, 11th Edition to the ITE Trip Generation Manual 12th Edition.
Bishop Ranch Orchards Traffic Operations Report | 12
above, it does not account for transportation demand management (TDM) measures, such as a
constrained parking supply, subsidized transit passes, or other incentives to travel by non-auto
modes.
The Project’s trip generation accounts for internal capture
(where residents use the on-site retail) and for walking,
biking, and transit use. The Project’s residential trip
generation is conservatively high as it has not been adjusted
for higher levels of work-from-home that are occurring post-
pandemic.
Table 4 presents the estimates of the trip generation for the Project, developed using the ITE Trip
Generation Manual 11th Edition. The reasonableness of reductions in the 18-22% range is justified by:
•Internalization: complementary nature of the land uses (local-serving and regional-serving
retail; park and open space), and
•External walk/bike/transit: complete sidewalk and crosswalk network; availability of County
Connection routes; excellent trail connection with Iron Horse Trail, with nearby
complementary land uses that include grocery store, retail, jobs, parks, and community
center.
Furthermore, our total reductions are comparable to what would be expected from stacking the
suggested reductions from the CCTA Technical Procedures for different components. Within the
Technical Procedures, the "3-6%" reduction for Mixed Residential/Commercial Use Projects is limited
to the specific effect of the Mix of Uses component and can be stacked (see Table 3 of the Technical
Procedures) with additional considerations for Transit Usage (≤3%), Surrounding Uses (≤5%), and
Multi-Use (≤25% applied to the half of the project trips that are retail is ≤12.5%). When summing
these, our reductions are within the expected range.
Bishop Ranch Orchards Traffic Operations Report | 13
Table 4. Estimated Project Vehicle Trip Generation
Land Use Units Quantity Daily AM PM
In Out Total In Out Total
Single-Family Detached
Housing DU 230 2,171 40 119 159 137 80 217
Single-Family Attached
Housing DU 138 1,001 17 49 66 46 33 79
Accessory Dwelling Units DU 58 391 6 17 23 19 11 30
Multifamily Housing (Mid-
Rise) DU 2,084 9,461 208 697 905 496 317 813
Shopping Plaza (40-150ksf) KSF 125 11,811 274 168 441 517 560 1,078
Total Raw Trip Generation (ITE Results) 24,835 545 1,050 1,595 1,215 1,002 2,216
Internal Capture Reduction -1,580 -44 -84 -128 -126 -104 -230
External Walk, Bike, Transit Reductions -2,953 -71 -136 -207 -136 -113 -249
Total Reductions -4,533 -115 -220 -335 -262 -217 -479
Total Reductions as a Percent of Total Raw Trip
Generation 18%21%22%
Final Trip Generation 20,302 430 830 1,260 953 785 1,737
Retail Pass-By Trip Reductions -2,897 -43 -27 -70 -162 -176 -338
Final Trip Generation after Pass-By Reductions 17,405 387 803 1,190 790 609 1,399
Notes:
•1 DU = 1 dwelling unit; 1 KSF = 1,000 square feet gross leasable area; Qnty = Quantity;
•Rounding differences may cause slight discrepancies in totals.
•Single-Family home trip generation based on Land Use Code 210 (Single-Family Detached Housing)
and Land Use Code 215 (Single-Family Attached Housing)
•Accessory Dwelling Units based on Land Use Code 220 (Low-Rise Multifamily Housing)
•Multifamily (apartments) trip generation based on Land Use Code 221 (Mid-Rise Multifamily Housing)
•Retail trip generation based on Land Use Code 821 (Shopping Plaza [40-150 ksf]).
•PM retail pass-by calculated using the ITE Trip Generation Manual, 11th Edition Pass-By Tables Appendix
(shown in Appendix E), and the average rate of 40% for Shopping Plaza land use (LU 821). As no data is
available for AM, we conservatively reduced the pass-by rate by half to account for morning commuters
typically exhibiting more direct, time-constrained travel patterns focused on reaching work destinations
efficiently. Daily retail pass-by percentage is the average of AM and PM.
Source: Institute of Transportation Engineers, Trip Generation, 11th Edition; Fehr & Peers, 2025.
As summarized in Table 4, the Project would generate approximately 17,405 weekday daily, 1,190
weekday morning peak hour, and 1,399 weekday evening peak hour trips.
The existing use is a vacant 1.398 KSF corporate headquarters. As shown in Table 5, the Project is
anticipated to generate 6,295 more daily vehicle trips compared to the existing use when fully
occupied. During the weekday AM peak hour, the Project is anticipated to generate 836 fewer
vehicle trips and during the PM peak hour, the Project is anticipated to generate 418 fewer vehicle
trips than the existing use when occupied.
Bishop Ranch Orchards Traffic Operations Report | 14
Table 5. Vehicle Trip Generation Comparison
Land Use Daily AM PM
In Out Total In Out Total
Corporate
Headquarters 11,110 1,885 141 2,026 164 1,653 1,817
Project 17,405 387 803 1,190 790 609 1,399
Net New Trips 6,295 -1,498 662 -836 626 -1,044 -418
Source: Institute of Transportation Engineers, Trip Generation, 11th Edition; Fehr & Peers, 2025.
Notably, the directionality of the Project’s vehicle trips is inverted to that of the existing use for the
weekday AM peak hour. The existing use overwhelmingly features inbound traffic in the morning,
whereas the Project features mostly outbound traffic in the morning. In the PM peak hour, Project
trips are skewed slightly towards inbound trips. The directionality of the Project is more aligned with
prevailing traffic, which features higher amounts of travel towards the I-680 freeway in the morning,
and away from it in the evening.
The Project would generate far fewer vehicle trips in the AM
and PM peak hours than the Chevron headquarters that it is
replacing (when the HQ is assumed to be fully occupied).
However, the Project would add more traffic in the prevailing
traffic directions (westbound towards I-680 in the morning
and eastbound from I-680 in the evening) than a fully
occupied Chevron HQ would.
Project Trip Distribution and Assignment
Project trip distribution refers to the directions of approach and departure that vehicles would take to
access and leave the site. The project trip distribution was estimated based on project site access,
existing traffic count data, existing travel patterns, and the location of complementary land uses.
Select zone analysis was performed using the Contra Costa Transportation Authority (CCTA) travel
demand model to calculate the resulting trip distribution, which is shown on Figure 5. Detailed
descriptions of trip distribution assumptions can be found in Appendix D.
While Project trip distribution provides information regarding larger-scale trip patterns, Project trip
assignment refers to project trip loading on specific roadway segments and intersection turning
movements in the study area. The project trip assignment for the Project is presented on Figure 6.
Furthermore, our total reductions are comparable to what would be expected from stacking the
suggested reductions from the CCTA Technical Procedures for different components. Within the
Technical Procedures, the "3-6%" reduction for Mixed Residential/Commercial Use Projects is limited
Bishop Ranch Orchards Traffic Operations Report | 15
to the specific effect of the Mix of Uses component and can be stacked (see Table 3 of the Technical
Procedures) with additional considerations for Transit Usage (≤3%), Surrounding Uses (≤5%), and
Multi-Use (≤25% applied to the half of the project trips that are retail is ≤12.5%). When summing
these, our reductions are within the expected range.
Table 4 includes a reduction for “pass-by” trips. The ITE Trip Generation Manual defines pass-by
trips as an intermediate stop on the way from an origin to a primary trip destination without a route
diversion. These trips are attracted by traffic passing the site on an adjacent roadway that offers
direct access to the generator, in this case, the retail portion of the Project. These pass-by trips were
then re-routed to enter (by adding to the southbound through, eastbound right, and westbound left
movements) and exiting the project site (by adding to the northbound left, through, and right
movements). These trips are reflected as negative values shown at Bollinger Canyon Road/Sunset
Drive—Chevron Drive and Bollinger Canyon Road/Camino Ramon—Bishop Ranch 1 intersections in
the eastbound left and through, southbound right and left, and westbound through and right
directions, shown on Figure 6, as a reflection that some of current drivers will turn off into the project
site to stop by the new retail uses in the future. Calculation of pass-by volumes is provided in
Appendix E.
Bishop Ranch Orchards Traffic Operations Report | 16
5.0 Existing with Project Conditions
The Existing with Project Conditions is the expected traffic volumes based on adding project traffic
assignment to existing counts. As mentioned previously, the site was partially occupied when some of
the counts were taken. Because the existing Corporate Headquarters is the only use accessible via
Chevron Drive in the existing condition, the Existing with Project scenario volumes were determined
by first zeroing out turning movements into and out of Chevron Drive (to represent the demolition of
the existing uses) before layering on Project trips. The peak hour volumes are summarized on Figure
7.
Existing with Project Intersection Level of Service
Level of service calculations were conducted to evaluate intersection operations under the Existing
with Project conditions. Based on the signal timing sheets provided by the city, some of the
signalized intersections along Bollinger Canyon Road are under adaptive timing:
•AM peak period: intersections at San Ramon Valley Boulevard, Sunset Drive-Chevron
Driveway, and Camino Ramon-Bishop Ranch 1
•PM peak period: intersections at San Ramon Valley Boulevard, I-680 Southbound Ramps,
I-680 Northbound Ramps, Sunset Drive-Chevron Driveway, and Camino Ramon-Bishop
Ranch 1
Therefore, under the Existing with Project conditions, the adaptive coordinated signals’ phase lengths
and offsets were optimized while maintaining a cycle length of 150 seconds from the Existing
condition timing settings based on the additional project traffic. The optimizations were calibrated
based on balancing the V/C ratios across all movements and visually inspecting the microsimulation
to get a reasonable progression along Bollinger Canyon Road – its results are reflected in Table 6.
Results of the Existing with Project analysis indicate that several intersections operate below the
threshold. Most notably, Chevron Drive-Sunset Drive/Bollinger Canyon Road expects an increase in
delay with the Project traffic, even with the signal optimizations. The detailed intersection LOS
calculation worksheets are included in Appendix B.
While Saturday midday conditions analysis results are not presented, we would expect the Project to
add substantial traffic to the nearby intersections during this period. Because prevailing traffic
volumes are much lower than during the weekday peak hours, we would expect traffic operations to
remain typical for a retail-heavy area and would not anticipate any significant effects to automobile
delay or queuing near to the Project site.
With the Project, most drivers would experience longer wait
times on Bollinger Canyon Road. However, traffic wouldn’t
become severely congested—drivers would still be able to get
through, though it may take a minute-or-two longer during
busy periods if you travel in the direction that most people
are going.
Bishop Ranch Orchards Traffic Operations Report | 17
Table 6. Existing with Project Conditions Peak Hour Intersection LOS Summary
Intersection Peak
Hour
Existing Existing with Project
Delay LOS Delay LOS
1 San Ramon Valley
Boulevard/Bollinger Canyon Road
AM
PM
41
50
D
D
46
54
D
D
2 I-680 SB Ramps/Bollinger Canyon
Road
AM
PM
14
35
B
D
18
35
B
D
3 I-680 NB Ramps/Bollinger Canyon
Road
AM
PM
22
25
C
C
23
28
C
C
4 Sunset Drive/Bishop Drive AM
PM
11
16
B
B
13
19
B
B
5 Sunset Drive/Shops at Bishop
Ranch-City Center
AM
PM
11
29
B
C
11
30
B
C
6 Chevron Drive-Sunset
Drive/Bollinger Canyon Road
AM
PM
22
29
C
C
71
74
E
E
7 Bishop Ranch 1-Camino
Ramon/Bollinger Canyon Road
AM
PM
26
25
C
C
69
74
E
E
Bold indicates potentially unacceptable operations.
Source: Fehr & Peers, 2025.
Existing with Project with Mitigations Intersection Level of Service
While all study intersections operate at acceptable LOS standards under existing with project
conditions, queueing spillback occurs (discussion presented in the following section) and mitigation
measures were applied. The following measures were implemented in the mitigated scenario:
•To increase the northbound left-turning storage capacity at Chevron Drive-Sunset
Drive/Bollinger Canyon Road, restripe the northbound approach from Left, Left-Through,
Right to Left, Left, Through-Right.
•To improve traffic progression mainly in the westbound direction along Bollinger Canyon
Road, in the AM peak hour, add I-680 SB Ramps/Bollinger Canyon Road and I-680 NB
Ramps/Bollinger Canyon Road to the adaptive signal system.
•To reduce delays and queuing at the I-680 southbound off-ramp intersection, improving
throughput of westbound traffic, adjust detector settings for the westbound approach at San
Ramon Valley Boulevard/Bollinger Canyon Road.
The adaptive signal system extends eastward to Alcosta Boulevard; however, our study area ends at
Camino Ramon 1. Therefore, further work would be needed to understand the effect of the adaptive
signal mitigation on intersections east of Camino Ramon. Since the AM peak hour mitigation measure
is to introduce two new intersections to the coordination system, we recommend that the entire
Bollinger Canyon Road coordination settings should be revisited – for now, we have applied similar
parameters to the newly folded-in intersections as apply in the PM period. The results of the
Bishop Ranch Orchards Traffic Operations Report | 18
mitigations are presented in Table 7. At Chevron Drive-Sunset Drive/Bollinger Canyon Road and
Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road, delays generally decreased for both the AM
and PM peak hours. However, the mitigations result in increases in delay at some downstream
intersections. The reason that mitigations don’t appear to solve all traffic issues is due to network
effects: vehicles initially accumulate at an upstream bottleneck, and once released through
implementation of a mitigation, those vehicles now accumulate more quickly downstream at the next
constraint and so the delay shifts there instead. All study intersections within the mitigated scenario
remain at acceptable LOS standards.
We considered lane restriping and signal retiming among
potential mitigations, although did not consider road
expansions such as lane additions nor intersection widenings,
as these would worsen the experience for pedestrians and
bicyclists, and induce more driving.
Each mitigation measure studied would be effective in
reducing delay and queuing at its immediate location.
However, taken together they would only slightly reduce
average delay and queuing across the network. This is
because each mitigation tends to have the effect of releasing
more traffic to the downstream location, shifting queues and
delay to that downstream location. Therefore, because they
reduce delay at some locations at the expense of other
locations, the combined benefits of the mitigation measures
are marginal. We recommend that the need for mitigation
measures is re-assessed after occupation of each phase of
development.
Bishop Ranch Orchards Traffic Operations Report | 19
Table 7. Existing with Project Conditions with Mitigations Peak Hour Intersection LOS
Summary
Intersection Peak
Hour
Existing with Project Existing with Project
and Mitigations
Delay LOS Delay LOS
1 San Ramon Valley
Boulevard/Bollinger Canyon Road
AM
PM
46
54
D
D
45
57
D
E
2 I-680 SB Ramps/Bollinger Canyon
Road
AM
PM
18
35
B
D
25
30
C
C
3 I-680 NB Ramps/Bollinger Canyon
Road
AM
PM
23
28
C
C
29
32
C
C
4 Sunset Drive/Bishop Drive AM
PM
13
19
B
B
12
17
B
B
5 Sunset Drive/Shops at Bishop
Ranch-City Center
AM
PM
11
30
B
C
12
29
B
C
6 Chevron Drive-Sunset
Drive/Bollinger Canyon Road
AM
PM
71
74
E
E
71
67
E
E
7 Bishop Ranch 1-Camino
Ramon/Bollinger Canyon Road
AM
PM
69
74
E
E
58
49
E
D
Bold indicates potentially unacceptable operations.
Source: Fehr & Peers, 2025.
Existing with Project Queues
Figure 8 shows the length of the 95th percentile queues per lane for a single selected run from the
SimTraffic simulation software. The detailed intersection queue calculation worksheets which present
average, 95th percentile, and maximum queue lengths per lane group are included in Appendix C.
Table 8 summarizes the average queue results and Table 9 summarizes 95th percentile queue results,
showing movements where queues that exceed their storage lengths. No queues at the freeway off-
ramps would extend to the freeway mainline.
Drivers would experience occasional queueing spillback
beyond turn pocket capacity with the Project traffic. At rare
cases in the peak hours, drivers may experience long queues
but they would still be served by the first green light that
they experience. As such, the Project’s traffic can generally
be adequately accommodated by existing capacity.
Bishop Ranch Orchards Traffic Operations Report | 20
Table 8. Existing with Project Conditions Peak Hour Intersection Average Queue Summary
Intersection Movement
Storage
Length
(ft)
Average Queue Length (ft)
Existing Existing with Project
AM PM AM PM
1
San Ramon Valley
Boulevard/Bollinger Canyon
Road
WBL 200 200 225 200 225
WBT 225 75 250 150 250
2 I-680 SB Ramps/Bollinger
Canyon Road EBT/R 100 100 150 100 125
Bold indicates queue potentially extends beyond available storage.
Notes:
•Only the movements that have an average percentile queue that exceed their storage lengths are shown
in this table.
•An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane,
which is not reflected in the storage length above.
Source: Fehr & Peers, 2025.
Bishop Ranch Orchards Traffic Operations Report | 21
Table 9. Existing with Project Conditions Peak Hour Intersection 95th Percentile Queue
Summary
Intersection Movement
Storage
Length
(ft)
95th Percentile Queue Length (ft)
Existing Existing with Project
AM PM AM PM
1
San Ramon Valley
Boulevard/Bollinger Canyon
Road
EBR
WBL
WBT
NBL
SBL
200
200
225
150
300
225
250
150
200
225
175
275
475
175
400
250
250
150
200
300
300
275
225
175
350
2 I-680 SB Ramps/Bollinger
Canyon Road
EBT
EBT/R
SBL
200
100
475
175
150
150
275
275
450
200
200
200
250
225
575
4 Sunset Drive/Bishop Drive NBL/T
SBL/T
225
175
250
50
100
175
250
50
125
200
5 Sunset Drive/Shops at
Bishop Ranch-City Center
EBR
WBL
WBT/R
NBL
SBL
SBT
100
100
100
175
100
250
75
75
75
150
50
75
150
200
125
225
150
275
75
75
75
175
50
75
150
175
125
200
125
275
6 Chevron Drive-Sunset
Drive/Bollinger
WBL
WBT
WBR
NBL
NBL/T
NBR
SBL
225
875
250
350
350
150
175
0
350
100
0
0
0
75
0
575
350
0
0
0
175
300
1,000
450
325
325
175
75
225
1,025
475
450
400
225
200
7
Bishop Ranch 1-Camino
Ramon/Bollinger Canyon
Road
EBR
WBL
WBT
SBT/R
200
150
575
700
75
75
450
150
75
25
300
250
100
275
725
200
300
225
475
725
Bold indicates queue potentially extends beyond available storage.
Notes:
•Only the movements that have a 95th percentile queue that exceed their storage lengths are shown in
this table.
•An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane,
which is not reflected in the storage length above.
Source: Fehr & Peers, 2025.
Bishop Ranch Orchards Traffic Operations Report | 22
Existing with Project with Mitigations Queues
The average and 95th percentile queuing under the mitigated scenario is shown in Table 10 and Table
11, respectively. Some queue lengths either were maintained or decreased between the Existing with
Project and Existing with Project with Mitigation scenarios, although some increased. This is because
each mitigation tends to have the effect of releasing more traffic to the downstream location, shifting
queues and delay to that downstream location. The 95th percentile queues for several approaches
exceed storage limits. No queues at the freeway off-ramps would extend to the freeway mainline.
Increasing turn bay lengths (as proposed in the mitigation measure) or widening the intersection to
add lanes (which is not proposed) can reduce queues in that location; however, at scale these
capacity-increasing interventions adversely degrade bicycle and pedestrian safety and comfort,
which compromises the appeal for people to shift from driving to walking/biking as a way of reducing
traffic.
The objective of the mitigation measures was to primarily improve on the bottleneck found at the
project driveways, and as a result, resulted in increases in some queues elsewhere. For example, the
westbound through queue decreases from the Existing with Project to the Existing with Project and
Mitigations scenario at Chevron Drive-Sunset Drive/Bollinger and Bishop Ranch 1-Camino
Ramon/Bollinger Canyon Road intersections (presented in Table 11). Instead, queuing now occurs
downstream instead at San Ramon Valley Boulevard/Bollinger Canyon Road and I-680 SB
Ramps/Bollinger Canyon Road.
Table 10. Existing with Project Conditions Peak Hour Intersection Average Queue Summary
Intersection Movement
Storage
Length
(ft)
Average Queue Length (ft)
Existing with
Project
Existing with Project
and Mitigations
AM PM AM PM
1
San Ramon Valley
Boulevard/Bollinger Canyon
Road
WBL 200 200 225 200 225
WBT 225 75 250 150 350
2 I-680 SB Ramps/Bollinger
Canyon Road EBT/R 100 100 125 100 150
Bold indicates queue potentially extends beyond available storage.
Notes:
•Only the movements that have an average percentile queue that exceed their storage lengths are shown
in this table.
•An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane,
which is not reflected in the storage length above.
Source: Fehr & Peers, 2025.
Bishop Ranch Orchards Traffic Operations Report | 23
Table 11. Existing with Project Conditions Peak Hour Intersection 95th Percentile Queue
Summary
Intersection Movement
Storage
Length
(ft)
95th Percentile Queue Length (ft)
Existing with
Project
Existing with Project
and Mitigations
AM PM AM PM
1
San Ramon Valley
Boulevard/Bollinger Canyon
Road
EBR 200 250 300 325 300
WBL 200 250 275 250 250
WBT 225 150 225 300 675
NBL 150 200 175 200 175
SBL 300 300 350 225 300
2 I-680 SB Ramps/Bollinger
Canyon Road
EBT 200 200 250 225 275
EBT/R 100 200 225 200 250
SBL 475 200 575 425 500
4 Sunset Drive/Bishop Drive NBL/T 225 250 125 250 125
SBL/T 175 50 200 50 175
5 Sunset Drive/Shops at
Bishop Ranch-City Center
EBR 100 75 150 75 150
WBL 100 75 175 75 175
WBT/R 100 75 125 75 125
NBL 175 175 200 150 200
SBL 100 50 125 50 125
SBT 250 75 275 75 275
6 Chevron Drive-Sunset
Drive/Bollinger
WBL 225 300 225 250 150
WBT 875 1,000 1,025 1,000 975
WBR 250 450 475 450 450
NBL 350 325 450 300 425
NBL/T 350 325 400 200 225
NBR 150 175 225 75 200
SBL 175 75 200 250 150
7
Bishop Ranch 1-Camino
Ramon/Bollinger Canyon
Road
EBR 200 100 300 75 150
WBL 150 275 225 250 225
WBT 575 725 475 650 500
SBT/R 700 200 725 200 425
Bold indicates queue potentially extends beyond available storage.
Notes:
•Only the movements that have an average or 95th percentile queue that exceed their storage lengths are
shown in this table.
•An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane,
which is not reflected in the storage length above.
Source: Fehr & Peers, 2025.
Bishop Ranch Orchards Traffic Operations Report | 24
Potential Pedestrian Improvements
Given the proximity of the City Center Bishop Ranch and the Shops at Bishop Ranch shopping
centers, as well as the business park to the north, it is reasonable to expect that the Project would
generate and attract walking trips. The Project is planned to connect to Bollinger Canyon
Road/Sunset Drive-Chevron Drive and Bollinger Canyon Road/Bishop Ranch 1 intersections with
sidewalks and a crosswalk.
Bollinger Canyon Road is classified as a principal arterial with a posted speed limit of 40 miles per
hour. Based on aerial imagery, the crossing distance at both intersections would be approximately
130 feet, with crossings prohibited across some intersection legs. Across the three study scenarios,
the cycle lengths for these intersections are 150 seconds. The characteristics of these intersections
indicate a low comfort environment for those walking across Bollinger Canyon Road.
Some additional recommendations to reduce characteristics that may increase the likelihood of
collisions featuring pedestrians and bicyclists:
•Separate turning conflicts with protected phases
•Protected left-turn phases provide drivers with a dedicated green arrow so they do not
have to wait for a gap in either oncoming traffic or conflicting pedestrian crossings while
they are making a left-turn. This simplifies decision-making and reduces conflicts.
Prohibiting right-turn-on-red separates users in time and space, reducing the possibility
for pedestrians, bicyclists, and drivers to interact in the crossing at the same time.
•Increase the pedestrian walk and flashing don’t walk times
•Increasing the pedestrian walk and flashing don’t walk time allows those who need extra
time such as seniors, children, and those with disabilities extra time to cross the street.
This reduces the likelihood that conflicting vehicles will be given a green light before
pedestrians have finished crossing the street.
•Introduce leading pedestrian intervals (LPIs)
•At busy intersections, such as our study intersections along Bollinger Canyon Road, an LPI
gives pedestrians a head start of a few seconds to begin crossing so that pedestrians are
more visible within the crosswalk before drivers receive a green light, increasing the
likelihood that a crossing pedestrian is noticed by the driver.
•Stripe high-visibility crosswalks
•High-visibility crosswalks use bold, striped patterns – often called “ladder markings” –
made from durable, reflective materials like thermoplastic instead of traffic paint. These
markings make crosswalks easier for drivers to see, especially at night or in bad weather,
and serve as a clearer signal that pedestrians may be present crossing the street.
•Paint green high-visibility bicycle extension striping through the intersection
•Solid green paint across an intersection signifies the bicycle crossing and serves as a
clearer signal that bicyclists may be present crossing the street while pointing out their
anticipated path of travel. Green conflict striping, often green dashed markings across an
intersection, driveway, or merging area, is used to alert bicyclists and drivers to a location
where their paths may cross or conflict.
•Signalize the eastbound right slip lane at Bollinger Canyon Road/Chevron Drive
Bishop Ranch Orchards Traffic Operations Report | 25
•Signalizing the right slip lane requires motorists to stop and wait for a green light before
turning. The signal slows turning vehicles also providing protected crossing times for
pedestrians and bicyclists (i.e. reducing the likelihood of conflict).
These measures are not coded into the traffic models for project conditions to provide a clean
comparison of the effect of Project trips on current infrastructure. The inclusion of these measures
would benefit pedestrian safety and convenience and may result in delay increases and queue
increases for some automobile turning movements. These measures should be considered in the
design phase.
Pedestrian improvements would help improve the experience
for people walking, biking, and taking transit; increasing the
appeal to switching from driving for some trips, which would
reduce congestion.
Bishop Ranch Orchards Traffic Operations Report | 26
6.0 Cumulative (Year 2040) Conditions
The Cumulative condition represents conditions at the buildout of the City’s General Plan and other
regional planning documents such as Plan Bay Area. To evaluate the potential effect of traffic
generated by the Project on the surrounding street system, volume estimates representing
Cumulative without Project Conditions were prepared using the Contra Costa Transportation
Authority (CCTA) travel demand model. Traffic conditions without the Project under this future
scenario reflect traffic increases due to nearby and regional development along with background
roadway network changes and street improvements. Project trips were added to the forecasted
Cumulative without Project Conditions traffic volumes to identify if the study intersections would
operate within the City’s LOS standards. This chapter presents the results of the LOS calculations
under Cumulative Conditions with the Project.
Cumulative Conditions Traffic Volumes
Traffic volumes for Cumulative Conditions are comprised of Existing Conditions volumes plus traffic
generated by anticipated local and regional land use growth. After reviewing the structure of the
model traffic analysis zone (TAZ) system and roadway network detail in and around the Project site
and study intersections, it was determined that the Contra Costa Transportation Authority (CCTA, or
Countywide) travel demand model would be a suitable tool for the estimation of future year demand
volumes.
The following presents the specific steps used to develop Year 2040 forecasts from the model:
•Step 1 – Run the Base Year (2025) model to estimate AM and PM peak hour traffic volumes.
•Step 2 – Run the Year 2040 model to estimate AM and PM peak hour traffic volumes.
•Step 3 – Compare total entering volumes at study intersections to develop growth rates
•Step 4 – Check for reasonableness (e.g., ensure that volumes do not drop below Existing
levels, or grow exponentially unless there is a valid reason).
As an additional check, the cumulative model land use growth was reviewed to provide context for
the traffic growth rates. This review of the larger influence area showed substantial new residential
growth east of I-680 and west of Alcosta Boulevard, where existing uses are mostly non-residential,
while west of I-680 remains largely built out and therefore shows lower land use growth. At the city
level, the CCTA travel demand model (2040 General Plan) reflects annual growth of about 2.2% for
households, 0.8% for employment, and 1.3% for service population (comparing raw outputs from
2025 to 2040).
Cumulative forecasts are largely based on existing and planned developments and the traffic volumes
presented in this analysis do not account for other factors that could influence future demand. New
transportation technologies, such as autonomous vehicles (AVs), are expected to proliferate over the
next 15 years. AVs may increase vehicular throughput if connected (i.e. enabled by technologies
allowing vehicles to communicate with each other), but they may also induce additional travel
demand. Additionally, the project has a 20 year buildout period and there will be opportunities to
adapt its Travel Demand Management (TDM) measures in later phases to respond to effectiveness of
TDM in the early phases of buildout. Other uncertainties that could affect traffic levels are potential
changes to road pricing (e.g. shift to a per-mile charge from gas taxes, or congestion pricing),
Bishop Ranch Orchards Traffic Operations Report | 27
potential expansions or reductions in transit service, further evolving work-from-home trends, and
changes to last-mile logistics.
The cumulative scenario represents traffic demand under a
set of simplistic growth assumptions and does not capture the
large degree of uncertainty inherent in potential travel
changes over the next 15 years. While future trends are
uncertain, some trends indicate that traffic levels may not
grow at the trajectory seen in the past.
Cumulative volume development is documented in Appendix G.
Cumulative with Project Intersection Level of
Service
Net new trips from the Project were added to the Cumulative without Project Conditions traffic
projections to develop traffic volumes for Cumulative with Project Conditions. The resulting volumes
are presented on Figure 9.
Intersection LOS was calculated for Cumulative with Project Conditions. The results of the analyses
are used to identify potential deficiencies within the operations of the roadway system. The
coordinated adaptive signals timings were optimized based on the forecasted traffic volumes and
Project traffic. Similarly to the Existing with Project scenario, the optimizations were done to the
respective adaptive signals in their time periods, while maintaining its original cycle length of 150
seconds. The phase splits and offsets were optimized for the freeway off-ramp phases to ensure that
queues do not spill back to the freeway mainline, while maintaining a moderate amount of
progression through Bollinger Canyon Road.
Given the amount of traffic growth anticipated in the cumulative with project scenario, a
comprehensive re-evaluation of adaptive signal timings and coordination in the long-term would be
merited, which may result in an ability to increase vehicular capacity along the corridor. Newer signal
controller technologies (such as machine learning, computer vision, real-time detection, and
coordination with connected vehicles) should be considered as the City progresses into the future.
Additionally, the traffic model does not consider how drivers react to peak hour congestion. Typically,
drivers who incur significant peak hour congestion for their working commute, may choose to leave
at an alternative schedule to avoid the congestion. Similarly, drivers tend to find the fastest route to
their destination, the traffic model does not consider drivers choosing an alternative route, and delay
imposed to the driver does not affect their routing decisions.
Bishop Ranch Orchards Traffic Operations Report | 28
The Cumulative scenario represents a future with much higher
levels of driving than today. In this scenario, a couple
intersections along Bollinger Canyon Road would become
bottlenecks where drivers experience long waits and slow-
moving traffic. Because conditions in the Existing Plus Project
scenario are much better, any worsening shown here would be
entirely due to general increases in driving, not the Project’s
effect. Furthermore, some drivers would adapt where and when
they drive when faced with this amount of congestion; the model
doesn’t capture this behavior change, thereby overstating peak
hour delay and queuing.
Because it is based on a set of growth assumptions, these
conditions may not materialize. In any case the City should
continuously monitor traffic conditions and adapt signal timings
in response. Investments in sustainable modes of transportation
such as walking, biking, and transit will improve their
respective appeal and lead to reductions in driving as people
switch over to them.
Table 12 provides the results of the intersection LOS calculations, while Appendix B contains the
corresponding calculation sheets. The Cumulative with Project Conditions expect all intersections to
operate below the City Standard, with some intersections operating at LOS F. The following
intersections would operate at LOS F in at least one time period:
•San Ramon Valley Boulevard/Bollinger Canyon Road during the PM peak hour
•Chevron Drive-Sunset Drive/Bollinger Canyon Road during the AM and PM peak hours
•Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road during the AM and PM peak hours
These signals were optimized based on the timing settings provided by the City for the adaptive
signals. The freeway off-ramp signals were optimized in attempt to prevent queues to spillback to the
mainline.
In the AM peak hour, the intersections operating at LOS F are a result of bottlenecks6 generally in the
westbound direction along Bollinger Canyon Road. The most notable bottleneck was found on the
westbound traffic along Bollinger Canyon Road to access the I-680 on-ramps. Both the I-680
6 A bottleneck is a localized section of a road or highway where traffic flow is significantly reduced.
Bishop Ranch Orchards Traffic Operations Report | 29
northbound and southbound on-ramps have one travel lane to enter the freeway. When platoons
arrive at the fork to enter either the northbound or southbound ramps, field observations found that
drivers may change lanes. Due to this behavior, it is reasonable to see that a high growth of traffic
(such as an annualized 1.3% growth rate over a 15 year period) would exacerbate the delays caused by
the on-ramp diverge, that causes queue spillback to the upstream intersections. Westbound drivers
along Bollinger Canyon Road would have to wait multiple cycles at an intersection to progress to the
on-ramps. In general, the signals are optimized to prioritize the progression along Bollinger Canyon
Road, which would cause higher delays to the minor cross-streets.
As a result of optimizing the freeway off-ramp movements, a bottleneck forms in the PM peak hour.
The intersections operating at an LOS F are caused by heavy left-turning traffic that originate from
either the southbound or northbound off-ramp. The likely cause of the high delays at San Ramon
Valley Boulevard/Bollinger Canyon Road (Intersection #1) is the proximity to the I-680 Southbound
Off-Ramp intersection. Progression for the eastbound movement is bottlenecked in attempt to
provide adequate green time for the southbound off-ramp, as queues would spill back onto the
freeway mainline otherwise. The likely cause of the high delays at Chevron Drive-Sunset
Drive/Bollinger (Intersection #6) and Bishop Ranch 1-Camino Ramon/Bollinger Canyon Road
(Intersection #7) are due to the eastbound left-turning traffic originating from the off-ramps. The
eastbound left-turning phase conflicts with the westbound direction. Both movements would need a
large proportion of green time, however, the eastbound left-turn phase is favored to prevent the off-
ramps from spilling back to the mainline.
Given the amount of traffic growth anticipated in the cumulative with project scenario, a
comprehensive re-evaluation of adaptive signal timings and coordination in the long-term would be
merited, which may result in an ability to increase vehicular capacity along the corridor. Newer signal
controller technologies (such as machine learning, computer vision, real-time detection, and
coordination with connected vehicles) should be considered as the City progresses into the future.
Additionally, the traffic model does not consider how drivers react to peak hour congestion. Typically,
drivers who incur significant peak hour congestion for their working commute, may choose to leave
at an alternative schedule to avoid the congestion. Similarly, drivers tend to find the fastest route to
their destination, the traffic model does not consider drivers choosing an alternative route, and delay
imposed to the driver does not affect their routing decisions.
Bishop Ranch Orchards Traffic Operations Report | 30
Table 12. Cumulative with Project Conditions Peak Hour Intersection LOS Summary
Intersection Peak Hour Delay LOS
1 San Ramon Valley Boulevard/Bollinger Canyon
Road
AM
PM
62
107
E
F
2 I-680 SB Ramps/Bollinger Canyon Road AM
PM
29
36
C
D
3 I-680 NB Ramps/Bollinger Canyon Road AM
PM
35
36
C
D
4 Sunset Drive/Bishop Drive AM
PM
13
24
B
C
5 Sunset Drive/Shops at Bishop Ranch-City
Center
AM
PM
14
36
B
D
6 Chevron Drive-Sunset Drive/Bollinger AM
PM
96
80
F
F
7 Bishop Ranch 1-Camino Ramon/Bollinger
Canyon Road
AM
PM
>120
>120
F
F
Bold indicates potentially unacceptable operations.
Source: Fehr & Peers, 2025.
Cumulative with Project Queues
The detailed intersection queue calculation worksheets which present average, 95th percentile, and
maximum queue lengths per lane group are included in Appendix C. Table 13 shows the movements
that have an average queue that exceed the storage length, while Table 14 shows the 95th percentile
queue that exceed their storage lengths. The freeway off-ramp signals were optimized in attempt to
prevent queues to spillback to the mainline.
Similar to the intersection operations results, Cumulative
with Project scenario queue lengths are a conservative
representation of a future with much higher general driving
levels. Because conditions in the Existing Plus Project
scenario are much better, any worsening shown here would
be entirely due to general increases in driving, not the Project
itself. Mitigations such as lane restriping and signal retiming
would have marginal effect in this scenario, although the City
should periodically optimize signal timings under future
conditions.
Bishop Ranch Orchards Traffic Operations Report | 31
Table 13. Cumulative with Project Conditions Peak Hour Intersection Average Queue
Summary
Intersection Movement Storage
Length (ft)
Queue Length (ft)
Average
AM PM
1 San Ramon Valley
Boulevard/Bollinger Canyon Road
EBT 700 475 775
EBR 200 200 225
WBL 200 225 175
NBT 750 375 1,400
SBL 300 250 400
2 I-680 SB Ramps/Bollinger Canyon
Road EBT/R 100 150 175
5 Sunset Drive/Shops at Bishop
Ranch-City Center
EBR 100 50 125
WBL 100 50 125
6 Chevron Drive-Sunset
Drive/Bollinger WBT 875 875 900
7 Bishop Ranch 1-Camino
Ramon/Bollinger Canyon Road
WBL 150 150 225
WBT 575 1,175 1,075
NBT 425 450 350
Bold indicates queue potentially extends beyond available storage.
Notes:
•Only the movements that have an average queue that exceed their storage lengths are shown in this
table.
•An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane,
which is not reflected in the storage length above.
Source: Fehr & Peers, 2025.
Bishop Ranch Orchards Traffic Operations Report | 32
Table 14. Cumulative with Project Conditions Peak Hour Intersection 95th Percentile Queue
Summary
Intersection Movement Storage
Length (ft)
Queue Length (ft)
95th Percentile
AM PM
1 San Ramon Valley
Boulevard/Bollinger Canyon Road
EBL 150 75 225
EBT 700 775 800
EBR 200 350 350
WBL 200 250 275
WBT 225 425 425
NBL 150 225 225
NBT 750 700 1,500
SBL 300 375 425
2 I-680 SB Ramps/Bollinger Canyon
Road
EBT 200 250 225
EBT/R 100 225 225
SBL 475 350 550
3 I-680 NB Ramps/Bollinger Canyon
Road
EBR 175 75 350
NBL 550 375 650
4 Sunset Drive/Bishop Drive NBL 225 275 125
SBL 175 75 225
5 Sunset Drive/Shops at Bishop
Ranch-City Center
EBL 200 75 325
EBR 100 100 150
WBL 100 75 225
WBT/R 100 100 150
NBL 175 175 200
SBL 100 50 150
SBT 250 75 275
SBT/R 250 75 275
6 Chevron Drive-Sunset
Drive/Bollinger
WBL 225 400 425
WBT 875 975 950
WBR 250 475 475
NBL 350 500 425
NBL/T 350 500 400
NBR 150 275 250
SBL 175 150 225
7 Bishop Ranch 1-Camino
Ramon/Bollinger Canyon Road
EBL 475 625 200
EBT 850 975 275
Bishop Ranch Orchards Traffic Operations Report | 33
WBL 150 300 325
WBT 575 1,875 1,850
WBR 575 900 800
NBL 425 525 525
NBT 425 675 625
SBL 700 275 800
SBT/R 700 425 825
SBR 700 400 800
Bold indicates queue potentially extends beyond available storage.
