HomeMy WebLinkAboutOrchards Project CEQA Section 15183 Consistency Checklist, December 4, 2025 Orchards Project CEQA Guidelines Section 15183 Consistency Checklist City of San Ramon, Contra Costa County, California State Clearinghouse Number 2022060549 PREPARED FOR: City of San Ramon 7000 Bollinger Canyon Road San Ramon, CA 94583 925.973.2562 Contact: Cindy M. Yee, AICP, Division Manager PREPARED BY: FirstCarbon Solutions 2999 Oak Road, Suite 250 Walnut Creek, CA 94597 925.357.2562 Contact: Mary Bean, Project Director Maddie Dolan, Project Manager December 1, 2025 •• • FCS An ADEC Innovation THIS PAGE INTENTIONALLY LEFT BLANK ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS iii Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Table of Contents Acronyms and Abbreviations v 1 - Introduction 1 1.1 - CEQA Assessment 1 1.2 - Summary of Results 1 2 - Project Description 3 2.1 - Location and Setting 3 2.2 - Project Background 13 2.3 - Project Characteristics 13 2.4 - Approvals 23 3 - CEQA Guidelines Section 15183: Projects Consistent With a Community Plan or Zoning 25 4 - Environmental Checklist 27 4.1 Aesthetics 28 4.2 Agriculture and Forestry Resources 35 4.3 Air Quality 40 4.4 Biological Resources 61 4.5 Cultural and Tribal Cultural Resources 73 4.6 Energy 84 4.7 Geology and Soils 92 4.8 Greenhouse Gas Emissions 103 4.9 Hazards and Hazardous Materials 108 4.10 Hydrology and Water Quality 118 4.11 Land Use and Planning 129 4.12 Mineral Resources 133 4.13 Noise 135 4.14 Population and Housing 148 4.15 Public Services 151 4.16 Recreation 159 4.17 Transportation 162 4.18 Utilities and Service Systems 170 4.19 Wildfire 177 4.20 Mandatory Findings of Significance 181 5 - List of Preparers 185 ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST iv FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Appendix A: 2040 General Plan EIR Appendix B: Air Quality, GHG, and Energy Supporting Information Appendix C: Biological Resources Supporting Information Appendix D: Cultural Resources Supporting Information Appendix E: Geology and Soils Supporting Information Appendix F: Hazards and Hazardous Materials Supporting Information Appendix G: Hydrology and Water Quality Supporting Information Appendix H: Noise Supporting Information Appendix I: Transportation Supporting Information Tables Table 1: Neighborhood District Unit Mix 20 Table 2: Neighborhood District Parking 21 Table 3: Annual Project Construction Exhaust Emissions–Unmitigated 49 Table 4: Average Daily Project Construction Exhaust Emissions–Unmitigated 50 Table 5: Summary of the Health Impacts at the Maximally Exposed Individual Receptors During Project Construction 54 Table 6: Summary of the Cumulative Health Impacts During Project Construction at the Maximally Exposed Individual 56 Table 7: Transportation Demand Management Measures 168 Exhibits Exhibit 1: Regional Location Map 5 Exhibit 2: Local Vicinity Map 7 Exhibit 3: General Plan Land Use Map 9 Exhibit 4: Zoning Map 11 Exhibit 5: Site Plan 15 Exhibit 6: Phasing Plan 17 ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS v Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx ACRONYMS AND ABBREVIATIONS µg/m3 micrograms per cubic meter °F degrees Fahrenheit °C degrees Celsius (Centigrade) ABAG Association of Bay Area Governments ADT Average Daily Traffic ADU accessory dwelling unit APN Assessor’s Parcel Number AQMP Air Quality Management Plan ARB California Air Resources Board BART Bay Area Rapid Transit Bay Area Air District Bay Area Air Quality Management District BERD Built Environment Resource Directory BMP Best Management Practice BMR Below Market Rate CAA Clean Air Act CAAQS California Ambient Air Quality Standards CalEEMod California Emissions Estimator Model CAL FIRE California Department of Forestry and Fire Protection CALGreen California Green Building Standards Code Cal/OSHA California Occupational Safety and Health Administration CAP Climate Action Plan CBC California Building Standards Code CBTP Community-Based Travel Plan CCA Community Choice Aggregate CCAA California Clean Air Act CCCWP Contra Costa County Clean Water Program CCTA Contra Costa Transportation Authority CDFW California Department of Fish and Wildlife Central San Central Contra Costa Sanitary District CEQA California Environmental Quality Act CFC California Fire Code CGS California Geologic Survey ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST vi FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx CHL California Historic Landmarks CIP Capital Improvement Program CNDDB California Natural Diversity Database CNEL Community Noise Equivalent Level CNPS Inventory CNPS Inventory of Rare Plants CPHI California Points of Historical Interest CRA Cultural Resources Assessment CRHR California Register of Historical Resources CWA Clean Water Act DMU-S Downtown Mixed-Use South DOF California Department of Finance DPM diesel particulate matter DSRSD Dublin San Ramon Services District DTSC California Department of Toxic Substances Control du/acre dwelling units per acre DWR California Department of Water Resources EBMUD East Bay Municipal Utilities District EIR Environmental Impact Report EPA United States Environmental Protection Agency ESL Environmental Screening Level FAR floor area ratio FCS FirstCarbon Solutions FEIR Final Environmental Impact Report FEMA Federal Emergency Management Agency FHSZ Fire Hazard Severity Zone FTA Federal Transit Administration GHG greenhouse gas GSP Groundwater Sustainability Plan HCP Habitat Conservation Plan HMUPA Hazardous Materials Unified Program Agency HRA Health Risk Assessment HVAC heating, ventilation, and air conditioning IPaC Information for Planning and Consultation LCI California Governor’s Office of Land Use and Climate Innovation Ldn day/night average sound level ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS vii Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Leq equivalent continuous sound level LHMP Local Hazard Mitigation Plan LID Low Impact Development Lmax maximum noise/sound level MBTA Migratory Bird Treaty Act MCE Marin Clean Energy MEI Maximally Exposed Individual MEIR Maximally Exposed Individual Resident MEIW Maximally Exposed Individual Worker MM Mitigation Measure mph miles per hour MWELO Model Water Efficient Landscape Ordinance NAAQS National Ambient Air Quality Standards NAHC Native American Heritage Commission NCCP National Community Conservation Plan NHMRR National Hazardous Materials Route Registry NOx oxides of nitrogen NPDES National Pollutant Discharge Elimination System NRHP National Register of Historic Places NWIC Northwest Information Center OEHHA Office of Environmental Health Hazard Assessment PG&E Pacific Gas and Electric Company PM2.5 particulate matter less than 2.5 microns in diameter PM10 particulate matter less than 10 microns in diameter PPV peak particle velocity PRIMP Paleontological Resources Impact Mitigation Program REC Recognized Environmental Condition ROG reactive organic gases RPS Renewable Portfolio Standard RWQCB Regional Water Quality Control Board SCH State Clearinghouse SFBAAB San Francisco Bay Area Air Basin SIP State Implementation Plan SLF Sacred Lands File SRA State Responsibility Area ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST viii FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx SRMC San Ramon Municipal Code SRPCSD San Ramon Parks and Community Services Department SRPD San Ramon Police Department SRVFPD San Ramon Valley Fire Protection District SRVUSD San Ramon Valley Unified School District State Water Board California State Water Resources Control Board SVP Society of Vertebrate Paleontology SWPPP Storm Water Pollution Prevention Plan TAC toxic air contaminant TCR Tribal Cultural Resources TDM Transportation Demand Management UCMP University of California Museum of Paleontology UGB Urban Growth Boundary USACE United States Army Corps of Engineers USGS United States Geologic Survey UST underground storage tank UWMP Urban Water Management Plan VHFHSZ Very High Fire Hazard Severity Zone VMT Vehicle Miles Traveled VOC volatile organic compound Orchards Project CEQA Guidelines Section 15183 Consistency Checklist FCS 1 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 1 - INTRODUCTION This California Environmental Quality Act (CEQA) Guidelines Section 15183 Consistency Checklist, and attached supporting documents have been prepared to examine whether and to what extent the proposed Orchards Project (proposed project), includes project-specific significant effects which are peculiar to the project or its site. 1.1 - CEQA Assessment The following Consistency Checklist has been prepared pursuant to CEQA Guidelines Section 15183 (Projects Consistent with a Community Plan or Zoning) to determine whether the proposed project has project-specific significant effects that would preclude the use of an exemption and require additional environmental review. CEQA Guidelines Section 15183 is a statutory exemption from CEQA which mandates that projects that are consistent with the development density established by existing zoning, community plan or general plan policies for which a Final EIR was certified (in this case, the San Ramon 2040 General Plan Final EIR (FEIR), State Clearinghouse [SCH] Number 2022060549) shall not require additional environmental review, except as might be necessary to examine whether there are project-specific significant impacts which are peculiar to the project or its site. 1.2 - Summary of Results The Consistency Checklist confirms that the proposed project’s potential impacts on all environmental factors have been previously analyzed and mitigated, consistent with the San Ramon 2040 General Plan (2040 General Plan) and other regulatory frameworks. Therefore, no further CEQA review is required. THIS PAGE INTENTIONALLY LEFT BLANK Orchards Project CEQA Guidelines Section 15183 Consistency Checklist FCS 3 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2 - PROJECT DESCRIPTION 2.1 - Location and Setting 2.1.1 - Location The approximately 91.5-acre site is located at 6001 Bollinger Canyon Road in the City of San Ramon (City), in Contra Costa County (County), California. The project site is bounded by Bollinger Canyon Road to the north, existing commercial and office development to the east, existing residential development to the south, and Interstate 680 (I-680) to the west. The project site corresponds to Assessor’s Parcel Number (APN) 213-120-008 (Exhibit 1 and Exhibit 2). The proposed project is within the City of San Ramon General Plan 2040 Planning Area. 2.1.2 - Environmental Setting Existing Land Use Activities The project site is currently developed with the Chevron Park Campus, which consists of 13 vacant commercial office buildings, one vacant mechanical/maintenance building, and a telecommunications tower, totaling approximately 1.48 million square feet. The Chevron Campus Park includes paved parking, driveways, and walkway areas throughout the site. The project site also includes various landscaped areas and a man-made pond near the center of the site. Surrounding Land Uses The project site is surrounded by commercial uses to the north, commercial uses, a parking lot, and a senior living home to the east, residential uses to the south, and Highway I-680 and residential and commercial uses to the west. Exhibit 2 shows an aerial view of the site and surrounding uses. 2.1.3 - Land Use Designation and Zoning The project site is currently designated Downtown Mixed-Use South (DMU-S) in both the General Plan and zoning code (Exhibit 3 and Exhibit 4). The purpose of the DMU-S land use is to encourage a mixed-use neighborhood, extending the activity of City Center across Bollinger Canyon Road with shops, offices, and a diversity of housing opportunities with walkable streets, parks and trails. General Plan Policy 4.7.I-5 indicates that the DMU-S zone envisions up to 2,900 residential units, including both the proposed Orchards project and residential development in Bishop Ranch 1, as well as a landscape corridor to serve as a buffer to the existing neighborhood to the south and connectively to the Iron Horse Trail as an extension of the City’s Walking District. This zoning district allows for a density of 20-60 dwelling units per acre and a minimum floor area ratio (FAR) of 1.25. As described in further detail below, the proposed project is requesting a waiver of the minimum FAR through the State Density Bonus Law. THIS PAGE INTENTIONALLY LEFT BLANK Sourc e: Cens us 2000 Data, The California Sp atial Inform ation Library (CaSIL). ! ·|}þ12 ·|}þ29 ·|}þ37 ·|}þ4 ·|}þ4 C o n tr a C o s t a C o u nt y A l a m e d a C o un t y !"#$580 ·|}þ92 ·|}þ24 !"#$680 !"#$780 ·|}þ160 CarquinezStrait !"#$80 !"#$80 Mount DiabloState Park Napa CountySolano County !"#$580 !"#$80 Solano C o u n t y Vallejo Richmond San Pablo Pinole Martinez Pleasant Hill LafayetteOrinda El Cerrito Albany Berkeley MoragaPiedmont Oakland Alameda Walnut Creek Concord Clayton Pittsburg Benicia Denverton Cordelia Alamo Danville San Ramon Dublin Pleasanton LivermoreFairview Hayward San Leandro Antioch Bay Point ·|}þ242!"#$ !"#$680 680 ·|}þ13!"#$580 !"#$880 N a p a R i v e r ¥5 0 52.5 Miles F C S ! Text Projec t Site Projec t Site O R C H A R D S P R O J E C T C E Q A G U I D E L I N E S S E C T I O N 1 5 1 8 3 C O N S I S T E N C Y C H E C K L I S TCITY OF SAN RAMON 24910040 • 07/2025 | 1_regional.m xd Exhibit 1Regional Loc ation Map Legend City of San Ram on . \ ,_-.. ,"' #-' ,"' ,....... .. ........ __ ,,,,,, , \ ,,,,,.----........ ___ .. ___ ... __ , ·, / .... _______ . • ,· \ '· V ~...-·,!'!1 ... -",•,, ~ -· ~ -' ' --' ...... -· -· , ...... • ) . , I . I ' • . . I \ \ . \ . \ . \ . \ \ . \ . ----- ----------, .. \ \ \ 1- \ '· • . < ---.. -.. -.. -.. "' ·, • '· -· -· .,. .,,,,. -,,,,,. -. -. '· .- -· --,,,,,.-,,,,,.- THIS PAGE INTENTIONALLY LEFT BLANK Source: ESRI Aerial Imag ery . Contra Costa County . Trib of So u t h S a n R a m o n Norri s C r e e k Bollinger Ca n y o n R d B i s h o p D r W a l n u t D r S u n s e t D r Ascot Dr S a n R a m o n V a l l e y B l v d Al c o s t a B l v d C a m i n o R a m o n B r o a d m o o r D r Mor g a n D r 680 Canyon LakesGolf Course Central Park Memorial Park Athan DownsParkBishop Ranch RegionalOpen Space Preserve MontevideoElementary School Iron HorseMiddle School Ir o n H o r s e R e g i o n a l T r a i l 1,000 0 1,000500 Feet F C S Legend Project Site O R C H A R D S P R O J E C T C E Q A G U I D E L I N E S S E C T I O N 1 5 1 8 3 C O N S I S T E N C Y C H E C K L I S TCITY OF SAN RAMON 24910040 • 12/2025 | 2_local_v icinity .mxd Exhibit 2Local Vicinity Map THIS PAGE INTENTIONALLY LEFT BLANK 24910040 • 12/2025 | 3_GPLU.m xd Exhibit 3 Source : ESRI Ae rial Im age ry . City of San Ram on. Contra Costa County . O R C H A R D S P R O J E C T C E Q A G U I D E L I N E S S E C T I O N 1 5 1 8 3 C O N S I S T E N C Y C H E C K L I S T Trib of So u t h S a n R a m o n Bollinger Ca n y o n R d W a l n u t D r S u n s e t D r Ascot Dr S a n R a m o n V a l l e y B l v d C A M I N O R a m o n 680 Bishop D r Ma r k e t P l Ascot Dr Oakham D r T o b y R d L o n g h o r n D r M o r g a n D r S o m b r e r o C i r Ir o n H o r s e R e g i o n a l T r a i l 650 0 650325 Fe e t F C S Ge ne ral Plan Land Use Map CIT Y OF SAN RAMON Legend Proje ct SiteGeneral Plan Land Use DesignationsDowntown Mixe d-Use - South (DMU-S) Low Me dium De nsity Re side ntial (3.00 - 6.00 du/ac) Me dium De nsity Re side ntial (6.00 - 15.00 du/ac) Me dium High De nsity (15.00 - 30.00 du/ac) Mixe d Use - City Ce nte r (FAR 0.70) Mixe d Use - Com m e rcial Em phasis (FAR 0.7 -2.0) Ope n Space (FAR 0.10) Park s (FAR 0.10) - Include s publicly -owne d ope n-space Public and Se m ipublic (FAR 0.35) Re tail Shopping (FAR 0.35) T horoughfare Com m e rcial (FAR 0.5) ------ THIS PAGE INTENTIONALLY LEFT BLANK 24910040 • 12/2025 | 4_z on in g .m xd Exhibit 4 Source: ESRI Aerial Im ag ery. City of San Ram on . Con tra Costa Coun ty. O R C H A R D S P R O J E C T C E Q A G U I D E L I N E S S E C T I O N 1 5 1 8 3 C O N S I S T E N C Y C H E C K L I S T Trib of So u t h S a n R a m o n Bollinger Ca n y o n R d W a l n u t D r Ascot Dr S a n R a m o n V a l l e y B l v d C A M I N O R a m o n 680 Bishop D r Ma r k e t P l Ascot Dr Oakham D r T o b y R d L o n g h o r n D r M o r g a n D r S o m b r e r o C i r 650 0 650325 Feet F C S Z on in g Map CITY OF SAN RAMON Legend Project SiteZoning Designations CC - Com m un ity Com m ercial CC-H - Com m un ity Com m ercial (with a Heig h t Overlay) CCMU - City Cen ter Mixed Use CT - Th oroug h fare Com m ercial DMU-S - Down town Mixed-Use South MU - Mixed Use - Com m ercial Em ph asis OS-1 - Open Space P - Parks an d Recreation PS - Public an d Sem ipublic RH - Hig h Den sity Residen tial RM - Medium -Den sity Residen tial RMH - Medium -Hig h Den sity Residen tial RS-10 - Sin g le-Fam ily Residen tial RS-D - Sin g le-Fam ily Residen tial Ir o n H o r s e R e g i o n a l T r a i l [cil -----D ----D --D THIS PAGE INTENTIONALLY LEFT BLANK ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 13 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2.2 - Project Background 2.2.1 - General Plan The City certified the General Plan EIR (SCH Number 2022060549) and adopted the City of San Ramon General Plan 2040 on December 12, 2023. As part of the General Plan 2040 update process, the City adopted the General Plan 2040 which includes 11 respective General Plan elements, amended the San Ramon Village Specific Plan, repealed the North Camino Ramon Specific Plan, and updated the San Ramon Zoning Ordinance (collectively referred to in the General Plan EIR as the 2040 General Plan). The 2040 General Plan elements include: Land Use; Housing; Traffic and Circulation; Safety; Open Space and Conservation; Parks and Recreation; Public Facilities and Utilities; Noise, Air Quality and Greenhouse Gas (GHG) Emissions, Growth Management, and Economic Development. The General Plan 2040 update process also included updates to the San Ramon Zoning Ordinance to ensure consistency with the updated General Plan. The 2040 General Plan serves as the long-term blueprint for development across the Planning Area. 2.3 - Project Characteristics 2.3.1 - Project Summary Project Overview The proposed project consists of three districts: the Neighborhood District, Mixed-Use District, and the Multi-Family District, which would include a multi-family affordable housing building (Exhibit 5). Each district would be developed in phases. All three districts combined would total approximately 2,510 residential units (including multi-family apartments, stacked flats, townhomes, single-family homes, vertical mixed-use units, and accessory dwelling units [ADUs]), 125,000 square feet of new retail, commercial and entertainment uses, and approximately 15 acres of open space, including a 2.5-acre centralized park space and additional pocket parks and recreational amenities. For the purposes of this document, development of the Neighborhood District as well as demolition, grading, and hydroseeding of an ‘Interim Area’ (Exhibit 6) are analyzed at a project-level as a first phase (Phase 1 or Project-level analysis). The Interim Area is located on part of the Mixed-Use and Multi-Family District. It would be demolished, graded, and hydroseeded to support future development of the Mixed-Use and Multi-Family Districts, with the development of those districts not being approved as part of this project. The Mixed-Use District and Multi-Family District are analyzed at a program level, as specific site plans for these districts would be developed in later phases and are too speculative to evaluate at this time. THIS PAGE INTENTIONALLY LEFT BLANK Source: William Hezmalhalch Architects, Inc. DBA WHA. January 21, 2025. F C S Exhibit 5 24910040 • 07/2025 | 5_site_plan.cdr Site Plan C I T Y O F S A N R A M O N O R C H A R D S P R O J E C T C E Q A G U I D E L I N E S S E C T I O N 1 5 1 8 3 C O N S I S T E N C Y C H E C K L I S T Feet 0 0 0 0 LEGEND NEIGHBORHOOD DISTRICT ~ Single-Family court Homes (42 Total) 1w1 + 10 ADUSJ (11) Plan 1 (10) Plan 2 (10) Plan 3 (11) Plan 4 ~ Single-Family Homes (130 Tolan (42) Plan 1 • (44) Plan 2 • (44) Plan 3 ~ Sjngle-Famuy Row Homes (58 Tolan (20) Plan 1 • (20) Plan 2 • (18) Plan 3 ~ Attached Row Townhomes (26 Buildings) • 138 Units lwl +4BJADUsl (7) Building 100 I 4-Plex (2) Building 200 I 4-Plex (5) Building 300 I 5-Plex (6) Building 400 I 6-Plex (1) Building 500 I 6-Plex (5) Building 600 I 7-Plex ~ MULTI-FAMILY DISTRICT Affordable Housing • Building H • Proposed Gang Mailbox Location ~ 0 50 100 200 THIS PAGE INTENTIONALLY LEFT BLANK Feet 0 0 0 0 24910040 • 10/2025 | 6_phasing_plan.cdrF C S Phasing Plan Exhibit 6 Source: William Hezmalhalch Architects, Inc. DBA WHA. September 10, 2025. C I T Y O F S A N R A M O N O R C H A R D S P R O J E C T C E Q A G U I D E L I N E S S E C T I O N 1 5 1 8 3 C O N S I S T E N C Y C H E C K L I S T Multi-Family Affordable Housing Building to be Processed Under a Separate Application. EX ISTING TO REMAIN INTERIM CONDITION -~ - I .I - . ... ~ - THIS PAGE INTENTIONALLY LEFT BLANK ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 19 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2.3.2 - Designation of Multi-Family District and Mixed-Use District The program-level analysis in this document includes designation of the Multi-Family and Mixed-Use Districts. Future development under the Mixed-Use District and Multi-Family District combined would not exceed 2,084 residential units. Mixed-Use District The 11.3-acre Mixed-Use District, located in the northeast portion of the project site, would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The Mixed-Use District would have two retail-lined streets, one north–south and one east–west, leading to Standard Park. The retail streets have wide sidewalks and are lined with active, pedestrian-oriented uses including retail shops, restaurants and outdoor seating. This programmatic analysis of the Mixed-Use District accounts for a maximum of 619 residential units, 388,097 square feet of mixed-use development, 35,717 square feet of open space, and 69,303 square feet of private streets. Multi-Family District The 26-acre Multi-Family District, located in the northwest portion of the project site, would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Standard Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. It is activated by the retail district and offers playground amenities for children and a flexible lawn allowing for a variety of uses. A wide, multiuse pathway along Sunset Drive connects the Mixed-Use and Multi-Family Districts with the Neighborhood District to the south. This programmatic analysis of the Multi-Family District accounts for a maximum of 1,465 residential units, 711,164 square feet of multi-family residential development, including the proposed multi-family affordable housing building (Building H), 210,861 square feet of open space (including a 2.5-acre centralized park), and 214,407 square feet of private streets. 2.3.3 - Neighborhood District plus Grading of Interim Area The project-level analysis in this document evaluates the following project elements: 1. Demolition of the Neighborhood District of the Interim Area 2. Grading and hydroseeding of the Interim Area 3. Complete construction of the Neighborhood District Development Interim Area The Interim Area, as shown in Exhibit 6, would be demolished, graded, and hydroseeded, in preparation for later phases of development under the Mixed-Use and Multi-Family District. While the ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 20 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx demolition and grading will be approved as part of the project-level analysis, future development in this area is only being analyzed at the program level. The Existing to Remain area shown in Exhibit 6 will not undergo any demolition, tree removal, or grading, and will remain as-is until a future project under the Mixed-Use and/or Multi-Family District is approved. Neighborhood District The proposed project includes the construction of a 54-acre Neighborhood District, located in the southern portion of the project site that would total 368 residential dwelling units, including single- family homes, townhomes, single-family homes, and vertical mixed-use units, as shown in Table 1. Up to 58 ADUs would also be constructed. The Neighborhood District Development would have a FAR of 0.41. As shown in Exhibit 4, the attached Row Townhomes would be located in the northern portion of the Neighborhood District; Single-Family Detached Homes would be located at the east and west ends of the Neighborhood District; Single-Family Row Homes would be located in the center of the Neighborhood District; and Single-Family Court Homes would be located along the southern portion of the Neighborhood District. Exhibit 5 depicts the proposed layout; Exhibit 6 depicts the proposed housing types. Table 1: Neighborhood District Unit Mix Unit Type Number of Units ADUs Total Residential Units Single-family Court Homes 42 10 52 Single-family Detached Homes 130 — — Single-family Row Homes 58 — — Attached Row Townhomes 138 48 186 Total 368 58 426 Notes: ADU = accessory dwelling unit Source: William Hezmalhalch Architects, Inc. DBA WHA. 2025. Amenities The Neighborhood District would include three publicly accessible parks and open space amenities in addition to private open space, for a total of 397,184 square feet, or 9.12 acres of parkland. A greenway and multiuse trail would wrap the perimeter of the proposed project with connections to the Heritage Oak Tree Parks, which are designed around the existing heritage oak trees on the site. The pathway includes passive and active recreational activities. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 21 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Additionally, the Neighborhood District would include two pocket parks within the Townhome community. Circulation The main access to the Neighborhood District would be provided by the existing Chevron Drive. Another access point would be provided via a connection to the office building parking lot to the east of the project site. Sidewalks are proposed along all roadways. The proposed greenway multiuse trail would be a new addition to the City’s Walking District. Parking Parking in the Neighborhood District would be provided as shown in Table 2. Table 2: Neighborhood District Parking Unit Type Covered Spaces in Garage/DU Uncovered Space in Driveway/DU Total Covered and Uncovered Spaces Guest Parking Total Spaces Provided On- Street EV/ ADA Single-family Court Homes 3 2 210 64 — 274 Single-family Detached Homes 2 2 520 161 — 681 Single-family Row Homes 2 — 116 101 — 217 Attached Row Homes 2 — 368 35 2 405 Total — — 1,214 361 2 1,577 Notes: ADA = Americans with Disabilities Act DU = dwelling unit EV = electric vehicle Source: William Hezmalhalch Architects, Inc. DBA WHA. 2025. Storm Drainage Bio-treatment areas for stormwater would be provided throughout the east and west greenways of the project site. These were designed in accordance with the applicable C.3 guidelines within the Contra Costa County Clean Water Program (CCCWP). ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 22 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Utilities Water Potable water service would be provided by East Bay Municipal Utilities District (EBMUD) via existing water lines at the project site. Wastewater Wastewater treatment services would be provided by Central Contra Costa Sanitary District (Central San) via existing sanitary sewer lines at the project site. Electricity and Natural Gas Electricity would be provided by Marin Clean Energy (MCE) via existing Pacific Gas and Electric Company (PG&E) power lines, unless individual residents elect to have PG&E provided. Natural gas would be provided by PG&E via existing gas lines. 2.3.4 - Affordable Housing The proposed project would comply with the City’s Inclusionary Housing Ordinance and would also qualify for the benefits provided by State Density Bonus Law by providing sufficient on-site affordable housing. Specifically, the Neighborhood District’s on-site affordable housing obligation will be satisfied through a stand-alone affordable housing development on a 1.8-acre parcel in the Multi-Family District, shown in Exhibit 5 as “Building H.” The Multi-Family Residential and Mixed-Use Development will provide on-site affordable housing as obligated by the City’s Inclusionary Housing Ordinance and a Development Agreement. State Density Bonus Waivers The development provides sufficient affordable housing on-site to qualify for the State Density Bonus Law, including incentives/concessions and unlimited waivers. The proposed project would utilize a waiver to seek relief from the minimum required FAR. The proposed project’s density would be 47.2 dwelling units per net acre, which exceeds the applicable minimum General Plan residential density of 20 dwelling units per acre. However, the proposed Neighborhood District Development would have a FAR of 0.41 which is less than the minimum required sitewide FAR and therefore would request a waiver under the State Density Bonus Law of the required minimum sitewide FAR of 1.25 in DMU- South zone, as compliance with this development standard would make construction of the proposed project physically infeasible. Additionally, the proposed project is also requesting to waive the City’s Objective Design Standards for Multi-Family Residential and Mixed-Use Development.1 1 City of San Ramon. 2024. Objective Design Standards for Multi-Family Residential and Mixed-Use Development. November 12, 2024. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 23 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2.3.5 - Phasing and Construction The proposed project would be developed over a 20-year period, beginning with the Neighborhood District Development and followed by the affordable multi-family housing units within the Multi-Family District. The Mixed-Use District and the remainder of the Multi-Family District would be phased over time to allow for residential absorption. Phasing would be subject to market conditions. 2.4 - Approvals The proposed project requires the following discretionary approvals from the City: • Development Plan • Vesting Tentative Map • Architectural Review Permit • Tree Removal Permit • Development Agreement The following administrative actions would also be required from the City: • Grading Permits • Building Permits • Certificates of Occupancy; and • Other City approvals as necessary to develop the proposed project. Other agencies with permitting or regulatory authority over the proposed project include: • EBMUD • San Francisco Bay Regional Water Quality Control Board (San Francisco Bay RWQCB) • Bay Area Air Quality Management District THIS PAGE INTENTIONALLY LEFT BLANK Orchards Project CEQA Guidelines Section 15183 Consistency Checklist FCS 25 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 3 - CEQA GUIDELINES SECTION 15183: PROJECTS CONSISTENT WITH A COMMUNITY PLAN OR ZONING CEQA Guidelines Section 15183 mandates that projects which are consistent with the development density established by existing zoning, community plan, or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary to examine whether there are project-specific significant effects which are peculiar to the project or its site. This streamlines the review of such projects and reduces the need to prepare repetitive environmental studies. Proposed Project Qualifies for No Further Environmental Review under CEQA Guidelines Section 15183 CEQA Guidelines Section 15183 applies to the project since it meets all of the requirements of subsection (d)(1) and (d)(2) as explained below. (d)(1)(C) The project is consistent with the San Ramon 2040 General Plan. The proposed project is consistent with the development density established by existing general plan policies identified in the certified San Ramon 2040 General Plan Final EIR, SCH Number 2022060549. (d)(2) An EIR was certified by the lead agency for the zoning action, the community plan, or the general plan. The San Ramon 2040 General Plan Final EIR, SCH Number 2022060549, was certified on December 12, 2023. THIS PAGE INTENTIONALLY LEFT BLANK Orchards Project CEQA Guidelines Section 15183 Consistency Checklist FCS 27 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 4 - ENVIRONMENTAL CHECKLIST CEQA Guidelines Section 15183(b) states that: (b) In approving a project meeting the requirements of this section, a public agency shall limit its examination of environmental effects to those which the agency determines, in an initial study or other analysis: (1) Are peculiar to the project or the parcel on which the project would be located; (2) Were not analyzed as significant effects in a prior FEIR on the zoning action, general plan, or community plan, with which the project is consistent; (3) Are potentially significant off-site impacts and cumulative impacts which were not discussed in the prior FEIR prepared for the general plan, community plan or zoning action; or (4) Are previously identified significant effects which, as a result of substantial new information which was not known at the time the FEIR was certified, are determined to have a more severe adverse impact than discussed in the prior FEIR. The following pages of this document contain an Environmental Checklist that examines the project’s potential for project-specific environmental effects that are peculiar to the project or its site within the parameters outlined at CEQA Guidelines Section 15183(b). Impacts that were analyzed in the prior EIR are not peculiar to the project or its site and do not require further review. The “prior EIR” used for comparison is the 2040 General Plan FEIR certified by the City on December 12, 2023, including all impact determinations and significance thresholds utilized therein. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 28 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.1 Aesthetics Except as provided in Public Resources Code Section 21099, would the project: a) Have a substantial adverse effect on a scenic vista? Less than significant impact No No No No b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic building within a State Scenic Highway? Less than significant impact No No No No c) In non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less than significant impact No No No No d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Less than significant impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 29 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx a) Scenic Vista Would the project: Have a substantial adverse effect on a scenic vista? Summary of 2040 General Plan FEIR The 2040 General Plan FEIR identifies scenic views of the hills of Hidden Valley Open Space and Tassajara Valley to the east; Mount Diablo to the northeast; the Diablo Range foothills to the north; the Las Trampas Regional Wilderness to the northwest; and Bishop Ranch Regional Preserve to the west. The 2040 General Plan does not designate these views of these natural features as “vistas.” However, the 2040 General Plan FEIR does designate 12 viewpoint locations as scenic views, particularly hillside areas. These public views are largely limited by intervening development, topography, and landscaping. Development facilitated by the 2040 General Plan is expected to occur within already urbanized areas, with land uses ranging up to five stories tall. The 2040 General Plan Land Use Element and Open Space and Conservation Element contains policies for ensuring the protection of scenic views, including Policy 4.6-I-17 (Clustered Development); Policy 4.8-I-9 (Park and Recreational Amenities); and Policy 8.3-I-13 (Viewshed Criteria). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The project site is not within the vicinity of a scenic vista and there are no identified scenic vistas within the General Plan Area. However, the project site is located 140 feet from a scenic viewpoint designated as View #8 in Figure 3.1.2 of the 2040 General Plan FEIR. From View #8, there are existing views of the Bishop Ranch Open Space Preserve that are impacted by the project site, which is located 0.69 mile southwest of the project site.2 Views of the Preserve from View #8 are partially screened by existing trees and buildings on-site. Designation of the proposed Mixed-Use District and Multi-Family Districts would not in itself impact views of the Bishop Ranch Open Space Preserve. Furthermore, because the project site is already developed with office buildings, it is not expected that future development under the proposed Mixed-Use District and Muti-Family Districts would create additional screening of the Bishop Ranch Open Space Preserve beyond existing conditions. As concluded by the 2040 General Plan, compliance with Policy 4.6-I-17 (Clustered Development) would maximize the preservation of visible open space; implementation of Policy 4.8-I-19 (Park and Recreational Amenities) through well-designed buildings and landscaping; and Policy 8.3-I-13 (Viewshed Criteria) to manage views of the natural hillsides surrounding the City would ensure that impacts to scenic views are less than significant. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2 City of San Ramon. 2023. 2040 General Plan Final Environmental Impact Report (FEIR). Pages 3.1-6 through 3.1-10. November. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 30 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Project-level Analysis (Neighborhood District plus Grading of Interim Area) As discussed above, the project site is located between the General Plan designated View #8 and the Bishop Ranch Open Space Preserve, and existing trees and buildings partially obstruct views of the Bishop Ranch Open Space Preserve from View #8. Demolition and grading that would occur on the Interim Area would result in an increased visibility of the Bishop Ranch Open Space Preserve and would not create an adverse impact. The proposed Neighborhood District includes buildings ranging from 26 to 34 feet tall, similar or shorter than the buildings currently on-site. Furthermore, the Existing to Remain area at the northern portion of the project site contains trees that would remain in place until sites are developed under future applications, to maintain a screening effect for the proposed buildings (Exhibit 6). As such, construction of the Neighborhood District would not significantly alter views of the Bishop Ranch Open Space Preserve from View #8 beyond existing conditions. As the proposed project is consistent with the General Plan’s zoning designation and density and does not introduce new or more severe environmental effects than those previously analyzed, it does not include any potentially significant impacts that are peculiar to the project or its site pursuant to CEQA Guidelines Section 15183. Thus, any impacts to scenic vistas would be less than significant. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) State Scenic Highways Would the project: Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic building within a State Scenic Highway? Summary of 2040 General Plan EIR The City is bisected from north to south by the Interstate 680 (I-680) Highway, an officially designated State Scenic Highway, with urban development occurring on both sides. Views eastward of I-680 are obscured by walls, trees, and other landscaping not designated as scenic resources, which would therefore not be impacted by development under the 2040 General Plan. Views westward of I-680 include adjacent neighborhoods, landscaping, open space, and distant hilltops, which could be impacted by buildout of the 2040 General Plan, which would result in intervening development that could obscure scenic westward views. However, it was determined that compliance with the City’s Tree Preservation Guidelines and the 2040 General Plan Open Space and Conservation Element (including Policy 8.7-1-3 (Archaeological Resources Assessment) and Policy 8.7-I-4 (Officially Listed Historic Resources)), would ensure that trees and historic buildings within a State Scenic Highway ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 31 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx are not damaged by new development. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District plus Grading of Interim Area) The project site is adjacent to the I-680, a designated State Scenic Highway. As previously mentioned, views eastward of the I-680 are obscured by walls, trees, and other landscaping not designated as scenic resources, and would therefore not be impacted by the proposed project. Furthermore, per the findings of the Phase I Cultural Resources Assessment (Phase I CRA) prepared by FirstCarbon Solutions on September 26, 2025, there are no officially listed historic resources within the vicinity of the project site that would be impacted by development of the proposed project.3 Thus, the proposed project would have less than significant impacts to resources within a State Scenic Highway. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Visual Character Would the project: In non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Summary of 2040 General Plan EIR The City is considered an urbanized area. Given that buildout of the 2040 General Plan Area prioritizes infill development and redevelopment projects in already developed areas, it was determined that compliance with the following policies would reduce impacts to less than significant: Policy 4.6-I-9 (360-Design Principles); Policy 4.8-I-2 (Natural Features); Policy 4.8-I-5 (Complete Streets Networks); Policy 4.8-I-8 (Views of the Natural Landscape); Policy 4.8-I-9 (Public Roadways); Policy 4.8-I-12 (Drought-Tolerant Landscaping); and Policy IP 11.5.2-7 (Neighborhood Compatibility), which address design, compatibility, preservation of natural features, landscape standards, public art, and other scenic quality metrics. Future development under the General Plan would also be required to comply with the Site Planning and Project Design Standards specified under Title D of the San Ramon Municipal Code and Zoning Code. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. 3 FirstCarbon Solutions (FCS). 2025. Phase I Cultural Resources Assessment. The Orchards Project. Page 26. September. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 32 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) As previously mentioned, the project site is in an urbanized area. Designation of the Mixed-Use and Multi-Family Districts would be compatible with the existing DMU-S land use designation, which is designed to promote an integrated transit-oriented and mixed-use neighborhood extending from City Center along Bollinger Canyon Road and include a variety of housing types. The proposed Mixed- Use and Multi-Family Districts are intended to include these uses and would be in close proximity to existing transit routes on Bollinger Canyon Road. The maximum density permitted under the DMU-S is 60 dwelling units per acre (du/ac) or 5,490 units for the 91.5-acre project site. The maximum number of units permitted under the Mixed-Use and Multi-Family Districts combined would be 2,084. The Neighborhood District proposes 426 units, meaning the maximum number of units proposed under the Mixed-Use and Multi-Family Districts would be well within the number of units permitted at the project site. Because designation of the Mixed-Use and Multi-Family Districts does not include any project construction, it would be too speculative at this time to evaluate specific impacts related to compatibility with policies governing scenic quality. Future development of the Mixed-Use and Multi- Family Districts would be required to comply with General Plan policies and programs, as well as development and design standards in the Orchards Design Guidelines. For example, buildings would not exceed the permitted height of 85 feet for the DMU-S zone. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed- Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) The project includes the demolition, grading, and tree removal of the Interim Area. However, the northern edge of the Interim Area would be shielded by a large number of trees in the northern portion of the project site, which would remain untouched at this time. The remainder of the Interim Area would be shielded by the Neighborhood District and the landscaping proposed around its perimeter. As such, the Interim Area would not impact the visual character of the area. Development of the Neighborhood District would comply with General Plan policies and programs and would adhere to development and design standards in the Municipal Code, specifically development standards for Downtown Mixed-Use South development as stipulated in Title D, Division D2, Chapter III Mixed-Use Zones of the San Ramon Municipal Code.4 4 City of San Ramon. 