Loading...
HomeMy WebLinkAboutK. EBMUD Water Supply Assessment, dated September 9, 2025Cindy Yee, Senior Planner, City of San Ramon September 9, 2025 Page 2 water demand for the Project of approximately 368,000 GPD; however, this water demand estimate included only indoor domestic water use and did not account for household irrigation and other household potable outdoor uses. Therefore, the District’s water demand estimate of 453,700 GPD, which includes indoor and outdoor potable water use was used as the basis of the WSA. EBMUD’s demand projections indicate both densification and land use changes in a few existing land use classifications, including commercial and residential land use areas. These changes increase demand for EBMUD water. EBMUD’s UWMP 2020 projects water demands over time, accounting for estimated variations in demand usage minus conservation and recycled supply sources, as noted in the UWMP 2020, Table 3-1, 2050 Demand Projections (Table 1). Typically, EBMUD prepares a full demand study every ten years; the most recent version, the 2050 Demand Study, was completed in 2020, and the study results are incorporated into the UWMP 2020. For planning purposes, water demands are estimated in five-year increments, but it is recognized that actual incremental amounts may occur stepwise in shorter time increments. An increase in usage by one customer in a particular customer class does not require a strict gallon-for-gallon increase in conservation by other customers in that class, as, in actuality, the amount of potable demand, conservation and recycled water use EBMUD-wide will vary somewhat. Table 1 2050 Demand Projections (UWMP 2020, Table 3-1) Project Area The Orchards Development Project is in the City of San Ramon, at the site of the former Chevron Park office campus, at 6001 Bollinger Canyon Road. The Orchards Development Project site is bounded to the north by Bollinger Canyon Road, to the east by existing office buildings and parking, to the south by single family homes on Ascot Drive, and to the west by Highway 680 and San Ramon Valley Boulevard, and consists of approximately 92 acres. EBMUD Water Demand Projections Since the 1970s, water demand within EBMUD’s service area has ranged from 200 to 220 million gallons per day (MGD) in non-drought years. Section 3.1 of the UWMP 2020 Cindy Yee, Senior Planner, City of San Ramon September 9, 2025 Page 3 outlines past and current EBMUD water demand, including Figure 3-1 which shows historic water use (including metered and unmetered demands) within EBMUD’s service area, along with the number of customer accounts. The 2050 water demand forecast of 297 MGD for EBMUD’s service area can be reduced to 218 MGD with the successful implementation of water recycling and conservation programs, as outlined in the UWMP 2020. Current demand is lower than estimated in the 2050 Demand Study as a result of recent droughts. The difference is because the planning level of demand may differ from the actual demand in any given year due to water use reductions that typically occur during droughts. After droughts, a rebound effect is expected wherein demand rises back to projected levels. Thus, the 2050 Demand Study still reflects a reasonable expectation for demands in future years, as the demands are expected to gradually increase back to 2050 projected demand levels as development and water use return to pre-drought conditions. The proposed Orchards Development Project future development and operations will not change EBMUD’s 2050 demand projection. EBMUD Water Supply, Water Rights and the UWMP 2020 EBMUD has water right permits and licenses that allow for water delivery from the Mokelumne River to the East Bay, subject to the availability of Mokelumne River runoff and the senior water rights of other users. EBMUD’s position in the hierarchy of Mokelumne River water users is determined by a variety of agreements between Mokelumne River water right holders and the terms of the appropriative water right permits and licenses. Conditions that could, depending on hydrology, restrict EBMUD’s ability to receive its full entitlement include: • Upstream water use by senior water right holders. • Downstream water use by riparian and senior appropriators and other downstream obligations, including protection of public trust resources. • Variability in precipitation and runoff. • Curtailments by State Water Resources Control Board. During prolonged severe droughts, the Mokelumne River supply cannot meet EBMUD’s projected customer demands. To address this, EBMUD has completed construction of the Freeport Regional Water Facility and is evaluating future local groundwater projects in the East Bay Plain Subbasin (EBP Subbasin) as part of a Groundwater Sustainability Plan (GSP), which are discussed below in the Supplemental Water Supply and Demand Management section of this assessment. EBMUD has obtained and continues to seek supplemental supplies. The UWMP 2020, adopted on June 22, 2021, by EBMUD’s Board of Directors under Resolution No. 35234-21, is a long-range planning document used to assess current and projected water usage, water supply planning, and conservation and recycling efforts. The Water Shortage Contingency Plan (WSCP) 2020, also adopted on July 22, 2021, by Cindy Yee, Senior Planner, City of San Ramon September 9, 2025 Page 4 EBMUD’s Board of Directors under Resolution No. 35235-21 for inclusion as Attachment 1 within the UWMP 2020, is a document used to develop a coordinated response for when water shortages occur (for example, due to drought, earthquakes, and other emergencies that could impact EBMUD’s ability to supply water to customers), and to guide EBMUD’s planning and response through thoughtful assessment and management of the water supply. EBMUD’s water supply sources are discussed in Section 1.4.3 of the UWMP 2020. EBMUD’s main water supply is the Mokelumne River, and EBMUD has rights to receive up to 325 MGD of water from this source subject to the availability of runoff, senior water rights of other users, and downstream fishery flow requirements. EBMUD also has a Long-Term Renewal Contract (Contract No. 14-06-200-5183A-LTR1) with the United States (U.S.) Bureau of Reclamation to receive water from the Central Valley Project (CVP) through the Freeport Regional Water Facility in years when EBMUD’s water supplies are relatively low (for more details, see Section 1.4.3 of the UWMP 2020). During some dry years, EBMUD may purchase water transfers to help meet customer demands. Section 4.2 of the UWMP 2020 discusses EBMUD’s water transfer program. EBMUD maintains a biennial budget and five-year capital improvement program to optimize investments and maximize drinking water quality, and the reliability, safety, flexibility, and overall efficiency of the water supply system. EBMUD’s most recently adopted budget, which includes capital expenditures for the delivery of water supplies to its customers, can be found at http://www.ebmud.com/about-us/investors/budget-and-rates/. EBMUD complies with applicable local, state, and federal regulations in the operation of its water supply system. Figure 1-4 of the UWMP 2020 illustrates the numerous local, state, and federal agencies that may regulate EBMUD’s facilities and operations. A summary of EBMUD's demand and supply projections, in five-year increments, for a 30-year planning horizon is provided in UWMP 2020 Attachment 1, WSCP, Table W-3, Supply and Demand Assessment, 2020-2050 (Table 2). Cindy Yee, Senior Planner, City of San Ramon September 9, 2025 Page 5 Table 2 Supply and Demand Assessment, 2020-2050 (UWMP 2020, WSCP Table W-3) EBMUD's evaluation of water supply availability accounts for the diversions of both upstream and downstream water right holders and fishery releases on the Mokelumne River. Fishery releases are based on the requirements of a 1998 Joint Settlement Agreement (JSA) between EBMUD, U.S. Fish and Wildlife Service, and the California Department of Fish and Wildlife. The JSA requires EBMUD to make minimum flow releases from its reservoirs to the lower Mokelumne River to protect and enhance the fishery resources and ecosystem of the river. As this water is released downriver, it is, therefore, not available for use by EBMUD’s customers. The available supply and demand shown in Table 2 were derived from EBMUD’s baseline hydrologic model with the following assumptions: • Customer demand values are based on the 2050 Demand Study, and planning-level demands account for projected savings from water recycling and conservation programs. • EBMUD Drought Planning Sequence assumes water years 1976, 1977 and a modified 1978 hydrology. • Total system storage is depleted by the end of the third year of the drought. • EBMUD