Notes:
•Only the movements that have a95th percentile queue that exceed their storage lengths are shown in
this table.
•An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane,
which is not reflected in the storage length above.
Source: Fehr & Peers, 2025.
12INTRODUCTION
FIGURE 1.6.1:
1.6 ILLUSTRATIVE PLAN + PROGRAM
Bollinger Canyon RoadBollinger Canyon Road
Su
n
s
e
t
D
r
i
v
e
Su
n
s
e
t
D
r
i
v
e
(f
o
r
m
e
r
l
y
C
h
e
v
r
o
n
D
r
i
v
e
)
(f
o
r
m
e
r
l
y
C
h
e
v
r
o
n
D
r
i
v
e
)
Site Plan Source: Bishop Ranch, November 2024.
Project Site Plan
FIGURE 1
S
a
n
R
a
m
o
n
V
a
ll
e
y
B
l
v
d
S
a
n
R
a
m
o
n
V
a
ll
e
y
B
l
v
d
No rris Cany on Rd
No rris Cany on Rd
S
a
n
R
a
m
o
n
V
a
ll
e
y
B
l
v
d
S
a
n
R
a
m
o
n
V
a
ll
e
y
B
l
v
d
Alcosta Blvd
Alcosta Blvd
Bollin
ger Ca
n
y
on Rd
Bollin
ger Ca
n
y
on Rd
T
a
la
v
e
r
a D
r
T
a
la
v
e
r
a D
r
C
a
m
in
o
R
a
m
o
n
C
a
m
in
o
R
a
m
o
n
M
o
r
g
a
n
D
r
M
o
r
g
a
n
D
r
Bollinger Cany o n R dBollinger Cany o n R d
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
Bi
s
h
o
p
R
a
n
c
h
1
Bi
s
h
o
p
R
a
n
c
h
1
Execut
i
v
e
P
k
w
y
Execut
i
v
e
P
k
w
yBishop DrBishop DrShopsDrivewayShopsDriveway
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
280680
1 2
3
4
5
6
7
0 0.25 0.50.125
Miles
Project Site Vicinity and Study Intersections
FIGURE 2
Project Site
Study Intersection#
Existing Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 3
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
3
(
4
1
9
)
17 (23)510 (449)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
17
4
(
2
3
4
)
275 (334)318 (596)407 (657)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,164 (1,093)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
60
6
(
7
5
2
)
762 (953)
28
8
(
3
5
1
)
96
1
(
7
3
2
)
1,053 (1,381)
721 (443)1,263 (1,672)
22
8
(
5
5
)
22
9
(
2
7
)
65
(
1
3
1
)
21 (4)55 (95)46 (208)
3 (
2
9
)
10
(
1
9
2
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
47
9
(
1
5
0
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
65
(
3
9
7
)
10
(
3
3
)
31 (39)14 (22)45 (148)
0 (
0
)
0 (
0
)
0 (
0
)
660 (479)1,354 (1,634)0 (0)
15
9
(
6
5
7
)
0 (
0
)
50
(
2
1
2
)
88 (145)1,825 (1,458)0 (0)
23
(
9
4
)
15
(
2
9
)
3 (
2
4
)
348 (119)955 (1,701)101 (26)
12
5
(
4
5
7
)
22
(
6
)
13
3
(
4
4
0
)
372 (284)1,765 (1,052)28 (1)
1,416 (1,582)371 (303)
789 (1,070)762 (953)
1,053 (1,381)363 (201)
1,551 (2,023)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
R
a
m
on
V
a
lley
B
l
v
d
Bollinger Canyon Rd
I-68
0
N
B
O
n
-
R
a
m
p
s
I-68
0
N
B
Off
-R
a
m
p
s
Bishop Dr
Sun
se
t
D
r
Shops
Sun
se
t
D
r
Bollinger Canyon Rd
Sun
se
t
Chevron D
r
Bollinger Canyon Rd
Camino
R
a
m
o
n
Bis
h
o
p
R
anch
1
Bollinger Canyon Rd
I-68
0
SB
O
n-R
a
m
p
I-68
0
NB
O
n-R
a
m
p
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-R
a
m
p
s
Dri
ve
w
a
y
I-6
8
0
N
B
O
n
-
R
a
m
p
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
R
a
m
on
V
a
lley
B
l
v
d
Bollinger Canyon Rd
I-68
0
N
B
O
n
-
R
a
m
p
s
I-68
0
N
B
Off
-R
a
m
p
s
Bishop Dr
Sun
se
t
D
r
Shops
Sun
se
t
D
r
Bollinger Canyon Rd
Sun
se
t
Chevron D
r
Bollinger Canyon Rd
Camino
R
a
m
o
n
Bis
h
o
p
R
anch
1
Bollinger Canyon Rd
I-68
0
SB
O
n-R
a
m
p
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-R
a
m
p
s
Dri
ve
w
a
y
Project Trip Assignment (Pre-Pass-By)
FIGURE 6A
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)42 (39)8 (8)
31 (71)
12
6
(
2
6
3
)
58 (59)
10
1
(
2
4
0
)
157 (334)
212 (228)286 (242)
23
(
1
5
)
24
(
1
6
)
8 (17)
8 (
1
9
)
47
(
3
1
)
16
(
3
6
)
37
6
(
4
0
8
)
47
(
3
1
)
87
(
4
4
)
53 (125)205 (449)
16
(
3
6
)
122 (62)54 (120)
12
2
(
6
2
)
78
(
8
7
)
12
0
(
1
5
3
)
87 (44)53 (125)
47
(
1
0
3
)
54 (120)55 (119)
157 (334)
228 (183)58 (59)
157 (334)
286 (242)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACF
CF
C
AC
ACF
CF
C
AC
C
CF
C
C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
Total pass-by ins differ from total pass-by outs (because retail in/out
split is not 50:50) resulting in non-zero net pass-by volumes that are
propogated out from the project site to maintain balanced volumes
between intersections.
*
**
**
*
**
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
R
a
m
on
V
a
lley
B
l
v
d
Bollinger Canyon Rd
I-68
0
N
B
O
n
-
R
a
m
p
s
I-68
0
N
B
Off
-R
a
m
p
s
Bishop Dr
Sun
se
t
D
r
Shops
Sun
se
t
D
r
Bollinger Canyon Rd
Sun
se
t
Chevron D
r
Bollinger Canyon Rd
Camino
R
a
m
o
n
Bis
h
o
p
R
anch
1
Bollinger Canyon Rd
I-68
0
SB
O
n-R
a
m
p
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-R
a
m
p
s
Dri
ve
w
a
y
Project Pass-By Assignment
FIGURE 6B
-8 (7)-8 (7)-8 (7)
-4
(
-
2
)
-4
(
-
2
)
8 (
4
9
)
3 (
1
5
)
6 (
4
2
)
-6 (-15)-12 (-52)18 (67)
-1
(
-
1
4
)
1 (
1
9
)
0 (
-
5
)
-1 (-2)-15 (-28)10 (28)
5 (
2
6
)
2 (
7
)
3 (
3
7
)
-7 (-22)1 (7)
-1
(
-
7
)
1 (
1
4
)
0 (
-
7
)
-2 (-6)-10 (-21)12 (27)-8 (7)-8 (7)
C C C
C C ACFAC
F
ACF AC
F
ACF
CF
ACF AC
F C C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
R
a
m
on
V
a
lley
B
l
v
d
Bollinger Canyon Rd
I-68
0
N
B
O
n
-
R
a
m
p
s
I-68
0
N
B
Off
-R
a
m
p
s
Bishop Dr
Sun
se
t
D
r
Shops
Sun
se
t
D
r
Bollinger Canyon Rd
Sun
se
t
Chevron D
r
Bollinger Canyon Rd
Camino
R
a
m
o
n
Bis
h
o
p
R
anch
1
Bollinger Canyon Rd
I-68
0
SB
O
n-R
a
m
p
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-R
a
m
p
s
Dri
ve
w
a
y
Project Trip Assignment
FIGURE 6C
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)34 (46)8 (8)
32 (71)
12
6
(
2
6
3
)
50 (66)
10
1
(
2
4
0
)
157 (334)
212 (228)278 (249)
23
(
1
5
)
20
(
1
4
)
8 (17)
8 (
1
9
)
43
(
2
9
)
16
(
3
6
)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
-6 (-15)41 (73)223 (516)
-1
(
-
1
4
)
17
(
5
5
)
-1 (-2)107 (34)64 (148)
12
7
(
8
8
)
80
(
9
4
)
12
3
(
1
9
0
)
80 (22)54 (132)
-1
(
-
7
)
48
(
1
1
7
)
0 (
-
7
)
-2 (-6)44 (99)67 (146)
157 (334)
228 (183)50 (66)
157 (334)
278 (249)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACFAC
F
CF AC
F
ACF
CF
ACF AC
F
C
CF
C
C
Existing with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 7
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
R
a
m
on
V
a
lley
B
l
v
d
Bollinger Canyon Rd
I-68
0
N
B
O
n
-
R
a
m
p
s
I-68
0
N
B
Off
-R
a
m
p
s
Bishop Dr
Sun
se
t
D
r
Shops
Sun
se
t
D
r
Bollinger Canyon Rd
Sun
se
t
Chevron D
r
Bollinger Canyon Rd
Camino
R
a
m
o
n
Bis
h
o
p
R
anch
1
Bollinger Canyon Rd
I-68
0
SB
O
n-R
a
m
p
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-R
a
m
p
s
Dri
ve
w
a
y
I-68
0
NB
O
n-R
a
m
p
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
7
(
4
2
9
)
17 (23)531 (498)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
18
0
(
2
4
6
)
283 (346)352 (642)415 (665)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,195 (1,164)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
73
2
(
1
,
0
1
5
)
812 (1,019)
28
8
(
3
5
1
)
1,
0
6
2
(
9
7
2
)
1,210 (1,715)
933 (671)1,541 (1,921)
25
1
(
7
0
)
24
9
(
4
1
)
65
(
1
3
1
)
21 (4)55 (95)54 (225)
3 (
2
9
)
18
(
2
1
1
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
52
2
(
1
7
9
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
81
(
4
3
3
)
10
(
3
3
)
31 (39)14 (22)45 (148)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
654 (464)1,395 (1,707)223 (516)
15
8
(
6
4
3
)
17
(
5
5
)
50
(
2
0
7
)
87 (143)1,932 (1,492)64 (148)
15
0
(
1
8
2
)
95
(
1
2
3
)
12
6
(
2
1
4
)
348 (119)1,035 (1,723)155 (158)
12
4
(
4
5
0
)
70
(
1
2
3
)
13
3
(
4
3
3
)
370 (278)1,809 (1,151)95 (147)
1,573 (1,916)371 (303)
1,017 (1,253)812 (1,019)
1,210 (1,715)363 (201)
1,829 (2,272)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
Cumulative with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 9
20
0
(
1
7
0
)
36
0
(
3
7
0
)
54
4
(
5
0
0
)
20 (30)581 (639)280 (200)
10
(
3
0
)
31
0
(
4
5
0
)
18
6
(
2
7
2
)
328 (392)414 (776)478 (768)
0 (
1
0
)
0 (
0
)
20
(
5
0
)
1,291 (1,401)20 (10)
34
0
(
8
1
0
)
20
(
2
0
)
1,
0
0
6
(
1
,
1
6
3
)
880 (1,116)
39
0
(
7
8
0
)
1,
2
3
1
(
1
,
1
6
0
)
1,367 (1,854)
1,132 (1,048)1,598 (1,959)
27
3
(
7
5
)
27
0
(
4
4
)
80
(
1
4
0
)
30 (10)60 (100)68 (257)
10
(
3
0
)
18
(
2
3
9
)
10
(
3
0
)
30 (10)60 (110)30 (80)
19
0
(
3
1
0
)
56
3
(
1
8
9
)
12
0
(
2
2
0
)
20 (30)10 (20)130 (370)
10
(
5
0
)
96
(
4
8
6
)
10
(
4
0
)
40 (40)20 (30)60 (170)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
724 (515)1,651 (1,983)223 (516)
20
9
(
7
4
6
)
17
(
5
5
)
60
(
2
2
5
)
99 (158)2,137 (1,804)64 (148)
15
7
(
2
0
8
)
11
0
(
1
5
4
)
13
3
(
2
2
0
)
380 (140)1,250 (1,982)174 (172)
14
9
(
5
3
3
)
98
(
1
3
7
)
17
0
(
4
8
3
)
408 (324)1,994 (1,369)107 (156)
1,887 (2,124)430 (490)
1,108 (1,623)880 (1,116)
1,367 (1,854)520 (270)
1,988 (2,739)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
R
a
m
on
V
a
lley
B
l
v
d
Bollinger Canyon Rd
I-68
0
N
B
O
n
-
R
a
m
p
s
I-68
0
N
B
Off
-R
a
m
p
s
Bishop Dr
Sun
se
t
D
r
Shops
Sun
se
t
D
r
Bollinger Canyon Rd
Sun
se
t
Chevron D
r
Bollinger Canyon Rd
Camino
R
a
m
o
n
Bis
hop
R
anch
1
Bollinger Canyon Rd
I-68
0
SB
O
n-R
a
m
p
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-R
a
m
p
s
Dri
ve
w
a
y
I-68
0
NB
O
n-R
a
m
p
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
R
a
m
on
V
a
lley
B
l
v
d
Bollinger Canyon Rd
I-68
0
N
B
O
n
-
R
a
m
p
s
I-68
0
N
B
Off
-R
a
m
p
s
Bishop Dr
Sun
se
t
D
r
Shops
Sun
se
t
D
r
Bollinger Canyon Rd
Sun
se
t
Chevron D
r
Bollinger Canyon Rd
Camino
R
a
m
o
n
Bis
h
o
p
R
anch
1
Bollinger Canyon Rd
I-68
0
SB
O
n-R
a
m
p
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-R
a
m
p
s
Dri
ve
w
a
y
I-68
0
NB
O
n-R
a
m
p
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
NorrisCan
y
o
n
R
d
NorrisCan
y
o
n
R
d
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
Alcosta Blvd
Alcosta Blvd
Bol
l
i
n
g
e
r
C
a
n
y
o
n
R
d
Bol
l
i
n
g
e
r
C
a
n
y
o
n
R
d
T
ala
v
e
r
a D
r
T
ala
v
e
r
a D
r
C
a
m
i
n
o
R
a
m
o
n
C
a
m
i
n
o
R
a
m
o
n
M
o
r
g
a
n
D
r
M
o
r
g
a
n
D
r
BollingerCanyon R dBollingerCanyonRd
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJ
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi
s
h
o
p
R
a
n
c
h
1
Bi
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
280680
1 2
3
4
5
6
7
8
9
0 0.1 0.2
Miles
Project Site
Study Intersection#
AM (PM)
Peak Hour Traffic Volumes
XX (YY)
Signalized Intersection
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
San
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
San
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
C
a
m
i
n
o
R
a
m
o
n
C
a
m
i
n
o
R
a
m
o
n
Ir
o
n
H
o
r
s
e
T
r
a
i
l
Ir
o
n
H
o
r
s
e
T
r
a
i
l
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
B
i
s
h
o
p
R
a
n
c
h
1
B
i
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
T
a
l
a
v
e
r
a
D
r
T
a
l
a
v
e
r
a
D
r
Bollinger C
a
n
y
o
n
R
d
Bollinger C
a
n
y
o
n
R
d
Bishop
D
r
Bishop
D
r
280680
95th Percentile Queue
AM Existing Conditions 95th Percentile QueuesFIGURE 4APM Existing Conditions 95th Percentile QueuesFIGURE 4B
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
San
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
San
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
C
a
m
i
n
o
R
a
m
o
n
C
a
m
i
n
o
R
a
m
o
n
Ir
o
n
H
o
r
s
e
T
r
a
i
l
Ir
o
n
H
o
r
s
e
T
r
a
i
l
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
B
i
s
h
o
p
R
a
n
c
h
1
B
i
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
T
a
l
a
v
e
r
a
D
r
T
a
l
a
v
e
r
a
D
r
Bollinger C
a
n
y
o
n
R
d
Bollinger C
a
n
y
o
n
R
d
Bishop
D
r
Bishop
D
r
280680
95th Percentile Queue
AM Existing Conditions 95th Percentile QueuesFIGURE 4APM Existing Conditions 95th Percentile QueuesFIGURE 4B
S
a
n R
a
m
o
n
V
all
e
y Blv
d
S
a
n R
a
m
o
n
V
all
e
y Blv
d
N o rris C a n y on R d
N o rris C a n y on R d
S
a
n R
a
m
o
n
V
all
e
y Bl
v
d
S
a
n R
a
m
o
n
V
all
e
y Bl
v
d
Alcosta Blvd
Alcosta Blvd
Bollin
ger Canyon Rd
Bollin
ger Canyon Rd
T
a
la
v
e
r
a D
r
T
a
la
v
e
r
a D
r
C
a
m
in
o
R
a
m
o
n
C
a
m
in
o
R
a
m
o
n
M
o
r
g
a
n D
r
M
o
r
g
a
n D
r
Bollinger Cany o n R dBollinger Cany o n R d
Bi
s
h
o
p
R
a
n
c
h
1
Bi
s
h
o
p
R
a
n
c
h
1
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
Execut
i
v
e
P
k
w
y
Execut
i
v
e
P
k
w
yBishop DrBishop DrShopsDrivewayShopsDriveway
280680
25%(
2
5
%
)
3
0
%
(
3
5
%
)
2
5
%
(
2
0
%
)
5%(5%)
15%(15%)
Trip Distribution
Residential (Retail)
0 0.25 0.50.125
Miles
Project Trip Distribution
FIGURE 5
Project Site
XX%(YY%)
Existing Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 3
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
3
(
4
1
9
)
17 (23)510 (449)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
17
4
(
2
3
4
)
275 (334)318 (596)407 (657)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,164 (1,093)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
60
6
(
7
5
2
)
762 (953)
28
8
(
3
5
1
)
96
1
(
7
3
2
)
1,053 (1,381)
721 (443)1,263 (1,672)
22
8
(
5
5
)
22
9
(
2
7
)
65
(
1
3
1
)
21 (4)55 (95)46 (208)
3 (
2
9
)
10
(
1
9
2
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
47
9
(
1
5
0
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
65
(
3
9
7
)
10
(
3
3
)
31 (39)14 (22)45 (148)
0 (
0
)
0 (
0
)
0 (
0
)
660 (479)1,354 (1,634)0 (0)
15
9
(
6
5
7
)
0 (
0
)
50
(
2
1
2
)
88 (145)1,825 (1,458)0 (0)
23
(
9
4
)
15
(
2
9
)
3 (
2
4
)
348 (119)955 (1,701)101 (26)
12
5
(
4
5
7
)
22
(
6
)
13
3
(
4
4
0
)
372 (284)1,765 (1,052)28 (1)
1,416 (1,582)371 (303)
789 (1,070)762 (953)
1,053 (1,381)363 (201)
1,551 (2,023)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
I-68
0
NB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-6
8
0
N
B
O
n
-
R
a
m
p
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment (Pre-Pass-By)
FIGURE 6A
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)42 (39)8 (8)
31 (71)
12
6
(
2
6
3
)
58 (59)
10
1
(
2
4
0
)
157 (334)
212 (228)286 (242)
23
(
1
5
)
24
(
1
6
)
8 (17)
8 (
1
9
)
47
(
3
1
)
16
(
3
6
)
37
6
(
4
0
8
)
47
(
3
1
)
87
(
4
4
)
53 (125)205 (449)
16
(
3
6
)
122 (62)54 (120)
12
2
(
6
2
)
78
(
8
7
)
12
0
(
1
5
3
)
87 (44)53 (125)
47
(
1
0
3
)
54 (120)55 (119)
157 (334)
228 (183)58 (59)
157 (334)
286 (242)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACF
CF
C
AC
ACF
CF
C
AC
C
CF
C
C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
Total pass-by ins differ from total pass-by outs (because retail in/out
split is not 50:50) resulting in non-zero net pass-by volumes that are
propogated out from the project site to maintain balanced volumes
between intersections.
*
**
**
*
**
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Pass-By Assignment
FIGURE 6B
-8 (7)-8 (7)-8 (7)
-4
(
-
2
)
-4
(
-
2
)
8 (
4
9
)
3 (
1
5
)
6 (
4
2
)
-6 (-15)-12 (-52)18 (67)
-1
(
-
1
4
)
1 (
1
9
)
0 (
-
5
)
-1 (-2)-15 (-28)10 (28)
5 (
2
6
)
2 (
7
)
3 (
3
7
)
-7 (-22)1 (7)
-1
(
-
7
)
1 (
1
4
)
0 (
-
7
)
-2 (-6)-10 (-21)12 (27)-8 (7)-8 (7)
C C C
C C ACFAC
F
ACF AC
F
ACF
CF
ACF AC
F C C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment
FIGURE 6C
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)34 (46)8 (8)
32 (71)
12
6
(
2
6
3
)
50 (66)
10
1
(
2
4
0
)
157 (334)
212 (228)278 (249)
23
(
1
5
)
20
(
1
4
)
8 (17)
8 (
1
9
)
43
(
2
9
)
16
(
3
6
)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
-6 (-15)41 (73)223 (516)
-1
(
-
1
4
)
17
(
5
5
)
-1 (-2)107 (34)64 (148)
12
7
(
8
8
)
80
(
9
4
)
12
3
(
1
9
0
)
80 (22)54 (132)
-1
(
-
7
)
48
(
1
1
7
)
0 (
-
7
)
-2 (-6)44 (99)67 (146)
157 (334)
228 (183)50 (66)
157 (334)
278 (249)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACFAC
F
CF AC
F
ACF
CF
ACF AC
F
C
CF
C
C
Existing with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 7
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
7
(
4
2
9
)
17 (23)531 (498)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
18
0
(
2
4
6
)
283 (346)352 (642)415 (665)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,195 (1,164)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
73
2
(
1
,
0
1
5
)
812 (1,019)
28
8
(
3
5
1
)
1,
0
6
2
(
9
7
2
)
1,210 (1,715)
933 (671)1,541 (1,921)
25
1
(
7
0
)
24
9
(
4
1
)
65
(
1
3
1
)
21 (4)55 (95)54 (225)
3 (
2
9
)
18
(
2
1
1
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
52
2
(
1
7
9
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
81
(
4
3
3
)
10
(
3
3
)
31 (39)14 (22)45 (148)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
654 (464)1,395 (1,707)223 (516)
15
8
(
6
4
3
)
17
(
5
5
)
50
(
2
0
7
)
87 (143)1,932 (1,492)64 (148)
15
0
(
1
8
2
)
95
(
1
2
3
)
12
6
(
2
1
4
)
348 (119)1,035 (1,723)155 (158)
12
4
(
4
5
0
)
70
(
1
2
3
)
13
3
(
4
3
3
)
370 (278)1,809 (1,151)95 (147)
1,573 (1,916)371 (303)
1,017 (1,253)812 (1,019)
1,210 (1,715)363 (201)
1,829 (2,272)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
Cumulative with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 9
20
0
(
1
7
0
)
36
0
(
3
7
0
)
54
4
(
5
0
0
)
20 (30)581 (639)280 (200)
10
(
3
0
)
31
0
(
4
5
0
)
18
6
(
2
7
2
)
328 (392)414 (776)478 (768)
0 (
1
0
)
0 (
0
)
20
(
5
0
)
1,291 (1,401)20 (10)
34
0
(
8
1
0
)
20
(
2
0
)
1,
0
0
6
(
1
,
1
6
3
)
880 (1,116)
39
0
(
7
8
0
)
1,
2
3
1
(
1
,
1
6
0
)
1,367 (1,854)
1,132 (1,048)1,598 (1,959)
27
3
(
7
5
)
27
0
(
4
4
)
80
(
1
4
0
)
30 (10)60 (100)68 (257)
10
(
3
0
)
18
(
2
3
9
)
10
(
3
0
)
30 (10)60 (110)30 (80)
19
0
(
3
1
0
)
56
3
(
1
8
9
)
12
0
(
2
2
0
)
20 (30)10 (20)130 (370)
10
(
5
0
)
96
(
4
8
6
)
10
(
4
0
)
40 (40)20 (30)60 (170)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
724 (515)1,651 (1,983)223 (516)
20
9
(
7
4
6
)
17
(
5
5
)
60
(
2
2
5
)
99 (158)2,137 (1,804)64 (148)
15
7
(
2
0
8
)
11
0
(
1
5
4
)
13
3
(
2
2
0
)
380 (140)1,250 (1,982)174 (172)
14
9
(
5
3
3
)
98
(
1
3
7
)
17
0
(
4
8
3
)
408 (324)1,994 (1,369)107 (156)
1,887 (2,124)430 (490)
1,108 (1,623)880 (1,116)
1,367 (1,854)520 (270)
1,988 (2,739)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
S
a
n R
a
m
o
n
V
all
e
y Blv
d
S
a
n R
a
m
o
n
V
all
e
y Blv
d
Norris C a n y on R d
Norris C a n y on R d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
Alcosta Blvd
Alcosta Blvd
Bollin
ger Canyon Rd
Bollin
ger Canyon Rd
T
ala
v
e
r
a D
r
T
ala
v
e
r
a D
r
C
a
m
in
o
R
a
m
o
n
C
a
m
in
o
R
a
m
o
n
M
o
r
g
a
n D
r
M
o
r
g
a
n D
r
Bollinger Canyon R dBollinger Canyon R d
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJ
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi
s
h
o
p
R
a
n
c
h
1
Bi
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
280680
1 2
3
4
5
6
7
8
9
0 0.1 0.2
Miles
Project Site
Study Intersection#
AM (PM)
Peak Hour Traffic Volumes
XX (YY)
Signalized Intersection
Existing Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 3
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
3
(
4
1
9
)
17 (23)510 (449)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
17
4
(
2
3
4
)
275 (334)318 (596)407 (657)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,164 (1,093)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
60
6
(
7
5
2
)
762 (953)
28
8
(
3
5
1
)
96
1
(
7
3
2
)
1,053 (1,381)
721 (443)1,263 (1,672)
22
8
(
5
5
)
22
9
(
2
7
)
65
(
1
3
1
)
21 (4)55 (95)46 (208)
3 (
2
9
)
10
(
1
9
2
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
47
9
(
1
5
0
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
65
(
3
9
7
)
10
(
3
3
)
31 (39)14 (22)45 (148)
0 (
0
)
0 (
0
)
0 (
0
)
660 (479)1,354 (1,634)0 (0)
15
9
(
6
5
7
)
0 (
0
)
50
(
2
1
2
)
88 (145)1,825 (1,458)0 (0)
23
(
9
4
)
15
(
2
9
)
3 (
2
4
)
348 (119)955 (1,701)101 (26)
12
5
(
4
5
7
)
22
(
6
)
13
3
(
4
4
0
)
372 (284)1,765 (1,052)28 (1)
1,416 (1,582)371 (303)
789 (1,070)762 (953)
1,053 (1,381)363 (201)
1,551 (2,023)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
I-68
0
NB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-6
8
0
N
B
O
n
-
R
a
m
p
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment (Pre-Pass-By)
FIGURE 6A
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)42 (39)8 (8)
31 (71)
12
6
(
2
6
3
)
58 (59)
10
1
(
2
4
0
)
157 (334)
212 (228)286 (242)
23
(
1
5
)
24
(
1
6
)
8 (17)
8 (
1
9
)
47
(
3
1
)
16
(
3
6
)
37
6
(
4
0
8
)
47
(
3
1
)
87
(
4
4
)
53 (125)205 (449)
16
(
3
6
)
122 (62)54 (120)
12
2
(
6
2
)
78
(
8
7
)
12
0
(
1
5
3
)
87 (44)53 (125)
47
(
1
0
3
)
54 (120)55 (119)
157 (334)
228 (183)58 (59)
157 (334)
286 (242)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACF
CF
C
AC
ACF
CF
C
AC
C
CF
C
C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
Total pass-by ins differ from total pass-by outs (because retail in/out
split is not 50:50) resulting in non-zero net pass-by volumes that are
propogated out from the project site to maintain balanced volumes
between intersections.
*
**
**
*
**
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Pass-By Assignment
FIGURE 6B
-8 (7)-8 (7)-8 (7)
-4
(
-
2
)
-4
(
-
2
)
8 (
4
9
)
3 (
1
5
)
6 (
4
2
)
-6 (-15)-12 (-52)18 (67)
-1
(
-
1
4
)
1 (
1
9
)
0 (
-
5
)
-1 (-2)-15 (-28)10 (28)
5 (
2
6
)
2 (
7
)
3 (
3
7
)
-7 (-22)1 (7)
-1
(
-
7
)
1 (
1
4
)
0 (
-
7
)
-2 (-6)-10 (-21)12 (27)-8 (7)-8 (7)
C C C
C C ACFAC
F
ACF AC
F
ACF
CF
ACF AC
F C C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment
FIGURE 6C
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)34 (46)8 (8)
32 (71)
12
6
(
2
6
3
)
50 (66)
10
1
(
2
4
0
)
157 (334)
212 (228)278 (249)
23
(
1
5
)
20
(
1
4
)
8 (17)
8 (
1
9
)
43
(
2
9
)
16
(
3
6
)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
-6 (-15)41 (73)223 (516)
-1
(
-
1
4
)
17
(
5
5
)
-1 (-2)107 (34)64 (148)
12
7
(
8
8
)
80
(
9
4
)
12
3
(
1
9
0
)
80 (22)54 (132)
-1
(
-
7
)
48
(
1
1
7
)
0 (
-
7
)
-2 (-6)44 (99)67 (146)
157 (334)
228 (183)50 (66)
157 (334)
278 (249)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACFAC
F
CF AC
F
ACF
CF
ACF AC
F
C
CF
C
C
Existing with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 7
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
7
(
4
2
9
)
17 (23)531 (498)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
18
0
(
2
4
6
)
283 (346)352 (642)415 (665)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,195 (1,164)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
73
2
(
1
,
0
1
5
)
812 (1,019)
28
8
(
3
5
1
)
1,
0
6
2
(
9
7
2
)
1,210 (1,715)
933 (671)1,541 (1,921)
25
1
(
7
0
)
24
9
(
4
1
)
65
(
1
3
1
)
21 (4)55 (95)54 (225)
3 (
2
9
)
18
(
2
1
1
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
52
2
(
1
7
9
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
81
(
4
3
3
)
10
(
3
3
)
31 (39)14 (22)45 (148)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
654 (464)1,395 (1,707)223 (516)
15
8
(
6
4
3
)
17
(
5
5
)
50
(
2
0
7
)
87 (143)1,932 (1,492)64 (148)
15
0
(
1
8
2
)
95
(
1
2
3
)
12
6
(
2
1
4
)
348 (119)1,035 (1,723)155 (158)
12
4
(
4
5
0
)
70
(
1
2
3
)
13
3
(
4
3
3
)
370 (278)1,809 (1,151)95 (147)
1,573 (1,916)371 (303)
1,017 (1,253)812 (1,019)
1,210 (1,715)363 (201)
1,829 (2,272)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
Cumulative with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 9
20
0
(
1
7
0
)
36
0
(
3
7
0
)
54
4
(
5
0
0
)
20 (30)581 (639)280 (200)
10
(
3
0
)
31
0
(
4
5
0
)
18
6
(
2
7
2
)
328 (392)414 (776)478 (768)
0 (
1
0
)
0 (
0
)
20
(
5
0
)
1,291 (1,401)20 (10)
34
0
(
8
1
0
)
20
(
2
0
)
1,
0
0
6
(
1
,
1
6
3
)
880 (1,116)
39
0
(
7
8
0
)
1,
2
3
1
(
1
,
1
6
0
)
1,367 (1,854)
1,132 (1,048)1,598 (1,959)
27
3
(
7
5
)
27
0
(
4
4
)
80
(
1
4
0
)
30 (10)60 (100)68 (257)
10
(
3
0
)
18
(
2
3
9
)
10
(
3
0
)
30 (10)60 (110)30 (80)
19
0
(
3
1
0
)
56
3
(
1
8
9
)
12
0
(
2
2
0
)
20 (30)10 (20)130 (370)
10
(
5
0
)
96
(
4
8
6
)
10
(
4
0
)
40 (40)20 (30)60 (170)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
724 (515)1,651 (1,983)223 (516)
20
9
(
7
4
6
)
17
(
5
5
)
60
(
2
2
5
)
99 (158)2,137 (1,804)64 (148)
15
7
(
2
0
8
)
11
0
(
1
5
4
)
13
3
(
2
2
0
)
380 (140)1,250 (1,982)174 (172)
14
9
(
5
3
3
)
98
(
1
3
7
)
17
0
(
4
8
3
)
408 (324)1,994 (1,369)107 (156)
1,887 (2,124)430 (490)
1,108 (1,623)880 (1,116)
1,367 (1,854)520 (270)
1,988 (2,739)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
S
a
n R
a
m
o
n
V
all
e
y Blv
d
S
a
n R
a
m
o
n
V
all
e
y Blv
d
Norris C a n y on R d
Norris C a n y on R d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
Alcosta Blvd
Alcosta Blvd
Bollin
ger Canyon Rd
Bollin
ger Canyon Rd
T
ala
v
e
r
a D
r
T
ala
v
e
r
a D
r
C
a
m
in
o
R
a
m
o
n
C
a
m
in
o
R
a
m
o
n
M
o
r
g
a
n D
r
M
o
r
g
a
n D
r
Bollinger Canyon R dBollinger Canyon R d
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJ
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi
s
h
o
p
R
a
n
c
h
1
Bi
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
280680
1 2
3
4
5
6
7
8
9
0 0.1 0.2
Miles
Project Site
Study Intersection#
AM (PM)
Peak Hour Traffic Volumes
XX (YY)
Signalized Intersection
Existing Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 3
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
3
(
4
1
9
)
17 (23)510 (449)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
17
4
(
2
3
4
)
275 (334)318 (596)407 (657)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,164 (1,093)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
60
6
(
7
5
2
)
762 (953)
28
8
(
3
5
1
)
96
1
(
7
3
2
)
1,053 (1,381)
721 (443)1,263 (1,672)
22
8
(
5
5
)
22
9
(
2
7
)
65
(
1
3
1
)
21 (4)55 (95)46 (208)
3 (
2
9
)
10
(
1
9
2
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
47
9
(
1
5
0
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
65
(
3
9
7
)
10
(
3
3
)
31 (39)14 (22)45 (148)
0 (
0
)
0 (
0
)
0 (
0
)
660 (479)1,354 (1,634)0 (0)
15
9
(
6
5
7
)
0 (
0
)
50
(
2
1
2
)
88 (145)1,825 (1,458)0 (0)
23
(
9
4
)
15
(
2
9
)
3 (
2
4
)
348 (119)955 (1,701)101 (26)
12
5
(
4
5
7
)
22
(
6
)
13
3
(
4
4
0
)
372 (284)1,765 (1,052)28 (1)
1,416 (1,582)371 (303)
789 (1,070)762 (953)
1,053 (1,381)363 (201)
1,551 (2,023)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
I-68
0
NB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-6
8
0
N
B
O
n
-
R
a
m
p
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment (Pre-Pass-By)
FIGURE 6A
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)42 (39)8 (8)
31 (71)
12
6
(
2
6
3
)
58 (59)
10
1
(
2
4
0
)
157 (334)
212 (228)286 (242)
23
(
1
5
)
24
(
1
6
)
8 (17)
8 (
1
9
)
47
(
3
1
)
16
(
3
6
)
37
6
(
4
0
8
)
47
(
3
1
)
87
(
4
4
)
53 (125)205 (449)
16
(
3
6
)
122 (62)54 (120)
12
2
(
6
2
)
78
(
8
7
)
12
0
(
1
5
3
)
87 (44)53 (125)
47
(
1
0
3
)
54 (120)55 (119)
157 (334)
228 (183)58 (59)
157 (334)
286 (242)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACF
CF
C
AC
ACF
CF
C
AC
C
CF
C
C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
Total pass-by ins differ from total pass-by outs (because retail in/out
split is not 50:50) resulting in non-zero net pass-by volumes that are
propogated out from the project site to maintain balanced volumes
between intersections.
