Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appendix B - Air Quality, GHG, and Energy Supporting Information COMBINED
Orchards Project CEQA Guidelines Section 15183 Consistency Checklist FCS Appendix B: Air Quality, Greenhouse Gas Emissions, and Energy Supporting Information THIS PAGE INTENTIONALLY LEFT BLANK Appendix B Orchards Project - Neighborhood District - Vertical Construction Custom Report 1 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report 29 Bay Area Air District Screening Evaluation for Project Operations 49 Orchards AERMOD DPM and PM2.5 Sources and Emissions 50 Livermore Airport WindRose 54 AERMOD Receptors and DPM Concentrations 55 AERMOD Receptors and PM2.5 Concentrations 56 AERMOD Report HARP MEIR 104 HARP MEIW Bay Area Air District Stationary Source Screening Map 108 Bay Area AIr District Mobile Source Screening Risk 110 CAP Consistency Checklist Orchards Project 111 104104 57 106 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 1 / 28 Orchards Project - Neighborhood District - Vertical Construction Custom Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.1. Construction Emissions Compared Against Thresholds 2.2. Construction Emissions by Year, Unmitigated 3. Construction Emissions Details 3.1. Building Construction (2027) - Unmitigated 3.3. Building Construction (2028) - Unmitigated 3.5. Building Construction (2029) - Unmitigated 3.7. Building Construction (2030) - Unmitigated 3.9. Building Construction (2031) - Unmitigated 3.11. Paving (2030) - Unmitigated Appendix B - Orchards Project 2 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 2 / 28 3.13. Architectural Coating (2030) - Unmitigated 3.15. Architectural Coating (2031) - Unmitigated 4. Operations Emissions Details 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 5. Activity Data 5.1. Construction Schedule 5.2. Off-Road Equipment 5.2.1. Unmitigated 5.3. Construction Vehicles 5.3.1. Unmitigated 5.4. Vehicles 5.4.1. Construction Vehicle Control Strategies 5.5. Architectural Coatings 5.6. Dust Mitigation 5.6.1. Construction Earthmoving Activities Appendix B - Orchards Project 3 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 3 / 28 5.6.2. Construction Earthmoving Control Strategies 5.7. Construction Paving 5.8. Construction Electricity Consumption and Emissions Factors 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.2. Sequestration 5.18.2.1. Unmitigated 8. User Changes to Default Data 8.1. Justifications Appendix B - Orchards Project 4 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 4 / 28 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Orchards Project - Neighborhood District - Vertical Construction Construction Start Date 4/8/2027 Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)3.0 Precipitation (days)17 Location 6001 Bollinger Canyon Rd, San Ramon, CA 94583, USA County Contra Costa City San Ramon Air District Bay Area AQMD Air Basin San Francisco Bay Area TAZ 1371 EDFZ 1 Electric Utility MCE Gas Utility Pacific Gas & Electric App Version 2022.1.1.33 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description Single Family Housing 230 Dwelling Unit 54 811,781 0.00 —665 SF Homes (42 Court, 130 Detached Appendix B - Orchards Project 5 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 5 / 28 Condo/Townhouse 138 Dwelling Unit 0.00 358,392 0.00 —399 Acreage Included in Primary Landuse for SF Homes Apartments Low Rise 58 Dwelling Unit 0.00 0.00 0.00 —168 Acreage and Bldg SF Included in Primary Landuse for SF Homes 1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected 2. Emissions Summary 2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Unmit. 48 46 46 49 0.20 0.77 8.3 9.1 0.73 2.2 2.9 — 27,267 27,267 1.9 3.4 38 28,352 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Unmit. 48 46 47 48 0.20 0.77 8.3 9.1 0.73 2.2 2.9 — 27,096 27,096 1.9 3.4 0.99 28,165 Average Daily (Max) — — — — — — — — — — — — — — — — — — Unmit. 32 32 15 21 0.06 0.30 3.0 3.3 0.28 0.75 1.0 — 8,428 8,428 0.50 0.79 5.0 8,680 Annual (Max) — — — — — — — — — — — — — — — — — — Unmit. 5.9 5.8 2.8 3.8 0.01 0.05 0.54 0.60 0.05 0.14 0.19 — 1,395 1,395 0.08 0.13 0.83 1,437 2.2. Construction Emissions by Year, Unmitigated Appendix B - Orchards Project 6 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 6 / 28 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - Summer (Max) — — — — — — — — — — — — — — — — — — 2027 2.1 1.8 11 22 0.03 0.35 2.2 2.5 0.33 0.52 0.85 — 5,479 5,479 0.20 0.27 9.0 5,573 2028 2.0 1.7 11 21 0.03 0.32 2.2 2.5 0.29 0.52 0.82 — 5,416 5,416 0.19 0.20 8.1 5,489 2029 2.0 1.6 10 21 0.03 0.29 2.2 2.5 0.26 0.52 0.78 — 5,351 5,351 0.19 0.20 7.2 5,423 2030 48 46 46 49 0.20 0.77 8.3 9.1 0.73 2.2 2.9 — 27,267 27,267 1.9 3.4 38 28,352 2031 44 44 11 22 0.03 0.26 2.5 2.8 0.24 0.61 0.85 — 5,712 5,712 0.18 0.19 6.4 5,779 Daily - Winter (Max) — — — — — — — — — — — — — — — — — — 2027 2.1 1.7 12 21 0.03 0.35 2.2 2.5 0.33 0.52 0.85 — 5,319 5,319 0.21 0.27 0.23 5,406 2028 2.0 1.7 11 20 0.03 0.32 2.2 2.5 0.29 0.52 0.82 — 5,259 5,259 0.20 0.27 0.21 5,343 2029 1.9 1.6 10 20 0.03 0.29 2.2 2.5 0.26 0.52 0.78 — 5,196 5,196 0.19 0.27 0.19 5,280 2030 48 46 47 48 0.20 0.77 8.3 9.1 0.73 2.2 2.9 — 27,096 27,096 1.9 3.4 0.99 28,165 2031 44 44 11 21 0.03 0.26 2.5 2.8 0.24 0.61 0.85 — 5,532 5,532 0.19 0.26 0.17 5,614 Average Daily — — — — — — — — — — — — — — — — — — 2027 1.1 0.90 6.1 11 0.02 0.19 1.1 1.3 0.17 0.27 0.45 — 2,830 2,830 0.11 0.14 2.1 2,878 2028 1.4 1.2 7.8 14 0.02 0.23 1.5 1.8 0.21 0.37 0.58 — 3,780 3,780 0.14 0.19 2.5 3,841 2029 1.4 1.1 7.4 14 0.02 0.21 1.5 1.7 0.19 0.37 0.56 — 3,724 3,724 0.14 0.19 2.2 3,785 2030 32 32 15 21 0.06 0.30 3.0 3.3 0.28 0.75 1.0 — 8,428 8,428 0.50 0.79 5.0 8,680 2031 16 16 3.8 7.6 0.01 0.09 0.91 1.0 0.09 0.22 0.31 — 2,010 2,010 0.07 0.07 1.0 2,033 Annual — — — — — — — — — — — — — — — — — — 2027 0.20 0.16 1.1 2.0 < 0.005 0.03 0.21 0.24 0.03 0.05 0.08 — 469 469 0.02 0.02 0.34 476 2028 0.26 0.22 1.4 2.6 < 0.005 0.04 0.28 0.32 0.04 0.07 0.11 — 626 626 0.02 0.03 0.41 636 2029 0.25 0.21 1.4 2.5 < 0.005 0.04 0.28 0.32 0.03 0.07 0.10 — 617 617 0.02 0.03 0.37 627 2030 5.9 5.8 2.8 3.8 0.01 0.05 0.54 0.60 0.05 0.14 0.19 — 1,395 1,395 0.08 0.13 0.83 1,437 