will implement its Drought Management Program (DMP) when necessary. • The diversions by Amador and Calaveras Counties upstream of Pardee Reservoir will increase over time, eventually reaching the full extent of their Cindy Yee, Senior Planner, City of San Ramon September 9, 2025 Page 6 senior rights. • Releases are made to meet the requirements of senior downstream water right holders and fishery releases, as required by the JSA. • EBMUD allocation of CVP supply, as available each drought year based on model results generated by the Department of Water Resources, is available the first year of a drought and subsequent drought years, according to the U.S. Bureau of Reclamation’s (USBR) Municipal and Industrial Shortage Policy. However, in some severe dry years, USBR could make a determination of insufficient CVP water supplies and therefore limit further the allocation amounts that EBMUD would receive. During the 2014-2016 drought, EBMUD's CVP allocation went as low as 25 percent, and the extreme drought scenario in Table 2 reflects this reduced allocation. The UWMP 2020 concludes that EBMUD has, and will have, adequate water supplies to serve existing and projected demand within the Ultimate Service Boundary during normal and wet years, but that deficits are projected for multi-year droughts. During multi-year droughts, EBMUD may require significant customer water use reductions and may also need to acquire supplemental supplies to meet customer demand. As discussed in the UWMP 2020 WSCP, EBMUD’s system storage generally allows EBMUD to continue serving its customers during dry-year events. EBMUD typically imposes water use restrictions based on the projected storage available at the end of September and may also implement water use restrictions in response to a State of California mandate. By imposing water use restrictions in the first dry year of potential drought periods, EBMUD attempts to minimize water use restrictions in subsequent years if a drought persists. Throughout dry periods, EBMUD must continue to meet its current and subsequent-year fishery flow release requirements and obligations to downstream agencies. The UWMP 2020 WSCP includes DMP Guidelines that establish the level of water use restrictions EBMUD may implement under varying conditions. Under the DMP Guidelines, water use restrictions may be determined based upon projected end-of- September Total System Storage (TSS). When state-mandated water use restrictions exceed the reductions that would otherwise be called for based upon end-of-September TSS, EBMUD’s water use reduction requirements may be guided by the applicable state mandates. Under either scenario, while EBMUD strives to keep water use reductions at or below 15 percent, if the drought is severe, mandatory water use reductions could exceed 15 percent. Despite water savings from EBMUD’s aggressive conservation and recycling programs and water use restrictions called for in the DMP Guidelines, supplemental supplies are still needed in significant, severe, and critical droughts. The Orchards Development Project will be subject to the same drought restrictions that apply to all EBMUD customers. In addition, the Orchards Development Project will be subject to EBMUD’s regulations Cindy Yee, Senior Planner, City of San Ramon September 9, 2025 Page 7 aimed at encouraging efficient water use, such as Sections 29 and 31 of EBMUD’s Regulations Governing Water Service. Section 29, “Water Use Restrictions,” promotes efficient water use by EBMUD customers and prohibits certain uses of potable water. Section 31, “Water Efficiency Requirements,” identifies the types of water efficiency requirements (i.e., maximum flow rates for flow control devices) for water service. Supplemental Water Supply and Demand Management The goals of meeting projected water needs, and increased water reliability rely on supplemental supplies, improving reliability of existing water supply facilities, water conservation, and recycled water programs. Chapter 4 of the UWMP 2020 describes potential supplemental water supply projects that could be implemented to meet projected long-term water demands during multi-year drought periods. The Freeport Regional Water Facility became operational in February 2011. EBMUD’s ability to take delivery of CVP water through the Freeport Regional Water Facility is based on its Long Term Renewal Contract (LTRC) with the U.S. Bureau of Reclamation. The LTRC provides for up to 133,000 acre feet of CVP supply in a single dry year, not to exceed a total of 165,000 acre feet in three consecutive dry years. Under the LTRC, the CVP supply is available to EBMUD only in dry years when EBMUD’s total stored water supply is forecast to be below 500,000 total acre feet on September 30 of each year. EBMUD is the Groundwater Sustainability Agency (GSA) for the portion of the East Bay Plain Subbasin underlying its service area, and as a GSA, is implementing a Groundwater Sustainability Plan (GSP) that was approved by the California Department of Water Resources in July 2023 and includes the first phase of the Bayside Groundwater Project. Construction of the first phase (Bayside Groundwater Project Phase 1) was completed in 2010, allowing EBMUD to pilot injection of treated potable water into a deep aquifer in the South East Bay Plain Groundwater Basin for later extraction, treatment, and use during severe droughts. A permit from the Department of Public Health is required before groundwater extraction can be piloted for municipal use. Additional information on the Bayside Groundwater Project can be found in Section 4.1.1 and the WSCP of the UWMP 2020. As part of the GSP management actions, EBMUD will collect additional data and use science-based decision making to inform whether future expansion of Bayside or other groundwater projects are necessary. Chapter 4 of the UWMP 2020 also lists other potential supplemental water projects, including Northern California water transfers, Bayside Groundwater Project Expansion, and others that could be implemented to meet the projected long-term water supplemental need during multi-year drought periods. The UWMP 2020 identifies a broad mix of projects, with inherent scalability and the ability to adjust implementation schedules for particular components, which will allow EBMUD to pursue the necessary supplemental supplies while minimizing the risks associated with future uncertainties, such as project implementation challenges, Cindy Yee, Senior Planner, City of San Ramon September 9, 2025 Page 8 evolving regulatory requirements, and global climate change. The Environmental Impact Report that EBMUD certified for the Water Supply Management Program 2040 examined the impacts of pursuing these supplemental supply projects at a program level. Separate project-level environmental documentation will be prepared, as appropriate, for specific components as they are developed in further detail and implemented in accordance with EBMUD’s water supply needs. In addition to pursuing supplemental water supply sources, EBMUD also maximizes resources through continuous improvements in the delivery and transmission of available water supplies and investments in ensuring the safety of its existing water supply facilities. These programs, along with emergency interties and planned water recycling and conservation efforts, would ensure a reliable water supply to meet projected demands for current and future EBMUD customers within the current service area. Water Conservation and Recycled Water Considerations The Orchards Development Project presents opportunities to incorporate water conservation measures. Conditions of approval for the implementation of the Orchards Development Project should require that the project sponsor comply with the California Model Water Efficient Landscape Ordinance (Division 2, Title 23, California Code of Regulations, Chapter 2.7, Sections 490 through 495). EBMUD staff would appreciate the opportunity to meet with the City and project sponsor to discuss conservation measures. This meeting will explore early opportunities to expand water conservation via EBMUD's conservation programs and best management practices applicable to the Orchards Development Project. Conservation strategies will be required to achieve water use reduction goals and restrictions, including compliance with Sections 29 and 31, described above, of EBMUD’s Regulations Governing Water Service, and all other legally mandated water conservation requirements. The State of California has established a new regulatory framework for urban water conservation based on two policy bills, Senate Bill 606 and Assembly Bill 1668, passed in 2018 which became effective on January 1, 2025. These bills