*
**
**
*
**
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Pass-By Assignment
FIGURE 6B
-8 (7)-8 (7)-8 (7)
-4
(
-
2
)
-4
(
-
2
)
8 (
4
9
)
3 (
1
5
)
6 (
4
2
)
-6 (-15)-12 (-52)18 (67)
-1
(
-
1
4
)
1 (
1
9
)
0 (
-
5
)
-1 (-2)-15 (-28)10 (28)
5 (
2
6
)
2 (
7
)
3 (
3
7
)
-7 (-22)1 (7)
-1
(
-
7
)
1 (
1
4
)
0 (
-
7
)
-2 (-6)-10 (-21)12 (27)-8 (7)-8 (7)
C C C
C C ACFAC
F
ACF AC
F
ACF
CF
ACF AC
F C C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment
FIGURE 6C
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)34 (46)8 (8)
32 (71)
12
6
(
2
6
3
)
50 (66)
10
1
(
2
4
0
)
157 (334)
212 (228)278 (249)
23
(
1
5
)
20
(
1
4
)
8 (17)
8 (
1
9
)
43
(
2
9
)
16
(
3
6
)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
-6 (-15)41 (73)223 (516)
-1
(
-
1
4
)
17
(
5
5
)
-1 (-2)107 (34)64 (148)
12
7
(
8
8
)
80
(
9
4
)
12
3
(
1
9
0
)
80 (22)54 (132)
-1
(
-
7
)
48
(
1
1
7
)
0 (
-
7
)
-2 (-6)44 (99)67 (146)
157 (334)
228 (183)50 (66)
157 (334)
278 (249)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACFAC
F
CF AC
F
ACF
CF
ACF AC
F
C
CF
C
C
Existing with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 7
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
7
(
4
2
9
)
17 (23)531 (498)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
18
0
(
2
4
6
)
283 (346)352 (642)415 (665)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,195 (1,164)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
73
2
(
1
,
0
1
5
)
812 (1,019)
28
8
(
3
5
1
)
1,
0
6
2
(
9
7
2
)
1,210 (1,715)
933 (671)1,541 (1,921)
25
1
(
7
0
)
24
9
(
4
1
)
65
(
1
3
1
)
21 (4)55 (95)54 (225)
3 (
2
9
)
18
(
2
1
1
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
52
2
(
1
7
9
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
81
(
4
3
3
)
10
(
3
3
)
31 (39)14 (22)45 (148)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
654 (464)1,395 (1,707)223 (516)
15
8
(
6
4
3
)
17
(
5
5
)
50
(
2
0
7
)
87 (143)1,932 (1,492)64 (148)
15
0
(
1
8
2
)
95
(
1
2
3
)
12
6
(
2
1
4
)
348 (119)1,035 (1,723)155 (158)
12
4
(
4
5
0
)
70
(
1
2
3
)
13
3
(
4
3
3
)
370 (278)1,809 (1,151)95 (147)
1,573 (1,916)371 (303)
1,017 (1,253)812 (1,019)
1,210 (1,715)363 (201)
1,829 (2,272)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
Cumulative with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 9
20
0
(
1
7
0
)
36
0
(
3
7
0
)
54
4
(
5
0
0
)
20 (30)581 (639)280 (200)
10
(
3
0
)
31
0
(
4
5
0
)
18
6
(
2
7
2
)
328 (392)414 (776)478 (768)
0 (
1
0
)
0 (
0
)
20
(
5
0
)
1,291 (1,401)20 (10)
34
0
(
8
1
0
)
20
(
2
0
)
1,
0
0
6
(
1
,
1
6
3
)
880 (1,116)
39
0
(
7
8
0
)
1,
2
3
1
(
1
,
1
6
0
)
1,367 (1,854)
1,132 (1,048)1,598 (1,959)
27
3
(
7
5
)
27
0
(
4
4
)
80
(
1
4
0
)
30 (10)60 (100)68 (257)
10
(
3
0
)
18
(
2
3
9
)
10
(
3
0
)
30 (10)60 (110)30 (80)
19
0
(
3
1
0
)
56
3
(
1
8
9
)
12
0
(
2
2
0
)
20 (30)10 (20)130 (370)
10
(
5
0
)
96
(
4
8
6
)
10
(
4
0
)
40 (40)20 (30)60 (170)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
724 (515)1,651 (1,983)223 (516)
20
9
(
7
4
6
)
17
(
5
5
)
60
(
2
2
5
)
99 (158)2,137 (1,804)64 (148)
15
7
(
2
0
8
)
11
0
(
1
5
4
)
13
3
(
2
2
0
)
380 (140)1,250 (1,982)174 (172)
14
9
(
5
3
3
)
98
(
1
3
7
)
17
0
(
4
8
3
)
408 (324)1,994 (1,369)107 (156)
1,887 (2,124)430 (490)
1,108 (1,623)880 (1,116)
1,367 (1,854)520 (270)
1,988 (2,739)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
S
a
n R
a
m
o
n
V
all
e
y Blv
d
S
a
n R
a
m
o
n
V
all
e
y Blv
d
Norris C a n y on R d
Norris C a n y on R d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
Alcosta Blvd
Alcosta Blvd
Bollin
ger Canyon Rd
Bollin
ger Canyon Rd
T
ala
v
e
r
a D
r
T
ala
v
e
r
a D
r
C
a
m
in
o
R
a
m
o
n
C
a
m
in
o
R
a
m
o
n
M
o
r
g
a
n D
r
M
o
r
g
a
n D
r
Bollinger Canyon R dBollinger Canyon R d
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJ
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi
s
h
o
p
R
a
n
c
h
1
Bi
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
280680
1 2
3
4
5
6
7
8
9
0 0.1 0.2
Miles
Project Site
Study Intersection#
AM (PM)
Peak Hour Traffic Volumes
XX (YY)
Signalized Intersection
Existing Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 3
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
3
(
4
1
9
)
17 (23)510 (449)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
17
4
(
2
3
4
)
275 (334)318 (596)407 (657)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,164 (1,093)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
60
6
(
7
5
2
)
762 (953)
28
8
(
3
5
1
)
96
1
(
7
3
2
)
1,053 (1,381)
721 (443)1,263 (1,672)
22
8
(
5
5
)
22
9
(
2
7
)
65
(
1
3
1
)
21 (4)55 (95)46 (208)
3 (
2
9
)
10
(
1
9
2
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
47
9
(
1
5
0
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
65
(
3
9
7
)
10
(
3
3
)
31 (39)14 (22)45 (148)
0 (
0
)
0 (
0
)
0 (
0
)
660 (479)1,354 (1,634)0 (0)
15
9
(
6
5
7
)
0 (
0
)
50
(
2
1
2
)
88 (145)1,825 (1,458)0 (0)
23
(
9
4
)
15
(
2
9
)
3 (
2
4
)
348 (119)955 (1,701)101 (26)
12
5
(
4
5
7
)
22
(
6
)
13
3
(
4
4
0
)
372 (284)1,765 (1,052)28 (1)
1,416 (1,582)371 (303)
789 (1,070)762 (953)
1,053 (1,381)363 (201)
1,551 (2,023)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
I-68
0
NB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-6
8
0
N
B
O
n
-
R
a
m
p
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment (Pre-Pass-By)
FIGURE 6A
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)42 (39)8 (8)
31 (71)
12
6
(
2
6
3
)
58 (59)
10
1
(
2
4
0
)
157 (334)
212 (228)286 (242)
23
(
1
5
)
24
(
1
6
)
8 (17)
8 (
1
9
)
47
(
3
1
)
16
(
3
6
)
37
6
(
4
0
8
)
47
(
3
1
)
87
(
4
4
)
53 (125)205 (449)
16
(
3
6
)
122 (62)54 (120)
12
2
(
6
2
)
78
(
8
7
)
12
0
(
1
5
3
)
87 (44)53 (125)
47
(
1
0
3
)
54 (120)55 (119)
157 (334)
228 (183)58 (59)
157 (334)
286 (242)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACF
CF
C
AC
ACF
CF
C
AC
C
CF
C
C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
Total pass-by ins differ from total pass-by outs (because retail in/out
split is not 50:50) resulting in non-zero net pass-by volumes that are
propogated out from the project site to maintain balanced volumes
between intersections.
*
**
**
*
**
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Pass-By Assignment
FIGURE 6B
-8 (7)-8 (7)-8 (7)
-4
(
-
2
)
-4
(
-
2
)
8 (
4
9
)
3 (
1
5
)
6 (
4
2
)
-6 (-15)-12 (-52)18 (67)
-1
(
-
1
4
)
1 (
1
9
)
0 (
-
5
)
-1 (-2)-15 (-28)10 (28)
5 (
2
6
)
2 (
7
)
3 (
3
7
)
-7 (-22)1 (7)
-1
(
-
7
)
1 (
1
4
)
0 (
-
7
)
-2 (-6)-10 (-21)12 (27)-8 (7)-8 (7)
C C C
C C ACFAC
F
ACF AC
F
ACF
CF
ACF AC
F C C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment
FIGURE 6C
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)34 (46)8 (8)
32 (71)
12
6
(
2
6
3
)
50 (66)
10
1
(
2
4
0
)
157 (334)
212 (228)278 (249)
23
(
1
5
)
20
(
1
4
)
8 (17)
8 (
1
9
)
43
(
2
9
)
16
(
3
6
)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
-6 (-15)41 (73)223 (516)
-1
(
-
1
4
)
17
(
5
5
)
-1 (-2)107 (34)64 (148)
12
7
(
8
8
)
80
(
9
4
)
12
3
(
1
9
0
)
80 (22)54 (132)
-1
(
-
7
)
48
(
1
1
7
)
0 (
-
7
)
-2 (-6)44 (99)67 (146)
157 (334)
228 (183)50 (66)
157 (334)
278 (249)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACFAC
F
CF AC
F
ACF
CF
ACF AC
F
C
CF
C
C
Existing with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 7
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
7
(
4
2
9
)
17 (23)531 (498)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
18
0
(
2
4
6
)
283 (346)352 (642)415 (665)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,195 (1,164)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
73
2
(
1
,
0
1
5
)
812 (1,019)
28
8
(
3
5
1
)
1,
0
6
2
(
9
7
2
)
1,210 (1,715)
933 (671)1,541 (1,921)
25
1
(
7
0
)
24
9
(
4
1
)
65
(
1
3
1
)
21 (4)55 (95)54 (225)
3 (
2
9
)
18
(
2
1
1
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
52
2
(
1
7
9
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
81
(
4
3
3
)
10
(
3
3
)
31 (39)14 (22)45 (148)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
654 (464)1,395 (1,707)223 (516)
15
8
(
6
4
3
)
17
(
5
5
)
50
(
2
0
7
)
87 (143)1,932 (1,492)64 (148)
15
0
(
1
8
2
)
95
(
1
2
3
)
12
6
(
2
1
4
)
348 (119)1,035 (1,723)155 (158)
12
4
(
4
5
0
)
70
(
1
2
3
)
13
3
(
4
3
3
)
370 (278)1,809 (1,151)95 (147)
1,573 (1,916)371 (303)
1,017 (1,253)812 (1,019)
1,210 (1,715)363 (201)
1,829 (2,272)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
Cumulative with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 9
20
0
(
1
7
0
)
36
0
(
3
7
0
)
54
4
(
5
0
0
)
20 (30)581 (639)280 (200)
10
(
3
0
)
31
0
(
4
5
0
)
18
6
(
2
7
2
)
328 (392)414 (776)478 (768)
0 (
1
0
)
0 (
0
)
20
(
5
0
)
1,291 (1,401)20 (10)
34
0
(
8
1
0
)
20
(
2
0
)
1,
0
0
6
(
1
,
1
6
3
)
880 (1,116)
39
0
(
7
8
0
)
1,
2
3
1
(
1
,
1
6
0
)
1,367 (1,854)
1,132 (1,048)1,598 (1,959)
27
3
(
7
5
)
27
0
(
4
4
)
80
(
1
4
0
)
30 (10)60 (100)68 (257)
10
(
3
0
)
18
(
2
3
9
)
10
(
3
0
)
30 (10)60 (110)30 (80)
19
0
(
3
1
0
)
56
3
(
1
8
9
)
12
0
(
2
2
0
)
20 (30)10 (20)130 (370)
10
(
5
0
)
96
(
4
8
6
)
10
(
4
0
)
40 (40)20 (30)60 (170)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
724 (515)1,651 (1,983)223 (516)
20
9
(
7
4
6
)
17
(
5
5
)
60
(
2
2
5
)
99 (158)2,137 (1,804)64 (148)
15
7
(
2
0
8
)
11
0
(
1
5
4
)
13
3
(
2
2
0
)
380 (140)1,250 (1,982)174 (172)
14
9
(
5
3
3
)
98
(
1
3
7
)
17
0
(
4
8
3
)
408 (324)1,994 (1,369)107 (156)
1,887 (2,124)430 (490)
1,108 (1,623)880 (1,116)
1,367 (1,854)520 (270)
1,988 (2,739)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
S
a
n R
a
m
o
n
V
all
e
y Blv
d
S
a
n R
a
m
o
n
V
all
e
y Blv
d
Norris C a n y on R d
Norris C a n y on R d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
Alcosta Blvd
Alcosta Blvd
Bollin
ger Canyon Rd
Bollin
ger Canyon Rd
T
ala
v
e
r
a D
r
T
ala
v
e
r
a D
r
C
a
m
in
o
R
a
m
o
n
C
a
m
in
o
R
a
m
o
n
M
o
r
g
a
n D
r
M
o
r
g
a
n D
r
Bollinger Canyon R dBollinger Canyon R d
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJ
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi
s
h
o
p
R
a
n
c
h
1
Bi
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
280680
1 2
3
4
5
6
7
8
9
0 0.1 0.2
Miles
Project Site
Study Intersection#
AM (PM)
Peak Hour Traffic Volumes
XX (YY)
Signalized Intersection
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
San
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
San
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
C
a
m
i
n
o
R
a
m
o
n
C
a
m
i
n
o
R
a
m
o
n
Ir
o
n
H
o
r
s
e
T
r
a
i
l
Ir
o
n
H
o
r
s
e
T
r
a
i
l
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
B
i
s
h
o
p
R
a
n
c
h
1
B
i
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
T
a
l
a
v
e
r
a
D
r
T
a
l
a
v
e
r
a
D
r
Bollinger C
a
n
y
o
n
R
d
Bollinger C
a
n
y
o
n
R
d
Bishop
D
r
Bishop
D
r
280680
95th Percentile Queue
AM Existing with Project Conditions 95th Percentile QueuesFIGURE 8APM Existing with Project Conditions 95th Percentile QueuesFIGURE 8B
This queue extends
beyond the model
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
S
a
n
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
San
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
San
R
a
m
o
n
V
a
l
l
e
y
B
l
v
d
C
a
m
i
n
o
R
a
m
o
n
C
a
m
i
n
o
R
a
m
o
n
Ir
o
n
H
o
r
s
e
T
r
a
i
l
Ir
o
n
H
o
r
s
e
T
r
a
i
l
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
B
i
s
h
o
p
R
a
n
c
h
1
B
i
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
T
a
l
a
v
e
r
a
D
r
T
a
l
a
v
e
r
a
D
r
Bollinger C
a
n
y
o
n
R
d
Bollinger C
a
n
y
o
n
R
d
Bishop
D
r
Bishop
D
r
280680
95th Percentile Queue
AM Existing with Project Conditions 95th Percentile QueuesFIGURE 8APM Existing with Project Conditions 95th Percentile QueuesFIGURE 8B
This queue extends
beyond the model
Existing Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 3
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
3
(
4
1
9
)
17 (23)510 (449)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
17
4
(
2
3
4
)
275 (334)318 (596)407 (657)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,164 (1,093)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
60
6
(
7
5
2
)
762 (953)
28
8
(
3
5
1
)
96
1
(
7
3
2
)
1,053 (1,381)
721 (443)1,263 (1,672)
22
8
(
5
5
)
22
9
(
2
7
)
65
(
1
3
1
)
21 (4)55 (95)46 (208)
3 (
2
9
)
10
(
1
9
2
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
47
9
(
1
5
0
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
65
(
3
9
7
)
10
(
3
3
)
31 (39)14 (22)45 (148)
0 (
0
)
0 (
0
)
0 (
0
)
660 (479)1,354 (1,634)0 (0)
15
9
(
6
5
7
)
0 (
0
)
50
(
2
1
2
)
88 (145)1,825 (1,458)0 (0)
23
(
9
4
)
15
(
2
9
)
3 (
2
4
)
348 (119)955 (1,701)101 (26)
12
5
(
4
5
7
)
22
(
6
)
13
3
(
4
4
0
)
372 (284)1,765 (1,052)28 (1)
1,416 (1,582)371 (303)
789 (1,070)762 (953)
1,053 (1,381)363 (201)
1,551 (2,023)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
I-68
0
NB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-6
8
0
N
B
O
n
-
R
a
m
p
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment (Pre-Pass-By)
FIGURE 6A
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)42 (39)8 (8)
31 (71)
12
6
(
2
6
3
)
58 (59)
10
1
(
2
4
0
)
157 (334)
212 (228)286 (242)
23
(
1
5
)
24
(
1
6
)
8 (17)
8 (
1
9
)
47
(
3
1
)
16
(
3
6
)
37
6
(
4
0
8
)
47
(
3
1
)
87
(
4
4
)
53 (125)205 (449)
16
(
3
6
)
122 (62)54 (120)
12
2
(
6
2
)
78
(
8
7
)
12
0
(
1
5
3
)
87 (44)53 (125)
47
(
1
0
3
)
54 (120)55 (119)
157 (334)
228 (183)58 (59)
157 (334)
286 (242)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACF
CF
C
AC
ACF
CF
C
AC
C
CF
C
C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
Total pass-by ins differ from total pass-by outs (because retail in/out
split is not 50:50) resulting in non-zero net pass-by volumes that are
propogated out from the project site to maintain balanced volumes
between intersections.
*
**
**
*
**
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Pass-By Assignment
FIGURE 6B
-8 (7)-8 (7)-8 (7)
-4
(
-
2
)
-4
(
-
2
)
8 (
4
9
)
3 (
1
5
)
6 (
4
2
)
-6 (-15)-12 (-52)18 (67)
-1
(
-
1
4
)
1 (
1
9
)
0 (
-
5
)
-1 (-2)-15 (-28)10 (28)
5 (
2
6
)
2 (
7
)
3 (
3
7
)
-7 (-22)1 (7)
-1
(
-
7
)
1 (
1
4
)
0 (
-
7
)
-2 (-6)-10 (-21)12 (27)-8 (7)-8 (7)
C C C
C C ACFAC
F
ACF AC
F
ACF
CF
ACF AC
F C C
I-6
8
0
N
B
O
n
-
R
a
m
p
Note: Negative values are diverted retail pass-by trips.
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
Project Trip Assignment
FIGURE 6C
4 (
1
0
)
21 (49)
6
(
1
2
)
8 (12)34 (46)8 (8)
32 (71)
12
6
(
2
6
3
)
50 (66)
10
1
(
2
4
0
)
157 (334)
212 (228)278 (249)
23
(
1
5
)
20
(
1
4
)
8 (17)
8 (
1
9
)
43
(
2
9
)
16
(
3
6
)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
-6 (-15)41 (73)223 (516)
-1
(
-
1
4
)
17
(
5
5
)
-1 (-2)107 (34)64 (148)
12
7
(
8
8
)
80
(
9
4
)
12
3
(
1
9
0
)
80 (22)54 (132)
-1
(
-
7
)
48
(
1
1
7
)
0 (
-
7
)
-2 (-6)44 (99)67 (146)
157 (334)
228 (183)50 (66)
157 (334)
278 (249)
F
C
A AC
F
C
A
C
F
C
CF
AC
F
C
C
C
ACFAC
F
CF AC
F
ACF
CF
ACF AC
F
C
CF
C
C
Existing with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 7
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
17
6
(
1
1
0
)
31
5
(
2
9
0
)
49
7
(
4
2
9
)
17 (23)531 (498)250 (154)
9
(
1
5
)
25
6
(
3
3
3
)
18
0
(
2
4
6
)
283 (346)352 (642)415 (665)
0 (
1
)
0 (
0
)
17
(
4
0
)
1,195 (1,164)13 (9)
23
8
(
6
3
3
)
12
(
2
0
)
73
2
(
1
,
0
1
5
)
812 (1,019)
28
8
(
3
5
1
)
1,
0
6
2
(
9
7
2
)
1,210 (1,715)
933 (671)1,541 (1,921)
25
1
(
7
0
)
24
9
(
4
1
)
65
(
1
3
1
)
21 (4)55 (95)54 (225)
3 (
2
9
)
18
(
2
1
1
)
4 (
2
5
)
30 (9)56 (103)28 (73)
16
7
(
2
8
3
)
52
2
(
1
7
9
)
10
2
(
1
9
1
)
12 (24)3 (16)99 (324)
9 (
4
3
)
81
(
4
3
3
)
10
(
3
3
)
31 (39)14 (22)45 (148)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
654 (464)1,395 (1,707)223 (516)
15
8
(
6
4
3
)
17
(
5
5
)
50
(
2
0
7
)
87 (143)1,932 (1,492)64 (148)
15
0
(
1
8
2
)
95
(
1
2
3
)
12
6
(
2
1
4
)
348 (119)1,035 (1,723)155 (158)
12
4
(
4
5
0
)
70
(
1
2
3
)
13
3
(
4
3
3
)
370 (278)1,809 (1,151)95 (147)
1,573 (1,916)371 (303)
1,017 (1,253)812 (1,019)
1,210 (1,715)363 (201)
1,829 (2,272)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
Cumulative with Project Conditions Peak Hour
Intersection Traffic Volumes, Lane Configurations, and Traffic Control
FIGURE 9
20
0
(
1
7
0
)
36
0
(
3
7
0
)
54
4
(
5
0
0
)
20 (30)581 (639)280 (200)
10
(
3
0
)
31
0
(
4
5
0
)
18
6
(
2
7
2
)
328 (392)414 (776)478 (768)
0 (
1
0
)
0 (
0
)
20
(
5
0
)
1,291 (1,401)20 (10)
34
0
(
8
1
0
)
20
(
2
0
)
1,
0
0
6
(
1
,
1
6
3
)
880 (1,116)
39
0
(
7
8
0
)
1,
2
3
1
(
1
,
1
6
0
)
1,367 (1,854)
1,132 (1,048)1,598 (1,959)
27
3
(
7
5
)
27
0
(
4
4
)
80
(
1
4
0
)
30 (10)60 (100)68 (257)
10
(
3
0
)
18
(
2
3
9
)
10
(
3
0
)
30 (10)60 (110)30 (80)
19
0
(
3
1
0
)
56
3
(
1
8
9
)
12
0
(
2
2
0
)
20 (30)10 (20)130 (370)
10
(
5
0
)
96
(
4
8
6
)
10
(
4
0
)
40 (40)20 (30)60 (170)
38
4
(
4
5
7
)
50
(
4
6
)
93
(
8
6
)
724 (515)1,651 (1,983)223 (516)
20
9
(
7
4
6
)
17
(
5
5
)
60
(
2
2
5
)
99 (158)2,137 (1,804)64 (148)
15
7
(
2
0
8
)
11
0
(
1
5
4
)
13
3
(
2
2
0
)
380 (140)1,250 (1,982)174 (172)
14
9
(
5
3
3
)
98
(
1
3
7
)
17
0
(
4
8
3
)
408 (324)1,994 (1,369)107 (156)
1,887 (2,124)430 (490)
1,108 (1,623)880 (1,116)
1,367 (1,854)520 (270)
1,988 (2,739)
AACCFAC
C
F
AACE AA
C
C
F
DCC
C
E
ABFF CC
C
AFFFCC
C
CC
C
F
BCFAC
F
BE AE
AACCEBF
ACE AA
E
ABFAA
C
C
C
C
F
ABFF AA
C
C
C
C
F
ACFAA
C
C
C
C
F
AAEF AA
C
C
C
C
F
CC
C
F
CC
F
CC
E
CC
C
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
1. San Ramon Valley Blvd/Bollinger Canyon Rd 2. I-680 SB Off-Ramps/Dwy/Bollinger Canyon Rd 3. I-680 NB Ramps/Bollinger Canyon Rd
4. Sunset Dr/Bishop Dr 5. Sunset Dr/Shops 6. Sunset/Chevron Dr/Bollinger Canyon Rd
7. Camino Ramon/Bishop Ranch 1/Bollinger Canyon Rd 8. I-680 SB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
San
Ramon
Valley Blvd
Bollinger Canyon Rd
I-68
0
NB On-Ramps
I-68
0
NB Off
-Ramps
Bishop Dr
Sun
set Dr
Shops
Sun
set Dr
Bollinger Canyon Rd
Sun
set
Chevron Dr
Bollinger Canyon Rd
Camino
Ramon
Bishop Ranch 1
Bollinger Canyon Rd
I-68
0
SB
O
n-Ramp
9. I-680 NB On-Ramp/Bollinger Canyon Rd
Bollinger Canyon Rd
Bollinger Canyon Rd
I-680
SB
Off
-Ramps
Dri
veway
I-68
0
NB
O
n-Ramp
S
a
n R
a
m
o
n
V
all
e
y Blv
d
S
a
n R
a
m
o
n
V
all
e
y Blv
d
Norris C a n y on R d
Norris C a n y on R d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
S
a
n R
a
m
o
n
V
a
ll
e
y Blv
d
Alcosta Blvd
Alcosta Blvd
Bollin
ger Canyon Rd
Bollin
ger Canyon Rd
T
ala
v
e
r
a D
r
T
ala
v
e
r
a D
r
C
a
m
in
o
R
a
m
o
n
C
a
m
in
o
R
a
m
o
n
M
o
r
g
a
n D
r
M
o
r
g
a
n D
r
Bollinger Canyon R dBollinger Canyon R d
C
h
e
v
r
o
n
D
r
C
h
e
v
r
o
n
D
r
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJ
džĞĐƵƟǀ
Ğ
W
Ŭ
ǁ
LJBishop DrBishop DrShopsƌŝǀĞǁĂLJShopsƌŝǀĞǁĂLJ Bi
s
h
o
p
R
a
n
c
h
1
Bi
s
h
o
p
R
a
n
c
h
1
S
u
n
s
e
t
D
r
S
u
n
s
e
t
D
r
280680
1 2
3
4
5
6
7
8
9
0 0.1 0.2
Miles
Project Site
Study Intersection#
AM (PM)
Peak Hour Traffic Volumes
XX (YY)
Signalized Intersection
P
Appendix A.
Traffic Counts
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
1
3
4
2
2
1
1
3
17
6
Date: 02/20/2025Peak Hour Count Period: 7:00 AM 9:00 AM
SB 1.9%0.72
TOTAL 2.1%0.86
TH RT
WB 3.2%0.86
NB 2.0%0.97
Peak Hour: 7:45 AM 8:45 AM
HV %:PHF
EB 1.1%0.80
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min
TotalUTLTTHRT
4 57 27 24 1 12
26 22 1 302 0
7:15 AM 0 3 70 17
27 0 6 20 72 07:00 AM 0 3 56 5 4 36 24
21 35 2 505 0
7:45 AM 0 3 135 84
40 1 20 42 81 0
364 0
7:30 AM 0 2 98 40 3 73 47
27 81 0 15 26 0
768 1,939
8:00 AM 0 7 124 97 4 96 77
70 107 0 30 83 31807749046
5 87 60 75 0 45
44 98 4 855 2,492
8:15 AM 0 2 106 49
70 0 35 79 120 0
30 30 1 592 2,936
8:45 AM 0 1 77 23
40 0 50 79 112 0
721 2,849
8:30 AM 0 5 95 20 8 65 57
87 106 0 53 45 1
505 2,673641050242558565544018
Count Total 0 26 761 335 37 550 424 243 364 17 4,612 0
Peak
Hour
All 0 17 460
369 2 232 468 784 0
0 4 4 0 62 051102107
9 2,936 0
HV 0 0 4 4 0 11
176 315 445 0 157 256250183282712340
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
2%-3%2%0%2%3%2%5%-1%3%HV%-0%1%2%0%
0 0
7:15 AM 3 8 4 2 17 0 0
0 0 0 0 1 0
West North South
7:00 AM 0 8 4 2 14 0
EB WB NB SB Total East
7:45 AM 3 6 4 2 15
0 0 0 0 0 4
1
7:30 AM 0 7 4 1 12 0 0 0
0 0 0 1 1 0
0 1
8:15 AM 2 11 4 0 17 0 0
0 0 0 0 0 1
0 0 2
8:00 AM 2 4 3 4 13 0
0 0 0 0 0 0
8:45 AM 2 7 12 6 27
0 0 1 0 0 0
1
8:30 AM 1 6 8 2 17 0 0 0
0 0 0 0 0 0
0 2 1001010
2 10
Peak Hour 8 27 19 8 62 0 0
0 1 0 1 3 2Count Total 13 57 43 19 132 0
4000110
0
0
0
0 0 0
000
0
0
0
0
4
1 1
N
San Ramon Valley Blvd
Bollinger Canyon Rd
Bollinger Canyon Rd
Sa
n
R
a
m
o
n
Va
l
l
e
y
B
l
v
d
Bollinger Canyon Rd
Sa
n
R
a
m
o
n
Va
l
l
e
y
B
l
v
d
2,936TEV:0.86PHF:
9 25
6
15
7
42
2
56
6
0
234
271
328
851
1,08018
44
5
31
5
17
6
93
6
83
4
0
250
460
17
727
456 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
SouthboundNorthboundWestboundEastbound
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min
Total
Rolling
One HourEastboundWestbound
1 1 0 14 0
7:15 AM 0 0 0 3
4 0 0 0 4 0
TH RT
7:00 AM 0 0 0 0 0 4 0
UT LT TH RT UT LT
17 0
7:30 AM 0 0 0 0 0 3 3
0 4 0 2 0 0070100
0 2 1 3 0 0
0 1 0 12 0
7:45 AM 0 0 2 1
1 0 1 0 3 0
2 2 0 13 57
8:15 AM 0 0 1 1
1 0 0 1 2 0
15 58
8:00 AM 0 0 0 2 0 1 2
1 3 0 1 1 0
17 57
8:30 AM 0 0 1 0 0 5 0
1 2 0 0 0 0032601
0 4 1 2 0 0
1 1 0 17 62
8:45 AM 0 0 2 0
1 0 1 7 0 0
27 740120240
9 10 0 132 0
Peak Hour 0 0 4 4
19 0 3 10 30 0Count Total 0 0 6 7 0 29 9
0 07:00 AM
RT
62 0
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min
Total
Rolling
One Hour
10 7 0 4 4 001151102
RTTHLT RTTHLTRT
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
110010000
Peak Hour
0 0Count Total
0
THLT
0000000
1 00010
0 0
0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
000 0 0 0
000 0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
2
0
0
0
1
0
1
2
6
4
Date: 02/20/2025Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0%0.88
TOTAL 1.3%0.97
TH RT
WB 2.5%0.84
NB 1.3%0.92
Peak Hour: 5:00 PM 6:00 PM
HV %:PHF
EB 0.4%0.88
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min
TotalUTLTTHRT
0 117 85 52 0 20
42 55 3 606 0
4:15 PM 0 4 91 23
48 0 37 87 46 04:00 PM 0 2 88 22 3 74 99
36 45 2 565 0
4:45 PM 0 5 77 33
53 0 23 63 78 1
644 0
4:30 PM 0 4 93 20 1 63 83
70 86 0 45 48 3
624 2,439
5:00 PM 0 2 101 44 4 100 99
60 83 0 52 61 40829455018
2 109 86 55 0 19
35 91 5 707 2,540
5:15 PM 0 8 102 38
44 0 26 71 85 0
48 83 4 722 2,787
5:45 PM 0 8 67 22
53 0 47 79 83 0
734 2,630
5:30 PM 1 7 79 39 2 107 90
80 84 0 51 98 2
746 2,9099096147681210913868029
Count Total 1 40 698 241 14 761 774 356 549 24 5,348 0
Peak
Hour
All 1 25 349
428 0 219 600 641 2
0 0 0 0 39 02210163
12 2,909 0
HV 0 0 2 0 0 4
121 320 348 1 181 340143104254132200
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
1%0%0%0%0%1%1%0%10%-1%2%HV%0%0%1%0%0%
1 0
4:15 PM 0 2 0 0 2 0 0
0 0 0 0 1 0
West North South
4:00 PM 0 0 0 2 2 0
EB WB NB SB Total East
4:45 PM 0 3 1 0 4
0 0 0 0 0 0
0
4:30 PM 0 6 0 1 7 0 0 0
0 0 0 0 0 0
0 1
5:15 PM 1 6 3 0 10 1 0
0 0 0 0 0 0
0 0 0
5:00 PM 1 5 2 0 8 0
0 0 0 0 0 0
5:45 PM 0 8 2 0 10
0 1 0 0 0 1
0
5:30 PM 0 8 3 0 11 0 0 1
1 0 2 0 0 0
0 1 1000000
2 3
Peak Hour 2 27 10 0 39 1 0
0 2 0 3 1 0Count Total 2 38 11 3 54 1
3203001
0
1
0
0 0 0
020
0
0
0
1
3
0 0
N
San Ramon Valley Blvd
Bollinger Canyon Rd
Bollinger Canyon Rd
Sa
n
R
a
m
o
n
Va
l
l
e
y
B
l
v
d
Bollinger Canyon Rd
Sa
n
R
a
m
o
n
Va
l
l
e
y
B
l
v
d
2,909TEV:0.97PHF:
12 34
0
18
1
53
4
56
6
1
220
413
425
1,068
88810
34
8
32
0
12
1
78
9
90
8
0
143
349
25
518
547 1
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
SouthboundNorthboundWestboundEastbound
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min
Total
Rolling
One HourEastboundWestbound
1 1 0 2 0
4:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 0 0 0 0 0
UT LT TH RT UT LT
2 0
4:30 PM 0 0 0 0 0 1 0
0 0 0 0 0 0000200
0 2 0 1 0 1
1 0 0 7 0
4:45 PM 0 0 0 0
5 0 0 0 0 0
0 0 0 8 21
5:15 PM 0 0 1 0
4 0 0 1 1 0
4 15
5:00 PM 0 0 1 0 0 1 0
0 0 0 0 0 0
10 29
5:30 PM 0 0 0 0 0 0 1
1 1 0 0 0 0000601
0 3 1 4 0 0
0 0 0 11 33
5:45 PM 0 0 0 0
7 0 0 2 1 0
10 39200000
2 1 0 54 0
Peak Hour 0 0 2 0
29 0 2 6 3 0Count Total 0 0 2 0 0 7 2
0 04:00 PM
RT
39 0
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd San Ramon Valley Blvd San Ramon Valley Blvd 15-min
Total
Rolling
One Hour
6 3 0 0 0 00422101
RTTHLT RTTHLTRT
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0
4:30 PM
00000004:15 PM 0
0 0
0 0 0
1 3
5:45 PM
0 1 0 0
2
5:30 PM
2000001
0 0
5:15 PM
0 0 0
0 1 0
0 0 0
0 0 0
300000000
Peak Hour
0 0Count Total
0
THLT
3000002
3 00020
0 0
0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
010 0 0 0
010 0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
WB 2.6%0.90
NB 6.7%0.75
HV %:PHF
EB 1.6%0.87
TOTAL 2.2%0.96
Peak Hour
--Peak Hour: 7:45 AM to 8:45 AM
Date: 10/24/2024SB2.5%0.88 Count Period: 7:00 AM to 9:00 AMNWB
3,165TEV:
0.96PHF:
I-680 SB Ramps
Bollinger Canyon Rd
N
0
Bollinger Canyon Rd
1525
6
0 0 1140
0
Bollinger Canyon Rd
1,088
853
0715
0
0
13
360
0
I-68
0
S
B
R
a
m
p
s
Pa
r
k
&
R
i
d
e
D
w
y
0
81
0
63
7
0
023
8
56
0
012
1,252
1,279
0
615
0
637
0
0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0002,4482,8343,079
3,1653,047
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
13
6
0
1
4
1
5
0
0
2
I-680 SB On-Ramp 15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northwestbound One
RT
Interval Start
Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps
UT LT TH Hour
4 0 0 0 RT UT HL BL BR HRRTHRUTLTBLTHUTLTTHBRRTUTHLLTTH
7:15 AM 0 0 120 58 13 0 0 0 0 0 43120710335591200001005367:00 AM 0 0 87 49
146 63 2 0 0 6 43 0 0 00019095000701210 0 656
7:45 AM 0 0 218 92 2 0 0
3 76 0 0 0 000201320009513700
825
7:30 AM 0 0
4 0 0 0
82 0 0 0 0 0120148000134146000
8:15 AM 0 0 161 86 3
0 0 0 0 0 8175012604641891500000
0 0 781
8:00 AM 0 0 180 95
156 87 4 0
0 5 46 0 0 0002101290001841640
0 7428:45 AM 0 0 130 64 4 0 0 3 46 0 0 0 0013015700010817700 7078:30 AM 0 0 68 0 0 0 0 0330160030112160000Count Total 0 0 1,198 594 36 0 0 0
Peak
Hour
All 0 0 715 360
0 0 0 0 0 5,4952701,018 0 27 4609511,175 0 0 0 9
0 0 0 3,165HV008
560 0 12 238 0 0000411013000615637
0 0 71HV%--1%3%0%-
0 2 5 0 0 000010130001914090
SB NWBStartEBWBNBSBNWB
-2%
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
17%2%-----0%9%-2%---3%2%--
7:15 AM 5 4 3 8 0 0 0 0 0 0 0 Total7:00 AM 3 5 2 21 0 31 0 0 Total East West North South SoutheastTotalEBWBNB
0 25 0 0 0 0 0 0 1 02000000000
19 0 0 0 0 0
0 2 2
7:45 AM 3 13 0 3 0
0 0 0 0 0 0
0 0 0 0 1 0
7:30 AM 5 9 1 10
8:15 AM 2 8 0 4 0
0 0 0 0 0 08:00 AM 5 6 0 5 0 16 0 0
0 22 0 0
0 0 0 0 0 01400000
0 5 0
27 0 0 0 0 0
0 0 0
8:45 AM 11 11 1 4 0
0 0 0 0 0 0
0 0 0 0 2 0
8:30 AM 7 6 1 8
0 11 2
Peak Hr 17 33 1 20 0
0 0 0 0 0 0Count Total 41 62 8 63 0 174 0 0
0 0 0 0 6 07100000
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
000958074
71790
0
Two-Hour Count Summaries - Bikes
00
0
0
0
00
00
0
Westbound Northbound Southbound Northwestbound OneUTLTTHBRRTInterval Start
Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps I-680 SB On-Ramp 15-min
Total
RollingEastboundBRHRHour7:00 AM 0 0 1 2 0 0 BL TH RT UT HL BLLTTHRTHRUTLTUTHLLTTHRTUT
7:15 AM 0 0 2 0 3130001800000020120004100200000200000030501004000
7:45 AM 0 0 3 0 0
0 0 0 0 0 25109001270000
0 0 19
7:30 AM 0 0 3 2
1 4 0 0
0 0 1 0 0 0000002000940
0 16
8:15 AM 0 0 1 1 0 0 0
0 2 0 0 0 0000030002400
14
8:00 AM 0 0
0 0 0 0
0 0 0 0 0 0000202053000
8:45 AM 0 0 8 3 0
0 0 0 0 0 22106002330000
0 0 27
8:30 AM 0 0 3 4
0 0 3 0 0 0000101000650Count Total 0 0 22 19 0 0 14 0 0 0 0 174Peak Hour 0 0 8 9 0 0 0 4 19 0 0 0 0008040000313100
LT
RollingEastboundWestboundNorthboundSouthboundNorthwestboundOne
71
Interval Start
Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps I-680 SB On-Ramp 15-min
TotalUTLT
5 0 0 0 0 00101302019
7:00 AM 0 0 0 0 0 UT HL BL BR HR HourHRUTLTBLTHRTTHRTUTLTTHRT000THBRRTUTHL
0 0 0 0 0 0 0 0 0 0000000000000 0 07:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 07:15 AM 0 0
0 0 0 0
0 0 0 0 0 0000000000000
8:00 AM 0 0 0 0 0
0 0 0 0 0 0000000000000
0 0 0
7:45 AM 0 0 0 0
0 0 0 0
0 0 0 0 0 0000000000000
0 0
8:30 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000000000000
0
8:15 AM 0 0
0 0 0 0 0 0 0 0 0 000000000000000000 00000000000008:45 AM 0 0 0 0
Peak Hour 0 0 0 0 0 0
0 0 0 0 0 0000000000000Count Total 0 0 0 0 0
0 0000000000000000000
0 0 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
WB 2.3%0.92
NB 7.9%0.63
HV %:PHF
EB 0.8%0.93
TOTAL 1.6%0.95
Peak Hour
--Peak Hour: 4:45 PM to 5:45 PM
Date: 10/24/2024SB0.8%0.94 Count Period: 4:00 PM to 6:00 PMNWB
3,664TEV:
0.95PHF:
I-680 SB Ramps
Bollinger Canyon Rd
N
0
Bollinger Canyon Rd
3829
3
0 1 5320
0
Bollinger Canyon Rd
1,030
1,046
0730
0
0
9
291
0
I-68
0
S
B
R
a
m
p
s
Pa
r
k
&
R
i
d
e
D
w
y
0
89
9
89
8
0
024
6
62
6
720
1,697
1,388
0
799
0
898
0
0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0003,3163,4323,550
3,6643,633
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
14
7
1
0
0
0
0
2
5
6
I-680 SB On-Ramp 15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northwestbound One
RT
Interval Start
Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps
UT LT TH Hour
5 0 0 0 RT UT HL BL BR HRRTHRUTLTBLTHUTLTTHBRRTUTHLLTTH
4:15 PM 0 0 170 69 2 0 0 0 0 0 81650130010851611780002008504:00 PM 0 0 173 67