2025. Title D Zoning. Division D2 Allowable Land Uses and Zoning Standards. Chapter III Mixed-Use Zones. Chapter III—Mixed-Use Zones. Website: https://online.encodeplus.com/regs/sanramon-ca/doc- viewer.aspx?secid=5418#secid-5418. Accessed October 29, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 33 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx The DMU-S land use designation allows for a density range between 20-60 du/acre. The proposed Neighborhood District, in combination with the anticipated development of the Mixed-Use and Multi- Family Districts, would have a density of 47.2 du/acre. The DMU-S land use designation requires a minimum FAR of 1.25. The proposed Neighborhood District would result in a FAR of 0.41, lower than the minimum FAR permitted for the land use. However, the proposed Neighborhood District would be eligible for a waiver under the State’s Density Bonus Law due to providing sufficient on-site affordable housing units to qualify for the State Density Bonus Law (see Section 2.3.4 Affordable Housing). The maximum building height limit for the DMU-S zone is up to 85 feet. The Neighborhood District proposes buildings ranging from 26 to 34 feet tall, consistent with the DMU-S zone. The proposed Neighborhood District would contain similar height or shorter than the buildings currently on the site. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. d) Light or Glare Would the project: Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Summary of 2040 General Plan EIR Light and glare levels within the City are consistent with suburban and urbanized development, with the presence of stationary sources such as streetlights, exterior building lights, and lighted signs in addition to mobile sources such as motor vehicle headlights. Although the 2040 General Plan FEIR notes that new development could result in increased stationary sources of lighting, enforcement Section D3-7(H) (Light Fixtures); Section D3-7(C)(Lighting Plan); and Section D5-5(2)(b) (Hillside, Creek, and Ridgelines Areas) in addition to 2040 General Plan Policy 4.8-I-3 (Citywide Lighting Standards) address lighting impacts. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) Designation of the Mixed-Use and Multi-Family Districts would not include any approved development and therefore, would not include new sources of light and glare. While designation of these districts anticipates development at a future time, it would be too speculative to analyze specific light and glare impacts at this time. Although new development resulting from the 2040 General Plan is expected to generate an increase in new lighting, conformance with refined citywide lighting standards stipulated in Policy 4.8-I-3, in addition to applicable policies outlined in the San Ramon Municipal Code, would reduce impacts related to light and glare. Future development under the Mixed-Use and Multi-Family Districts would be required to comply with these policies. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 34 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District plus Grading of Interim Area) The proposed Neighborhood District would contribute to an increase in stationary light sources and mobile light sources. However, development of the Neighborhood District is required to comply with refined citywide lighting standards stipulated in Policy 4.8-I-3 and applicable policies in the San Ramon Municipal Code to reduce impacts related to light and glare. Thus, the proposed Neighborhood District would result in less than significant impacts to light and glare and would be consistent with the General Plan. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District Development plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Aesthetics, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 35 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.2 Agriculture and Forestry Resources In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the State’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to nonagricultural use? Less than significant impact No No No No b) Conflict with existing zoning for agricultural use, or a Williamson Act Contract? Less than significant impact No No No No c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned No impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 36 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? Timberland Production (as defined by Government Code Section 51104(g))? d) Result in the loss of forest land or conversion of forest land to non-forest use? No impact No No No No e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to nonagricultural use or conversion of forest land to non-forest use? Less than significant impact No No No No a) Conversion of Important Farmland Would the project: Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to nonagricultural use? Summary of 2040 General Plan EIR As noted by the 2040 General Plan FEIR, the General Plan Area contains approximately 5,927 acres of Important Farmland, including 5,838 acres of Farmland of Local Importance, 60 acres of Unique Farmland, and 29 acres of Prime Farmland. Therefore, the General Plan accounted for the conversion of agricultural land. The project site was not identified as agricultural land in the General Plan. While the majority of new development facilitated by the 2040 General Plan would be primarily through infill development, and would therefore result in no impact to existing agricultural lands, the 2040 General Plan contains policies for minimizing impacts associated with the conversion of Prime Farmland and Unique Farmland to nonagricultural use within the General Plan Area. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 37 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site is classified as Urban and Builtup Land and the proposed project would be infill development consistent with the land use designations identified in the 2040 General Plan EIR.5 Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) Agricultural Zoning and Williamson Act Contracts Would the project: Conflict with existing zoning for agricultural use, or a Williamson Act Contract? Summary of 2040 General Plan EIR The 2040 General Plan Area contains land designated as Open Space, Rural Conservation, or Park, which allow for agricultural activities. Although some agricultural lands are under an active Williamson Act Contract, these lands are located outside of the infill development sites targeted within the Urban Growth Boundary (UGB). The General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site is zoned as DMU-S and is not subject to a Williamson Act Contract, consistent with the General Plan. Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Forest Zoning Would the project: Conflict with existing zoning for forest land or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))? 5 Department of Conservation. 2025. California Important Farmland Finder. Website: https://maps.conservation.ca.gov/DLRP/CIFF/. Accessed August 12, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 38 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Summary of 2040 General Plan EIR The 2040 General Plan Area does not contain land identified as forest land or timberland. As such, development facilitated by the 2040 General Plan would not conflict with existing zoning for forest land or timberland and there would be no impact. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site does not contain land zoned as forest land or timberland. Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. d) Conversion of Forest Land Would the project: Result in the loss of forest land or conversion of forest land to non- forest use? Summary of 2040 General Plan EIR As previously mentioned, the 2040 General Plan Area does not contain land identified as forest land. Therefore, there would be no loss in forest land or conversion of forest land to non-forest use and there would be no impact. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site is within the 2040 General Plan Area and thus does not contain forest land or timberland. Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. e) Pressures to Convert Farmland or Forest Land Would the project: Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to nonagricultural use or conversion of forest land to non-forest use? Summary of 2040 General Plan EIR The 2040 General Plan Area does not contain land identified as forest land or agricultural land on the project site. There are 5,927 acres of Important Farmland within the 2040 General Plan Area. As noted within the 2040 General Plan FEIR, new development would be required to comply with 2040 General Plan Policy 8.5-I-1 (Evaluation of Impacts) and Policy 8.5-I-5 (Designate Land for Rural ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 39 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Conservation for Compatibility with Adjoining Agricultural Uses) to reduce impacts that would result in the conversion of Farmland to nonagricultural uses. Therefore, the General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) As previously mentioned, the project site consists of Urban/Builtup land and is an infill site that is not on or near Farmland or forest land. Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Agriculture and Forestry Resources, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 40 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.3 Air Quality Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? Less than significant impact No No No No b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or State ambient air quality standard? Less than significant impact with mitigation incorporated No No No No c) Expose sensitive receptors to substantial pollutant concentrations? Less than significant with mitigation incorporated No No No No d) Result in other emissions (such as those leading to odors or) adversely affecting a substantial number of people? Less than significant impact No No No No Environmental Setting The project site is located in the City of San Ramon and is within the San Francisco Bay Area Air Basin (SFBAAB) which covers Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, and parts of Solano and Sonoma counties and is under the Bay Area Air Quality Management District’s (Bay Area Air District’s) jurisdiction. The SFBAAB is bordered by the Pacific Ocean to the west and surrounded by coastal and inland mountain ranges that influence local airflow and pollutant dispersion. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 41 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx The region has a Mediterranean climate with mild, wet winters and warm, dry summers. Prevailing westerly and northwesterly winds, driven by marine influences, generally help disperse pollutants inland. In summer and early fall, high temperatures and sunlight promote ozone formation, and occasional inversions can trap this pollution near the surface, particularly in inland valleys. In winter, strong temperature inversions are more frequent, limiting vertical air mixing and allowing fine particulate matter (PM₂.₅) from wood-burning, traffic, and other sources to accumulate. Topography and seasonal weather create distinct microclimates; coastal areas benefit from stronger ventilation, while sheltered interior areas are more prone to pollutant buildup. Existing Air Quality The United States Environmental Protection Agency (EPA) administers national air quality programs under the authority of the federal Clean Air Act (CAA), which mandates the establishment of National Ambient Air Quality Standards (NAAQS) for the six criteria pollutants: ozone, CO, NO₂, SO₂, particulate matter (PM₁₀, and PM₂.₅), and lead. To meet and maintain these standards, each state is required to develop a State Implementation Plan (SIP), which is updated periodically to reflect current emissions inventories, planning strategies, and regulatory developments reported by local air quality agencies. Criteria pollutant emissions primarily stem from combustion sources and have been linked to serious respiratory and cardiovascular conditions, especially in vulnerable populations. Another classification of pollutants includes toxic air contaminants (TACs), such as diesel particulate matter and benzene, which pose additional health risks including cancer and neurological damage, and are managed through targeted controls rather than ambient air quality standards. In California, the California Air Resources Board (ARB) oversees State and regional air pollution control efforts and enforces the California Clean Air Act (CCAA). Under the CCAA, ARB sets California Ambient Air Quality Standards (CAAQS), which include the federal criteria pollutants and additional contaminants such as sulfates, hydrogen sulfide, vinyl chloride, and visibility-reducing particulate matter. CAAQS are typically more stringent than NAAQS, reflecting California’s commitment to enhanced air quality protection. To assess air pollution levels and overall air quality in the SFBAAB, the Bay Area Air District operates an extensive network of ambient air quality monitoring stations distributed across the nine-county region. The monitoring network plays a critical role in measuring ambient air pollutant levels and tracking trends. These data support the development of air quality management strategies. The stations continuously measure concentrations of key pollutants, including: Data from these stations are collected, validated, and reported on an ongoing basis to provide a comprehensive understanding of air quality. The network employs standardized measurement techniques and adheres to protocols set by the ARB and the EPA to ensure accuracy and comparability of data. Because of periodic exceedances of ozone and particulate matter standards, the SFBAAB is designated as a nonattainment area under both CCAA and federal CAA requirements. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 42 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx a) Air Quality Plan Conflict Would the project: Conflict with or obstruct implementation of the applicable air quality plan? Summary of 2040 General Plan EIR The 2040 General Plan FEIR analyzed the consistency of the 2040 General Plan with the assumptions and objectives of the 2017 Bay Area Clean Air Plan (the regional Air Quality Management Plan [AQMP]) to determine whether implementation of the 2040 General Plan would interfere with the region’s ability to comply with federal and State air quality standards. To demonstrate consistency with the 2017 Clean Air Plan, the Bay Area Air District recommends satisfying the following questions: (1) does the project support the primary goals of the AQMP; (2) does the project include applicable control measures from the AQMP; and (3) does the project disrupt or hinder implementation of any AQMP control measures. According to the analysis in the 2040 General Plan FEIR—which included a consistency analysis of all of the policies in the 2040 General Plan against the control measures contained with the 2017 Clean Air Plan—the 2040 General Plan would be consistent with the three criteria for evaluating consistency with the 2017 Clean Air Plan, and would not conflict with or obstruct implementation of the applicable air quality plan. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level Analysis (Mixed-Use and Multi-Family Districts) The 11.3-acre Mixed-Use District would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The 26-acre Multi-Family District would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. As discussed above, the 2040 General Plan FEIR analyzed the policies contained within the 2040 General Plan against the control measures contained within the 2017 Clean Air Plan and concluded that the policies would demonstrate consistency with the control measures of the 2017 Clean Air Plan. Individual development projects within the Mixed-Use District and Multi-Family District would be required to implement relevant and applicable policies from the 2040 General Plan. Therefore, the Mixed-Use District and Multi-Family District would be consistent with the 2017 Clean Air Plan and would not conflict with or obstruct implementation of the applicable AQMP, and impacts would be less than significant. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 43 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-Level Analysis (Neighborhood District Development plus Grading of Interim Area) The current Bay Area Air District attainment plan is the 2017 Clean Air Plan, which is the regional AQMP for the SFBAAB for attaining NAAQS. A project would be judged to conflict with or obstruct the 2017 Clean Air Plan implementation if it would result in substantial new regional emissions not foreseen in the air quality planning process. The Bay Area Air District’s 2022 CEQA Guidelines outline the following criteria that should be used for determining a project’s consistency with the AQMP. • Criterion 1: Does the project support the primary goals of the AQMP? • Criterion 2: Does the project include applicable control measures from the AQMP? • Criterion 3: Does the project disrupt or hinder implementation of any AQMP control measures? Primary Goals of the Air Quality Management Plan The primary goals of the 2017 Clean Air Plan are to attain air quality standards, reduce population exposure to unhealthy air and protect the public health in the Bay Area, and reduce GHG emissions and protect the climate. As discussed under Impact 4.3(b), the Neighborhood District plus Grading of Interim Area would not result in a cumulatively considerable net increase of any criteria pollutant during project construction or operation and, therefore, would not impede the 2017 Clean Air Plan’s goal to attain air quality standards. Therefore, the proposed project supports the 2017 Clean Air Plan’s goal to attain air quality standards. As discussed under Impact 4.3(c), implementation of the Neighborhood District plus Grading of Interim Area would not expose sensitive populations to unhealthy air during project construction or operation, and therefore, the Neighborhood District plus Grading of Interim Area supports the 2017 Clean Air Plan’s goal to reduce population exposure to unhealthy air and protect public health in the Bay Area. Finally, as discussed under Impact 4.8(a), implementation of the Neighborhood District plus Grading of Interim Area would not result in direct or indirect emissions of GHGs that would cause significant impacts, and therefore, the Neighborhood District supports the 2017 Clean Air Plan’s goal to reduce GHG emissions and protect the climate. As demonstrated, the Neighborhood District plus Grading of Interim Area would meet the primary goals of the of the 2017 Clean Air Plan and would be consistent with Criterion 1. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 44 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Applicable Control Measures The 2017 Clean Air Plan contains 85 control measures that describe specific actions to reduce air pollutants and GHG emissions at the local, regional, and global levels. To establish compliance with the Clean Air Plan, the Neighborhood District would be required to comply with applicable Clean Air Plan control measures, listed below:6 • BL1: Green Buildings; • BL2: Decarbonize Buildings; • BL4: Urban Heat Island Migration; • EN1: Decarbonize Electricity Generation; • EN2: Decrease Electricity Demand; • NW2: Urban Tree Planting; • WA3: Green Waste Diversion; • WA4: Recycling and Waste Reduction; • SS36: Particulate Matter from Trackout; • TR9: Bicycle and Pedestrian Access and Facilities. The Neighborhood District plus Grading of Interim Area would comply with the above control measures as specified below: • For consistency with Clean Air Plan Measures BL1, BL2, EN1, and EN2, development within the Neighborhood District plus Grading of Interim Area would comply with the latest energy efficiency standards, such as the 2022 California Title 24 Energy Code. In addition, the Neighborhood District would be constructed as all-electric and would not utilize natural gas. It would be served by MCE, which provides electricity options that are more renewable than PG&E’s (although PG&E would deliver energy through existing power lines, and maintain the lines). In 2024, MCE’s Light Green option procured 69 percent of the electricity it provides from eligible renewables. The MCE Deep Green Option offers 100 percent of the electricity it provides from eligible renewables.7 Therefore, the energy use and indirect GHG emissions associated with the building’s energy would originate from a greater portion of renewable energy than what is currently required by the Renewable Portfolio Standard (RPS). • For consistency with Clean Air Plan Measures BL4 and NW2, the Neighborhood District would include park space, including three publicly accessible parks and open space amenities in addition to private open space. A greenway and multiuse trail would wrap the perimeter with 6 Bay Area Air Quality Management District (Bay Area Air District). 2017. Final 2017 Clean Air Plan. Website: https://www.baaqmd.gov/plans-and-climate/air-quality-plans/current- plans#:~:text=The%202017%20Plan%20includes%20a,climate%20pollutants%20in%20the%20near%2D. Accessed November 11, 2025. 7 Marin Clean Energy. 2025. Where Your Energy Comes From. Website: https://mcecleanenergy.org/energy-sources/. Accessed November 13, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 45 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx connections to the Heritage Oak Tree Parks, which are designed around the existing heritage oak trees on the site. • For consistency with Clean Air Plan Measures WA3 and WA4, the Neighborhood District would utilize a waste service provider compliant with Assembly Bill (AB) 341, Senate Bill (SB) 939, and SB 1374 requirements. • For consistency with Clean Air Plan Measure SS36, the Neighborhood District plus Grading of Interim Area would be required to comply with Policy 12.6-I-3 and Policy 12.6-I-5 of the 2040 General Plan which would require construction and grading activities to limit fugitive dust and particulate pollution related to construction equipment by including particulate emissions reduction measures in Grading Manual Standards and compliance with Bay Area Air District basic Best Management Practices for construction-related fugitive dust. • For consistency with Clean Air Plan Measure TR9, the proposed project would construct sidewalks along all roads. In addition, a greenway and multiuse trail would wrap the perimeter of the Neighborhood District with connections to the Heritage Oak Tree Parks, which are designed around the existing heritage oak trees on-site. The pathway includes passive and active recreational activities. Accordingly, implementation of the Neighborhood District plus Grading of Interim Area would not conflict with any applicable measures under the 2017 Clean Air Plan given the implementation of Policy 12.6-I-3 and Policy 12.6-I-5 of the 2040 General Plan for dust control measures, and would therefore be consistent with Criterion 2. Hindrance of Implementation of AQMP Control Measures The Neighborhood District would not preclude extension of a transit line or bike path, propose excessive parking beyond parking requirements, or otherwise create an impediment or disruption to implementing any AQMP control measures, as discussed above. The Neighborhood District plus Grading of Interim Area would not disrupt or hinder the implementation of any AQMP control measures and would therefore be consistent with Criterion 3. Overall, the Neighborhood District plus Grading of Interim Area would demonstrate consistency with all three criterion as outlined by the Bay Area Air District for demonstrating that it would not conflict with or obstruct implementation of the applicable AQMP, and impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 46 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx b) Air Quality Standard, Criteria Pollutants Would the project: Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or State ambient air quality standard? Summary of 2040 General Plan EIR The 2040 General Plan FEIR analyzed the potential impacts related to air quality that could occur from development under the 2040 General Plan. Construction activities would involve activities that would result in air pollution emissions from dust, fumes, equipment exhaust and other air contaminants. The 2040 General Plan includes Policy 12.6-I- 3 and Policy 12.6-1-5 which require measures to reduce fugitive dust during construction and grading activities, and compliance with Bay Area Air District CEQA guidance and thresholds as part of conditions of approval and CEQA review for subsequent development projects. The 2040 General Plan FEIR identified Mitigation Measure (MM) AQ-1, which requires an evaluation of criteria pollutant emissions during the construction phase for projects that are subject to CEQA and exceed screening sizes in the Bay Area Air District’s CEQA Guidelines. If the evaluation finds that construction-related criteria air pollutants exceed the Bay Area Air District’s thresholds, then the project shall mitigate the impacts to a less than significant level. With implementation of MM AQ-1, overall cumulative construction criteria pollutant emissions impacts would be less than significant. Operational activities would be from mobile sources as well as natural gas usage and area sources. The 2040 General Plan includes a number of policies intended to reduce emissions from mobile sources. In addition, the 2040 General Plan FEIR identified MM AQ-2 which requires an evaluation of project-specific operational emissions in accordance with the Bay Area Air District’s CEQA Guidelines. If the evaluation finds that operational-related air pollutants exceed the Bay Area Air District’s thresholds, then the project shall mitigate the impacts to a less than significant level. With implementation of MM AQ-2, overall cumulative operational criteria pollutant emissions impacts would be less than significant. Therefore, the 2040 General Plan FEIR concluded that impacts from construction and operation would be less than significant after incorporation of mitigation. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The 11.3-acre Mixed-Use District would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The 26-acre Multi-Family District would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. The Mixed-Use District and Multi-Family District are expected to be developed under ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 47 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx separate projects over the longer-term future and would be subject to future project-level CEQA analysis. Development of the Mixed-Use District and the Multi-Family District would include construction activities that would result in air pollution emissions from dust, fumes, equipment exhaust and other air contaminants. Individual development within the Mixed-Use District and the Multi-Family District would be required to comply with the City’s 2040 General Plan Policy 12.6-I-3 and Policy 12.6-1-5, which would require measures to reduce fugitive dust during construction and grading activities; compliance with Bay Area Air District CEQA guidance and thresholds as part of conditions of approval; and CEQA review for subsequent development projects. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. The 2040 General Plan FEIR identified MM AQ-1 which requires an evaluation of criteria pollutant emissions during the construction phase for projects that are subject to CEQA and exceed screening sizes in the Bay Area Air District’s CEQA Guidelines. If the evaluation finds that construction-related criteria air pollutants exceed the Bay Area Air District’s thresholds, then the project shall mitigate the impacts to a less than significant level. The 2040 General Plan FEIR identified MM AQ-2, which requires an evaluation of project-specific operational emissions in accordance with the Bay Area Air District’s CEQA Guidelines. If the evaluation finds that operational-related air pollutants exceed the Bay Area Air District’s thresholds, then the project shall mitigate the impacts to a less than significant level. Therefore, all individual development projects subject to CEQA would be required to conduct a project-level evaluation of construction- and operational-related emissions and mitigate emissions to less than significant levels. Accordingly, construction- and operational-related emissions associated with the Mixed-Use District and Multi-Family District would be less than significant. There are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) A technical assessment evaluating potential project construction- and operational-related air quality impacts was conducted for the proposed project and is provided herein. The evaluation follows Bay Area Air District methodology for assessing air quality impacts and utilizes the thresholds of significance and other guidance identified in its 2022 CEQA Air Quality Guidelines. According to the Bay Area Air District, the thresholds of significance represent the allowable emissions each project can generate without causing a cumulatively considerable contribution to regional air quality impacts. Therefore, a project that would not exceed the Bay Area Air District thresholds of significance on a project level also would not be considered to result in a cumulatively considerable contribution to these regional air quality impacts. Construction- and operational-related impacts are discussed separately below. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 48 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Construction Fugitive Dust Emissions Construction-related activities, such as soil disturbance, grading, and material hauling result in fugitive dust emissions (e.g., PM2.5 and PM10). PM10/PM2.5 (fugitive dust) is recognized to impact local communities. The Bay Area Air District does not have a numerical threshold of significance for fugitive dust particulate matter emissions. Instead, the Bay Area Air District bases the determination of significance for fugitive dust on implementing feasible and effective control measures. For a project to have a less than significant impact related to construction-related fugitive dust emissions, it must implement all of the Bay Area Air District’s Best Management Practices (BMPs). Implementation of Policy 12.6-I-3 and Policy 12.6-I-5 would require plans and projects to comply with Bay Area Air District’s CEQA guidance and thresholds as part of conditions of approval and CEQA review, which would include basic BMPs for construction-related fugitive dust emissions in accordance with Bay Area Air District standards. Therefore, in compliance with 2040 General Plan Policy 12.6-I-3 and Policy 12.6.-I-5, the Neighborhood District plus Grading of Interim Area shall implement BMPs to control fugitive dust and, therefore, impacts related to short-term construction fugitive dust emissions would be less than significant.8 Exhaust Emissions Construction emissions were quantified and estimated using CalEEMod Version 2022.1.1. As described in the Project Description, the construction analysis evaluated the construction-related activities associated with the Neighborhood District plus Grading of Interim Area. The following project characteristics and assumptions were utilized in the analysis: • Construction emissions were estimated for the demolition, grading and hydroseeding of the Neighborhood District plus Grading of the Interim Area which was assumed to be 67.82 acres. Construction activities were assumed to begin in June 2026 and conclude in April 2027. - Demolition activities were conservatively estimated to include demolishing up to 1.927 million square feet of existing office buildings, which represents a worst-case scenario. - Grading and site preparation (including hydroseeding) would occur across the entire 67.82- acre area. • Construction emissions were estimated for building construction, architectural coatings and paving throughout the 54-acre Neighborhood District which would include a total of 426 residential dwelling units including single-family homes, ADUs and townhomes. - Building construction was assumed to begin in April 2027 and conclude in July 2031. - Construction of the Neighborhood District would include approximately 23.2 acres of paved roadways. 8 Bay Area Air Quality Management District (Bay Area Air District). 2022. CEQA Guidelines. Website: https://www.baaqmd.gov/~/media/files/planning-and-research/ceqa/ceqa-guidelines-2022/ceqa-guidelines-chapter-5- project-air-quality-impacts_final-pdf.pdf?rev=de582fe349e545989239cbbc0d62c37a&sc_lang=en. Accessed August 21, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 49 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Although it does not form the basis of the evaluation or conclusion in this document, it is reasonable to assume that future improvements in technology would be incorporated into regulatory requirements related to equipment and fuels. Accordingly, should the construction schedule move to later years or take longer, construction emissions would be expected to decrease because of mandatory compliance with improvements in technology and more stringent regulatory requirements that would affect future construction equipment and fuels (therefore, the analysis represents a worst-case, conservative approach). Additional details on the assumptions and inputs are included in the CalEEMod output reports (Appendix B). Table 3 shows the annual construction-related criteria air pollutant exhaust emissions associated with the Neighborhood District Plus the Grading of the Interim Area (in tons per year). As shown, all estimated emissions are well below the annual thresholds of significance for construction exhaust. Table 3: Annual Project Construction Exhaust Emissions–Unmitigated Construction Year Criteria Air Pollutant Emissions (tons/year) ROG NOX PM10 (Exhaust) PM2.5 (Exhaust) 2026 0.23 2.90 0.09 0.08 2027 0.26 1.95 0.07 0.06 2028 0.22 1.42 0.04 0.03 2029 0.21 1.35 0.04 0.03 2030 5.76 2.78 0.05 0.05 2031 2.88 0.70 0.02 0.02 Significance Threshold (tons/year) 10 10 15 10 Exceeds Significance Threshold? No No No No Notes: lbs = pounds NOX = oxides of nitrogen PM10 = particulate matter less than 10 microns in diameter (includes only exhaust-related emissions) PM2.5 = particulate matter less than 2.5 microns in diameter (includes only exhaust-related emissions) ROG = reactive organic gases Source: Appendix B Table 4 shows the average daily construction-related criteria air pollutant exhaust emissions associated with the Neighborhood District Plus the Grading of the Interim Area (in pounds per day). As shown, all estimated emissions are well below the average daily thresholds of significance for construction exhaust. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 50 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Table 4: Average Daily Project Construction Exhaust Emissions–Unmitigated Construction Year Criteria Air Pollutant Emissions (lbs/day) ROG NOX PM10 (Exhaust) PM2.5 (Exhaust) 2026 2.97 37.62 1.21 1.06 2027 2.02 14.95 0.52 0.48 2028 1.66 10.91 0.32 0.26 2029 1.59 10.37 0.29 0.26 2030 44.12 21.29 0.42 0.39 2031 43.24 10.50 0.26 0.24 Significance Threshold (lbs/day) 54 54 82 54 Exceeds Significance Threshold? No No No No Notes: lbs = pounds NOX = oxides of nitrogen PM10 = particulate matter less than 10 microns in diameter (includes only exhaust-related emissions) PM2.5 = particulate matter less than 2.5 microns in diameter (includes only exhaust-related emissions) ROG = reactive organic gases The average daily emissions per year were derived by taking total emissions for each year and dividing by the number of working days in the same year. Source: Appendix B Overall, construction-related fugitive dust and exhaust emissions would be below all applicable thresholds of significance and impacts from construction would be less than significant. Operation The residential buildings constructed as a part of the Neighborhood District would be associated with ongoing operational emissions including from area, energy, and mobile sources. Area sources would include emissions from architectural coatings, consumer products, and landscape equipment. For building energy, there are no on-site emissions of criteria pollutants because the residential buildings to be constructed in the Neighborhood District would be all-electric and would not utilize natural gas for building heat or hot water. Building operations would only result in indirect emissions related to electricity production. Mobile sources would include exhaust and road dust emissions from the vehicles that would travel to and from the project site. The Bay Area Air District developed screening criteria for criteria air pollutants and precursors. These screening criteria provide lead agencies with a conservative indication of whether implementing a proposed project could result in potentially significant criteria air pollutants and precursor impacts. If ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 51 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx all screening criteria for criteria air pollutants and precursors are met by a proposed project, then the lead agency would not need to perform a detailed assessment of the project’s criteria air pollutant and precursor emissions. The Neighborhood District would include only residential land uses; however, the residential uses include multiple types of residential (single-family, townhomes, and ADUs). Therefore, the Bay Area Air District’s Mixed Land Use Screening Tool for Criteria Pollutants and Precursors was used for the screening level analysis.9 The proposed project meets the screening criteria detailed in the Bay Area Air District’s 2022 CEQA Guidelines as discussed below: • The Mixed Land Use Screening Tool for Criteria Pollutants and Precursors was used and the Neighborhood District would not exceed operational thresholds (according to the tool). It was assumed that the Neighborhood District would include the development of 230 single-family homes, 138 condo-townhomes, and 58 ADUs (modeled as low-rise apartments, consistent with the traffic analysis). See Appendix B for additional documentation. • Operational activities would not include stationary sources or industrial sources subject to Bay Area Air District rules and regulations. • Operational activities would not overlap with construction-related activities. Therefore, operational-related impacts from criteria air pollutant emissions would be less than significant. There are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Sensitive Receptors Would the project: Expose sensitive receptors to substantial pollutant concentrations? Summary of 2040 General Plan EIR Development facilitated by the 2040 General Plan would result in diesel particulate matter (DPM) emissions from off-road, heavy-duty equipment from construction-related activities. Future projects facilitated by the 2040 General Plan would be required to implement relevant and applicable General Plan policies to reduce emissions, including Policy 12.6-I-3 and Policy 12.6-G-5, which would require dust reduction measures during grading and construction. In addition, the 2040 General Plan EIR identified MM AQ-3, which requires future development projects subject to CEQA review to coordinate with the City to determine whether a construction Health Risk Assessment (HRA) would need to be 9 Bay Area Air Quality Management District (Bay Area Air District). 2025. CEQA Thresholds and Guidelines Update. Website: https://www.baaqmd.gov/plans-and-climate/california-environmental-quality-act-ceqa/updated-ceqa-guidelines. Accessed November 13, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 52 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx performed for projects with construction timelines greater than two months and within 1,000 feet of sensitive receptors, in order to identify and reduce potential risk exposure to nearby sensitive receptors. Therefore, the 2040 General Plan FEIR concluded that construction-related impacts would be less than significant after incorporation of mitigation. Development facilitated by the 2040 General Plan would also accommodate additional residential and nonresidential development which could be associated with ongoing TAC and/or DPM emissions. Future projects facilitated by the 2040 General Plan would be required to implement relevant and applicable General Plan policies to reduce emissions, including Policy 12.5-I-1, Policy 12.6.I-1 and Policy 12.6.I-2, which aim to reduce air pollution and public exposure to hazardous air contaminants by aligning project reviews and approvals with CEQA standards, GHG emission reduction targets, and Bay Area Air District thresholds. The policies also emphasize proper siting of emission sources and careful evaluation of hazardous material handling in new developments to protect sensitive land uses and public health. In addition, the 2040 General Plan EIR identified MM AQ-4, which requires that potential risk exposure to nearby sensitive receptors from the operation phase of discretionary development projects be identified and reduced. In addition, MM AQ-4 requires that applicants for commercial land uses that would generate substantial diesel truck travel (i.e., 100 diesel trucks per day or 40 or more trucks with diesel-powered transport refrigeration units per day) to determine the appropriate level of operational HRA required. If required, the operational HRA shall be prepared in accordance with the Office of Environmental Health Hazard Assessment (OEHHA) and Bay Area Air District requirements and include mitigation to reduce the exposure risk to an acceptable level. Therefore, the 2040 General Plan FEIR concluded that operational-related impacts would be less than significant after incorporation of mitigation. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The 11.3-acre Mixed-Use District would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The 26-acre Multi-Family District would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. Development of the Mixed-Use District and the Multi-Family District would include construction activities that would result in air pollution emissions from dust, fumes, equipment exhaust and other air contaminants that could expose nearby sensitive receptors to elevated concentrations of TACs and/or DPM. Individual development within the Mixed-Use District and the Multi-Family District would be required to comply with the City’s 2040 General Plan Policy 12.6-I-3 and Policy 12.6-1-5 which would require measures to reduce fugitive dust during construction and grading activities, and compliance with Bay Area Air District CEQA guidance and thresholds as part of conditions of approval ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 53 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx and CEQA review for subsequent development projects. Future projects facilitated by the 2040 General Plan would also be required to implement relevant and applicable General Plan policies to reduce operational emissions, including Policy 12.5-I-1, Policy 12.6.I-1 and Policy 12.6.I-2, which aim to reduce air pollution and public exposure to hazardous air contaminants by aligning project reviews and approvals with CEQA standards, GHG emission reduction targets, and Bay Area Air District thresholds. The policies also emphasize proper siting of emission sources and careful evaluation of hazardous material handling in new developments to protect sensitive land uses and public health. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. To address construction-related impacts, the 2040 General Plan FEIR identified MM AQ-3, which requires future development projects subject to CEQA review to coordinate with the City to determine whether a construction HRA would need to be performed for projects with construction timelines greater than two months and within 1,000 feet of sensitive receptors, in order to identify and reduce potential risk exposure to nearby sensitive receptors. If the evaluation finds that construction-related air pollutants exceed the Bay Area Air District’s thresholds, then the project shall mitigate the impacts to a less than significant level. To address operational-related impacts, the 2040 General Plan EIR identified MM AQ-4 which requires that potential risk exposure to nearby sensitive receptors from the operation phase of discretionary development projects be identified and reduced. In addition, MM AQ-4 requires that applicants for commercial land uses that would generate substantial diesel truck travel (i.e., 100 diesel trucks per day or 40 or more trucks with diesel-powered transport refrigeration units per day) to determine the appropriate level of operational HRA required. If required, the operational HRA shall be prepared in accordance with the OEHHA and Bay Area Air District requirements and include mitigation to reduce the exposure risk to an acceptable level. If the evaluation finds that operation- related air pollutants exceed the Bay Area Air District’s thresholds, then the project shall mitigate the impacts to a less than significant level. Therefore, all individual development projects subject to CEQA would be required to conduct a project-level evaluation of construction- and operational-related health risk impacts to nearby sensitive receptors and mitigate emissions and exposures to less than significant levels. Accordingly, construction- and operational-related impacts associated with the Mixed-Use District and Multi-Family District would be less than significant. There are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 54 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Project-LEVEL Analysis (Neighborhood District Development plus Grading of Interim Area) An assessment evaluating potential construction- and operational-related air quality impacts to nearby sensitive receptors from implementation of the Neighborhood District plus Grading of Interim Area was conducted and is provided herein. Construction and operation are discussed separately below. Construction An HRA evaluating potential project construction-related health risks to nearby sensitive receptors was conducted for the Neighborhood District plus Grading of the Interim Area. Details on the assumptions and inputs are included in Appendix B. The HRA follows Bay Area Air District methodology for assessing potential impacts and utilizes the thresholds of significance identified in their 2022 CEQA Air Quality Guidelines. The project site is located within 1,000 feet of sensitive receptors, including residences to the west and south, and employment establishments with worker receptors to the north and east. Because of the presence of residential and worker receptors, construction emissions have the potential to result in significant health risks from construction-related TAC and/or PM2.5 emissions. Table 5 presents a summary of the Neighborhood District plus Grading of the Interim Area’s construction cancer risk, chronic non-cancer hazard, and predicted annual PM2.5 concentration impacts at the Maximally Exposed Individual Resident (MEIR) and the Maximally Exposed Worker (MEIW). The MEIR is the residential receptor that would experience the highest health effects from the Neighborhood District plus Grading of the Interim Area’s construction and the MEIW is the worker receptor that would experience the highest health effects from the Neighborhood District plus Grading of the Interim Area’s construction. As shown in Table 4, the potential health risks would not exceed the Bay Area Air District’s thresholds of significance, and impacts would be less than significant. Table 5: Summary of the Health Impacts at the Maximally Exposed Individual Receptors During Project Construction Project Construction Impacts Maximally Exposed Individual Receptor Risks Receptors Cancer Risk (per million) Chronic HI PM2.5 Concentration (µg/m3) Project Construction Impacts at MEIR 6.43 <0.01 0.1039 Project Construction Impacts at MEIW 0.77 <0.01 0.09607 Bay Area Air District Single Source Threshold of Significance 10 1 0.3 Threshold Exceeded? No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 55 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Project Construction Impacts Maximally Exposed Individual Receptor Risks Receptors Cancer Risk (per million) Chronic HI PM2.5 Concentration (µg/m3) Notes: µg/m3 = micrograms per cubic meter HI = hazard index MEIR = Maximally Exposed Individual Resident MEIW = Maximally Exposed Individual Worker PM2.5 = particulate matter less than 2.5 microns in diameter Project risks and hazards are for diesel exhaust, which does not have an established Acute Reference Exposure Level. The MEIR was found to be a residence located approximately 50 feet to the south of the project site. The MEIW was found to be an industrial establishment located approximately 150 feet to the west of the project site. Source: Appendix B Health Risk Assessment–Cumulative (Project Construction Plus Existing Sources) The Bay Area Air District also recommends assessing the cumulative impacts at the most impacted nearby receptors from a project’s construction-related health risks and PM2.5 concentrations in combination with existing sources of TACs and PM2.5 concentrations within 1,000 feet of the proposed project. To conduct a cumulative HRA, the Bay Area Air District provides several tools for use in identifying the existing sources of air pollution and associated health risks near a project site. These tools include the Stationary Source Screening Map10 which provides the location of all the stationary sources permitted by the Bay Area Air District; the Roadway Screening Data Layers which provide estimated cancer risk, hazards estimates and PM2.5 concentrations at varying distances from all Bay Area highways and surface streets; and Rail and Railyard Screening Data Layers which provide estimated cancer risks, hazards estimates, and PM2.5 concentrations at varying distances from diesel locomotives and select railyards. Outputs from the Bay Area Air District screening tools are documented in Appendix B. Table 6 presents the cumulative health risks at the MEIR (which is the most impacted nearby receptor, also known as the maximally exposed individual [MEI]). As shown, health risks and PM2.5 concentrations would be below the Bay Area Air District’s cumulative thresholds of significance and impacts would be less than significant. 10 Bay Area Air Quality Management District (Bay Area Air District). 2024. Stationary Source Screening Map. Website: https://baaqmd.maps.arcgis.com/apps/webappviewer/index.html?id=845658c19eae4594b9f4b805fb9d89a3. Accessed July 10, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 56 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Table 6: Summary of the Cumulative Health Impacts During Project Construction at the Maximally Exposed Individual Source Cancer Risk (per million) Chronic Hazard Index Maximum Annual PM2.5 Concentration (µg/m3) On-site MEI Project Construction 6.43 < 0.01 0.10 Stationary Sources 50 0.09 0.04 Roadways 12.63 0.03 0.23 Rail Lines and Rail Yards 0 0 0 Cumulative Health Risks at On-site MEI 69.06 < 0.12 0.4 Bay Area Air District Cumulative Thresholds of Significance 100 10 0.8 Threshold Exceedance? No No No Notes: Bay Area Air District = Bay Area Air Quality Management District PM2.5 = particulate matter less than 2.5 microns in diameter µg/m3 = micrograms per cubic meter Bay Area Air District = Bay Area Air Quality Management District MEI = Maximally Exposed Individual TAC = toxic air contaminant Project and stationary source risks and hazards are for diesel exhaust, which does not have an established Acute Reference Exposure Level. Stationary source values were calculated at the centroid of the facility; however, the distances from each stationary source and the MEI varies up to distances greater than 1,000 feet. Because emissions and associated health risks have been demonstrated to diminish with distance, the values shown in the table are conservative and actual health risks would be expected to be much lower. Facility ID 7237 is located at the project site at 6001 Bollinger Road and is assumed to be decommissioned during project demolition. Therefore, the stationary source values do not include Facility ID 7237. Source: Appendix B Operation As the development proposed within the Neighborhood District does not constitute a commercial development that is expected to result in 100 or more daily diesel truck trips or involve 40 or more trucks equipped with diesel-powered transport refrigeration units, 2040 General Plan FEIR MM AQ-4 would not apply. The proposed residential development is not expected to generate substantive DPM or TAC emissions during operational activity because ongoing emissions would primarily involve passenger vehicle use with no heavy-duty truck activity, resulting in minimal localized air pollutant contributions. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 57 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx The residences within the Neighborhood District would not have stationary sources or on-site sources of TACs during operation. Traffic generated by the residences of the Neighborhood District would consist mostly of light-duty gasoline-powered vehicles, which are not a significant source of TAC and air pollutant emissions. Thus, the Neighborhood District would not result in significant health impacts to nearby sensitive receptors during operation, and operational-related impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. d) Odors Would the project: Result in other emissions (such as those leading to odors or) adversely affecting a substantial number of people? Summary of 2040 General Plan EIR All diesel fuel and oil odors would be limited to the construction period and would be temporary. During operations, all new development, including those typically producing objectionable odors (i.e., agricultural uses, wastewater treatment plants, food manufacturing plants), would be required to demonstrate consistency with San Ramon Zoning Ordinance D3 8(L). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The 11.3-acre Mixed-Use District would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The 26-acre Multi-Family District would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. Odor impacts could occur if the Mixed-Use District or the Multi-Family District introduce a new odor source near existing receptors. The Bay Area Air District provides a list of recommended odor screening distances for specific odor-generating facilities. According to the Bay Area Air District, neither residential nor commercial uses are odor-generating facilities. Potential sources that may emit odors during construction activities include exhaust from diesel construction equipment. However, because of the temporary nature of these emissions, the intermittent nature of construction activities, and the highly diffusive properties of diesel PM exhaust, ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 58 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx nearby receptors would not be affected by diesel exhaust odors associated with project construction. Odors from these sources would be localized and generally confined to the immediate area surrounding the project site. The Mixed-Use District and Multi-Family District would utilize typical construction techniques, and the odors would be typical of most construction sites and temporary in nature. Thus, the Mixed-Use and Multi-Family Districts would not introduce a new odor source near existing receptors during construction. The Mixed-Use District and Multi-Family District would involve the development of residential and commercial uses; operations could lead to odors from associated vehicle exhaust and waste disposal. However, such odors generated by operation would be small in quantity and duration and would not pose an objectionable odor impact to future and existing receptors. Thus, Mixed-Use and Multi-Family Districts would not introduce a new odor source near existing receptors during construction or operation and impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-Level Analysis (Neighborhood District plus Grading of Interim Area) Similar to the impacts evaluated and disclosed in the 2040 General Plan FEIR, construction and operation of the proposed project would not create objectionable odors. Potential sources that may emit odors during construction activities include exhaust from diesel construction equipment. However, because of the temporary nature of these emissions, the intermittent nature of construction activities, and the highly diffusive properties of DPM exhaust, nearby receptors would not be significantly affected by diesel exhaust odors associated with project construction. Odors from these sources would be localized and generally confined to the immediate area surrounding the project site. The Neighborhood District plus Grading of the Interim Area would utilize typical construction techniques, and the odors would be typical of most construction sites and temporary in nature. Thus, the Neighborhood District plus Grading of the Interim Area would not introduce a new odor source near existing receptors during construction. During operation, the Neighborhood District could include activities that might lead to odors from associated vehicle exhaust and waste disposal. However, such odors generated by project operation would be small in quantity and duration and would not pose an objectionable odor impact to future and existing receptors. Furthermore, the Neighborhood District consists of residential uses which are not considered odor-generating uses according to the 2040 General Plan FEIR, as noted above. Therefore, impacts associated with construction-generated and operational-generated odors would be considered less than significant. There are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 59 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Applicable 2040 General Plan FEIR Mitigation Measures MM AQ-1 Reduce Construction Criteria Pollutant Emissions To reduce temporary increases in criteria air pollutant emissions during the construction phase for discretionary development projects that are subject to CEQA and exceed the screening sizes in the Bay Area Air Quality Management District11 (BAAQMD) CEQA Guidelines, the City shall require such projects to evaluate project- specific construction emissions in conformance with the BAAQMD methodology. If construction-related criteria air pollutants exceed the BAAQMD thresholds of significance, the project applicant shall mitigate the impacts to a less than-significant level. MM AQ-2 Reduce Operational Criteria Pollutant Emissions To reduce long-term increases in air pollutants during the operation phase for discretionary development projects that are subject to CEQA and exceed the screening sizes in the Bay Area Air Quality Management District (BAAQMD) CEQA Guidelines, the City shall require such projects to evaluate project- specific operation emissions in conformance with BAAQMD CEQA Guidelines. If operation- related air pollutants exceed the BAAQMD-adopted thresholds of significance, the project applicant shall mitigate the impact to a less than significant level. MM AQ-3 Conduct and Implement Construction Health Risk Assessment To identify and reduce potential risk exposure to nearby sensitive receivers during construction of individual projects (excluding ADUs, single-family residences, and duplexes) where construction activities would (a) occur within 1,000 feet of sensitive receptors, (b) last longer than two months, and (c) not utilize equipment rated US EPA Tier 4 for equipment of 50 horsepower or more, construction equipment fitted with Level 3 Diesel Particulate Filters for all equipment of 50 horsepower or more, and/or alternative fuel construction equipment, the project applicant shall coordinate with the City to determine whether a construction Health Risk Assessment (HRA) shall be performed. If an HRA is to be performed, the HRA shall determine potential risk and compare the risk to the following BAAQMD thresholds: • Non-compliance with Qualified Community Risk Reduction Plan • Increased cancer risk of > 10.0 in a million • Increased non-cancer risk of > 1.0 Hazard Index (Chronic or Acute) • Ambient PM2.5 increase of > 0.3 µg/m3 annual average 11 Now referred to as Bay Area Air District. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 60 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx If risk exceeds the thresholds, measures such as requiring the use of Tier 4 engines, Level 3 Diesel Particulate Filters, and/or alternative fuel construction equipment shall be incorporated to reduce the exposure risk to acceptable levels. Conclusion With regard to Air Quality, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 61 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.4 Biological Resources Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or United States Fish and Wildlife Service? Less than significant impact No No No No b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, and regulations or by the California Department of Fish and Wildlife or United States Fish and Wildlife Service? Less than significant impact No No No No c) Have a substantial adverse effect on State or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? Less than significant impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 62 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of wildlife nursery sites? Less than significant impact No No No No e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? Less than significant impact No No No No f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State Habitat Conservation Plan? Less than significant impact No No No No a) Special-status Species Would the project: Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or United States Fish and Wildlife Service? Summary of 2040 General Plan EIR The General Plan Area is mostly built out, which limits suitable habitat for special-status species. The Plan Area contains some sensitive ecological communities such as oak woodlands which are preserved within rural conservations, parks, and open space areas. Riparian corridors such as creeks and drainages support special-status species such as the California red-legged frog, California tiger ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 63 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx salamander, Alameda whipsnake, and special-status raptors such as the Cooper’s hawk and northern harrier within the Plan Area. Development proposed under the 2040 General Plan would consist primarily of infill within already urbanized zones, thereby minimizing direct impacts on areas of ecological significance. While the Plan increases allowable densities, existing development limits the need for significant new utility installations. However, temporary construction activities within riparian habitats have the potential to impact aquatic resources and sensitive natural habitats. Isolated trees and vegetation in urbanized areas may serve as nesting habitat for migratory birds or roosting areas for special-status bats. Bats such as pallid bat, western red bat, Townsend’s big-eared bat, and western mastiff bat may use urban features like trees and abandoned buildings for roosting. To address risks to special-status species, the 2040 General Plan includes comprehensive environmental protections. General Plan Policies such as 4.6-I-6, 4.6-I-7, and 8.1-G-1 through 8.3-I-7 establish requirements for biological surveys, agency coordination, and mitigation strategies prior to construction. The 2040 General Plan EIR anticipated potential impacts associated with development implementing the General Plan and identified mitigation measures that would be applicable to future development. In certifying the 2040 General Plan EIR, the City found that with implementation of these policies and mitigation measures, impacts on special-status species would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site and surrounding area are fully developed and surrounded by development. The proposed project is located on a typical infill site that is consistent with the development anticipated in the General Plan. A Tree Inventory Report prepared by HortScience in October 2022 found 3,084 trees within the project site, including 46 species such as Deodar cedar (Cedrus deodara), hackberry (Celtis occidentalis), evergreen ash (Fraxinus uhdei), fruitless white mulberry (Morus alba ‘Fruitless’), London plane (Platanus x hispanica), and coast redwood (Sequoia sempervirens) (Appendix C). Trees are dispersed throughout the site. FirstCarbon Solutions (FCS) conducted a field survey on July 22, 2025, as well as an associated literature review for the proposed project. Species observed within the project site consist of American crow (Corvus brachyrhynchos), scrub jay (Aphelocoma californica), mourning dove (Zenaida macroura), and house finch (Haemorhous mexicanus). Plants were all ornamental types found in business parks that have been abandoned. Landscaping has not been maintained. The California Natural Diversity Database (CNDDB), California Natural Plant Society (CNPS) Inventory of Rare Plants (CNPS Inventory), and Information for Planning and Consultation (IPaC) identified 73 special-status plant species and 29 special-status animals within the Diablo, California United States Geologic Survey (USGS) Topographic Quadrangle Map and the eight surrounding ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 64 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx quadrangles. As discussed above, the project site is composed of development and ornamental vegetation. Because of the high level of anthropogenic disturbances and impacted vegetation within the project site, the site does not contain suitable habitat to support special-status plant species, as discussed in greater detail in the Special-status Species Evaluation Tables (Appendix C). Habitat types necessary to support special-status plant species include meadows, seeps, chenopod scrub, foothill grassland, vernal pools, and alkaline soils, none of which the project site contains. Habitat needed to support most special-status wildlife species include sandy washes, alluvial fans, pin-oak woodlands, desert scrub, rivers, marshes, annual grasslands, chaparral, and redwood habitats, none of which the project site contains. There is potential for special-status bat species, such as Townsend’s big-eared bat (Corynorhinus townsendii ) and western mastiff bat (Eumops perotis californicus) to be present on-site. The project site contains large quantities of ornamental trees suitable for roosting habitat. Additionally, abandoned buildings on-site could provide suitable roosting habitat for bats. Although no special-status plant or wildlife species were identified during the field surveys, there is a low potential for the Townsend’s big- eared bat and western mastiff bat to be present within the site. Furthermore, the numerous ornamental trees within the project site could provide suitable habitat for a variety of non-special-status nesting bird species. As such, construction activities that occur during the avian nesting season (generally February 1 to August 31) or bat roosting season (April 15 to August 15) could disturb nesting sites for bird species protected under the Fish and Game Code or Migratory Bird Treaty Act (MBTA) or roosting bats protected under California Fish and Game Code Section 4150. The removal of trees and abandoned buildings during the nesting and roosting seasons could result in direct harm to nesting birds and roosting bats, while noise, light, and other man-made disturbances may cause nesting birds or roosting bats to abandon their nests/roosts, resulting in a potentially significant impact. The proposed project is consistent with the type and scope of development anticipated in the 2040 General Plan EIR, As such, the applicant is required to implement General Plan EIR MM BIO-1 and MM BIO-2, which require pre-construction bird surveys and the implementation of avoidance and minimization measures if individuals are found. The proposed project would be required to adhere to federal and State regulations that protect nesting and migratory birds. In compliance with MM BIO-1 and as described in this analysis, the applicant shall hire a qualified Biologist to conduct pre- construction surveys and implement avoidance measures, if necessary, lowering impacts to nesting birds to less than significant. Per MM BIO-2, the proposed project would be required to perform pre- construction roosting bat surveys prior to construction and implement avoidance measures if roosting bats are found present within the site, lowering impacts to bats to less than significant. No additional or project-specific mitigation is required. Therefore, with implementation of MM BIO-1 and MM BIO-2, development of the site would be consistent with the anticipated impacts in the General Plan and would not result in significant environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 65 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx b) Riparian Habitat and Sensitive Natural Communities Would the project: Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, and regulations or by the California Department of Fish and Wildlife or United States Fish and Wildlife Service? Summary of 2040 General Plan EIR The 2040 General Plan notes the presence of freshwater forested and shrub wetlands primarily along Tassajara Creek and Bollinger Canyon, as well as numerous riverine features such as Alamo Creek, South San Ramon Creek, and various drainage canals throughout the Plan Area. It was determined that General Plan buildout would primarily consist of infills in already urbanized areas that are unlikely to contain wetlands or riparian zones. However, it was determined that some projects may intersect sensitive habitats and waterways. Such developments may require permits from regulatory agencies like the United States Army Corps of Engineers (USACE), California Department of Fish and Wildlife (CDFW), and the Regional Water Quality Control Board (RWQCB), in accordance with federal and State laws including Sections 404 and 401 of the Clean Water Act (CWA), the Porter-Cologne Water Quality Control Act, and the California Fish and Game Code Section 1600 et seq. For projects near wetlands, streams, or riparian areas, the 2040 General Plan EIR requires an aquatic resources delineation to establish jurisdictional boundaries in compliance with State and federal policies. Permit issuance for grading and construction activities requires confirmation that such work will not cause erosion, sedimentation, or other harmful off-site effects. On sites larger than one acre, developers must implement a Storm Water Pollution Prevention Plan (SWPPP) and BMPs as required by the National Pollutant Discharge Elimination System (NPDES) to mitigate potential impacts during storm events. Additionally, the San Ramon Municipal Code mandates erosion and stormwater control measures and the submittal of plans prior to the issuance of grading permits. Development within or adjacent to sensitive habitats could pose direct impacts through vegetation removal, hydrological changes, and pollutant runoff, or indirect effects like soil compaction and dust generation. To mitigate these impacts, the 2040 General Plan includes several guiding and implementing policies in its Open Space, Conservation, and Safety Elements. These measures aim to minimize disruption to creeks and riparian zones and require permitting and environmental review by appropriate agencies. Therefore, it was determined that, through adherence to the General Plan’s policies and applicable environmental regulations, potential impacts to wetlands and riparian habitats would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site does not contain any riparian habitat or other sensitive natural community. The site is completely developed, and the nearest aquatic resource is located 0.8 mile east and is separated from the site by commercial development and roadways. The site does contain a concrete-lined, ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 66 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx man-made pond. However, the pond is not expected to be regulated as State- or federally- protected waters or wetlands under CWA Sections 404/401, Porter-Cologne Water Quality Control Act, or Fish and Game Code Sections 1602 et seq., because the pond has been excavated within developed habitat for the purpose of on-site beautification and contains actively managed landscaping, and is therefore hydrologically disconnected from natural flows. Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. c) Federally Protected Wetlands Would the project: Have a substantial adverse effect on State or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? Summary of 2040 General Plan EIR For projects near wetlands, streams, or riparian areas, the 2040 General Plan EIR requires an aquatic resources delineation to establish jurisdictional boundaries. Permit issuance for grading and construction activities requires confirmation that such work will not cause erosion, sedimentation, or other harmful off-site effects. On sites larger than one acre, developers must implement a SWPPP and BMPs as required by the NPDES to mitigate potential impacts during storm events. Additionally, the San Ramon Municipal Code mandates erosion and stormwater control measures and the submittal of plans prior to the issuance of grading permits. The 2040 General Plan notes the presence of freshwater forested and shrub wetlands primarily along Tassajara Creek and Bollinger Canyon. The General Plan EIR determined that plan development would primarily consist of infills in already urbanized areas that are unlikely to contain wetlands. However, some projects may intersect waterways and wetlands. Such developments may require permits from regulatory agencies like the USACE, CDFW, and the RWQCB, in accordance with federal and State laws including Sections 404 and 401 of the CWA, the Porter-Cologne Water Quality Control Act, and the California Fish and Game Code Section 1600 et seq. It was determined that development within or adjacent to aquatic habitats could pose direct impacts through vegetation removal, hydrological changes, and pollutant runoff, or indirect effects like soil compaction and dust generation. To mitigate these impacts, the 2040 General Plan includes several guiding and implementing policies in its Open Space, Conservation, and Safety Elements. These measures aim to minimize disruption to creeks and riparian zones and require permitting and environmental review by appropriate agencies. Therefore, it was determined that, through adherence to the General Plan’s policies and applicable environmental regulations, potential impacts to wetlands and riparian habitats would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 67 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) As stated above, the project site contains a concrete-lined, man-made pond. This feature is not expected to be considered a State- or federally protected wetland pursuant to CWA Sections 404/401 and/or Fish and Game Code Section 1602. There are no other water features on-site. Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the proposed project. Therefore, the proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. d) Fish or Wildlife Movement Would the project: Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of wildlife nursery sites? Summary of 2040 General Plan EIR Wildlife movement corridors in the General Plan Area are primarily located in riparian zones, creeks, and open spaces found within local and regional parks. These corridors support migratory species such as fish, birds, and sensitive amphibians and reptiles, including the Alameda whipsnake (Masticophis lateralis euryxanthus), California tiger salamander (Ambystoma californiense), and California red-legged frog (Rana draytonii). The 2040 General Plan does not propose changes to existing land use designations for Rural Conservation, Parks, or Open Space, which include key creek and riparian zones. Therefore, the 2040 General Plan would not facilitate permanent development within established wildlife movement corridors. Development will be concentrated in urbanized areas and focused on infill sites already containing structures or pavement, away from sensitive habitat zones. Policies in the 2040 General Plan, such as Policy 8.3-1-2 and others listed under Impact 4.4(b), promote the preservation and restoration of riparian corridors and require development setbacks from creek protection zones and wetlands. These policies aim to protect and maintain the ecological integrity of wildlife corridors. Additionally, guiding and implementing policies from the Open Space and Conservation Element support a cohesive network of open space, further enhancing opportunities for uninterrupted wildlife movement. Therefore, it was determined that the 2040 General Plan will avoid development in natural corridors and emphasize habitat protection through strategic policies and land use designations. Therefore, construction-related impacts on wildlife movement corridors will be less than significant with adherence to General Plan policies and land use designations. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 68 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site is entirely developed and is surrounded by urban development in all directions. Based on the July 22, 2025 field survey, the project site does not contain any natural features that could serve as a suitable corridor for wildlife or fish movement. As discussed in Impact 4.4(a) above, the implementation of MM BIO-1 and MM BIO-2 would reduce any potential impacts to nesting birds and roosting bats from the proposed project to less than significant levels. Therefore, development of the site as proposed would not result in significant environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. e) Conflict with Local Policies or Ordinances Would the project: Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? Summary of 2040 General Plan EIR The 2040 General Plan EIR determined that development under the 2040 General Plan could occur on properties with mature trees, including street trees. Any removal or modification of these trees is regulated by Chapter 2 of Division D5 in the San Ramon Municipal Code, which defines "protected trees" and outlines their protection standards. These regulations require permits, arborist reports, and proper procedures for tree removal and replacement. Additional measures, such as tree protection during construction grading, are also mandated under San Ramon Municipal Code Section D5-12. The 2040 General Plan includes Policies COS-2.3 through COS-2.6, which require the preservation of native oak woodlands and encourages native plantings around reservoirs and streams, that further protect local vegetation. With adherence to 2040 General Plan policies and San Ramon Municipal Code ordinances such as Chapter 2 of Division D5, impacts to biological resources from development are expected to be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The Tree Inventory Report prepared by HortScience in October 2022 identified 3,084 trees within the project site. Of the 3,084 trees on-site, 2,608 trees were identified as protected trees under San Ramon Municipal Code Section D5. The proposed project would be required to adhere to the City’s Tree Preservation Ordinance, which requires removal permits for any protected tree on-site proposed for removal. Therefore, with adherence to the City’s Tree Preservation Ordinance and by obtaining tree removal permits for protected trees slated for removal on-site, the development of the site as proposed would not result in significant environmental effects that are peculiar to the proposed ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 69 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. Impacts would be less than significant. f) Habitat Conservation Plan/Natural Community Conservation Plan Would the project: Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or State Habitat Conservation Plan? Summary of 2040 General Plan EIR No Habitat Conservation Plans (HCPs) or Natural Community Conservation Plans (NCCPs) have been adopted within the General Plan Area. Consequently, none apply to the 2040 General Plan. As a result, it was determined that development and policy implementation under the 2040 General Plan would not conflict with any adopted local, regional, or State HCP, and therefore would result in no related impacts. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site is not located within a HCP or NCCP area; therefore, development of the site would not result in any significant environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. 2040 General Plan FEIR Mitigation Measures MM BIO-1 Conduct Pre-Construction Bird Surveys and Implement Avoidance and Minimization Measure For construction activities initiated during the bird nesting season (February 1– September 15) involving removal of vegetation that could potentially serve as habitat for special-status bird species or other nesting bird habitat, including abandoned structures and other man-made features, a pre-construction nesting bird survey shall be conducted no more than 14 days prior to initiation of ground disturbance and vegetation removal activities. The nesting bird pre-construction survey shall be conducted on foot and shall include a buffer around the construction site at a distance determined by a qualified Biologist. The survey shall be conducted by a Biologist familiar with the identification of avian species known to occur in California Bay Area communities (i.e., qualified Biologist). If nests are found, an avoidance buffer shall be determined by a qualified Biologist dependent upon the species, the proposed work activity, and existing disturbances associated with land uses outside of the site. The buffer shall be demarcated by the Biologist with bright orange construction fencing, flagging, construction lathe, or other means to demarcate the ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 70 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx boundary. All construction personnel shall be notified as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No ground- disturbing activities shall occur within the buffer until the Biologist has confirmed that breeding/nesting is completed, and the young have fledged the nest. Encroachment into the buffer shall occur only at the discretion of the qualified Biologist on the basis that the encroachment will not be detrimental to an active nest. A report summarizing the pre-construction survey(s) shall be prepared by a qualified Biologist and shall be submitted to the City prior to the commencement of construction activities. Future project site plans shall include a statement acknowledging compliance with the federal Migratory Bird Treaty Act (MBTA) and California Fish and Game Code that includes avoidance of active bird nests and identification of Best Management Practices (BMPs) to avoid impacts to active nests, including checking for nests prior to construction activities during February 1 to September 15 and what to do if an active nest is found so that the nest is not inadvertently impacted during grading or construction activities. MM BIO-2 Conduct Pre-construction Roosting Bats Surveys and Implement Avoidance Measures Prior to Removal Prior to the removal or alteration of trees and structures that may serve as roosting habitat for special-status bat species, a qualified Biologist shall conduct a focused survey of all trees and structures to be removed or impacted by construction activities to determine whether active roosts of special-status bats are present on-site. The survey shall be conducted during seasonal periods of bat activity (March 1 through October 15). The Biologist shall have access to all structures and interior attics, as needed. If a colony of bats is found roosting in any structure, tree or other habitat, further surveys, such as night emergent surveys, shall be conducted sufficient to determine the species present and the type of roost (day, night, maternity, etc.). Tree or structure removal shall be planned for either the spring or the fall and timed to ensure both suitable conditions for the detection of bats and adequate time for tree and/or structure removal to occur during seasonal periods of bat activity exclusive of the breeding season, as described below. Trees and/or structures containing suitable potential bat roost habitat features shall be clearly marked or identified. If no bat roosts are found, the results of the survey will be documented and submitted to the City within 30 days of the survey, after which no further action will be required. If day roosts are present, the Biologist shall prepare a site-specific roosting bat protection plan to be implemented by the contractor following the City’s approval. The plan shall incorporate the following guidance as appropriate: • When possible, removal of trees/structures identified as suitable roosting habitat shall be conducted during seasonal periods of bat activity, including the following: ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 71 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx - Between September 1 and about October 15, or before evening temperatures fall below 45 degrees Fahrenheit and/or more than 0.5 inch of rainfall within 24 hours occurs. - Between March 1 and April 15, or after evening temperatures rise above 45 degrees Fahrenheit and/or no more than 0.5 inch of rainfall within 24 hours occurs. • If a tree /structure must be removed during the maternity season and is identified as potentially containing a colonial maternity roost, then a qualified Biologist shall conduct acoustic emergence surveys or implement other appropriate methods to further evaluate if the roost is an active maternity roost. Under the Biologist’s guidance, the contractor shall implement measures that consist of (or exceed) the following: - If it is determined that the roost is not an active maternity roost, then the roost may be removed in accordance with the other requirements of this measure. - If it is found that an active maternity roost of a colonial roosting species is present, the roost shall not be disturbed during the maternity season (April 15 to August 31) or until the maternity roost has dispersed. ○ Tree removal procedures shall be implemented using a two-step tree removal process. This method is conducted over two consecutive days and works by creating noise and vibration by cutting non-habitat branches and limbs from habitat trees using chainsaws only (no excavators or other heavy machinery) on day one. The noise and vibration disturbance, together with the visible alteration of the tree, is very effective in causing bats that emerge nightly to feed to not return to the roost that night. The remainder of the tree is removed on day two. ○ Prior to the demolition of vacant structures within the project site, a qualified Biologist shall conduct a focused habitat assessment of all structures to be demolished. The habitat assessment shall be conducted enough in advance to ensure the commencement of building demolition can be scheduled during seasonal periods of bat activity (see above), if required. If no signs of day roosting activity are observed, no further actions will be required. If bats or signs of day roosting by bats are observed, a qualified Biologist will prepare specific recommendations such as partial dismantling to cause bats to abandon the roost, or humane eviction, both to be conducted during seasonal periods of bat activity, if required. Should maternity roosts be observed the roost shall not be disturbed during the maternity season (April 15 to August 31) or until maternity roost has dispersed. If project schedules do not allow for maternity season avoidance, a bat habitat mitigation and monitoring plan shall be developed to reduce risks to bat pups and consultation with CDFW would be required. • If the qualified Biologist determines a roost is used by a large number of bats (large hibernaculum), bat boxes shall be installed near the project site. The ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 72 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx number of bat boxes installed will depend on the size of the hibernaculum and shall be determined through consultation with California Department of Fish and Wildlife (CDFW). If a maternity colony has become established, all construction activities shall be postponed within a 500-foot buffer around the maternity colony until it is determined by a qualified Biologist that the young have dispersed. Once it has been determined that the roost is clear of bats, the roost shall be removed immediately. Conclusion With regard to Biological Resources, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan EIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan EIR. 4. MM BIO-1 and MM BIO-2 from the 2040 General Plan EIR would be required and would reduce potential impacts to below a level of significance consistent with the analysis in the 2040 General Plan EIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 73 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.5 Cultural and Tribal Cultural Resources Would the project: a) Cause a substantial adverse change in the significance of a historical resource as pursuant to Section 15064.5? Less than significant impact with mitigation incorporated No No No No b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5? Less than significant impact with mitigation incorporated No No No No c) Disturb any human remains, including those interred outside of formal cemeteries? Less than significant impact No No No No Would the project cause a substantial adverse change in the significance of a Tribal Cultural Resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: d) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k), or Less than significant impact with mitigation incorporated No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 74 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? e) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe. Less than significant impact with mitigation incorporated No No No No The analysis in this section is based, in part, on the Phase I CRA prepared by FCS in September 2025 for the Orchards Project. The confidential Phase I CRA complies with MM CR-1, MM CR-2 and MM CR-3 of the 2040 General Plan EIR and can be requested by qualified personnel upon request (Appendix D). Northwest Information Center On Junel 24, 2025, a records search was conducted at the Northwest Information Center (NWIC) at Sonoma State University, located in Rohnert Park, California, for the proposed project and a 0.5-mile radius beyond the project boundaries. The current inventories of the National Register of Historic Places (NRHP), the California Register of Historical Resources (CRHR), the California Historical Landmarks (CHL) list, the California Points of Historical Interest (CPHI) list, and the California Built Environment Resource Directory (BERD) for Contra Costa County were also reviewed to determine the existence of previously documented local historic resources. The results of the records search indicate that no cultural resources have been recorded within the project boundaries, nor within the 0.5-mile search radius. In addition, 10 area-specific survey reports are on file with the NWIC for the project site and its 0.5-mile search radius, two of which (S-000229 and S-000830) address the project ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 75 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx site, indicating that the project has been previously surveyed for cultural resources. Report S-000830 addresses the site in its entirety. Native American Heritage Commission On June 20, 2025, FCS sent a request to the Native American Heritage Commission (NAHC) in an effort to determine whether any sacred sites are listed on its Sacred Lands File (SLF) for the project site. A response was received on June 20, 2025, indicating that the SLF search was negative for Native American cultural resources in the immediate project site. The NAHC included a list of 45 Tribal representatives available for consultation. To ensure that all Native American knowledge and concerns over potential Tribal Cultural Resources (TCRs) that may be affected by the proposed project are addressed, a letter containing project information and requesting any additional information was sent to each Tribal representative on July 24, 2025. One response was received from Lucy Beyhan of the Confederated Villages of Lisjan Nation on September 7, 2025; their recommendation is that caution be taken with exempting this project due to its proximity to a historic creek (the nearest recorded creek is South San Ramon Creek; however, it is completely hardscaped). They also requested a copy of the site-specific report and access to the full project report when available. No additional responses have been received to date.12 Pedestrian Survey On July 17, 2025, FCS Cultural Resources Specialist Anthony Martin conducted a pedestrian survey to identify any unrecorded cultural resources within the project boundary. The entirety of the site is developed and served as the corporate campus for Chevron Energy. At the center of the property are 14 office buildings (labeled Building A, B, C, D, E, F, G, H, J, K, L, T, V, and W), several courtyards and a large decorative fountain/pool. The property is surrounded by landscape features and is bordered by parking lots on the northern, southern, western and eastern perimeters, with an auto access road to the north along Bollinger Canyon Road and to the east, along Bishop Ranch 1 Loop Road. A hiking trail is located on the southern border of the site, which connects to the Iron Horse Regional Trail. Overview shots of the project area were taken from the northeast, northwest, southeast and southwest corners, which showcase the office buildings, the courtyard, and the surrounding landscape and hardscape features. Visibility of the exposed soil was nonexistent since the entirety of the project site is landscaped and/or hardscaped; thus, inspection of the soil for cultural resources was not possible. The landscaped areas within the courtyard are overgrown and at varying degrees of plant mortality due to abandonment. Survey conditions were documented using digital photographs. During the survey, Mr. Martin examined all areas of the exposed ground surface for prehistoric artifacts (e.g., fire-affected rock, milling tools, flaked stone tools, toolmaking debris, ceramics), soil discoloration and depressions that might indicate the presence of a cultural midden, faunal and human osteological remains, and 12 Please note that FCS Tribal outreach was for additional information regarding the project site that can be added to the analysis in the Phase I CRA and does not constitute government-to-government consultation pursuant to SB 18 and AB 52. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 76 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx features indicative of the former presence of structures or buildings (e.g., postholes, standing exterior walls, foundations) or historic debris (e.g., glass, metal, ceramics). One historic era ship propeller belonging to the tanker SS Hillyer Brown (active 1953-1985) was found south of Building B. According to the plaque, the SS Hillyer Brown was a Chevron-operated T-2 tanker, and the propeller was retained following the vessel’s decommissioning as a tribute to the company's long service history. The installation of the propeller and marker are commemorative in nature but does not constitute a significant historic resource as defined by CEQA Guidelines Section 15064.5. The propeller may be of historical interest to Chevron or maritime organizations, but its treatment and dispossession do not warrant additional analysis. a) Historical Resources Would the project: Cause a substantial adverse change in the significance of a historical resource as pursuant to Section 15064.5? Summary of 2040 General Plan EIR The 2040 General Plan EIR determined that two known historical resources were identified within the 2040 General Plan Area. In addition to these known historical resources, there may be other yet unidentified resources within the General Plan Area that are age-eligible for listing in the NRHP, CRHR, or locally. The 2040 General Plan would facilitate development of residential, commercial, office, institutional, and industrial land uses that could in turn result in the conversion of existing properties and structures to new uses. With relatively limited opportunities for new development in the City, the 2040 General Plan emphasizes infill and reuse development within the city limits and encourages higher-density and mixed-use projects where appropriate. It also includes potential incorporation of adjacent unincorporated areas within the UGB. Construction is associated with such potential. As such, it was determined that effects on historical resources can only be determined once a specific project has been proposed. Demolition or other structural alteration associated with development facilitated by the 2040 General Plan has the potential to impair historical built environment resources. Consequently, it was determined that damage to or destruction of historical resources could occur as a result of development under the proposed 2040 General Plan. In order to assess impacts to historical resources which occur through development under the General Plan, each project would need to be assessed as it is proposed. MM CR-1 requires the preparation of a historical resources evaluation prior to approval for projects involving buildings 45 years or older. It was determined that implementation of 2040 General Plan Guiding Policy 8.7-G-1; 1.2, 1.4 and 1.5 and Guiding Policy 6.5- G-1; 1.11 and 1.12 and MM CR-1 would reduce potential impacts related to historical resources. Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The results of the NWIC records search did not identify any historical resources within the project boundaries or within the 0.5-mile search radius. Additionally, the pedestrian survey failed to identify ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 77 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx any historical resources as defined by CEQA Guidelines Section 15064.5. There are no buildings over 45 years in age at the project site. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. b) Archaeological Resources Would the project: Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5? Summary of 2040 General Plan EIR The 2040 General Plan EIR determined that the effects on archaeological resources are only known once a specific development has been proposed because the effects are highly dependent on both the individual development site conditions and the characteristics of the proposed ground-disturbing activity. Consequently, damage to or destruction of cultural resources could occur as a result of development under the proposed 2040 General Plan. In order to ensure that development within San Ramon does not have a detrimental effect on archaeological resources, each future project would need to be assessed once the project location and design concept is available. As such, an archaeological resources assessment is required by MM CR-2 for projects involving ground disturbance. Potential future development occurring under the 2040 General Plan may include site preparation, demolition and construction activities, which could uncover cultural resources that were previously unknown. MM CR-3 requires that future projects stop work in the event of unanticipated cultural resources discoveries during construction. It was determined that implementation of 2040 General Plan Guiding Policy 8.7-G-1; 1.3 and 1.4 and Guiding Policy 6.5-G-1; 1.12 and MM CR-2 and MM CR-3 would reduce potential impacts related to historical resources. Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) A Phase I CRA was prepared for the proposed project in compliance with MM CR-2. Results from the NWIC indicate that no archaeological resources have been recorded within the project boundaries or the 0.5-mile search radius. Additionally, the pedestrian survey failed to identify any archaeological resources. While there are no known archaeological resources within the project site, it is possible that project-related earthmoving and construction activities could unearth previously undiscovered archaeological resources. Archaeological resources can include but are not limited to stone, bone, wood, or shell artifacts or features, including hearths and structural elements. Damage or destruction of these resources would be a potentially significant impact. Nevertheless, the Phase I CRA analysis for archaeological resources determined that the proposed project adheres to the 2040 General Plan Guiding Policy 8.7-G-1; 1.3 and 1.4 and Guiding Policy 6.5-G-1; 1.12 and MM CR-2. As the possibility remains for unanticipated cultural resources to be discovered during project construction, General Plan MM CR-3 applies to the proposed project, preventing impacts to archaeological resources. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 78 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx c) Human Remains Would the project: Disturb any human remains, including those interred outside of formal cemeteries? Summary of 2040 General Plan EIR The 2040 General Plan EIR determined human burials outside of formal cemeteries can occur in prehistoric archaeological contexts. Excavations during construction activities could have the potential to disturb these resources that could include Native American burial sites. As such, ground-disturbing activities that may occur within San Ramon (the General Plan Area) during implementation of the 2040 General Plan have the potential to unearth previously unidentified human remains. In addition, all development projects are also subject to California Health and Safety Code Section 7050.5 and Public Resources Code Section 5097.98. Thus, implementation of 2040 General Plan Guiding Policy 8.7-G-1 and Guiding Policy 6.5-G-1; 1.6 and MM CR-2 and MM CR-3 would reduce potential impacts related to human remains to a less than significant level. Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) Results from the NWIC failed to identify any human remains and/or cemeteries within the project site or a 0.5-mile radius. While it is highly unlikely that the presence of human remains exists within or near the project site, there is always the possibility that subsurface construction activities associated with the proposed project, such as grading or trenching, could potentially damage or destroy previously undiscovered human remains. In the event of the accidental discovery or recognition of any human remains, CEQA Guidelines Section 15064.5, Health and Safety Code Section 7050.5, and Public Resources Code Sections 5097.94 and 5097.98 must be followed. While there are no known human remains within the project site, implementation of 2040 General Plan Guiding Policy 8.7-G-1 and Guiding Policy 6.5-G-1; 1.6 and General Plan MM CR-2 and MM CR-3 would reduce potential impacts related to human remains. MM CR-2 has been satisfied with the preparation of the Phase I CRA. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. d) Listed or Eligible Tribal Cultural Resources Would the project: Cause a substantial adverse change in the significance of a Tribal Cultural Resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American Tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k)? ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 79 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx e) Lead Agency Determined Tribal Cultural Resources Would the project: Cause a substantial adverse change in the significance of a Tribal Cultural Resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American Tribe, and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1? Summary of 2040 General Plan EIR The 2040 General Plan determined that ground-disturbing activities associated with future development projects could expose previously unidentified subsurface TCRs during project construction, creating a potentially significant impact. However, it was determined that implementation of 2040 General Plan Guiding Policy 8.7-G-1 and Policy 8.7-1.8 would reduce potential impacts related to TCRs. Furthermore, MM CR-4, which requires suspension of work around TCRs identified during construction, was identified for projects under the 2040 General Plan. It was determined that with implementation of relevant policies and MM CR-4, impacts would be less than significant. Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The records search conducted at the NWIC, which included a search of the CRHR, failed to identify pre-contact resources within the project boundaries or the 0.5-mile search radius of the project site. Furthermore, the NAHC SLF search results were positive for TCRs within the project boundaries. As described above, as part of the PI-CRA, FCS received a response from the Confederated Villages of Lisjan Nation on September 7, 2025, recommending that caution be taken with exempting this project due to its proximity to a historic creek (the nearest recorded creek is South San Ramon Creek; however, it is completely hardscaped). AB 52 consultation is required for all projects for which a Notice of Preparation, Notice of a Mitigated Negative Declaration, or Notice of Negative Declaration is filed or issued. As none of these notices apply to the CEQA Guidelines Section 15183 Consistency Checklist, AB 52 is not required for the proposed project. Should any undiscovered TCRs be encountered during project construction, implementation of 2040 General Plan Guiding Policy 8.7-G-1 and MM CR-4 would be required. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 80 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2040 General Plan EIR Mitigation Measures MM CR-2 Prepare an Archaeological Resources Assessment Prior To Project Approval and Implement Mitigation Prior To and During Construction13 An archaeological resources assessment for projects involving ground disturbance shall be prepared as follows: • Assessments shall include a California Historical Resources Information System records search at the Northwest Information Center (NWIC) and a Sacred Lands File search maintained by the Native American Heritage Commission (NAHC). The records searches will characterize the results of previous cultural resource surveys and disclose any cultural resources that have been recorded and/or evaluated in and around a project site. A Phase I pedestrian survey shall be undertaken at a project site that is on previously undeveloped land in order to locate any surface cultural materials. By performing a records search, consultation with the NAHC, and a Phase I survey, a qualified Archaeologist shall be able to classify a project site as having high, medium, or low sensitivity for archaeological resources. • If the Phase I archaeological survey identifies resources that may be affected by a project, the archaeological resources assessment shall also include Phase II testing and evaluation. If resources are determined significant or unique through Phase II testing and site avoidance is not possible, appropriate site-specific mitigation measures shall be identified in the Phase II evaluation. These measures shall include, but would not be limited to, a Phase III data recovery program, avoidance, or other appropriate actions to be determined by a qualified Archaeologist in consultation with the City and any interested Tribes, as stated in the 2040 General Plan Tribal Consultation Implementation Program outlined by Guiding Policy ENV-5 and Guiding Policy 8.7 G-1. If significant archaeological resources cannot be avoided, impacts may be reduced to less than-significant levels by adding fill soils on top of the sites rather than cutting into cultural deposits. Alternatively, and/or in addition, a data collection program may be warranted, including mapping the location of artifacts, surface collection of artifacts, or excavation of the cultural deposit to characterize the nature of the buried portions of sites. Curation of the excavated artifacts or samples shall occur as specified by the Archaeologist in consultation with the City and any interested Tribes. As stated in the 2040 General Plan Tribal Consultation Implementation Program outlined by Guiding Policy ENV-5 and Guiding Policy 8.7-G-1, the final disposition of artifacts not directly associated with Native American graves shall be negotiated during consultation with interested Tribes. If Native American Tribes do not accept the artifact, it shall be offered to an institution staffed by qualified professionals, as determined by the City Planner. Artifacts include material 13 MM CR-2 has been satisfied by the completion of the Phase I CRA. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 81 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx recovered from all phases of work, including the initial survey, testing, indexing, data recovery, and monitoring. MM CR-3 Stop Work in the Event of Unanticipated Cultural Resources Discoveries During Construction If cultural resources are encountered during ground-disturbing activities for a project, work in the immediate area shall be halted and an Archaeologist meeting the Secretary of the Interior’s Professional Qualification Standards for archaeology in either prehistoric or historic archaeology shall be contacted immediately to evaluate the find. If necessary, the evaluation may require preparation of a treatment plan and archaeological testing for CRHR eligibility. If the discovery proves to be significant under CEQA and cannot be avoided by a project, additional work such as excavating the cultural deposit to fully characterize its extent, and collecting and curating artifacts may be warranted to mitigate any significant impacts to cultural resources. In the event that archaeological resources of Native American origin are identified during project construction, a qualified Archaeologist will consult with the City to begin Native American consultation procedures. MM CR-4 Suspend Work Around Tribal Cultural Resources Identified During Construction In the event that cultural resources of Native American origin are identified during construction of a project implemented under the 2040 General Plan, all earth- disturbing work in the vicinity of the find shall be temporarily suspended or redirected until an Archaeologist has evaluated the nature and significance of the find as a cultural resource and an appropriate local Native American representative is consulted. If the City, in consultation with local Native Americans, determines that the resource is a Tribal Cultural Resource and, thus, significant under CEQA, a mitigation plan shall be prepared and implemented in accordance with State guidelines and in consultation with local Native American group(s). The mitigation plan shall include avoidance of the resource or, if avoidance of the resource is infeasible, the plan shall outline the appropriate treatment of the resource in coordination with the appropriate local Native American Tribal representative and, if applicable, a qualified Archaeologist. Examples of appropriate mitigation for Tribal Cultural Resources include, but are not limited to, protecting the cultural character and integrity of the resource, protecting traditional use of the resource, protecting the confidentiality of the resource, or heritage recovery. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 82 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2040 General Plan EIR Policies Guiding Policy 6.5-G-1: Create and maintain a high-quality publicly accessible park and trail system for San Ramon. Policy 6.5-I-11 Seek partnership opportunities with the private sector and with other public agencies to enhance park facilities and provide recreational activities. In 2013, the Parks Community Services Department established a Partnership Program to provide the private sector with various levels of sponsorship opportunities for City events, facilities, and programs. Where possible, seek out partnerships with the private sector and/or local historic preservation groups, such as the San Ramon Historic Foundation, to fund and facilitate the preserve local historic resources that are of value to the community. Policy 6.5-I-12 Identify, document and seek to preserve and protect sites of historic interest. Guiding Policy 8.7-G-1: Identify, evaluate, and preserve the archaeological, paleontological and historic resources that are found within the San Ramon Planning Area. Policy 8.7-1.2 Prepare Historical Resources Evaluations for projects involving structures 45 years or folder and implement mitigation prior to and during construction. Policy 8.7-1.3 Conduct Archaeological Resources Assessment prior to project approval and implement identified mitigation prior to and during construction and include a policy to stop work in the event of unanticipated cultural resources discoveries during construction. Policy 8.7-1.4 Protect and maintain the integrity of officially listed historic resources. Policy 8.7-1.5 Review any proposals to nominate resources for eligibility for listing on national or State historic registers. Discretion should be used in reviewing such nominations to ensure that resources have significant historic value and have been appropriately evaluated. Policy 8.7-1.6 As a standard condition of approval, require all development projects involving grading and excavation to implement appropriate measures in the event that burial sites or human remains are encountered during earthwork activities. Policy 8.7-1.7 Perform required consultation with the appropriate Tribal organization(s) as part of projects subject to the California Environmental Quality Act (CEQA). For projects involving a General Plan Amendment, the development of a Specific Plan (or amendment), or designating open space, provide Tribal consultation opportunities in accordance with State law. Policy 8.7-1.8 Require Tribal monitor(s) during all activities in areas with cultural resources of interest to local Native American Tribes when requested. Cultural resources may ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 83 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx include a sanctified cemetery, place of worship, religious or ceremonial site, or sacred shrine. Both monitors shall observe grading, ground-disturbing, and other earthmoving activities. Conclusion With regard to Cultural resources and Tribal Cultural Resources, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan EIR. 3. No substantial new information has been identified, which results in an impact which is more severe than anticipated by the 2040 General Plan EIR. 4. MM CR-3 and MM CR-4 from the 2040 General Plan EIR would be required and would reduce potential impacts to below a level of significance consistent with the analysis in the 2040 General Plan EIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 84 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.6 Energy Would the project: a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? Less than significant impact No No No No b) Conflict with or obstruct a State or local plan for renewable energy or energy efficiency? Less than significant impact No No No No Buildout of the 2040 General Plan would consume energy primarily in the form of fuel consumption. All new development would be required to comply with applicable ARB regulations regarding the accelerated retrofitting, repowering, or replacement of heavy-duty diesel on- and off-road equipment, and restricted idling of heavy-duty diesel motor vehicles; the provisions of California Code of Regulations Title 13, sections 2449 and 2485, prohibiting diesel-fueled commercial and off-road vehicles from idling for more than five minutes; and EPA Construction Equipment Fuel Efficiency Standards per 40 Code of Federal Regulations Parts 1039, 1065, and 1068. Therefore, the General Plan FEIR concluded that impacts from construction would be less than significant. During operation, all new development would be required to comply with applicable 2040 General Plan policies targeting GHG reductions (which have the co-benefit of reducing energy demand and fuel use), particularly those related to vehicle trip reductions. These include Policy 4.6-I-G-1 (High- Density Compatible Uses in the Mixed-Use Land Use Designation); Policy 5.6-I-7 (Mix of Uses and Complete Streets Concepts to Reduce VMT); Policy 5.7-I-3 (Bicycle and Pedestrian Connectivity to the Iron Horse Trail); Policy 5.7-I-5 (Bicycle Parking, Storage, and Support Facilities); Policy 12.4-I-3 (CEQA Policy for Disclosing Air Quality and Climate Change Impacts); Policy 12.4-I-4 (Mitigation Measures Consistent with City CAP); Policy 12.4-I-5 (Implementation of Bay Area Air District BMPs and GHG Reductions); Policy 12.5-I-2 (Infill and Mixed-Use Development for Walkable and Bicycle- Friendly Communities with Access to Transit); Policy 12.5-I-4 (Jobs-to-Housing Ratio); Policy 12.8-I-8 ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 85 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx (Use of Recycled Materials and Composting); and Policy 7.5-I-9 (Compliance with Municipal Code’s Construction and Demolition Debris Diversion Requirements). Therefore, the 2040 General Plan FEIR concluded that impacts during operation would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The 11.3-acre Mixed-Use District would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The 26acre Multi-Family District would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. Construction Construction of the Mixed-Use District and Multi-Family District would require the use of heavy-duty construction equipment and vehicles and would be associated with worker commute trips and materials delivery. These activities would consume diesel fuel, gasoline, and electricity (for limited on- site uses such as lighting or small tools). Energy use during construction would be temporary in nature, and equipment used would be typical of construction projects in the region. Construction contractors would be required to demonstrate compliance with applicable ARB regulations that restrict the idling of heavy-duty diesel motor vehicles and govern the accelerated retrofitting, repowering, or replacement of heavy-duty diesel on- and off- road equipment. Development within the Multi-Use District and Multi-Family District would also be required to comply with California’s Green Building Standards (CALGreen) construction waste management practices to recycle 65 percent of all construction and demolition debris. It is anticipated that fuel efficiency of the construction vehicle fleet would increase over time due to advancement in technologies and regulations. As such, the amount of fuel consumed during construction would decrease over time. In addition, construction of the Mixed-Use District and Multi- Family District would not be unusual as compared to the local and regional demand for energy resources. There are no unusual project characteristics indicating that construction equipment would be less energy-efficient than at comparable construction sites in the region or State. Therefore, construction-related impacts would be less than significant. Operation Long-term operation of the Mixed-Use District and the Multi-Family District would include electricity use for lighting, appliances, heating, ventilation, and air conditioning (HVAC), common areas, cooking, space heating, water heating, and electric vehicle (EV) charging stations. It is anticipated that the proposed project would be served by MCE for electricity use. Currently, MCE offers clean ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 86 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx energy that is sourced from options ranging from 69 percent to 100 percent renewable energy (in 2024). This exceeds the State’s current mandate for renewable energy 2030 requirements set forth in SB 100 (SB 100 requires energy providers to procure 60 percent of electricity needs from eligible renewable sources by 2030). EV parking would be required to be provided in compliance with State requirements, helping to support the transition to electric transportation and reducing GHG emissions tied to fuel combustion. All buildings would be required to be designed and constructed to comply with the State’s Building Energy Efficiency Standards, which reduce energy consumption through enhanced insulation, efficient HVAC systems, lighting, and appliances. Therefore, operational-related impacts would be less than significant. Accordingly, the Mixed-Use District and Multi-Family District would not result in the wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation, and impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-Level Analysis (Neighborhood District Development plus Grading of Interim Area) The Neighborhood District plus Grading of the Interim Area would result in energy use during construction and operation, which are discussed separately below. Construction Construction of the Neighborhood District plus Grading of the Interim Area would involve demolition, site preparation, grading, and the construction of roads and building of structures, which would require the use of heavy-duty construction equipment and vehicles and would be associated with worker commute trips and materials delivery. These activities would consume diesel fuel, gasoline, and electricity (for limited on-site uses such as lighting or small tools) as is typical for similar development. Energy use during construction would be temporary in nature, and equipment used would be typical of construction projects in the region. Construction contractors would be required to demonstrate compliance with applicable ARB regulations that restrict the idling of heavy-duty diesel motor vehicles and govern the accelerated retrofitting, repowering, or replacement of heavy-duty diesel on- and off- road equipment. The Neighborhood District plus Grading of the Interim Area would also be required to comply with CALGreen construction waste management practices to recycle 65 percent of all construction and demolition debris. The Neighborhood District plus Grading of the Interim Area is anticipated to begin construction in June 2026 and conclude in July 2031. It is anticipated that fuel efficiency of the construction vehicle fleet will increase over time due to advancement in technologies and regulations. As such, the ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 87 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx amount of fuel consumed during construction would decrease over time if the construction were to occur at a later date than anticipated. In addition, construction of the Neighborhood District plus Grading of the Interim Area would not be unusual as compared to the local and regional demand for energy resources. There are no unusual project or project site characteristics indicating construction equipment would be less energy-efficient than at comparable construction sites in the region or State. Therefore, construction-related impacts associated with the Neighborhood District plus Grading of the Interim Area would be less than significant. Operation Long-term operation of the Neighborhood District would include electricity use for lighting, appliances, HVAC, common areas, cooking, space heating, water heating, and EV charging stations. The Neighborhood District would be constructed as all-electric. It is anticipated that the proposed project would be served by MCE for electricity use. MCE offers clean energy that is sourced from options ranging from 69 percent to 100 percent renewable energy (in 2024). This exceeds the State’s current mandate for renewable energy 2030 requirements set forth in SB 100 (SB 100 requires energy providers to procure 60 percent of electricity needs from eligible renewable sources by 2030). EV parking would be provided in compliance with State requirements, helping to support the transition to electric transportation and reducing GHG emissions tied to fuel combustion. All buildings would be designed and constructed to comply with the 2022 Building Energy Efficiency Standards, which reduce energy consumption through enhanced insulation, efficient HVAC systems, lighting, and appliances. The site plan would include pedestrian and bicycle connectivity, thereby indirectly reducing transportation energy efficiencies. The proposed project would include water efficient landscaping to reduce energy use associated with landscaping. Therefore, operational- related impacts associated with the Neighborhood District plus Grading of the Interim Area would be less than significant. Accordingly, the Neighborhood District would not result in the wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation, and impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 88 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx b) Energy Efficiency and Renewable Energy Standards Consistency Would the project: Conflict with or obstruct a State or local plan for renewable energy or energy efficiency? Summary of 2040 General Plan EIR The 2040 General Plan was evaluated for compliance with the relevant provisions of CALGreen (Title 24, Part 11) and the California Building Energy Efficiency Standards. As noted within the 2040 General Plan FEIR, policy conformance with applicable energy or energy efficiency plans would be limited to operational impacts. All new development would be required to comply with CALGreen (Title 24 Part 11) requirements for mandatory minimum environmental performance standards for all ground-up new nonresidential and residential structures and major renovations, per the requirements of San Ramon Municipal Code Title 14 and Strategy E-1 from the San Ramon Climate Action Plan (CAP), which calls for an increase in the use of energy conservation features in new and existing development projects, such as obtaining energy from renewable energy sources and installing low- emission equipment. In addition, new development would be required to comply with California Building Energy Efficiency Standards (Title 24 Part 6) through incorporation of sustainability and energy efficiency measures such as high-efficiency lighting and HVAC systems, low-flow water fixtures, dual-paned windows, and water efficient landscaping and irrigation systems. Thus, the 2040 General Plan would ensure consistency with the goals and policies established by SB 100 and CALGreen, which include monitoring by the City for compliance with Title 24 standards. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The 11.3-acre Mixed-Use District would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The 26-acre Multi-Family District would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. SB 100 supports the reduction of GHG emissions from the electricity sector by accelerating the State’s RPS and requires electricity providers to increase procurement from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60 percent by 2030, and 100 percent by 2045. The City is part of the MCE CCA, which provides electricity primarily from clean, renewable sources. The City would continue to reduce its use of nonrenewable energy resources. The electricity generated by renewable resources provided by MCE continues to increase to comply with SB 100 ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 89 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx requirements for electricity providers to increase procurement from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60 percent by 2030, and 100 percent by 2045. As stated above, it is anticipated that the Mixed-Use District and the Multi-Family District would be served by MCE for electricity use. MCE offers clean energy that is sourced from options ranging from 69 percent to 100 percent renewable energy (in 2024). This exceeds the State’s current mandate for renewable energy 2030 requirements set forth in SB 100 (SB 100 requires energy providers to procure 60 percent of electricity needs from eligible renewable sources by 2030). Therefore, the Mixed-Use District and Multi-Family District would be consistent with SB 100. CALGreen (Title 24 Part 11) institutes mandatory minimum environmental performance standards for all ground-up new nonresidential and residential structures and major renovations. In addition, the California Building Energy Efficiency Standards (Title 24 Part 6) establish energy efficiency standards for residential and nonresidential buildings in order to reduce California’s energy demand. The City has adopted State energy conservation plans, including CALGreen (Title 24 Part 11), pursuant to San Ramon Municipal Code Title 14. Additionally, Strategy E-1 from the City’s CAP calls for an increase in the use of energy conservation features in new and existing development projects, such as obtaining energy from renewable energy sources and installing low-emission equipment. Therefore, operations associated with development within the Mixed-Use District and the Multi-Family District would be designed to comply with the CALGreen energy source standards, and would be required to demonstrate compliance with the CALGreen Standards by implementing sustainability and energy efficiency measures such as high-efficiency lighting and HVAC systems, low-flow water fixtures, dual- paned windows, and water efficient landscaping and irrigation systems. During plan check, the City building department will ensure that new projects within the Mixed-Use District and the Multi-Family District include all required Title 24 energy efficiency standards. Therefore, the Mixed-Use District and the Multi-Family District would be consistent with CALGreen and the State’s Building Energy Efficiency Standards. Overall, the Mixed-Use District and the Multi-Family District represent typical development in the area and would not conflict with or obstruct implementation of a State or local plan for renewable energy, and impacts would be less than significant. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi- Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-Level Analysis (Neighborhood District Development plus Grading of Interim Area) The Neighborhood District is evaluated for compliance with SB 100, the relevant provisions of CALGreen (Title 24, Part 11) and the California Building Energy Efficiency Standards in determining whether it would conflict with or obstruct a State or local plan for renewable energy or energy efficiency. SB 100 supports the reduction of GHG emissions from the electricity sector by accelerating the State’s RPS and requires electricity providers to increase procurement from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60 percent by 2030, and 100 percent by ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 90 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2045. The City is part of the MCE CCA, which provides electricity primarily from clean, renewable sources. The City would continue to reduce its use of nonrenewable energy resources. The electricity generated by renewable resources provided by MCE continues to increase to comply with SB 100 requirements for electricity providers to increase procurement from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60 percent by 2030, and 100 percent by 2045. As stated above, it is anticipated that the Neighborhood District would be served by MCE for electricity use. MCE offers clean energy that is sourced from options ranging from 69 percent to 100 percent renewable energy (in 2024). This exceeds the State’s current mandate for renewable energy 2030 requirements set forth in SB 100 (SB 100 requires energy providers to procure 60 percent of electricity needs from eligible renewable sources by 2030). Therefore, the Neighborhood District would be consistent with SB 100. CALGreen (Title 24 Part 11) institutes mandatory minimum environmental performance standards for all ground-up new nonresidential and residential structures and major renovations. In addition, the California Building Energy Efficiency Standards (Title 24 Part 6) establish energy efficiency standards for residential and nonresidential buildings in order to reduce California’s energy demand. The City has adopted State energy conservation plans, including CALGreen (Title 24 Part 11), pursuant to San Ramon Municipal Code Title 14. Additionally, Strategy E-1 from the San Ramon CAP calls for an increase in the use of energy conservation features in new and existing development projects, such as obtaining energy from renewable energy sources and installing low-emission equipment. Therefore, operations associated with development within the Neighborhood District would be designed to comply with the energy source standards of the CALGreen and would be required to demonstrate compliance with the CALGreen Standards by implementing sustainability and energy efficiency measures such as high-efficiency lighting and HVAC systems, low-flow water fixtures, dual- paned windows, and water efficient landscaping and irrigation systems. During plan check, the City building division will ensure that new projects within the Neighborhood District include all required Title 24 energy efficiency standards. Therefore, the Neighborhood District would be consistent with CALGreen and the State’s Building Energy Efficiency Standards. Overall, the Neighborhood District plus Grading of the Interim Area would not conflict with or obstruct implementation of a State or local plan for renewable energy, and impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2040 General Plan FEIR Mitigation Measures None. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 91 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Conclusion With regard to Energy, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 92 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.7 Geology and Soils Would the project: a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42? Less than significant impact No No No No ii) Strong seismic ground shaking? Less than significant impact No No No No iii) Seismic-related ground failure, including liquefaction? Less than significant impact No No No No iv) Landslides? Less than significant impact No No No No b) Result in substantial soil erosion or the loss of topsoil? Less than significant impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 93 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? Less than significant impact No No No No d) Be located on expansive soil, as defined in Table 18- 1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Less than significant impact No No No No e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? No impact No No No No f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Less than significant impact with mitigation incorporated No No No MM GEO-1 ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 94 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx a) Earthquake Hazards Would the project: Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury or death involving: (i)Rupture of a known earthquake fault, as delineated on the most recent Alquist- Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault; (ii) Strong Seismic Ground Shaking; (iii) Seismic-related ground failure, including liquefaction; or (iv) Landslides. i) Fault Rupture Summary of 2040 General Plan EIR The General Plan Area lies within the San Francisco Bay Area, which contains numerous earthquake faults with the potential for surface rupture, including the Calaveras Fault extending north–south, west of Interstate 680 (I-680) and the Pleasanton Fault extending north–south, east of the I-680. To mitigate impacts associated with surface rupture, implementation of mandatory California Building Standards Code (CBC) requirements and 2040 General Plan policies would minimize risks associated with personal injury and property damage as a result of fault rupture. Relevant policies include Policy 9.20I-1 (Site Risk Assessment); Policy 9.1-I-3 (Comprehensive Geologic Studies); and Policy 9.2-I-5 (Geotechnical Field Review During Construction). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) As noted in the program-level Feasibility Level Geotechnical Evaluation, there are no known active faults at the Orchards project site (Appendix E).14 The closest earthquake fault zone, the northern segment of the Calaveras Fault, is located approximately 0.3 mile southwest of the project site. The Geotechnical Evaluation concluded that there was no evidence of faulting on the project site, and that fault surface rupture is not a significant geologic hazard at the project site. Pursuant to Policy 9.1-I-3 (Comprehensive Geologic Studies), the proposed project would be required to follow the recommendations provided in the Geotechnical Evaluation to reduce risks related to fault rupture. Through compliance with Policy 9.2-I-1, the proposed project would identify and mitigate any potential geologic or seismic hazards, including those related to fault rupture. These hazards would be assessed during the construction phase during required geotechnical field review pursuant to Policy 9.2-I-5. 14 Sunset Development Company. 2022. Feasibility Level Geotechnical Evaluation. Bishop Ranch: Proposed Future Residential Development. August 16. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 95 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Therefore, development of the proposed project as part of the Orchards project site would not result in any environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ii) Ground Shaking Summary of 2040 General Plan EIR The General Plan Area has been impacted by ground shaking during major earthquakes, given its location within the seismically-active San Francisco Bay region, and has been classified as having “violent” ground shaking potential on either side of the I-680 and “severe” in the rest of the General Plan Area. To minimize impacts associated with life or property damage as a result of violent ground shaking, new development would be required to comply with mandatory CBC requirements in addition to guiding policies of the 2040 General Plan designed to address these impacts during building operations. These include Policy 9.2-I-12 (Continued Geologic Investigation) and Policy 9.1-I- 13 (Updates to City Excavation, Grading, and Filling Requirements). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) As noted within the Geotechnical Evaluation, the project site is located in the San Francisco Bay Area, a seismically active region subject to very strong ground shaking in response to a major earthquake on any one of several nearby faults. Considering the proximity of the site to active faults capable of producing a maximum moment magnitude of 6.0 or more, the Geotechnical Evaluation concluded that there is a high potential for strong ground shaking at the project site; however, this is typical of all sites in the area. As previously mentioned, the proposed project would be designed in accordance with CBC requirements as well as recommendations outlined in the Geotechnical Evaluation prepared for the proposed project, pursuant to General Plan Policy 9.1-I-3 (Comprehensive Geologic Studies). Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the General Plan EIR. iii) Ground Failure Summary of 2040 General Plan EIR As previously mentioned, the General Plan Area contains the Calaveras Fault which extends through the western portion of the City in a north to south direction and the Pleasanton Fault extending in a north to south direction in the eastern portion of the City. To prevent impacts associated with ground failure and liquefaction, the proposed project would implement mandatory CBC requirements and ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 96 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2040 General Plan policies, including Policy 9.2-I-1 (Site Risk Assessment); Policy 9.1-I-3 (Comprehensive Geologic Studies); and Policy 9.2-I-5 (Geotechnical Field Review During Construction). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) According to the Geotechnical Evaluation, the project site is not within an area that has been cited by the California Geologic Survey (CGS) for liquefaction potential. However, the project site has been included in regional liquefaction studies conducted by the USGS. The soil sampling performed as part of the Geotechnical Evaluation found that soils at the project site below a depth of 9 feet could experience liquefication during a seismic event with a magnitude of 6.9 or greater. However, because of the depth of the liquefiable layers, it was determined that they would not need design consideration for the proposed project. Therefore, the proposed project would not result in any environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. iv) Landslides Summary of 2040 General Plan EIR The western and eastern hillside portions of the General Plan Area are identified as having the potential for landslide hazards. To minimize risks associated with landslides, in addition to mandatory CBC requirements, new development would be required to comply with policies incorporated into the 2040 General Plan, including Policy 9.2-I-7 (Limit Cut-and-Fill Slopes to 33 Percent); Policy 9.2-I-8 (Blend Cut-and-Fill Slopes with Existing Contours); and Policy 9.2-I-10 (Control Erosion of Graded Areas). Implementation of these policies would prevent impacts associated with new development and exacerbating landslide conditions within the eastern and western portions of San Ramon. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site is not within an area identified as having the potential for landslide hazards, according to Figure 3.5-5 of the 2040 General Plan FEIR. The project site is relatively flat and is not located on or adjacent to a significant slope. Therefore, development of the site as proposed would not result in any environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 97 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx b) Erosion Summary of 2040 General Plan EIR Buildout proposed within the 2040 General Plan would include construction activities such as stockpiling, excavation, and grading, that would result in ground disturbance. Construction activities that disturb one or more acres of land surface would be subject to the regional NPDES Permit requiring preparation of a SWPPP which would include BMPs, including those for erosion and sediment controls. Additionally, compliance with the provisions of Title C, Chapter IV of the San Ramon Municipal Code for addressing erosion prevention and sediment control would apply to all construction within the 2040 General Plan Area. Therefore, the 2040 General Plan concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) Development of the proposed project could result in soil erosion or the loss of topsoil. The proposed project exceeds 1 acre in size and would therefore be subject to the regional NPDES Permit requiring preparation of a SWPPP which would include erosion and sediment control BMPs during project construction. Furthermore, similar to other developments, the proposed project would include landscaping and would implement its own stormwater plan in order to prevent erosion resulting from stormwater runoff during project operation. The Interim Area would include hydroseeding, which would protect the soil from erosion while applications for development of the Interim Area are in process. Therefore, development of the project site as proposed would not result in any environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Unstable Soils or Geologic Units Would the project: Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landsliding, lateral spreading, subsidence, liquefaction, or collapse? Summary of 2040 General Plan EIR As previously mentioned, the eastern and western hillside portions of the General Plan Area are identified with the potential for landslide hazards. The General Plan Area also contains soils with the potential for liquefaction, particularly along the I-680, in addition to expansive soils that may result in subsidence or lateral spreading. To minimize impacts that would exacerbate conditions related to liquefaction, lateral spreading, or subsidence, new development is required to comply with current seismic standards, as stipulated within mandatory CBC requirements that address safe building development, in addition to 2040 General Plan policies such as Policy 9.2-I-7 (Limit Cut-and-Fill ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 98 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Slopes to 33 Percent); Policy 9.2-I-8 (Blend Cut-and-Fill Slopes with Existing Contours); and Policy 9.2-I-10 (Control Erosion of Graded Areas). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) As discussed previously, the project site is relatively flat and is not within an area identified as having the potential for landslide hazards. Furthermore, there are soils that could result in liquefaction, lateral spreading, and settlement during a seismic event. However, it was determined that these soils are at a depth for which they do not present design constraints for development at the site. Therefore, the proposed project would not result in any environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. d) Expansive Soils Would the project: Be located on expansive soil, creating substantial direct or indirect risks to life or property? Summary of 2040 General Plan EIR The eastern portion of the 2040 General Plan Area contains soils that are highly expansive, i.e., composed of compressible sediments. The 2040 General Plan EIR determined that, to minimize impacts associated with expansive soils, including soil shrinks or swells, new development would be required to comply with mandatory CBC requirements for testing expansive soils and design specifications, including measures for treating expansive soil conditions through removal, proper fill section, and compaction. Compliance with the requirements of the CBC, in addition to relevant policies of the 2040 General Plan (Policy 9.2-I-6 [Preparation of a Soils Report as Needed]; Policy 9.2-I-12 [Continued Geologic Investigation by State Agencies]; and Policy 9.2-I-13 [Updates to City Excavation, Grading, and Filling Requirements]), would reduce impacts related to expansive soils. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) Soil testing conducted as part of the Geotechnical Evaluation prepared for the proposed project indicated that the near-surface soils at the project site have expansion characteristics ranging from low to moderate and a high expansion potential. Per Policy 9.2-I-6 of the 2040 General Plan, the proposed project would be required to comply with the recommendations of the Geotechnical Evaluation as well as CBC requirements for expansive soils. These include the use of import material with low expansion potential, controlled compaction, ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 99 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx moisture conditioning to reduce the soil water absorption and volume change potentials, and/or the use of selective lime treatment to reduce the soil’s expansion potential. The proposed project would be required to comply with updated City Code requirements for excavation, grading, and filling pursuant to Policy 9.2-I-13. Therefore, development of the site as proposed would not result in any environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the General Plan EIR. e) Septic Tanks Would the project: Have soils incapable of supporting the use of septic tanks or other alternative wastewater disposal systems where sewers are not available? Summary of 2040 General Plan EIR Development facilitated within the 2040 General Plan Area would occur in urbanized areas serviced by existing wastewater infrastructure. Therefore, buildout resulting from implementation the 2040 General Plan would not include or require the use of septic tanks or alternative wastewater disposal systems. Therefore, the 2040 General Plan FEIR concluded that there would be no impact. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The proposed project would not include or require the use of septic tanks or alternative wastewater disposal systems. Therefore, development of the site as proposed would not result in any environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the General Plan EIR. f) Destruction of Paleontological Resource or Unique Geologic Feature Would the project: Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Summary of 2040 General Plan EIR The General Plan Area intersects with the Las Trampas Ridge, Diablo, Tassajara, Hayward, Dublin, and Livermore USGS 7.5-minute topographic quadrangles. Within these quadrangles, seven distinct geologic units were identified: Quaternary alluvium (Qa), Quaternary landslide deposits (Qls), Quaternary older alluvium (Qoa); Livermore Gravel (QTlg), Orinda Formation (Tor), Briones Sandstone (Tbr), and Monterey Formation (Tmc). Quaternary alluvium and Quaternary landslide deposits (Qls) were identified as having low paleontological sensitivity and Quaternary older alluvium, ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 100 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Livermore Gravel, Orinda Formation, Briones Sandstone, and Monterey Formation were identified as having high paleontological sensitivity. To minimize construction-related impacts associated with the damage or destruction of paleontological resources, new development would be required to implement 2040 General Plan EIR MM GEO-1, which would require the retention of a qualified professional Paleontologist to conduct a paleontological resource analysis prior to ground disturbance activities within areas consisting of geologic units with high paleontological sensitivity. If the potential for impacts to paleontological resources is found to be significant, the qualified professional Paleontologist would be required to implement a Paleontological Resources Impact Mitigation Program (PRIMP) to reduce impacts to paleontological resources to a level that is less than significant. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant with mitigation. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) Fossils are nonrenewable resources subject to protection by federal, State, and local rules and regulations. The Society of Vertebrate Paleontology (SVP) Standard Procedures classifies significant paleontological resources as identifiable vertebrate fossils, or large or small, uncommon invertebrate, plant, and trace fossils older than the middle Holocene that provides important scientific information to various disciplines. Rock units with high paleontological potential consist of sedimentary rock units older than the middle Holocene that are temporally or lithologically suitable for the preservation of fossils such as fine-grained fluvial and marine sandstones, argillaceous paleosols, some volcanic rocks like ashes or tephras, and low-grade metamorphic rocks that have yielded significant paleontological resources within their geographical extent.15 Furthermore, areas that have previously experienced gradual deposition such as fluvial and alluvial environments at lower elevations usually provide a favorable environment for fossil preservation. The University of California Museum of Paleontology (UCMP) prepared a paleontological records search on, and within a 0.5-mile radius of the project site to identify whether any fossil localities that have yielded significant paleontological resources currently curated at their repository institution have been previously uncovered in the project vicinity. Although no fossil localities were identified in the project area, the UCMP identified two locations that have yielded significant paleontological resources approximately 2.5 miles from the project site. The first fossil locality was uncovered from the San Ramon Creek to the north 10 feet below the surface within Quaternary rock units yielding a late- Pleistocene bison femur underlain by grey siltstone, while the second locality is situated in the Greenbrook neighborhood that produced over 1,200 screen-washed mammalian specimens within a 15 Society of Vertebrate Paleontology (SVP). 2010. Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 101 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 6 to 8-inch layer of grey green siltstone with pumice fragments associated with the Green Valley and Tassajara Formations, undivided from the late-Pliocene.16 A Feasibility Level Geotechnical Investigation prepared for the project site by Ninyo & Moore identified the project site, based on geologic mapping, to be underlain by older Pleistocene epoch alluvial fan deposits that were deposited from the upper portions of the Amador and San Ramon Valleys.17 The Feasibility Level Geotechnical Investigation identified older Pleistocene epoch alluvial fan deposits from geologic mapping that were deposited from sediments washed from higher elevations.18 Pleistocene alluvian fans are known to produce vertebrate fossils in multiple areas of California. Older Pleistocene alluvial fans are equivalent to Quaternary older alluvium specified in the 2040 General Plan EIR. As such, given that the project site is located on alluvial fan deposits, excavations from the construction of the proposed project could encounter significant paleontological resources. However, new significant impacts are not anticipated because the 2040 General Plan FEIR identifies MM GEO-1 for areas with high paleontological sensitivity. MM GEO-1 requires the retention of a qualified professional Paleontologist as defined by the SVP to conduct a paleontological resources analysis prior to ground disturbance and to develop and implement a PRIMP as needed. With implementation of MM GEO-1, the new information identified in the Geotechnical Investigation would not constitute a significant impact. Therefore, development of the proposed project would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the General Plan EIR. 2040 General Plan FEIR Mitigation Measures MM GEO-1 Protect Paleontological Resources The City of San Ramon shall provide for the protection of paleontological resources. The City shall require the following: • A qualified professional Paleontologist (as defined by SVP14) must be retained to conduct a paleontological resources analysis prior to the beginning of projects involving ground disturbance in geologic units with high paleontological sensitivity to determine whether there is a potential for significant impacts to paleontological resources. 16 Holroyd, Patricia A. Senior Museum Scientist, University of California Museum of Paleontology. Personal communication: email. August 21, 2025. 17 Ninyo & Moore. 2022. Feasibility Level Geotechnical Evaluation, Bishop Ranch, Proposed Future Residential Development, 6001 Bollinger Canyon Road, San Ramon, California, August 16. 18 Ibid. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 102 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx • If potential impacts to paleontological resources are found to be significant, then a qualified professional Paleontologist shall be retained to develop and implement a Paleontological Resources Impact Mitigation Program to ensure that impacts to paleontological resources are less than significant. Conclusion With regard to Geology and Soils, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. MM GEO-1 would be required for the proposed project’s specific impacts to be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 103 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.8 Greenhouse Gas Emissions Would the project: a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? Less than significant impact with mitigation incorporated No No No No b) Conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases? Less than significant impact with mitigation incorporated No No No No a) Greenhouse Gas Emissions Would the project: Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? The 2040 General Plan FEIR discussed emissions associated with implementation of the 2040 General Plan qualitatively and compared the 2040 General Plan to the 2022 Bay Area Air District thresholds. Construction- and operational-related emissions were discussed separately. The 2040 General Plan FEIR found operational impacts related to generation of GHG emissions could be potentially significant. To address the potentially significant impact, MM GHG-1 required the City to adopt and implement a qualified CAP that would align with State GHG reduction targets, the Bay Area Air District’s 2022 CEQA Guidelines, and would represent an update to the City’s CAP. With implementation of MM GHG-1, the 2040 General Plan FEIR concluded that the 2040 General Plan would not generate indirect or direct GHG emissions that would have a significant impact on the environment, and impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 104 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The 11.3-acre Mixed-Use District would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The 26-acre Multi-Family District would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. The Bay Area Air District’s 2022 CEQA Air Quality Guidelines provide recommended significance thresholds for GHGs for land use development projects and plans. The thresholds state that projects demonstrating consistency with either one of two enumerated Criterion “A” or “B” would result in a less than significant impact related to the generation of direct and indirect GHG emissions. A project’s consistency with Criterion A is based on incorporating specific project design elements. A project’s consistency with Criterion B involves demonstrating consistency with a local GHG reduction strategy that meets the criteria under CEQA Guidelines Section 15183.5(b). As stated above, the City adopted a qualified CAP in June 2025. Individual projects developed within the Mixed-Use District or Multi- family District would be required to demonstrate consistency with the 2025 CAP (either through consistency with the checklist, or another method) or demonstrate that project implementation would not result in direct or indirect GHG emissions that may have significant climate impacts. Therefore, the Mixed-Use District and Multi-Family District would not generate direct or indirect emissions of GHGs that may have a significant impact on the environment, and impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) The Bay Area Air District’s 2022 CEQA Air Quality Guidelines provide recommended significance thresholds for GHGs for land use development projects and plans. The thresholds state that projects demonstrating consistency with either one of two enumerated Criterion “A” or “B” would result in a less than significant impact related to the generation of direct and indirect GHG emissions. A project’s consistency with Criterion A is based on incorporating specific project design elements. A project’s consistency with Criterion B involves demonstrating consistency with a local GHG reduction strategy that meets the criteria under CEQA Guidelines Section 15183.5(b). As stated above, the City adopted a qualified CAP in June 2025. The 2025 CAP includes a checklist for individual projects to demonstrate their consistency with the 2025 CAP. The checklist is provided in Appendix B and demonstrates that the Neighborhood District would be consistent with the applicable measures ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 105 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx contained within the 2025 CAP. Accordingly, the Neighborhood District would meet Criterion B of the Bay Area Air District’s thresholds of significance, and impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) Greenhouse Gases Emissions Reduction Plan Conflict Would the project: Conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases? The 2040 General Plan FEIR evaluated the 2040 General Plan for consistency with the applicable plans adopted for the purpose of reducing GHG emissions which included ARB’s Scoping Plan, the Bay Area Air District’s 2022 CEQA Guidelines, and consistency with the 2011 San Ramon CAP. The 2040 General Plan FEIR found that the 2040 General Plan could be inconsistent with the Scoping Plan, Bay Area Air District’s 2022 CEQA Guidelines, and the 2011 San Ramon CAP. To address the potentially significant impact, MM GHG-1 required the City to adopt and implement a qualified CAP that would align with State GHG reduction targets, the Bay Area Air District’s 2022 CEQA Guidelines, and would represent an update to the City’s CAP. With implementation of MM GHG-1, the 2040 General Plan FEIR concluded that the 2040 General Plan would not conflict with an applicable plan, policy, or regulation of an agency adopted for the purpose of reducing GHG emissions and impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The 11.3-acre Mixed-Use District would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The 26-acre Multi-Family District would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. The Mixed-Use District and Multi-Family District are expected to be developed under separate projects over the longer-term future and would be subject to future project-level CEQA analysis. Pursuant to MM GHG-1 of the 2040 General Plan FEIR, the City adopted a qualified CAP in June 2025, which includes targets that reflect those set by California SB 32 to reduce GHG emissions by 40 percent below the 1990 levels by 2030 and AB 1279 to achieve carbon neutrality by 2045.19 19 City of San Ramon. 2025. Climate Action Plan. Website: ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 106 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx These reduction targets also align with the targets set forth in the 2022 ARB Scoping Plan. The City’s 2025 CAP includes a checklist for individual projects to demonstrate their consistency with the 2025 CAP. Individual projects developed within the Mixed-Use District or Multi-family District would be required to demonstrate consistency with the 2025 CAP (either through the checklist, or another method), or demonstrate that project implementation would not result in direct or indirect GHG emissions that may have significant climate impacts. Accordingly, the Mixed-Use District and the Multi-Family District would demonstrate consistency with the Bay Area Air District’s 2022 CEQA Guidelines, the City’s CAP and the 2022 ARB Scoping Plan. Therefore, implementation of the Mixed-Use District and the Multi-Family District would not conflict with any applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases, and impacts would be less than significant. There are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Pursuant to MM GHG-1 of the 2040 General Plan FEIR, the City adopted a qualified CAP in June 2025 (2025 CAP) which includes targets that reflect those set by California SB 32 to reduce GHG emissions by 40 percent below the 1990 levels by 2030 and AB 1279 to achieve carbon neutrality by 2045.20 These reduction targets also align with the targets set forth in the 2022 ARB Scoping Plan. The City’s 2025 CAP includes a checklist for individual projects to demonstrate their consistency with the 2025 CAP. The checklist is provided in Appendix B and demonstrates that the Neighborhood District Development plus Grading of Interim Area would be consistent with the applicable measures contained in the 2025 CAP. Therefore, the Neighborhood District Development plus Grading of Interim Area would demonstrate consistency with the Bay Area Air District’s 2022 CEQA Guidelines, the City’s CAP and the 2022 ARB Scoping Plan. There are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2040 General Plan FEIR Mitigation Measures None. https://sanramon.ca.gov/our_city/departments_and_divisions/community_development/planning_services/climate_action _plan. Accessed November 7, 2025. 20 City of San Ramon. 2025. Climate Action Plan. Website: https://sanramon.ca.gov/our_city/departments_and_divisions/community_development/planning_services/climate_action _plan. Accessed November 7, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 107 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Conclusion With regard to Greenhouse Gases, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site that were not analyzed as significant effects in the 2040 General Plan FEIR have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not analyzed in the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures from the 2040 General Plan FEIR would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 108 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.9 Hazards and Hazardous Materials Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Less than significant impact No No No No b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Less than significant impact No No No No c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less than significant impact No No No No d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? Less than significant impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 109 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? No impact No No No No f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Less than significant impact No No No No g) Expose people or structures, either directly or indirectly to a significant risk of loss, injury or death involving wildland fires? Less than significant impact with mitigation incorporated No No No No a) Routine Transport, Use, or Disposal of Hazardous Materials Would the project: Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Summary of 2040 General Plan EIR The I-680, running north–south through the General Plan Area, is designated as a Class A (All Non- radioactive Hazardous Materials) route and Class B (Class 1 Explosives) route by the National Hazardous Materials Route Registry (NHMRR). During both construction and operations, all new development would be required to with comply with County, State, and federal standards related to the transportation, use, and disposal of hazardous materials, including the Hazardous Materials Transportation Act, the California Hazardous Waste Control Law, California Health and Safety Code, ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 110 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx and the Hazardous Materials Unified Program Agency (HMUPA). Compliance with these regulations would reduce impacts associated with the transport, use, or disposal of hazardous waste, including on the I-680 and local roads adjacent to or near open hazardous waste sites, such as Alcosta Boulevard and Dougherty Road. Through compliance with these regulations, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site lies adjacent to the I-680, a designated Class A route and Class B route by the NHMRR. Typical of similar projects, the proposed project may utilize hazardous materials, such as fuels or solvents, during the construction phase of the project. During the operations phase, residents may also routinely use commonly available hazardous substances such as fuels, lubricants, and household cleaners. As discussed above, potential hazards arising from the transport, use, and disposal of these hazardous materials would be minimized and regulated in accordance with local, State, and federal policies, regulations, and standards. As such, there are no environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) Risk of Upset Would the project: Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Summary of 2040 General Plan EIR Hazardous materials within the General Plan Area include hazardous building materials (e.g., asbestos, lead), hazardous substances in the physical environment (e.g., cleaning products, herbicides, pesticides), and hazardous waste. To avoid resulting in upset or accident conditions that would involve the release of hazardous materials into the environment, new development would be required to abide by the California Division of Occupational Safety and Health (Cal/OSHA), the Clean Air Act, and all applicable regional, State, and federal regulations listed during both construction and operations. As noted in the 2040 General Plan FEIR, in the case of underground storage tanks (USTs), all new development would be required to minimize risk according to existing standards contained within Chapters 6.7 and 6.75 (UST Program) of the California Health and Safety Code and all sources of contamination of groundwater sources from UST and elsewhere would require remediation under the oversight of the San Francisco Bay RWQCB. New development would also be required to comply with applicable 2040 General Plain policies, including Policy 5.4-I-9 (Specify Hauling Routes for Transportation of Hazardous Materials); Policy 9.3-I-3 (Cleanup of Contaminated Sites); and Policy 9.3-I-4 (Compliance with Contra Costa County Hazardous Waste Management Plan) in order to minimize impacts associated with hazardous materials. The 2040 General Plan FEIR concluded that, with compliance with these regulations, impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 111 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) A Phase I Environmental Site Assessment (Phase I ESA) was prepared on July 12, 2022 and a follow-up Phase II ESA was prepared on August 30, 2022 which identified two significant Recognized Environmental Conditions (RECs) on the site (Appendix F). These conditions are not unique or unusual for properties undergoing urban infill or redevelopment. A REC refers to the presence or likely presence of any hazardous substances or petroleum products in, on, or at a property. According to the Phase I ESA, the RECs for the project site included: • Historical land use as orchard farm • A 15,000-gallon diesel underground storage tank (UST) is located within the Building J courtyard area and was installed sometime before 1996 with no UST record of subsurface investigation in the area Given these RECS, the following recommendations were made: • A Limited Phase II Subsurface Investigation to evaluate contamination from former agricultural operations on-site and those from a 15,000-gallon diesel UST estimated to be over 25 years old. • A comprehensive hazardous materials survey (including asbestos and lead) prior to demolition activities. A Phase II ESA was prepared on October 1, 2025 by ENGEO, which included soil and groundwater sampling, which revealed trace amounts of volatile organic compounds (VOCs), namely, benzene, in exceedance of San Francisco Bay RWQCB Commercial/Industrial Soil Vapor Intrusion Environmental Screening Levels (ESLs). However, the project site contains properties favorable for natural bio attenuation.21 It was determined that benzene does not exceed the ESL when factoring in bio attenuation. The Phase II ESA provided the following recommendations: • Removal of the UST in collaboration with the Contra Costa Health Services Hazardous Materials Programs and Contra Costa County Fire Protection District. • Preparation of a Soil Management Plan outlining protocols for handling soil, appropriate safety procedures, monitoring, and other items to support the redevelopment. 21 Bio attenuation is the natural reduction of contaminant concentrations through biological processes, such as microbial activity that breaks down VOCs in the presence of oxygen and other favorable conditions. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 112 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx A Soil Management Plan was prepared on October 8, 2025, by ENGEO Incorporated (Appendix F). The Phase II ESA also recommended removal of the UST, which would be done through appropriate permitting and coordination with the Contra Costa Health Services Hazardous Materials Programs and Contra Costa County Fire Protection District. According to the General Plan FEIR, potential risks associated with removal of on-site USTs prior to construction activities would be minimized through compliance with existing standards contained in Division 20, Chapter 6.7 and 6.75 (UST Program) of the California Health and Safety Code as enforced by the Environmental Programs Division.22 As such, the presence of the UST, which would be removed in compliance with State law, would not constitute a peculiar impact. The proposed project would also be required to comply with all applicable regional, State, and federal regulations regarding the transport, use, and disposal of hazardous materials. All contaminated waste would be collected and disposed of at an appropriately licensed disposal or treatment facility. The UST is not peculiar to the project or site because it reflects typical environmental conditions found in redevelopment areas and was anticipated in the General Plan and is being managed through well-established regulatory processes. Thus, there are no environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Exposure of Schools to Hazardous Materials or Emissions Would the project: Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Summary of 2040 General Plan EIR The 2040 General Plan Area contains 14 elementary schools, five middle schools, and two high schools operated by the San Ramon Valley Unified School District (SRVUSD). Currently, there are no open hazardous materials sites located within a 0.25-mile distance of any school within the 2040 General Plan Area; however, 11 of these schools are located near an identified hazardous materials transportation route. As previously mentioned, the transportation of hazardous materials along the I- 680 and nearby local roads would be subject to federal, State, and local regulations, including the Hazardous Materials Transportation Act, the California Hazardous Waste Control Law, California Health and Safety Code, and the HMUPA. Furthermore, development facilitated by the 2040 General Plan would be primarily residential, commercial, office, and semi-public, and would therefore not involve substantial quantities of hazardous materials during operations. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. 22 City of San Ramon. 2023. San Ramon 2040 General Plan Draft Environmental Impact Report. August 30. Page 3.7-32. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 113 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site boundary is 0.2 mile west of the Montevideo Elementary School. The proposed project would involve the temporary use of hazardous materials during construction such as diesel fuel, asphalt, and concrete mixtures. However, use of construction-related hazardous materials is typical of similar construction projects and would be temporary. The proposed project would only result in mixed-use, park and open space, and residential development. Uses involving large quantities of hazardous materials would not be permitted. As such, project operations may involve the use of small quantities of household materials through the use of household cleaners or solvents. Therefore, there are no environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. d) Hazardous Materials Sites Would the project: Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? Summary of 2040 General Plan EIR The General Plan Area contains four hazardous materials sites listed pursuant to Government Code Section 65962.5. Two of these are open sites where remedial activities have not yet been conducted: Former Green Valley Shopping Center, located at 12141 Alcosta Boulevard, and Shell Service Station #16049, located at 2850 Crow Canyon Road. Given that new development would be required to conduct remediation activities to the satisfaction of the California Department of Toxic Substances Control (DTSC) and the RWQCB prior to construction activities, construction impacts would be reduced through compliance with federal, State, and local regulations. These regulations would also apply for new development facilitated on identified hazard sites, which would require site-specific remediation and containment measures to the satisfaction of the oversight agency. Additionally, new development would be required to comply with various measures of the 2040 General Plan to minimize impacts related to hazardous materials, including: Policy 5.4-I-9 (Specify Hauling Routes for Transportation of Hazardous Materials); Policy 9.3-I-3 (Cleanup of Contaminated Sites); and Policy 9.3-I-4 (Compliance with Contra Costa County Hazardous Waste Management Plan). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) According to the California State Water Resources Control Board (State Water Board) GeoTracker and the DTSC Envirostor database, there are no hazardous sites within the project site, and the ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 114 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx project site is not included on the Cortese list.23,24 Furthermore, according to the regulatory database report included in the Phase I ESA, the project site is not included in the EPA databases which list properties that are subject to land use restrictions or Federal Superfund Liens, or any lists maintained by DTSC. Therefore, there are no environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. e) Airports Would the project: For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Summary of 2040 General Plan EIR The nearest airport to the 2040 General Plan Area is the Livermore Municipal Airport, located approximately 7 miles to the southeast. There are no flight paths, airport noise contours, or airport- restricted development zones that overlap with San Ramon. Therefore, the 2040 General Plan FEIR concluded that there would be no impact. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) As previously mentioned, there are no airports within the 2040 General Plan Area and there is no overlap with flight paths, airport noise contours, or airport-restricted development zones from the Livermore Municipal Airport. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan EIR. 23 California State Water Resources Control Board (State Water Board). 2025. Geotracker (Web Viewer). Website: https://geotracker.waterboards.ca.gov/map/?CMD=runreport&myaddress=Sacramento. Accessed August 13, 2025. 24 California Department of Toxic Substances Control (DTSC). 2025. EnviroStor. Hazardous Waste and Substances Site List (Cortese). Website: https://www.envirostor.dtsc.ca.gov/public/search?cmd=search&reporttype=CORTESE&site_type=CSITES,FUDS&status =ACT,BKLG,COM&reporttitle=HAZARDOUS+WASTE+AND+SUBSTANCES+SITE+LIST+%28CORTESE%29. Accessed August 13, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 115 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx f) Emergency Response and Evacuation Would the project: Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Summary of 2040 General Plan EIR Potential emergency evacuation routes within the 2040 General Plan Area include the I-680, Crow Canyon Road, San Ramon Valley Boulevard, Dougherty Road, and Alcosta Boulevard. All new development would be required to comply with the provisions of the Contra Costa County Emergency Operation Plan and Contra Costa County Local Hazard Mitigation Plan (LHMP) to ensure adequate emergency vehicle access during construction, including through the preparation of a construction management plan during CEQA review. New development would also be required to comply with 2040 General Plan policies, including Policy 9.1-I-4 (Two Emergency Evacuation Routes for Development within High Risk Hazard Areas) and Policy 9.5-I-1 (Site Design Features). In addition, new development would be required to provide adequate fire truck and apparatus turning radii and clearance for purposes of adequate emergency access and response for review by the San Ramon Valley Fire Protection District (SRVFPD). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The intersection of I-680 and Bollinger Canyon Road is located to the northwest of the project site. Bollinger Canyon Road provides access to the I-680 north–south evacuation route. Both the I-680 and Bollinger Canyon Road provide connections to Crow Canyon Road, located 1.35 miles to the west, which would serve as an emergency evacuation route in the east–west direction. Bollinger Canyon Road also provides connections to San Ramon Valley Boulevard, located directly across the project site on the other side of the I-680, and Alcosta Boulevard located. Both Bollinger Canyon Road and Crow Canyon Road provide direct access to Dougherty Road located 1.99 miles to the east, past hillside development. Construction or operation of the proposed project would not be expected to significantly impede the use of these evacuation routes, as it would connect to the existing circulation system. The proposed project’s internal street network would be designed to accommodate the turning radius of emergency vehicles, such as large fire trucks, and the proposed project would undergo review by the SRVFPD to ensure adequate emergency access. The proposed project would undergo review by the SRVFPD to ensure adequate emergency access. Therefore, there are no environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 116 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx g) Wildland Fires Would the project: Expose people or structures, either directly or indirectly to a significant risk of loss, injury or death involving wildland fires? Summary of 2040 General Plan EIR At the time of its publication, the 2040 General Plan Area was not located within a designated Very High Fire Hazard Severity Zone (VHFHSZ). However, the northwesternmost portion of the 2040 General Plan Area is located within a VHFHSZ within a Local Responsibility Area. New development facilitated by the 2040 General Plan would be subject to the requirements of the California Fire Code and the CBC, as stipulated within the 2040 General Plan, including: Policy 9.5-I-1 (Site Design Features) and Policy 9.5-I-4 (Sprinklers in New Homes). Additionally, new development would be required to meet minimum standards for emergency access, fuel modification, setback, signage, and water supply, as set forth in California Code of Regulations Title 14, and all new development within a High FHSZ would be required to implement MM HAZ-1 (Conduct Project Landscape and Slope Design Wildfire Risk Reduction). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant with mitigation. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) As noted by the latest California Department of Fire (CAL FIRE) Fire Hazard Severity Zone (FHSZ) maps, the project site is not located within a designated FHSZ. The nearest Medium FHSZ is located approximately 0.17 mile west of the project site directly across the I-680, and the closest High FHSZ is located 0.21 mile east if the project site. The closest VHFHSZ is located approximately 3.84 miles northeast of the project site.25 The proposed project would not include any uses that would exacerbate fire risk. The proposed project would be required to comply with applicable goals and policies from the 2040 General Plan, including Policy 9.5-I-1 (Site Design Features) to ensure the use of fire retardant building materials and other measures to reduce the risk of fire on-site. This would also include General Plan 2050 Policy 9.5-I-4 (Sprinklers in New Homes) through the installation of sprinklers in all new residential units. The proposed project would be subject to the requirements of the California Fire Code (CFC) and the CBC, as well as minimum standards set forth by California Code of Regulations Title 14 regarding emergency access, fuel modification, setback, signage, and water supply. Therefore, there are no environmental effects that are peculiar to the site or the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 25 California Department of Forestry and Fire Protection (CAL FIRE). 2025. Fire Hazard Severity Zone Viewer (Map Viewer). Website: https://fire-hazard-severity-zones-rollout-calfire-forestry.hub.arcgis.com/pages/access-map. Accessed August 13, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 117 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Hazards and Hazardous Materials, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 118 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.10 Hydrology and Water Quality Would the project: a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality? Less than significant impact No No No No b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin? Less than significant impact No No No No c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would: (i) result in substantial erosion or siltation on- or off-site; Less than significant impact No No No No (ii) substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site; Less than significant impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 119 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? (iii) create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or Less than significant impact No No No No (iv) impede or redirect flood flows? Less than significant impact No No No No d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? Less than significant impact No No No No e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? Less than significant impact No No No No a) Water Quality Would the project: Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality? Summary of 2040 General Plan EIR The 2040 General Plan Area is located within the Suisun Basin under the jurisdiction of the San Fransico Bay RWQCB, which manages strategies for achieving water quality objectives in accordance with the Water Quality Control Plan (Basin Plan) for the San Francisco Bay Basin. During construction, new development would be required to mitigate impacts to water quality through compliance with the provisions of the NPDES Construction General Permit and San Ramon Municipal Code requirements, which include implementation of site-specific BMPs to reduce impacts. New ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 120 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx development would also be required to prepare a SWPPP in accordance with the City’s NPDES permit, which would require use of Low Impact Development (LID) treatment measures such as bioretention systems, swales, green roofs, infiltration systems, and permeable pavers per the requirements of the CCCWP Stormwater C.3 Guidebook, as stipulated in Section B6-3644 of the San Ramon Municipal Code and 2040 General Plan Policy 8.3-I-11 (Participation in Contra Costa Clean Water Program). During operations, new development would be required to continue compliance with City-specific components of the CCCWP, including implementation of stormwater control measures to minimize or avoid potential water quality impacts. These would be complemented by adherence to relevant 2040 General Plan Policies, including Policy 8.3-I-3 (Explore Opportunities for Preservation of Open Space) and Policy 8.6-I-6 (Continued Implementation of City Stormwater Management Program). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) Designation of the Mixed-Use and Multi-Family Districts does not include any construction. However, future development under the Mixed-Use and Multi-Family Districts may impact water quality due to changes in stormwater patterns. During construction of future projects under the Mixed-Use and Multi-Family Districts, projects would be required to comply with the NPDES Permit, meaning they would follow the required SWPPP, which includes BMPs to prevent erosion and siltation during project construction. The proposed project would comply with Section B6-364 of the San Ramon Municipal Code and the latest CCCWP recommendations. Furthermore, future development projects would be required to use LID treatment measures as part of the project design, including an optimized site layout featuring open space and landscaped areas in addition to on-site treatment systems for managing stormwater runoff. These features are outlined in the Stormwater Control Plan.26 Furthermore, as noted in the Stormwater Control Plan, the Mixed- Use and Multi-Family Districts would involve the use of permanent source control BMPs such as minimizing pesticide and fertilizer use during landscaping and maintenance activities and operational source control BMPs such as providing information on integrated pest management to new site owners. This would prevent polluted runoff from impacting water quality. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Demolition and grading activities for the Neighborhood and Interim Area would be compliant with the NPDES Permit, meaning they would follow the required SWPPP, which includes BMPs to prevent 26 Sunset Development. January. Stormwater Control Plan for Orchards Subdivision 9693. January. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 121 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx erosion and siltation during project construction. The proposed project would comply with Section B6- 364 of the San Ramon Municipal Code and the latest CCCWP recommendations. The proposed project would include demolition, tree removal, and grading of the Interim Area. This would expose soils and could create sedimented stormwater runoff, which could negatively impact water quality. However, the proposed Interim Area includes hydroseeding. Hydroseeding is the process of spraying a watery mixture of seed, mulch, fertilizer and binder on the ground to promote fast-growing turf in order to control erosion. During demolition and grading activities for the Interim Area, hydroseeding specifically would be utilized to minimize erosion and surface runoff throughout construction, reducing potential impacts on surface or groundwater quality. In compliance with 2040 General Plan Policy 8.3-I-11, the Neighborhood District would include LID treatment measures as explained in the Stormwater Control Plan.27 For example, it would include bioretention basins on-site to treat 100 percent of on-site runoff. Furthermore, as noted in the Stormwater Control Plan, the Mixed-Use and Multi-Family Districts would involve the use of permanent source control BMPs such as minimizing pesticide and fertilizer use during landscaping and maintenance activities and operational source control BMPs such as providing information on integrated pest management to new site owners. This would prevent polluted runoff from impacting water quality. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) Groundwater Would the project: Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin? Summary of 2040 General Plan EIR The 2040 General Plan Area overlies the San Ramon Valley Groundwater Basin and the Livermore Valley Groundwater Basin. Water supply for new development would be provided either via the EBMUD, which covers the San Ramon Valley Groundwater Basin and does not produce groundwater, or the Dublin San Ramon Services District (DSRSD), which covers the Livermore Valley Groundwater Basin and produces a limited amount of groundwater supply under the jurisdiction of the Zone 7 Water Agency, a California Department of Water Resources (DWR)-approved Groundwater Sustainability Agency. As noted within the 2040 General Plan FEIR, new development would be required to development project-specific SWPPPs for the implementation BMPs to comply with the CWA and the CCCWP during construction. Furthermore, during operations, new development would be required to maintain or increase pervious surfaces aimed at maximizing stormwater retention and infiltration, per the requirements of the San Ramon Municipal Code, the CCCWP, and 2040 General 27 Sunset Development. January. Stormwater Control Plan for Orchards Subdivision 9693. January. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 122 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Plan Policy 5.6-I-18 (Compatible Land Uses to Minimize Unnecessary Pavement). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The proposed project would not result in direct groundwater consumption. The project site is already developed and already has a limited area of impervious surfaces where groundwater recharge may occur. The proposed project would include bioretention areas and landscaped areas that would allow for groundwater recharge. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Drainage Would the project: Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would: i) result in substantial erosion or siltation on- or off-site; Summary of 2040 General Plan EIR As noted within the 2040 General Plan FEIR, new development facilitated by the 2040 General Plan would be primarily infill development and would therefore not alter the course of any stream or river. However, new development would still be required to comply with the provisions of the 2040 General Plan to minimize impacts, including those related to erosion or siltation, including Policy 9.2-I-109 (Control Erosion of Graded Areas) in addition to the City’s NPDES requirements, Municipal Code, and CCCWP Stormwater C.3 requirements for implementation of BMPs to minimize or avoid the potential of erosion or siltation during construction. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) No specific development is proposed within the Mixed-Use and Multi-Family Districts. As such, determining specific erosion of siltation impacts is too speculative at this time. Future development of the Mixed-Use and Multi-Family Districts would be required to prepare a project-specific SWPPP incorporating construction-related BMPs for erosion and sediment controls in accordance with 2040 General Plan Policy 9.2-I-19 (Control Erosion of Graded Areas), the City’s NPDES requirements, the City’s Municipal Code, and CCCWP Stormwater C.3 requirements. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 123 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Demolition and grading activities for the Neighborhood District and Interim Area would be compliant with the NPDES Permit, meaning they would follow the required SWPPP, which includes BMPs to prevent erosion and siltation during project construction. The proposed project would comply with Section B6-364 of the San Ramon Municipal Code and the latest CCCWP recommendations. The proposed Interim Area would include demolition, tree removal, and grading of the area. This would expose soils which could create impacts related to erosion or siltation. However, the proposed Interim Area includes hydroseeding, which would prevent erosion and siltation in the area while applications for development of the Interim Area are in process. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. (ii) substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site; Summary of 2040 General Plan EIR The 2040 General Plan FEIR refers to Section B6-364 the San Ramon Municipal Code, per the most recent version of the CCCWP, for the implementation of LID treatment measures during construction, including the use of infiltration ponds and other design measures, which would be used to minimize runoff. As previously mentioned, these measures would be required to be addressed by new development through development of a site-specific SWPPP per the requirements of the City’s NPDES permit. During operations, all new developments would be required to conform to the regulations of the County Flood Control and Water Conservation District’s 50-Year Plan. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) As previously mentioned, development of the Mixed-Use and Multi-Family Districts would be required to comply with Section B6-364 of the San Ramon Municipal Code and latest CCCWP recommendations for construction-related LID treatment measures for managing surface runoff through a project-specific SWPPP. As noted in the program-level Stormwater Control Plan, the Mixed-Use and Multi-Family Districts would incorporate an on-site treatment system designed in accordance with CCCWP Provision C.3 requirements for managing stormwater flow during operations in addition to the installation of landscape and open space areas. The Preliminary Stormwater Control Plan prepared for the project ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 124 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx accounts for an increase in impervious surface area, and outlines a stormwater plan such that development of the Mixed-Use and Multi-Family Districts would not result in an exceedance stormwater runoff flow from pre-development conditions. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed- Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Demolition and grading activities for the Neighborhood and Interim Area would be compliant with the NPDES Permit, meaning they would follow the required SWPPP, which includes BMPs to prevent surface runoff during project construction. The proposed project would comply with Section B6-364 of the San Ramon Municipal Code and the latest CCCWP recommendations. The proposed Interim Area would include demolition and grading of the area, which would impact stormwater flow. However, the proposed Interim Area includes hydroseeding, which, by spraying a mixture of seed, mulch, fertilizer, and water would promote soil stabilization and vegetative growth, thus increasing water absorption and preventing surface runoff. As noted in the Preliminary Stormwater Control Plan, the Neighborhood District would include bioretention basins located in a few areas around the project site perimeter in open space areas. The bioretention areas would treat stormwater flows during operations, which are designed to have capacity for 100 percent of anticipated stormwater runoff. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District Development plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. (iii) create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; Summary of 2040 General Plan EIR As noted within the 2040 General Plan FEIR, new development facilitated by the 2040 General Plan would be concentrated as infill development. Therefore, new development would be unlikely to contribute to alterations in existing drainage patterns that would result in exceedances of the storm drain system. As previously mentioned, new development would be required to implement LID treatment measures to minimize surface runoff during construction per the San Ramon Municipal Code and the CCCWP. During operations, new development would be required to comply with 2040 General Plan Policies for minimizing potential impacts associated with stormwater drainage and capacity of the storm drain system, including Policy 9.4-I-3 (Preparation of Hydrologic Studies); Policy 9.4-I-4 (Maintenance of Drainage Facilities); and Policy 9.4-I-5 (Landscape and Maintenance Guidelines for Detention Basins). Therefore, development of the project site as proposed would not result in any environmental effects that are peculiar to the proposed project. The proposed project ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 125 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) Development of the Mixed-Use and Multi-Family Districts does not include construction. However, future development under the Mixed-Use and Multi-Family Districts may impact storm drain capacity through increased impervious surfaces, creating changes in runoff or additional sources of polluted runoff. Future development projects would be required to use on-site treatment systems designed in accordance with Provision C.3 requirements. As explained in the Preliminary Stormwater Management Plan, the proposed project includes a bioretention system designed to treat 100 percent of anticipated stormwater runoff. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Demolition and grading activities for the Neighborhood and Interim Area would be compliant with the NPDES Permit, meaning they would follow the required SWPPP, which includes BMPs to prevent polluted runoff during project construction. The proposed project would comply with Section B6-364 of the San Ramon Municipal Code and the latest CCCWP recommendations. The proposed Interim Area would include demolition, tree removal, and grading of the area. It would also include hydroseeding of the area in order to increase absorption and reduce stormwater runoff. During operations, the Neighborhood Development District would utilize proposed bioretention basins to manage stormwater runoff. As explained in the Preliminary Stormwater Management Plan, the proposed bioretention system would have capacity to treat 100 percent of anticipated stormwater runoff. As such, it is not anticipated that the Neighborhood District would result in new sources of polluted runoff. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. (iv) impede or redirect flood flows? Summary of 2040 General Plan EIR The 2040 General Plan FEIR identifies Federal Emergency Management Agency (FEMA)-designated Flood Zones within the 2040 General Plan Area, where 100-year floodplains are found along San Ramon Creek, South San Ramon Creek, West Branch Alamo Creek, and Alamo Creek. Portions of ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 126 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx the 500-year floodplain are along South San Ramon Creek, which is entirely modified for flood control purposes. New development associated with the 2040 General Plan would be concentrated as infill development and would be required to comply with all regulations applicable to the presence of designated Flood Hazard Areas, including those for appropriately sized and designed drainage facilities that would not result in increased runoff or flooding. These compliance measures would support 2040 General Plan policies designed to minimize or avoid impacts related to flood flows, specifically Guiding Policy 9.4-G-1 (Protect Risks to Lives and Property). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The project site is not located within a FEMA-designated Flood Zone. The closest FEMA-designated Flood Zone is Coyote Creek, a 100-year floodplain (FEMA Zone AE) located approximately 0.63 mile southeast of the proposed Districts.28 Thus, future development of the Mixed-Use and Multi-Family Districts would not impede or redirect flood flows within a FEMA-designated Flood Zone. Furthermore, as explained in the Preliminary Stormwater Management Plan, future development of the proposed Mixed-Use and Multi-Family Districts would not result in an exceedance in pre- stormwater runoff during operations. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) The closest FEMA-designated Flood Hazard Area is located along Coyote Creek. It is a 100-year floodplain (FEMA Zone AE) located approximately 0.4 mile southeast of the proposed Neighborhood District across intervening development.29 The proposed Interim Area would include demolition and grading of the area. It would also include hydroseeding of the area in order to increase absorption and prevent additional runoff. As noted in the project-specific Preliminary Stormwater Management Plan, the proposed bioretention system would have capacity to treat 100 percent of anticipated stormwater at the project site. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 28 Federal Emergency Management Agency (FEMA). 2025. National Flood Hazard Layer (Web Viewer). Website: https://www.arcgis.com/apps/webappviewer/index.html?id=8b0adb51996444d4879338b5529aa9cd. Accessed September 3, 2025. 29 Ibid. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 127 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx d) Risk of Pollutant Release Due to Inundation Would the project: In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? Summary of 2040 General Plan EIR The City is not within a tsunami hazard zone; a coastal zone; or a large body of water where there would be a risk of seiche. As previously mentioned, new development would be required to comply with the provisions of the CWA and the CCCWP through implementation of a SWPPP to reduce impacts related to pollutant release. As previously mentioned, implementation of BMPs would be site- specific and would therefore mitigate impacts related to pollutant release to a level that is less than significant regardless of location within a flood hazard zone. Furthermore, new development would be required to comply with 2040 General Plan Policy 9.4-I-8 (Not Increase Runoff to 100-Year Peak Flow) and Policy 9.4-I-9 (Locate Buildings Above 100-Year Floodplain). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site is located 13.4 miles east of the nearest coastline; thus, the proposed project is not located within the coastal zone, nor is at risk for tsunami inundation. The project site is not near a large body of water where there would be the risk of a seiche. Therefore, development of the project site as proposed would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. e) Water Quality Control or Sustainable Groundwater Management Plans Consistency Would the project: Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? Summary of 2040 General Plan EIR As previously mentioned, all new development would be required to comply with all applicable regional and local requirements to conform with water quality objectives under the Basin Plan, including the preparation of a project-specific SWPPP and compliance with all relevant 2040 General Plan Policies mentioned under Impact 4.10(a). The 2040 General Plan Area overlies the Sam Ramon Valley Groundwater Basin, which has been designated by the DWR as Very Low Priority and therefore not required to be managed by a Groundwater Sustainability Plan (GSP). The 2040 General Plan Area also overlies the Livermore Valley Groundwater Basin, which is designated as Medium Priority and is regulated by the Zone 7 Water Agency as the exclusive GSP for compliance with the Sustainable Groundwater Management Act within the 2040 General Plan Area. As previously mentioned, new development would be required to implement project-specific SWPPPs during construction which would minimize or avoid conflict or ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 128 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx obstruction of implementation of a water quality control plan or sustainable groundwater management plan. During operations, no groundwater supply would be sourced for new development serviced by the EBMUD and groundwater used by new development serviced by the DSRSD would be regulated under the GSP for the Basin. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use, Multi-Family District, and Neighborhood Districts plus Grading of Interim Area) Designation of the Mixed-Use and Multi-Family Districts does not include any construction. The project site is within the Livermore Valley Groundwater Basin, which is regulated by a GSP. Demolition and grading activities for the Neighborhood District and Interim Area would be compliant with the NPDES Permit, meaning they would follow the required SWPPP, which includes BMPs to prevent impacts to water quality during project construction. The proposed project does not include direct groundwater consumption during construction or operation. The potential for impacts associated with groundwater and water quality are typical of urban development and are adequately covered by existing regulatory frameworks. Therefore, no additional site-specific or project-specific impacts are anticipated. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Hydrology and Water Quality, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 129 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.11 Land Use and Planning Would the project: a) Physically divide an established community? Less than significant impact No No No No b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Less than significant impact No No No No a) Division of an Established Community Would the project: Physically divide an established community? Summary of 2040 General Plan EIR The 2040 General Plan Area is comprised of 20.09 square miles (approximately 12,861 acres) of land within the San Ramon Planning Area. Vacant/undeveloped lands comprise approximately 1.5 percent of all land within the 2040 General Plan Area. The majority of new development facilitated by the 2040 General Plan Area would involve infill development, and would be conducted in accordance with net new residential and nonresidential development assumptions for all land within the 2040 General Plan Area by 2040. To ensure that existing communities within the 2040 General Plan Area are maintained, and that existing communities would not be divided, all new development would be required to comply with applicable 2040 General Plan policies, including: Policy 4.6-I-10 (Provide a Wide Range of Housing Opportunities); Policy 4.8-I-5 (Encourage Neighborhood Linkage and Integration through Pedestrian and Bicycle Connections); Policy IP 11.5.1-6 (Maintain a Variety of Housing Types for Jobs-to-Housing Ratio); and Policy IP 11.5.2-6 (Preservation of Affordable Housing Units). These policies would be designed to promote orderly development while enhancing the City’s multimodal circulation system, maximizing connections, and minimizing barriers to connectivity. Therefore, the 2040 General Plan FEIR concluded that the 2040 General Plan would not physically divide a community and that impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 130 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) Future development under the designated Mixed-Use and Multi-Family Districts includes the construction of up to 2,084 residential units on an infill site, and would therefore not result in the division of an established community. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Development of the proposed Neighborhood District would involve construction of up to 368 residential units and 58 ADUs at a vacant office building site. Development of the proposed Neighborhood District would involve the construction of a proposed greenway and multiuse path along the Neighborhood District’s outer boundaries, providing direct connections to adjacent office park land uses to the east and indirect connections to commercial land uses to the north and residential land uses to the south. Therefore, development of the proposed Neighborhood District would not divide an established community. Furthermore, a multiuse path along the District’s outer boundaries provides connections to Bollinger Canyon Road and the nearby Iron Horse Trail. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) Conflict with Applicable Land Use Plans, Policies, or Regulations Would the project: Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Summary of 2040 General Plan EIR The 2040 General Plan requires compliance with Association of Bay Area Governments/Metropolitan Transportation Commission (ABAG/MTC) Plan Bay Area 2050 in promoting healthy, safe, and equitable communities through enforcement of 2040 General Plan Policies, including: Policy IP 11.5.1-5 (Compliance with City Inclusionary Housing Ordinance); Policy IP 11.5.2-6 (Preservation of Affordable Housing Units); Policy IP 11.5.1-6 (Maintain a Variety of Housing Types for Jobs-to- Housing Ratio); and Policy IP 11.5.1-7 (Diversity of Unity Size and Bedroom Numbers for Multi-family Housing); Policy IP 11.5.3-4 (Variety of Housing Types for Housing Mobility); and Policy 3.1-I-3 (Diverse Housing Options for Local Employment Base). Therefore, the 2040 General Plan FEIR concluded that the 2040 General Plan would not physically divide a community and that impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 131 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The project site has a land use and zoning designation of DMU-S. The purpose of the DMU-S land use is to encourage a mixed-use neighborhood, extending the activity of City Center across Bollinger Canyon Road with shops, offices, and a diversity of housing opportunities with walkable streets, parks and trails. Designation of the proposed Mixed-Use and Multi-Family Districts would be in conformance with land use and zoning designations of the project site. Future development under the proposed Mixed-Use and Multi-Family Districts would include the construction of up to 2,084 residential units on 37.3 acres, at a density of 55.87. As the DMU-S designation allows for a density of up to 60 du/ac, future development of the 2,084 residential units would be within what is permitted for DMU-S. Specifically, the Mixed-Use District would include up to 125,000 square feet of ground floor retail. Development of these Districts would also include bicycle and pedestrian improvements, including those providing accessibility to the nearby Iron Horse Trail. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi- Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) The proposed Neighborhood District is located in the DMU-S land use designation. Development under the DMU-S land use designation includes a permitted density range of between 20 to 60 du/acre; a minimum FAR of 1.25; a maximum height of 85 feet; and a minimum front setback distance of 10 feet. The proposed Neighborhood District, in combination with the anticipated development Mixed-Use and Multi-Family Districts, would have a sitewide density of 47.2 du/acre. The Neighborhood District would also have a FAR of 0.41 and building heights ranging from 26 to 34 feet tall and a minimum front setback distance of 10 feet. Although the FAR of the Neighborhood District would be less than the standard expressed in the General Plan, the proposed project would be eligible for a FAR waiver under the State Density Bonus Law. As explained in CEQA Guidelines Section 15183(j)(2), “For purposes of this section, ‘consistent’ means that the density of the proposed project is the same or less than the standard expressed for the involved parcel in the general plan, community plan or zoning action for which an EIR has been certified, and that the project complies with the density- related standards contained in that plan or zoning.” Furthermore, in accordance with the objectives of the DMU-S land use designation to encourage a diversity of housing types and multimodal connections, development of the proposed Neighborhood District would result in the construction of 368 residential units comprised of single-family homes, townhomes, and vertical mixed-use units, in addition to 58 ADUs along with bicycle and pedestrian connections to Bollinger Canyon Road and the nearby Iron Horse Trail. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 132 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Land Use and Planning, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 133 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.12 Mineral Resources Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State? No impact No No No No b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No impact No No No No a, b) Loss of Minerals Resources of Statewide or Local Importance Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State? b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? Summary of 2040 General Plan EIR There are no significant mineral deposits or active mining operations within or in the vicinity of the 2040 General Plan Area. In addition, implementation of the proposed plan would not affect a locally important mineral resource recovery site delineated by an applicable land use plan. Therefore, the 2040 General Plan FEIR concluded that there would be no impact. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 134 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The project site does not contain significant mineral resources and would not result in the loss of availability of a locally important mineral resource recovery site. Thus, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Minerals and Mineral Resources, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project would have no impact with respect to mineral resources. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 135 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.13 Noise Would the project: a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less than significant impact with mitigation incorporated No No No No b) Generation of excessive groundborne vibration or groundborne noise levels? Less than significant impact with mitigation incorporated No No No No c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Less than significant impact No No No No Characteristics of Noise and Vibration Noise is defined as unwanted sound. Sound levels are usually measured and expressed in decibels (dB), with 0 dB corresponding roughly to the threshold of hearing. Most of the sounds that we hear in the environment do not consist of a single frequency, but rather a broad band of frequencies, with ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 136 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx each frequency differing in sound level. The intensities of each frequency add together to generate a sound. Noise is typically generated by transportation, specific land uses, and ongoing human activity. The standard unit of measurement of the loudness of sound is the dB. The 0 point on the dB scale is based on the lowest sound level that the healthy, unimpaired human ear can detect. Changes of 3 dB or less are only perceptible in laboratory environments. A change of 3 dB is the lowest change that can be perceptible to the human ear in outdoor environments. While a change of 5 A-weighted decibel (dBA) is considered to be the minimum readily perceptible change to the human ear in outdoor environments. Since the human ear is not equally sensitive to sound at all frequencies, the dBA scale was derived to relate noise to the sensitivity of humans. It gives greater weight to the frequencies of sound to which the human ear is most sensitive. The A-weighted sound level is the basis for a number of various sound level metrics, including the day/night sound level (Ldn) and the Community Noise Equivalent Level (CNEL), both of which represent how humans are more sensitive to sound at night. In addition, the equivalent continuous sound level (Leq) is the average sound energy of time-varying noise over a sample period and the Lmax is the maximum instantaneous noise level occurring over a sample period. Groundborne vibration consists of rapidly fluctuating motion through a solid medium, specifically the ground, which has an average motion of zero and in which the motion’s amplitude can be described in terms of displacement, velocity, or acceleration. The effects of groundborne vibration typically only cause a nuisance to people, but in extreme cases, excessive groundborne vibration has the potential to cause structural damage to buildings. Although groundborne vibration can be felt outdoors, it is typically only an annoyance to people indoors where the associated effects of the shaking of a building can be notable. Groundborne noise is an effect of groundborne vibration and only exists indoors, since it is produced from noise radiated from the motion of the walls and floors of a room, and may also consist of the rattling of windows or dishes on shelves. Several different methods are used to quantify vibration amplitude such as the maximum instantaneous peak in the vibrations velocity, which is known as the peak particle velocity (PPV) or the root mean square (rms) amplitude of the vibration velocity. Existing Noise Environment An ambient noise monitoring effort was conducted to document daytime ambient noise levels on the project site. Short-term noise monitoring was conducted by FCS on October 31, 2025, between 11:16 and 11:56 a.m. Dominant noise sources in the vicinity included freeway traffic from I-680, as well as pedestrian activity and parking lot noise located near the site. The documented daytime average noise levels range from 43.1 dBA to 67.6 dBA Leq on the project site. The noise monitoring data sheets are included in Appendix H. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 137 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx a) Noise Levels in Excess of Adopted Standards Would the project result in: Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Summary of 2040 General Plan EIR The City identified potential significant construction noise impacts that could occur with implementation of the General Plan. To reduce these potential impacts, the City stated that new development would be expected to comply with 2040 General Plan policies for reducing construction noise impacts, including Policy 10.1-I-14 requiring implementation of all best management practice noise attenuation measures for limiting adverse impacts. In addition, the City identified that MM NOI-1 was required to ensure construction noise impacts would be reduced to less than significant. This mitigation measure requires implementation of best management noise reduction measures and use of temporary sound barriers, if needed, to ensure construction noise for development projects within the City would be reduced to below the significance threshold. Thus, impacts would be less than significant with mitigation. The City also identified potential traffic noise increase impacts that could occur with implementation of the General Plan. The analysis identified multiple City policies that would help reduce traffic noise impacts. Although compliance with these policies would reduce roadway noise, the City found that impacts resulting from roadway vehicle noise would remain potentially significant. Therefore, new development would be required to implement MM NOI-2, implementation of operational roadway vehicle noise reduction measures, in order to reduce impacts. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant with mitigation. In addition, the City identified potential stationary noise impacts from sources such as HVAC systems, loading docks, maintenance activities, and other intermittent or continuous noise-generating uses associated with residential, commercial, and public facilities. The analysis noted that the proposed Noise Element includes guiding and implementing policies requiring noise analyses for projects exceeding normally acceptable levels, attenuation measures, and protection of sensitive receptors. Implementation of these policies would ensure that stationary noise impacts are minimized and mitigated to acceptable levels. Therefore, the 2040 General Plan FEIR concluded that stationary operational noise impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) Construction Noise Impacts A significant impact would occur if project construction activities would generate a substantial temporary substantial increase in ambient noise levels as measured at sensitive receptors in excess of established standards. According to the policies of the General Plan, construction activities should ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 138 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx be commissioned to occur during normal work hours of the day to provide relative quiet during the more sensitive evening and early morning periods. In compliance with the methodology of the 2040 General Plan EIR, this analysis uses the noise limits established by the Federal Transit Administration (FTA) to determine the potential construction noise impacts. The FTA identifies construction noise limits in the Transit Noise and Vibration Impact Assessment Manual. During daytime hours, a significant temporary increase would be an increase in excess of the average daily noise level of 80 dBA Leq(8-hr) as measured at a receiving residential land use. Although there are no site-specific development plans, construction activities associated with future development could result in the potential for construction noise to reach a relatively high single event resulting in temporary substantial increase in ambient noise levels in the vicinity of the proposed project in excess of established standards, potentially resulting in an intermittent noise nuisance that could result in annoyance or sleep disturbances at nearby sensitive receptors. Therefore, to ensure compliance with City standards, Mitigation Measure NOI-1 must be implemented. This measure requires the use of BMPs, compliance with restricted construction hours, and installation of temporary sound barriers, as needed, to ensure that construction noise would not exceed the FTA’s construction noise thresholds of 80 dBA Leq(8-hr) as measured at a receiving residential land use. In addition, the City’s General Plan EIR mandates implementation of General Plan Policy 10.1-I-14, which requires all feasible noise attenuation measures to be applied. With implementation of MM NOI-1 and adherence to applicable General Plan policies, construction noise impacts would be reduced to less than significant. Operational/Stationary Source Noise Impacts A significant impact would occur if operational noise levels generated by stationary noise sources at the project site would result in a substantial permanent increase in ambient noise levels in excess of normally acceptable thresholds for receiving land uses. Although specific operational details are not yet available, implementation of future development could introduce new stationary and mobile noise sources, such as HVAC systems, mechanical equipment, and increased vehicle traffic. To ensure compliance with City standards and reduce potential impacts, new development would be required to implement Mitigation Measure NOI-2, which includes operational roadway vehicle noise reduction strategies. Additionally, the City’s General Plan EIR identifies policies designed to minimize operational noise impacts, including requirements for noise analysis, acoustical studies, noise attenuation measures, and disclosure of potential significant noise impacts. These policies are mandatory and would apply to all future development within the Future Mixed-Use and Multi-Family Districts. With implementation of MM NOI-2 and adherence to applicable General Plan policies, operational noise impacts would be reduced to less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 139 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi- Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Construction Noise Impacts A significant impact would occur if project construction activities would generate a substantial temporary substantial increase in ambient noise levels as measured at sensitive receptors in excess of established standards. According to the policies of the General Plan, construction activities should be commissioned to occur during normal work hours of the day to provide relative quiet during the more sensitive evening and early morning periods. In compliance with the methodology of the 2040 General Plan EIR, this analysis uses the noise limits established by the FTA to determine the potential construction noise impacts. As such, during daytime hours, a significant temporary increase would be an increase in excess of the average daily noise level of 80 dBA Leq(8-hr) as measured at a receiving residential land use. Construction is completed in discrete steps, each of which has its own mix of equipment and, consequently, its own noise characteristics. These various sequential phases would change the character of the noise generated on the site and, therefore, the noise levels surrounding the site as construction progresses. Despite the variety in the type and size of construction equipment, similarities in the dominant noise sources and patterns of operation allow construction-related noise ranges to be categorized by work phase. Typical operating cycles for these types of construction equipment may involve 1 or 2 minutes of full power operation followed by 3 or 4 minutes at lower power settings. Impact equipment such as pile drivers are not proposed for construction of this project. The site preparation phase, which includes excavation and grading of the site, tends to generate the highest noise levels because the noisiest construction equipment is earthmoving equipment. Earthmoving equipment expected to be used includes excavators, bulldozers, backhoes, front loaders, and graders. The closest noise-sensitive receptor to the project site is a single-family residence located south of the project site. This closest noise-sensitive receptor would be located approximately 50 feet from the closest footprint of construction activity where heavy construction equipment would potentially operate at the project site. To calculate the reasonable worst-case hourly and 8-hour average construction noise levels, the modeling assumed the loudest piece of equipment operating at the point of the closest footprint with the next four loudest pieces of equipment operating at the nearest safe distance from that closest piece of equipment. Based on these assumptions, reasonable worst- case maximum hourly average construction noise levels would attenuate to below 82 dBA Leq at the closest residential receptor. The reasonable worst-case calculated 8-hour noise level would be 75 dBA Leq(8-hr), as measured at this nearest sensitive receptor. The calculation spreadsheet with the detailed modeling assumptions is included in Appendix H. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 140 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx The calculated worst-case construction noise levels do not exceed the FTA’s 80 dBA Leq(8-hr) threshold as measured at the nearest residential receptors. Therefore, temporary or periodic noise impacts from construction activities associated with implementation of the proposed project would be less than significant. This analysis demonstrates that the proposed project complies with the requirements of the 2040 General Plan Policy 10.1-I-14 requiring measures for limiting adverse construction noise impacts and meets the requirements of General Plan EIR MM NOI-1 since project construction noise would not exceed the significance threshold of 80 dBA Leq (8-hr) during the daytime at residential uses and other sensitive receptors in all cases. Thus, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. Operational Stationary Source Noise Impacts A significant impact would occur if operational noise levels generated by stationary noise sources at the project site would result in a substantial permanent increase in ambient noise levels in excess of normally acceptable thresholds for receiving land uses. The General Plan Noise Element established the following thresholds for stationary noise sources. • The ambient noise level is less than 60 dB Ldn and the project increases noise levels by 5 dB or more. • The ambient noise level is 60-65 dB Ldn and the project increases noise levels by 3 dB or more. • The ambient noise level is greater than 65 dB Ldn and the project increases noise levels by 1.5 dB or more. The primary stationary noise source associated with implementation of the proposed project would be new mechanical ventilation system operations. Mechanical Equipment Operations Typical residential-grade mechanical ventilation equipment systems range up to approximately 70 dBA Leq at a distance of 3 feet. Proposed mechanical ventilation systems would be located adjacent to each proposed residential unit. The nearest sensitive receptor to potential mechanical ventilation system locations is a single-family residence located south of the project site. The façade of this receptor could be located approximately 120 feet from the nearest proposed mechanical ventilation system. At this distance, noise generated by proposed mechanical ventilation equipment would attenuate to 24 dBA Leq. The calculation spreadsheet is included in Appendix H. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 141 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx These projected noise levels are well below the documented existing ambient noise levels, which range from 43.1 dBA Leq to 67.6 dBA Leq. The noise monitoring data is included in Appendix H. Therefore, noise levels from proposed mechanical ventilation equipment operations would not result in a substantial permanent increase in ambient noise levels in the project vicinity and the impact of noise produced by project-related mechanical ventilation equipment operations to off-site sensitive receptors would be less than significant. Thus, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. Operational Mobile Source Noise Impacts Mobile Source Noise Impacts A significant impact would occur if implementation of the proposed project would result in a substantial increase in traffic noise levels compared with traffic noise levels existing without the proposed project. The General Plan Noise Element established the following thresholds for mobile noise sources: • The ambient noise level is less than 60 dB Ldn and the project increases noise levels by 5 dB or more. • The ambient noise level is 60-65 dB Ldn and the project increases noise levels by 3 dB or more. • The ambient noise level is greater than 65 dB Ldn and the project increases noise levels by 1.5 dB or more. Based on the traffic analysis prepared for this project, the proposed project would generate approximately 2,442 net new average daily trips. Based on the traffic analysis prepared for this project, Bolinger Canyon Road, where 100 percent of the project trips would occur as they access the project site, currently experiences 3,998 AM peak-hour trips and 4,228 PM peak-hour trips, which conservatively represents a minimum of 42,200 average daily trips under existing conditions. Therefore, project trips would clearly not double existing traffic volumes on roadway segments accessing the project site. Therefore, the project Average Daily Traffic (ADT) of 2,442 would not result in even a 1 dBA increase in traffic noise levels along this, or any other, roadway segment in the project vicinity. Therefore, project-related traffic would result in a less than significant permanent increase in traffic noise levels. Thus, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 142 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx b) Groundborne Vibration Would the project result in: Generation of excessive groundborne vibration or groundborne noise levels? Summary of 2040 General Plan EIR The City identified that new development generated from buildout of the 2040 General Plan Area would result in intermittent groundborne vibration during construction. The analysis identified that all new development would be required to comply with 2040 General Plan Policy 10.1-I-18 (Mitigate Below Federal Transit Administration-Recommend Criteria) and would be required to implement MM NOI-3, requiring preparation of a noise and vibration analysis and implementation of construction vibration controls and setbacks, to reduce impacts. Therefore, construction-related groundborne vibration impacts would be less than significant with mitigation. The analysis also identified that no operational groundborne vibration impacts would occur from the development that could occur under the General Plan; thus, operational groundborne vibration impacts were determined to be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) Construction Vibration Impacts A significant impact would occur if the proposed project would generate groundborne vibration or groundborne noise levels in excess of established standards. As required by Policy 10.1-I-18 of the City’s 2040 General Plan, all new development must mitigate vibration levels below FTA recommended criteria. Therefore, the FTA vibration impact thresholds are applied in this analysis. These guidelines are published in its Transit Noise and Vibration Impact Assessment Manual.30 Although there are no site-specific development plans proposed at this time for this portion of the project site, construction activities associated with future development in the proposed Future Mixed- Use and Multi-Family Districts could potentially result in construction vibration levels that could exceed the FTA’s damage threshold criteria for receiving structures. As a result, mitigation would be required to reduce this potential impact. Therefore, consistent with the 2040 General Plan FEIR, future development would be required to implement General Plan EIR MM NOI-3, which mandates preparation of a noise and vibration analysis and implementation of construction vibration controls and setbacks. These measures would ensure that vibration impacts generated by future development projects would be reduced to a less than significant impact at residential uses and other sensitive receptors in all cases. Thus, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi- Family Districts. The proposed Mixed-Use and Multi-Family District Designations would not result in a 30 Federal Transit Administration (FTA). 2018. Transit Noise and Vibration Impact Assessment Manual. September. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 143 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. Operational Vibration Impacts Implementation of the proposed project would not include any permanent sources that would expose persons in the project vicinity to groundborne vibration levels that could be perceptible without instruments at any receiving property line. Therefore, project operational groundborne vibration level impacts would be less than significant. Thus, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi- Family Districts. The proposed Mixed-Use and Multi-Family District Designations would not result in a new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Construction Vibration Impacts A significant impact would occur if the proposed project would generate groundborne vibration or groundborne noise levels in excess of established standards. As required by Policy 10.1-I-18 of the City’s 2040 General Plan, all new development must mitigate vibration levels below FTA recommended criteria. Therefore, the FTA vibration impact thresholds are applied in this analysis. These guidelines are published in its Transit Noise and Vibration Impact Assessment Manual. Of the variety of equipment that would be used during construction, a large vibratory roller would produce the greatest groundborne vibration levels nearest the project boundaries. A large vibratory roller can produce groundborne vibration levels ranging up to 0.210 inch per second (in/sec) PPV at 25 feet from the operating equipment. Impact equipment such as pile drivers is not expected to be used during construction of this project. The closest structure to the project site would be a pool located approximately 130 feet south from the nearest construction footprint where a large vibratory roller would potentially operate. At this distance, groundborne vibration levels would range up to 0.017 in/sec PPV from operation of a large vibratory roller. This is well below the FTA’s Construction Vibration Impact Criteria of 0.5 in/sec PPV for this type of structure, which is a structure constructed of reinforced concrete. In addition, the closest that other heavy equipment such as a large bulldozer would operate would be 50 feet from the pool, and at this distance vibration levels would attenuate to approximately 0.031 in/sec PPV, which is still below the FTA’s threshold of 0.5 in/sec PPV for this type of structure. Accordingly, construction activities would not adversely impact this structure. The nearest off-site residential structure would be a located approximately 160 feet south from the nearest construction footprint where a large vibratory roller would potentially operate. At this distance, groundborne vibration levels would range up to 0.012 in/sec PPV from operation of a large vibratory roller. This is well below the FTA’s Construction Vibration Impact Criteria of 0.5 in/sec PPV for this type of structure, which is a building of nonengineered timber and masonry construction. Other heavy ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 144 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx equipment such as a large bulldozer could operate as close as 50 feet from the residential structure, and at this distance vibration levels would be approximately 0.031 in/sec PPV, which is still below the applicable threshold of 0.20 in/sec PPV for this type of structure. As a result, construction of the proposed project would not expose nearby buildings to groundborne vibration levels in excess of their applicable FTA damage criteria and this impact would be less than significant. This analysis demonstrates that the proposed project complies with the requirements of the 2040 General Plan Policy 10.1-I-18, which calls for mitigating construction vibration impacts below the FTA recommended criteria. The analysis also demonstrates that the project meets the criteria of General Plan EIR MM NOI-3. Therefore, MM NOI-3 does not apply to this project-level portion, and project construction vibration would not exceed the significance threshold at residential uses and other sensitive receptors in all cases. Thus, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Operational Vibration Impacts The City does not have adopted operational vibration impact criteria; therefore, consistent with the General Plan EIR, operational vibration impacts are evaluated qualitatively. Implementation of the proposed project would not include any permanent sources that would expose persons in the project vicinity to groundborne vibration levels that could be perceptible without instruments at any receiving property line. In addition, there are no existing significant permanent sources of groundborne vibration in the project vicinity to which the proposed project would be exposed. Therefore, project operational groundborne vibration level impacts would be less than significant. Thus, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Airport or Private Airstrip Noise Would the project result in: For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Summary of 2040 General Plan EIR As noted in the 2040 General Plan FEIR, impacts related to airport or private airstrip noise would be limited to operational impacts. The nearest airport to San Ramon is the Livermore Municipal Airport, ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 145 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx which is located approximately 4.7 miles southeast of the City boundary. The 2040 General Plan Area does not fall within the 60 dBA CNEL noise contours of the Livermore Municipal Airport. The Livermore Municipal Airport does not offer commercial airline service and therefore would not be impacted by buildout of the 2040 General Plan Area. As such, there would be no exposure of residents or workers to excessive noise. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The entire project site is not located within 2 miles of a public airport or private airstrip or within an airport land use plan. The nearest airport facility is the Livermore Municipal Airport, approximately 8.1 miles southeast of the project site. While aircraft noise is occasionally audible at the project site, due to the distance from the airport and the orientation of runways and flight patterns, the project site does not lie within 60 dBA CNEL noise contours of Livermore Municipal Airport. Therefore, implementation of the proposed project would not expose persons residing or working in the project vicinity to noise levels from airport activity that would exceed normally acceptable standards for the proposed land use development, and no impact would occur. Thus, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. 2040 General Plan FEIR Mitigation Measures MM NOI-1 Include and Implement Construction Noise Reduction Measures To minimize noise during construction, construction contractors shall implement the following measures for construction activities conducted within San Ramon. Construction plans submitted to the City shall include construction noise analysis and identify these measures on demolition, grading, and construction plans submitted to the City. The City of San Ramon Building Division and/or Public Works Department shall verify that grading, demolition, and/or construction plans submitted to the City include these notations prior to issuance of demolition, grading and/or building permits. • Mufflers. During excavation and grading construction phases, all construction equipment, fixed or mobile, shall be operated with closed engine doors and shall be equipped with properly operating and maintained mufflers consistent with manufacturers’ standards. • Stationary Equipment. All stationary construction equipment shall be placed so that emitted noise is directed away from the nearest sensitive receivers. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 146 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx • Equipment Staging Areas. Equipment staging shall be located in areas that will create the greatest distance feasible between construction-related noise sources and noise-sensitive receivers. • Smart Backup Alarms. Mobile construction equipment shall have smart backup alarms that automatically adjust the sound level of the alarm in response to ambient noise levels. Alternatively, backup alarms shall be disabled and replaced with human spotters to ensure safety when mobile construction equipment is moving in the reverse direction in compliance with applicable safety laws and regulations. • Electrically-Powered Tools and Facilities. Electrical power shall be used to run air compressors and similar power tools and to power any temporary structures, such as construction trailers or caretaker facilities, where feasible. • Noise Disturbance Coordinator. The project applicant shall designate a “noise disturbance coordinator” responsible for responding to any local complaints about construction noise. The disturbance coordinator shall determine the cause of any noise complaint and shall require that reasonable measures be implemented to correct the problem. A telephone number for the disturbance coordinator and the City shall be posted at the construction site. • Temporary Noise Barriers. Erect temporary noise barriers, where feasible, when construction noise is predicted to exceed the acceptable standards (e.g., 80 dBA Leq at residential receivers, schools or other sensitive receptors during the daytime) and when the anticipated construction duration is greater than is typical (e.g., two years or greater). Temporary noise barriers shall be constructed with solid materials (e.g., wood) with a density of at least 1.5 pounds per square foot with no gaps from the ground to the top of the barrier. If a sound blanket is used, barriers shall be constructed with solid material with a density of at least 1 pound per square foot with no gaps from the ground to the top of the barrier and be lined on the construction side with acoustical blanket, curtain or equivalent absorptive material rated Sound Transmission Class (STC) 32 or higher. MM NOI-3 Prepare a Noise and Vibration Analysis and Implement Construction Vibration Control Measures and Screening Distances Prior to issuance of a building permit for a project requiring pile driving during construction (a) within 135 feet of fragile structures (historical resources, 100 feet of nonengineered timber and masonry buildings [e.g., most residential buildings], or within 75 feet of engineered concrete and masonry (no plaster); (b) a vibratory roller within 40 feet of fragile historical resources or 25 feet of any other structure; and/or d) a dozer or other large earthmoving equipment within 20 feet for a fragile historical structure and/or (c) 15 feet of any other structure, the project applicant shall prepare a groundborne noise and vibration analysis to assess and mitigate potential noise and vibration impacts related to these construction activities. This noise and vibration ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 147 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx analysis shall be conducted by a qualified and experienced acoustical consultant or engineer. The vibration levels shall not exceed FTA architectural damage thresholds (e.g., 0.12 in/sec PPV for fragile or historical resources, 0.2 in/sec PPV for nonengineered timber and masonry buildings, and 0.3 in/sec PPV for engineered concrete and masonry). If vibration levels would exceed this threshold, alternative uses such as drilling piles as opposed to pile driving, static rollers as opposed to vibratory rollers, and lower horsepower earthmoving equipment shall be used. If necessary, construction vibration monitoring shall be conducted to ensure FTA vibration thresholds are not exceeded. Conclusion With regard to Noise, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 148 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.14 Population and Housing Would the project: a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? Less than significant impact No No No No b) Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere? Less than significant impact No No No No a) Growth Inducement Would the project: Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? Summary of 2040 General Plan EIR The ABAG projections for the 2040 General Plan Area suggest that the City’s population would grow by approximately 0.4 percent (approximately 345 new residents); the number of dwelling units are expected to increase by 5 percent (approximately 1,460 new dwelling units) and the number of jobs would increase by 32.9 percent (approximately 17,775 new jobs) between 2022 and 2040. New development facilitated by the 2040 General Plan is expected to result in approximately 30,874 new residents and 11,812 net new residential units, resulting in more than a 35 percent increase in total population projections over that assumed by ABAG. However, growth anticipated by ABAG is based on existing land use assumptions, and growth anticipated by the 2040 General Plan would meet regional housing needs over the long-term through the facilitation of affordable housing and ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 149 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx increasing the jobs-to-household ratio. These aims would be met through implementation of relevant 2040 General Plan policies, including Policy IP 11.5.4-1 (Diverse Housing Options for Infill Development), in addition to the 2040 General Plan’s prioritization of infill development during Plan buildout. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) While no development is currently proposed in the Mixed-Use and Multi-Family Districts, it is anticipated that the Mixed-Use and Multi-Family District would generate 2,084 residential units. The Neighborhood District proposes 368 units, including 58 ADUs, resulting in a total unit count of 426 residential units. The Department of Finance (DOF) estimates that the average household size in the City is 2.86.31 As such, the 2,048 residential units anticipated for the Mixed-Use and Multi-Family Districts is expected to generate approximately 5,960 persons.32 The Neighborhood District is expected to generate approximately 1,218 persons.33 In total, the proposed project would construct a maximum of 2,510 units and is estimated to result in 7,179 residents. The DMU-S land use designation allows for a density of 20 to 60 du/acre, meaning a maximum of 5,490 residential units is permitted at the project site.34 As such the proposed project would be within the envelope of residents anticipated in the General Plan. As such, the anticipated population increase from future development under the Mixed-Use and Multi-Family Districts would be considered planned growth consistent with the City’s projections. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) Displacement of Persons or Housing Would the project: Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere? Summary of 2040 General Plan EIR The 2040 General Plan proposes approximately 11,812 new housing units by 2040 across a variety of housing types to accommodate new development. The 2040 General Plan also does not propose the demolition of existing residences. Therefore, the 2040 General Plan would not result in substantial 31 Department of Finance (DOF). E-5 Population and Housing Estimates for Cities, Counties, and the State, 2020-2025. Website: https://dof.ca.gov/forecasting/demographics/estimates/e-5-population-and-housing-estimates-for-cities- counties-and-the-state-2020-2025/. Accessed September 22, 2025. 32 (2.86 persons/household) * (2,084 households) = 5,960 persons. 33 (2.86 persons/household)*(426 households) = 1,218 persons. 34 (60 du/acre) * (91.5 acres) = 5,490 du. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 150 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx numbers of displacement necessitating the construction of replacement housing elsewhere. Thus, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The proposed project would result in the demolition of a vacant office park and parking area. It would not displace any people or housing and would not necessitate any replacement housing. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Population and Housing, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 151 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.15 Public Services Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: a) Fire protection? Less than significant impact No No No No b) Police protection? Less than significant impact No No No No c) Schools? Less than significant impact No No No No d) Parks? Less than significant impact No No No No e) Other public facilities? Less than significant impact No No No No a) Fire Protection Would the project: Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 152 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Summary of 2040 General Plan EIR The SRVFPD provides fire protection services within the 2040 General Plan Area and operates nine fire stations with 14 fire companies and approximately 45 full-time staff members. SRVFPD response times for first unit response are approximately seven minutes and 33 seconds in urban areas; and eight minutes in suburban areas. Medical responses are approximately 10 minutes in urban and suburban areas. Buildout of the 2040 General Plan would result in a net increase of approximately 11,812 residential units and the addition of 30,874 net new residents. To accommodate the anticipated demand for new facilities, the SRVFPD would review all development plans to ensure consistency with all federal, State, and local regulations, including the requirements of the 2022 CFC for building construction standards, road widths and configurations to allow for fire truck and engine circulation, requirements for sprinkler systems, and minimum flow rates for water mains. New development would be required to comply with applicable 2040 General Plan Policies, including Policy 3.3-I-4 (Review of Impacts Public Services); Policy 7-6-I-2 (Coordination with SRVFPD); and Policy 7.6-I-2 (Input from SRVFPD during the Review Process). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Program-level Analysis (Mixed-Use and Multi-Family Districts) The designation of the Mixed-Use and Multi-Family Districts does not include any proposed construction. However, as explained under Impact 4.15(a), future development of the Mixed-Use and Multi-Family Districts could eventually result in a population growth of up to 5,960 persons.35 However, the maximum density that would be permitted under the Mixed-Use and Multi-Family Districts is consistent with the General Plan. As such, while the increase in population could eventually result in an increase in demand for fire protection, this increased demand would not be beyond what is already anticipated by the General Plan. Future development of these Districts would be subject to review by the SRVFPD for consistency with the 2022 CFC building construction standards and inclusion of fire protection measures. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) As explained under Impact 4.15(a), development of the Neighborhood District would result in a population increase of up to 1,218 new residents; however, this population growth is anticipated in the General Plan, which also accounts for the corresponding increase in demand for fire protection services. Furthermore, the SRVFPD has reviewed the proposed project and provided standard conditions of approval.36 Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District 35 (2.86 persons/household) * (2,084 households) = 5,960 persons. 36 Letter from the San Ramon Valley Fire Protection District (SRVFPD), Community Risk Reduction Division. July 15, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 153 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) Police Protection Would the project: Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Police protection? Summary of 2040 General Plan EIR Law enforcement services within San Ramon city limits are provided by the San Ramon Police Department (SRPD), which consists of 70 sworn officers, 19 civilian staff, and 40 volunteers. Law enforcement services in the General Plan Area outside of San Ramon city limits are provided by the Contra Costa County Office of the Sheriff, which consists of approximately 723 sworn officers and 377 professional employees and operates six stations and administrative offices. As previously mentioned, the 2040 General Plan would result in a net increase of approximately 11,812 residential units and the addition of 30,874 net new residents. Buildout from the 2040 General Plan would be concentrated as infill development and would therefore likely occur on previously disturbed or developed areas; therefore, adverse impacts resulting from the construction of new police facilities would be considered less than significant. Furthermore, deployment of applicable 2040 General Plan policies, including Policy 78.7-I-1 (Participation in the Crime Prevention Through Environmental Design program [CPTED]); Policy 7.7-I-2 (Monitoring of New Development in Unincorporated Areas); and Policy 7.7.-I-3 (Funding Mechanism to Support Police Services), would ensure that new development would not exceed the service capacity of the SRVFPD and that adequate staffing levels would be provided through year 2040. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The designation of the Mixed-Use and Multi-Family Districts does not include any proposed construction. However, as explained under Impact 4.15(a), future development of the Mixed-Use and Multi-Family Districts could eventually result in a population growth of up to 5,960 persons. This is within the maximum density that would be permitted under the Mixed-Use and Multi-Family Districts and is consistent with the General Plan. As such, while the increase in population could eventually result in an increase in demand for police protection services, this increased demand would not exceed what is already anticipated by the General Plan. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 154 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Project-level Analysis (Neighborhood District plus Grading of Interim Area) As previously mentioned under Impact 4.15(a), development of the Neighborhood District would result in an increase of up to 1,218 persons37 which would result in an increase in demand on police protection services. As such, while the increase in population could eventually result in an increase in demand for police protection services, this increased demand would not be beyond what is already anticipated by the General Plan. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Schools Would the project: Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Schools? Summary of 2040 General Plan EIR The SRVUSD serves the 2040 General Plan Area and contains 14 elementary schools; five middle schools; and three high schools. The 2040 General Plan would result in a net increase of approximately 11,812residential units and the addition of 30,874 net new residents, including approximately 6,835 students to the SRVUSD by 2040 based on the proportion of the projected number of detached single-family housing within 2040 General Plan buildout.38 As previously mentioned, the 2040 General Plan would prioritize infill development so construction impacts related to the construction of new school facilities would be less than significant. To ensure that operational impacts of the school would not exceed SRVUSD capacity due to increased enrollment, the City would implement 2040 General Plan Policies involving collaboration with the SRVUSD on meeting enrollment needs, including Policy 7.2-I-1 (Development of Public “School Parks”) and Policy 7.2-I-4 (Student Generation Rates). Additionally, new development facilitated by the 2040 General Plan would be required to pay SRVUSD school impact fees pursuant to Section 65995(3)(h) of the California Government Code. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. 37 (2.86 persons/household)*(426 households) = 1,218 persons. 38 City of San Ramon. 2021. General Plan Final Environmental Impact Report (FEIR). Page 3.11-22. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 155 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The designation of the Mixed-Use and Multi-Family Districts does not include any proposed construction. However, as explained under Impact 4.15(a), future development of the Mixed-Use and Multi-Family Districts could eventually result in a population growth of up to 5,960 persons. The maximum density that would be permitted under the Mixed-Use and Multi-Family Districts is consistent with the General Plan. As such, while this increase in population would result in increased demand on schools, this increased demand would not exceed what is already anticipated by the General Plan. Future development of the Mixed-Use and Multi-Family Districts would still be required to pay school impact fees. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District plus Grading of Interim Area) Development of the Neighborhood District would result in the development of 368 single-family detached dwelling units, which would result in an increase in school enrollment. Based on the City’s student generation rates, this would result in 96 K-5 students, 67 Grade 6-8 students, and 118 Grade 9-12 students, for a total of 281 new students within the SRVUSD.39,40,41 Because the residential density of the Neighborhood District and the proposed project as a whole is within what was anticipated for the site by the 2040 General Plan, this increase in students was already accounted for by the 2040 General Plan FEIR. The payment of school impact fees would be required. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 39 0.25 K-5 students/single-family detached unit * 368 single-family detached units = 96 K-5 students 40 0.18 Grade 6-8 students/single-family detached unit * 368 single-family detached units = 67 Grade 6-8 students 41 0.32 Grade 9-12 students/ single-family detached unit * 368 single-family detached units = 118 Grade 9-12 students ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 156 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx d, e) Parks and Other Public Services? Would the project: Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Parks? Other public services? Summary of 2040 General Plan EIR Parkland within the 2040 General Plan Area totals approximately 395 acres and is managed by the San Ramon Parks and Community Services Department (SRPCSD). This includes approximately 140 acres of neighborhood parks, 78 acres of school parks, 108 acres of community parks, 78 acres of specialized recreation areas, and 22 acres of public spaces. The Iron Horse Trail, a regional multiuse trail, runs north–south through the City along the I-680. To maintain the City’s parkland ratio of 6.5 acres per 1,000 residents, implementation of applicable 2040 General Plan policies would ensure the availability of parkland and recreational facilities to meet City needs, including Policy 4.6-I-14 (Clustered Development for Four or More Units); Policy 4.8-I-6 (Maximize Public Access to the Iron Horse Trail); Policy 4.8-I-19 (Well-Designed Parks and Recreational Amenities); Policy 5.7-I-4 (Connection Points and Adjacent Amenities Along the Iron Horse Trail); Policy 6.5-I-5 (Dedications for Land, Improvements, and/or In Lieu Fees); Policy 6.5-I-8 (Completion of Parkland Dedication Requirements Prior to Final Occupancy); Policy 6.5-I-9 (Development of Landscaped and Dedicated Public Spaces); and Policy 6.5-I-18 (Provision of Public Spaces for Active or Passive Use). Therefore, the 2040 General Plan FEIR concluded that impacts to parks would be less than significant. The Contra Costa County Library System operates two Library Locations in the General Plan Area: the San Ramon Library is located at 100 Montgomery Street, and the Dougherty Station Library is located at 17017 Bollinger Canyon Road. To enhance library services in response to increased community need throughout buildout of the 2040 General Plan, the City would implement Policy 7.1-I- 1 (Confer with Contra Costa County Library) and similar policies to maintain services. Therefore, the 2040 General Plan FEIR concluded that impacts to other public facilities would be less than significant. Program-level Analysis (Mixed-Use and Multi-Family Districts) No construction is proposed as part of the designation of the Mixed-Use and Multi-Family Districts. Future development under the proposed Mixed-Use and Multi-Family Districts could result in up to 5,960 new residents. This addition of residents would require up to an additional 38.7 acres of parkland to maintain the City’s ratio of 6.5 acres per 1,000 residents.42 42 6.5 acres * (5,960) residents/1000 residents) = 38.7 acres ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 157 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx It is anticipated that future development of the Mixed-Use and Multi-Family Districts would partially offset this requirement by constructing approximately 246,578 square feet, or 5.66 acres of parkland space, including a 2.5-acre park as well as the construction of a greenway and multiuse path along the project’s perimeter.43 The project applicant would also be required to pay parkland impact fees equivalent to the park acreage that would not be included as part of the proposed Mixed-Use and Multi-Family Districts. The closest library to the proposed Mixed-Use and Multi-Family Districts, the San Ramon Library, is located approximately 0.31 mile east of the project site. Development of the proposed Mixed-Use and Multi-Family Districts would result in an increase of up to 5,960 residents, which may result in an increase in demand for library services. However, per the 2040 General Plan FEIR, implementation of the 2040 General Plan would ensure the enhancement of City facilities, including library facilities, to meet public needs. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi- Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) Development of the Neighborhood District would result in up to 1,218 new residents. As such, the proposed project would require up to 7.91 acres of parkland to maintain the City’s ratio of 6.5 acres per 1,000 residents.44 The Neighborhood District proposes three publicly accessible parks and open space amenities and two pocket parks totaling up to 397,184 square feet, or 9.12 acres of parkland, exceeding the required parkland acreage to meet the City’s ratio. Development of this District would also include connections, through sidewalk installation and a proposed greenway and multiuse trail located along the perimeter of the site, to the Iron Horse Trail, located approximately 0.23 mile northeast of the District. No specific development is currently proposed for the Interim Area. Furthermore, the project applicant would be required to pay a park impact fee for the required park acreage not covered by the proposed facilities in the Neighborhood District. The closest library to the proposed Neighborhood District, the San Ramon Library, is located approximately 0.23 mile northeast of the project site. Although the Neighborhood District would result in up to 1,218 new residents, which may increase demand for library services, this is considered planned growth under the General Plan. Implementation of the 2040 General Plan would ensure the enhancement of City facilities, including library facilities, to meet public needs. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 43 (246,578 sq ft) x (1 acre/43,4560 sq ft) = 5.66 acres 44 6.5 acres * (1,218 residents/1000 residents) = 7.91 acres ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 158 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Public Services, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 159 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.16 Recreation Would the project: a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? Less than significant impact No No No No b) Does the project include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment? Less than significant impact No No No No a, b) Existing Neighborhood and Regional Parks and Recreational Facilities Would the project: a) increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated; or Does the project: b) include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment? Summary of 2040 General Plan EIR Parkland within the 2040 General Plan Area totals approximately 395 acres and is managed by the SRPCSD. This includes approximately 140 acres of neighborhood parks, 78 acres of school parks, 108 acres of community parks, 78 acres of specialized recreation areas, and 22 acres of public spaces. The Iron Horse Trail, a regional multiuse trail, runs north–south through the City along the I- 680. To maintain the City’s parkland ratio of 6.5 acres per 1,000 residents, the SRPCSD would need ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 160 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx to incrementally increase their parks and recreational services through year 2040. To minimize or avoid impacts that would result in substantial physical deterioration of existing parks during 2040 General Plan buildout or environmental impacts to existing recreational facilities, the City would require new development to conform with applicable 2040 General Plan policies. These include Policy 4.8-I-19 (Well-Designed Parks and Recreational Amenities); Policy 5.7-I-4 (Connection Points and Adjacent Amenities Along the Iron Horse Trail); Policy 6.5-I-5 (Dedications for Land, Improvements, and/or In Lieu Fees); Policy 6.5-I-9 (Development of Landscaped and Dedicated Public Spaces in New Development); and Policy 6.5-I-18 (Provision of Public Spaces for Active or Passive Use for Parkland Dedication Credit). Therefore, the 2040 General Plan FEIR concluded that impacts to parks would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) As explained under Impact 4.16(d), development of the proposed Mixed-Use and Multi-Family Districts could result in up to 5,960 new residents, which would therefore require the provision of an additional 38.7 acres of parkland to meet public need. It is anticipated that future development of these Districts would partially offset this requirement through the provision of 5.66 acres of open space, including a 2.5-acre park. Development of these Districts would also include the construction of a proposed greenway and multiuse path along the District perimeters, which alongside off-site improvements on Bollinger Canyon Road, would enhance accessibility to the Iron Horse Trail. The project applicant would also be required to pay parkland impact fees equivalent to the park acreage that would not be included as part of the proposed project. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed- Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-level Analysis (Neighborhood District Development plus Grading of Interim Area) As mentioned previously under Impact 4.16(d), development of the Neighborhood District would result in up to 1,218 new residents. As such, the proposed project would require the provision of up to 7.91 acres of parkland to maintain the City’s ratio of 6.5 acres per 1,000 residents. However, as previously explained under Impact 4.16(d), the proposed Neighborhood District would exceed these requirements through the provision of 9.64 acres of parkland, encompassing three publicly accessible parks and open space amenities and two pocket parks. Development of this District would also include connections, through sidewalk installation and a proposed greenway and multiuse trail located along the perimeter of the site, to the Iron Horse Trail, located approximately 0.23 mile northeast of the District. The project applicant would also be required to pay parkland impact fees equivalent to the park acreage that would not be included as part of the proposed project. Therefore, there are no environmental effects that are peculiar to the proposed Neighborhood District plus Grading of Interim Area. The proposed Neighborhood District plus Grading of Interim Area would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 161 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2040 General Plan FEIR Mitigation Measures None. Conclusion With regard to Recreation, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 162 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.17 Transportation Would the project: a) Conflict with a program plan, ordinance or policy of the circulation system, including transit, roadway, bicycle and pedestrian facilities? Less than significant impact with mitigation incorporated No No No No b) Would the project conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b)? Significant and unavoidable impact No No No No c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Less than significant impact No No No No d) Result in inadequate emergency access? Less than significant impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 163 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx a) Conflict with a Circulation System Policy Would the project: Conflict with a program plan, ordinance or policy of the circulation system, including transit, roadway, bicycle and pedestrian facilities? Summary of 2040 General Plan EIR The 2040 General Plan Area contains a regional highway, the I-680; arterials; collectors; and local streets, as shown in Figure 3.12-1 of the 2040 General Plan FEIR. The 2040 General Plan Area also contains bicycle and pedestrian facilities, including the Iron Horse Trail, a multiuse trail running north– south through the City just east of the I-680. Additionally, multiple Bay Area Rapid Transit (BART) lines provide local and regional connections. The General Plan FEIR identifies potential construction impacts associated with encroachment into lane, bicycle path, or sidewalk closures that would impact bicycle, pedestrian, or roadway/transit connections. The 2040 General Plan FEIR requires implementation of MM TRA-1, where all new development must prepare a Construction Traffic Management Plan for projects that require off-site staging, lane closures, or substantial hauling of cut and fill on a local street. Furthermore, new development would be expected to comply with various 2040 General Plan policies to reduce these impacts, including: Policy 5.2-I-5 (TDM and Trip Reduction Strategies); Policy 5.6-I-7 (Mix of Uses and Complete Streets Concepts to Reduce VMT); Policy 5.7-I-4 (Connection Points to Iron Horse Trail); and Policy 5.7-I-5 (Bicycle Parking, Storage, and Support Facilities). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant with mitigation. Program-level Analysis (Mixed-Use and Multi-Family Districts) The proposed Mixed-Use and Multi-Family Districts would include their own circulation network with sidewalks throughout, in compliance with Policy 5.2-I-5. Furthermore, the project site is walking distance from two bus stops. The Bishop Ranch 1 bus stop is located less than 0.25 mile from the project site and is on the County Connection 92X, 96X, and 97X bus lines, which arrive to the Dublin/Pleasanton BART station. The Bollinger Canyon Road and Bishop Ranch 1 bus stop is also located less than 0.25 mile from the project site and is on the County Connection 35 and 335 bus lines. The 35 and 335 also arrive at the Dublin/Pleasanton BART station via a different route. Future development under the Mixed-Use and Multi-Family Districts would provide adequate bicycle facilities and parking in compliance with Policy 5.7-I-5. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi- Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Project-Level Analysis (Neighborhood District Development plus Grading of Interim Area) The proposed Neighborhood District would include its own circulation network with sidewalks throughout, in compliance with Policy 5.2-I-5. The proposed multiuse greenway trail would allow for additional bicycle and pedestrian circulation and connect the project site to the Iron Horse Trail and City’s Walking District in compliance with Policy 5.7-I-4. As the Neighborhood District would consist of primarily single-family homes with garages, bicycle parking would be adequate in compliance with Policy 5.7-I-5. As described above, the project site is walking distance from multiple County ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 164 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Connection lines that lead to Dublin/Pleasanton BART. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. b) Inconsistent with CEQA Guidelines Section 15064.3 Would the project: Would the project conflict or be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b) Summary of 2040 General Plan EIR According to the Governor’s Office of Land Use and Climate Innovation (LCI) guidance on the application of SB 743, a Vehicle Miles Traveled (VMT) impact is significant if VMT per capita or employee remains above 15 percent below the existing baseline. At the time the General Plan EIR was prepared, the City’s Home-Based VMT per Resident was 20.4 and the Home-Work VMT per Employee was 15.0. To achieve a 15 percent reduction, the 2040 General Plan would have needed to reduce Home-Based VMT per Resident to 17.3 and the Home-Work VMT per Employee to 12.8. The General Plan EIR determined that Home-Based VMT per Resident would be reduced to 18.6 and the Home-Work VMT per Employee would be reduced to 14.9 under the 2040 General Plan. As such, it was determined that the 2040 General Plan would have a potentially significant impact related to VMT. The 2040 General Plan FEIR included MM TRA-2, which requires development projects to either modify project characteristics to reduce VMT or implement a Transportation Demand Management (TDM) program. Examples of TDM Measures include T-7 (Commute Trip Reduction Marketing), T-9 (Subsidized or Discounted Transit Program), T-10 (End-of-Trip Bicycle Facilities), and T-18 (Pedestrian Network Improvements). MM TRA-2 also provides the option for the City to participate in a Contra Costa Transportation Authority (CCTA)-approved VMT impact fee program and/or VMT mitigation exchange/banking program, once it is completed by the CCTA. Although these measures would likely reduce project-level VMT impacts, impacts of project-level mitigation on 2040 General Plan Area VMT remain uncertain pending buildout through 2040. Therefore, the 2040 General Plan FEIR concluded that impacts would be significant and unavoidable. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use, Multi-Family, and Neighborhood Districts plus Grading of Interim Area) A VMT analysis was prepared by Fehr & Peers for the proposed project on November 10, 2025 (Appendix I).45 The analysis evaluated whether the proposed project would generate Home-Based VMT per resident and Home-Work VMT per service population higher than 85 percent of the Home- Based VMT per resident in the City or higher than 85 percent of the existing countywide average VMT per service population. 45 Fehr & Peers. 2025. Bishop Ranch Orchards VMT Analysis. November 10. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 165 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx The City’s average Home-Based VMT per resident is 18.7, meaning a significant impact would occur if the proposed project would generate VMT per resident greater than 15.9.46 The proposed project is expected to generate 16.7 Home-Based VMT per resident, meaning impacts would be potentially significant. The County’s Home-Work VMT per service population is 16.8, meaning a significant impact would occur if the proposed project would generate VMT per service population greater than 14.3. The proposed project is expected to generate 3.7 Home-Work VMT per service population, which would not create a significant impact. Because Home-Based VMT per resident would create a potentially significant impact, the proposed project is required to implement General Plan MM TRA-2 via TDM strategies, including integration of affordable and below market rate housing and community-based travel planning. The proposed project would be required to mitigate just over 5 percent of its Home-Based VMT to result in a less than significant impact. It is expected that these measures would reduce the proposed project’s Home-Based VMT by 6.1 percent, meaning impacts would be less than significant with mitigation incorporated. Because the 2040 General Plan EIR concluded that VMT impacts would be significant and unavoidable, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Roadway Safety Hazards Would the project: Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? Summary of 2040 General Plan EIR Construction during buildout of the 2040 General Plan Area would utilize vacant areas for staging and designated travel routes for the transport of materials to reduce impacts. New development that would add traffic to streets not designed to current standards would be required to provide mitigation to minimize or eliminate traffic hazards or to fund related improvements where needed, including the installation of shoulder widening, signalized intersections, or the addition of sidewalks or cross walks. Additionally, new development would be required to comply with federal, State, and local design standards as well as applicable 2040 General Plan Policies: Policy 5.1-I-3 (Traffic Impact Studies for 50 or More New Net Peak-Hour Trips and VMT Assessment) and Policy 5.1-I-4 (Identify Mitigation Measures). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. 46 18.7 * 0.85=15.9 ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 166 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use, Multi-Family, and Neighborhood Districts plus Grading of Interim Area) The proposed project would include its own circulation network in compliance with Policy 5.1-I-4. The proposed circulation network would be evaluated by the Public Works department to ensure compliance with all City policies. Therefore, there are no environmental effects that are peculiar to the proposed Mixed-Use and Multi-Family Districts. The proposed Mixed-Use and Multi-Family District designations would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. d) Emergency Access Would the project: Result in inadequate emergency access? Summary of 2040 General Plan EIR Construction during buildout of the 2040 General Plan would utilize multiple access routes and provide detour signs. Development facilitated by the 2040 General Plan would be required to provide adequate fire access to structure frontages, multiple access points to development, as well as adequate width, height, and turning radius of roadways and access points, pursuant to CBC requirements. This would include compliance with requirements of the CFC, including the provision of at least two separated and approved fire apparatus access roads that have a minimum width of 20 feet with turning radii of 25 feet inside and 45 feet outside. Additionally, new development would be required to comply with applicable 2040 General Plan policies, including Policy 5.1-I-3 (Traffic Impact Studies for 50 or More New Net Peak-Hour Trips and VMT Assessment) and Policy 5.1-I-4 (Identify Mitigation Measures) to ensure adequate emergency access. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use, Multi-Family, and Neighborhood Districts plus Grading of Interim Area) The proposed project’s internal street network would be designed to accommodate the turning radius of emergency vehicles, such as large fire trucks, and the proposed project would undergo review by the SRVFPD to ensure adequate emergency access. The SRVFPD reviewed the proposed project to ensure adequate emergency access and provided standard conditions of approval.47 Lastly, while it is not anticipated, it is possible that construction of the proposed project could result in lane closures. As such, implementation of 2040 General Plan EIR MM TRA-1 is required. With implementation of MM TRA-1, impacts would be less than significant. Therefore, there are no environmental effects that are peculiar to the site or the proposed project. The 47 Letter from the San Ramon Valley Fire Protection District, Community Risk Reduction Division. July 15, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 167 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. 2040 General Plan FEIR Mitigation Measures MM TRA-1 Prepare and Implement Construction Traffic Management Plans Prior to issuance of building permits, the contractor for an individual development project that requires off-site staging, lane closures, or substantial hauling of cut and fill on a local street (i.e., not under Caltrans’ jurisdiction) shall prepare a Construction Traffic Management Plan that includes measures such as, but not limited to, the following as deemed necessary by the City. The approved Construction Traffic Management Plan shall be implemented during construction. • Provide a temporary traffic signal, if necessary • Project Staging Plan to maximize on-site storage of materials and equipment • A set of comprehensive traffic control measures, including scheduling of major truck trips and deliveries to avoid peak-hours; lane closure proceedings; signs, cones, and other warning devices for drivers; and designation of construction access routes • Permitted construction hours • Location of construction staging • Identification of parking areas for construction employees, site visitors, and inspectors, including on-site locations • Provisions for street sweeping to remove construction-related debris on public streets MM TRA-2 Prepare and Implement VMT Reduction Measures The CCTA’s VMT Analysis for Land Use Projects in Contra Costa, which is found in Appendix A in CCTA’s Final Technical Procedures (November 2022) describes options for mitigation of VMT impacts. The first two options below apply to development projects and plans, and the third applies at a General Plan area-wide scale. 1. A project applicant shall modify a project’s characteristics to reduce VMT generated by such project prior to issuance of an occupancy permit. This might involve changing the density or mixture of land uses on a project site, or changing a project’s location to one that is more accessible by transit or other travel modes. 2. A project applicant shall implement Transportation Demand Management (TDM) or physical design measures to reduce VMT generated by a project prior to issuance of an occupancy permit. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 168 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 3. The City shall participate in a CCTA-approved VMT impact fee program and/or VMT mitigation exchange/banking program, once it is completed and published by CCTA. (Note that CCTA is developing such a program for Contra Costa County.) When option 2 (TDM plan) is applied for future land use development projects facilitated by the 2040 General Plan that do not meet CCTA screening criteria and thresholds, the City shall require preparation and implementation of a project-level TDM plan with the [TDM measures outlined under Table 3.12-4 in the General Plan FEIR.] Feasible options listed under General Plan FEIR Table 3.12-4 to reduce VMT below CCTA thresholds shall be implemented for individual projects facilitated by the 2040 General Plan. VMT reduction measures shall be included at project design review and be reviewed and approved by the City prior to issuance of construction permits. Table 7 lists the measures applicable to the proposed project. Table 7: Transportation Demand Management Measures CAPCOA Handbook Measure Description T-4: Integrate Affordable and Below Market Rate Housing This measure requires Below Market Rate (BMR) housing. BMR housing provides greater opportunity for lower income families to live closer to job centers and achieve a jobs/housing match near transit. It is also an important strategy to address the limited availability of affordable housing that might force residents to live far away from jobs or school, requiring longer commutes. T-23: Community-Based Travel Planning This measure will target residences in the plan/community with Community-Based Travel Plan (CBTP). CBTP is a residential-based approach to outreach that provides households with customized information, incentives, and support to encourage the use of transportation alternatives in place of single occupancy vehicles, thereby reducing household Vehicle Miles Traveled (VMT) and associated greenhouse gas (GHG) emissions. Notes: CAPCOA = California Air Pollution Control Officers Association Source: Fehr & Peers. 2025. Bishop Ranch Orchards VMT Analysis. September 3. Conclusion With regard to Transportation, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 169 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. MM TRA-2 would be required for impacts to be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 170 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.18 Utilities and Service Systems Would the project: a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Less than significant impact with mitigation incorporated No No No No b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years? Less than significant impact No No No No c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the Less than significant impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 171 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? provider’s existing commitments? d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less than significant impact No No No No e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste? Less than significant impact No No No No Setting Water supply providers within the 2040 General Plan Area include EBMUD and DSRSD. Wastewater collected in the northern portion of the City, in the Dougherty Valley area, is collected and diverted to the l Central San wastewater treatment plant. Wastewater collected in the southern portion of the City is collected and diverted to the DSRSD wastewater treatment plant. Stormwater is collected by a system of storm drains, inlets, curbside gutters, catch basins, drainage ditches, and man-made channels managed by the Contral Costa County Public Works. Electricity would be provided by MCE via existing PG&E power lines unless individual residents have chosen to opt in to PG&E. Telecommunications service is provided by Xfinity and AT&T. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 172 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx a) Water, Wastewater, and Stormwater Facilities Would the project: Require or result in the relocation or construction of new or expanded water, wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Summary of 2040 General Plan EIR All new development would be required to comply with all applicable federal, State, and local regulations governing the provision of utility infrastructure and utilities, which would reduce the potential for adverse construction impacts associated with construction of new or expanded utility and infrastructure and facilities associated with implementation of the 2040 General Plan. To mitigate impacts during operations, the 2040 General Plan FEIR included MM UTL-1 (Measures to Provide Adequate Water Supply) and MM UTL-2 (Measures to Provide Adequate Wastewater Infrastructure and Treatment), both which contain service requirements for new development. New development would also be required to include site-specific BMPs for LID treatment and would be required to comply with applicable 2040 General Plan policies, including Policy 9.4-I-4 (Maintenance of Drainage Facilities) and Policy 9.4-I-8 (Not Increase Runoff to 100-Year Peak Flow). New development would also be required to comply with 2040 General Plan Policy 7.4-I-8 (Technological Support for Telecommunications Services) to reduce impacts to telecommunications services. Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant with mitigation. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The proposed project represents typical development anticipated in the General Plan. Development of the proposed project would involve the routine construction of new utility lines throughout the project site, consistent with standard infrastructure improvements commonly associated with similar projects. The proposed wastewater system would connect to an existing sanitary sewer line at the southern border of the project site. The proposed potable water system would connect to an existing water line in Bollinger Canyon Road. The proposed storm drain and bioretention system would connect to existing stormwater lines at the southeast corner of the project site and at two locations on the eastern border of the project site, as well as in Bollinger Canyon Road. Given the Districts’ location within an urbanized area of the City, development of the Districts would not involve the construction or expansion of new telecommunications infrastructure. Impacts resulting from the construction of these on-site utility features and off-site connections are included in the evaluation of the proposed project throughout this document. Therefore, development of the project site as proposed would not result in any environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 173 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx b) Water Supply Would the project: Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years? Summary of 2040 General Plan EIR The 2040 General Plan EIR concluded that, according to the Urban Water Management Plan (UWMPs) for both EBMUD and DSRSD, there would be sufficient water supplies for normal and dry years, but the EBMUD UWMP determined that there may be supply shortfalls after three consecutive dry years at buildout of the 2040 General Plan. All new development within EBMUD’s jurisdiction would be subject to the same drought restrictions as for all EBMUD customers stipulated within its Water Shortage Contingency Plan and Drought Management Plan, which the agency concluded would be sufficient to address projected supply deficits during multiple dry years. By imposing water restrictions in the first dry year of potential drought periods, EBMUD attempts to minimize water use restrictions in subsequent years if a drought persists. Additionally, all new development would be required to comply with applicable 2040 General Plan policies, including Policy 8.6-I-1 (Outdoor Water Conservation and Demand Management); Policy 8.6- I-3 (Accommodations for Nonpotable Water Service); and Policy 8.6-I-4 (Compliance with the State Model Water Efficient Landscape Ordinance [MWELO]). Furthermore, the General Plan EIR recognizes that under SB 610 requirements, when an EIR, negative declaration or Mitigated Negative Declaration is required for new development of a certain size, a water supply assessment may be required.48 Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) As explained in Section 4.11, Land Use and Planning, and Section 4.14, Population and Housing, future development under the proposed project would have a maximum density that is consistent with the DMU-S land use designation and is considered planned growth. Development of the proposed Neighborhood District would involve construction of up to 368 residential units and 58 ADUs. The City will comply with SB 610 and the requirements of the California Water Code for any additional future development beyond the proposed Neighborhood District. Additional future development is anticipated and is reviewed with regard to water supply at a programmatic level. Because the amount 48 Section 10910 of the California Water Code does not specify exemptions as requiring Water Supply Assessments (WSAs). Additionally, SB 610 does not apply to program-level environmental analyses, such as those conducted for general plans, specific plans, or other broad planning documents. These program-level reviews typically evaluate policies or land use designations over a large geographic area and do not authorize specific development projects. Because SB 610 is intended to assess water supply adequacy for discrete, project-level proposals, its requirements are triggered only when a qualifying project is proposed for approval. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 174 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx of residential and commercial development permitted by the proposed project is consistent with what was anticipated in the 2040 General Plan, it is assumed that the water demand resulting from the proposed project has already been anticipated by the 2040 General Plan, and that there would be sufficient water supply for the proposed project. The proposed project would be required to comply with all indoor water conservation and demand management measures, consistent with building code standards and CAP policies as well as to comply with the State MWELO. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. c) Wastewater Treatment Capacity Would the project: Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments? Summary of 2040 General Plan EIR The 2040 General Plan FEIR determined that the majority of wastewater collected within the 2040 General Plan Area is serviced by Central San. According to the 2040 General Plan FEIR, Central San would have sufficient treatment capacity to accommodate wastewater generated at buildout of the 2040 General Plan. Furthermore, Central San is expected to enact its 10-year Capital Improvement Program (CIP) to expand, upgrade, and replace its collection system to maintain or improve service. Therefore, the 2040 General Plan concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) As explained in Section 4.11, Land Use and Planning, and Section 4.14, Population and Housing, future development under the proposed project would have a maximum density that is consistent with the DMU-S land use designation and is considered planned growth. Because the amount of residential and commercial development permitted by the proposed project is consistent with what was anticipated in the 2040 General Plan, it is assumed that the wastewater generation resulting from the proposed project was already anticipated in the 2040 General Plan, and there would be sufficient wastewater capacity to serve the proposed project. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 175 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx d, e) Solid Waste Reduction Goals Consistency and Solid Waste Regulations Consistency Would the project: Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Would the project: Comply with federal, State, and local management and reduction statutes and regulations related to solid waste? Summary of 2040 General Plan EIR Solid waste is collected by Alameda County Industries within the 2040 General Plan Area. All new development within the 2040 General Plan Area would be subject to federal, State, and local regulations and would be required to pay solid waste service fees. The 2040 General Plan EIR determined that the 2040 General Plan would yield an annual solid waste generation of approximately 53,923 pounds per day, which would account for approximately 1 percent of the throughput of the Vasco Road Landfill. In addition to the Vasco Road Landfill, solid waste could also be transferred to the Altamont Landfill, which has a maximum throughput of roughly 11,150 tons per day and an anticipated closure date of December 1, 2070. Altamont Landfill has a remaining capacity of approximately 65,400,000 cubic yards and could also divert a portion of the solid waste from the General Plan Area. During construction, all new development would be subject to 2040 General Plan Policy 7.5-I-9 (Compliance with Municipal Code’s Construction and Demolition Debris Diversion Requirements) to ensure that construction-generated solid waste would not be in excess of State or local standards or impair solid waste reduction goals. During operations, the 2040 General Plan FEIR found that local solid waste infrastructure would provide sufficient capacity for new development. Additionally, new development would be subject to applicable policies of the 2040 General Plan, including Policy 7.5-I-4 (Convenient Recyclable Material Storage Locations); Policy 7.5-I-5 (Compliance with State Requirements for Proper Handling and Storage of Solid Waste); and Policy 7.5-I-7 (Options for Safe Disposal of Hazardous Waste and Materials). Therefore, the 2040 General Plan FEIR concluded that impacts would be less than significant. Orchards Project Analysis and Conclusion Program-level Analysis (Mixed-Use and Multi-Family Districts) The proposed project would be subject to Policy 7.5-I-9 (Compliance with Municipal Code’s Construction and Demolition Debris Diversion Requirements) ensuring that construction-generated solid waste would not be in excess of State or local standards or impair solid waste reduction goals. As explained in Section 4.11, Land Use and Planning, and Section 4.14, Population and Housing, future development under the proposed project would have a maximum density that is consistent with the DMU-S land use designation and is considered planned growth. Because the amount of residential and commercial development permitted by the proposed project is consistent with what was anticipated in the 2040 General Plan, it is assumed that the waste generation resulting from the ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 176 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx proposed project was already anticipated in the 2040 General Plan, and there would be sufficient landfill capacity to serve the proposed project. Additionally, the proposed project would be required to comply with all federal, State, and local management and reduction statutes and regulations related to solid waste. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Conclusion With regard to Utilities and Service Systems, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FIER. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 177 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.19 Wildfire If located in or near State Responsibility Areas or lands classified as Very High Fire Hazard Severity Zones, would the project: a) Substantially impair an adopted emergency response plan or emergency evacuation plan? Less than significant impact with mitigation incorporated No No No No b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire? Less than significant impact with mitigation incorporated No No No No c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? Less than significant impact with mitigation incorporated No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 178 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post- fire slope instability, or drainage changes? Less than significant impact with mitigation incorporated No No No No a) Emergency Response/Evacuation Plan Consistency Would the project: If located in or near State Responsibility Areas or lands classified as Very High Fire Hazard Severity Zones, substantially impair an adopted emergency response plan or emergency evacuation plan? b) Expose Project Occupants to Pollutant Concentrations from Wildfire Would the project: If located in or near State Responsibility Areas or lands classified as Very High Fire Hazard Severity Zones, due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire? c) Infrastructure that Exacerbates Fire Risk Would the project: If located in or near State Responsibility Areas or lands classified as Very High Fire Hazard Severity Zones, require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 179 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx d) Flooding and Landslide Hazards Due To Post-fire Slope Instability/Drainage Changes Would the project: If located in or near State Responsibility Areas or lands classified as Very High Fire Hazard Severity Zones, expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? Summary of 2040 General Plan EIR Although the City is not located within a VHFHSZ or a State Responsibility Area (SRA), the northwestern portion of the 2040 General Plan Area is located in a VHFHSZ in an SRA. There is also a High FHSZ within an SRA located within the southwestern and eastern portions within the City and in areas east of city limits. New development would be expected to conform with existing local and State regulations, including California Code of Regulations Title 14, which sets forth the minimum standards for emergency access, fuel modification, setback, signage, and water supply. Compliance with these guidelines would reduce the potential for any wildfire risk associated with new development or the installation or maintenance of project infrastructure that may exacerbate fire risk. New development would also be reviewed for compliance with CFC design standards for residential development. These include the use of non-combustible or ignition-resistant building materials and fire flow requirements for buildings, fire hydrant location, and distribution criteria (which are also specified in 2040 General Plan Policy 9.5-I-1 (Site Design Features), Policy 9.5-I-4 (Sprinklers in New Homes), and Policy 9.5-I-5 (Sprinklers in Mixed-Use Development)). All new development would be required to comply with 2040 General Plan Policy 9.5-I-2 (Fire Protection Plan) to evaluate appropriate mitigation measures and all development within or adjacent to High FHSZs would be required to implement MM HAZ-1. Implementation of MM HAZ-1 would require review of project landscape plans, including slope design, as well as geotechnical if the project site is within a known landslide area, and would minimize or avoid impacts related to wildfire spread, pollutant exposure, and post-fire instability. Therefore, the 2040 General Plan concluded that impacts would be less than significant with mitigation incorporated. Orchards Project Analysis and Conclusions Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The latest CAL FIRE FHSZ maps show that the project site is not located within a designated FHSZ and is not within or adjacent to a designated High FHSZ.49 The project site is typical of sites evaluated for development in the 2040 General Plan. 49 California Department of Forestry and Fire Protection (CAL FIRE). 2025. Fire Hazard Severity Zone Viewer (Map Viewer). Website: https://fire-hazard-severity-zones-rollout-calfire-forestry.hub.arcgis.com/pages/access-map. Accessed August 13, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 180 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx As explained in Section 4.9, Hazards and Hazardous Materials and Section 4.17, Transportation, the proposed project would provide adequate access for emergency vehicles. The project site provides direct connections to all of the City’s potential evacuation routes and the proposed project would comply with the Contra Costa County Emergency Operation Plan and the Contra Costa County LHMP during and would not obstruct either Plan during operations. Additionally, the SRVFPD has reviewed the proposed project to ensure adequate fire truck and apparatus turning radii and clearance for purposes of adequate emergency access and response and provided standard conditions of approval.50The project site is surrounded by intervening development, meaning there is not very much fuel for wildfire in the immediate vicinity of the project site. Furthermore, as described in Section 4.7 Geology and Soils, the project site is not at risk of landslides, meaning wildfires would not exacerbate any landslide or downslope flooding risks. As described in Section 4.10, Hydrology and Water Quality, the proposed project would not substantially alter the existing drainage pattern of the site or area. Finally, the proposed project would comply with applicable 2040 General Plan policies, including Policy 9.5-I-1 (Site Design Features) to ensure the use of fire retardant building materials and other measures to reduce the risk of fire on-site and Policy 9.5-I-4 (Sprinklers in New Homes) through the installation of sprinklers in all new residential units. The proposed project would also be subject to the requirements of the CFC and the CBC as well as minimum standards set forth by California Code of Regulations Title 14 regarding emergency access, fuel modification, setback, signage, and water supply, avoiding the use of infrastructure that would exacerbate fire risk. Therefore, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact that was not previously identified in the 2040 General Plan FEIR. Conclusion With regard to Wildfire, the Consistency Checklist demonstrates that: 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FIER. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. 50 Letter from the San Ramon Valley Fire Protection District, Community Risk Reduction Division. July 15, 2025. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 181 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? 4.20 Mandatory Findings of Significance a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory? Less than significant impact with mitigation incorporated No No No No b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection Significant and unavoidable impact No No No No ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 182 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Environmental Issues Prior FEIR Determination CEQA Section 15183(b) Criteria Effect Peculiar to Project or Site? New Significant Effect? New Significant Off-site, Cumulative Impact? New Information, More Severe Adverse Impact? with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? c) Does the project have environmental effects, which will cause substantial adverse effects on human beings, either directly or indirectly? Significant and unavoidable impact No No No No a) Potential Degradation to Environment and Examples of California History or Prehistory Does the project: Have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory? Summary of 2040 General Plan EIR The 2040 General Plan EIR found that the 2040 General Plan would not eliminate or threaten wildlife habitats or eliminate important examples of California history or prehistory with incorporation of mitigation with incorporation of mitigation. Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The proposed project would not eliminate or threaten wildlife habitats or eliminate important examples of California history or prehistory with incorporation of General Plan MM BIO-1, MM BIO-2, CR-2, CR- 3, and CR-4. Thus, there are no environmental effects that are peculiar to the proposed project. The ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST FCS 183 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx proposed project would not result in a new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. b) Cumulatively Considerable Impacts Does the project: Have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? Summary of 2040 General Plan EIR The 2040 General Plan EIR found that, while the 2040 General Plan includes policies that encourage the reduction of VMT, GHG emissions, solid waste generation, as well as energy, fuel, and water usage, there would still be significant and unavoidable impacts related to VMT and cumulative VMT impacts. Impacts were determined to be significant and unavoidable. Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The proposed project would have a less than significant VMT impact with incorporation of General Plan MM TRA-2. Thus, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. c) Adverse Effects on Human Beings? Does the project: Have environmental effects, which will cause substantial adverse effects on human beings, either directly or indirectly? Summary of 2040 General Plan EIR The 2040 General Plan EIR found that, while the 2040 General Plan would result in a significant and unavoidable impact related to transportation that could, in turn, affect human beings. It was determined that impacts would be significant and unavoidable. Program-level and Project-level Analysis (Mixed-Use District, Multi-Family District, and Neighborhood District Development plus Grading of Interim Area) The proposed project would have a less than significant VMT impact with incorporation of General Plan MM TRA-2. Thus, there are no environmental effects that are peculiar to the proposed project. The proposed project would not result in a new or more severe adverse impact than what was previously identified in the 2040 General Plan EIR. 2040 General Plan FEIR Mitigation Measures General Plan MM BIO-1, MM BIO-2, CR-2, CR-3, CR-4, and TRA-2. ORCHARDS PROJECT CEQA GUIDELINES SECTION 15183 CONSISTENCY CHECKLIST 184 FCS Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx Conclusion 1. No peculiar impacts related to the proposed project or its site have been identified. 2. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the 2040 General Plan FEIR. 3. No substantial new information has been identified which results in an impact which is more severe than anticipated by the 2040 General Plan FEIR. 4. No mitigation measures would be required because the proposed project’s specific impacts would be less than significant. Orchards Project CEQA Guidelines Section 15183 Consistency Checklist FCS 185 Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2491/24910040/Consistency Checklist/24910040 Orchards Project Consistency Checklist CY Screencheck Draft.docx 5 - LIST OF PREPARERS FirstCarbon Solutions 2999 Oak Road, Suite 250 Walnut Creek, CA 94597 Phone: 925.357.2562 Project Director ........................................................................................................................ Mary Bean Project Manager ................................................................................................................. Maddie Dolan Legal Counsel ................................................................................................................. Megan Starr, JD Director of Cultural Resources ....................................................................... Dana DePietro, PhD, RPA Senior Archaeologist ......................................................................................... Stefanie Griffin, MA, RPA Archaeologist and Field Supervisor ................................................................................... Natalie Adame Director of Noise and Air Quality ............................................................................. Phil Ault, LEED® AP Senior Air Quality Scientist ................................................................................................. Jackie Winkel Senior Biologist ................................................................................................................... Robert Carroll Biologist ................................................................................................................................. Kelly Evans Environmental Services Analyst .......................................................................................... Heather Carr Senior Managing Editor ........................................................................................................ Susie Harris Publications Manager ............................................................................................................. Alec Harris Technical Editor ...................................................................................................................... Sarah Vine Technical Document Manager ....................................................................................... Melissa Ramirez GIS/Graphics .............................................................................................................. Karlee McCracken THIS PAGE INTENTIONALLY LEFT BLANK