established water use efficiency targets for urban water agencies based on indoor residential water use, outdoor water use, and distribution systems. EBMUD will continue to comply with State water conservation regulations as they are developed. The Orchards Development Project is located within the boundaries of the Dublin San Ramon Services District-EBMUD Recycled Water Authority (DERWA) San Ramon Valley Recycled Water Program service area. Per EBMUD Policy 9.05 and Section 30 of EBMUD’s Regulations Governing Nonpotable Water Service, the project sponsor, at their expense, will be required to use non-potable water, including recycled water, for non-potable purposes including, but not limited to, irrigation of the public landscaping and parks. The project sponsor may be required to plan for and extend new recycled water mains within the Orchards Development Project site, at their expense. Extension of potable City Council 973-2530 City Clerk: 973-2539 Parks & Community Services: 973-3200 Planning Department: 973-2560 City Manager: 973-2530 Employee Services: 973-2503 Police Services: 973-2700 Public Services: 973-2800 City Attorney: 973-2549 Finance Department: 973-2609 Economic Development: 973-2554 Engineering Services: 973-2670 7000 BOLLINGER CANYON RD. SAN RAMON, CALIFORNIA 94583 PHONE: (925) 973-2500 WEB SITE: WWW.SANRAMON.CA.GOV APPLICATION NOTICE July 15, 2025 Mr. David Rehnstrom, Manager of Water Distribution Planning East Bay Municipal Water District Distribution Planning Department. Mail Stop 701 375 11th Street Oakland, CA 94607 Sent via Email to: drehnstrom@ebmud.com RE: Water Supply Assessment Request for the Orchards Development Project (Applications: PHD 2025-0004, MJ 2024-0004, DP 2024-0006, DA 2024-0001, AR 2024-0013, TRP 2024-0009) in the City of San Ramon Pursuant to Section 15155 of the California Environmental Quality Act Guidelines, and Sections 10910-10915 of the California Water Code, the City of San Ramon is formally requesting preparation of a Water Supply Assessment (WSA) by the East Bay Municipal Utility District (District) with respect to the proposed Orchards Development Project. The assessment is required in order to determine whether adequate water supply is available to meet the projected water demand of the proposed Orchards Development Project, which encompasses an approximately 92-acre planning area located in the City of San Ramon, as shown on Exhibit 1 (Vicinity Map). The Project area is designated as “Downtown Mixed Use – South” by the City of San Ramon General Plan 2040 and zoned Downtown Mixed Use – South (DMU-S) by the San Ramon Zoning Ordinance. The Orchards Development Project is being analyzed under the exemption in State CEQA Guidelines 15183 for projects consistent with the development density established in the General Plan. The analysis will be contained within a consistency checklist that follows the topical areas contained within Appendix G to the State CEQA Guidelines. The consistency checklist will analyze the current development proposal for the Neighborhood District, at the project-level and the remaining portions of the project site; and the Mixed-Use District and Multi-Family District, at a programmatic level. The consistency checklist is being prepared by the City as lead agency. The Orchards Development has a 20-year buildout horizon. The buildout potential of the Master Plan includes up to 2,510 dwelling units (including 58 accessory dwelling units) in a variety of housing types; 125,000 square feet of commercial, retail, and entertainment uses; and 15 acres of parks and open space, including a 2.5-acre centralized park space Enclosure 1 Applications: Orchards (former Chevron Park) Development Project (PHD 2025-0004, MJ 2024-0004, DP 2024-0006, DA 2024-0001, AR 2024-0013, TRP 2024-0009) Page 2 of 2 and additional pocket parks and recreational amenities. Attached, please find a copy of the Applicant’s Project Water Demand Technical Memorandum for your reference. The City will use the information regarding water demand and supply provided in the WSA as a resource for completing the exemption analysis. The City's primary consultant for preparation of the exemption analysis is First Carbon Solutions. The City appreciates the District's attention to this request and looks forward to working with the District through this process. The City will provide additional information as it becomes available Please feel free to contact me directly at (925) 973-2562 or cyee@sanramon.ca.gov. Sincerely, Cindy Yee Senior Planner A: Orchards Project Water Demand Technical Memorandum, dated June 13, 2025 CIVIL ENGINEERS I SURVEYORS I PLANNERS June 13, 2025 Job No.: 3740-000 M E M O R A N D U M TO: FROM: Stephanie Hill, Sunset Development Jason J. Neri, P.E., Principal Evan M. Dambacher, P.E., QSD, Project Manager SUBJECT: Project Water Demand Orchards (Chevron Park) San Ramon, California INTRODUCTION Sunset Development Company is redeveloping the former Chevron Park commercial office campus located in San Ramon, California, into a pedestrian-oriented, mixed-use community (named Orchards) that includes concentrated commercial, residential, and recreation uses that are integrated with Bishop Ranch and City Center. The innovative Orchards (“Project”) plan proposes redeveloping the existing 92-acre office campus into a new walkable mixed-use community with three districts comprising of residential, commercial and recreational/open space uses. The Project will contain 2,510 residential units and 125,000 square feet of ground-floor commercial/retail uses. Refer to Attachment A for proposed land uses, density and site layout. The potable water for the former Chevron Park property is currently provided by East Bay Municipal Utility District (EBMUD). EBMUD obtains approximately 90 percent of its water supply from the Mokelumne River Watershed in the Sierra Nevada Mountains. The remaining 10 percent is provided by local runoff collected in its five terminal reservoirs. With the proposed land uses, the Project is anticipated to increase the demand for water consumption from existing levels. As such, the Project is required to evaluate if the existing water supply system is adequate to support the Project. The purpose of this technical memorandum is to document the estimated demand for potable water to assist EBMUD in evaluating regional water supply sources to support the Project. 2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322 1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456 www.cbandg.com P:\3700 - 3799\3740-000\Memos\Memo-001 Water Demand.docx Revised August 19, 2025 Orchards (Chevron Park) – Project Water Demand Page 2 of 3 June 13, 2025 Job No.: 3740-000 P:\3700 - 3799\3740-000\Memos\Memo-001 Water Demand.docx EXISTING WATER DISTRIBUTION SYSTEM EBMUD provides water to San Ramon customers from four pressure zones that correspond to elevation ranges. The Project site is within the Amador Pressure Zone (450 to 650 feet). Potable water destined for San Ramon is treated at the Walnut Creek Water Treatment Plant and conveyed south down a transmission line within the Iron Horse Trail right-of-way through Alamo and Danville. All Bishop Ranch parcels, including Chevron Park, have existing connections to the EBMUD potable water distribution system. EBMUD’s system maps show the Project property is currently being served by two (2) potable water services: A 10-inch potable water service and meter from the existing 16-inch potable water distribution line along the Project’s fronting street, Bollinger Canyon Road (north side of Project). An 8-inch potable water service and meter from the existing 12-inch potable water distribution line located at the intersection of Ascot Dr / Dunbarton Circle / Broadmoor Drive (south side of Project). Refer to Attachment B for EBMUD’s existing distribution system layout. In addition to potable water, EBMUD and the Dublin San Ramon Services District (DSRSD) jointly provide and distribute recycled municipal water in San Ramon through the San Ramon Valley Recycled Water Program. The program is administered by a joint powers authority DSRSD-East Bay MUD Recycled Water Authority (DERWA). EBMUD’s water system maps show the Project property is currently being served by one (1) non- potable recycled water service: An 8-inch non-potable water service and meter from the existing 16-inch non-potable water distribution line along the Project’s fronting street, Bollinger Canyon Road (north side of Project). Revised August 19, 2025 Orchards (Chevron Park) – Project Water Demand Page 3 of 3 June 13, 2025 Job No.: 3740-000 P:\3700 - 3799\3740-000\Memos\Memo-001 Water Demand.docx WATER DEMAND ESTIMATES The Project water consumption includes both indoor and