163 63 3 0 0 4 61 0 0 0104401360001732260 0 783
4:45 PM 0 0 181 83 1 0 0
4 49 0 0 0 0053014810018615800
867
4:30 PM 0 0
1 0 0 0
57 0 0 0 0 01220151070199173010
5:15 PM 0 0 201 74 2
0 0 0 0 0 9323015024582042520003
0 0 968
5:00 PM 0 0 185 70
163 64 5 0
2 8 58 0 0 0002001620002042550
0 8975:45 PM 0 0 159 59 2 0 0 1 73 0 0 0 00150016330019221800 8365:30 PM 0 0 67 0 0 0 0 0210147060212180010Count Total 0 0 1,395 549 21 0 0 0
Peak
Hour
All 0 0 730 291
0 0 0 0 0 6,9491801,187 8 44 5081,531 1,640 0 3 0 45
0 0 0 3,664HV006
626 7 20 246 0 001032509000799898
0 0 57HV%--1%1%0%-
3 0 1 0 0 0002103000327020
SB NWBStartEBWBNBSBNWB
-2%
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
0%0%-----6%20%-0%43%--4%1%-0%
4:15 PM 2 5 1 3 0 0 0 0 0 0 0 Total4:00 PM 3 5 0 1 0 9 0 0 Total East West North South SoutheastTotalEBWBNB
0 17 0 0 0 0 0 0 0 01100000010
15 0 0 0 0 0
0 0 0
4:45 PM 2 9 2 2 0
0 0 0 0 0 0
0 0 0 0 0 0
4:30 PM 3 10 0 4
5:15 PM 3 9 0 2 0
0 0 0 0 0 05:00 PM 2 8 0 0 0 10 0 0
0 18 0 0
0 0 0 0 1 11400000
0 0 0
11 0 0 0 0 0
0 2 3
5:45 PM 4 6 0 1 0
0 0 0 0 0 0
0 0 0 0 3 3
5:30 PM 1 13 1 3
0 7 7
Peak Hr 8 39 3 7 0
0 0 0 0 0 0Count Total 20 65 4 16 0 105 0 0
0 0 0 0 3 45700000
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
000525356
57530
0
Two-Hour Count Summaries - Bikes
00
0
0
0
00
00
0
Westbound Northbound Southbound Northwestbound OneUTLTTHBRRTInterval Start
Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps I-680 SB On-Ramp 15-min
Total
RollingEastboundBRHRHour4:00 PM 0 0 3 0 0 0 BL TH RT UT HL BLLTTHRTHRUTLTUTHLLTTHRTUT
4:15 PM 0 0 1 0 91000000000000010002300110000000000000300032010
4:45 PM 0 0 2 0 0
0 0 0 0 0 17004000820000
0 0 15
4:30 PM 0 0 1 2
0 2 0 0
0 0 0 0 0 0001102000630
0 10
5:15 PM 0 0 3 0 0 0 0
0 0 0 0 0 0000000007100
14
5:00 PM 0 0
0 0 0 0
0 0 0 0 0 0000110072000
5:45 PM 0 0 2 2 0
0 0 0 0 0 180002011210001
0 0 11
5:30 PM 0 0 1 0
0 0 0 0 0 0000001000330Count Total 0 0 13 7 0 0 7 0 0 0 0 105Peak Hour 0 0 6 2 0 0 0 0 1 0 0 0 0021012300481701
LT
RollingEastboundWestboundNorthboundSouthboundNorthwestboundOne
57
Interval Start
Bollinger Canyon Rd Bollinger Canyon Rd Park & Ride Dwy I-680 SB Ramps I-680 SB On-Ramp 15-min
TotalUTLT
1 0 0 0 0 0210330032
4:00 PM 0 0 0 0 0 UT HL BL BR HR HourHRUTLTBLTHRTTHRTUTLTTHRT000THBRRTUTHL
0 0 0 0 0 0 0 0 0 0000000000000 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000 04:15 PM 0 0
0 0 0 0
0 0 0 0 0 0000000000000
5:00 PM 0 0 0 0 0
0 0 0 0 0 0000000000000
0 0 0
4:45 PM 0 0 0 0
0 0 0 0
0 0 0 0 0 0000000000000
0 0
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000000000
0
5:15 PM 0 0
0 0 0 0 0 0 0 0 0 000000000000000000 00000000000005:45 PM 0 0 0 0
Peak Hour 0 0 0 0 0 0
0 0 0 0 0 0000000000000Count Total 0 0 0 0 0
0 0000000000000000000
0 0 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
0
0
0
0
0
0
0
0
00000000
0 0
Peak Hour 27 38 35 0 100 0 0
0 0 0 0 0 0Count Total 51 64 66 0 181 0
0 0 00000008:45 AM 7 8 5 0 20
0 0 0 0 0 0
0
8:30 AM 5 11 7 0 23 0 0 0
0 0 0 0 0 0
0 0
8:15 AM 10 9 7 0 26 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 4 11 10 0 25 0
0 0 0 0 0 0
0 0 0
0
7:30 AM 6 10 11 0 27 0 0 0
0 0 0 0 0 0
0 18 0
EB WB NB SB Total East
7:45 AM 8 7 11 0 26
0 0 0
-5%-HV%--2%2%-
0 0
7:15 AM 3 5 8 0 16 0 0
0 0 0 0 0 0
West North South
7:00 AM 8 3 7
0
288 0 866 0 0 0363001,057 603 0
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
3%----2%-2%2%
Peak
Hour
All 0 0 950
1,076 0 494 0 1,539 0
0 0 0 0 100 02513013022
0 4,127 0
HV 0 0 18 9 0
Count Total 1 0 1,631 670 0 0 1,807 0 0 0 7,218 0
992 4,0890239000000233127063
0 0 0 984 4,127
8:45 AM 0 0 259 71
157 0 49 0 224 0
1,037 3,998
8:30 AM 0 0 220 76 0 0 258
0 217 0 0 0 000270153086
0 0 0 1,076 3,674
8:15 AM 0 0 230 81
128 0 87 0 228 0
1,030 3,129
8:00 AM 0 0 261 100 0 0 272
0 197 0 0 0 000257165066
0 0 0 855 0
7:45 AM 0 0 239 106
137 0 58 0 168 0
713 0
7:30 AM 0 0 196 107 0 0 189
0 158 0 0 0 000181113050
0 0 0 531 0
7:15 AM 1 0 139 71
96 0 35 0 108 07:00 AM 0 0 87 58 0 0 147
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min
TotalUTLTTHRT
Date: 10/22/2024
Peak Hour Count Period: 7:00 AM 9:00 AM
SB --
TOTAL 2.4%0.96
TH RT
WB 2.3%0.98
NB 3.0%0.92
Peak Hour: 7:45 AM 8:45 AM
HV %:PHF
EB 2.1%0.91
0
0
0
0 0 0
000
0
0
0
0
0
0 0
N
I-680 NB Ramps
Bollinger Canyon Rd
Bollinger Canyon Rd
I-68
0
N
B
R
a
m
p
s
Bollinger Canyon Rd
I-68
0
N
B
R
a
m
p
s
4,127TEV:
0.96PHF:
0 0 0
0
60
3
0
603
1,057
0
1,660
1,8160
86
6
0
28
8
1,
1
5
4
36
3
0
363
950
0
1,313
1,345 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
100 0
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min
Total
Rolling
One Hour
0 22 0 0 0 0002513013
RTTHLT RTTHLTRT
0 0 0 181 0
Peak Hour 0 0 18 9
27 0 26 0 40 0Count Total 0 0 36 15 0 0 37
20 94020000002603
0 0 0 23 100
8:45 AM 0 0 5 2
4 0 3 0 4 0
26 104
8:30 AM 0 0 4 1 0 0 7
0 6 0 0 0 0006301
0 0 0 25 94
8:15 AM 0 0 8 2
4 0 3 0 7 0
26 87
8:00 AM 0 0 2 2 0 0 7
0 5 0 0 0 0005206
0 0 0 27 0
7:45 AM 0 0 4 4
4 0 3 0 8 0
16 0
7:30 AM 0 0 6 0 0 0 6
0 4 0 0 0 0003204
0 0 0 18 0
7:15 AM 0 0 2 1
2 0 3 0 4 0
TH RT
7:00 AM 0 0 5 3 0 0 1
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
0
0
0
0
0
0
0
0
00001000
0 0
Peak Hour 6 15 39 0 60 0 1
1 0 0 1 0 0Count Total 16 35 51 0 102 0
0 0 00000005:45 PM 1 3 4 0 8
0 0 0 0 0 0
0
5:30 PM 1 3 14 0 18 0 0 0
0 0 0 0 0 0
0 0
5:15 PM 3 3 12 0 18 0 0
1 0 0 1 0 0
0 0 0
5:00 PM 1 5 6 0 12 0
0 0 0 0 0 0
0 0 0
0
4:30 PM 1 5 4 0 10 0 0 0
0 0 0 0 0 0
0 16 0
EB WB NB SB Total East
4:45 PM 1 4 7 0 12
0 0 0
-9%-HV%--0%2%-
0 0
4:15 PM 2 3 3 0 8 0 0
0 0 0 0 0 0
West North South
4:00 PM 6 9 1
0
351 0 707 0 0 0201001,414 375 0
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
1%----1%-0%2%
Peak
Hour
All 0 0 1,281
818 0 659 0 1,343 0
0 0 0 0 60 07803306
0 4,329 0
HV 0 0 2 4 0
Count Total 0 0 2,311 417 0 0 2,795 0 0 0 8,343 0
1,012 4,327018700000032989096
0 0 0 1,083 4,329
5:45 PM 0 0 267 44
81 0 88 0 197 0
1,117 4,297
5:30 PM 0 0 295 42 0 0 380
0 197 0 0 0 000347103092
0 0 0 1,115 4,161
5:15 PM 0 0 320 58
94 0 88 0 161 0
1,014 4,016
5:00 PM 0 0 339 56 0 0 377
0 152 0 0 0 00031097083
0 0 0 1,051 0
4:45 PM 0 0 327 45
110 0 76 0 156 0
981 0
4:30 PM 0 0 269 60 0 0 380
0 169 0 0 0 000316124075
0 0 0 970 0
4:15 PM 0 0 250 47
120 0 61 0 124 04:00 PM 0 0 244 65 0 0 356
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min
TotalUTLTTHRT
Date: 10/22/2024
Peak Hour Count Period: 4:00 PM 6:00 PM
SB --
TOTAL 1.4%0.97
TH RT
WB 0.8%0.95
NB 3.7%0.92
Peak Hour: 4:45 PM 5:45 PM
HV %:PHF
EB 0.4%0.94
0
0
0
0 0 0
000
0
1
0
0
0
0 0
N
I-680 NB Ramps
Bollinger Canyon Rd
Bollinger Canyon Rd
I-68
0
N
B
R
a
m
p
s
Bollinger Canyon Rd
I-68
0
N
B
R
a
m
p
s
4,329TEV:
0.97PHF:
0 0 0
0
37
5
0
375
1,414
0
1,789
1,9880
70
7
0
35
1
1,
0
5
8
20
1
0
201
1,281
0
1,482
1,765 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 1 0
000 0 1 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 1 0
0 0 0
0
THLT
1000000
1 00000
0 0
0 0
Peak Hour
0 0Count Total
0
100000000
0 1
5:45 PM
0 0 0 0
1
5:30 PM
0000000
1 1
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0
4:30 PM
00000004:15 PM 0
0 0
0 0 0
0 04:00 PM
RT
60 0
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min
Total
Rolling
One Hour
0 6 0 0 0 00078033
RTTHLT RTTHLTRT
0 0 0 102 0
Peak Hour 0 0 2 4
18 0 42 0 9 0Count Total 0 0 7 9 0 0 17
8 56010000001203
0 0 0 18 60
5:45 PM 0 0 1 0
1 0 13 0 1 0
18 52
5:30 PM 0 0 0 1 0 0 2
0 2 0 0 0 00012010
0 0 0 12 42
5:15 PM 0 0 1 2
3 0 5 0 1 0
12 46
5:00 PM 0 0 0 1 0 0 2
0 2 0 0 0 0002205
0 0 0 10 0
4:45 PM 0 0 1 0
1 0 4 0 0 0
8 0
4:30 PM 0 0 0 1 0 0 4
0 1 0 0 0 0000302
0 0 0 16 0
4:15 PM 0 0 2 0
4 0 0 0 1 0
TH RT
4:00 PM 0 0 2 4 0 0 5
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
Bollinger Canyon Rd Bollinger Canyon Rd I-680 NB Ramps I-680 NB Ramps 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
10
3
6
14
4
7
4
2
50
17
Date: 02/20/2025Peak Hour Count Period: 7:00 AM 9:00 AM
SB 11.1%0.56
TOTAL 1.3%0.95
TH RT
WB 4.8%0.68
NB 0.5%0.91
Peak Hour: 8:00 AM 9:00 AM
HV %:PHF
EB 0.0%0.96
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
Bishop Dr Bishop Dr Sunset Dr Driveway 15-min
TotalUTLTTHRT
0 10 9 3 0 31
0 3 0 88 0
7:15 AM 0 1 6 7
1 0 28 23 9 07:00 AM 0 1 4 14 0 3 2
1 3 2 127 0
7:45 AM 0 5 8 9
1 0 45 29 12 0
103 0
7:30 AM 0 1 11 13 0 6 3
26 9 0 0 1 0
168 486
8:00 AM 0 7 13 15 0 8 12
55 15 0 1 2 10497052
0 12 24 10 0 59
1 2 0 211 609
8:15 AM 0 6 17 9
3 0 60 70 20 0
0 2 1 188 780
8:45 AM 0 4 13 16
10 0 57 53 14 0
213 719
8:30 AM 0 3 17 15 0 5 11
51 17 0 2 5 1
220 83266190040031711067
Count Total 0 28 89 98 0 51 87 5 22 5 1,318 0
Peak
Hour
All 0 20 60
46 0 399 373 115 0
0 2 0 0 11 0100111
2 832 0
HV 0 0 0 0 0 5
243 240 70 0 3 135502864340
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
1%-67%0%0%1%18%2%0%-0%0%HV%-0%0%0%-
3 0
7:15 AM 0 2 1 0 3 0 0
0 0 0 0 2 5
West North South
7:00 AM 1 0 1 0 2 0
EB WB NB SB Total East
7:45 AM 1 3 0 0 4
0 0 0 2 0 4
0
7:30 AM 0 1 0 0 1 0 0 0
0 0 0 0 0 3
0 2
8:15 AM 0 2 1 2 5 0 0
0 0 0 0 0 2
2 6 4
8:00 AM 0 1 0 0 1 0
0 0 0 0 0 2
8:45 AM 0 0 1 0 1
0 0 1 0 1 2
2
8:30 AM 0 3 1 0 4 0 0 0
0 0 0 0 2 3
2 0 0000000
16 14
Peak Hour 0 6 3 2 11 0 0
0 0 0 0 5 15Count Total 2 12 5 2 21 0
6000164
0
0
0
0 0 0
000
0
0
0
4
6
6 1
N
Sunset Dr
Bishop Dr
Bishop Dr
Su
n
s
e
t
D
r
Bishop Dr
Dr
i
v
e
w
a
y
832TEV:0.95PHF:
2 13 3
18
29
4
0
34
64
28
126
1330
70
24
0
24
3
55
3
96
0
55
60
20
135
309 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
SouthboundNorthboundWestboundEastbound
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
Bishop Dr Bishop Dr Sunset Dr Driveway 15-min
Total
Rolling
One HourEastboundWestbound
0 0 0 2 0
7:15 AM 0 0 0 0
0 0 1 0 0 0
TH RT
7:00 AM 0 0 0 1 0 0 0
UT LT TH RT UT LT
3 0
7:30 AM 0 0 0 0 0 1 0
0 0 0 0 0 0020001
0 1 1 1 0 0
0 0 0 1 0
7:45 AM 0 0 1 0
0 0 0 0 0 0
0 0 0 1 9
8:15 AM 0 0 0 0
0 0 0 0 0 0
4 10
8:00 AM 0 0 0 0 0 1 0
0 0 0 0 0 0
5 11
8:30 AM 0 0 0 0 0 2 1
0 0 0 2 0 0020001
0 0 0 0 0 0
0 0 0 4 14
8:45 AM 0 0 0 0
0 0 0 1 0 0
1 11010000
2 0 0 21 0
Peak Hour 0 0 0 0
1 0 3 1 1 0Count Total 0 0 1 1 0 9 2
0 07:00 AM
RT
11 0
Interval
Start
Bishop Dr Bishop Dr Sunset Dr Driveway 15-min
Total
Rolling
One Hour
1 1 0 2 0 0051001
RTTHLT RTTHLTRT
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
000000000
Peak Hour
0 0Count Total
0
THLT
0000000
0 00000
0 0
0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
000 0 0 0
000 0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
11
14
18
17
12
26
11
28
137
66
Date: 02/20/2025Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0%0.64
TOTAL 0.7%0.86
TH RT
WB 3.3%0.84
NB 0.5%0.78
Peak Hour: 4:45 PM 5:45 PM
HV %:PHF
EB 0.0%0.91
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
Bishop Dr Bishop Dr Sunset Dr Driveway 15-min
TotalUTLTTHRT
0 17 30 2 0 17
5 40 2 212 0
4:15 PM 0 1 25 55
0 0 10 9 29 04:00 PM 0 0 22 58 0 19 18
5 41 5 240 0
4:45 PM 0 0 14 48
1 0 7 2 27 0
210 0
4:30 PM 0 3 34 71 0 15 29
4 25 0 2 31 1
184 846
5:00 PM 0 1 29 51 0 12 25
8 15 0 5 34 8018202012
0 17 31 3 0 12
6 81 8 271 905
5:15 PM 0 3 25 56
1 0 13 6 38 0
5 44 7 254 937
5:45 PM 0 2 16 36
3 0 14 8 43 0
228 923
5:30 PM 0 0 27 51 0 25 27
5 30 0 9 31 6
173 92652807224015231014
Count Total 0 10 192 426 0 138 203 44 324 41 1,772 0
Peak
Hour
All 0 4 95
13 0 99 47 235 0
0 0 0 0 7 0000100
29 937 0
HV 0 0 0 0 0 6
51 27 126 0 25 19020607210390
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%0%0%1%8%0%0%-2%0%HV%-0%0%0%-
4 1
4:15 PM 2 2 0 0 4 1 0
0 0 0 0 2 4
West North South
4:00 PM 0 2 2 1 5 0
EB WB NB SB Total East
4:45 PM 0 0 0 0 0
0 1 2 2 7 7
7
4:30 PM 1 2 1 1 5 1 0 0
0 0 1 0 3 4
4 2
5:15 PM 0 1 0 0 1 0 0
1 0 0 1 4 2
4 5 7
5:00 PM 0 2 0 0 2 0
0 0 0 0 0 1
5:45 PM 0 0 0 0 0
0 0 3 0 7 1
11
5:30 PM 0 3 1 0 4 0 0 0
0 0 0 7 2 6
1 7 17000003
44 53
Peak Hour 0 6 1 0 7 0 1
1 0 0 3 22 18Count Total 3 12 4 2 21 2
2100115822
0
0
0
0 0 0
000
0
0
1
22
21
8 15
N
Sunset Dr
Bishop Dr
Bishop Dr
Su
n
s
e
t
D
r
Bishop Dr
Dr
i
v
e
w
a
y
937TEV:0.86PHF:
29 19
0
25
24
4 40
0
9
103
72
184
2460
12
62751
20
4
46
8
0
206
95
4
305
183 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
SouthboundNorthboundWestboundEastbound
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
Bishop Dr Bishop Dr Sunset Dr Driveway 15-min
Total
Rolling
One HourEastboundWestbound
0 1 0 5 0
4:15 PM 0 0 1 1
0 0 0 1 1 0
TH RT
4:00 PM 0 0 0 0 0 2 0
UT LT TH RT UT LT
4 0
4:30 PM 0 0 1 0 0 2 0
0 0 0 0 0 0011000
0 0 0 0 0 0
0 0 1 5 0
4:45 PM 0 0 0 0
0 0 0 0 1 0
0 0 0 2 11
5:15 PM 0 0 0 0
0 0 0 0 0 0
0 14
5:00 PM 0 0 0 0 0 2 0
0 0 0 0 0 0
1 8
5:30 PM 0 0 0 0 0 3 0
0 0 0 0 0 0010000
0 0 0 0 0 0
0 0 0 4 7
5:45 PM 0 0 0 0
0 0 1 0 0 0
0 7000000
0 1 1 21 0
Peak Hour 0 0 0 0
0 0 1 1 2 0Count Total 0 0 2 1 0 11 1
0 04:00 PM
RT
7 0
Interval
Start
Bishop Dr Bishop Dr Sunset Dr Driveway 15-min
Total
Rolling
One Hour
0 0 0 0 0 0060001
RTTHLT RTTHLTRT
2
5:00 PM
0000
1 0
4:45 PM
0 0 0 0
0
4:30 PM
10000004:15 PM 0
0 0
0 0 0
0 1
5:45 PM
0 0 0 0
2
5:30 PM
0000000
1 3
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
100000000
Peak Hour
0 0Count Total
0
THLT
1000000
3 00000
0 0
0 0
0000
0
0
0
01
1
THLT
00000000
0
00
0
0
1 0 0
0 0 0
0
000 1 0 0
020 1 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
1
4
3
2
4
6
1
4
25
15
Date: 02/20/2025Peak Hour Count Period: 7:00 AM 9:00 AM
SB 5.1%0.85
TOTAL 1.7%0.96
TH RT
WB 1.1%0.87
NB 1.0%0.95
Peak Hour: 8:00 AM 9:00 AM
HV %:PHF
EB 3.4%0.85
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min
TotalUTLTTHRT
0 12 1 8 0 25
3 16 2 140 0
7:15 AM 0 1 0 15
8 0 21 51 13 07:00 AM 0 0 1 13 0 11 1
1 15 2 185 0
7:45 AM 0 2 0 15
3 0 25 84 17 0
144 0
7:30 AM 0 0 0 25 0 12 1
55 10 0 7 9 1
209 678
8:00 AM 0 7 0 22 0 10 3
114 15 0 1 12 101424029
0 9 3 12 0 39
5 21 3 287 825
8:15 AM 0 0 3 35
10 0 50 134 22 0
3 16 2 289 1,055
8:45 AM 0 1 1 41
5 0 50 118 37 0
270 951
8:30 AM 0 3 0 33 0 16 6
116 29 0 1 20 3
299 1,145138240419208111148
Count Total 0 14 5 199 0 92 18 25 128 16 1,823 0
Peak
Hour
All 0 11 4
61 1 287 810 167 0
0 0 5 0 19 0100125
10 1,145 0
HV 0 0 0 5 0 0
187 506 112 0 13 7613104313381
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
4%-0%7%0%2%0%8%0%0%1%0%HV%-0%0%4%-
0 1
7:15 AM 0 0 1 2 3 0 0
0 0 0 0 0 0
West North South
7:00 AM 3 0 3 2 8 0
EB WB NB SB Total East
7:45 AM 0 1 0 2 3
0 0 0 2 0 1
2
7:30 AM 2 1 1 0 4 0 0 0
0 0 0 0 0 2
4 0
8:15 AM 1 0 2 2 5 0 0
0 0 0 0 0 0
1 1 0
8:00 AM 0 0 1 1 2 0
0 0 0 0 0 0
8:45 AM 4 0 1 2 7
0 0 0 0 0 1
4
8:30 AM 0 1 4 0 5 0 0 0
0 0 0 0 2 0
0 2 0000002
9 9
Peak Hour 5 1 8 5 19 0 0
0 0 0 0 2 5Count Total 10 3 13 11 37 0
5000226
0
0
0
0 0 0
000
0
0
0
6
5
2 2
N
Sunset Dr
City Center Driveway
City Center Driveway
Su
n
s
e
t
D
r
Shops at Bishop Ranch
Su
n
s
e
t
D
r
1,145TEV:0.96PHF:
10 76 13
99
55
5
0
38
13
43
94
1290
11
2
50
6
18
7
80
6
25
1
1
131
4
11
146
210 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
SouthboundNorthboundWestboundEastbound
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min
Total
Rolling
One HourEastboundWestbound
0 2 0 8 0
7:15 AM 0 0 0 0
0 0 2 1 0 0
TH RT
7:00 AM 0 0 0 3 0 0 0
UT LT TH RT UT LT
3 0
7:30 AM 0 0 0 2 0 1 0
1 0 0 0 2 0000000
0 1 0 0 0 0
0 0 0 4 0
7:45 AM 0 0 0 0
0 0 0 1 0 0
0 1 0 2 12
8:15 AM 0 0 0 1
0 0 0 0 1 0
3 18
8:00 AM 0 0 0 0 0 0 0
0 0 0 0 2 0
5 14
8:30 AM 0 0 0 0 0 0 1
0 1 0 0 2 0000001
0 0 0 0 0 0
0 0 0 5 15
8:45 AM 0 0 0 4
0 0 0 1 3 0
7 19100020
0 11 0 37 0
Peak Hour 0 0 0 5
0 0 3 5 5 0Count Total 0 0 0 10 0 2 1
0 07:00 AM
RT
19 0
Interval
Start
Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min
Total
Rolling
One Hour
2 5 0 0 5 0001001
RTTHLT RTTHLTRT
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
000000000
Peak Hour
0 0Count Total
0
THLT
0000000
0 00000
0 0
0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
000 0 0 0
000 0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
11
22
15
13
21
15
16
21
134
65
Date: 02/20/2025Peak Hour Count Period: 4:00 PM 6:00 PM
SB 1.3%0.86
TOTAL 0.5%0.94
TH RT
WB 0.5%0.88
NB 0.0%0.94
Peak Hour: 4:45 PM 5:45 PM
HV %:PHF
EB 0.3%0.87
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min
TotalUTLTTHRT
0 27 6 10 0 73
5 103 7 390 0
4:15 PM 0 4 3 92
5 0 67 38 42 14:00 PM 0 9 3 77 0 24 9
10 108 10 383 0
4:45 PM 0 3 5 84
5 0 58 23 30 0
395 0
4:30 PM 0 8 3 79 0 40 9
30 47 0 8 83 12
375 1,543
5:00 PM 1 7 3 69 0 37 7
27 46 0 11 80 1003743065
0 41 7 10 0 71
1 125 10 408 1,561
5:15 PM 0 7 5 92
9 0 64 37 38 0
9 96 12 407 1,621
5:45 PM 0 6 5 86
15 0 69 45 41 0
431 1,597
5:30 PM 0 5 3 77 0 31 4
28 57 1 11 90 11
373 1,619343624561103867082
Count Total 1 49 30 656 0 275 52 59 741 83 3,162 0
Peak
Hour
All 1 22 16
64 0 549 262 337 4
0 1 5 0 8 0010000
43 1,621 0
HV 0 0 0 1 0 0
269 137 182 1 32 391322014622370
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%0%3%1%0%0%0%0%3%-0%0%HV%0%0%0%0%-
7 4
4:15 PM 1 1 0 1 3 0 0
0 0 0 0 0 0
West North South
4:00 PM 1 1 2 3 7 0
EB WB NB SB Total East
4:45 PM 1 0 0 0 1
0 0 0 2 2 11
16
4:30 PM 0 1 1 3 5 0 0 0
0 0 0 0 2 4
5 13
5:15 PM 0 0 0 1 1 0 0
0 0 0 0 0 3
0 6 7
5:00 PM 0 0 0 2 2 0
0 0 0 0 0 0
5:45 PM 0 0 0 0 0
0 0 0 2 7 7
13
5:30 PM 0 1 0 3 4 0 0 0
0 0 0 0 1 1
0 14 7000000
46 78
Peak Hour 1 1 0 6 8 0 0
0 0 0 0 0 10Count Total 3 4 3 13 23 0
400000619
0
0
0
0 0 0
000
0
0
0
19
40
6 0
N
Sunset Dr
City Center Driveway
City Center Driveway
Su
n
s
e
t
D
r
Shops at Bishop Ranch
Su
n
s
e
t
D
r
1,621TEV:0.94PHF:
43 39
1
32
46
7
19
7
1
37
22
146
205
2300
18
2
13
7
26
9
58
8
85
9
0
322
16
22
361
335 1
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
SouthboundNorthboundWestboundEastbound
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min
Total
Rolling
One HourEastboundWestbound
0 3 0 7 0
4:15 PM 0 0 0 1
1 0 1 0 1 0
TH RT
4:00 PM 0 1 0 0 0 0 0
UT LT TH RT UT LT
3 0
4:30 PM 0 0 0 0 0 1 0
0 0 0 0 1 0010000
0 0 0 0 0 0
0 3 0 5 0
4:45 PM 0 0 0 1
0 0 0 1 0 0
0 2 0 2 11
5:15 PM 0 0 0 0
0 0 0 0 0 0
1 16
5:00 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
1 9
5:30 PM 0 0 0 0 0 0 0
0 0 0 1 0 0000000
0 0 0 0 0 0
0 3 0 4 8
5:45 PM 0 0 0 0
1 0 0 0 0 0
0 7000000
1 12 0 23 0
Peak Hour 0 0 0 1
2 0 1 1 1 0Count Total 0 1 0 2 0 2 0
0 04:00 PM
RT
8 0
Interval
Start
Shops at Bishop Ranch City Center Driveway Sunset Dr Sunset Dr 15-min
Total
Rolling
One Hour
0 0 0 1 5 0000100
RTTHLT RTTHLTRT
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0
4:30 PM
00000004:15 PM 0
0 0
0 0 0
0 0
5:45 PM
0 0 0 0
0
5:30 PM
0000000
0 0
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
000000000
Peak Hour
0 0Count Total
0
THLT
0000000
0 00000
0 0
0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
000 0 0 0
000 0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
Prepared by National Data & Surveying Services
ID:24-080149-001 Day:
City:San Ramon Date:
AM 159 17 50 0 AM
NOON 0000 NOON
PM 657 4 210 1 PM
AM NOON PM PM NOON AM
2 0.5 1.5 0 1 144 0 82
4 1451 0 1825
000 026095
621 0 466 2 TEV 4508 0 4808 0 200
1354 0 1583 4 PHF 0.98 0.95
269 0 10 1 0 1.5 0.5 1
AM NOON PM PM NOON AM
PM 0 172 21 81 PM
NOON 0000NOON
AM 019512AM
0 NONE
04:45 PM - 05:45 PM 632
Chevron Dr/ Sunset Dr & Bollinger Canyon Rd
Peak Hour Turning Movement Count
Chevron Dr/ Sunset Dr Tuesday
SOUTHBOUND 5/21/2024
4:00 PM - 06:00 PMPE
A
K
H
O
U
R
S
07:45 AM - 08:45 AM 708 7:00 AM - 09:00 AM CO
U
N
T
P
E
R
I
O
D
S
NONE
1876 0 1416
Cars (AM)20 HT (AM)
Bo
l
l
i
n
g
e
r
C
a
n
y
o
n
R
d
EA
S
T
B
O
U
N
D
WE
S
T
B
O
U
N
D
Bo
l
l
i
n
g
e
r
C
a
n
y
o
n
R
d
2003 0 2280
CONTROL
Signalized
Pedestrians (Crosswalks)
Cars (PM)HT (PM)
0
381
NORTHBOUND
Chevron Dr/ Sunset Dr
Cars (NOON) HT (NOON)
NOONAM PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
NO
O
N
PM AM NO
O
N
AM PM
NO
O
N
AM PMNO
O
N
PM AM
00 0
00 0
4 0 1 40 1
170 1
60 3
20 000 0
0
10
00
6
0
4 0 3
000
0
0
00
0
0
0 0 0
000
0
34
10
44
12
9 0 3
100
144
1441
610
1577
466
65
3
4 20
7
812117
2
0
0
00
0
0
0 0 0
000
82
1791
94269
1310
609
15
0
17 47
11519
P
Appendix B:
Intersection LOS
Worksheet
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Volume and Delay by Movement AM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 176 173 98.5%71 5.0 E
Through 315 309 98.1%49 5.7 D
Right Turn 493 483 97.9%33 17.6 C
Subtotal 984 965 98.1%45 8.0 D
Left Turn 174 170 97.5%79 13.9 E
Through 256 246 96.0%44 4.9 D
Right Turn 9 11 118.9%17 17.3 B
Subtotal 439 426 97.1%57 7.8 E
Left Turn 17 18 103.5%63 19.3 E
Through 510 528 103.5%38 5.7 D
Right Turn 250 253 101.2%11 2.8 B
Subtotal 777 798 102.7%30 5.1 C
Left Turn 407 403 98.9%67 8.7 E
Through 318 318 100.1%27 3.6 C
Right Turn 275 273 99.3%8 3.2 A
Subtotal 1,000 994 99.4%38 5.1 D
Total 3,200 3,183 99.5%41 3.6 D
79.1
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 0 0 0.0%0 0.0 A
Right Turn 17 16 94.7%9 3.7 A
Subtotal 17 16 94.7%9 3.7 A
Left Turn 606 607 100.1%15 1.4 B
Through 12 12 98.3%15 8.6 B
Right Turn 238 238 100.1%11 3.4 B
Subtotal 856 857 100.1%14 1.6 B
Through 1,164 1,169 100.4%12 1.1 B
Right Turn 13 15 112.3%8 3.9 A
Subtotal 1,177 1,183 100.5%12 1.1 B
Through 762 756 99.1%19 8.3 B
Subtotal 762 756 99.1%19 8.3 B
Total 2,812 2,812 100.0%14 2.7 B
13.8
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Volume and Delay by Movement AM Peak Hour
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 288 291 101.1%15 2.7 B
Right Turn 961 970 100.9%20 3.7 B
Subtotal 1,249 1,261 101.0%19 3.4 B
Through 1,053 1,063 100.9%22 4.4 C
Subtotal 1,416 1,416 100.0%17 3.6 B
Through 474 463 97.6%28 3.2 C
Right Turn 1,510 1,516 100.4%27 2.6 C
Subtotal 1,984 1,978 99.7%27 2.3 C
Total 4,649 4,656 100.1%22 1.7 C
24.9
Intersection 4 Sunset Drive/Bishop Drive Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 228 227 99.7%14 3.3 B
Through 229 228 99.6%14 3.4 B
Right Turn 65 63 97.2%3 1.0 A
Subtotal 522 519 99.3%13 3.0 B
Left Turn 4 3 65.0%5 7.1 A
Through 10 11 108.0%19 13.4 B
Right Turn 3 4 140.0%4 2.7 A
Subtotal 17 18 103.5%14 8.4 B
Left Turn 21 22 104.8%20 5.2 B
Through 55 60 108.9%7 2.2 A
Right Turn 46 46 99.3%2 0.5 A
Subtotal 122 128 104.6%7 1.2 A
Left Turn 28 24 87.1%16 7.2 B
Through 56 52 92.7%6 4.0 A
Right Turn 30 29 97.7%3 1.2 A
Subtotal 114 106 92.6%8 3.4 A
Total 775 769 99.3%11 2.3 B
20.7
EB
WB
Served Volume (vph)
NB
SB
Served Volume (vph)
NB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Volume and Delay by Movement AM Peak Hour
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 167 174 103.9%28 7.1 C
Through 479 475 99.1%6 2.7 A
Right Turn 102 102 100.1%3 2.3 A
Subtotal 748 750 100.3%11 2.0 B
Left Turn 10 11 106.0%21 15.1 C
Through 65 62 95.7%11 4.7 B
Right Turn 9 9 101.1%4 2.5 A
Subtotal 84 82 97.5%12 3.4 B
Left Turn 12 13 110.0%19 13.1 B
Through 3 3 96.7%5 9.2 A
Right Turn 99 102 102.5%3 0.3 A
Subtotal 114 118 103.2%5 0.6 A
Left Turn 45 44 98.0%17 4.5 B
Through 14 17 118.6%15 8.8 B
Right Turn 31 31 101.3%18 5.0 B
Subtotal 90 92 102.3%17 3.1 B
Total 1,036 1,042 100.6%11 1.6 B
24.9
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 0 0 0.0%0 0.0 A
Through 0 0 0.0%0 0.0 A
Right Turn 0 0 0.0%0 0.0 A
Subtotal 0 0 0.0%0 0.0 A
Left Turn 50 48 96.4%71 10.2 E
Through 0 0 0.0%0 0.0 A
Right Turn 159 159 100.3%5 2.8 A
Subtotal 209 208 99.3%22 4.9 C
Left Turn 660 668 101.2%84 24.2 F
Through 1,354 1,362 100.6%4 1.1 A
Right Turn 0 0 0.0%0 0.0 A
Subtotal 2,014 2,031 100.8%30 7.9 C
Left Turn 0 0 0.0%0 0.0 A
Through 1,825 1,819 99.7%14 3.8 B
Right Turn 88 84 94.9%7 3.5 A
Subtotal 1,913 1,903 99.5%14 3.7 B
Total 4,136 4,141 100.1%22 4.0 C
74.6
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Volume and Delay by Movement AM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 23 21 93.0%72 17.4 E
Through 15 15 100.7%63 28.0 E
Right Turn 3 4 143.3%2 2.8 A
Subtotal 41 41 99.5%68 17.0 E
Left Turn 133 133 99.7%55 9.2 E
Through 22 25 111.4%50 18.4 D
Right Turn 125 123 98.2%24 7.7 C
Subtotal 280 280 100.0%41 7.6 D
Left Turn 348 347 99.8%73 6.8 E
Through 955 963 100.8%11 3.8 B
Right Turn 101 98 97.1%3 1.2 A
Subtotal 1,404 1,409 100.3%26 4.7 C
Left Turn 28 27 97.9%82 18.3 F
Through 1,765 1,763 99.9%26 5.2 C
Right Turn 372 364 97.8%8 1.2 A
Subtotal 2,165 2,154 99.5%24 4.4 C
Total 3,890 3,883 99.8%26 4.2 C
79.3
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Volume and Delay by Movement AM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 176 176 100.1%73 8.6 E
Through 315 317 100.7%43 2.9 D
Right Turn 497 500 100.6%29 5.0 C
Subtotal 988 993 100.5%41 2.5 D
Left Turn 180 183 101.8%115 32.1 F
Through 256 261 101.8%41 4.4 D
Right Turn 9 10 111.1%21 26.2 C
Subtotal 445 454 102.0%73 15.9 E
Left Turn 17 16 94.7%76 26.6 E
Through 531 528 99.3%37 5.0 D
Right Turn 250 248 99.1%10 2.3 B
Subtotal 798 791 99.2%30 4.2 C
Left Turn 415 407 98.0%82 30.9 F
Through 352 347 98.6%37 22.7 D
Right Turn 283 278 98.2%19 23.8 B
Subtotal 1,050 1,032 98.3%50 26.2 D
Total 3,281 3,270 99.7%46 9.2 D
90.1
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 0 0 0.0%0 0.0 A
Right Turn 17 17 101.2%7 3.1 A
Subtotal 17 17 101.2%7 3.1 A
Left Turn 732 736 100.5%16 2.7 B
Through 12 13 110.0%18 7.7 B
Right Turn 238 238 100.1%17 8.3 B
Subtotal 982 987 100.5%16 3.6 B
Through 1,195 1,197 100.2%14 1.2 B
Right Turn 13 15 114.6%8 3.4 A
Subtotal 1,208 1,212 100.3%13 1.3 B
Through 812 796 98.0%28 14.1 C
Subtotal 812 796 98.0%28 14.1 C
Total 3,019 3,012 99.8%18 5.2 B
17.1
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Volume and Delay by Movement AM Peak Hour
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 288 293 101.7%14 3.2 B
Right Turn 1,062 1,082 101.9%19 1.8 B
Subtotal 1,350 1,375 101.9%18 1.6 B
Through 1,210 1,218 100.6%23 2.8 C
Subtotal 1,573 1,573 100.0%19 2.4 B
Through 524 513 97.8%28 3.2 C
Right Turn 1,950 1,889 96.9%28 3.8 C
Subtotal 2,474 2,402 97.1%28 2.9 C
Total 5,397 5,350 99.1%23 1.8 C
27.2
Intersection 4 Sunset Drive/Bishop Drive Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 251 248 99.0%17 3.9 B
Through 249 242 97.0%14 3.7 B
Right Turn 65 64 98.3%5 1.8 A
Subtotal 565 554 98.0%15 3.5 B
Left Turn 4 4 97.5%19 15.9 B
Through 18 20 108.9%20 7.1 C
Right Turn 3 3 106.7%3 3.1 A
Subtotal 25 27 106.8%20 6.0 C
Left Turn 21 20 94.8%20 6.4 B
Through 55 59 107.1%8 2.2 A
Right Turn 54 56 103.7%2 0.9 A
Subtotal 130 135 103.7%8 2.2 A
Left Turn 28 27 97.9%18 5.1 B
Through 56 54 96.4%8 3.8 A
Right Turn 30 29 95.7%3 0.9 A
Subtotal 114 110 96.6%9 1.9 A
Total 834 826 99.0%13 2.1 B
20.4
EB
WB
Served Volume (vph)
NB
SB
Served Volume (vph)
NB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Volume and Delay by Movement AM Peak Hour
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 167 161 96.5%24 3.4 C
Through 522 508 97.3%9 2.3 A
Right Turn 102 98 96.0%5 1.6 A
Subtotal 791 767 97.0%11 2.0 B
Left Turn 10 10 102.0%19 16.2 B
Through 81 85 104.8%10 3.9 B
Right Turn 9 11 116.7%7 8.1 A
Subtotal 100 106 105.6%11 4.0 B
Left Turn 12 12 99.2%25 11.0 C
Through 3 3 90.0%7 10.0 A
Right Turn 99 97 98.2%4 0.4 A
Subtotal 114 112 98.1%6 2.1 A
Left Turn 45 44 96.7%18 7.0 B
Through 14 14 100.7%20 15.4 C
Right Turn 31 33 106.5%16 4.5 B
Subtotal 90 91 100.7%18 5.9 B
Total 1,095 1,075 98.2%11 1.8 B
23.4
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 384 385 100.2%54 4.7 D
Through 50 50 99.8%55 16.1 E
Right Turn 93 91 97.4%12 6.3 B
Subtotal 527 525 99.7%47 5.3 D
Left Turn 50 48 95.2%67 14.3 E
Through 17 17 99.4%79 28.0 E
Right Turn 158 160 101.3%3 1.0 A
Subtotal 225 225 99.8%22 7.8 C
Left Turn 654 643 98.3%77 20.2 E
Through 1,395 1,420 101.8%39 5.9 D
Right Turn 223 224 100.6%4 0.6 A
Subtotal 2,272 2,288 100.7%46 6.5 D
Left Turn 64 61 95.5%84 25.5 F
Through 1,932 1,865 96.5%117 23.7 F
Right Turn 87 80 92.3%71 21.8 E
Subtotal 2,083 2,006 96.3%114 23.7 F
Total 5,107 5,044 98.8%71 8.6 E
72.2
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Volume and Delay by Movement AM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 150 155 103.1%97 32.0 F
Through 95 96 100.9%44 10.5 D
Right Turn 126 124 98.3%7 1.8 A
Subtotal 371 374 100.9%55 14.8 D
Left Turn 133 132 98.9%66 7.3 E
Through 70 72 102.7%52 11.9 D
Right Turn 124 131 106.0%28 7.4 C
Subtotal 327 335 102.4%48 4.9 D
Left Turn 348 343 98.4%93 12.2 F
Through 1,035 1,054 101.9%10 2.5 B
Right Turn 155 154 99.5%6 1.2 A
Subtotal 1,538 1,551 100.8%28 3.0 C
Left Turn 95 93 97.6%121 33.9 F
Through 1,809 1,765 97.6%113 44.1 F
Right Turn 370 357 96.4%58 44.2 E
Subtotal 2,274 2,215 97.4%105 43.1 F
Total 4,510 4,475 99.2%69 20.3 E
81.8
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Volume and Delay by Movement AM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 176 169 96.1%65 8.8 E
Through 315 320 101.5%41 6.6 D
Right Turn 497 502 101.0%37 18.9 D
Subtotal 988 991 100.3%43 9.0 D
Left Turn 180 173 96.1%84 22.2 F
Through 256 261 101.8%37 6.4 D
Right Turn 9 11 124.4%12 16.4 B
Subtotal 445 445 99.9%56 10.4 E
Left Turn 17 17 99.4%80 17.8 F
Through 531 535 100.8%61 15.3 E
Right Turn 250 258 103.0%28 24.6 C
Subtotal 798 810 101.4%51 17.3 D
Left Turn 415 407 98.1%60 13.9 E
Through 352 351 99.6%34 15.6 C
Right Turn 283 269 95.1%12 15.0 B
Subtotal 1,050 1,027 97.8%38 15.2 D
Total 3,281 3,272 99.7%45 8.2 D
74.3
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 0 0 0.0%0 0.0 A
Right Turn 17 18 105.9%14 6.0 B