Appendix B - Orchards Project 7 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 7 / 28 2031 2.9 2.9 0.70 1.4 < 0.005 0.02 0.17 0.18 0.02 0.04 0.06 — 333 333 0.01 0.01 0.17 337 3. Construction Emissions Details 3.1. Building Construction (2027) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 1.2 1.0 9.4 13 0.02 0.34 — 0.34 0.31 — 0.31 — 2,397 2,397 0.10 0.02 — 2,405 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 1.2 1.0 9.4 13 0.02 0.34 — 0.34 0.31 — 0.31 — 2,397 2,397 0.10 0.02 — 2,405 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.65 0.55 5.0 6.9 0.01 0.18 — 0.18 0.16 — 0.16 — 1,271 1,271 0.05 0.01 — 1,276 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 8 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 8 / 28 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.12 0.10 0.91 1.3 < 0.005 0.03 — 0.03 0.03 — 0.03 — 210 210 0.01 < 0.005 — 211 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.76 0.68 0.47 8.2 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,899 1,899 0.03 0.07 6.5 1,928 Vendor 0.11 0.04 1.5 0.72 0.01 0.02 0.32 0.34 0.02 0.09 0.11 — 1,183 1,183 0.07 0.18 2.6 1,240 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.72 0.64 0.57 7.0 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,738 1,738 0.04 0.08 0.17 1,762 Vendor 0.10 0.03 1.6 0.74 0.01 0.02 0.32 0.34 0.02 0.09 0.11 — 1,184 1,184 0.07 0.18 0.07 1,238 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.38 0.34 0.29 3.6 0.00 0.00 0.97 0.97 0.00 0.23 0.23 — 932 932 0.02 0.04 1.5 945 Vendor 0.06 0.02 0.80 0.39 < 0.005 0.01 0.17 0.18 0.01 0.05 0.06 — 628 628 0.04 0.09 0.59 657 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker 0.07 0.06 0.05 0.66 0.00 0.00 0.18 0.18 0.00 0.04 0.04 — 154 154 < 0.005 0.01 0.25 156 Vendor 0.01 < 0.005 0.15 0.07 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 104 104 0.01 0.02 0.10 109 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.3. Building Construction (2028) - Unmitigated Appendix B - Orchards Project 9 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 9 / 28 Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 1.2 0.99 8.9 13 0.02 0.30 — 0.30 0.28 — 0.28 — 2,397 2,397 0.10 0.02 — 2,406 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 1.2 0.99 8.9 13 0.02 0.30 — 0.30 0.28 — 0.28 — 2,397 2,397 0.10 0.02 — 2,406 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.85 0.71 6.4 9.3 0.02 0.22 — 0.22 0.20 — 0.20 — 1,717 1,717 0.07 0.01 — 1,723 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.15 0.13 1.2 1.7 < 0.005 0.04 — 0.04 0.04 — 0.04 — 284 284 0.01 < 0.005 — 285 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 10 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 10 / 28 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.74 0.66 0.41 7.7 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,865 1,865 0.03 0.01 5.8 1,876 Vendor 0.10 0.04 1.4 0.69 0.01 0.02 0.32 0.34 0.02 0.09 0.11 — 1,154 1,154 0.06 0.17 2.3 1,208 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.70 0.63 0.56 6.5 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,706 1,706 0.04 0.08 0.15 1,731 Vendor 0.10 0.03 1.5 0.71 0.01 0.02 0.32 0.34 0.02 0.09 0.11 — 1,155 1,155 0.06 0.17 0.06 1,207 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.50 0.44 0.35 4.6 0.00 0.00 1.3 1.3 0.00 0.31 0.31 — 1,235 1,235 0.03 0.05 1.8 1,253 Vendor 0.07 0.03 1.0 0.50 0.01 0.01 0.23 0.24 0.01 0.06 0.08 — 827 827 0.04 0.12 0.70 865 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker 0.09 0.08 0.06 0.83 0.00 0.00 0.24 0.24 0.00 0.06 0.06 — 205 205 < 0.005 0.01 0.30 208 Vendor 0.01 < 0.005 0.19 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 137 137 0.01 0.02 0.12 143 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.5. Building Construction (2029) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 11 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 11 / 28 2,405—0.020.102,3972,397—0.25—0.250.28—0.280.02138.60.971.2Off-Roa d Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 1.2 0.97 8.6 13 0.02 0.28 — 0.28 0.25 — 0.25 — 2,397 2,397 0.10 0.02 — 2,405 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.82 0.69 6.1 9.2 0.02 0.20 — 0.20 0.18 — 0.18 — 1,712 1,712 0.07 0.01 — 1,718 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.15 0.13 1.1 1.7 < 0.005 0.04 — 0.04 0.03 — 0.03 — 283 283 0.01 < 0.005 — 284 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.70 0.63 0.41 7.3 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,832 1,832 0.03 0.01 5.2 1,842 Vendor 0.10 0.04 1.3 0.67 0.01 0.02 0.32 0.34 0.01 0.09 0.10 — 1,122 1,122 0.06 0.17 2.0 1,175 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 12 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 12 / 28 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.62 0.60 0.49 6.1 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,677 1,677 0.04 0.08 0.13 1,701 Vendor 0.09 0.03 1.4 0.68 0.01 0.02 0.32 0.34 0.01 0.09 0.10 — 1,123 1,123 0.06 0.17 0.05 1,174 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.48 0.42 0.30 4.3 0.00 0.00 1.3 1.3 0.00 0.31 0.31 — 1,211 1,211 0.02 0.05 1.6 1,228 Vendor 0.07 0.03 0.98 0.48 0.01 0.01 0.23 0.24 0.01 0.06 0.07 — 802 802 0.04 0.12 0.62 839 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker 0.09 0.08 0.06 0.78 0.00 0.00 0.24 0.24 0.00 0.06 0.06 — 200 200 < 0.005 0.01 0.27 203 Vendor 0.01 < 0.005 0.18 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 133 133 0.01 0.02 0.10 139 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.7. Building Construction (2030) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 1.1 0.94 8.4 13 0.02 0.26 — 0.26 0.24 — 0.24 — 2,397 2,397 0.10 0.02 — 2,405 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 13 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 13 / 28 Off-Roa Equipment 1.1 0.94 8.4 13 0.02 0.26 — 0.26 0.24 — 0.24 — 2,397 2,397 0.10 0.02 — 2,405 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.80 0.67 6.0 9.2 0.02 0.19 — 0.19 0.17 — 0.17 — 1,712 1,712 0.07 0.01 — 1,718 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.15 0.12 1.1 1.7 < 0.005 0.03 — 0.03 0.03 — 0.03 — 283 283 0.01 < 0.005 — 284 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.62 