outdoor uses. Indoor water consumption primarily includes water used in restrooms, bathrooms, kitchen, laundry, cleaning and by cooling appliances. Outdoor uses include irrigation and cleaning/washing-down hardscape areas. The City of San Ramon Ordinance (No. 218) requires that water conservations features be incorporated into landscaping plans. It is anticipated that all outdoor landscaped areas will be irrigated with recycled water from the existing DERWA system. Estimated indoor water use for the Project has been projected utilizing EBMUD’s 2015 Urban Water Management Plan and industry-standard average daily water demand factors for the proposed project land uses (55 gpcd). In addition, estimated indoor water use has also been projected based on State water conservation legislation and objectives aimed at adopting long-term standards for efficient water use. A joint study by DWR and the State Water Resources Control Board (prepared in August 2021)1 recommended from 2030 onward, a reduced indoor residential consumption standard of 42 gpcd (a 23±% reduction). Refer to the attached Tabel I for summary of estimated indoor water demands by the Project’s proposed land use areas. Lastly, for reference, the historical potable water usage for the existing property has been derived from provided EBMUD billing information (2012-2023). Refer to the attached Tabel II for summary of historical indoor use. CONCLUSION We recommend the included Project water demands be shared with EBMUD for preparation of a Water Supply Assessment to evaluate the availability, quality, reliability, and sustainability of water sources to meet current and future water needs and to provide requirements for water distribution and servicing related to the proposed Project. ATTACHMENTS Table 1: Indoor Water Use (Proposed Project) Table 2: Illustrative Water Use (Historical Usage – Existing Property) Attachment A: Orchards Innovative Plan Development Program Attachment B: EBMUD Water System Maps 1.California Department of Water Resources, August 2021, Results of the Indoor Residential Water Use Study - A Report the Legislature Prepared pursuant to Water Code Section 10609.4(b). Revised August 19, 2025 CIVIL ENGINEERS I SURVEYORS I PLANNERS 2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322 1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456 www.cbandg.com Job No.: 3740-000 Revised August 19, 2025 TABLE I. INDOOR WATER USE (PROPOSED PROJECT) Preliminary Land Use Plan District (Land Use)Residential Units (DU's) Commercial / Retail (SF) Average Day Demand (gpd) Maximum Day Demand (gpd) Peak Hour Demand (gpd) Average Day Demand (gpd) Maximum Day Demand (gpd) Peak Hour Demand (gpd) Neighborhood District (Residential) Single Family Court Homes 42 n/a 6,930 13,860 16,632 5,292 10,584 12,701 Single Family Court Homes - ADU's 10 n/a 550 1,100 1,320 420 840 1,008 Single Family Homes 130 n/a 21,450 42,900 51,480 16,380 32,760 39,312 Single Family Row Homes 58 n/a 9,570 19,140 22,968 7,308 14,616 17,539 Attached Row Townhomes 138 n/a 22,770 45,540 54,648 17,388 34,776 41,731 Attached Row Townhomes - ADU's 48 n/a 2,640 5,280 6,336 2,016 4,032 4,838 Multi-Family District (Residential) Multi-Family Units (inc. Affordable Housing)1,465 n/a 201,438 402,875 483,450 153,825 307,650 369,180 Mixed-Use District (Residential / Commercial / Retail) Multi-Family Units 619 n/a 85,113 170,225 204,270 64,995 129,990 155,988 Neighborhood Commercial/Retail n/a 125,000 17,500 35,000 42,000 17,500 35,000 42,000 TOTALS 2,510 125,000 367,960 735,920 883,104 285,124 570,248 684,298 TABLE II. INDOOR WATER USE (HISTORICAL USAGE - EXISTING PROPERTY) Existing Property Commerical Building Area (SF) Chevron Park - Ex .Commercial (15 bldgs.)1,928,000 Water Demand Factors: Single Family (Detached)165 gpd per unit (based on 55 gallons per capita per day @ average 3.0 residents per unit) Single Family (Attached)165 gpd per unit (based on 55 gallons per capita per day @ average 3.0 residents per unit) Single Family/Townhome (ADU's)55 gpd per unit (based on 55 gallons per capita per day @ average 1.0 resident per unit) Multi-Family Apartments / Condominiums 137.5 gpd per unit (based on 55 gallons per capita per day @ average 2.5 residents per unit) Commercial / Retail 0.14 gpd per square foot Maximum Day Peak Factor 2.0 (x Average Day Demand) Peak Hour Factor 2.4 (x Average Day Demand) Notes: 1. Project development land use information based on Orchards Vesting Tentative Map - Subdivision 9693, dated January 21, 2025. 2. Residential water demands are based on per capita demand values per EBMUD 2015 Urban Water Management Plan. 3. Reduced residential water demands are based on per capita demand values per DWR and State Water Board Study August 2021 (Year 2030). 4. Summary does not include existing site water demands for facilities no longer in use. 5. Summary does not include projected site outdoor water demands for irrigation purposes. 6. Summary does not include projected fire flow demands for fire hydrant and building sprinkler purposes. 7. Water usage derived from historic EBMUD biling information (2012-2023) provided by Sunset Development. Average Daily Usage (gpd) 62,142 ORCHARDS (CHERVON PARK) SUMMARY OF PROJECTED INDOOR WATER DEMANDS SAN RAMON, CALIFORNIA June 12, 2025 Historic Potable Water Usage (2012-2023) 7 District Data Indoor Potable Water Demand (2015 UWMP) Indoor Potable Water Demand (Reduced Demand Factors – 42 gpcpd) \\dl2023a\P-Drive\3700 - 3799\3740-000\Engineering\Water\EBMUD Demands_001_2025-06-12 - REV.xlsx CIVIL ENGINEERS I SURVEYORS I PLANNERS 2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322 1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456 www.cbandg.com June 13, 2025 Job No.: 3740-000 EBMUD WATER BILLING DATA (2012-2023) Meter Address (Location)Meter Size (Meter #) EBMUD Account Number Total Usage (Gallons)Average Monthly Usage (Gallons/Month) Average Daily Usage (Gallons/Day) 6001 Bollinger Canyon Road (@ Bollinger Canyon Rd approx. 915' west of entry) 10" (25813675)13036100001 242,458,651 1,822,997 59,866 6001 Bollinger Canyon Road (@ Ascot/Dunbarton/Broadmoor approx.150' north of intersection) 8" (18233213)51127700001 9,141,943 69,257 2,275 251,600,594 1,892,255 62,142 6001 Bollinger Canyon Road (@ Bollinger Canyon Rd approx. 445' east of entry) 8" (R5014633)56645800001 410,540,257 3,133,895 103,099 410,540,257 3,133,895 103,099 Note: 1. Water usage derived from historic EBMUD biling information (2012-2023) provided by Sunset Development. ORCHARDS (CHEVRON PARK)HISTORIC SITE WATER USAGE SAN RAMON, CALIFORNIA TOTALS NON-POTABLE / RECLAIMED USAGE Potable / Domestic Non-Potable / Reclaimed TOTAL POTABLE / DOMESTIC USAGE P:\3700 - 3799\3740-000\Engineering\Water\Historical Info\6001BollingerCanyonRoad_BillHistory_230301125904_CBG.xlsx Attachment A 2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322 1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456 www.cbandg.com CIVIL ENGINEERS I SURVEYORS I PLANNERS Attachment B 680 R/ W 4 4 7 3 R/W 555 2 R/ W & C O N S T D W G S - 9 0 9 & S - 1 1 9 8 20' R / W 2 7 2 5 DW G 9 8 7 9 - G DWG 6 4 9 2 - G PARCEL 3DWG 4 0 7 9 - B T 56 ' D 100 ' VALDIV I A PAMPL O N A R CARDO N A ROA T A N 17' L DR TALAV E R A A 56 ' D CIR 52' RA M O N 17' BOLLING E R DR IN T E R S T A T E RD 17' CT V TALAV E R A TA L A V E R A DR C O N A CIR CA R D O N A CT 12 4 ' B L V D D R 124' BI S H O P T A L A V E R A A 5 6 ' A 60' 56 ' VALDIV I A BOLLINGE R D 6 0 ' CT 52 ' CIR 68' F W Y RD DR R 56 ' S DR R SABA C R A M O N S A N CANYON D R A DR R DR CT CI R LORCA B L V D I RD VA L L E Y SAN R A M O N V A L L E Y BI S H O P SU N S E T 52' E DR D R T N 56' A CANYON V A L L E Y SA N IN T E R S T A T E BOLLINGE R C A N Y O N R D BL V D BLV D 12 4 ' A 10 0 ' T A L A V E R A N E 100' 56' 52 ' R CT S A N CANYON BOLLINGE R 12 4 ' % % % % % % "! + + + R 2600 D2994 0 6N016 6SMB0 1 6 6N0162009696 ,&C àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅàÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! "± "± F4A F5B f F4A F5B f F5Bf DWG 7 6 0 4 - G 1195 BOL L I N G E R R C S A 5 2 0 4 9 A 5 2 0 4 6 1" A50692 3 3 10 0 A51831 2414 A5 0 7 4 7 A5 0 7 4 9 40 8 40 6 1" 1 " 1" 1 " 2 4 6 7 605 A5 2 0 6 3 1" A52105 1" 3 0 2401 28 A 5 0 2 6 4 A5 0 7 4 1 A54407 1 8 8 A5 2 0 6 5 A5 2 0 8 9 11 3 1 1 6 A 5 0 7 3 9 1 " 2300 A 5 2 0 6 6 29 2 4 8 2 A35 7 7 9 297 0 A5 2 1 0 6 1 8 4 2 5 A5 4 2 8 3 17 7 2325 2329 A 5 2 0 8 0 389 1" 1 7 6 2 4 8 9 18 A52146 A 5 4 2 8 1 A5 1 9 4 0 A 5 2 0 7 8 136 134 A52138 A5 2 1 4 7 A5 2 1 5 0 138 A52148 A5214 9 1 6 6 A51955 148 154 368 158 340 A52117 18000 IRR 17900 1" 1.5" A7 8 2 5 3 6" 26 0 0 B0 9 0 3 5 26 1 0 4" 150 2 6 6 3 10"FS 2 A 5 2 0 5 8 2428 4 1 2 1" 2 4 5 5 1" A 5 2 0 6 0 2402 24 6 8 1" 24 6 5 1 0 5 1 0 8 1" 1 " 6 0 4 1" A5 2 0 8 8 A5 0 7 4 0 A5 0 6 5 4 4" 8"FS 2302 24 7 5 2 4 11 8 2 2 1 2 0 2301 A521 3 3 1 2 2 1 " A5 0 6 5 2 392 A54284 3 0 4 A5 1 9 3 7 A5 2 0 7 0 A5 0 6 5 1 A54288 A54287 30 5 A5 2 1 0 8 1 7 8 A5 2 0 7 1 1" 1. 