Subtotal 17 18 105.9%14 6.0 B
Left Turn 732 719 98.3%46 7.7 D
Through 12 11 93.3%46 20.6 D
Right Turn 238 235 98.7%18 5.7 B
Subtotal 982 966 98.3%39 6.8 D
Through 1,195 1,199 100.3%13 3.2 B
Right Turn 13 11 83.8%9 9.9 A
Subtotal 1,208 1,210 100.1%13 3.2 B
Through 812 792 97.5%25 9.7 C
Subtotal 812 792 97.5%25 9.7 C
Total 3,019 2,985 98.9%25 4.1 C
57.2
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Volume and Delay by Movement AM Peak Hour
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 288 288 99.9%34 9.2 C
Right Turn 1,062 1,053 99.2%43 13.5 D
Subtotal 1,350 1,341 99.3%41 12.1 D
Through 1,210 1,192 98.5%28 5.4 C
Subtotal 1,573 1,553 98.7%22 4.2 C
Through 524 510 97.3%30 4.2 C
Right Turn 1,950 1,872 96.0%24 1.7 C
Subtotal 2,474 2,381 96.2%26 1.2 C
Total 5,397 5,275 97.7%29 3.8 C
39.6
Intersection 4 Sunset Drive/Bishop Drive Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 251 242 96.3%16 3.6 B
Through 249 242 97.3%14 2.9 B
Right Turn 65 63 97.5%4 0.9 A
Subtotal 565 548 96.9%14 2.8 B
Left Turn 4 3 80.0%12 13.2 B
Through 18 19 106.1%24 5.6 C
Right Turn 3 4 146.7%4 4.0 A
Subtotal 25 27 106.8%21 5.4 C
Left Turn 21 21 97.6%21 7.5 C
Through 55 56 102.2%8 3.1 A
Right Turn 54 58 107.0%2 0.4 A
Subtotal 130 135 103.5%7 1.8 A
Left Turn 28 29 103.6%22 8.8 C
Through 56 57 101.6%9 3.2 A
Right Turn 30 28 94.3%4 2.1 A
Subtotal 114 114 100.2%10 2.7 B
Total 834 823 98.7%12 1.6 B
21.3
EB
WB
Served Volume (vph)
NB
SB
Served Volume (vph)
NB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Volume and Delay by Movement AM Peak Hour
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 167 165 98.9%26 10.7 C
Through 522 507 97.0%8 4.2 A
Right Turn 102 107 104.5%4 1.7 A
Subtotal 791 778 98.4%11 4.4 B
Left Turn 10 10 102.0%23 19.5 C
Through 81 89 109.5%12 4.7 B
Right Turn 9 9 98.9%6 10.2 A
Subtotal 100 108 107.8%12 4.7 B
Left Turn 12 13 104.2%19 12.8 B
Through 3 3 96.7%10 13.7 A
Right Turn 99 106 106.9%4 0.7 A
Subtotal 114 121 106.3%6 1.8 A
Left Turn 45 47 104.7%16 5.6 B
Through 14 14 101.4%30 16.9 C
Right Turn 31 29 93.5%14 8.0 B
Subtotal 90 90 100.3%18 2.5 B
Total 1,095 1,098 100.2%12 3.7 B
26.4
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 384 377 98.1%55 3.8 D
Through 50 54 107.0%52 13.2 D
Right Turn 93 92 98.8%29 10.0 C
Subtotal 527 522 99.1%50 3.7 D
Left Turn 50 50 99.2%68 15.2 E
Through 17 18 107.6%93 17.0 F
Right Turn 158 171 107.9%3 1.2 A
Subtotal 225 238 106.0%24 3.4 C
Left Turn 654 639 97.7%76 19.2 E
Through 1,395 1,386 99.3%39 6.1 D
Right Turn 223 214 96.0%4 0.5 A
Subtotal 2,272 2,239 98.6%47 8.6 D
Left Turn 64 63 97.8%62 23.8 E
Through 1,932 1,843 95.4%113 22.5 F
Right Turn 87 83 95.7%75 25.3 E
Subtotal 2,083 1,988 95.5%109 22.4 F
Total 5,107 4,988 97.7%71 10.4 E
83.3
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Volume and Delay by Movement AM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 150 146 97.1%69 23.5 E
Through 95 94 98.9%41 9.2 D
Right Turn 126 132 104.5%8 2.8 A
Subtotal 371 371 100.1%40 11.2 D
Left Turn 133 135 101.7%72 10.3 E
Through 70 65 93.4%50 13.1 D
Right Turn 124 121 97.7%27 3.8 C
Subtotal 327 322 98.4%51 8.1 D
Left Turn 348 344 98.8%101 12.7 F
Through 1,035 1,025 99.1%10 3.2 B
Right Turn 155 154 99.0%7 1.3 A
Subtotal 1,538 1,523 99.0%30 5.5 C
Left Turn 95 90 95.1%114 47.9 F
Through 1,809 1,761 97.3%90 49.3 F
Right Turn 370 358 96.7%35 37.7 D
Subtotal 2,274 2,209 97.1%82 46.4 F
Total 4,510 4,424 98.1%58 22.0 E
87.1
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Volume and Delay by Movement PM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 110 114 103.9%72 12.0 E
Through 290 290 100.1%52 8.0 D
Right Turn 419 407 97.2%54 49.0 D
Subtotal 819 812 99.1%56 21.8 E
Left Turn 234 228 97.3%87 22.4 F
Through 333 342 102.7%40 6.7 D
Right Turn 15 15 102.7%25 12.1 C
Subtotal 582 585 100.5%58 8.9 E
Left Turn 23 25 109.1%70 13.3 E
Through 449 444 98.9%52 9.1 D
Right Turn 154 159 103.2%9 1.7 A
Subtotal 626 628 100.3%42 6.6 D
Left Turn 657 621 94.5%64 35.0 E
Through 596 589 98.8%42 24.8 D
Right Turn 334 325 97.3%25 26.6 C
Subtotal 1,587 1,535 96.7%48 29.0 D
Total 3,614 3,560 98.5%50 11.8 D
95.5
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 1 1 50.0%8 19.2 A
Right Turn 40 41 102.8%11 5.1 B
Subtotal 41 42 101.5%11 5.8 B
Left Turn 752 739 98.2%38 4.5 D
Through 20 20 99.5%46 11.3 D
Right Turn 633 618 97.6%40 23.8 D
Subtotal 1,405 1,376 97.9%39 9.6 D
Through 1,093 1,065 97.5%30 9.1 C
Right Turn 9 9 95.6%14 18.1 B
Subtotal 1,102 1,074 97.5%30 9.0 C
Through 953 924 96.9%37 8.2 D
Subtotal 953 924 96.9%37 8.2 D
Total 3,501 3,415 97.6%35 6.4 D
42.5
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Volume and Delay by Movement PM Peak Hour
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 351 344 97.9%47 20.1 D
Right Turn 732 736 100.5%40 3.5 D
Subtotal 1,083 1,079 99.7%41 4.9 D
Through 1,381 1,347 97.5%10 5.5 A
Subtotal 1,582 1,542 97.5%9 4.7 A
Through 602 599 99.6%27 7.2 C
Right Turn 1,513 1,489 98.4%29 4.2 C
Subtotal 2,115 2,089 98.7%28 4.0 C
Total 4,780 4,710 98.5%25 3.5 C
39.5
Intersection 4 Sunset Drive/Bishop Drive Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 55 55 100.7%25 3.8 C
Through 27 29 107.0%19 6.9 B
Right Turn 131 127 97.2%7 1.2 A
Subtotal 213 212 99.3%13 1.9 B
Left Turn 25 23 92.4%22 11.1 C
Through 192 194 100.9%26 8.5 C
Right Turn 29 30 103.1%9 5.1 A
Subtotal 246 247 100.3%24 7.8 C
Left Turn 4 3 75.0%18 20.2 B
Through 95 95 100.1%16 3.3 B
Right Turn 208 199 95.9%7 3.2 A
Subtotal 307 298 96.9%10 2.6 A
Left Turn 73 70 96.3%29 9.1 C
Through 103 105 101.7%10 1.0 B
Right Turn 9 8 85.6%6 5.1 A
Subtotal 185 183 98.8%17 3.9 B
Total 951 939 98.7%16 3.4 B
27.8
EB
WB
Served Volume (vph)
NB
SB
Served Volume (vph)
NB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Volume and Delay by Movement PM Peak Hour
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 283 288 101.8%41 13.6 D
Through 150 151 100.9%26 9.6 C
Right Turn 191 195 102.0%17 5.2 B
Subtotal 624 634 101.7%30 8.9 C
Left Turn 33 31 92.7%56 14.7 E
Through 397 391 98.4%36 5.8 D
Right Turn 43 42 98.4%19 4.4 B
Subtotal 473 463 98.0%35 5.8 D
Left Turn 24 22 92.9%31 14.4 C
Through 16 16 100.0%26 15.0 C
Right Turn 324 318 98.0%10 3.6 B
Subtotal 364 356 97.8%12 3.8 B
Left Turn 148 146 98.6%38 7.5 D
Through 22 23 102.7%40 9.7 D
Right Turn 39 38 97.2%34 8.1 C
Subtotal 209 207 98.8%37 5.9 D
Total 1,670 1,660 99.4%29 5.2 C
52.4
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 0 0 0.0%0 0.0 A
Through 0 0 0.0%0 0.0 A
Right Turn 0 0 0.0%0 0.0 A
Subtotal 0 0 0.0%0 0.0 A
Left Turn 212 213 100.6%55 5.5 D
Through 0 0 0.0%0 0.0 A
Right Turn 657 642 97.7%15 5.3 B
Subtotal 869 855 98.4%25 3.2 C
Left Turn 479 483 100.8%68 18.4 E
Through 1,634 1,612 98.7%15 2.3 B
Right Turn 0 0 0.0%0 0.0 A
Subtotal 2,113 2,095 99.1%28 5.6 C
Left Turn 0 0 0.0%0 0.0 A
Through 1,458 1,455 99.8%36 6.2 D
Right Turn 145 152 104.8%16 4.4 B
Subtotal 1,603 1,607 100.2%34 5.9 C
Total 4,585 4,556 99.4%29 3.6 C
59.9
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Volume and Delay by Movement PM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 94 97 102.9%62 6.3 E
Through 29 32 111.4%58 16.7 E
Right Turn 24 26 109.6%7 3.7 A
Subtotal 147 155 105.6%53 4.0 D
Left Turn 440 442 100.5%48 4.3 D
Through 6 5 83.3%34 28.2 C
Right Turn 457 460 100.6%19 3.5 B
Subtotal 903 907 100.5%33 2.2 C
Left Turn 119 118 99.0%68 7.7 E
Through 1,701 1,681 98.8%20 5.6 C
Right Turn 26 25 96.9%5 2.1 A
Subtotal 1,846 1,824 98.8%23 5.4 C
Left Turn 1 1 80.0%2 5.4 A
Through 1,052 1,040 98.9%24 2.9 C
Right Turn 284 295 104.0%5 1.1 A
Subtotal 1,337 1,336 100.0%20 2.2 B
Total 4,233 4,223 99.8%25 2.9 C
70.9
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Volume and Delay by Movement PM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 110 108 98.3%69 9.7 E
Through 290 293 101.1%47 5.8 D
Right Turn 429 434 101.0%50 31.2 D
Subtotal 829 835 100.7%52 16.3 D
Left Turn 246 241 98.0%106 37.9 F
Through 333 329 98.7%40 5.4 D
Right Turn 15 15 98.0%21 15.8 C
Subtotal 594 585 98.4%69 20.7 E
Left Turn 23 22 96.1%90 26.4 F
Through 498 492 98.7%67 17.2 E
Right Turn 154 157 101.8%28 29.2 C
Subtotal 675 671 99.3%59 18.7 E
Left Turn 665 658 98.9%63 11.8 E
Through 642 650 101.3%41 13.4 D
Right Turn 346 340 98.2%27 13.5 C
Subtotal 1,653 1,648 99.7%47 12.6 D
Total 3,751 3,738 99.6%54 8.7 D
81.5
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 1 0 30.0%16 39.7 B
Right Turn 40 37 93.5%9 5.2 A
Subtotal 41 38 92.0%9 7.1 A
Left Turn 1,015 1,004 98.9%51 3.5 D
Through 20 19 93.5%56 19.3 E
Right Turn 633 659 104.1%36 3.6 D
Subtotal 1,668 1,682 100.8%45 2.3 D
Through 1,164 1,159 99.6%18 3.7 B
Right Turn 9 10 107.8%8 7.8 A
Subtotal 1,173 1,169 99.7%18 3.7 B
Through 1,019 988 97.0%41 5.5 D
Subtotal 1,019 988 97.0%41 5.5 D
Total 3,901 3,877 99.4%35 2.5 D
62.8
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Volume and Delay by Movement PM Peak Hour
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 351 338 96.3%50 8.5 D
Right Turn 972 976 100.4%47 5.1 D
Subtotal 1,323 1,314 99.3%48 5.2 D
Through 1,715 1,694 98.8%18 2.4 B
Subtotal 1,916 1,897 99.0%17 2.3 B
Through 668 645 96.6%18 3.7 B
Right Turn 1,924 1,806 93.8%28 4.9 C
Subtotal 2,592 2,451 94.6%25 3.6 C
Total 5,831 5,662 97.1%28 2.5 C
43.1
Intersection 4 Sunset Drive/Bishop Drive Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 70 72 103.4%26 3.6 C
Through 41 41 100.0%27 3.6 C
Right Turn 131 127 97.3%7 1.3 A
Subtotal 242 241 99.5%16 1.8 B
Left Turn 25 23 91.2%27 13.1 C
Through 211 211 100.1%31 4.7 C
Right Turn 29 30 102.1%7 3.3 A
Subtotal 265 264 99.5%28 5.3 C
Left Turn 4 3 75.0%9 23.4 A
Through 95 94 99.1%16 2.8 B
Right Turn 225 219 97.5%7 2.4 A
Subtotal 324 316 97.7%10 2.1 A
Left Turn 73 73 99.6%39 5.6 D
Through 103 109 106.1%13 1.9 B
Right Turn 9 9 102.2%6 5.6 A
Subtotal 185 191 103.4%23 3.3 C
Total 1,016 1,012 99.6%19 2.5 B
32.0
EB
WB
Served Volume (vph)
NB
SB
Served Volume (vph)
NB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Volume and Delay by Movement PM Peak Hour
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 283 265 93.6%44 4.7 D
Through 179 176 98.1%26 6.8 C
Right Turn 191 194 101.8%14 5.4 B
Subtotal 653 635 97.2%30 4.6 C
Left Turn 33 32 97.3%56 15.2 E
Through 433 427 98.5%38 4.3 D
Right Turn 43 45 104.9%22 5.2 C
Subtotal 509 504 99.0%38 4.3 D
Left Turn 24 27 110.4%36 16.5 D
Through 16 16 98.1%27 11.6 C
Right Turn 324 332 102.5%13 4.5 B
Subtotal 364 374 102.9%15 4.3 B
Left Turn 148 151 102.1%40 3.2 D
Through 22 23 104.5%36 7.2 D
Right Turn 39 39 99.2%34 8.8 C
Subtotal 209 213 101.8%38 3.8 D
Total 1,735 1,726 99.5%30 2.9 C
64.3
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 457 465 101.6%63 5.9 E
Through 46 48 105.0%60 6.5 E
Right Turn 86 88 102.4%14 3.3 B
Subtotal 589 601 102.0%55 5.0 E
Left Turn 207 203 98.2%49 5.1 D
Through 55 58 105.1%56 10.1 E
Right Turn 643 644 100.2%19 3.9 B
Subtotal 905 905 100.0%28 2.7 C
Left Turn 464 461 99.2%63 4.8 E
Through 1,707 1,727 101.2%47 5.6 D
Right Turn 516 516 100.0%7 1.1 A
Subtotal 2,687 2,704 100.6%42 3.7 D
Left Turn 148 134 90.8%76 21.4 E
Through 1,492 1,355 90.8%176 28.7 F
Right Turn 143 132 92.3%128 32.9 F
Subtotal 1,783 1,622 91.0%164 28.1 F
Total 5,964 5,832 97.8%74 6.3 E
75.2
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Volume and Delay by Movement PM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 182 172 94.5%110 73.3 F
Through 123 125 101.8%44 11.3 D
Right Turn 214 205 95.9%17 4.2 B
Subtotal 519 502 96.8%58 30.3 E
Left Turn 433 405 93.5%104 29.4 F
Through 123 106 86.0%248 79.4 F
Right Turn 450 392 87.2%181 74.1 F
Subtotal 1,006 903 89.8%155 54.4 F
Left Turn 119 113 94.9%48 10.6 D
Through 1,723 1,707 99.1%51 8.2 D
Right Turn 158 157 99.1%21 3.2 C
Subtotal 2,000 1,977 98.8%48 7.3 D
Left Turn 147 141 95.9%100 13.8 F
Through 1,151 1,128 98.0%82 44.7 F
Right Turn 278 270 97.0%16 22.7 B
Subtotal 1,576 1,538 97.6%73 36.1 E
Total 5,101 4,920 96.5%74 20.7 E
93.0
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Volume and Delay by Movement PM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 110 109 99.1%70 8.2 E
Through 290 289 99.6%43 3.5 D
Right Turn 429 418 97.5%62 22.3 E
Subtotal 829 816 98.4%57 11.6 E
Left Turn 246 244 99.1%81 13.5 F
Through 333 332 99.5%38 5.5 D
Right Turn 15 14 93.3%25 16.2 C
Subtotal 594 589 99.2%55 6.4 E
Left Turn 23 22 93.5%65 13.2 E
Through 498 503 101.0%68 12.3 E
Right Turn 154 150 97.7%28 25.6 C
Subtotal 675 675 100.0%59 14.2 E
Left Turn 665 635 95.5%67 18.8 E
Through 642 667 103.9%54 22.6 D
Right Turn 346 353 102.1%40 24.8 D
Subtotal 1,653 1,656 100.2%56 21.7 E
Total 3,751 3,736 99.6%57 8.9 E
77.9
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 1 1 80.0%22 44.8 C
Right Turn 40 42 105.8%10 4.1 A
Subtotal 41 43 105.1%11 5.7 B
Left Turn 1,015 1,019 100.4%36 3.8 D
Through 20 18 89.0%37 21.5 D
Right Turn 633 650 102.6%24 3.5 C
Subtotal 1,668 1,687 101.1%31 3.3 C
Through 1,164 1,158 99.5%21 2.8 C
Right Turn 9 10 112.2%12 10.7 B
Subtotal 1,173 1,168 99.6%21 2.7 C
Through 1,019 1,000 98.1%41 5.2 D
Subtotal 1,019 1,000 98.1%41 5.2 D
Total 3,901 3,898 99.9%30 1.9 C
40.4
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Volume and Delay by Movement PM Peak Hour
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 351 352 100.2%43 7.6 D
Right Turn 972 985 101.3%41 4.7 D
Subtotal 1,323 1,337 101.0%41 3.1 D
Through 1,715 1,721 100.3%19 7.0 B
Subtotal 1,916 1,917 100.1%18 6.7 B
Through 668 662 99.0%29 4.1 C
Right Turn 1,924 1,854 96.4%40 14.5 D
Subtotal 2,592 2,516 97.1%37 10.3 D
Total 5,831 5,769 98.9%32 4.5 C
41.9
Intersection 4 Sunset Drive/Bishop Drive Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 70 72 102.7%22 3.4 C
Through 41 42 102.4%22 6.3 C
Right Turn 131 126 96.1%7 2.1 A
Subtotal 242 240 99.1%14 1.5 B
Left Turn 25 23 93.6%29 10.2 C
Through 211 202 95.9%29 5.8 C
Right Turn 29 30 102.1%8 5.4 A
Subtotal 265 255 96.3%26 6.1 C
Left Turn 4 3 67.5%22 23.8 C
Through 95 98 102.7%16 4.8 B
Right Turn 225 233 103.6%9 8.7 A
Subtotal 324 333 102.9%11 6.9 B
Left Turn 73 73 99.9%32 9.8 C
Through 103 105 102.3%10 3.5 B
Right Turn 9 10 115.6%4 4.4 A
Subtotal 185 189 102.0%18 4.2 B
Total 1,016 1,017 100.1%17 3.5 B
31.8
EB
WB
Served Volume (vph)
NB
SB
Served Volume (vph)
NB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Volume and Delay by Movement PM Peak Hour
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 283 277 98.0%40 7.7 D
Through 179 178 99.4%25 7.8 C
Right Turn 191 189 99.1%19 5.0 B
Subtotal 653 644 98.7%30 6.6 C
Left Turn 33 29 88.5%59 15.4 E
Through 433 432 99.7%37 5.8 D
Right Turn 43 48 112.6%23 11.5 C
Subtotal 509 509 100.1%37 6.4 D
Left Turn 24 24 101.7%31 8.0 C
Through 16 16 101.9%28 12.4 C
Right Turn 324 342 105.5%12 2.4 B
Subtotal 364 383 105.1%14 2.4 B
Left Turn 148 153 103.6%37 5.4 D
Through 22 22 100.0%37 11.2 D
Right Turn 39 40 102.1%35 17.0 C
Subtotal 209 215 102.9%36 5.4 D
Total 1,735 1,751 100.9%29 4.4 C
55.4
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 457 465 101.8%55 7.2 E
Through 46 46 99.1%50 7.4 D
Right Turn 86 88 102.3%29 6.1 C
Subtotal 589 599 101.6%51 4.8 D
Left Turn 207 212 102.4%50 6.0 D
Through 55 55 100.4%46 11.3 D
Right Turn 643 655 101.8%23 5.1 C
Subtotal 905 922 101.8%31 2.8 C
Left Turn 464 464 100.1%75 33.7 E
Through 1,707 1,740 101.9%45 4.4 D
Right Turn 516 517 100.2%8 0.9 A
Subtotal 2,687 2,721 101.3%43 7.7 D
Left Turn 148 151 102.1%42 8.2 D
Through 1,492 1,414 94.8%147 42.9 F
Right Turn 143 136 94.8%92 33.5 F
Subtotal 1,783 1,701 95.4%132 37.3 F
Total 5,964 5,942 99.6%67 11.5 E
77.2
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Volume and Delay by Movement PM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 182 178 97.6%59 8.7 E
Through 123 117 94.9%42 6.6 D
Right Turn 214 216 100.8%16 3.9 B
Subtotal 519 510 98.3%37 3.6 D
Left Turn 433 424 98.0%57 7.3 E
Through 123 125 101.5%62 14.1 E
Right Turn 450 446 99.0%38 9.3 D
Subtotal 1,006 995 98.9%49 7.6 D
Left Turn 119 119 99.9%101 20.8 F
Through 1,723 1,748 101.4%25 8.7 C
Right Turn 158 158 99.8%12 2.4 B
Subtotal 2,000 2,025 101.2%28 8.9 C
Left Turn 147 146 99.0%90 14.2 F
Through 1,151 1,118 97.2%98 53.5 F
Right Turn 278 279 100.4%12 18.5 B
Subtotal 1,576 1,543 97.9%82 41.7 F
Total 5,101 5,073 99.4%49 14.6 D
90.4
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Volume and Delay by Movement AM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 200 203 101.7%72 12.4 E
Through 360 360 100.0%37 4.9 D
Right Turn 544 543 99.7%54 28.9 D
Subtotal 1,104 1,106 100.2%52 15.3 D
Left Turn 186 183 98.2%167 106.4 F
Through 310 303 97.8%36 6.1 D
Right Turn 10 10 97.0%25 36.8 C
Subtotal 506 496 98.0%87 41.8 F
Left Turn 20 20 98.0%68 15.3 E
Through 581 574 98.8%75 33.7 E
Right Turn 280 277 99.0%39 37.4 D
Subtotal 881 871 98.9%63 34.5 E
Left Turn 478 449 93.9%95 32.9 F
Through 414 393 95.0%51 31.0 D
Right Turn 328 303 92.4%29 30.1 C
Subtotal 1,220 1,145 93.9%62 31.8 E
Total 3,711 3,618 97.5%62 17.1 E
106.1
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 0 0 0.0%0 0.0 A
Right Turn 20 21 105.0%12 5.6 B
Subtotal 20 21 105.0%12 5.6 B
Left Turn 1,006 1,000 99.4%37 31.1 D
Through 20 20 100.0%33 8.2 C
Right Turn 340 333 98.0%37 25.9 D
Subtotal 1,366 1,353 99.0%37 25.5 D
Through 1,291 1,275 98.8%19 4.8 B
Right Turn 20 21 103.0%13 4.5 B
Subtotal 1,311 1,296 98.8%19 4.7 B
Through 880 810 92.0%34 14.5 C
Subtotal 880 810 92.0%34 14.5 C
Total 3,577 3,479 97.3%29 9.9 C
30.5
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Volume and Delay by Movement AM Peak Hour
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 390 384 98.6%53 60.3 D
Right Turn 1,231 1,206 98.0%55 56.5 E
Subtotal 1,621 1,591 98.1%55 56.9 D
Through 1,367 1,341 98.1%43 27.3 D
Subtotal 1,887 1,866 98.9%32 19.4 C
Through 490 431 88.0%31 5.4 C
Right Turn 2,240 2,002 89.4%27 8.4 C
Subtotal 2,730 2,433 89.1%27 7.7 C
Total 6,238 5,889 94.4%35 20.4 C
30.0
Intersection 4 Sunset Drive/Bishop Drive Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 273 256 93.6%17 3.1 B
Through 270 255 94.6%15 2.3 B
Right Turn 80 75 93.3%4 1.0 A
Subtotal 623 585 94.0%14 2.3 B
Left Turn 10 10 101.0%30 9.5 C
Through 18 20 111.7%20 4.6 B
Right Turn 10 10 104.0%6 2.3 A
Subtotal 38 41 106.8%18 4.0 B
Left Turn 30 30 101.0%22 7.1 C
Through 60 63 105.2%9 4.0 A
Right Turn 68 72 105.4%2 0.6 A
Subtotal 158 165 104.5%8 2.0 A
Left Turn 30 29 96.3%20 6.0 B
Through 60 58 97.0%10 2.0 A
Right Turn 30 30 100.3%5 3.7 A
Subtotal 120 117 97.7%11 3.5 B
Total 939 908 96.7%13 1.8 B
26.0
EB
WB
EB
WB
Served Volume (vph)
NB
SB
Served Volume (vph)
NB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Volume and Delay by Movement AM Peak Hour
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 190 179 94.3%27 9.9 C
Through 563 526 93.4%12 4.4 B
Right Turn 120 118 97.9%5 1.6 A
Subtotal 873 822 94.2%14 4.9 B
Left Turn 10 11 111.0%27 15.5 C
Through 96 98 102.2%15 9.0 B
Right Turn 10 13 126.0%6 5.7 A
Subtotal 116 122 105.0%15 8.0 B
Left Turn 20 16 79.0%22 9.6 C
Through 10 9 92.0%22 14.2 C
Right Turn 130 139 106.8%7 9.9 A
Subtotal 160 164 102.4%9 8.8 A
Left Turn 60 61 101.8%18 7.1 B
Through 20 19 95.5%19 5.9 B
Right Turn 40 42 104.5%21 6.3 C
Subtotal 120 122 101.7%20 5.5 B
Total 1,269 1,230 96.9%14 5.7 B
27.0
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 384 371 96.5%105 62.7 F
Through 50 52 104.4%105 66.1 F
Right Turn 93 90 97.2%90 89.1 F
Subtotal 527 513 97.4%103 64.9 F
Left Turn 60 61 101.2%200 144.4 F
Through 17 18 105.3%169 103.7 F
Right Turn 209 216 103.3%6 3.6 A
Subtotal 286 295 103.0%57 47.0 E
Left Turn 724 687 94.9%113 79.6 F
Through 1,651 1,628 98.6%50 18.5 D
Right Turn 223 215 96.5%4 0.5 A
Subtotal 2,598 2,531 97.4%62 24.4 E
Left Turn 64 52 81.6%132 31.3 F
Through 2,137 1,848 86.5%151 26.0 F
Right Turn 99 85 85.6%97 26.8 F
Subtotal 2,300 1,985 86.3%148 26.0 F
Total 5,711 5,323 93.2%96 16.3 F
132.3
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Volume and Delay by Movement AM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 157 53 34.0%567 170.9 F
Through 110 43 38.8%215 218.0 F
Right Turn 133 55 41.4%125 178.2 F
Subtotal 400 151 37.8%314 188.4 F
Left Turn 170 168 99.0%103 26.3 F
Through 98 93 94.5%169 60.9 F
Right Turn 149 157 105.3%98 22.9 F
Subtotal 417 418 100.2%118 26.6 F
Left Turn 380 328 86.3%297 55.9 F
Through 1,250 1,247 99.8%29 6.5 C
Right Turn 174 177 101.5%7 1.6 A
Subtotal 1,804 1,752 97.1%78 15.4 E
Left Turn 107 90 83.9%278 49.3 F
Through 1,994 1,785 89.5%228 84.2 F
Right Turn 408 388 95.2%94 73.4 F
Subtotal 2,509 2,263 90.2%207 80.5 F
Total 5,130 4,583 89.3%148 35.9 F
295.9
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Volume and Delay by Movement PM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 170 122 71.6%83 68.3 F
Through 370 266 71.8%78 55.1 E
Right Turn 500 325 65.1%338 33.2 F
Subtotal 1,040 713 68.6%207 27.5 F
Left Turn 272 113 41.7%534 122.9 F
Through 450 196 43.5%113 24.1 F
Right Turn 30 14 47.0%104 33.0 F
Subtotal 752 323 43.0%266 61.4 F
Left Turn 30 21 70.7%100 29.6 F
Through 639 445 69.7%211 28.0 F
Right Turn 200 152 76.2%189 38.2 F
Subtotal 869 619 71.2%202 30.0 F
Left Turn 768 746 97.1%27 8.4 C
Through 776 764 98.5%19 4.7 B
Right Turn 392 391 99.7%11 3.4 B
Subtotal 1,936 1,901 98.2%20 5.5 C
Total 4,597 3,556 77.4%107 9.3 F
564.8
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 10 11 111.0%57 34.4 E
Right Turn 50 50 100.6%22 16.4 C
Subtotal 60 61 102.3%29 20.5 C
Left Turn 1,163 1,151 99.0%38 5.3 D
Through 20 22 111.5%40 13.5 D
Right Turn 810 808 99.8%30 4.0 C
Subtotal 1,993 1,982 99.4%35 4.6 C
Through 1,401 875 62.5%45 4.6 D
Right Turn 10 6 61.0%34 38.6 C
Subtotal 1,411 881 62.5%46 4.6 D
Through 1,116 1,084 97.1%31 4.5 C
Subtotal 1,116 1,084 97.1%31 4.5 C
Total 4,580 4,008 87.5%36 3.1 D
57.1
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Volume and Delay by Movement PM Peak Hour
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 780 776 99.5%48 19.1 D
Right Turn 1,160 1,165 100.4%27 8.5 C
Subtotal 1,940 1,941 100.0%36 12.4 D
Through 1,854 1,531 82.6%43 9.8 D
Subtotal 2,124 1,756 82.7%39 9.8 D
Through 336 305 90.8%40 5.8 D
Right Turn 2,671 2,389 89.4%32 6.2 C
Subtotal 3,007 2,694 89.6%33 5.7 C
Total 7,071 6,390 90.4%36 5.4 D
43.8
Intersection 4 Sunset Drive/Bishop Drive Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 75 71 94.8%27 7.1 C
Through 44 44 100.2%26 9.2 C
Right Turn 140 133 94.6%7 0.8 A
Subtotal 259 248 95.6%16 2.9 B
Left Turn 30 28 94.3%38 27.1 D
Through 239 242 101.1%36 25.6 D
Right Turn 30 33 108.3%17 12.0 B
Subtotal 299 302 101.1%34 23.3 C
Left Turn 10 10 98.0%39 18.8 D
Through 100 99 98.8%22 10.6 C
Right Turn 257 253 98.2%18 28.8 B
Subtotal 367 361 98.4%19 22.2 B
Left Turn 80 82 102.1%45 27.8 D
Through 110 108 98.5%12 3.1 B
Right Turn 10 10 97.0%6 6.0 A
Subtotal 200 200 99.9%26 14.3 C
Total 1,125 1,111 98.8%24 16.7 C
47.4
EB
WB
Served Volume (vph)
NB
SB
Served Volume (vph)
NB
EB
WB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Volume and Delay by Movement PM Peak Hour
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 310 269 86.9%47 6.8 D
Through 189 176 93.1%27 8.8 C
Right Turn 220 203 92.1%21 8.9 C
Subtotal 719 648 90.1%34 6.1 C
Left Turn 40 40 100.8%64 17.6 E
Through 486 486 100.0%43 11.4 D
Right Turn 50 51 101.8%35 14.5 C
Subtotal 576 577 100.2%44 11.1 D
Left Turn 30 29 97.0%43 19.0 D
Through 20 19 94.0%43 24.1 D
Right Turn 370 373 100.8%23 15.1 C
Subtotal 420 421 100.2%26 14.7 C
Left Turn 170 167 98.2%40 8.8 D
Through 30 31 104.7%38 13.4 D
Right Turn 40 42 105.0%44 13.5 D
Subtotal 240 240 100.2%41 8.4 D
Total 1,955 1,886 96.5%36 8.0 D
65.8
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 457 459 100.4%70 12.4 E
Through 46 46 99.8%66 13.4 E
Right Turn 86 90 104.9%12 4.9 B
Subtotal 589 595 101.0%60 11.1 E
Left Turn 225 228 101.4%56 5.1 E
Through 55 51 92.2%66 10.0 E
Right Turn 746 746 100.0%41 16.1 D
Subtotal 1,026 1,025 99.9%46 11.7 D
Left Turn 515 469 91.1%97 43.1 F
Through 1,983 1,761 88.8%37 4.3 D
Right Turn 516 466 90.3%6 1.1 A
Subtotal 3,014 2,697 89.5%42 9.6 D
Left Turn 148 124 83.9%131 48.4 F
Through 1,804 1,495 82.9%174 14.5 F
Right Turn 158 132 83.4%114 8.7 F
Subtotal 2,110 1,751 83.0%167 15.9 F
Total 6,739 6,067 90.0%80 6.4 F
161.2
WB
Served Volume (vph)
NB
SB
EB
WB
Served Volume (vph)
NB
SB
EB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Volume and Delay by Movement PM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Demand Total Delay (sec/veh)
Direction Movement Volume (vph)Average Percent Average Std. Dev.LOS
Left Turn 208 161 77.2%271 56.7 F
Through 154 130 84.4%81 29.1 F
Right Turn 220 195 88.8%24 12.9 C
Subtotal 582 486 83.5%126 32.4 F
Left Turn 483 369 76.4%222 49.1 F
Through 137 100 73.2%300 75.7 F
Right Turn 533 412 77.3%241 70.2 F
Subtotal 1,153 882 76.5%241 58.6 F
Left Turn 140 125 89.6%120 27.3 F
Through 1,982 1,796 90.6%16 2.7 B
Right Turn 172 156 90.6%7 1.3 A
Subtotal 2,294 2,078 90.6%22 2.4 C
Left Turn 156 127 81.3%387 62.8 F
Through 1,369 1,199 87.6%323 60.0 F
Right Turn 324 315 97.3%82 140.7 F
Subtotal 1,849 1,641 88.7%283 68.5 F
Total 5,878 5,086 86.5%148 15.5 F
140.6
Served Volume (vph)
NB
SB
EB
WB
Fehr & Peers 9/18/2025
P
Appendix C:
Intersection
Queue
Worksheet
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Queue Length By Lane Group AM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 150 25 6 75 11 100 14
Through 700 200 27 350 63 425 108
Right Turn 200 100 20 225 40 275 0
Left Turn 200 200 7 250 4 225 4
Through 225 75 10 150 20 175 38
Right Turn 225 25 11 100 42 150 50
Left Turn 150 125 9 200 17 225 8
Through 750 175 37 375 88 475 105
Right Turn 750 175 14 275 5 250 0
Left Turn 300 150 19 225 34 250 38
Through 2,300 125 6 200 9 225 23
Through/Right 2,300 100 8 150 13 175 27
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 200 75 12 175 25 200 44
Through/Right 100 100 10 150 16 200 14
Through 800 125 25 250 34 275 62
Shared 200 25 3 50 6 75 13
Left Turn 475 100 8 150 14 200 37
Left/Through 1,300 125 8 200 17 250 38
Right Turn 1,300 75 7 125 22 175 53
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 800 225 19 375 45 450 100
Through 1,025 275 47 550 62 575 129
Right Turn 1,025 400 42 625 39 650 72
Left Turn 550 100 9 175 25 250 56
Right Turn 1,300 225 16 350 31 400 62
NB
SB
EB
WB
NB
EB
WB
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Queue Length By Lane Group AM Peak Hour
Intersection 4 Sunset Drive/Bishop Drive Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 200 25 4 50 6 75 13
Through 525 25 3 50 6 75 19
Right Turn 150 25 3 50 6 50 13
Left Turn 200 25 4 50 6 75 12
Through/Right 750 50 4 75 10 75 26
Left/Through 225 125 13 250 15 250 4
Through 225 100 10 200 14 225 17
Right Turn 225 50 5 75 9 75 19
Left/Through 175 25 2 50 5 50 14
Through/Right 175 25 3 50 7 50 10
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left/Through 200 25 3 50 7 50 10
Right Turn 100 50 4 75 7 100 18
Left Turn 100 25 3 75 8 75 16
Through/Right 100 50 5 75 6 100 21
Left Turn 175 75 11 150 27 200 37
Through 375 75 15 175 44 250 49
Through/Right 375 50 10 100 38 175 75
Left Turn 100 25 2 50 5 50 12
Through 250 25 3 75 4 75 15
Through/Right 250 25 2 50 4 75 5
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 750 375 56 525 100 575 127
Through 1,050 50 21 150 111 300 312
Right Turn 300 0 0 0 0 0 0
Left Turn 225 0 0 0 0 0 0
Through 875 150 29 350 77 500 182
Right Turn 250 25 10 100 52 200 146
Left Turn 350 0 0 0 0 0 0
Left/Through 350 0 0 0 0 0 0
Right Turn 150 0 0 0 0 0 0
Left Turn 175 25 6 75 12 75 20
Left/Through 375 50 5 75 8 100 21
Right Turn 375 25 9 100 20 125 31
NB
SB
EB
WB
SB
EB
WB
NB
SB
EB
WB
NB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Queue Length By Lane Group AM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 475 175 14 275 17 300 22
Through 850 75 8 150 14 175 29
Right Turn 200 25 5 75 7 75 12
Left Turn 150 50 16 75 46 150 90
Through 575 275 27 450 40 500 59
Right Turn 575 100 10 175 21 225 37
Left Turn 425 25 7 75 17 100 23
Through 425 25 3 50 9 75 21
Right Turn 425 25 1 25 2 25 0
Left Turn 700 100 11 175 23 200 25
Through/Right 700 75 7 150 16 175 42
Right Turn 700 25 5 75 23 125 45
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Queue Length By Lane Group AM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 150 25 6 75 12 100 21
Through 700 225 16 400 43 500 85
Right Turn 200 125 21 250 36 275 0
Left Turn 200 200 8 250 6 225 3
Through 225 150 82 325 129 400 131
Right Turn 225 25 6 100 23 175 46
Left Turn 150 125 15 200 19 225 8
Through 750 225 42 450 67 525 88
Right Turn 750 200 10 275 7 250 0
Left Turn 300 175 24 300 54 325 65
Through 2,300 125 11 200 29 250 86
Through/Right 2,300 100 11 175 28 225 75
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 200 125 10 200 17 225 24
Through/Right 100 100 11 200 13 200 3
Through 800 175 40 300 47 275 46
Shared 200 25 3 50 5 75 16
Left Turn 475 125 11 200 19 275 37
Left/Through 1,300 175 12 275 17 325 27
Right Turn 1,300 100 17 200 25 275 41