0.60 0.34 6.9 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,801 1,801 0.03 0.01 4.6 1,811 Vendor 0.10 0.04 1.3 0.64 0.01 0.01 0.32 0.33 0.01 0.09 0.10 — 1,087 1,087 0.06 0.16 1.8 1,138 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.59 0.58 0.43 5.8 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,649 1,649 0.04 0.07 0.12 1,671 Vendor 0.09 0.03 1.3 0.66 0.01 0.01 0.32 0.33 0.01 0.09 0.10 — 1,088 1,088 0.06 0.16 0.05 1,137 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 14 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 14 / 28 Worker 0.42 0.40 0.30 4.0 0.00 0.00 1.3 1.3 0.00 0.31 0.31 — 1,190 1,190 0.02 0.01 1.4 1,196 Vendor 0.07 0.03 0.93 0.47 0.01 0.01 0.23 0.23 0.01 0.06 0.07 — 777 777 0.04 0.11 0.55 812 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker 0.08 0.07 0.05 0.74 0.00 0.00 0.24 0.24 0.00 0.06 0.06 — 197 197 < 0.005 < 0.005 0.24 198 Vendor 0.01 < 0.005 0.17 0.08 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 129 129 0.01 0.02 0.09 134 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.9. Building Construction (2031) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 1.1 0.92 8.1 13 0.02 0.24 — 0.24 0.22 — 0.22 — 2,397 2,397 0.10 0.02 — 2,405 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 1.1 0.92 8.1 13 0.02 0.24 — 0.24 0.22 — 0.22 — 2,397 2,397 0.10 0.02 — 2,405 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 15 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 15 / 28 871—0.010.04868868—0.08—0.080.09—0.090.014.72.90.330.40Off-Roa d Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.07 0.06 0.54 0.85 < 0.005 0.02 — 0.02 0.01 — 0.01 — 144 144 0.01 < 0.005 — 144 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.59 0.58 0.34 6.5 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,776 1,776 0.02 0.01 4.1 1,785 Vendor 0.09 0.03 1.2 0.62 0.01 0.01 0.32 0.33 0.01 0.09 0.10 — 1,051 1,051 0.05 0.15 1.5 1,098 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.57 0.55 0.42 5.5 0.00 0.00 1.9 1.9 0.00 0.43 0.43 — 1,625 1,625 0.03 0.07 0.11 1,648 Vendor 0.08 0.03 1.3 0.63 0.01 0.01 0.32 0.33 0.01 0.09 0.10 — 1,051 1,051 0.05 0.15 0.04 1,098 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.20 0.20 0.13 2.0 0.00 0.00 0.66 0.66 0.00 0.16 0.16 — 595 595 0.01 0.01 0.64 597 Vendor 0.03 0.01 0.45 0.23 < 0.005 < 0.005 0.12 0.12 < 0.005 0.03 0.03 — 380 380 0.02 0.05 0.24 397 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker 0.04 0.04 0.02 0.36 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 98 98 < 0.005 < 0.005 0.11 99 Vendor 0.01 < 0.005 0.08 0.04 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 63 63 < 0.005 0.01 0.04 66 Appendix B - Orchards Project 16 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 16 / 28 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.11. Paving (2030) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.77 0.64 6.3 9.9 0.01 0.22 — 0.22 0.20 — 0.20 — 1,511 1,511 0.06 0.01 — 1,516 Paving 0.81 0.81 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.77 0.64 6.3 9.9 0.01 0.22 — 0.22 0.20 — 0.20 — 1,511 1,511 0.06 0.01 — 1,516 Paving 0.81 0.81 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.16 0.13 1.3 2.0 < 0.005 0.05 — 0.05 0.04 — 0.04 — 310 310 0.01 < 0.005 — 311 Paving 0.17 0.17 — — — — — — — — — — — — — — — — Appendix B - Orchards Project 17 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 17 / 28 0.000.000.000.000.000.00—0.000.000.000.000.000.000.000.000.000.000.00Onsite truck Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.03 0.02 0.24 0.37 < 0.005 0.01 — 0.01 0.01 — 0.01 — 51 51 < 0.005 < 0.005 — 52 Paving 0.03 0.03 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.04 0.04 0.02 0.46 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 121 121 < 0.005 < 0.005 0.31 121 Vendor 2.3 0.60 29 16 0.15 0.27 5.6 5.9 0.27 1.5 1.8 — 19,856 19,856 1.7 3.1 31 20,864 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.04 0.04 0.03 0.39 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 110 110 < 0.005 < 0.005 0.01 112 Vendor 2.2 0.53 30 16 0.15 0.27 5.6 5.9 0.27 1.5 1.8 — 19,878 19,878 1.7 3.1 0.79 20,856 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.01 0.01 0.01 0.08 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 23 23 < 0.005 < 0.005 0.03 23 Vendor 0.47 0.12 6.1 3.3 0.03 0.06 1.1 1.2 0.06 0.31 0.37 — 4,082 4,082 0.34 0.65 2.7 4,285 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.8 3.8 < 0.005 < 0.005 < 0.005 3.8 Vendor 0.08 0.02 1.1 0.60 0.01 0.01 0.21 0.22 0.01 0.06 0.07 — 676 676 0.06 0.11 0.45 710 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 18 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 18 / 28 3.13. Architectural Coating (2030) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.12 0.10 0.78 1.1 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect ural Coating s 42 42 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.12 0.10 0.78 1.1 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect ural Coating s 42 42 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.09 0.07 0.56 0.79 < 0.005 0.01 — 0.01 0.01 — 0.01 — 95 95 < 0.005 < 0.005 — 96 Appendix B - Orchards Project 19 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 19 / 28 Architect Coatings 30 30 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.02 0.01 0.10 0.14 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 16 16 < 0.005 < 0.005 — 16 Architect ural Coating s 5.5 5.5 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.12 0.12 0.07 1.4 0.00 0.00 0.37 0.37 0.00 0.09 0.09 — 360 360 0.01 < 0.005 0.93 362 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.12 0.12 0.09 1.2 0.00 0.00 0.37 0.37 0.00 0.09 0.09 — 330 330 0.01 0.01 0.02 334 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.08 0.08 0.06 0.81 0.00 0.00 0.26 0.26 0.00 0.06 0.06 — 238 238 < 0.005 < 0.005 0.29 239 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —Appendix B - Orchards Project 20 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 20 / 28 Worker 0.02 0.01 0.01 0.15 0.00 0.00 0.05 0.05 0.00 0.01 0.01 — 39 39 < 0.005 < 0.005 0.05 40 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.15. Architectural Coating (2031) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.12 0.10 0.78 1.1 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect ural Coating s 42 42 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.12 0.10 0.78 1.1 < 0.005 0.01 — 0.01 0.01 — 0.01 — 134 134 0.01 < 0.005 — 134 Architect ural Coating s 42 42 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 21 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 21 / 28 ——————————————————Average Daily Off-Roa d Equipm ent 0.04 0.03 0.28 0.40 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 48 48 < 0.005 < 0.005 — 49 Architect ural Coating s 15 15 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.01 0.01 0.05 0.07 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 8.0 8.0 < 0.005 < 0.005 — 8.0 Architect ural Coating s 2.8 2.8 — — — — — — — — — — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.12 0.12 0.07 1.3 0.00 0.00 0.37 0.37 0.00 0.09 0.09 — 355 355 < 0.005 < 0.005 0.82 357 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.11 0.11 0.08 1.1 0.00 0.00 0.37 0.37 0.00 0.09 0.09 — 325 325 0.01 0.01 0.02 330 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 22 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 22 / 28 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.04 0.04 0.03 0.39 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 119 119 < 0.005 < 0.005 0.13 119 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker 0.01 0.01 < 0.005 0.07 0.00 0.00 0.02 0.02 0.00 0.01 0.01 — 20 20 < 0.005 < 0.005 0.02 20 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 4. Operations Emissions Details 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati on TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 23 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 23 / 28 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Sequest ered — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 24 ------------------- Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 24 / 28 ——————————————————Daily, Winter (Max) Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Sequest ered — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Sequest ered — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 5. Activity Data 5.1. Construction Schedule Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Building Construction Building Construction 4/5/2027 7/4/2031 5.0 1,110 Vertical Constrction of the Neighborhood District Appendix B - Orchards Project 25 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 25 / 28 755.04/15/20301/1/2030PavingPaving Default Phase Length - Paving ofNeighborhood District Roads and Motor Courts Architectural Coating Architectural Coating 1/1/2030 7/4/2031 5.0 394 Coating Starting in Jan 2030 - Architectual Coating of Neigborhood District Homes 5.2. Off-Road Equipment 5.2.1. Unmitigated Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Building Construction Forklifts Diesel Average 3.0 8.0 82 0.20 Building Construction Generator Sets Diesel Average 1.00 8.0 14 0.74 Building Construction Cranes Diesel Average 1.00 7.0 367 0.29 Building Construction Welders Diesel Average 1.00 8.0 46 0.45 Building Construction Tractors/Loaders/Back hoes Diesel Average 3.0 7.0 84 0.37 Paving Pavers Diesel Average 2.0 8.0 81 0.42 Paving Paving Equipment Diesel Average 2.0 8.0 89 0.36 Paving Rollers Diesel Average 2.0 8.0 36 0.38 Architectural Coating Air Compressors Diesel Average 1.00 6.0 37 0.48 5.3. Construction Vehicles 5.3.1. Unmitigated Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Building Construction Worker 224 12 LDA,LDT1,LDT2 Building Construction Vendor 46 8.4 HHDT,MHDT Building Construction Hauling 0.00 20 HHDTAppendix B - Orchards Project 26 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 26 / 28 Building Construction Onsite truck ——HHDT Paving Worker 15 12 LDA,LDT1,LDT2 Paving Vendor 724 8.4 HHDT Paving Hauling 0.00 20 HHDT Paving Onsite truck ——HHDT Architectural Coating Worker 45 12 LDA,LDT1,LDT2 Architectural Coating Vendor —8.4 HHDT,MHDT Architectural Coating Hauling 0.00 20 HHDT Architectural Coating Onsite truck ——HHDT 5.4. Vehicles 5.4.1. Construction Vehicle Control Strategies Non-applicable. No control strategies activated by user. 5.5. Architectural Coatings Phase Name Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft) Non-Residential Exterior Area Coated (sq ft) Parking Area Coated (sq ft) Architectural Coating 2,369,600 789,867 0.00 0.00 — 5.6. Dust Mitigation 5.6.1. Construction Earthmoving Activities Phase Name Material Imported (cy)Material Exported (cy)Acres Graded (acres)Material Demolished (sq. ft.)Acres Paved (acres) Paving 0.00 0.00 0.00 0.00 23 5.6.2. Construction Earthmoving Control Strategies Non-applicable. No control strategies activated by user. Appendix B - Orchards Project 27 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 27 / 28 5.7. Construction Paving Phase Name Land Use Area Paved (acres)% Asphalt Paving Single Family Housing 23 100% Paving Condo/Townhouse —0% Paving Apartments Low Rise —0% 5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh) Year kWh per Year CO2 CH4 N2O 2027 0.00 188 0.03 < 0.005 2028 0.00 188 0.03 < 0.005 2029 0.00 188 0.03 < 0.005 2030 0.00 188 0.03 < 0.005 2031 0.00 188 0.03 < 0.005 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres Appendix B - Orchards Project 28 Orchards Project - Neighborhood District - Vertical Construction Custom Report, 11/18/2025 28 / 28 5.18.2. Sequestration 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 8. User Changes to Default Data 8.1. Justifications Screen Justification Characteristics: Utility Information Marin Clean Energy is the Electricity Provider for San Ramon and Contra Costa County Land Use Applicant provided information Construction Only Run - Landscaping Area not used in Emission Calculations ADU Square Footage Included in SF Housing Construction: Construction Phases Site Preparation and Grading Calculated in a Separate CalEEMod Run which includes the Demolition, Site Prep and Grading of the Interim Area + Neighborhood District (combined) Default phase lengths for Vertical Construction and Paving based on total lot acreage of Neighborhood District Construction activity