5 " A5 1 9 3 9 1" 384 3 0 9 31 2 A50731 385 A5 2 0 7 4 A52 1 1 1 A 5 1 9 4 4 320 152 A52125 A52116 A5194 7 A52 1 1 5 39 B15074 A357 8 9 18050 6"FS 8"F S 26 1 0 B090 3 8 A6 4 5 5 0 1" 8"FS 120 120 A67425 8"FS B22951 100 1" A50691 2432 3 5 1"2422 6 2 0 A51832 A 5 0 7 4 6 1 " 1" 2410 1 0 4 1" A 5 0 7 5 2 A5 1 9 3 2 1" 10 9 11 0 A5 0 7 4 2 1" 11 4 A5 1 9 3 3 1 8 6 A 5 0 7 3 8 A 5 1 9 3 5 17 9 A5 0 7 6 0 2333 3 0 1 18 0 A5 2 0 8 2 1 2 4 A5 0 7 3 5 A52 1 3 1 2317 A54286 1" 25 0 0 17 4 A52145 A5 2 0 7 3 1 6 9 A50730 1 7 0 A 5 1 9 4 2 13 132 A52142 A5 2 1 1 0 1 6 5 140 A5 2 1 2 8 345 339 A51953 A5 2 1 2 7 364 A52123 336 35 B172578"FS 18000 C10954 B16120 IRR 1. 5 " 60 0 1 25 9 6 B22954 150 150 2600 A5 1 9 2 6 2 4 6 4 A 5 0 6 6 1 1" 1" 2 4 6 1 A 5 0 6 6 3 4 0 4 A 5 0 7 4 4 A5 1 9 3 0 A52102 60 8 2405A52104 A 5 2 0 8 7 2300 1 8 9 1" 24 7 3 A5 0 7 5 5 A 5 0 6 6 5 1 8 7 26 A5 0 2 6 3 18 5 1 1 5 24 7 7 1. 5 " A5 2 0 6 7 A 5 2 0 8 4 A5 0 7 3 7 596 A 5 1 9 3 6 A 5 2 0 8 3 2 0 A 5 2 0 9 2 A52134 A54285 A5 2 1 0 7 2 1 12 1 A5 0 2 5 9 2 4 8 5 2321 1 2 6 A 5 0 7 3 4 1 7 A5 0 7 3 3 A5 2 1 3 0 17 1 15 A 5 2 0 9 6 14 A50729 25 316 A5 2 0 7 6 A51957 146 37 6 A51952 1 6 2 A51949 344 38 A51948 A52114 2905 4" 6"FS IR R A73 3 6 0 IR R B090 3 9 A6 3 6 6 4 8"FS B22953 34 1" 4 0 9 A51859 A 5 1 9 2 7 40 7 1" 40 5 A51884 A51885 A5 0 2 6 9 A5 0 2 6 8 40 2 2413 A52101 A5 0 2 6 7 4 0 0 10 7 A 5 0 7 5 4 11 2 A54408 C17672 A 5 1 9 3 4 1 8 3 18 1 A5 2 0 6 8 2 7 A5 0 2 6 1 2 4 7 9 1 8 2 A5 0 7 3 6 2 4 8 6 A 5 0 7 6 1 2 4 9 0 1" 17 5 1 2 3 A5 0 2 5 8 A5 0 7 6 2 IR R A52 1 3 5 A5 2 0 7 2 A5 2 0 9 5 A 5 0 2 5 7 28 A507 3 2 15 24 1 6 7 A5 2 0 7 5 A50728 38 0 A 5 2 1 3 7 351 A52143 A51950 328 156 B16620 B21701 1" 25 8 5 B0 9 0 3 7 8"FS 8"FS B22952 1.5" 29 6 2 1 " A5 0 6 5 9 A 5 2 0 4 8 A51833 4 1 0 2418 10 2 A 5 0 7 1 4 A 5 2 0 6 1 A5 0 6 5 7 A 5 1 9 2 9 4 0 3 A 5 2 0 6 2 A 5 0 7 5 1 2 4 7 2 A 5 0 6 5 6 1" 1" A5 0 7 4 3 8"FS A5 0 7 5 3 24 7 1 24 7 4 A85048 1" 24 7 8 IRR A5 2 0 8 6 A5 0 7 5 6 B28 7 9 1 A 5 2 0 9 0 A 5 0 6 5 3 3 0 0 A 5 2 0 6 9 A 5 0 2 6 0 1" A5 4 2 8 2 A5 2 0 9 4 12 5 24 8 7 B 1 4 7 6 1 1 7 3 A5 2 0 7 9 1" A5 0 7 6 3 29 12 A52 1 4 4 359 329 142 16 4 A5 1 9 4 5 150 A52124 356 352 A52119 A52 1 1 3 A52118 2"A54385 2585 B16119 B0 9 0 3 6 2" IR R A63 7 9 0 2610 25 9 6 10 " 29 6 1 A 5 1 9 2 5 A 5 2 0 5 9 1" A 5 0 6 5 8 1" A 5 2 0 4 7 1" 6 1 6 61 1 A 5 1 9 2 8 A5 0 7 5 0 A52100 2421 1 0 3 A5 0 7 1 5 2417 A 5 0 6 6 4 2409 1" A 5 0 2 6 6 A 5 0 6 5 5 A5 2 0 6 4 A 5 0 2 6 5 11 1 A5 2 0 8 5 A 5 0 2 6 2 1" 50 0 1 A 5 2 0 9 1 A 5 0 7 5 8 2 4 8 1 11 9 A5 0 7 5 9 2 4 8 3 18 A 5 2 0 9 3 388 A 5 1 9 3 8 19 128 A52 1 4 1 A 5 2 0 7 7 A 5 1 9 4 3 A51954 34 A 5 1 9 4 6 A52121 332 18000 17900 1.5" 18050 1. 5 " 26 1 0 2" 1"B22955 1" 2" 100 3 4 A50690 2424 A5 0 7 4 8 A5 0 6 6 2 2406 10 1 A5 0 7 4 5 24 6 3 61 2 1 0 6 A5 1 9 3 1 4 0 1 A52103 1" 24 6 9 4" 2300 3 1 1" 60 0 A 5 0 6 6 6 2" A5 0 7 5 7 IRR 1 1 7 1" A52132 24 9 2 1" 2313 23 A5 2 0 8 1 A5 4 3 8 6 3 0 8 1 6 1 4 A52 1 3 6 A52140 A5 2 1 0 9 1 7 2 130 A521 3 9 A5 1 9 4 1 A5 2 1 2 9 37 3 317 1 6 8 A51956 144 A 5 2 1 1 2 A51951 37 2 A52126 360 A52122 348 A52120 160 B21702 18000 260 0 A78 2 5 4 2" 2610 2" 2600 B22950 B22956 A67423 A 6 3 6 7 3 H-1331 0 H-13291 H - 1 3 2 8 8 H- 1 3 2 8 5 H-13284 H- 1 3 2 8 1 H- 1 3 2 6 8 H- 1 4 8 1 2 H-14811 H- 1 3 2 7 7 H-1538 1 H-13279 H-1 3 2 8 6 H-14808 FH-1001 8 FH-10017 H- 1 3 2 7 8 H-132 7 2 H-13270 H-13292 H-13290 H - 1 3 2 7 6 H-13289 H- 1 5 4 9 8 H-1327 4 H-1 3 2 8 7 H- 1 3 2 8 0 H- 1 3 2 8 3 FH - 1 1 0 0 6 H-1481 5 H-1327 1 H-1328 2 H-13269 H- 1 4 8 0 9 H-14813 FH-1166 5 8 A 7 9 45031-T 8 A 7 9 450 3 1 - Q 450 3 1 - C 45 8 7 6 4664 4 16SMM B 7 6 45030-A 45 0 3 1 - O 45031-E 8A79 6A79 6A79 45031-E 45031-R 8 A 8 1 24 S M M 6 5 43934 439 3 4 - A P 4 5 7 4 1 6 A 7 9 45031-A 4 5 0 3 0 4 5 0 3 0 6 A 7 9 39 2 7 1 2 4 S M M 6 5 16SMMB7 6 45876 8 H 0 1 7 45 0 3 1 - A 6A79 45031-A 6A79 45031-B 43935 45031-D 392 7 1 P415168SMB 16SM B 7 6 46667 24SM M 6 5 43934-B 8A81 6A79 45031- E 8A 7 9 6A79 45031-F 6A 7 9 6A 7 9 6A7 9 39 2 7 1 12SMMB76 8 A 8 1 24S M M 6 5 43934 16S M M B 7 6 43934 45 8 7 6 6 A 7 9 45030-A 6 A 7 9 450 3 0 6A79 6A79 6A79 3 6 S M M 6 5 45 0 3 1 - B 3 9 2 7 0 2 4 S M M 6 5 43935 16SM B 8 4 46646 8A 8 1 45876 45 0 3 1 - A 6A79 45 0 3 1 - E 12SMMB76 466 4 4 3 9 2 7 1 39271 16SMB85 8A81 12SMMB76 8A79 4 5 0 3 1 - A 45031-B 6A79 45 8 7 6 16S M B 8 4 16SMMB7 6 16S M M B 7 6 15 7 8 B 4 6 2 15 7 5 B 4 6 2 1578B462 1578B464 1578B462 1578B460 15 7 2 B 4 6 2 15 7 5 B 4 6 2 1572B464 1572B462 1572B460 1575B462 1575B464 1575B462 1575B460 15 7 5 B 4 6 4 15 7 8 B 4 6 4 15 7 2 B 4 6 0 15 7 5 B 4 6 0 15 7 8 B 4 6 0 15 7 5 B 4 6 0 F 4 A F5Bf F5Bf F5 B f F5Bf F5Bf F5 B f F5B f F5Bf F 5 B f F5Bf F5Bf F4 A F4A F4A F5Bf F4 A F5Bf F 5 B f Potable Distribution System Potable Pipeline Service Lateral àÅ System Valve (OL = Opens Left) I3 Check Valve "±Zone Valve Change of Pipe ID &,C Rate Control Station &,R Regulator ",P Pressure Reducing Station G¥Flow Meter +Manhole Service Connection !Hydrant Facility a Pumping Plant Recycled Distribution System Recycled Pipeline Service Lateral Service Connection Landbase EBMUD Right of Way ± 0 250 500125 Feet Date Printed: 3/2/2023 This information is furnished as a public service by East BayMunicipal Utility District. The District makes every effort to produceand publish the most current and accurate information possible.This information must be accepted and used by the recipient withthe understanding that the District makes no warranties, expressedor implied, concerning the accuracy, completeness, reliability, orsuitability for the use of this information. Furthermore, the Districtassumes no liability associated with the use or misuse of suchinformation. Please notify the District if discrepancies are found. By receipt of requested documents, the DOCUMENT RECIPIENTagrees that he or she, and/or any other authorized representativesof the DOCUMENT RECIPIENT, will provide no copy (nor partialcopy) to any other person or agency, will not redistribute anydocument to any other entity, business or individual, nor use thedocument for other than the specified purpose. At the point thedocument is no longer required for use by the DOCUMENTRECIPIENT, the data shall be returned to the District or destroyed. 1575B4621575B462 PROJECT SITE DWG 40 7 9 - B 5 2 ' R / W 3 6 6 1 D W G 7 9 2 9 - G 40 ' R / W 3 6 5 3 25' R/W 3 6 6 1 DWG 7929- G DWG 7 6 6 3 - G R/W 555 2 DWG 91 5 2 - G 1 5 ' R / W 3 8 9 0 - B 15' R/ W 3 8 9 0 - A DW G 7 9 2 9 - G R/W 3 4 7 9 15' R / W 3 4 7 9 PARCEL 2 25' R / W 3 6 6 1 DWG 40 7 9 - B PARCEL 1R/W 555 2 DWG 79 2 9 - G DWG 915 2 - G 26' R/W 36 6 5 DW G 7 9 1 5 - G 5 2 ' R / W 3 6 6 1 DW G 7 9 1 5 - G PARCEL 3 R/W 55 5 2 DW G 9 1 5 2 - G DWG 915 2 - G DW G 9 1 5 2 - G R/ W 3 6 6 5 DWG 7 9 1 5 - G DWG 4 0 7 9 - B 15' R/W 3 8 9 0 - D 15' R/W 3 8 9 0 - C 26 ' R / W 3 6 6 5 25' R/W 3 6 6 1 DWG 791 5 - G R/ W 3 4 7 9 1 5 ' R / W 3 8 9 0 - E DWG 7 9 1 5 - G DWG 7 6 6 3 - G 2 5 ' R / W 3 6 6 1 6 8 ' R A M O N A E R A RD 17' CANYON BOLL I N G E R C A N Y O N T RD 100' K T M 10 0 ' T A L C O S T A CIR 25 ' 100' CIR M K BISHO P 100' 1 0 0 ' M BOLL I N G E R C A N Y O N 100' E 100' Y 84' E L M A N T O REFLE C T I O N S WINT E R CANYON D R DR C A M I N O 84' 12 4 ' 1 0 0 ' P R E F L E C T I O N S B L V D P 60' T WINTE R W I N D 42' SU N S E T R 40' M WI N T E R S I D E B L V D 25' 37' L R A L C O S T A NA O C 12 4 ' RD K 90' REFLE C T I O N S G Y E L D E 12 4 ' BOLLING E R 60' O C I R R S S P R I N G F I % % % % % % % %% % % % % % % %% % % % % % % % % % % % % % % % % % "! àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ 2019DERWAPUMP STATION R200A FAC 1879 R R R R R R R R R D 3 5 9 4 0 2600 D2994 0 2633 6 6 4 0 D 4 0 0 8 2 D 4 5 9 4 8 6 3 9 1 2665 60 0 0 D 4 1 4 2 0 C2 0 1 5 2 D34525 60 0 1 6 1 0 1 D34541 3 3 5 1 C 1 6 3 4 7 16SMB0 5 6N016 6SMB 16N05 16N0 0 9 1 6 N 0 1 6 1006 4 9 2 1 0 0 5 0 1 8 - A 10 0 5 0 1 8 - A 100649 2 2 0 0 9 6 9 2 20 0 9 6 9 3 16SM B 0 5 1 6 N 0 1 6 1 6 N 0 1 6 - R J 6SMB 0 5 6N05 10064 9 2 1 0 0 5 0 1 8 - A 1 6 N 0 1 6 - R J 1 6 S M B 0 1 6 1 6 N 0 1 6 - R J 20 0 9 7 0 5 1006492 6N05 1 6 S M B 0 5 16N00 9 2 0 0 9 6 9 3 - A 1 6 S M B 0 1 6 16SM B 0 5 6SMB01 6 8 S M B 0 5 1 6 S M B 0 5 2005696 10064 9 2 6N 1 6 S M B 0 5 6N016 8N 0 1 1 2 0 0 9 6 9 2 - A 8N 0 1 1 1 6 N 0 1 6 - R J 20 0 2 4 3 5 16 N 0 1 6 - R J 10064 9 2 1 6 N 0 1 6 6SMB0 1 6 200969 6 20 0 9 6 9 2 10064 9 2 6N016 16N05 1 6 N 0 1 6 1 6 N 0 1 6 2 0 0 9 6 9 2 - A 1 6 S M B 0 1 6 2009696 àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅàÅ àÅ àÅ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! "±F4 A F5 B f R4S2 2 6 6 3 10"FS 2 A3 5 7 8 1 60 0 0 - D 5 D4 5 0 9 3 D4 5 0 9 4 4 2" 2" A63661 B 2 8 7 1 6 7 0 0 0 6" F S 1 0 8 1 A87359 1.5" A80614 200 2 0 0 1 . 