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 800 225 18 350 33 425 63
Through 1,025 400 28 725 45 750 149
Right Turn 1,025 500 31 750 56 825 151
Left Turn 550 100 13 200 30 225 62
Right Turn 1,300 250 15 375 24 400 59
NB
SB
EB
WB
NB
EB
WB
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Queue Length By Lane Group AM Peak Hour
Intersection 4 Sunset Drive/Bishop Drive Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 200 25 3 50 6 75 12
Through 525 25 5 75 8 75 14
Right Turn 150 25 2 50 4 75 11
Left Turn 200 25 3 75 7 75 14
Through/Right 750 50 4 75 7 75 17
Left/Through 225 150 15 250 13 250 5
Through 225 100 15 200 22 250 14
Right Turn 225 50 4 75 6 100 24
Left/Through 175 25 3 50 6 75 16
Through/Right 175 25 4 50 9 50 18
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left/Through 200 25 3 50 6 50 12
Right Turn 100 50 3 75 6 100 15
Left Turn 100 25 4 75 7 75 15
Through/Right 100 50 6 75 9 100 22
Left Turn 175 75 9 175 26 225 37
Through 375 100 17 225 38 275 51
Through/Right 375 50 6 125 23 175 49
Left Turn 100 25 3 50 8 50 15
Through 250 50 4 75 8 100 14
Through/Right 250 25 4 50 10 75 17
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 750 350 61 525 137 575 140
Through 1,050 325 34 525 117 625 184
Right Turn 300 25 7 75 55 125 168
Left Turn 225 100 21 300 42 300 18
Through 875 675 85 1,000 120 900 102
Right Turn 250 200 39 450 45 350 0
Left Turn 350 225 21 325 34 375 38
Left/Through 350 200 16 325 44 375 53
Right Turn 150 75 15 175 44 275 0
Left Turn 175 25 3 75 8 75 23
Left/Through 375 75 10 100 16 125 28
Right Turn 375 25 6 75 19 100 36
NB
SB
EB
WB
NB
SB
SB
EB
WB
EB
WB
NB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Queue Length By Lane Group AM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 475 225 13 350 28 375 34
Through 850 75 19 175 46 250 90
Right Turn 200 50 11 100 35 150 77
Left Turn 150 150 23 275 38 250 33
Through 575 500 92 725 146 675 107
Right Turn 575 225 96 525 260 525 210
Left Turn 425 175 29 275 56 300 65
Through 425 75 10 150 18 175 46
Right Turn 425 50 4 75 9 100 15
Left Turn 700 125 6 175 14 200 19
Through/Right 700 125 7 200 14 225 42
Right Turn 700 50 8 125 20 175 32
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Queue Length By Lane Group AM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 150 25 5 75 27 150 86
Through 700 350 68 600 137 700 149
Right Turn 200 175 13 325 13 275 0
Left Turn 200 200 11 250 8 225 5
Through 225 150 43 300 79 400 86
Right Turn 225 50 8 150 21 200 3
Left Turn 150 125 9 200 15 225 7
Through 750 200 43 450 105 525 155
Right Turn 750 175 10 275 8 250 0
Left Turn 300 150 23 225 46 250 56
Through 2,300 125 13 200 27 250 49
Through/Right 2,300 100 10 175 22 200 36
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 200 125 16 225 30 225 31
Through/Right 100 100 13 200 22 200 9
Through 800 175 31 300 38 275 12
Shared 200 25 5 50 8 75 29
Left Turn 475 275 22 425 45 500 72
Left/Through 1,300 325 17 500 60 575 118
Right Turn 1,300 175 27 350 79 500 83
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 800 275 25 475 60 550 119
Through 1,025 250 34 500 64 550 137
Right Turn 1,025 425 40 650 54 675 122
Left Turn 550 200 30 350 80 550 88
Right Turn 1,300 400 51 575 134 650 218
EB
WB
NB
SB
EB
WB
NB
SB
EB
WB
NB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Queue Length By Lane Group AM Peak Hour
Intersection 4 Sunset Drive/Bishop Drive Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 200 25 3 50 4 75 12
Through 525 25 3 50 6 75 9
Right Turn 150 25 3 50 5 75 8
Left Turn 200 25 3 75 9 75 17
Through/Right 750 50 6 75 12 100 28
Left/Through 225 150 9 250 12 250 5
Through 225 125 13 200 25 225 25
Right Turn 225 50 5 75 8 100 23
Left/Through 175 25 5 50 6 75 14
Through/Right 175 25 2 50 6 50 16
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left/Through 200 25 3 50 6 50 13
Right Turn 100 50 4 75 8 100 14
Left Turn 100 25 6 75 10 75 20
Through/Right 100 50 5 75 9 100 15
Left Turn 175 75 8 150 18 200 51
Through 375 75 14 175 27 250 50
Through/Right 375 50 8 125 24 175 39
Left Turn 100 25 3 50 6 50 10
Through 250 50 5 75 11 100 19
Through/Right 250 25 3 50 7 75 13
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 750 425 142 625 206 650 151
Through 1,050 325 101 625 245 700 263
Right Turn 300 25 3 50 18 75 38
Left Turn 225 100 26 250 64 300 26
Through 875 675 77 1,000 125 900 77
Right Turn 250 200 30 450 30 350 0
Left Turn 350 200 17 300 19 325 47
Through/Right 350 125 21 200 41 250 40
Left Turn 175 25 7 75 14 100 26
Left/Through 375 75 7 125 14 150 23
Right Turn 375 25 6 75 15 125 29
EB
WB
NB
SB
EB
WB
NB
SB
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Queue Length By Lane Group AM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 475 225 17 350 37 375 50
Through 850 50 15 125 33 175 39
Right Turn 200 25 5 75 10 125 17
Left Turn 150 125 26 250 49 250 30
Through 575 450 80 650 148 650 97
Right Turn 575 200 129 400 301 400 240
Left Turn 425 150 15 250 39 300 53
Through 425 75 10 150 19 200 40
Right Turn 425 50 5 100 12 125 26
Left Turn 700 125 11 200 18 225 24
Through/Right 700 100 9 200 15 225 19
Right Turn 700 50 8 125 20 200 16
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Queue Length By Lane Group PM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 150 50 9 100 31 150 78
Through 700 200 18 300 36 350 55
Right Turn 200 75 15 175 39 250 3
Left Turn 200 225 12 275 8 250 13
Through 225 250 39 475 61 600 68
Right Turn 225 75 19 200 29 200 0
Left Turn 150 100 8 175 17 200 24
Through 750 275 95 625 247 725 289
Right Turn 750 200 19 275 13 250 0
Left Turn 300 275 42 400 55 375 22
Through 2,300 225 142 450 273 525 221
Through/Right 2,300 200 116 375 237 450 236
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 200 175 19 275 17 250 19
Through/Right 100 150 17 225 10 200 0
Through 800 250 22 325 16 300 16
Shared 200 50 4 75 7 100 21
Left Turn 475 300 35 450 103 525 109
Left/Through 1,300 450 233 750 542 775 452
Right Turn 1,300 400 266 725 570 775 447
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 800 125 20 250 46 375 73
Through 1,025 125 23 275 46 375 50
Right Turn 1,025 325 54 625 48 600 68
Left Turn 550 250 18 375 46 450 77
Right Turn 1,300 275 18 400 32 450 80
NB
SB
EB
WB
NB
EB
WB
NB
SB
EB
WB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Queue Length By Lane Group PM Peak Hour
Intersection 4 Sunset Drive/Bishop Drive Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 200 25 2 25 6 50 11
Through 525 50 4 100 6 125 17
Right Turn 150 50 8 100 19 150 36
Left Turn 200 75 10 100 16 150 34
Through/Right 750 50 8 100 10 100 7
Left/Through 225 50 5 100 13 125 37
Through 225 25 4 75 11 100 21
Right Turn 225 50 5 100 12 125 28
Left/Through 175 100 8 175 21 200 37
Through/Right 175 50 6 125 18 150 42
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left/Through 200 75 12 175 32 250 44
Right Turn 100 100 6 150 4 150 0
Left Turn 100 100 11 200 23 250 45
Through/Right 100 75 9 125 14 125 8
Left Turn 175 125 11 225 20 225 21
Through 375 50 10 125 52 200 125
Through/Right 375 150 19 325 27 350 22
Left Turn 100 50 7 150 16 150 1
Through 250 175 15 275 10 250 3
Through/Right 250 125 10 225 19 250 16
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 750 250 28 375 57 425 69
Through 1,050 175 16 325 24 350 33
Right Turn 300 0 0 0 0 0 0
Left Turn 225 0 0 0 0 0 0
Through 875 350 27 575 62 575 111
Right Turn 250 150 24 350 42 350 0
Left Turn 350 0 0 0 0 0 0
Left/Through 350 0 0 0 0 0 0
Right Turn 150 0 0 0 0 0 0
Left Turn 175 100 9 175 18 200 4
Left/Through 375 125 10 200 25 250 54
Right Turn 375 225 18 325 27 350 42
NB
SB
EB
WB
NB
SB
SB
EB
WB
EB
WB
NB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing
Queue Length By Lane Group PM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 475 75 9 125 15 150 23
Through 850 175 21 300 44 400 68
Right Turn 200 25 8 75 36 125 89
Left Turn 150 25 1 25 6 25 14
Through 575 200 11 300 20 325 59
Right Turn 575 75 5 125 16 150 34
Left Turn 425 100 9 175 18 200 37
Through 425 50 6 75 13 100 18
Right Turn 425 25 3 50 7 50 16
Left Turn 700 250 8 350 13 400 29
Through/Right 700 150 11 250 26 325 60
Right Turn 700 75 11 175 23 250 41
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Queue Length By Lane Group PM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 150 50 10 125 43 200 82
Through 700 300 57 525 149 600 155
Right Turn 200 150 27 300 32 275 0
Left Turn 200 225 6 275 7 275 15
Through 225 250 78 500 117 600 108
Right Turn 225 75 18 200 30 200 2
Left Turn 150 100 9 175 22 200 30
Through 750 175 49 400 147 475 179
Right Turn 750 175 17 250 23 225 1
Left Turn 300 250 25 350 46 350 40
Through 2,300 175 40 300 128 425 181
Through/Right 2,300 150 37 275 122 350 194
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 200 175 15 250 28 225 38
Through/Right 100 125 14 225 10 200 0
Through 800 250 16 325 10 300 15
Shared 200 50 3 75 10 100 39
Left Turn 475 375 28 575 42 625 2
Left/Through 1,300 475 29 675 84 800 137
Right Turn 1,300 375 49 650 85 775 112
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 800 275 34 450 60 525 81
Through 1,025 75 16 200 34 325 78
Right Turn 1,025 350 81 675 85 625 99
Left Turn 550 250 13 425 31 500 61
Right Turn 1,300 325 23 500 62 600 162
EB
WB
NB
SB
EB
WB
NB
SB
EB
WB
NB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Queue Length By Lane Group PM Peak Hour
Intersection 4 Sunset Drive/Bishop Drive Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 200 25 2 25 5 50 1
Through 525 50 5 100 11 125 18
Right Turn 150 50 8 100 18 150 33
Left Turn 200 75 5 100 10 150 18
Through/Right 750 50 7 100 13 125 31
Left/Through 225 75 8 125 14 125 20
Through 225 50 3 75 7 100 20
Right Turn 225 75 4 100 13 125 43
Left/Through 175 125 14 200 26 225 39
Through/Right 175 75 8 125 22 175 36
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left/Through 200 75 13 200 40 300 68
Right Turn 100 100 7 150 7 150 0
Left Turn 100 100 9 175 25 225 45
Through/Right 100 75 5 125 7 125 1
Left Turn 175 125 8 200 19 225 15
Through 375 50 9 100 28 125 74
Through/Right 375 150 17 275 31 300 37
Left Turn 100 50 6 125 16 150 1
Through 250 200 8 275 10 250 8
Through/Right 250 150 12 225 15 250 6
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 750 225 21 350 35 375 35
Through 1,050 325 16 500 31 550 57
Right Turn 300 75 9 200 21 250 44
Left Turn 225 100 24 225 77 275 56
Through 875 700 121 1,025 207 900 106
Right Turn 250 250 33 475 20 350 0
Left Turn 350 325 33 450 52 475 51
Left/Through 350 275 33 400 45 425 53
Right Turn 150 100 15 225 31 275 0
Left Turn 175 125 9 200 12 200 6
Left/Through 375 150 12 250 27 300 43
Right Turn 375 200 16 300 27 325 32
EB
WB
NB
SB
EB
WB
NB
SB
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project
Queue Length By Lane Group PM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 475 100 25 225 111 375 218
Through 850 400 28 600 45 675 127
Right Turn 200 150 12 300 17 250 0
Left Turn 150 150 22 225 24 250 11
Through 575 325 63 475 146 525 153
Right Turn 575 100 32 175 139 250 218
Left Turn 425 200 35 325 65 375 52
Through 425 125 34 250 109 300 132
Right Turn 425 75 9 150 17 200 35
Left Turn 700 400 90 675 199 675 105
Through/Right 700 450 94 725 159 700 90
Right Turn 700 375 95 675 172 650 97
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Queue Length By Lane Group PM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 150 50 10 100 43 175 92
Through 700 325 49 550 119 625 152
Right Turn 200 150 26 300 33 275 0
Left Turn 200 225 4 250 8 250 10
Through 225 350 80 675 103 725 91
Right Turn 225 50 16 200 31 200 0
Left Turn 150 100 10 175 17 200 30
Through 750 350 157 650 254 725 243
Right Turn 750 200 15 275 12 250 0
Left Turn 300 200 23 300 35 350 61
Through 2,300 150 8 225 13 275 74
Through/Right 2,300 125 10 200 12 250 34
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 200 200 11 275 20 225 52
Through/Right 100 150 15 250 11 200 0
Through 800 250 15 325 21 300 14
Shared 200 50 5 75 9 100 19
Left Turn 475 325 21 500 53 575 65
Left/Through 1,300 400 35 575 88 725 182
Right Turn 1,300 300 43 550 98 725 190
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 800 275 27 500 60 600 91
Through 1,025 200 64 425 202 600 282
Right Turn 1,025 500 147 825 167 825 174
Left Turn 550 275 19 425 49 525 51
Right Turn 1,300 300 20 450 78 575 231
EB
WB
NB
SB
EB
WB
NB
SB
EB
WB
NB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Queue Length By Lane Group PM Peak Hour
Intersection 4 Sunset Drive/Bishop Drive Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 200 25 2 25 6 50 6
Through 525 50 9 100 41 175 110
Right Turn 150 75 10 125 28 175 53
Left Turn 200 75 6 100 9 125 18
Through/Right 750 50 7 100 22 125 46
Left/Through 225 75 4 125 8 150 24
Through 225 50 5 75 7 100 11
Right Turn 225 75 4 100 11 150 31
Left/Through 175 125 11 175 24 225 30
Through/Right 175 75 7 125 18 175 20
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left/Through 200 75 15 200 32 250 40
Right Turn 100 100 5 150 7 150 0
Left Turn 100 100 9 175 22 225 50
Through/Right 100 75 6 125 6 125 2
Left Turn 175 150 12 200 17 225 16
Through 375 50 7 100 30 125 71
Through/Right 375 150 17 275 26 325 30
Left Turn 100 50 8 125 14 150 0
Through 250 200 12 275 7 250 4
Through/Right 250 150 15 225 19 250 5
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 750 275 56 450 117 475 121
Through 1,050 375 18 500 32 575 88
Right Turn 300 100 13 200 38 275 119
Left Turn 225 75 17 150 44 250 62
Through 875 700 194 975 241 900 182
Right Turn 250 250 68 450 47 350 0
Left Turn 350 300 21 425 51 475 74
Through/Right 350 125 17 225 30 250 7
Left Turn 175 125 11 200 16 200 0
Left/Through 375 175 11 275 31 325 52
Right Turn 375 225 26 325 39 350 43
EB
WB
NB
SB
EB
WB
NB
SB
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Existing Plus Project Plus Mitigations
Queue Length By Lane Group PM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 475 75 9 125 18 150 28
Through 850 125 25 275 77 425 176
Right Turn 200 50 10 150 36 225 54
Left Turn 150 150 10 225 21 250 20
Through 575 325 79 500 173 575 158
Right Turn 575 100 48 225 165 325 251
Left Turn 425 175 10 275 15 300 26
Through 425 100 9 175 14 200 39
Right Turn 425 75 10 150 21 225 45
Left Turn 700 250 17 375 31 450 65
Through/Right 700 275 24 425 42 475 50
Right Turn 700 200 27 375 40 425 71
EB
WB
NB
SB
Fehr & Peers 9/17/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Queue Length By Lane Group AM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 150 25 11 75 43 150 75
Through 700 475 70 775 95 775 144
Right Turn 200 200 16 350 7 275 0
Left Turn 200 225 5 250 12 225 3
Through 225 200 124 425 161 500 145
Right Turn 225 50 15 150 32 200 21
Left Turn 150 150 9 225 12 225 2
Through 750 375 96 700 221 750 223
Right Turn 750 225 11 275 14 250 0
Left Turn 300 250 48 375 74 375 40
Through 2,300 200 98 425 247 525 211
Through/Right 2,300 150 69 350 203 475 228
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 200 175 15 250 25 225 21
Through/Right 100 150 11 225 10 200 0
Through 800 225 33 300 25 300 28
Shared 200 25 4 50 5 75 8
Left Turn 475 200 29 350 83 450 127
Left/Through 1,300 300 45 475 182 675 408
Right Turn 1,300 225 56 450 177 625 343
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 800 325 51 525 123 550 137
Through 1,025 325 74 750 168 850 296
Right Turn 1,025 400 68 875 131 1,000 179
Left Turn 550 200 53 375 150 425 132
Right Turn 1,300 400 161 675 438 725 420
EB
WB
NB
SB
EB
WB
NB
SB
EB
WB
NB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Queue Length By Lane Group AM Peak Hour
Intersection 4 Sunset Drive/Bishop Drive Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 200 25 5 75 7 75 14
Through 525 25 4 75 8 75 20
Right Turn 150 25 3 50 5 75 11
Left Turn 200 25 3 75 6 75 12
Through/Right 750 50 4 75 6 100 21
Left/Through 225 150 12 275 17 250 3
Through 225 125 11 225 17 250 5
Right Turn 225 50 4 75 6 125 17
Left/Through 175 25 3 75 6 75 14
Through/Right 175 25 3 50 4 50 11
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left/Through 200 25 1 75 10 100 41
Right Turn 100 50 4 100 10 125 16
Left Turn 100 50 7 75 15 100 37
Through/Right 100 50 4 100 10 125 19
Left Turn 175 100 14 175 32 225 34
Through 375 100 22 225 54 325 63
Through/Right 375 50 9 150 31 225 64
Left Turn 100 25 2 50 4 50 11
Through 250 50 4 75 7 100 12
Through/Right 250 25 5 75 9 75 14
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 750 450 131 675 226 700 133
Through 1,050 450 153 825 307 825 205
Right Turn 300 25 11 75 79 175 231
Left Turn 225 175 28 400 26 325 26
Through 875 875 20 975 41 925 14
Right Turn 250 225 17 475 11 350 0
Left Turn 350 300 49 500 94 525 60
Left/Through 350 300 49 500 92 525 31
Right Turn 150 125 29 275 41 275 0
Left Turn 175 75 18 150 38 175 41
Left/Through 375 100 27 175 65 225 81
Right Turn 375 50 13 125 25 150 31
EB
WB
NB
SB
EB
WB
NB
SB
EB
WB
NB
SB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Queue Length By Lane Group AM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 475 425 61 625 59 550 0
Through 850 475 179 975 271 850 152
Right Turn 200 75 15 150 50 275 108
Left Turn 150 150 13 300 24 250 24
Through 575 1,175 335 1,875 532 1,725 291
Right Turn 575 375 117 900 168 775 0
Left Turn 425 425 19 525 38 450 0
Through 425 450 41 675 52 525 16
Right Turn 425 25 13 100 68 200 167
Left Turn 700 175 27 275 43 275 53
Through/Right 700 275 51 425 103 450 108
Right Turn 700 200 55 400 104 400 109
EB
WB
NB
SB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Queue Length By Lane Group PM Peak Hour
Intersection 1 San Ramon Valley Boulevard/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 150 75 16 225 33 250 0
Through 700 775 48 800 39 800 13
Right Turn 200 225 6 350 5 275 0
Left Turn 200 175 9 275 16 250 5
Through 225 175 48 425 77 525 82
Right Turn 225 50 13 150 32 200 3
Left Turn 150 125 17 225 23 225 14
Through 750 1,400 136 1,500 160 1,450 25
Right Turn 750 225 0 250 2 250 0
Left Turn 300 400 46 425 44 400 0
Through 2,300 875 4 900 5 925 11
Through/Right 2,300 350 117 875 179 875 51
Intersection 2 I-680 SB Off-Ramp-Park & Ride Driveway/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 200 200 12 225 16 250 9
Through/Right 100 175 8 225 8 200 0
Through 800 225 21 325 17 275 15
Shared 200 50 8 100 13 125 28
Left Turn 475 350 18 550 33 600 22
Left/Through 1,300 450 29 700 92 975 241
Right Turn 1,300 425 47 750 100 975 243
Intersection 3 I-680 NB Ramps/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Through 800 375 40 600 52 650 69
Right Turn 175 150 23 350 22 275 0
Through 1,025 350 90 700 158 825 213
Right Turn 1,025 575 105 900 161 1,000 183
Left Turn 550 475 17 650 25 575 0
Right Turn 1,300 475 93 975 223 1,200 188
NB
SB
EB
WB
NB
EB
WB
NB
SB
EB
WB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Queue Length By Lane Group PM Peak Hour
Intersection 4 Sunset Drive/Bishop Drive Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 200 25 3 50 6 50 14
Through 525 75 31 125 99 200 142
Right Turn 150 75 26 150 51 200 50
Left Turn 200 75 15 150 35 175 35
Through/Right 750 50 6 100 15 175 79
Left/Through 225 75 8 125 15 150 34
Through 225 50 3 75 5 75 8
Right Turn 225 75 4 100 5 125 14
Left/Through 175 150 25 225 53 300 76
Through/Right 175 75 14 175 40 225 75
Intersection 5 Sunset Drive/Shops At Bishop Ranch-City Center Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left/Through 200 150 62 325 94 375 65
Right Turn 100 125 6 150 3 150 0
Left Turn 100 125 12 225 33 275 47
Through/Right 100 75 9 150 7 125 0
Left Turn 175 125 8 200 12 225 14
Through 375 50 8 100 25 150 66
Through/Right 375 150 16 300 24 300 27
Left Turn 100 75 15 150 21 150 1
Through 250 225 14 275 8 250 9
Through/Right 250 175 21 275 14 250 8
Intersection 6 Sunset Drive-Chevron Drive/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 750 325 80 500 147 500 152
Through 1,050 325 16 475 24 525 56
Right Turn 300 50 10 150 25 200 46
Left Turn 225 225 21 425 10 325 11
Through 875 900 49 950 31 925 25
Right Turn 250 250 29 475 9 350 0
Left Turn 350 300 25 425 55 475 50
Left/Through 350 275 30 400 68 425 75
Right Turn 150 100 15 250 29 275 0
Left Turn 175 125 9 225 11 200 1
Left/Through 375 175 14 275 31 300 50
Right Turn 375 275 37 375 31 375 19
NB
SB
EB
WB
NB
SB
SB
EB
WB
EB
WB
NB
Fehr & Peers 9/18/2025
SimTraffic Post-Processor Orchards Site Planning
Average Results from 10 Runs Cumulative Plus Project
Queue Length By Lane Group PM Peak Hour
Intersection 7 Camino Ramon-Bishop Ranch 1/Bollinger Canyon Road Signal
Storage Average Queue (ft)95th Queue (ft)Maximum Queue (ft)Block Time
Direction Lane Group (ft)Average Std. Dev.Average Std. Dev.Average Std. Dev.
Left Turn 475 125 26 200 56 225 66
Through 850 125 29 275 73 325 104
Right Turn 200 50 8 125 36 225 95
Left Turn 150 225 25 325 17 250 0
Through 575 1,075 277 1,850 413 1,700 320
Right Turn 575 275 275 800 733 1,100 730
Left Turn 425 350 69 525 54 450 0
Through 425 350 111 625 109 550 14
Right Turn 425 75 15 175 34 250 91
Left Turn 700 550 118 800 94 725 11
Through/Right 700 550 105 825 76 725 11
Right Turn 700 500 116 800 86 725 12
EB
WB
NB
SB
Fehr & Peers 9/18/2025
P
Appendix D:
Mixed-Use Trip
Generation Model
Recalibration and
Validation
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 1
This paper documents the recalibration and validation effort undertaken by Fehr & Peers in 2019-
2020 of the MXD+ Tool. This revalidation was necessary given the myriad changes in mobility,
technology, and societal behavior that have occurred since MXD+ was originally formulated in
the late-2000’s. This paper provides a straightforward “nuts and bolts” type description of this
process.
MXD+ Model Origin
In the late-2000’s, two separate research studies improved the state of practice regarding
prediction of trips from mixed-use projects. Studies sponsored by the US EPA (MXD) and the
Transportation Research Board (NCHRP 684) developed separate tools for improving trip
generation estimates for mixed-use developments. The MXD model was originally derived from
239 mixed-use sites across the country, and validated in 2009 against 22 sites. NCHRP 684:
Enhancing Internal Trip Capture Estimation for Mixed-Use Developments (2011) was based on six
well-known MXD sites.
The principal authors of these original two methods (Reid Ewing at the University of Utah, Brian
Bochner at Texas A&M, and Jerry Walters at Fehr & Peers) decided to collaborate on an integrated
method that captured the best of both sets of research findings. And thus, MXD+ was created.
They published a paper entitled Getting Trip Generation Right: Eliminating the Bias Against Mixed-
Use Development (American Planning Association, 2013). According to that paper, MXD+ achieved
average errors of 2%, 12%, and 4%, for daily, AM peak hour, and PM peak hour conditions,
respectively. These values suggest a good fit between the model’s estimation and the counts.
Purpose/Need of Revalidation and Calibration
Excluding the unprecedented changes in travel and economic distress that have occurred in 2020
due to the COVID-19 Pandemic, there have been sweeping changes in travel behavior in the 10-
plus years since MXD+ was originally validated. Some of the many examples include increased e-
commerce activity, the introduction of ridehailing (i.e., Transportation Network Companies (TNCs),
such as Uber and Lyft), increased telecommuting, micromobility (e.g., bikeshare, e-scooters, and
microtransit), increased auto ownership, and decreased transit ridership.
Additionally, in 2017, the Institute of Transportation Engineers (ITE) released the 10th Edition of
the Trip Generation Manual. When compared to the 9th Edition (2012), the 10th Edition
demonstrates sizeable decreases in vehicle trip rates for nearly all types of employment uses (due
to the replacement of very old data with new data collected after 2010). It also includes several
new land use categories (i.e., fast casual restaurant), more overall data, and better definitions for
land uses often found in mixed-use sites
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 2
Model Recalibration
Model recalibration involved site selection, data collection, and then calibration.
Site Selection
Fehr & Peers selected sites that were geographically diverse, both in terms of locations across the
US, and as well as in their place type. They had varying levels of mode choice options, and their
site trips were able to be accurately counted. The sites were well understood in terms of occupied
land uses, available modes of travel, and other built environment characteristics. This diversity of
use type, geographic placement, size allows for the model to be calibrated against a wider set of
conditions versus an alternate approach where a more homogeneous set of sites were selected.
Consistent with standard practice in statistical analysis, the selected sites were divided into
separate “calibration” and “validation” datasets. Early analysis findings indicated that model
accuracy could be improved for weekday AM and PM peak hour conditions through a set of minor
adjustments, which are discussed in detail later. The calibration dataset (12 sites) was used to
determine the best fit provided by the adjusted set of factors. The validation dataset (4 sites),
which was not included in the calibration dataset, were specifically selected to provide a diverse
range of geographic settings, modal opportunities, and project sizes, which could be used to test
the accuracy of the model. Those results are presented in case study format at the end of this
paper.
Figure 1 shows the 12 calibration sites that were selected, as well as the four validation sites.
Aside from the four case studies, individual site locations are not disclosed in this article because
such information is not necessary to understand the data collection and analysis results. Case in
point, transportation planners/engineers routinely use data from the Trip Generation Manual,
which only discloses the states from which the data was collected. The traffic data collection did
not require encroachment onto any private property to place cameras or hose tubes.
Data Collection
Table 1 provides an overview of the size, diversity of uses, and transit proximity of the sites that
comprise the calibration database.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 3
Figure 1: MXD+ Calibration and Validation Sites
Table 1 – Overview of MXD+ Calibration Sites
Metric Range Average Median Total
Acres 4 – 221 acres 50 acres 19 acres 603 acres
Number of Dwelling
Units 1
8 – 1,841 units 563 units 414 units 6,756 units
Retail 0 – 753,000 sq. ft. 168,000 sq. ft. 38,000 sq. ft. 2,013,000 sq. ft.
Office 0 – 1,084,000 sq. ft. 212,000 sq. ft. 41,000 sq. ft. 2,544,000 sq. ft.
Range of Transit
Services
None, adjacent street bus stops, on-site transit centers, and nearby/on-site light rail
Range of Land Uses Grocery Store
Student Housing
Medical-Office
Building
Restaurants
Health Club
Pharmacy
Hotel
Coffee Shop
Library
Schools
Museum
Movie Theater
Bowling Alley
Hospital
Notes: 1 Over 95% of dwelling units are multi-family. Site with only 8 dwelling units also includes 315 student
housing units.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 4
The average site was 50 acres and consisted of about 563 dwelling units (the vast majority being
multi-family) and 380,000 square feet of non-residential space.
The MXD+ tool includes queries from various sources (e.g., US Census, American Community
Survey, local travel demand models, etc.) to enable easy importing of built environment and
surrounding area travel characteristics and demographic variables. Some of the more important
variables are: Employment within a one-mile walk, Percentage of regional employment within a
30 minute transit ride, and site/adjacent area intersection density (a proxy for site walkability and
internal trip-making potential), and Average vehicle ownership per household.
Measurement of vehicle trips generated by each site was a critical component of the data
collection effort. It was important that the data collection was comprehensive in terms of
collecting all types of vehicle trips generated by each site (including project-related vehicles
parking on-site or on-street, persons being dropped-off or picked-up by a taxi, TNC, or
friend/spouse/coworker, and truck/service deliveries.
To overcome the considerable cost associated with data collection via video cameras, an
innovative approach was undertaken whereby collection of a site’s travel during its busiest 14
hours can be used to accurately estimate its 24-hour traffic generation. Typically, these 14 hours
represent about 90 percent of the land use’s total daily trip generation. A factoring process was
then performed using the ITE hourly trip generation data (from the Trip Generation Manual) to
convert the 14 hour counts into 24-hour observations.