phases adjusted to overlap paving and architectural coating (worst case day) and move all construction activities within 4 years for initial home completion Architectural coating assumed to start in 2030 and continue to end of construction, exceeds default phase length but equipment per day is not reduced so does not underestimate daily eqpt emissions Construction: Trips and VMT Added Vendor Delivery Trips for Delivery of Asphalt Road Materials for 23.2 acres of roadway as per Vesting Tentative Parcel Maps calculations Construction: Paving 23.2 acres of roadway per Vesting Tentative Parcel Map Calculations ; All Roads Included under SF Housing for calculational purposes Appendix B - Orchards Project 29 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 1 / 20 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report Table of Contents 1. Basic Project Information 1.1. Basic Project Information 1.2. Land Use Types 1.3. User-Selected Emission Reduction Measures by Emissions Sector 2. Emissions Summary 2.1. Construction Emissions Compared Against Thresholds 2.2. Construction Emissions by Year, Unmitigated 3. Construction Emissions Details 3.1. Demolition (2026) - Unmitigated 3.3. Site Preparation (2026) - Unmitigated 3.5. Grading (2026) - Unmitigated 3.7. Grading (2027) - Unmitigated 4. Operations Emissions Details 4.10. Soil Carbon Accumulation By Vegetation Type Appendix B - Orchards Project 30 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 2 / 20 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 5. Activity Data 5.1. Construction Schedule 5.2. Off-Road Equipment 5.2.1. Unmitigated 5.3. Construction Vehicles 5.3.1. Unmitigated 5.4. Vehicles 5.4.1. Construction Vehicle Control Strategies 5.5. Architectural Coatings 5.6. Dust Mitigation 5.6.1. Construction Earthmoving Activities 5.6.2. Construction Earthmoving Control Strategies 5.7. Construction Paving 5.8. Construction Electricity Consumption and Emissions Factors 5.18. Vegetation Appendix B - Orchards Project 31 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 3 / 20 5.18.1. Land Use Change 5.18.1.1. Unmitigated 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated 5.18.2. Sequestration 5.18.2.1. Unmitigated 8. User Changes to Default Data 8.1. Justifications Appendix B - Orchards Project 32 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 4 / 20 1. Basic Project Information 1.1. Basic Project Information Data Field Value Project Name Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Construction Start Date 6/1/2026 Lead Agency — Land Use Scale Project/site Analysis Level for Defaults County Windspeed (m/s)3.0 Precipitation (days)17 Location 6001 Bollinger Canyon Rd, San Ramon, CA 94583, USA County Contra Costa City San Ramon Air District Bay Area AQMD Air Basin San Francisco Bay Area TAZ 1371 EDFZ 1 Electric Utility Pacific Gas & Electric Company Gas Utility Pacific Gas & Electric App Version 2022.1.1.33 1.2. Land Use Types Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft) Special Landscape Area (sq ft) Population Description General Office Building 1,927 1000sqft 68 1,927,000 0.00 —665 Existing Office Park Appendix B - Orchards Project 33 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 5 / 20 1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected 2. Emissions Summary 2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Unmit. 5.0 3.2 48 33 0.18 1.3 24 25 1.1 4.3 5.4 — 25,768 25,768 1.9 3.6 47 26,937 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Unmit. 3.8 3.2 29 29 0.06 1.2 7.8 9.1 1.1 4.0 5.1 — 6,757 6,757 0.27 0.06 0.02 6,782 Average Daily (Max) — — — — — — — — — — — — — — — — — — Unmit. 1.8 1.3 16 13 0.05 0.51 5.8 6.4 0.45 1.4 1.9 — 6,330 6,330 0.42 0.70 3.9 6,554 Annual (Max) — — — — — — — — — — — — — — — — — — Unmit. 0.33 0.23 2.9 2.3 0.01 0.09 1.1 1.2 0.08 0.26 0.34 — 1,048 1,048 0.07 0.12 0.65 1,085 2.2. Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - Summer (Max) — — — — — — — — — — — — — — — — — — 2026 5.0 3.2 48 33 0.18 1.3 24 25 1.1 4.3 5.4 — 25,768 25,768 1.9 3.6 47 26,937 Appendix B - Orchards Project 34 ------------------- ------------------- Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 6 / 20 2027 3.6 3.0 26 28 0.06 1.0 3.8 4.8 0.96 1.5 2.4 — 6,768 6,768 0.27 0.06 0.58 6,793 Daily - Winter (Max) — — — — — — — — — — — — — — — — — — 2026 3.8 3.2 29 29 0.06 1.2 7.8 9.1 1.1 4.0 5.1 — 6,757 6,757 0.27 0.06 0.02 6,782 2027 3.6 3.0 26 28 0.06 1.0 3.8 4.8 0.96 1.5 2.4 — 6,753 6,753 0.27 0.06 0.01 6,778 Average Daily — — — — — — — — — — — — — — — — — — 2026 1.8 1.3 16 13 0.05 0.51 5.8 6.4 0.45 1.4 1.9 — 6,330 6,330 0.42 0.70 3.9 6,554 2027 0.64 0.54 4.6 5.0 0.01 0.19 0.68 0.86 0.17 0.26 0.44 — 1,216 1,216 0.05 0.01 0.04 1,221 Annual — — — — — — — — — — — — — — — — — — 2026 0.33 0.23 2.9 2.3 0.01 0.09 1.1 1.2 0.08 0.26 0.34 — 1,048 1,048 0.07 0.12 0.65 1,085 2027 0.12 0.10 0.84 0.92 < 0.005 0.03 0.12 0.16 0.03 0.05 0.08 — 201 201 0.01 < 0.005 0.01 202 3. Construction Emissions Details 3.1. Demolition (2026) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 2.7 2.3 21 19 0.03 0.84 — 0.84 0.78 — 0.78 — 3,427 3,427 0.14 0.03 — 3,438 Demoliti on — — — — — — 18 18 — 2.7 2.7 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 35 ------------------- Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 7 / 20 ——————————————————Daily, Winter (Max) Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.52 0.44 4.0 3.6 0.01 0.16 — 0.16 0.15 — 0.15 — 657 657 0.03 0.01 — 659 Demoliti on — — — — — — 3.4 3.4 — 0.52 0.52 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.10 0.08 0.72 0.67 < 0.005 0.03 — 0.03 0.03 — 0.03 — 109 109 < 0.005 < 0.005 — 109 Demoliti on — — — — — — 0.62 0.62 — 0.09 0.09 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.05 0.05 0.03 0.59 0.00 0.00 0.12 0.12 0.00 0.03 0.03 — 130 130 < 0.005 < 0.005 0.48 132 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 2.3 0.48 28 13 0.15 0.42 5.9 6.3 0.28 1.6 1.9 — 22,212 22,212 1.8 3.6 46 23,367 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Average Daily — — — — — — — — — — — — — — — — — — Worker 0.01 0.01 0.01 0.09 0.00 0.00 0.02 0.02 0.00 0.01 0.01 — 23 23 < 0.005 < 0.005 0.04 23 Appendix B - Orchards Project 36 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 8 / 20 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.43 0.09 5.5 2.6 0.03 0.08 1.1 1.2 0.05 0.31 0.36 — 4,261 4,261 0.34 0.69 3.8 4,477 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.8 3.8 < 0.005 < 0.005 0.01 3.