5 " 6"FS 1" 1" 1" A80621 30 0 1 0 0 1 8"FS 4" F S 77 5 40 3 A 7 9 2 9 4 A8 0 6 0 9 A8318 9 A8 0 6 1 0 A80627 A83188 7 8 3 4 4 5 A7 9 2 8 9 4 5 0 40 5 A8 3 1 9 7 1 . 5 " A 8 3 2 3 2 A8319 9 42 A79285 79 4 1 0 5 B22951 100 D4 3 3 6 2 60 0 0 - D 3 , 7 , 9 A 3 , A 4 , A 5 , A 6 6 0 0 0 60 0 0 A6 3 3 8 3 D 4 5 1 0 0 D 4 5 0 9 8 6 1 0 1 2" D 2 5 1 4 1 1 0 7 1 1 0 9 1 1 . 5 " 6"FS 2" 4" B0 0 2 5 9 6"FS 1" 1.5" 1" 161 A80683 1" A79306 1.5" 8"FS A8 0 6 8 1 A7 9 2 9 2 1.5" 490 1 " 2" 1 . 5 " 772A83190 8"FS A8 3 1 9 5 A 7 9 2 9 6 1. 5 " 8"FS A8 3 2 2 7 33 8 A8 3 2 3 4 A 7 9 3 0 4 5 0 0 7 8 6 44 A8 3 2 3 6 A 8 3 2 3 7 79 2 3 1 5 4"FS 120 A 8 3 1 6 7 A8 3 2 3 8 A8 3 2 0 4 1. 5 " 2600 2" 6 0 0 0 1. 5 " 60 0 0 D 4 5 0 9 5 D4 5 1 0 1 61 2 1 2 " 1 0 " F S B0 1 0 5 1 B 0 0 4 5 5 IRR 1061 1061 A87357 A8 0 6 1 6 A8250 8 12501 8"FS A87328 A87358 A87360 A80622 A8 8 8 4 5 8" F S 1 . 5 " A80635 4 0 1 A80633 IR R A8 3 1 9 6 A 7 9 2 8 8 1 . 5 " 1.5" 78 2 5 0 1 7 8 8 1 . 5 " A7 9 2 8 7 A 8 3 2 2 3 A7 9 2 9 9 A79286 A 8 3 2 2 1 33 1 14 A832 1 9 A832 2 0 800 13 0 A 7 9 2 8 4 8"FS B22953 IR R 2" 2" 4 2683 D 2 5 1 4 0 A87356 1 0 7 1 B 0 1 0 5 2 1. 5 " 8" F S A80615 290 A80612 A80613 100 1.5" A80682 IRR 4 1 5 1 0 0 1 77 3 A 7 9 2 9 1 1" A80634 A8 0 6 3 0 1 . 5 " 800 770 1. 5 " A8062 8 491 A 8 3 2 2 8 3 4 0 3 2 5 A 8 3 2 2 5 3 2 5 1 . 5 " A8 0 6 3 1 33 4 3 3 0 A8 3 2 4 0 A 8 3 2 0 5 A 7 9 2 7 7 1 . 5 " 1.5" D4 3 3 6 0 2" A1 , A 2 6 0 0 0 - C 1 2" 2" D4 5 0 9 9 B 2 8 7 1 9 2 " 2" 4" F S 1041 A768 6 2 12555 10 8 1 2" 1061 1061-A A8 0 6 8 4 A8061 8 1.5" 4 " D S 427 130 IR R 7 7 7 A 8 3 1 9 3 3 6 5 4 2 5 12 5 401 768 77 6 7 8 1 400 1.5" 1.5" A8 3 2 3 1 77 8 1. 5 " A 8 3 2 3 3 7 8 4 A8320 0 A8320 1 A 8 3 2 2 2 3 3 3 12 1 . 5 " 60 0 0 - D 1 , 1 0 , 2 , 8 1. 5 " D 4 3 3 6 1 2" D 4 3 3 4 8 6 0 0 0 C 6 , 7 , 9 , 1 0 60 0 0 1 2 1 6 , 1 2 1 7 , C 3 , C 5 70 0 0 A87329 1041 B 0 1 0 7 2 131 1" A80620 375 600 A80629 A 8 0 6 2 4 A8 3 1 9 1 700 A8062 5 7 7 9 A 7 9 2 9 5 4 3 5 401 1 . 5 " A 8 0 6 3 2 1 6 3 3 5 1 . 5 " A 7 9 3 0 0 A8 0 6 8 6 6" F S 33 6 33 2 A 8 3 2 0 2 1.5" A 8 3 2 0 3 A 7 9 2 7 6 IR R 2 8 5 110 A 8 3 1 6 6 A8 3 2 3 9 2" 100 3 4 32 0 0 B27343 8 " F S 2633 4 D 4 5 0 9 7 2 " 60 0 0 - C 8 B 2 8 7 1 8 6 1 0 1 B2 8 7 1 7 A87330 1" 6" F S 6"FS A88892 10 0 19 0 A8061 7 1021 1" 157 131 A 8 7 3 9 5 390 A 8 8 7 9 4 1" 1 . 5 " A 8 3 1 9 2 1 . 5 " A 7 9 3 0 3 10 1 35 5 A 7 9 2 9 0 A80687 A80626 A 8 3 2 3 0 600 400 A 8 3 2 2 9 7 8 5 43 45 A8 3 2 2 4 1 0 0 79 0 1.5" 7 9 9 A 7 9 3 0 5 A67423 A 6 3 6 7 3 60 0 0 2 " 4 B1 , B 2 , B 3 , B 4 16 1 2 , 2 6 0 1 , B 7 , B 8 2 " 6 0 0 0 4 1" 6 1 1 1 4" 250 1021-B A806 8 0 A8 0 6 1 9 1021 375A7929 3 40 5 R 2 A 7 9 3 0 8 A80611 101 391 3 0 0 4 2 5 A 8 3 1 9 4 1 . 5 " A80685 18 A8319 8 3 4 5 2"I R R 78 0 A 7 9 2 9 7 IR R A8 3 2 2 6 30 5 A8 3 2 3 5 A 7 9 2 9 8 79 5 1 . 5 " D23080 1 . 5 " 7 9 7 309 2 8 5 A 8 3 1 6 5 5 1 H-1830 8 H-172 3 4 H- 1 7 2 3 1 H-1738 6 H-1720 8 H-18 3 0 7 H - 1 8 3 1 2 H- 1 7 2 3 2 H- 1 7 2 2 9 FH-1001 8 FH-10017 F H - 1 3 8 2 2 H- 1 8 3 1 0 H- 1 8 3 1 1 H-172 3 6 H-17235 H-18309 H-17228 H-172 0 7 H- 1 7 2 2 7 H-1 6 0 4 2 H- 1 8 5 3 6 H- 1 7 2 3 0 H- 1 7 3 8 9 H-14816 H- 1 7 5 7 6 H-1 7 2 0 9 H-1721 1 H-1720 1 H-1481 5 H-1 6 0 4 3 H-1738 0 H- 1 7 2 9 5 H-15119 H- 1 4 8 0 5 H- 1 7 2 3 3 FH-10 8 6 6 H- 1 7 2 1 0 H-17212 H- 1 7 1 6 2 43934- B 8N89 4685 1 12SM B 8 5 16SM B 8 5 8N8747530- B 8N88 12SM B 8 7 8N88 47655 4693 0 - C P 4 5 7 4 1 45 8 7 5 16SM M B 7 6 12 S M B 8 8 48 2 9 8 - A 8N88 43934 - B 12SM B 8 5 12SMB8 8 8N88 8SMB 8 8 P405 8 6 46 8 5 1 6N87 46 8 5 1 8 H 0 1 7 45 8 7 5 48 2 9 8 47 5 8 3 8N89 46851 1 2 S M B 8 7 47 5 3 1 8N87 47654 8SM B 8 5 16SMMB 7 6 8 N 8 9 4 7 5 3 0 - B 4 7 5 8 4 - D 2 0 S M T W 8 5 6 N 8 7 47584 20 S M T W 8 5 8N 8 7 1 2 S M B 8 1 8 N 8 9 4393 4 - B 4758 4 - A 8 N 8 8 8N88 47584 - A 4697 4 - B 8N87 8 N 8 8 47584 - A 46 9 3 0 - C 45876 43934-B 45876 48298 16SM M B 7 6 20SM M 8 5 47584-E 2 0 S M T W 8 5 47583 47584 8N87 46 8 5 1 8A 8 5 6A8 5 47654 8N87 47530- B 8N87 47584- B 8N88 8A85 8A81 1 2 S M B 8 1 48298-A 46 8 5 1 47530- B 47 5 8 4 8S M B 8 5 1 2 S M B 8 7 8A81 8N 8 8 475 8 4 - C 16SM M B 7 6 8 N 8 7 4 7 6 5 5 - C 47530 469 3 1 - I 475 3 0 15 7 8 B 4 6 2 15 7 5 B 4 6 2 1578B462 1578B464 1578B462 1578B460 15 7 8 B 4 6 2 15 8 1 B 4 6 2 15 8 1 B 4 6 0 1575B462 1575B464 1575B462 1575B460 15 7 5 B 4 6 4 15 7 8 B 4 6 4 15 8 1 B 4 6 4 15 7 8 B 4 6 0 15 7 5 B 4 6 0 F 4 A F4A F 4 A F4A F4 A F5Bf F 4 A F4A F4A F4A F4A F4A F 4 A F4A F4A F4 A F4 A F4A Potable Distribution System Potable Pipeline Service Lateral àÅ System Valve (OL = Opens Left) I3 Check Valve "±Zone Valve Change of Pipe ID &,C Rate Control Station &,R Regulator ",P Pressure Reducing Station G¥Flow Meter +Manhole Service Connection !Hydrant Facility a Pumping Plant Recycled Distribution System Recycled Pipeline Service Lateral Service Connection Landbase EBMUD Right of Way ± 0 250 500125 Feet Date Printed: 3/2/2023 This information is furnished as a public service by East BayMunicipal Utility District. The District makes every effort to produceand publish the most current and accurate information possible.This information must be accepted and used by the recipient withthe understanding that the District makes no warranties, expressedor implied, concerning the accuracy, completeness, reliability, orsuitability for the use of this information. Furthermore, the Districtassumes no liability associated with the use or misuse of suchinformation. Please notify the District if discrepancies are found. By receipt of requested documents, the DOCUMENT RECIPIENTagrees that he or she, and/or any other authorized representativesof the DOCUMENT RECIPIENT, will provide no copy (nor partialcopy) to any other person or agency, will not redistribute anydocument to any other entity, business or individual, nor use thedocument for other than the specified purpose. At the point thedocument is no longer required for use by the DOCUMENTRECIPIENT, the data shall be returned to the District or destroyed. 1578B4621578B462 PROJECT SITE 680 3 0 ' R / W 2 8 7 2 D W G 7 9 4 1 - G R/ W 3 6 8 8 25' R / W 3 6 6 1 DWG 7 9 1 5 - G 25' R/W 3 6 6 1 DWG 791 5 - G DW G 3 0 1 7 - B 56' C O CT 52' 52' CIR L O M O N D 52' D LOMON D O DUNBA R T O N C I R 56' 5 2 ' S T 52'CIR CI R R S H E T L A N D 52' 56 ' 5 2 ' N E 100' CI CR CIR DR 52' 52' C H A U C E R C T CT B D 5 6 ' CI R 52 ' CT CT 60' R 52' 52' 52' C H A U C E R 5 2 ' U R O 52 ' DR DUNBA R T O N D R REFLE C T I O N S I FALLE N C I R WINT E R IN T E R S T A T E MAINPR I C E C T CI R 52' BURNS C T D 5 2 ' LOMON D R E F L E C T I O N S 5 2 ' WI N T E R W I N D FO X B O R O WINTE R W I N D C H A U C E R 52' R WI N T E R S I D E 52 ' 25' C I R ASCOT C T A C A M E R O N C A M E R O N ASCO T 52' 60' D A WINTE R S I D E PI N K E R T O N B U R N S 52' C I R E M O DUNBA R T O N C I R 45' 56 ' % % % % % % % % % % % àÅ àÅ àÅ àÅ àÅ 2019DERWAPUMP STATION R200A FAC 1879 R R RR 555 581 C17 0 8 0 62 5 D13803 13000 C17 0 7 9 C17325 1 0 0 5 0 1 8 - A 10 0 5 0 1 8 - A 100649 2 4N04 20 0 0 2 1 9 1 6 S M B 0 5 16N00 9 100541 7 1 0 0 5 4 1 8 10 0 5 0 1 8 - A 1 6 S M B 0 5 8 S M B 0 5 8 N 0 4 10 0 5 4 1 9 4 N 0 4 4 N 0 4 1 6 S M B 0 5 àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! 283 8 4 0 A 5 0 0 8 5 28 2 0 2 8 2 5 A5 0 0 6 7 A5 0 0 8 3 2 8 1 4 A5007 5 1. 5 " 374 65 356 27 23 21 A 5 6 2 8 9 332 316 2 7 6 6 532 313 321 495 2 7 4 8 55 0 A552 2 5 A 5 6 2 8 2 4 8 4 43 A 6 4 6 2 2 454 462 603 A64616 457 606 461 A55002 30 A 6 4 6 0 4 602 14 16 40 7 7 A6 4 5 6 6 A64636 627 A 5 1 8 4 5 A64637 A6 4 5 6 9 4017 77 5 A64572 A 7 9 2 9 4 13000 A8318 9 11 0 A64575 A83188 7 8 3 10 0 4000 A8 3 1 9 7 1 . 5 " A83180 756 A 8 3 2 3 2 A8319 9 752 344 A456 7 2 1"IRR 42 5 8 5 79 4 7 3 3 351 3 7 35 A5 0 0 6 4 28 3 2 A500 7 9 1 " 4 4 375A5007 6 368 A 5 4 8 5 2 A5 6 2 8 6 A55236 A54848 2 7 7 8 A5 4 8 4 2 3 3 8 326 2 7 6 0 A 5 5 2 3 3 27 5 9 A5 6 2 9 3 493 54 4 A57264 A5 6 2 9 5 2 7 4 1 494 2 7 3 0 A5 6 2 9 7 A5 6 2 8 3 568 450 609 A55010 A6 4 5 6 0 A64608 A6 4 5 6 1 A64624 2 6 9 3 40 9 5 31A64632 12 A6 4 6 0 3 A64 6 2 8 60 5 8 633 A 6 4 5 7 8 4 0 7 1 A 6 4 5 8 7 A6 4 5 9 8 20 A6 4 5 8 6 A64 5 9 7 3 0 7 4 A 5 1 8 4 7 5 3 A79306 1.5" 3 9 9 9 4038 4042 3 0 9 7 772A83190 A3 5 4 0 2 A8 3 1 9 5 A83183 A 7 9 2 9 6 1. 