In several instances, site characteristics allowed for a multi-day hose tube count (i.e., a pneumatic
tube placed across a road that would register a vehicle as it passes over) to be performed. But this
was the exception and not the norm since the majority of sites were located in dense, urban
environments where tube counts would have likely yielded inaccurate results.
In several cases, site reconnaissance was necessary to better understand site-specific travel
behavior. This led to conclusions that on-street parking on one side of the street is project-related,
while the other side is not. Other situations involved motorists parking in nearby garages/lots
and walking into the MXD. In those instances, pedestrian activity (both at intersections and mid-
block) were observed and classified into groups to translate pedestrian groups into vehicle trips.
Seven (7) of the 12 calibration data sites were counted in October 2019. The remaining five were
counted as part of prior research efforts, in either 2015 or 2017. Table 2 shows the number of
vehicle trips these sites were observed to generate on a weekday daily basis, and during the AM
and PM peak hours.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 5
Table 2 – Trips Generated by MXD+ Calibration Sites
Time Period External Vehicle Trips 1
Range Average Median
Weekday (Daily) 2,383 – 35,825 12,461 9,495
Weekday AM Peak Hour 2 100 – 2,017 752 518
Weekday PM Peak Hour 3 181 – 3,381 1,161 712
Notes:
1 Includes trips to/from the site for all purposes including deliveries, TNC trips, pass-by trips (i.e., already
on the adjacent street) in addition to the typical trip types.
2 AM peak hour represents the site’s busiest consecutive 60-minute period of travel between 7 and 9 AM.
3 PM peak hour represents the site’s busiest consecutive 60-minute period of travel between 4 and 6 PM.
Recalibration of MXD+
The land use and built environment variables described above were input into MXD+ for each of
the 12 calibration sites. MXD+ then processes that data in the following generalized steps:
• Step 1 – Gross number of vehicle trips are estimated for land uses based on published
rates contained in the Trip Generation Manual, 10th Edition.1
• Step 2 – Built environment and site characteristics variables are used to estimate the
likelihood for internal trip-making, and external trips being made by transit and
walking/biking.
• Step 3 – The model estimates the number of internal trips made between complementary
land uses within the site.
• Step 4 – The model estimates the number of external trips made by transit and
walking/biking.
Nearly all data presented in the current Trip Generation Manual for the suburban/urban place type
were collected at low-density, single-use, homogeneous developments with little or no public
transit service, free parking, and little to no convenient pedestrian access. Hence, direct use of
1 MXD+ is programmed to include trip generation rates (both weighted averages and as derived from fitted
curve equations) from the 10th Edition of the Trip Generation Manual. Data is input only for the
“suburban/urban” land use category, and not for the “rural”, “multi-use urban”, or “center city core” categories
because their corresponding datasets generally have insufficient numbers of sites from which reliable trip
generation rates could be derived.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 6
those rates for projects not aligned with those built environment factors are likely to result in an
overestimation of vehicle trips. This statement, while obvious, is intended to set the stage for why
gross ITE trip generation estimates (without any adjustments) substantially overestimate trips
observed at the MXD sites.
The following guidance from Page 14 of the Trip Generation Handbook (Institute of Transportation
Engineers, 2017) was used in the calibration process:
“The trip generation estimate should reflect, to the extent possible, the specific uses within
the known or assumed generalized (using zoning) classification.”
Thus, individual uses such as grocery stores, banks, pharmacies, restaurants, health clubs, day-care
centers, etc. present at each site were entered separately into MXD+ versus being aggregated into
a single ‘retail shopping center’ category.
In reviewing the preliminary MXD+ results, it was concluded that the daily results were sufficiently
accurate so as to not require any adjustments. But for AM and PM peak hour conditions, it was
observed that MXD+ tended to underestimate the observed count more often than desired. This
was certainly an undesirable outcome because MXD+ applications should be reasonably
conservative. If anything, they should err on the side of overestimating actual trips. The means
by which internal trips and external non-auto trips were estimated for AM and PM peak hour
conditions was quickly identified as a leading culprit.
The following describes the steps for how internal trips and external walk/bike trips for AM and
PM peak hour conditions are estimated:
• Step 1 – Apply the MXD+ peak hour factors by trip purpose to the daily predicted
probabilities of these trip reductions to obtain AM and PM peak hour percentages.
• Step 2 – Apply the following weighting of the two methods that independently estimate
these trip reductions:
o AM Peak Hour: 10% NCHRP 684 and 90% MXD+
o PM Peak Hour: 37% NCHRP 684 and 63% MXD+
An iterative statistical analysis was performed to determine which set of peak hour factors for the
MXD+ component of this calculation best fit the data from the calibration dataset. The best fit
values are shown in Table 3.
The NCHRP 684 procedure has been incorporated by ITE into its Trip Generation Handbook, and
is hence known as the “ITE with Internalization”. Note that this procedure estimates internal trips
only for AM and PM peak hours (and not daily conditions).
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 7
Table 3 – Updated MXD+ Peak Hour Factors by Trip Purpose 1
Predicted Probability 2
AM Peak Hour PM Peak Hour
HBW 3 HBO 4 NHB 5 HBW 3 HBO 4 NHB 5
Internal Capture 1.10 1.80 1.00 1.00 1.00 1.00
Walking/Biking External 1.20 1.30 1.00 1.00 1.00 1.00
Transit External 1.40 1.10 1.00 1.40 1.00 1.00
Notes:
1 Source was analysis of data from the 2017 National Household Travel Survey, specifically analyzing the
national dataset to understand the relative likelihood of each type of travel choice during weekday AM
and PM peak hours, versus on a daily basis.
2 These factors are multiplicatively applied (by trip purpose) to the daily predicted possibilities for each
type of vehicle trip reduction
3 HBW = Home-based work trip.
4 HBO = Home-based other trip (e.g., shopping, school, recreation, etc.).
5 NHB = Non-home-based trip (e.g., from office to deli).
Transparency in calculations is one of the many objectives of MXD+. By virtue of displaying these
values here, it is possible for others to replicate MXD+ results, albeit through a substantial amount
of data collection and analysis. The original MXD model (from 2011) is available for download
from EPA’s website (https://www.epa.gov/smartgrowth/mixed-use-trip-generation-model),
though it is noted that model does not include the latest land use categories, trip generation rates,
and equations from the 10th Edition of the Trip Generation Manual. However, that model does
form the basis for the daily module of MXD+, but with these aforementioned adjustments added.
The calibration tests focus on the following five specific areas (from least to most statistically
complex):
• Aggregate total trips
• Proportion of cases where MXD+ underestimates the actual number of trips
• Average absolute error
• Correlation coefficient2
2 This statistic measures the relationship between variables. A measure close to 1 means that
variables are highly positively correlated; a value of zero suggests no or weak correlation, and a
value close to -1 represents strong negative correlation.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 8
• Percent RMSE3
Table 4 displays the five calibration statistics for daily, and AM and PM peak hour conditions, as
well as the applicable statistical goal/objective for the given calibration statistic.
Table 4 – MXD+ Calibration Results
Calibration Statistic Goal/Objective Daily AM Peak
Hour
PM Peak
Hour
Aggregate Total of MXD+ Vehicle Trip
Generation Estimates Versus Actual Counts
As close to zero
as possible + 7% - 0.9% +1.6%
Proportion of Calibration Sites That Were
Underestimated by MXD+ 1 Ideally none 0 of 12 4 of 12 3 of 12
Average Absolute Error As close to zero
as possible 6% 11% 6%
Correlation Coefficient > 0.88 2 1.00 0.99 1.00
Percent RMSE < 40% 2 12% 13% 7%
Notes:
1 Estimates that were within five percent of the actual counts were not considered underestimations since
traffic volumes themselves may fluctuate by five percent or more from one day to the next.
2 Based on statistical measures typically applied in travel demand model development.
Table 4 indicates that MXD+ does an excellent job of fitting the data for all three time periods.
Challenges did however arise more frequently during peak hours versus daily conditions. Unique
site specific conditions, such as their specific temporal commute patterns, degree of retail tenant
success, and presence of TNCs contributed to some of these challenges.
Chart 1 orders the 12 calibration sites from least to greatest number of observed daily trips. Data
is then presented for the MXD+ external vehicle trip estimate and the ITE gross trip estimate. At
3 This statistic is a measure of the model’s accuracy. It is the square root of the mean squared error
between the predicted and observed count divided by the mean of the observed count.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 9
sites 1 – 6, MXD+ predictions are nearly identical to the observed counts. Slightly greater variation
occurs at the larger sites (i.e., 7 – 12) for reasons discussed below.
For the 12 sites, MXD+ estimated 160,696 daily external vehicle trips. This represents 7% more
trips than the 149,527 daily trips that were counted. This implies that MXD+ is being reasonably
conservative.
If these sites had simply been analyzed using ITE gross daily trip estimates (i.e., without any
reductions of internal trips or external non-auto trips), the resulting estimate would have been
192,905 daily trips, which is a 29% overestimation versus the counts. This reiterates prior research
findings that the use of ITE rates for the suburban/urban place type without any adjustments for
internal trips and external non-auto trips would result in a substantial overestimation of a mixed-
use site’s vehicle trip generation. This is acknowledged on page 8 of the Trip Generation Handbook
by the following statement: “The application of suburban data in dense or multimodal urban
settings can in some cases overestimate motor vehicle demand.”
For the 12 calibration sites, the reduction in daily trips caused by internal trip-making and external
non-auto travel ranged from 10 to 50 percent, with average/median values near 20 percent. This
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
1 2 3 4 5 6 7 8 9 10 11 12
Ve
h
i
c
l
e
T
r
i
p
s
P
e
r
D
a
y
Site
Chart 1: MXD+ Calibration for Daily Conditions
ITE Gross Trips MXD+ External Vehicle Trips Observed Count
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 10
large range is caused by a number of factors including: mix of land use, presence of transit, and
site design, size, and geographic location.
Validation of MXD+
Four case studies from across the US were selected for validation purposes. As noted previously,
these sites were excluded from the calibration dataset in order to achieve the statistically desirable
independent validation dataset. These sites were specifically chosen, as they are geographically
diverse, are of widely varying sizes, and provide widely differing levels of modal travel options.
• Safeway / Avalon, Bellevue, WA – This four-acre site is situated in downtown Bellevue,
across Lake Washington from downtown Seattle. Despite being only 10 miles from
downtown Seattle, a commute to downtown by auto can exceed over an hour. Sound
Transit operates fixed-route bus service with stops immediately adjacent to the
building. The site is located in a suburban downtown setting with good sidewalk
connectivity and heavy pedestrian volumes, but also wide arterial streets, large blocks, and
heavy traffic. There no bike routes/lanes nearby. Adjacent land uses include a variety of
residential, retail, and employment centers as well as a large regional mall and the
Downtown Park. Apartment residents pay $85 to $110 per month for a parking space.
• Hazard Center, San Diego, CA – is situated on 16-acres and located five miles north of
Downtown San Diego near the intersection of Interstate 8 and State Route 163. All land
uses are situated within a ¼-mile walk to the Hazard Center Light Rail Station, which serves
the San Diego Trolley Green Line light rail service. This station transports riders to
downtown San Diego in about 20 minutes. A bus stop is also situated within ¼ mile of the
site. A variety of uses are within a ½-mile walk of the site including Westfield Mission
Valley Mall, grocers, employers, and restaurants. The San Diego River multi-use pathway
is situated adjacent to this site.
• Avalon, Alpharetta, GA – is a quintessential suburban mixed-use project now found in
many communities across the country. At a considerable size of 79 acres, it features a vast
array of land uses – all of the typical ones found in mixed-use sites plus some other atypical
uses such as single-family residential. It is a food & beverage destination with numerous
bars and restaurants ranging from fast-food, fast casual, high-turnover sit-down, to quality
establishments. Avalon is located directly west of US Highway 19, about 25 miles north of
downtown Atlanta. Adjacent transit is limited to a single local bus route that operates on
30 minute headways. Parking is not priced anywhere within Avalon with the exception of
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 11
the hotel. The site is anchored by Avalon Boulevard, a 1,200-foot long, walkable “Main
Street” flanked by ground-floor retail and stacked residential on both sides. Lower density
residential, office, and parking extends outwardly from the site’s hub, with vehicular access
provided by 10 distinct driveways on two public streets. Adjacent land uses are suburban
or rural in nature.
• Southport, West Sacramento, CA – is a very large (3,000 developed acres), established
community situated directly west of downtown Sacramento. It features a wide array of
land use types (i.e., residential, jobs, shopping, schools, etc.) often found in self-contained
communities. Fixed route bus service is provided on main arterials within the community,
and downtown Sacramento can be reached via a five-mile trip. It is geographically isolated
from adjacent communities by the Sacramento River and shipping channels, allowing for
its trips to be accurately counted via four gateways.
Table 5 displays the land uses present at each validation data site.
Table 5 – Validation Sites Land Uses
Site Single-
Family
Multi-
Family Office General
Retail 1
Sit-Down
Restaurants
Grocery
Store Hotel Other/Note
Safeway / Avalon
Bellevue, WA - 368 du’s - 15 ksf 8 ksf 55 ksf - -
Hazard Center,
San Diego, CA - 120 du’s 256 ksf 111 ksf 23 ksf - 305
rooms
7-screen
movie theater
Avalon
Alpharetta, GA 100 du’s 525 du’s 582 ksf 250 ksf 54 ksf 45 ksf 330
rooms
12-screen
movie theater
Southport, West
Sacramento, CA
6,811
du’s 893 du’s 80 ksf 387 ksf 15 ksf 54 ksf -
Elementary &
High School,
600 ksf
manufacturing
Notes:
1 Includes wide array of uses such as: cleaners, dance studios, bookstore, financial office, salon, learning
center, jewelers, salons, auto detailing, optometry, etc. Banks, gas stations, fast-food restaurants, coffee
shops, and fitness studios were estimated separately (based on their specific uses) but included in this land
use total for reporting purposes.
du’s = dwelling units. ksf = thousand square feet.
Table 6 presents the number of external vehicle trips measured at each validation site in October
2019 versus the estimated number it would generate using MXD+. Footnote 2 in the table
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 12
highlights an interesting phenomenon associated with the Southport validation case study.
Because it is being validation at the gateways to entire community (versus essentially driveways
for the other sites), it is necessary to subtract pass-by trips that would visit the retail uses, as those
trips would not add traffic to the community gateways. Those values are shown in brackets.
Table 6 – Validation Sites Trip Generation Comparison
Site Size
External Vehicle Trip Generation
Daily AM Peak Hour PM Peak Hour
October
2019 Count MXD+ 1 October
2019 Count MXD+ 1 October
2019 Count MXD+ 1
Safeway / Avalon
Bellevue, WA 4 acres 5,505 5,968
(+8%) 239 254
(+6%) 512 497
(- 3%)
Hazard Center
San Diego, CA 16 acres 11,189 12,395
(+11%) 680 696
(+2%) 930 977
(+5%)
Avalon
Alpharetta, GA 79 acres 33,301 33,332
(0%) 1,685 1,894
(+12%) 2,543 2,674
(+5%)
Southport West
Sacramento, CA
3,000
acres 75,191
78,961
[74,138] 2
(-1.4%)
6,484
5,919
[5,672] 2
(-12.5%)
6,192
8,156
[7,480] 2
(+21%)
Notes:
1 Values in parentheses represent the percent increase in trips estimated by MXD+ versus the 2019 field
measurements.
2 Values in brackets represent the MXD+ external vehicle trips minus pass-by trips (see text below for
explanation). The corresponding percentage (shown in parentheses) represents the percent change in
trips estimated by MXD+ (after subtracting pass-by trips) versus the 2019 field measurements.
du’s = dwelling units. ksf = thousand square feet.
The following findings are derived from Table 6:
• For the three smaller sites, MXD+ produces a desirable result in which each validation site’s
external vehicle trips tend to be slightly overestimated. This is preferable to the converse
in which MXD+ consistently underestimates actual trips. Accordingly, the results from
MXD+ can be considered reasonably, but not overly, conservative.
• The goodness of fit at the Avalon validation site was a particularly important outcome, as
the calibration sites were not in that part of the US and also not “manufactured mixed-
use” in an otherwise suburban setting.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 13
• Despite the calibration dataset consisting of a maximum site size of 221 acres and 1,840
units, the model’s estimate was within 1.4% of the actual count for daily conditions. But
AM and PM peak hour validation results did not fare as well. We suspect the AM peak
hour underestimation could be associated with the various schools (i.e., three K-8 public
schools and a public high school) in the community and their district boundaries (i.e., more
students being transported from outside the community to these schools). The PM peak
hour overestimation likely stems from reliance on ITE trip rates for single-family and multi-
family uses, which turned out to be substantially higher than was observed in one
particular neighborhood4. The Southport validation site highlights how use of MXD+ may
be considered for very large projects, but it would be prudent to perform spot checks of
trip rates, understand school district boundaries, etc.
Table 7 displays the internal trip percentage reductions, and external trips made by transit and
walk/bike for each validation site.
Table 7 – Percent Internal Trips and External Non-Auto Trips at Each Validation Site
Site
Percent Reduction in
Daily Trips Due to
Percent Reduction in AM
Peak Hour Trips Due to
Percent Reduction in PM
Peak Hour Trips Due to
Internal
Trips
External Trips
Internal
Trips
External Trips
Internal
Trips
External Trips
Transit Bike/
Walk Transit Bike/
Walk Transit Bike/
Walk
Safeway / Avalon
Bellevue, WA 4.1% 6.4% 29.1% 9.2% 6.7% 35.0% 14.2% 6.5% 28.4%
Hazard Center,
San Diego, CA 4.7% 4.9% 11.6% 10.1% 5.6% 14.3% 14.1% 5.3% 11.6%
Avalon
Alpharetta, GA 5.4% 3.8% 2.3% 9.9% 4.1% 2.9% 12.0% 3.9% 2.3%
Southport, West
Sacramento, CA 26.8% 1.8% 0.3% 39.0% 2.0% 0.3% 23.7% 2.2% 0.2%
4 In one neighborhood consisting a combined 325 single-family and multi-family units,
the measured vehicle trips entering/exiting the neighborhood during the PM peak
hour trip was 51% below the unadjusted ITE trip rates for those uses. When translated
to the 7,700 total units in Southport, this resulted in ITE gross trips beginning at a level
much higher than was being generated.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 14
Notes:
1 Output from MXD+.
The following conclusions are drawn from the results in Table 7:
• It is not surprising that the Bellevue, WA site had a large bike/walk percentage given that
is situated in Downtown Bellevue, where numerous jobs, retail, and recreation are situated
close to the site.
• At the San Diego, CA site, internalization was greatest during the PM peak hour given the
full activation of the various retail offerings and conclusion of the office workday.
• Despite the variety of complementary land uses at the Avalon Alpharetta, GA site, only
modest levels of internalization were estimated. This is due to the amount of office space
(over half a million square feet), which is disproportionately higher than the other uses.
The site’s jobs-housing balance skews heavily toward non-residential. It should also be
noted that about 4% of external trips were assumed to be transit. This would equate to
about 140 riders during the PM peak hour, which seems a bit excessive for the fixed-route
bus service present.5
• At the Southport, CA site, internalization was greatest during the AM peak hour, which is
expected given the effects of travel between home and school (to drop off students or
work). External travel by transit and walk/bike was modest (less than 2.5%) as expected
given that most households are not within walking distance of a bus stop and nearby
destinations cannot easily be accessed on foot or by bike.
Charts 2 and 3 show results for AM and PM peak hours, respectively, of how MXD+ performed
versus the ITE Internalization Method for the Bellevue, WA, San Diego, CA, and Alpharetta, GA
validation sites. The Southport West Sacramento, CA site was excluded for the aforementioned
5 In situations like this, local knowledge of expected transit ridership could dictate that
the analyst modify MXD+ to assume no transit service, with an “off model” approach followed
to determine whether any transit reductions are warranted. The presence of transit is a binary
choice in MXD+. The type of transit, headways, service duration, and geographic service area
are not explicitly considered.
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 15
reasons regarding the effects of pass-by traffic, which equally influence results from MXD+ and
the ITE Internalization Method.
As shown, the MXD+ estimate was closer to the actual count value at all three locations during
the AM peak hour, and at two of the three locations during the PM peak hour. During the AM
peak hour, the average absolute error was 7% for MXD+ and 28% for the ITE Internalization
method. During the PM peak hour, the average absolute error was 4% for MXD+ and 10% for the
ITE Internalization method. This clearly indicates that MXD estimates were more accurate than the
ITE Internalization Method at the validation data sites.
6%
2%
12%
59%
-11%-13%-20%
-10%
0%
10%
20%
30%
40%
50%
60%
70%
Pe
r
c
e
n
t
I
n
c
r
e
a
s
e
/
D
e
c
r
e
a
s
e
Ve
r
s
u
s
A
c
t
u
a
l
C
o
u
n
t
Chart 2: MXD+ Versus ITE Internalization Method
Comparison - AM Peak Hour Conditions
MXD+ Accuracy ITE Internalization Method Accuracy
Safeway / Avalon
Bellevue, WA Avalon
Alpharetta, GA
Hazard Center
San Diego, CA
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 16
Conclusions
This study has demonstrated that a minor recalibration of MXD+ has resulted in an analytical tool
that accurately estimates the trip generation of mixed-use developments for weekday daily, AM
peak hour, and PM peak hour conditions. By focusing the recalibration on 2019 conditions, the
model was proven to develop accurate travel estimates despite the myriad changes in travel
behavior that have occurred since the model was originally developed. The validation of the model
against four mixed-use sites indicates that it may be applied across a wide range of geographies,
project sizes, transportation mode availability, and land use mixes.
-3%
5%5%
13%
3%
-13%-15%
-10%
-5%
0%
5%
10%
15%
Pe
r
c
e
n
t
I
n
c
r
e
a
s
e
/
D
e
c
r
e
a
s
e
Ve
r
s
u
s
A
c
t
u
a
l
C
o
u
n
t
Chart 3: MXD+ Versus ITE Internalization Method
Comparison - PM Peak Hour Conditions
MXD+ Accuracy ITE Internalization Method Accuracy
Safeway / Avalon
Bellevue, WA
Hazard Center
San Diego, CA
Avalon
Alpharetta, GA
Mixed-Use Trip Generation (MXD+) Model
Recalibration and Validation to 2019 Conditions
July 13, 2020
Page 17
Paper Contributors
John Gard, T.E., is a Principal with 25 years of consulting experience at Fehr & Peers. John has
applied MXD+ on numerous projects across the Western United States. He has a Bachelor’s
degree in Applied Mathematics and a Master’s Degree in Civil Engineering from U.C. Davis. He
can be reached at j.gard@fehrandpeers.com.
Corwin Bell is a Transportation Planner at Fehr & Peers with a background in consulting and
academic research. He has a Bachelor’s Degree in Urban Studies and a Master’s Degree in City
Planning from U.C. Berkeley. He can be reached at c.bell@fehrandpeers.com.
References
Walters, Jerry, Bochner, Brian, and Ewing, Reid. 2013. Getting Trip Generation Right: Eliminating
the Bias Against Mixed-Use Development (American Planning Association, 2013 PAS Memo.
Bochner, Brian, Hooper, Kevin, Sperry, Benjamin, and Dunphy, Robert, 2011. NCHRP Report 684:
Enhancing Internal Trip Capture Estimation for Mixed-Use Developments. Washington, DC:
National Cooperative Highway Research Program, Transportation Research Board.
Institute of Transportation Engineers, 2017 Trip Generation Manual, 10th Edition.
Institute of Transportation Engineers, 2017 Trip Generation Handbook.
P
Appendix E:
Pass-by Volumes
Land Use Code
Land Use
Setting
Time Period
# Data Sites
Average Pass-By Rate
GLA (000)Primary (%)Diverted (%)Total (%)Source
45 Florida 1992 844 56 24 20 44 —30
50 Florida 1992 555 41 41 18 59 —30
52 Florida 1995 665 42 33 25 58 —30
53 Florida 1993 162 59 ——41 —30
57.23 Kentucky 1993 247 31 53 16 69 2659 34
60 Florida 1995 1583 40 38 22 60 —30
69.4 Kentucky 1993 109 25 42 33 75 1559 34
77 Florida 1992 365 46 ——54 —30
78 Florida 1991 702 55 23 22 45 —30
82 Florida 1992 336 34 ——66 —30
92.857 Kentucky 1993 133 22 50 28 78 3555 34
100.888 Kentucky 1993 281 28 50 22 72 2111 34
121.54 Kentucky 1993 210 53 30 17 47 2636 34
144 New Jersey 1990 176 32 44 24 68 —24
146.8 Kentucky 1993 —36 39 25 64 —34
General Urban/Suburban
Vehicle Pass-By Rates by Land Use
Source: ITE Trip Generation Manual , 11th Edition
821
Shopping Plaza (40 - 150k)
Weekday PM Peak Period
15
40%
Pass-By Characteristics for Individual Sites
State or Province
Survey
Year # Interviews
Pass-By
Trip (%)
Non-Pass-By Trips Adj Street Peak
Hour Volume
Orchards
Pass By Trip Calculation
9/16/25
Copied from Orchards_TripGen_11-12-2024:Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 San Ramon Valley Boulevard Bollinger Canyon Road 176 315 493 174 256 9 17 510 250 407 318 275 110 290 419 234 333 15 23 449 154 657 596 334 Prevailing traffic volumes on Bollinger2I-680 SB Ramps Bollinger Canyon Road 17 606 12 238 1164 13 762 1 40 752 20 633 1093 9 953 AM PM SA3I-680 NB Ramps Bollinger Canyon Road 288 961 1053 1263 721 351 732 1381 1672 443
4 Sunset Drive Shops Driveway 228 229 65 4 10 3 21 55 46 28 56 30 55 27 131 25 192 29 4 95 208 73 103 9 49%44%39%5 Sunset Drive Bishop Drive 167 479 102 10 65 9 12 3 99 45 14 31 283 150 191 33 397 43 24 16 324 148 22 39 51%56%61%6 Chevron Drive-Sunset Drive Bollinger Canyon Road 50 159 660 1354 1825 88 212 657 479 1634 1458 145
7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 23 15 3 133 22 125 348 955 101 28 1765 372 94 29 24 440 6 457 119 1701 26 1 1052 2848I-680 SB On-Ramp Bollinger Canyon Road 1416 371 762 789 1582 303 953 10709I-680 NB On-Ramp Bollinger Canyon Road 1053 363 1551 1381 201 2023
Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR1San Ramon Valley Boulevard Bollinger Canyon Road2I-680 SB Ramps Bollinger Canyon Road3I-680 NB Ramps Bollinger Canyon Road4Sunset Drive Shops Driveway5Sunset Drive Bishop Drive
6 Chevron Drive-Sunset Drive Bollinger Canyon Road 48%18%34%5%-5%-16%-33%49%46%-44%-2%46%14%40%-5%19%-14%-10%-36%46%35%-32%-3%7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 51%19%29%7%-7%-9%-26%35%58%-48%-10%37%10%53%-11%22%-11%-3%-42%45%33%-26%-7%8 I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road
Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR1San Ramon Valley Boulevard Bollinger Canyon Road2I-680 SB Ramps Bollinger Canyon Road3I-680 NB Ramps Bollinger Canyon Road4Sunset Drive Shops Driveway5Sunset Drive Bishop Drive6Chevron Drive-Sunset Drive Bollinger Canyon Road 8 3 6 1 -1 -6 -12 18 10 -9 -1 49 15 42 -5 19 -14 -15 -52 67 28 -26 -2
7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 5 2 3 1 -1 0 -1 1 12 -10 -2 26 7 37 -7 14 -7 0 -7 7 27 -21 -68I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road
Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR1San Ramon Valley Boulevard Bollinger Canyon Road -2 92I-680 SB Ramps Bollinger Canyon Road -2 9
3 I-680 NB Ramps Bollinger Canyon Road -2 94Sunset Drive Shops Driveway -4 -25Sunset Drive Bishop Drive -4 -2
6 Chevron Drive-Sunset Drive Bollinger Canyon Road7Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road -6 -158I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road
Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR1San Ramon Valley Boulevard Bollinger Canyon Road -6 -2
2 I-680 SB Ramps Bollinger Canyon Road -6 -23I-680 NB Ramps Bollinger Canyon Road -6 -24Sunset Drive Shops Driveway5Sunset Drive Bishop Drive6Chevron Drive-Sunset Drive Bollinger Canyon Road -6 -27Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road8I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road
Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 San Ramon Valley Boulevard Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 02I-680 SB Ramps Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 03I-680 NB Ramps Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 0
4 Sunset Drive Shops Driveway 0 -4 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 0 0 0 0 0 0 0 05Sunset Drive Bishop Drive 0 -4 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 0 0 0 0 0 0 0 06Chevron Drive-Sunset Drive Bollinger Canyon Road 8 3 6 0 1 -1 -6 -12 18 10 -15 -1 49 15 42 -5 19 -14 -15 -52 67 28 -28 -2
7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 5 2 3 0 1 -1 0 -7 1 12 -10 -2 26 7 37 -7 14 -7 0 -22 7 27 -21 -68I-680 SB On-Ramp Bollinger Canyon Road9I-680 NB On-Ramp Bollinger Canyon Road
Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR Project trip assignment for retail - Inbound Trips1San Ramon Valley Boulevard Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 0
2 I-680 SB Ramps Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 03I-680 NB Ramps Bollinger Canyon Road 0 0 0 0 0 0 0 0 0 0 -8 0 0 0 0 0 0 0 0 0 0 0 7 0 Int 1 Int 24Sunset Drive Shops Driveway 0 -4 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 0 0 0 0 0 0 0 0 50%50%5 Sunset Drive Bishop Drive 0 -4 0 0 0 0 0 0 0 0 0 0 0 -2 0 0 0 0 0 0 0 0 0 0
6 Chevron Drive-Sunset Drive Bollinger Canyon Road 8 3 6 0 1 -1 -6 -12 18 10 -15 -1 49 15 42 -5 19 -14 -15 -52 67 28 -28 -27Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 5 2 3 0 1 -1 0 -7 1 12 -10 -2 26 7 37 -7 14 -7 0 -22 7 27 -21 -68I-680 SB On-Ramp Bollinger Canyon Road -8 79I-680 NB On-Ramp Bollinger Canyon Road -8 7 Int 1 Int 2Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 90%10%1 San Ramon Valley Boulevard Bollinger Canyon Road 0 0 4 6 0 0 0 21 0 8 42 8 0 0 10 12 0 0 0 49 0 8 39 122I-680 SB Ramps Bollinger Canyon Road 0 0 0 126 0 0 0 32 0 0 58 0 0 0 0 263 0 0 0 71 0 0 59 03I-680 NB Ramps Bollinger Canyon Road 0 0 101 0 0 0 0 157 0 0 286 212 0 0 240 0 0 0 0 334 0 0 242 228
4 Sunset Drive Shops Driveway 23 24 0 0 8 0 0 0 8 0 0 0 15 16 0 0 19 0 0 0 17 0 0 05Sunset Drive Bishop Drive 0 47 0 0 16 0 0 0 0 0 0 0 0 31 0 0 36 0 0 0 0 0 0 0 Project trip assignment for retail - Outbound Trips6Chevron Drive-Sunset Drive Bollinger Canyon Road 376 47 87 0 16 0 0 53 205 54 122 0 408 31 44 0 36 0 0 125 449 120 62 0
7 Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 122 78 120 0 47 0 0 87 53 55 54 0 62 87 153 0 103 0 0 44 125 119 120 08I-680 SB On-Ramp Bollinger Canyon Road 0 0 0 0 0 0 0 157 0 0 58 228 0 0 0 0 0 0 0 334 0 0 59 1839I-680 NB On-Ramp Bollinger Canyon Road 0 0 0 0 0 0 0 157 0 0 286 0 0 0 0 0 0 0 0 334 0 0 242 0 Int 1 Int 2Study Int #N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 60%40%1 San Ramon Valley Boulevard Bollinger Canyon Road 176 315 497 180 256 9 17 531 250 415 360 283 110 290 429 246 333 15 23 498 154 665 635 3462I-680 SB Ramps Bollinger Canyon Road 0 0 17 732 12 238 0 1196 13 0 820 0 1 0 40 1015 20 633 0 1164 9 0 1012 0
3 I-680 NB Ramps Bollinger Canyon Road 288 0 1062 0 0 0 0 1210 0 0 1549 933 351 0 972 0 0 0 0 1715 0 0 1914 6714Sunset Drive Shops Driveway 251 253 65 4 18 3 21 55 54 28 56 30 70 43 131 25 211 29 4 95 225 73 103 95Sunset Drive Bishop Drive 167 526 102 10 81 9 12 3 99 45 14 31 283 181 191 33 433 43 24 16 324 148 22 39
6 Chevron Drive-Sunset Drive Bollinger Canyon Road 376 47 87 50 16 159 660 1407 205 54 1947 88 408 31 44 212 36 657 479 1759 449 120 1520 1457Camino Ramon-Bishop Ranch 1 Bollinger Canyon Road 145 93 123 133 69 125 348 1042 154 83 1819 372 156 116 177 440 109 457 119 1745 151 120 1172 2848I-680 SB On-Ramp Bollinger Canyon Road 0 0 0 0 0 0 0 1573 371 0 820 1017 0 0 0 0 0 0 0 1916 303 0 1012 1253
9 I-680 NB On-Ramp Bollinger Canyon Road 0 0 0 0 0 0 0 1210 363 0 1837 0 0 0 0 0 0 0 0 1715 201 0 2265 0
Pass-by trips In 43 In 162Out27Out176
A. Existing Volumes AM Peak PM Peak
Existing Plus Project Plus Pass-by Volumes AM Peak PM Peak
C. Final Pass-By Volumes with Network Balancing AM Peak PM Peak
C.1 Pass-By Trip Volume Network Balance (Int 6)AM Peak PM Peak
G. Primary Trip Volume Adjustment (Done with Vistro)AM Peak PM Peak
Referenced Pass By Trips AM Peak PM Peak
B. Pass By Pattern AM Peak PM Peak
C. Pass-By Trip Volume Adjustment AM Peak PM Peak
C.2 Pass-By Trip Volume Network Balance (Int 7)AM Peak PM Peak
P
Appendix F: Trip
Distribution
Bishop Ranch Orchards Trip Distribution | 1
Memo
Date: June 16, 2025
To: Stephanie Hill, Senior VP of Development, Bishop Ranch
From: Andy Kosinski, PE and Ashlee Takushi, RSP1, Fehr & Peers
Subject: Bishop Ranch Orchards Trip Distribution Analysis
This Technical Memorandum presents the trip distribution analysis and assumptions for the Orchards
Mixed-Use Development (“Project”) at 6001 Bollinger Canyon Road in San Ramon, California. The
Project proposes a mix of single-family housing, multi-family housing, and retail uses to replace a
corporate headquarters campus.
Project Description
The Project includes construction of 230 single-family detached residences, 138 single-family
attached residences, 58 accessory dwelling units (ADU), 2,084-units of multi-family housing units,
and 125,000 square feet of retail.
Methodology
Select zone analysis was performed using the Contra Costa Transportation Authority (CCTA) travel
model to assess the impact and distribution of Project trips on the surrounding area by isolating the
trips that begin and end at the traffic analysis zone (TAZ) where the Project is to be located. As the
project is a mix of residential and retail uses, the trip distribution of employees and residents were
calculated separately.
Employment Trip Distribution
The employment component of the Project is 125,000 square feet of retail. For this analysis, a
representative zone north of the actual project TAZ was selected, TAZ 40108, which falls on the north
side of Bollinger Canyon Road, instead of TAZ 40109. TAZ 40108 was used for this analysis to be
consistent with the employment trips vehicle-miles-travelled (VMT) analysis, in which it was the
superior choice of TAZ, as it had an employed residents-to-workers ratio more aligned with the City
average, resulting in more reasonable VMT results. This analysis was also conducted using TAZ
40109, with negligible effect, as both TAZs have only retail as their only land use (as the model can
only return link volumes for all employment in aggregate for a selected TAZ). Figure 1 and Figure 2
Bishop Ranch Orchards Trip Distribution | 2
present the link volumes representing automobile trips generated by the selected zone for the retail
component of the project. The resulting trip distribution is summarized in Table 1.
Residential Trip Distribution
The residential component of the Project is 230 single-family detached residences, 138 single-family
attached residences, 58 accessory dwelling units (ADU), and 2,084-units of multi-family housing
units. For this analysis, the actual project TAZ of 40109 was selected. Figure 3 and Figure 4 present
the link volumes representing automobile trips generated by the selected zone for the residential
component of the project. The resulting trip distribution is summarized in Table 2.
Bishop Ranch Orchards Trip Distribution | 3
Figure 1. AM Automobile Trips Generated by TAZ 40108 from Select Zone Analysis for
Model “Interim Year 2024” Baseline Plus Retail Component of Project
Source: CCTA Travel Demand Model, Fehr & Peers, 2025.
40108
Representative Zone
Internal Trips
1
2
3
4
5
Camino
Ramon
Alcosta
Boulevard
40108
Bishop Ranch Orchards Trip Distribution | 4
Figure 2. PM Automobile Trips Generated by TAZ 40108 from Select Zone Analysis for
Model “Interim Year 2024” Baseline Plus Retail Component of Project
Source: CCTA Travel Demand Model, Fehr & Peers, 2025.
Representative Zone
Internal Trips
1
2
3
4
5
Camino
Ramon
Alcosta
Boulevard
Bishop Ranch Orchards Trip Distribution | 5
Table 1. Employment Trip Distribution
Gate Model Segment
Names
AM
Volume
AM Volume
Distribution
PM
Volume
PM Volume
Distribution
Unrounded
Average
Distribution
Rounded Average
Distribution
Proposed Trip
Distribution
1
I-680 North1 127 28% 125 25% 28% 30%
30% San Ramon
Valley Blvd
North
2 0% 2 0% 0% 0%
2 Bollinger
Canyon West 17 4% 19 4% 4% 5% 5%
3
San Ramon
Valley Blvd
South
22 5% 30 6% 6% 5% 25%
I-680 South 102 22% 85 17% 20% 20%
4 Bollinger
Canyon East2 121 26% 147 30% 29% 30% 25%
5
Sunset Drive 0 0% 0 0% 0% 0%
15% Bishop Drive
West 12 3% 22 4% 4% 5%
Camino Ramon 37 8% 45 9% 9% 10%
Total of Gates 1-5 439 96% 473 96% 100% 105% 100%
Internal Trips3 17 4% 22 4%
Total Trips 457 100% 495 100%
Notes:
1. Many residential areas that may serve as the labor pool for this area lie to the north, such as Central Contra Costa County and Lamorinda; thus, the
proposed trip distribution to Gate 1 is greater than Gate 3.
2. The model may be overstating the access to workers who live to/from the east via local roads, such as Gate 4, rather than the freeway, so the proposed
trip distribution for Gate 4 is slightly reduced.