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.08 0.02 1.0 0.47 0.01 0.01 0.20 0.22 0.01 0.06 0.07 — 705 705 0.06 0.11 0.63 741 3.3. Site Preparation (2026) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 3.7 3.1 29 29 0.05 1.2 — 1.2 1.1 — 1.1 — 5,298 5,298 0.21 0.04 — 5,316 Dust From Material Movement — — — — — — 7.7 7.7 — 3.9 3.9 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 3.7 3.1 29 29 0.05 1.2 — 1.2 1.1 — 1.1 — 5,298 5,298 0.21 0.04 — 5,316 Appendix B - Orchards Project 37 ------------------- Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 9 / 20 ———————3.93.9—7.77.7——————Dust From Material Movement Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.41 0.34 3.2 3.2 0.01 0.14 — 0.14 0.13 — 0.13 — 581 581 0.02 < 0.005 — 583 Dust From Material Movement — — — — — — 0.84 0.84 — 0.43 0.43 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.07 0.06 0.58 0.58 < 0.005 0.02 — 0.02 0.02 — 0.02 — 96 96 < 0.005 < 0.005 — 96 Dust From Material Movement — — — — — — 0.15 0.15 — 0.08 0.08 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.06 0.06 0.04 0.69 0.00 0.00 0.14 0.14 0.00 0.03 0.03 — 151 151 < 0.005 0.01 0.56 154 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 38 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 10 / 20 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.06 0.05 0.05 0.58 0.00 0.00 0.14 0.14 0.00 0.03 0.03 — 138 138 < 0.005 0.01 0.01 140 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.01 0.01 < 0.005 0.06 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 15 15 < 0.005 < 0.005 0.03 16 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.5 2.5 < 0.005 < 0.005 < 0.005 2.6 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.5. Grading (2026) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 3.6 3.0 27 28 0.06 1.1 — 1.1 1.0 — 1.0 — 6,599 6,599 0.27 0.05 — 6,621 Appendix B - Orchards Project 39 ------------------- Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 11 / 20 ———————1.41.4—3.63.6——————Dust From Material Movement Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.43 0.36 3.2 3.2 0.01 0.13 — 0.13 0.12 — 0.12 — 775 775 0.03 0.01 — 777 Dust From Material Movement — — — — — — 0.42 0.42 — 0.17 0.17 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.08 0.07 0.58 0.59 < 0.005 0.02 — 0.02 0.02 — 0.02 — 128 128 0.01 < 0.005 — 129 Dust From Material Movement — — — — — — 0.08 0.08 — 0.03 0.03 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.07 0.06 0.06 0.66 0.00 0.00 0.17 0.17 0.00 0.04 0.04 — 158 158 < 0.005 0.01 0.02 160 Appendix B - Orchards Project 40 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 12 / 20 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.01 0.01 0.01 0.08 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 19 19 < 0.005 < 0.005 0.03 19 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.1 3.1 < 0.005 < 0.005 0.01 3.2 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 3.7. Grading (2027) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 3.5 2.9 26 27 0.06 1.0 — 1.0 0.96 — 0.96 — 6,598 6,598 0.27 0.05 — 6,621 Dust From Material Movement — — — — — — 3.6 3.6 — 1.4 1.4 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 41 ------------------- Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 13 / 20 Off-Roa Equipment 3.5 2.9 26 27 0.06 1.0 — 1.0 0.96 — 0.96 — 6,598 6,598 0.27 0.05 — 6,621 Dust From Material Movement — — — — — — 3.6 3.6 — 1.4 1.4 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.63 0.53 4.6 4.9 0.01 0.19 — 0.19 0.17 — 0.17 — 1,188 1,188 0.05 0.01 — 1,192 Dust From Material Movement — — — — — — 0.65 0.65 — 0.26 0.26 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Off-Roa d Equipm ent 0.12 0.10 0.84 0.90 < 0.005 0.03 — 0.03 0.03 — 0.03 — 197 197 0.01 < 0.005 — 197 Dust From Material Movement — — — — — — 0.12 0.12 — 0.05 0.05 — — — — — — — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — — Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Worker 0.07 0.06 0.04 0.73 0.00 0.00 0.17 0.17 0.00 0.04 0.04 — 170 170 < 0.005 0.01 0.58 172 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00Appendix B - Orchards Project 42 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 14 / 20 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Worker 0.06 0.06 0.05 0.62 0.00 0.00 0.17 0.17 0.00 0.04 0.04 — 155 155 < 0.005 0.01 0.01 157 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average Daily — — — — — — — — — — — — — — — — — — Worker 0.01 0.01 0.01 0.11 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 28 28 < 0.005 < 0.005 0.04 29 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — — Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 4.7 4.7 < 0.005 < 0.005 0.01 4.7 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 4. Operations Emissions Details 4.10. Soil Carbon Accumulation By Vegetation Type 4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati on TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 43 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 15 / 20 ——————————————————Daily, Winter (Max) Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — 4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Total — — — — — — — — — — — — — — — — — — 4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Summer (Max) — — — — — — — — — — — — — — — — — — Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Sequest ered — — — — — — — — — — — — — — — — — — Appendix B - Orchards Project 44 ------------------- Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 16 / 20 Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Daily, Winter (Max) — — — — — — — — — — — — — — — — — — Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Sequest ered — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — Annual — — — — — — — — — — — — — — — — — — Avoided — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Sequest ered — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — Remove d — — — — — — — — — — — — — — — — — — Subtotal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 5. Activity Data Appendix B - Orchards Project 45 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 17 / 20 5.1. Construction Schedule Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 6/1/2026 9/4/2026 5.0 70 Demolition of Chevron Park Campus Site Preparation Site Preparation 9/7/2026 10/30/2026 5.0 40 Site Preparation of Neighborhood District plus Interim Area Grading Grading 11/2/2026 4/2/2027 5.0 110 Grading of Neighborhood District plus Interim Area 5.2. Off-Road Equipment 5.2.1. Unmitigated Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Rubber Tired Dozers Diesel Average 2.0 8.0 367 0.40 Demolition Excavators Diesel Average 3.0 8.0 36 0.38 Demolition Concrete/Industrial Saws Diesel Average 1.00 8.0 33 0.73 Site Preparation Rubber Tired Dozers Diesel Average 3.0 8.0 367 0.40 Site Preparation Tractors/Loaders/Back hoes Diesel Average 4.0 8.0 84 0.37 Grading Graders Diesel Average 1.00 8.0 148 0.41 Grading Excavators Diesel Average 2.0 8.0 36 0.38 Grading Tractors/Loaders/Back hoes Diesel Average 2.0 8.0 84 0.37 Grading Scrapers Diesel Average 2.0 8.0 423 0.48 Grading Rubber Tired Dozers Diesel Average 1.00 8.0 367 0.40 5.3. Construction Vehicles Appendix B - Orchards Project 46 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 18 / 20 5.3.1. Unmitigated Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition Worker 15 12 LDA,LDT1,LDT2 Demolition Vendor —8.4 HHDT,MHDT Demolition Hauling 317 20 HHDT Demolition Onsite truck ——HHDT Site Preparation Worker 18 12 LDA,LDT1,LDT2 Site Preparation Vendor —8.4 HHDT,MHDT Site Preparation Hauling 0.00 20 HHDT Site Preparation Onsite truck ——HHDT Grading Worker 20 12 LDA,LDT1,LDT2 Grading Vendor —8.4 HHDT,MHDT Grading Hauling 0.00 20 HHDT Grading Onsite truck ——HHDT 5.4. Vehicles 5.4.1. Construction Vehicle Control Strategies Non-applicable. No control strategies activated by user. 5.5. Architectural Coatings 5.6. Dust Mitigation 5.6.1. Construction Earthmoving Activities Phase Name Material Imported (cy)Material Exported (cy)Acres Graded (acres)Material Demolished (Building Square Footage) Acres Paved (acres) Demolition 0.00 0.00 0.00 1,927,000 0.00 Site Preparation ——60 0.00 0.00 Appendix B - Orchards Project 47 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 19 / 20 Grading ——330 0.00 0.00 5.6.2. Construction Earthmoving Control Strategies Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61%61% Water Demolished Area 2 36%36% 5.7. Construction Paving 5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh) Year kWh per Year CO2 CH4 N2O 2026 0.00 204 0.03 < 0.005 2027 0.00 204 0.03 < 0.005 5.18. Vegetation 5.18.1. Land Use Change 5.18.1.1. Unmitigated Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres 5.18.1. Biomass Cover Type 5.18.1.1. Unmitigated Biomass Cover Type Initial Acres Final Acres 5.18.2. Sequestration Appendix B - Orchards Project 48 Orchards Project - Neighborhood District and Interim Area -Demolition and Grading Custom Report, 11/18/2025 20 / 20 5.18.2.1. Unmitigated Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year) 8. User Changes to Default Data 8.1. Justifications Screen Justification Land Use Demolition of 1.927 Million Sq Feet of Office Park and Grading of 67.82 acres Construction Run Only - Landscaping Not Used for Emissions Construction: Construction Phases Demolition of Office Park and Site Preparation and Grading of the District Neighborhood and Interim Area. Appendix B - Orchards Project 49 Multi-land Use Screening Tool Overview Instructions Land Use Category Land Use Type Unit Project Land Use Size Has Overlapping Construction Phases? Residential Single Family Housing DU 230.0 FALSE Residential Condo-Townhouse DU 138.0 FALSE Residential Apartments Low Rise DU 58.0 FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE FALSE Developed by Last updated:5/6/2022 This screening tool helps to determine whether the daily construction or operational emissions associated with a proposed land use development project with multiple land use types would exceed BAAQMD's average daily thresholds. Exceeds Construction Threshold? Exceeds Operational Threshold? BAAQMD's Recommendation Use the drop-down menus to select the land use category and land use type for each type of land use included in the project. Enter the proposed size of each land use based on the default units that are autopopulated in column D. The tool will estimate whether the project may exceed the construction thresholds, operational thresholds, or both, and whether further analysis is needed before making a significance determination. This tool will not work for projects which have construction-related activities overlapping with operational activities, and vice versa. Construction and Operation Screening Tool YES NO Further Analysis Required Appendix B - Orchards Project 50 BAY AHA AlR 01/ALlTY e:-MANAGEMENT DISTRlCT n □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ Orchards Project Construction DPM Sources LOD_DPM Average - Off-Road Equipment Diesel Exhaust1 Project Site -Entire Limits of Disturbance Area 274383.9 m2 5 —1.4 0.021 9.64E-09 g/m2-sec NGBD_DPM Average - Off-Road Equipment Diesel Exhaust1 Project Site - Neighborhood District Area 219226.7 m2 5 1.4 0.032 1.84E-08 g/m2-sec ROAD1_DPM Haul Road - On-Road Diesel Exhaust 2,3 Bollinger Canyon Road Line-Volume 807.2 m2 3.4 12.09 3.16 2.70E-04 3.40E-05 g/s ROAD2_DPM Haul Road - On-Road Diesel Exhaust 2,3 Donald Doyle Highway - Nbound and Exit Ramp Line-Volume 973.9 m2 3.4 6.51 3.16 3.26E-04 4.11E-05 g/s ROAD3_DPM Haul Road - On-Road Diesel Exhaust 2,3 Donald Doyle Highway - Nbound Entrance Ramp Line-Volume 255.4 m2 3.4 6.51 3.16 8.54E-05 1.08E-05 g/s ROAD4_DPM Haul Road - On-Road Diesel Exhaust 2,3 Donald Doyle Highway -Sbound Line-Volume 1184.4 m2 3.4 13.95 3.16 3.96E-04 4.99E-05 g/s 1 Construction exhaust modeled as an area source. Release parameters for construction equipment DPM exhaust modeling from SCAQMD (2008) for gaseous exhaust from construction equipment as a five meter release with an initial vertical dimension of 1.4 meters. 