5 " A8 3 2 2 7 C17324 A 8 3 1 5 1 33 8 A8 3 2 3 4 A 7 9 3 0 4 A83176 7 8 6 44 10094 7 4 1 7 3 9 33 7 A8 3 2 3 6 A 8 3 2 3 7 79 2 3 1 5 10 0 7 4 7 3 7 347 A 8 3 1 6 7 A8 3 2 3 8 A8 3 2 0 4 A83300 IR R 36 A50058 2 8 2 6 380 IR R 362 A5 4 8 4 9 A5 6 2 8 8 A5 7 2 5 8 A5 6 2 9 1 A57257 2 7 6 5 A56279 13 27 3 6 A55223 A5501 9 A57272 557 561 4 8 0 2 7 1 8 44 A55009 A64617 60 0 1 - A 465A64609 A8 0 7 5 4 A64625 A6 4 5 6 2 A 5 1 8 5 5 A6 4 5 6 3 A64630 6 2 40 8 9 A6 4 6 0 2 3 0 5 5 A64629 A5 1 8 5 7 37 A6 4 6 0 1 40 7 8 A6 4 5 6 5 A 5 1 8 5 8 640 A6 4 5 9 2 A6464 0 56 A6 4 5 9 9 A6 4 5 6 7 2 1 A 6 4 6 4 1 A 6 4 5 9 4 A64 5 7 0 A8250 9 4024 A 5 1 8 5 0 12"FS A83187 A8 3 1 9 6 A64577 A64576 78 2 750 A83173 A 8 3 1 5 2 A83178 7 8 8 1. 5 " A8 3 1 5 3 354 A 8 3 2 2 3 A7 9 2 9 9 A 4 5 6 7 3 A83169 A 8 3 2 2 1 A45705 33 1 14 A832 1 9 A832 2 0 800 A50 0 6 3 2870 A5 0 0 8 1 A5 0 0 7 7 5 2 A5 0 0 6 8 A 5 0 0 8 2 A 5 6 2 8 4 A5 0 0 2 9 A55237 A 5 4 8 5 1 A55235 A50116 A54 8 4 3 A54845 2 7 7 1 A57262 A57263 A55228 496 27 2 9 A6 4 5 5 6 573A55015 A55007 46 42 40 27 0 0 2 6 9 9 608 A64623 A 6 4 6 0 5 17 A64 6 1 1 A 6 4 6 1 4 1.5" A6809 3 A6 4 6 2 7 30 6 1 A64634 A64635 A6 4 6 0 0 A6 4 5 9 3 4 0 6 6 A64638 3 9 8 1 40 6 5 2 5 A 6 4 6 4 2 52 A6 4 5 8 5 30 8 0 A64584 IRR A 5 1 8 4 8 A64571 77 3 4036 770 3 0 9 2 A 8 3 2 2 8 A83179 A83175 A83174 3 4 0 3 2 5 348 346 A 8 3 2 2 5 3 2 5 10 0 7 8 33 4 A83171 3 3 0 10089 A83299 353 A8 3 2 4 0 A 8 3 2 0 5 A 5 4 3 1 6 39 2864 2 8 0 7 350 27 9 6 2 7 9 0 A55234 A54847 A5 0 1 1 7 A5 7 2 6 0 A54853 A57261 A56280 A5 5 2 2 7 A5 6 2 9 6 A56277 556 47 A57 2 7 0 A64620 A64621 A57266 A64619 A64618 27 0 5 A6 4 6 0 6 8 " A6 4 6 1 0 34 3 0 4 9 40 9 0 A64631 A 6 4 5 6 4 A6 4 5 9 1 A646 3 9 5 9 4 0 6 0 A 6 4 6 4 5 39 8 7 A 6 4 5 6 8 404 7 3 0 8 5 22 130 A3 5 4 0 4 A 6 4 5 8 2 30 8 6 A5 1 8 2 8 7 7 7 A 8 3 1 9 3 3 6 5 4018 768 766 77 6 7 8 1 4006 764 A83185 A8 3 2 3 1 77 8 754 758 1. 5 " 74 7 A 8 3 2 3 3 7 8 4 A83373 581 5 8 1 350 A8320 0 A8320 1 A45668 A 8 3 2 6 7 5 8 3 A 8 3 2 6 8 A 8 3 2 2 2 A 8 3 1 5 4 A 8 3 1 5 5 A83170 3 3 3 A 8 3 1 5 6 12 1" 2856 34 41 A 5 0 0 7 8 2 8 0 2 A500 7 4 2 8 0 1 27 9 5 25 A54 8 3 9 28 24A54841 312 A5 6 2 9 0 A54844 A 5 6 2 9 2 317 A54854 27 5 4 498 2 7 4 2 A5 5 2 2 6 492 488 27 2 4 A6 4 5 5 7 565 569 A55008 A 6 4 5 5 8 A6 4 5 5 9 A55006 470 466 A55005 610 604 40 9 6 600 A646 2 6 33 A5 1 8 5 6 A64 6 3 3 A6 4 5 8 9 40 7 2 3 9 7 5 54 A 5 1 8 4 6 5 5 A6 4 5 9 5 A 6 4 6 4 4 A646 4 3 A6 4 5 9 6 404 8 375 A8 3 1 9 1 A 5 1 8 4 9 4011 A64574 A64573 7 7 9 A 7 9 2 9 5 1 6 3 3 5 13000 352A83177 33 6 33 2 A 8 3 2 0 2 A 8 3 2 0 3 A4 5 6 7 4 A 8 3 1 6 6 A83164 A8 3 2 3 9 A50 0 6 1 A5 0 0 6 5 A 5 0 0 6 6 2 8 3 1 A 5 0 0 8 4 369 6 3 A50072 A50071 A50073 29 A548 3 8 A54840 26 27 7 2 320 A 5 7 2 5 9 53 8 329 325 A57265 A56278 A55224 A56276 2 7 3 5 45 A57271 A 5 7 2 7 4 A55016 A57267 458 27 0 6 605 607 A55011 2 6 9 4 A55004 A55021 1 0 A 6 4 6 1 5 36 A64613 20 40 8 4 35 A 6 4 5 9 0 4 0 8 3 634 6 1 658 A 6 4 5 7 9 57 3 0 6 8 A6 4 5 8 0 40 5 4 A 6 4 6 4 6 A5 1 8 2 7 1 . 5 " 12 0 A 8 3 1 9 2 1 . 5 " 35 5 4012 A83186 A 8 3 2 3 0 A3 5 4 0 1 762 760 A 8 3 2 2 9 7 8 5 A83182 43 45 2" A8 3 2 2 4 A45669 10090 79 0 A 8 3 2 6 9 7 9 9 A45704 A83172 A50 0 6 2 A50059 A5 0 0 6 0 A50057 A5 0 0 8 0 2837 45 48 A50069 2 8 0 8 A 5 0 0 8 9 A50070 A 5 6 2 8 5 A5 4 8 5 0 A 5 6 2 8 7 27 8 9 27 8 4 308 A54846 A54856 A54855 A 5 6 2 9 4 491 489 487 A 5 6 2 8 1 562 A5 7 2 7 5 A57273 A55017 A55018 48 27 2 3 A5726 9 27 1 2 611 A57268 A64607 A55003 32 15051 38 A64612 39 628 30 6 7 646 A6 4 5 8 8 30 6 2 652 375A7929 3 3 9 9 3 A 6 4 5 8 1 5 0 30 9 1 24 A64650 A3 5 4 0 3 A64583 A 8 3 1 9 4 A83184 18 A8319 8 3 4 5 A83181 78 0 A 7 9 2 9 7 IR R A8 3 2 2 6 A45670 A45671 10086 1008 2 74 5 A8 3 2 3 5 A 7 9 2 9 8 A 8 3 1 6 8 79 5 349 33 5 7 9 7 578 5 8 7 7 3 5 A 8 3 1 6 5 5 1 H-13077 H- 1 3 4 1 5 H-13412 H- 1 3 4 1 3 H-12547 H-15128 H- 1 3 7 1 6 H-15136 H-15134 H-1738 6 H- 1 7 3 8 5 H-1720 8 H- 1 2 5 4 9 H-17387 H- 1 3 7 1 3 H- 1 5 1 3 8 H-15139 H-15132 H-1513 7 H- 1 1 4 5 3 H- 1 7 3 4 8 H-1 3 0 7 6 H-13081 H-13702 H- 1 3 7 0 8 H - 1 3 4 1 4 H-172 0 7 H-13080 H- 1 3 7 0 3 H-1370 4 H-137 0 7 H-13 7 1 5 H- 1 5 1 2 9 H-1 7 8 5 5 H- 1 7 3 8 9 H- 1 3 0 7 9 H-1370 6 H - 1 3 7 1 4 H-1513 0 H-15133 H-1 7 2 0 9 H-13701 H-1308 4 H- 1 3 7 0 5 H- 1 3 7 0 9 H-1513 1 H-1738 0 H-13712 H-1371 0 H-1371 1 H- 1 7 2 1 0 H - 1 5 1 3 5 8A7 9 44 9 5 2 - A 6 A 7 9 6 A 7 9 8A83 4627 2 - B 46 2 7 0 46272- E 8 A 8 3 8 S M B 8 3 6A84 6A 8 3 46272 45106 8SMB7 9 46 2 7 2 8N8747530- B 4 5 1 0 6 - A 8 A 7 7 47655-E 8N87 47655 8 N 8 7 44953-E 4 4 9 5 2 - A 6 A 7 9 45248- C 45 2 4 8 - D 6A83 4 6 2 7 1 46273 46273 - B 4N83 8A 8 3 4 6 2 7 1 44052 6A75 45 1 0 6 - A 44 0 5 1 6N87 8A79 6A79 6A79 6 A 7 9 6 A 7 9 46271-A 45 2 4 8 - B 6 A 7 9 46 2 7 3 - C 8S M B 8 3 6 A 7 9 46272-A 47654 6A79 8 A 7 9 6A79 6 A 7 9 6A7 9 4 5 2 4 8 - C 6 A 7 9 46271-A 6A 7 9 6A 8 3 6A83 6 A 8 3 4N 8 3 8A 8 3 4 7 5 3 0 - B 6SMB7 9 8A79 8S M M B 7 5 8A 7 9 47 6 5 4 8 A 7 5 6 N 8 7 8S M B 7 9 449 5 3 6 A 7 9 452 4 8 - B 6A79 46 2 7 2 - B 4 N 8 3 46 2 7 3 - A 46 2 7 2 - D 8 A 7 9 6 N 8 7 449 5 2 - A 45249 4 5 2 4 8 - D 6 A 7 9 45 2 4 8 - A 6A83 4 6 2 7 2 - C 462 7 1 46 2 7 1 8N87 47654 8N87 47530- B 8N87 44952 - A 44953-D 4 4 9 5 3 - F 44 9 5 3 - F 45248 8A79 45248-E 46272- D 4 5 1 0 7 - A 46 2 7 1 46272 46 2 7 1 45 1 0 7 6A84 45106- A 8 A 8 3 4 4 0 5 1 44 7 2 9 47654 47 6 5 2 1 2 S M B 8 7 8A79 6 A 7 9 4 5 2 4 8 - E 45249 8A83 4 5 2 4 8 - F 1 2 S M B 8 3 4N84 6A84 8 N 8 7 45107 6 A 8 4 8 N 8 7 6N87 4 7 6 5 5 - C 4 7 6 5 5 15 7 8 B 4 6 2 15 7 5 B 4 6 2 1578B462 1578B460 15 8 1 B 4 6 2 15 8 1 B 4 6 0 15 7 8 B 4 6 0 1581B458 1575B462 1575B460 15 7 8 B 4 5 8 15 7 5 B 4 5 8 1578B458 1578B460 1575B458 1575B460 15 7 8 B 4 6 0 15 7 5 B 4 6 0 F 4 A F 4 A F4A F4A F4A F4A F4A F4 A F4A F 4 A F4A F4 A F4A F 4 A F4A F4A F4A F 4 A F4 A F4A F4A Potable Distribution System Potable Pipeline Service Lateral àÅ System Valve (OL = Opens Left) I3 Check Valve "±Zone Valve Change of Pipe ID &,C Rate Control Station &,R Regulator ",P Pressure Reducing Station G¥Flow Meter +Manhole Service Connection !Hydrant Facility a Pumping Plant Recycled Distribution System Recycled Pipeline Service Lateral Service Connection Landbase EBMUD Right of Way ± 0 250 500125 Feet Date Printed: 3/2/2023 This information is furnished as a public service by East BayMunicipal Utility District. The District makes every effort to produceand publish the most current and accurate information possible.This information must be accepted and used by the recipient withthe understanding that the District makes no warranties, expressedor implied, concerning the accuracy, completeness, reliability, orsuitability for the use of this information. Furthermore, the Districtassumes no liability associated with the use or misuse of suchinformation. Please notify the District if discrepancies are found. By receipt of requested documents, the DOCUMENT RECIPIENTagrees that he or she, and/or any other authorized representativesof the DOCUMENT RECIPIENT, will provide no copy (nor partialcopy) to any other person or agency, will not redistribute anydocument to any other entity, business or individual, nor use thedocument for other than the specified purpose. At the point thedocument is no longer required for use by the DOCUMENTRECIPIENT, the data shall be returned to the District or destroyed. 1578B4601578B460 PROJECT SITE 680 680 DW G 7 3 4 5 - G 8' R/W 3 6 6 3 DWG 987 9 - G 15' R / W 3 3 6 7 R/W 4582 R/ W 3 3 6 7 DWG 7 3 4 5 - G R/ W 3 3 6 7 DWG 73 4 5 - G R/ W S - 9 0 9 & S - 1 1 9 8 R/W 3 3 6 7 C O N S T D W G S - 1 1 9 8 DW G 7 3 4 5 - G DWG 73 4 5 - G L 52 ' R 52' 100 ' C E R H T 56' A ES S A NE R CI R CI I N D 52' A 60' R N DR HA R N E S S H BLV D BOLLING E R B HAR N E S S IN T E R S T A T E DR 56' P A P H TA L A V E R A DR C 52' O N A CIR 12 4 ' E 124' DR R HARNE S S C T 28' 56' TRAILV I E W CT BARNW O O D A 60' BOLLINGE R C A C R CT N S M B R I D L E P A T H RD 52' 56' 56' A HO P I C T MO R G A N A R CH E R O K E E 52' A H A HA 28' R S O R O S O M B R E R O 52 ' 52' 36' R IN T E R S T A T E A H I 56' TWN O LORCA RD LN S O U T H 56' CIR 56 ' F W Y A R 56' A P CANYON R SS BOLLINGE R C A N Y O N R D R A M O N 36' 28' HA R N E S S D S E R C T 56' S A N R A M O N V A L L E Y S O M B R E R O B L V D S A N R A M O N ASCOT C T O 10 0 ' R O CT E S C I D 56' S A N H V A L L E Y LN N O R T H HA R N E S S CANYON L O N G H O R N 56' C R % % % % % % % + àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅàÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ àÅ ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! "±F4AF5Bf A6643 6 A66409 A66410 57 A66 3 2 0 A664 3 8 2905 A66 4 3 9 135 A6 6 4 4 1 A35 7 7 9 297 0 289 0 A6 6 4 4 3 14 6 389 287 5 20 150 24 2871 A52138 A6 6 4 4 8 15 8 A663 0 6 1170-A 368 16 0 A6 6 4 4 9 4 0 A68679 A68678 A686 5 9 1180 A68541 A68647 1130 A686 4 8 1140 1171 1190-A A68547 A685 5 2 1091 A68 6 7 1 A685 5 4 A685 5 5 1091 A68 6 6 4 1161 1.5" A686 2 9 1121 1171 - A 1121 1151 970 A686 3 7 1141 A6 8 5 7 3 9 9 0 1021 A686 1 2 1151 2936 A6 8 5 7 8 A56474 A685 2 9 A68 6 2 5 2956 2 8 9 2 IR R A68 5 9 6 A68 6 2 2 A6 8 6 2 0 2960 2939 A6 8 5 8 5 1020 A6 8 5 8 1 4" 102 0 A63864 28 28 7 6 IRR A6 8 5 3 1 A68592 A68593 1041 A63885 2987 28 6 5 A5 6 4 5 2 285 1 70 A63898 2821 2805 A56444 A63904 3127 2806 A63915 80 8 3111 A5 6 4 3 4 A 5 6 4 3 7 3107 8 0 0 IRR12201 1. 