3. The internal trips refer to Project trips that travel across Bollinger Canyon Road to the other side of the street, so they have not been included in the trip
distribution for simplicity.
Source: Fehr & Peers, 2025.
Bishop Ranch Orchards Trip Distribution | 8
Figure 3. PM Automobile Trips Generated by TAZ 40109 from Select Zone Analysis for
Model “Interim Year 2024” Baseline Plus Residential Component of Project
Source: CCTA Travel Demand Model, Fehr & Peers, 2025.
1
2
3
4
5
Camino
Ramon
Alcosta
Boulevard
Project TAZ
Bishop Ranch Orchards Trip Distribution | 9
Figure 4. PM Automobile Trips Generated by TAZ 40109 from Select Zone Analysis for
Model “Interim Year 2024” Baseline Plus Residential Component of Project
Source: CCTA Travel Demand Model, Fehr & Peers, 2025.
1
2
3
4
5
Camino
Ramon
Alcosta
Boulevard
Project TAZ
Bishop Ranch Orchards Trip Distribution | 8
Table 2. Residential Trip Distribution
Gate Model Segment
Names AM Volume AM Volume
Distribution PM Volume PM Volume
Distribution
Unrounded
Average
Distribution
Rounded
Average
Distribution
Proposed Trip
Distribution
1
I-680 North1 273 20% 260 18% 19% 20%
25% San Ramon Valley
Blvd North 5 0% 4 0% 0% 0%
2 Bollinger Canyon
West 35 3% 38 3% 3% 5% 5%
3
San Ramon Valley
Blvd South2 142 11% 133 9% 10% 10% 30%
I-680 South 315 23% 287 20% 22% 20%
4 Bollinger Canyon
East3 375 28% 452 32% 30% 30% 25%
5
Sunset Drive4 35 3% 39 3% 3% 5%
15% Bishop Drive West 38 3% 52 4% 3% 5%
Camino Ramon 122 9% 144 10% 10% 10%
Total of Gates
1-5 1341 100% 1410 100% 100% 105% 100%
Notes:
1. The model may be understating the longer distance to and from the north using Gate 1, while overstating the local trips using Gate 5; therefore, the
percentage using Gate 1 was slightly increased.
2. Much of the employment in the region lies to the south, in the Tri-Valley and Silicon Valley area. Trips travelling to job centers like San Francisco and
Oakland would primarily use Gates 1 and 3; thus, the proposed trip distribution to Gate 3 is greater than Gate 1.
3. Job opportunities to the east are highly accessible using the freeway, so the model may overstate volumes using local roads such as Gate 4. The
proposed trip distribution for Gate 4 is slightly reduced.
4. The model may be overstating longer distance trips to and from the north that are using the local roads of Gate 5, when freeway accessibility via Gate 1
is high for many. The proposed trip distribution for Gate 5 is slightly reduced.
Source: Fehr & Peers, 2025.
P
Appendix G:
Cumulative
Volumes
Use Cube or TransCAD?TransCAD TransCAD
Intersection ID East/West North/South LinkIDs AB Direction. 1 = towards int
1. Bollinger Canyon Rd / San Ramon Valley Blvd 1 Bollinger Canyon Rd San Ramon Valley Blvd 29063 0
29061 44970 0 1
42185 1
2. Bollinger Canyon Rd / I-680 SB Off-Ramps 2 Bollinger Canyon Rd I-680 SB Off-Ramps 103230 1
3510 3507 0 0
104108 0
3. Bollinger Canyon Rd / I-680 NB Off-Ramps 3 Bollinger Canyon Rd I-680 NB Off-Ramps 43513 0
43506 43512 1 0
103228 1
4. Shops Driveway / Sunset Dr 4 Shops Driveway Sunset Dr
5. Bishop Dr / Sunset Dr 5 Bishop Dr Sunset Dr
6. Bollinger Canyon Rd / Chevon Driveway-Sunset Dr 6 Bollinger Canyon Rd Chevon Driveway-Sunset Dr 42183 1
34384 42182 0 0
42184 1
7. Bollinger Canyon Rd / BR1-Camino Ramon 7 Bollinger Canyon Rd BR1-Camino Ramon 42180 0
34388 3562 1 0
84117 1
8. Bollinger Canyon Rd / I-680 SB On-Ramp 8 Bollinger Canyon Rd I-680 SB On-Ramp 104107 0
3507 43509 1 0
9. Bollinger Canyon Rd / I-680 NB On-Ramp 9 Bollinger Canyon Rd I-680 NB On-Ramp
43509 43506 1 0
104109 0
Orchards
Furness Setup_AM1Hr 9/16/25
Lookup Int. ID Description NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR ID NB SB EB WB NB SB EB WB TOTAL100111. Bollinger Canyon Rd / San Ramon Valley Blvd 176 315 493 174 256 9 17 510 250 407 318 275 1 984 439 777 1,000 607 913 1,177 503 3,200100222. Bollinger Canyon Rd / I-680 SB Off-Ramps 0 0 17 606 12 238 0 1,164 13 0 762 0 2 17 856 1,177 762 0 25 1,787 1,000 2,812100333. Bollinger Canyon Rd / I-680 NB Off-Ramps 288 0 961 0 0 0 0 1,053 0 0 1,263 721 3 1,249 0 1,053 1,984 721 0 2,014 1,551 4,286100444. Shops Driveway / Sunset Dr 228 229 65 4 10 3 21 55 46 28 56 30 4 522 17 122 114 280 84 124 287 775100555. Bishop Dr / Sunset Dr 167 479 102 10 65 9 12 3 99 45 14 31 5 748 84 114 90 522 209 115 190 1,036100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 0 0 0 50 0 159 660 1,354 0 0 1,825 88 6 0 209 2,014 1,913 748 0 1,404 1,984 4,136100777. Bollinger Canyon Rd / BR1-Camino Ramon 23 15 3 133 22 125 348 955 101 28 1,765 372 7 41 280 1,404 2,165 735 151 1,091 1,913 3,890100888. Bollinger Canyon Rd / I-680 SB On-Ramp 0 0 0 0 0 0 0 1,416 371 0 762 789 8 0 0 1,787 1,551 789 371 1,416 762 3,338100999. Bollinger Canyon Rd / I-680 NB On-Ramp 0 0 0 0 0 0 0 1,053 363 0 1,551 0 9 0 0 1,416 1,551 0 363 1,053 1,551 2,967
Initial Turning Movement Volumes Initial Entering Initial Exiting
Orchards
Furness Setup_AM1Hr 9/16/25
Lookup Int. ID Description100111. Bollinger Canyon Rd / San Ramon Valley Blvd100222. Bollinger Canyon Rd / I-680 SB Off-Ramps100333. Bollinger Canyon Rd / I-680 NB Off-Ramps100444. Shops Driveway / Sunset Dr100555. Bishop Dr / Sunset Dr100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 1007 7 7. Bollinger Canyon Rd / BR1-Camino Ramon100888. Bollinger Canyon Rd / I-680 SB On-Ramp100999. Bollinger Canyon Rd / I-680 NB On-Ramp
Difference Method Approach/Departure
ID NB SB EB WB NB SB EB WB Check11,533 804 887 1,094 962 1,408 1,403 545 3,2002179981,403 787 0 81 2,031 1,094 2,81231,263 0 1,217 1,667 380 0 2,190 1,576 4,2864#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A5#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A631981,697 1,603 737 40 1,550 2,160 5,1237544941,550 1,945 959 194 1,307 1,603 3,9108#N/A 0 2,031 1,576 789 #N/A 1,660 787 #N/A90#N/A 1,660 1,576 #N/A 443 1,217 1,576 #N/A
Entering Exiting
Orchards
Furness Setup_AM1Hr 9/16/25
Lookup Int. ID Description100111. Bollinger Canyon Rd / San Ramon Valley Blvd100222. Bollinger Canyon Rd / I-680 SB Off-Ramps100333. Bollinger Canyon Rd / I-680 NB Off-Ramps100444. Shops Driveway / Sunset Dr100555. Bishop Dr / Sunset Dr100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 1007 7 7. Bollinger Canyon Rd / BR1-Camino Ramon100888. Bollinger Canyon Rd / I-680 SB On-Ramp100999. Bollinger Canyon Rd / I-680 NB On-Ramp
TransCAD - Base Year TransCAD - Future Year
ID NB SB EB WB NB SB EB WB Check ID NB SB EB WB NB SB EB WB Check18442358019742551,214 1,018 367 0 1 1,393 601 911 1,068 610 1,710 1,244 409 0201,200 1,018 385 0 215 1,414 974 0 2 0 1,343 1,244 410 0 271 1,658 1,068 031,485 0 995 2,152 1,604 0 2,330 698 0 3 1,500 0 1,159 1,834 1,264 0 2,505 724 04#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 4 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A5#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 5 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A656752,152 2,141 260 293 1,897 2,330 356 6 58 64 1,834 1,832 249 333 2,043 2,505 1,3437681,509 1,897 2,629 336 159 1,120 2,141 -2,346 7 81 1,723 2,043 2,409 560 202 1,336 1,832 -2,3268#N/A 0 1,414 698 313 #N/A 1,414 385 #N/A 8 #N/A 0 1,658 724 313 #N/A 1,658 410 #N/A90#N/A 1,414 698 #N/A 419 995 698 #N/A 9 0 #N/A 1,658 724 #N/A 499 1,159 724 #N/A
Entering Exiting Entering Exiting
Orchards
Furness Setup_PM1Hr 9/16/25
Lookup Int. ID Description NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR ID NB SB EB WB NB SB EB WB TOTAL100111. Bollinger Canyon Rd / San Ramon Valley Blvd 110 290 419 234 333 15 23 449 154 657 596 334 1 819 582 626 1,587 647 1,144 1,102 721 3,614100222. Bollinger Canyon Rd / I-680 SB Off-Ramps 1 0 40 752 20 633 0 1,093 9 0 953 0 2 41 1,405 1,102 953 0 29 1,885 1,587 3,501100333. Bollinger Canyon Rd / I-680 NB Off-Ramps 351 0 732 0 0 0 0 1,381 0 0 1,672 443 3 1,083 0 1,381 2,115 443 0 2,113 2,023 4,579100444. Shops Driveway / Sunset Dr 55 27 131 25 192 29 4 95 208 73 103 9 4 213 246 307 185 40 473 251 187 951100555. Bishop Dr / Sunset Dr 283 150 191 33 397 43 24 16 324 148 22 39 5 624 473 364 209 213 869 240 348 1,670100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 0 0 0 212 0 657 479 1,634 0 0 1,458 145 6 0 869 2,113 1,603 624 0 1,846 2,115 4,585100777. Bollinger Canyon Rd / BR1-Camino Ramon 94 29 24 440 6 457 119 1,701 26 1 1,052 284 7 147 903 1,846 1,337 432 33 2,165 1,603 4,233100888. Bollinger Canyon Rd / I-680 SB On-Ramp 0 0 0 0 0 0 0 1,582 303 0 953 1,070 8 0 0 1,885 2,023 1,070 303 1,582 953 3,908100999. Bollinger Canyon Rd / I-680 NB On-Ramp 0 0 0 0 0 0 0 1,381 201 0 2,023 0 9 0 0 1,582 2,023 0 201 1,381 2,023 3,605
Initial Turning Movement Volumes Initial Entering Initial Exiting
Orchards
Furness Setup_PM1Hr 9/16/25
Lookup Int. ID Description100111. Bollinger Canyon Rd / San Ramon Valley Blvd100222. Bollinger Canyon Rd / I-680 SB Off-Ramps100333. Bollinger Canyon Rd / I-680 NB Off-Ramps100444. Shops Driveway / Sunset Dr100555. Bishop Dr / Sunset Dr100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 1007 7 7. Bollinger Canyon Rd / BR1-Camino Ramon100888. Bollinger Canyon Rd / I-680 SB On-Ramp100999. Bollinger Canyon Rd / I-680 NB On-Ramp
Difference Method Approach/Departure
ID NB SB EB WB NB SB EB WB Check11,676 1,150 664 1,704 953 2,123 1,222 896 3,6142411,300 1,222 939 0 -132 1,930 1,704 3,50131,059 0 1,551 1,995 667 0 1,982 1,956 4,5794#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A5#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A6318591,993 1,459 613 8 1,714 1,984 4,56371891,307 1,714 1,327 684 53 2,035 1,459 3,9278#N/A 0 1,930 1,956 1,017 #N/A 1,627 939 #N/A90#N/A 1,627 1,956 #N/A 76 1,551 1,956 #N/A
Entering Exiting
Orchards
Furness Setup_PM1Hr 9/16/25
Lookup Int. ID Description100111. Bollinger Canyon Rd / San Ramon Valley Blvd100222. Bollinger Canyon Rd / I-680 SB Off-Ramps100333. Bollinger Canyon Rd / I-680 NB Off-Ramps100444. Shops Driveway / Sunset Dr100555. Bishop Dr / Sunset Dr100666. Bollinger Canyon Rd / Chevon Driveway-Sunset 1007 7 7. Bollinger Canyon Rd / BR1-Camino Ramon100888. Bollinger Canyon Rd / I-680 SB On-Ramp100999. Bollinger Canyon Rd / I-680 NB On-Ramp
TransCAD - Base Year TransCAD - Future Year
ID NB SB EB WB NB SB EB WB Check ID NB SB EB WB NB SB EB WB Check19191974431,175 385 871 764 714 0 1 1,776 766 481 1,291 691 1,850 884 889 0201,776 764 680 0 235 1,810 1,175 0 2 0 1,670 884 666 0 74 1,855 1,291 0365401,671 2,041 755 0 2,006 1,606 0 3 630 0 1,841 1,921 978 0 1,874 1,539 04#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 4 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A5#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 5 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A62222202,041 1,737 106 83 1,954 2,006 -72 6 253 209 1,921 1,593 96 91 1,821 1,874 -9471765211,954 1,423 1,190 110 2,375 1,737 1,339 7 218 925 1,821 1,412 1,442 130 2,245 1,593 1,0348#N/A 0 1,810 1,606 926 #N/A 1,810 680 #N/A 8 #N/A 0 1,855 1,539 874 #N/A 1,855 666 #N/A90#N/A 1,810 1,606 #N/A 139 1,671 1,606 #N/A 9 0 #N/A 1,855 1,539 #N/A 14 1,841 1,539 #N/A
Entering Exiting Entering Exiting
Comparing existing counts with raw Furness volumes and balanced Furness volumes
Existing AM Existing PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614
2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501
3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579
4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951
5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670
6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585
7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233
8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908
9 1053 363 1551 2,967 9 1381 201 2023 3,605
26,440 30,646
Cumulative Raw AM (from Furness)Cumulative Raw PM (from Furness)
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 260 620 670 250 550 20 30 510 370 500 320 330 4,430 1 330 690 670 240 900 30 30 450 320 920 600 340 5,520
2 0 0 20 660 40 310 0 1360 50 0 790 0 3,230 2 10 0 50 760 20 730 0 1270 10 0 980 0 3,830
3 300 0 970 0 0 0 0 1220 0 0 1290 730 4,510 3 610 0 740 0 0 0 0 1530 0 0 1680 670 5,230
4 230 230 70 10 10 10 30 60 50 30 60 30 820 4 60 30 140 30 200 30 10 100 210 80 110 10 1,010
5 170 480 110 10 70 10 20 10 100 50 20 40 1,090 5 290 150 200 40 400 50 30 20 330 150 30 40 1,730
6 0 0 0 60 0 200 660 1500 0 0 1970 90 4,480 6 0 0 0 220 0 660 480 1640 0 0 1460 150 4,610
7 30 30 10 280 50 180 430 1030 120 40 1770 510 4,480 7 100 60 30 630 20 580 180 1710 40 10 1060 450 4,870
8 0 0 0 0 0 0 0 1660 380 0 790 790 3,620 8 0 0 0 0 0 0 0 1630 310 0 960 1070 3,970
9 0 0 0 0 0 0 0 1220 450 0 1580 0 3,250 9 0 0 0 0 0 0 0 1560 210 0 2030 0 3,800
29,910 34,570
Cumulative Balanced AM Cumulative Balanced PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 260 620 670 250 550 20 30 510 370 500 320 330 4,430 1 330 690 670 240 900 30 30 450 320 920 600 340 5,520
2 20 660 40 310 1380 50 840 3,300 2 10 50 760 20 750 1350 10 1100 4,050
3 300 970 1220 1390 780 4,660 3 620 740 1610 1690 670 5,330
4 230 240 70 10 10 10 30 60 60 30 60 30 840 4 60 30 140 30 210 30 10 100 210 80 110 10 1,020
5 170 480 110 10 80 10 20 10 120 60 20 40 1,130 5 310 160 220 40 410 50 30 20 340 160 30 40 1,810
6 60 200 670 1520 1970 90 4,510 6 220 690 530 1820 1670 160 5,090
7 30 30 10 280 50 190 430 1030 120 40 1840 510 4,560 7 100 60 30 630 20 620 190 1810 40 10 1110 450 5,070
8 1670 390 840 850 3,750 8 1820 340 1100 1210 4,470
9 1220 450 1690 3,360 9 1610 210 2310 4,130
30,540 36,490
Percent Growth (Existing -> Cumulative Adj) AM Percent Growth (Existing -> Cumulative Adj) PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 3.0%6.1%2.2%2.7%7.2%7.6%4.8%0.0%3.0%1.4%0.0%1.3%2.4%1 12.5%8.6%3.7%0.2%10.6%6.3%1.9%0.0%6.7%2.5%0.0%0.1%3.3%
2 1.1%0.6%14.6%1.9%1.2%17.8%0.6%1.1%2 56.3%1.6%0.1%0.0%1.2%1.5%0.7%1.0%1.0%
3 0.3%0.1%1.0%0.6%0.5%0.5%3 4.8%0.1%1.0%0.1%3.2%1.0%
4 0.1%0.3%0.5%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.5%4 0.6%0.7%0.4%1.3%0.6%0.2%9.4%0.3%0.1%0.6%0.4%0.7%0.5%
5 0.1%0.0%0.5%0.0%1.4%0.7%4.2%14.6%1.3%2.1%2.7%1.8%0.6%5 0.6%0.4%0.9%1.3%0.2%1.0%1.6%1.6%0.3%0.5%2.3%0.2%0.5%
6 1.3%1.6%0.1%0.8%0.5%0.1%0.6%6 0.2%0.3%0.7%0.7%0.9%0.6%0.7%
7 1.9%6.3%14.6%6.9%8.0%3.3%1.5%0.5%1.2%2.7%0.3%2.3%1.1%7 0.4%6.7%1.6%2.7%14.6%2.2%3.7%0.4%3.4%56.3%0.3%3.7%1.2%
8 1.1%0.3%0.6%0.5%0.8%8 0.9%0.8%1.0%0.8%0.9%
9 1.0%1.5%0.6%0.8%9 1.0%0.3%0.9%0.9%
1.0%1.2%
Orchards
Cumulative Volume Development
9/16/25
Shifting growth for certain (possible cut-through) movements to use freeway instead
Existing AM Existing PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614
2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501
3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579
4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951
5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670
6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585
7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233
8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908
9 1053 363 1551 2,967 9 1381 201 2023 3,605
26,440 30,646
Cumulative Adjustments AM Cumulative Adjustments PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 260 620 670 250 550 20 30 510 370 500 320 330 4,430 1 330 690 670 240 900 30 30 450 320 920 600 340 5,520
2 20 660 40 310 1380 50 840 3,300 2 10 50 760 20 750 1350 10 1100 4,050
3 300 970 1220 1390 780 4,660 3 620 740 1610 1690 670 5,330
4 230 240 70 10 10 10 30 60 60 30 60 30 840 4 60 30 140 30 210 30 10 100 210 80 110 10 1,020
5 170 480 110 10 80 10 20 10 120 60 20 40 1,130 5 310 160 220 40 410 50 30 20 340 160 30 40 1,810
6 60 200 670 1520 1970 90 4,510 6 220 690 530 1820 1670 160 5,090
7 30 30 10 280 50 190 430 1030 120 40 1840 510 4,560 7 100 60 30 630 20 620 190 1810 40 10 1110 450 5,070
8 1670 390 840 850 3,750 8 1820 340 1100 1210 4,470
9 1220 450 1690 3,360 9 1610 210 2310 4,130
30,540 36,490
Cumulative AM Shift Cumulative PM Shift
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 -60 -220 -130 -60 -210 -10 -10 -90 -70 -40 -900 1 -160 -280 -180 0 -400 0 0 -120 -190 0 -1,330
2 -20 -30 -50 2 0 0 0
3 0 3 0
4 0 4 0
5 0 5 0
6 0 6 0
7 -110 -50 -60 -100 -320 7 -140 -120 -50 -120 -430
8 0 8 0
9 0 9 0
-1,270 -1,760
Cumulative AM with Shift - Unbalanced Cumulative PM with Shift - Unbalanced
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 200 400 540 190 340 10 20 510 280 430 320 290 3,530 1 170 410 490 240 500 30 30 450 200 730 600 340 4,190
2 20 660 20 310 1380 20 840 3,250 2 10 50 760 20 750 1350 10 1100 4,050
3 300 970 1220 1390 780 4,660 3 620 740 1610 1690 670 5,330
4 230 240 70 10 10 10 30 60 60 30 60 30 840 4 60 30 140 30 210 30 10 100 210 80 110 10 1,020
5 170 480 110 10 80 10 20 10 120 60 20 40 1,130 5 310 160 220 40 410 50 30 20 340 160 30 40 1,810
6 60 200 670 1520 1970 90 4,510 6 220 690 530 1820 1670 160 5,090
7 30 30 10 170 50 140 370 1030 120 40 1840 410 4,240 7 100 60 30 490 20 500 140 1810 40 10 1110 330 4,640
8 1670 390 840 850 3,750 8 1820 340 1100 1210 4,470
9 1220 450 1690 3,360 9 1610 210 2310 4,130
29,270 34,730
Percent Growth (Estimated) AM Percent Growth (Estimated) PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 0.9%1.7%0.6%0.6%2.1%0.7%1.1%0.0%0.8%0.4%0.0%0.3%0.6%1 3.4%2.6%1.1%0.2%3.1%6.3%1.9%0.0%1.9%0.7%0.0%0.1%3.3%
2 1.1%0.6%4.2%1.9%1.2%3.4%0.6%1.1%2 56.3%1.6%0.1%0.0%1.2%1.5%0.7%1.0%1.0%
3 0.3%0.1%1.0%0.6%0.5%0.5%3 4.8%0.1%1.0%0.1%3.2%1.0%
4 0.1%0.3%0.5%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.5%4 0.6%0.7%0.4%1.3%0.6%0.2%9.4%0.3%0.1%0.6%0.4%0.7%0.5%
5 0.1%0.0%0.5%0.0%1.4%0.7%4.2%14.6%1.3%2.1%2.7%1.8%0.6%5 0.6%0.4%0.9%1.3%0.2%1.0%1.6%1.6%0.3%0.5%2.3%0.2%0.5%
6 1.3%1.6%0.1%0.8%0.5%0.1%0.6%6 0.2%0.3%0.7%0.7%0.9%0.6%0.7%
7 1.9%6.3%14.6%1.7%8.0%0.8%0.4%0.5%1.2%2.7%0.3%0.6%1.1%7 0.4%6.7%1.6%0.7%14.6%0.6%1.1%0.4%3.4%56.3%0.3%1.0%1.2%
8 1.1%0.3%0.6%0.5%0.8%8 0.9%0.8%1.0%0.8%0.9%
9 1.0%1.5%0.6%0.8%9 1.0%0.3%0.9%0.9%
0.7%0.8%
Orchards
Cumulative Volume Development
9/16/25
Adding growth for certain turning movements to be 0.5% at minimum
Existing AM Existing PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614
2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501
3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579
4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951
5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670
6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585
7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233
8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908
9 1053 363 1551 2,967 9 1381 201 2023 3,605
26,440 30,646
Cumulative Adjustments with 70% Shift AM - Balanced Cumulative Adjustments with 70% Shift PM - Balanced
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 200 400 540 180 340 10 20 610 280 430 390 290 3,690 1 170 410 490 240 500 30 30 650 200 730 760 340 4,550
2 20 890 20 370 1290 20 740 3,350 2 10 50 900 20 870 1370 10 950 4,180
3 360 1100 1200 1300 920 4,880 3 780 920 1520 1570 820 5,610
4 230 240 70 10 10 10 30 60 60 30 60 30 840 4 60 30 140 30 210 30 10 100 210 80 110 10 1,020
5 170 480 110 10 80 10 20 10 120 60 20 40 1,130 5 310 160 220 40 410 50 30 20 340 160 30 40 1,810
6 60 200 670 1630 2020 90 4,670 6 220 690 530 1910 1700 160 5,210
7 30 30 10 170 50 140 370 1200 120 40 1940 410 4,510 7 100 60 30 490 20 500 140 1950 40 10 1260 330 4,930
8 1720 480 740 920 3,860 8 1780 540 950 1400 4,670
9 1200 520 1660 3,380 9 1520 260 2350 4,130
30,310 36,110
Minimum Growth AM Minimum Growth PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 190 440 300 930 1 260 370 630
2 830 830 2 0
3 0 3 1810 1810
4 250 250 80 580 4 230 230
5 190 520 120 830 5 220 430 350 1000
6 720 720 6 0 230 230
7 380 410 790 7 110 110
8 830 830 8 0
9 0 9 0
5510 4010
Cumulative AM with Growth - Unbalanced Cumulative PM with Growth - Unbalanced
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 200 400 540 190 340 10 20 610 280 440 390 300 3,720 1 170 410 490 260 500 30 30 650 200 730 760 370 4,600
2 0 0 20 890 20 370 0 1290 20 0 830 0 3,440 2 10 0 50 900 20 870 0 1370 10 0 950 0 4,180
3 360 0 1100 0 0 0 0 1200 0 0 1300 920 4,880 3 780 0 920 0 0 0 0 1520 0 0 1810 820 5,850
4 250 250 80 10 10 10 30 60 60 30 60 30 880 4 60 30 140 30 210 30 10 100 230 80 110 10 1,040
5 190 520 120 10 80 10 20 10 120 60 20 40 1,200 5 310 160 220 40 430 50 30 20 350 160 30 40 1,840
6 0 0 0 60 0 200 720 1630 0 0 2020 90 4,720 6 0 0 0 230 0 690 530 1910 0 0 1700 160 5,220
7 30 30 10 170 50 140 380 1200 120 40 1940 410 4,520 7 110 60 30 490 20 500 140 1950 40 10 1260 330 4,940
8 0 0 0 0 0 0 0 1720 480 0 830 920 3,950 8 0 0 0 0 0 0 0 1780 540 0 950 1400 4,670
9 0 0 0 0 0 0 0 1200 520 0 1660 0 3,380 9 0 0 0 0 0 0 0 1520 260 0 2350 0 4,130
30,690 36,470
Percent Growth (Estimated) AM Percent Growth (Estimated) PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 0.9%1.7%0.6%0.6%2.1%0.7%1.1%1.2%0.8%0.5%1.4%0.6%1.0%1 3.4%2.6%1.1%0.7%3.1%6.3%1.9%2.8%1.9%0.7%1.7%0.7%1.6%
2 1.1%2.9%4.2%3.5%0.7%3.4%0.6%1.2%2 56.3%1.6%1.2%0.0%2.3%1.6%0.7%0.0%1.2%
3 1.6%0.9%0.9%0.2%1.7%0.9%3 7.6%1.6%0.6%0.5%5.3%1.4%
4 0.6%0.6%1.4%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.5%4 0.6%0.7%0.4%1.3%0.6%0.2%9.4%0.3%0.7%0.6%0.4%0.7%0.5%
5 0.9%0.5%1.1%0.0%1.4%0.7%4.2%14.6%1.3%2.1%2.7%1.8%0.6%5 0.6%0.4%0.9%1.3%0.5%1.0%1.6%1.6%0.5%0.5%2.3%0.2%0.5%
6 1.3%1.6%0.6%1.3%0.7%0.1%0.8%6 0.5%0.3%0.7%1.1%1.0%0.6%0.9%
7 1.9%6.3%14.6%1.7%8.0%0.8%0.6%1.6%1.2%2.7%0.6%0.6%1.0%7 1.1%6.7%1.6%0.7%14.6%0.6%1.1%0.9%3.4%56.3%1.2%1.0%1.0%
8 1.3%1.8%0.6%1.0%1.0%8 0.8%4.9%0.0%1.9%1.2%
9 0.9%2.7%0.4%0.9%9 0.6%1.8%1.0%0.9%
1.0%1.2%
Absolute Difference between Percent Growth Absolute Difference between Percent Growth
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 1 -9.1%-6.0%-2.7%0.5%-7.5%2.8%-4.9%-1.8%1.7%0.6%
2 2 1.2%1.2%0.1%-1.0%
3 3 2.8%1.5%-0.4%0.4%2.1%
4 4 0.6%
5 5 0.3%0.2%
6 6 0.3%0.3%0.1%
7 7 0.7%-2.0%-1.6%-2.6%0.5%0.9%-2.6%
8 8 -0.2%4.1%-1.0%1.1%
9 9 -0.4%1.6%0.1%
Orchards
Cumulative Volume Comparison with Existing
9/16/2025
Balanced Synchro volumes from final adjustments
Existing AM Existing PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614
2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501
3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579
4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951
5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670
6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585
7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233
8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908
9 1053 363 1551 2,967 9 1381 201 2023 3,605
overall 26,440 overall 30,646
Cumulative AM - Final Cumulative PM - Final
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 200 360 540 180 310 10 20 560 280 470 380 320 3,630 1 170 370 490 260 450 30 30 590 200 760 730 380 4,460
2 20 880 20 340 1260 20 830 3,370 2 10 50 900 20 810 1330 10 1050 4,180
3 390 1130 1210 1320 920 4,970 3 780 920 1520 1710 820 5,750
4 250 250 80 10 10 10 30 60 60 30 60 30 880 4 60 30 140 30 220 30 10 100 240 80 110 10 1,060
5 190 520 120 10 80 10 20 10 130 60 20 40 1,210 5 310 160 220 40 450 50 30 20 370 170 30 40 1,890
6 60 210 730 1610 2030 100 4,740 6 230 760 530 1910 1770 160 5,360
7 30 30 10 170 50 150 380 1170 120 40 1950 410 4,510 7 120 60 30 490 20 540 140 1960 40 10 1270 330 5,010
8 1730 430 830 880 3,870 8 1790 490 1050 1440 4,770
9 1210 520 1710 3,440 9 1520 270 2490 4,280
overall 30,620 overall 36,760
Percent Annualized Growth AM Percent Annualized Growth PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 0.9%0.9%0.6%0.2%1.3%0.7%1.1%0.6%0.8%1.0%1.2%1.0%0.8%1 3.4%1.7%1.1%0.7%2.2%6.3%1.9%2.0%1.9%1.0%1.4%0.9%1.5%
2 1.1%2.8%4.2%2.7%0.5%3.4%0.6%1.2%2 56.3%1.6%1.2%0.0%1.7%1.4%0.7%0.6%1.2%
3 2.2%1.1%0.9%0.3%1.7%1.0%3 7.6%1.6%0.6%0.1%5.3%1.6%
4 0.6%0.6%1.4%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.8%4 0.6%0.7%0.4%1.3%0.9%0.2%9.4%0.3%1.0%0.6%0.4%0.7%0.7%
5 0.9%0.5%1.1%0.0%1.4%0.7%4.2%14.6%2.0%2.1%2.7%1.8%1.0%5 0.6%0.4%0.9%1.3%0.8%1.0%1.6%1.6%0.9%0.9%2.3%0.2%0.8%
6 1.3%2.0%0.7%1.2%0.7%0.9%0.9%6 0.5%1.0%0.7%1.1%1.3%0.6%1.1%
7 1.9%6.3%14.6%1.7%8.0%1.3%0.6%1.4%1.2%2.7%0.7%0.6%1.0%7 1.7%6.7%1.6%0.7%14.6%1.1%1.1%1.0%3.4%56.3%1.3%1.0%1.1%
8 1.4%1.0%0.6%0.7%1.0%8 0.8%3.9%0.6%2.2%1.4%
9 0.9%2.7%0.6%1.0%9 0.6%2.1%1.4%1.2%
overall 1.0%overall 1.2%
Absolute Annualized Growth AM Absolute Annualized Growth PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 24 45 47 6 54 1 3 50 30 63 62 45 430 10%1 60 80 71 26 117 15 7 141 46 103 134 46 846
2 0 0 3 274 8 102 0 96 7 0 68 0 558 13%2 9 0 10 148 0 177 0 237 1 0 97 0 679
3 102 0 169 0 0 0 0 157 0 0 57 199 684 16%3 429 0 188 0 0 0 0 139 0 0 38 377 1171
4 22 21 15 6 0 7 9 5 14 2 4 0 105 3%4 5 3 9 5 28 1 6 5 32 7 7 1 109
5 23 41 18 0 15 1 8 7 31 15 6 9 174 4%5 27 10 29 7 53 7 6 4 46 22 8 1 220
6 0 0 0 10 0 51 70 256 0 0 205 12 604 14%6 0 0 0 18 0 103 51 276 0 0 312 15 775
7 7 15 7 37 28 25 32 215 19 12 185 38 620 15%7 26 31 6 50 14 83 21 259 14 9 218 46 777
8 0 0 0 0 0 0 0 314 59 0 68 91 532 13%8 0 0 0 0 0 0 0 208 187 0 97 370 862
9 0 0 0 0 0 0 0 157 157 0 159 0 473 11%9 0 0 0 0 0 0 0 139 69 0 467 0 675
overall 4180 overall 6114
Orchards
Cumulative Volume Comparison with Existing
9/16/2025
Existing AM Existing PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 176 315 493 174 256 9 17 510 250 407 318 275 3,200 1 110 290 419 234 333 15 23 449 154 657 596 334 3,614
2 17 606 12 238 1164 13 762 2,812 2 1 40 752 20 633 1093 9 953 3,501
3 288 961 1053 1263 721 4,286 3 351 732 1381 1672 443 4,579
4 228 229 65 4 10 3 21 55 46 28 56 30 775 4 55 27 131 25 192 29 4 95 208 73 103 9 951
5 167 479 102 10 65 9 12 3 99 45 14 31 1,036 5 283 150 191 33 397 43 24 16 324 148 22 39 1,670
6 50 159 660 1354 1825 88 4,136 6 212 657 479 1634 1458 145 4,585
7 23 15 3 133 22 125 348 955 101 28 1765 372 3,890 7 94 29 24 440 6 457 119 1701 26 1 1052 284 4,233
8 1416 371 762 789 3,338 8 1582 303 953 1070 3,908
9 1053 363 1551 2,967 9 1381 201 2023 3,605
overall 26,440 overall 30,646
Cumulative AM Cumulative PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 200 360 540 180 310 10 20 560 280 470 380 320 3,630 1 170 370 490 260 450 30 30 590 200 760 730 380 4,460
2 20 880 20 340 1260 20 830 3,370 2 10 50 900 20 810 1330 10 1050 4,180
3 390 1130 1210 1320 920 4,970 3 780 920 1520 1710 820 5,750
4 250 250 80 10 10 10 30 60 60 30 60 30 880 4 60 30 140 30 220 30 10 100 240 80 110 10 1,060
5 190 520 120 10 80 10 20 10 130 60 20 40 1,210 5 310 160 220 40 450 50 30 20 370 170 30 40 1,890
6 60 210 730 1610 2030 100 4,740 6 230 760 530 1910 1770 160 5,360
7 30 30 10 170 50 150 380 1170 120 40 1950 410 4,510 7 120 60 30 490 20 540 140 1960 40 10 1270 330 5,010
8 1730 430 830 880 3,870 8 1790 490 1050 1440 4,770
9 1210 520 1710 3,440 9 1520 270 2490 4,280
overall 30,620 overall 36,760
Percent Growth AM Percent Growth PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 0.9%0.9%0.6%0.2%1.3%0.7%1.1%0.6%0.8%1.0%1.2%1.0%0.8%1 3.4%1.7%1.1%0.7%2.2%6.3%1.9%2.0%1.9%1.0%1.4%0.9%1.5%
2 1.1%2.8%4.2%2.7%0.5%3.4%0.6%1.2%2 56.3%1.6%1.2%0.0%1.7%1.4%0.7%0.6%1.2%
3 2.2%1.1%0.9%0.3%1.7%1.0%3 7.6%1.6%0.6%0.1%5.3%1.6%
4 0.6%0.6%1.4%9.4%0.0%14.6%2.7%0.6%1.9%0.4%0.4%0.0%0.8%4 0.6%0.7%0.4%1.3%0.9%0.2%9.4%0.3%1.0%0.6%0.4%0.7%0.7%
5 0.9%0.5%1.1%0.0%1.4%0.7%4.2%14.6%2.0%2.1%2.7%1.8%1.0%5 0.6%0.4%0.9%1.3%0.8%1.0%1.6%1.6%0.9%0.9%2.3%0.2%0.8%
6 1.3%2.0%0.7%1.2%0.7%0.9%0.9%6 0.5%1.0%0.7%1.1%1.3%0.6%1.1%
7 1.9%6.3%14.6%1.7%8.0%1.3%0.6%1.4%1.2%2.7%0.7%0.6%1.0%7 1.7%6.7%1.6%0.7%14.6%1.1%1.1%1.0%3.4%56.3%1.3%1.0%1.1%
8 1.4%1.0%0.6%0.7%1.0%8 0.8%3.9%0.6%2.2%1.4%
9 0.9%2.7%0.6%1.0%9 0.6%2.1%1.4%1.2%
overall 1.0%overall 1.2%
Absolute Growth AM Absolute Growth PM
INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR INTID NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR
1 24 45 47 6 54 1 3 50 30 63 62 45 430 10%1 60 80 71 26 117 15 7 141 46 103 134 46 846
2 0 0 3 274 8 102 0 96 7 0 68 0 558 13%2 9 0 10 148 0 177 0 237 1 0 97 0 679
3 102 0 169 0 0 0 0 157 0 0 57 199 684 16%3 429 0 188 0 0 0 0 139 0 0 38 377 1171
4 22 21 15 6 0 7 9 5 14 2 4 0 105 3%4 5 3 9 5 28 1 6 5 32 7 7 1 109
5 23 41 18 0 15 1 8 7 31 15 6 9 174 4%5 27 10 29 7 53 7 6 4 46 22 8 1 220
6 0 0 0 10 0 51 70 256 0 0 205 12 604 14%6 0 0 0 18 0 103 51 276 0 0 312 15 775
7 7 15 7 37 28 25 32 215 19 12 185 38 620 15%7 26 31 6 50 14 83 21 259 14 9 218 46 777
8 0 0 0 0 0 0 0 314 59 0 68 91 532 13%8 0 0 0 0 0 0 0 208 187 0 97 370 862
9 0 0 0 0 0 0 0 157 157 0 159 0 473 11%9 0 0 0 0 0 0 0 139 69 0 467 0 675
overall 4180 overall 6114