5 " 3104 283 8 126 A6642 6 118 A66 3 1 9 A6 6 4 2 4 A66 4 1 8 290 2 34 289 1 A6 6 4 5 7 2301 A521 3 3 23 392 A54288 384 A663 0 8 385 2861 IRR A52125 A68674 A68673 1150 A68676 1150 1120-A 1150 A68540 1171 1" 1081 A685 4 9 1" A686 5 2 IRR 18050 6"FS A 6 8 5 5 7 A686 2 8 A6855 8 1151 970 A686 1 9 1151 2928 980 1090 A686 1 5 A 6 8 5 7 2 1061 A68 6 2 7 B05 3 7 5 A68 6 2 6 180 7 0 A 5 6 4 6 1 100 0 A68 6 0 6 101 0 A63871 10 5 3 - A A68 6 1 1 A68 6 0 9 A68 6 2 1 A63870 2925A56483 A6 8 5 8 7 A68 5 9 9 1030 2980A63866 A68 6 0 3 A5 6 4 5 6 IR R 5 4 A 5 6 5 0 2 2 8 6 4 A68590 A68595 A63886 A63 8 7 6 A 5 6 4 9 4 A5 6 5 0 3 62 A 6 3 8 8 0 A63899 2839 39 A56510 2813 A56448 A56512 2844 42 2801 A56441 36 40 8 1 2 3119 3101 A63831 A5 6 4 3 2 3120 A6 4 5 5 0 B0 5 3 7 6 3096 3 7 35 A5 0 0 6 4 28 3 2 A664 1 4 291 8 A664 2 8 122 A6 6 4 6 2 A6 6 4 4 0 A6 6 4 6 0 11 0 A 6 6 4 5 9 289 3 A6 6 4 2 2 A6 6 4 6 4 A6 6 4 4 2 A52 1 3 1 2317 A66452 A66 3 1 0 A5 2 1 2 8 A5 2 1 2 7 A6630 5 364 A52123 A68660 A68677 1180 #131 1120 A68644 A68545 1171 1171 1091A685 4 8 C10954 A685 5 0 1130 1130 B16120 IRR A6 8 5 6 2 1091 A686 3 0 1080 - A A685 6 0 IRR A686 1 6 1021 2920 2916 A68571 IRR 103 0 - A A68 5 3 8 A56471 103 1 A 5 6 4 6 2 A68 6 0 4 2952 10 6 0 IRR A68 6 1 0 A 5 6 4 5 8 A6 8 5 8 6 10 6 0 A68 5 9 8 1.5" A68532 10201030 2976 A5649 2 A56491 1" A6 3 8 7 5 A56500 1051 1051 25 A5 6 4 5 1 A56507 A56 4 5 0 285 2 A63 9 0 0 A6 3 9 0 1 A56443 2824 3123 2812 2816 A56440 A5 6 4 3 6 A59545 80 5 A 5 6 4 3 8 60 0 1 A63835 IR R 36 A50058 A664 0 8 A66 3 2 1 45 A664 2 7 136 2910 138 A66461 A66 4 1 7 2906 290 1 10 9 140 1. 5 " A66444 21 A52134 A6 6 4 6 7 A66 3 1 1 A5 2 1 3 0 A6 6 4 4 6 20 A664 6 9 14 A6 6 4 5 1 A663 0 7 37 6 2868 1170 A66302 1" 1120 A68645 1160-A A68668 1084-A A686 5 0 A68666 A685 3 9 IRR 1081 1081 A686 5 4 116 1 # 1 2 4 1161 A6852 8 A685 6 1 1071 A 6 8 5 5 6 1153 - A A6855 9 A686 4 0 1"IR R 980 A68566 1"I R R A6857 6 B15 3 5 4 2940 A 5 6 4 6 3 1061 109 9 IRR 180 7 0 6"F S 2944 A68 6 0 5 110 0 110 0 180 8 0 101 0 B15 3 5 3 2" A63869 A564 8 4 28 9 5 28 8 4 1" 2 8 8 9 10 6 0 1 0 5 0 A686 0 1 103 0 B15 1 5 7 A63865 2 8 8 5 2 8 8 0 1" 103 0 A 6 3 8 7 2 24 28 7 7 A 5 6 5 0 1 28 7 2 1 0 4 5 - A 1" A 5 6 4 5 4 1051A68591 2983 A56498 21 A56497 A56 5 0 4 A63878 71 2817 2825 284 8 2809 A56446 A56447 A56445 A639 0 3 A63905 3115 A63914 A 5 6 4 3 1 3112 7 9 9 A50 0 6 3 2870 41 A6 6 4 3 7 291 4 A 6 6 4 6 3 A66 3 1 7 3 3 A664 2 0 14 4 10 5 23 21 10 1 26 A52 1 3 5 24 2876 38 0 A 5 2 1 3 7 15 4 A664 7 1 A68661 1170 A68675 1170 A66303 A68662 2848 A686 5 7 A65353 A685 5 1 1" A686 4 9 A68669 A685 5 3 105 0 - A A685 4 4 1"IRR 971-A A6 8 5 6 3 A686 3 3 1131 A686 4 2 A685 4 2 1071 A686 1 7 1021 A686 3 6 A56465 A56 4 6 4 A686 1 8 A686 1 4 A68 5 3 7 A56469 970 9 9 0 - A A686 1 3 1021 1141 2 9 0 0 A 6 8 5 7 9 B15 3 5 5 1070 - A B15 3 5 6 2" A6 8 5 8 4 100 0 8"F S A56481 2909 A68 5 3 4 B15 1 5 6 2972A63868 2968 A68 6 0 0 2955 10 6 0 A6 3 8 8 3 53 57 36 A68594 IRR 40 2 8 7 3 A68588 1041 2991 28 6 0 35 66 41 A564 4 9 2836 2828 38 A63833 A63832 8 0 1 3116 3100 A 5 4 3 1 6 39 2864 A66411 29 6 2 1 " A664 1 5 2913 A66 4 1 6 125 12 1 A6 6 4 2 3 289 7 A66 3 1 6 10 7 A66 4 5 8 B28 7 9 1 100 A6 6 4 5 5 10 3 A66 3 1 2 A6 6 4 4 5 A664 6 8 287 2 359 2864 A52124 356 1160 1170 A68672 A 6 5 3 5 4 1160 1180 #132 A66301 1150 2844 IRR 1120 IRR 1120 1"IRR A68667 A686 5 3 1130 B16119 1071 - A A686 5 5 A68 6 7 0 98 1 A686 3 1 1140 1071 A686 3 41131 A686 3 5 1" 1121 A68568 1071 A56467 290 8 980 1" 1141 A56468 2 9 0 4 99 0 A6 8 5 2 7 A686 3 9 99 0 A68 6 0 7 1.5" A56475 2948 A6857 5 100 0 A68 6 2 4 101 0 100 0 110 0 103 1 103 1 A56482 2935 A5 6 4 8 5 A5 6 4 5 9 A63867 A56478 A56480 A5 6 4 8 6 A6 8 5 8 0 180 9 0 2951 A56477 A5 6 4 8 7 1024-A 5 1 32 104 3 - A A 6 3 8 8 2 A6 3 8 7 4 61 A68589 1051 1041 5 8 A6 3 8 8 1 4 4 65 A638 7 7 39 31 A63879 A56509 A63918 A63906 A5 6 4 3 5 A63916 A63913 A63912 10 " A63834 A63838 A63836 1" 2856 34 29 6 1 124 61 A663 1 8 A66 4 1 9 10 8 14 2 289 4 14 3 A6 6 4 6 5 A663 1 4 50 0 1 A66456 A 6 6 4 6 6 388 A6 6 4 4 7 2865 1 6 1 A6 6 4 5 0 A68546 A6630 4 2860 2856 1160 1160 A68 6 5 6 A68646 1" 1081 1140 18050 IRR 1131 A686 3 2 A68 5 4 3 9 8 1 9 8 1 1121 # 8 1 A686 4 3 1141 A686 4 1 A68565 980 1090 1090 A56470 A68567 A56472 99 0 1090 103 1 A6857 4 1061 B15 3 5 7 180 8 0 A56476 A6 8 5 3 0 10 5 0 A6 8 6 0 8 180 8 0 2964 10 5 0 A56479 2943 1"IRR 180 9 0 2984 A56488 A6 8 5 8 3 A56490 A68 5 3 3 2 8 6 8 A63884 A 5 6 4 5 3 1041 A56499 A56495 A56496 28 5 6 A56506 A565 0 5 45 A56511 A56508 2840 A6 3 9 0 2 2820 A63917 A56439 81 3 80 9 1.5" A5 6 4 3 3 A63839 A50 0 6 1 A5 0 0 6 5 63 A66 4 2 5 290 9 11 4 2898 A663 1 5 2" A6 6 4 2 1 IRR A52132 A66 3 1 3 1" 2313 A6 6 4 5 4 A66453 A663 0 9 25 A52 1 3 6 A521 3 9 A664 7 0 A5 2 1 2 9 37 3 15 7 1" 37 2 A52126 360 A68663 A686 5 8 1180 2852 A686 5 1 1140 18000 A685 3 6 1130 - A A686 6 5 98 1 116 1 IR R 105 1 - A 1" 2912 A56466 A68564 A68569 A68570 A686 3 8 2932 2924 970 A6857 7 101 0 A56473 28 9 6 110 0 A68 6 2 3 1.5" A 5 6 4 6 0 1061 1" B15 1 5 8 28 8 8 102 0A68 5 9 7 103 5 - A 180 9 0 IRR 2947 A68 6 0 2 20 A56489 A5 6 4 5 7 10 5 0 A6 8 5 8 2 8"F S 50 A6 3 8 7 3 A5 6 4 5 5 A5 6 4 9 3 29 2829 4 4 A56513 2832 A56442 8 0 4 A63911 3124 A63837 3108 IR R A50 0 6 2 A50059 A5 0 0 6 0 A50057 A5 0 0 8 0 H-1 5 3 8 4 H-15382 H-1550 5 H-14 1 8 8 H- 1 3 7 3 8 H- 1 4 8 9 0 H- 1 3 7 3 5 H- 1 4 8 8 4 H-1550 4 H-15502 H- 1 3 7 3 4 H-1538 1 H-1 3 2 8 6 H-1539 8 H-1 5 5 0 0 H-1 5 5 0 8 H-15 5 0 3 H-15 4 9 9 H-1 3 0 7 6 H-1 5 3 9 7 H-13292 H-13739 H-13733 H-1 5 3 8 3 H-15400 H-15 3 8 5 H- 1 5 4 9 8 H-15507 H- 1 4 8 8 9 H- 1 4 1 8 7 H-15393 H-1 3 2 8 7 H- 1 5 3 8 6 FH - 1 1 0 0 6 H- 1 5 5 0 1 H- 1 3 7 4 0 H- 1 4 8 8 5 H-13269 H- 1 5 5 0 6 46 4 4 9 450 3 1 - Q 24SMM6 5 8A83 6A8 3 4652 2 6 A 8 0 452 4 1 - C 8A80 8A7 9 44 9 5 2 - A 6A 8 4 461 3 9 6A 8 4 46449-B 24 S M M 6 5 465 2 2 - A 8A 8 3 465 2 3 45241-B 6 A 8 0 4 5 2 4 1 - A 6A 8 0 45 2 4 1 8SMB80 44953-E 6A 8 4 4 6 4 4 9 1 2 S M B 8 3 46 1 3 9 39 2 7 1 465 2 2 - A 46523 - A 6A 8 3 46620 46 0 3 0 8 A 8 0 45240 39 2 7 1 6A84 464 4 9 - B 4 N 8 4 464 5 0 - B 46 4 5 0 - C 45031-B 464 4 9 43935 6 A 8 4 392 7 1 6A 8 3 465 2 2 - D 6 S M P E 8 7 8SMPE 8 7 6A 8 1 6A 8 0 45240 20 S M M 6 5 6A79 8 A 7 9 4N 8 4 46449-B 8A 7 9 4N 8 4 6A 7 9 6A 7 9 12SMMB76 24S M M 6 5 6A 8 3 6A80 460314N81 2 4 S M M 6 5 39 2 7 2 8S M B 7 9 46 4 5 0 - E 46449 - B 464 4 9 450 3 0 464 5 0 - A 45 0 3 1 - B 43935 465 2 2 - C 39271 6A 8 3 465 2 2 46646 45 2 4 0 - A 45240 449 5 2 - A 12SM B 8 3 4N 8 4 12SMMB76 46522-B6A83 8A 8 3 465 4 3 8N P414 6 0 4 5 2 4 1 16SMB85 8A80 12SMMB76 6A84 6A8 4 46 4 5 0 - D 6A84 12S M B 8 3 4N8 4 6A79 6A84 6A 8 3 465 2 3 - B 8SM B 8 3 4 6 6 2 0 15 7 8 B 4 6 2 15 7 5 B 4 6 2 1578B462 1578B460 15 7 2 B 4 6 2 15 7 5 B 4 6 2 1572B462 1572B460 1575B462 1575B460 15 7 8 B 4 5 8 15 7 5 B 4 5 8 1572B458 15 7 2 B 4 6 0 15 7 5 B 4 6 0 1575B458 1575B460 15 7 8 B 4 6 0 15 7 5 B 4 6 0 F4 A F4A F4 A F5B f F4A F4 A F4 A F4A F4 A F5Bf F5Bf F4A F7 F 1 F 7 F 1 F4A F4 A F4A F 7 F 1 F7 F 1 F7F 1 F 4 A F5Bf F5Bf F5Bf F5 B f Potable Distribution System Potable Pipeline Service Lateral àÅ System Valve (OL = Opens Left) I3 Check Valve "±Zone Valve Change of Pipe ID &,C Rate Control Station &,R Regulator ",P Pressure Reducing Station G¥Flow Meter +Manhole Service Connection !Hydrant Facility a Pumping Plant Landbase EBMUD Right of Way ± 0 250 500125 Feet Date Printed: 3/2/2023 This information is furnished as a public service by East BayMunicipal Utility District. The District makes every effort to produceand publish the most current and accurate information possible.This information must be accepted and used by the recipient withthe understanding that the District makes no warranties, expressedor implied, concerning the accuracy, completeness, reliability, orsuitability for the use of this information. Furthermore, the Districtassumes no liability associated with the use or misuse of suchinformation. Please notify the District if discrepancies are found. By receipt of requested documents, the DOCUMENT RECIPIENTagrees that he or she, and/or any other authorized representativesof the DOCUMENT RECIPIENT, will provide no copy (nor partialcopy) to any other person or agency, will not redistribute anydocument to any other entity, business or individual, nor use thedocument for other than the specified purpose. At the point thedocument is no longer required for use by the DOCUMENTRECIPIENT, the data shall be returned to the District or destroyed. 1575B4601575B460 PROJECT SITE