2 Emissions for On-Road Mobile Sources (Vendor and Haul Diesel Exhaust) modeled only for roadways within 1,000 feet of the site within the modeling domain. 3 Parameters calculated as per US EPA Haul Road Workgroup Final Report released on March 2, 2012 which suggests the use of Adjacent Volume Sources to represent the haul road. 4 Emissions from CalEEModeling for Construction modeled during construction hours as included in Attachment A. Hours M-F 8 AM - 5 PM with break from 12-1 PM for lunch (HROFDAY Hour ending 9 -12 amd 13-17. See Note 2 above regarding roadway emission portion modeled. 5 Source Group DPM Unmitigated = LOD + NGBD + Road1 + Road 2 + Road 3 + Road 4 Source Release Parameters (m) Source ID Emissions4 (lb/hr)Modeled Source Location Description Source Type AERMOD Source Emission Rate Initial Lateral Dimension Initial Vertical DimensionSize Release Height Appendix B - Orchards Project 51 Orchards Project Construction PM25 Sources LOD_PM25 Construction Site PM2.51 Project Site -Entire Limits of Disturbance Area 274383.9 m2 0 —1 0.340 1.56E-07 g/m2-sec NGBD_PM25 Construction Site PM2.51 Project Site - Neighborhood District Area 219226.7 m2 0 —1 0.022 1.24E-08 g/m2-sec ROAD1_PM25 Haul Road - PM2.5T 2,3 Bollinger Canyon Road Line-Volume 807.2 m2 3.4 12.09 3.16 3.45E-03 4.3E-04 g/s ROAD2_PM25 Haul Road - PM2.5T 2,3 Donald Doyle Highway - Nbound and Exit Ramp Line-Volume 973.9 m2 3.4 6.51 3.16 4.16E-03 5.2E-04 g/s ROAD3_PM25 Haul Road - PM2.5T 2,3 Donald Doyle Highway - Nbound Entrance Ramp Line-Volume 255.4 m2 3.4 6.51 3.16 1.09E-03 1.4E-04 g/s ROAD4_PM25 Haul Road - PM2.5T 2,3 Donald Doyle Highway -Sbound Line-Volume 1184.4 m2 3.4 13.95 3.16 5.06E-03 6.4E-04 g/s 1 Construction exhaust modeled as an area source. Release parameters for construction PM2.5 from SCAQMD (2008) for PM10 Area source as a ground level release with initial vertical dimension of 1.0 meters. 2 Emissions for On-Road Mobile Sources (Vendor and Haul Diesel Exhaust) modeled only for roadways within 1,000 feet of the site within the modeling domain. 3 Parameters calculated as per US EPA Haul Road Workgroup Final Report released on March 2, 2012 which suggests the use of Adjacent Volume Sources to represent the haul road. 4 Emissions from CalEEModeling for Construction modeled during construction hours as included in Attachment A. Hours M-F 8 AM - 5 PM with break from 12-1 PM for lunch (HROFDAY Hour ending 9 -12 amd 13-17. See Note 2 above regarding roadway emission portion modeled. 5 Source Group DPM Unmitigated = LOD + NGBD + Road1 + Road 2 + Road 3 + Road 4 Emissions4 (lb/hr) AERMOD Source Emission Rate Source Release Parameters (m) Source ID Modeled Source Location Description Source Type Size Release Height Initial Lateral Dimension Initial Vertical Dimension Appendix B - Orchards Project 52 Orchards Project Construction DPM Emissions Net Work Days 1,330 Net Construction Years 5.09 Total Working Hours 10,640 Construction Year Construction Activity LOD Area Neighborhood District Off-Site Emissions lbs lbs lbs Worker Vendor Haul 2026 Demolition 59.02 29.31 - - 29.31 2026 Site Preparation 49.70 0.00 - - - 2026 Grading 48.06 0.00 - - - 2027 Grading 68.54 0.31 - 0.31 - 2027 Building Construction 65.15 3.26 - 3.26 - 2028 Building Construction 78.49 4.41 4.41 2029 Building Construction 71.86 4.40 4.40 2030 Building Construction 67.82 2.20 2.20 2031 Building Construction 32.14 1.11 1.11 2030 Paving 16.53 20.11 20.11 2030 Architectural Coating 2.86 0.00 2031 Architectural Coating 1.25 0.00 - 225.32 336.10 65.12 - 35.81 29.314 Note: PM10E = PM10 Exhaust which is a surrogate for Diesel Exhaust, particulate matter LOD = Limits of Disturbance (Neighborhood District + Interim Area) Worker Vendor Haul CalEEMod Distance (miles) 11.7 8.4 20 Roadways Included within 1,000 ft 2.00 2.00 2.00 Roadway Emissions included 17%24% 10% ` Worker Vendor Haul 11.465 - 8.53 2.93 Source acres/miles m2 / m lbs lb/hr g/m2-sec; g/s Limits of Disturbance Area 67.80 274,384 225.32 0.021 9.72E-09 Neighborhood District Area 54.17 219,227 336.10 0.0316 1.82E-08 Roadway 1 Segment 0.50 807.20 2.873 2.70E-04 3.40E-05 Roadway 2 Segment 0.61 973.90 3.467 3.26E-04 4.11E-05 Roadway 3 Segment 0.16 255.40 0.909 8.54E-05 1.08E-05 Roadway 4 Segment 0.74 1184.40 4.216 3.96E-04 4.99E-05 Off-site Roadway DPM Off-Site Diesel PM (lbs) within 1,000 ft Roadways Total PM Exhaust (On-site) Off-Site DPM(lbs) On-Site Emissions Appendix B - Orchards Project 53 Orchards Project Construction PM2.5 Emissions Net Work Days 260 Net Construction Years 1 Total Working Hours 2,080 Construction Year Construction Activity Percentage in LOD Area Neighborhood District Off-Site Emissions Max Year lbs lbs lbs Worker Vendor Haul 2026 Demolition 100%242.8 133.18 2.01 - 131.17 2026 Site Preparation 100%203.3 1.34 1.34 - - 2026 Grading 100%105.3 1.64 1.64 - - 2027 Grading 100%156.7 2.52 2.52 - - 2027 Building Construction 75%59.94 103.28 83.0 20.3 - 2028 Building Construction 0%72.21 139.48 112.1 27.4 - 2029 Building Construction 0%66.11 136.90 111.8 25.1 - 2030 Building Construction 0%62.39 136.90 111.8 25.1 - 2031 Building Construction 0%29.57 69.39 56.7 12.7 - 2030 Paving 0%15.20 137.14 2.2 135.0 - 2030 Architectural Coating 0%2.63 22.36 22.4 0.0 - 2031 Architectural Coating 0%1.15 11.33 11.3 0.0 - Total PM2.5 708.10 309.21 895.45 518.67 245.62 131.165 Max Year PM2.5 708.10 44.78 215.84 69.5 15.2 131.2 Note: PM2.5T includes PM2.5Exhaust, Dust, as well as Brake Wear and Tire wear LOD = Limits of Disturbance (Neighborhood District + Interim Area) Worker Vendor Haul CalEEMod Distance (miles) 11.7 8.4 20 Roadways Included within 1,000 ft 2.00 2.00 2.00 Roadway Emissions included 17%24% 10% ` Worker Vendor Haul 28.627 11.89 3.61 13.13 Source acres/miles m2 / m PM2.5 T lbs lb/hr g/m2-sec; g/s Limits of Disturbance Area 67.80 274,384 708.10 0.340 1.56E-07 Neighborhood District Area 54.17 219,227 44.78 0.0215 1.24E-08 Roadway 1 Segment 0.50 807.20 7.174 3.45E-03 4.35E-04 Roadway 2 Segment 0.61 973.90 8.656 4.16E-03 5.24E-04 Roadway 3 Segment 0.16 255.40 2.270 1.09E-03 1.38E-04 Roadway 4 Segment 0.74 1184.40 10.527 5.06E-03 6.38E-04 Off-Site PM2.5T(lbs) Total PM Exhaust (On-site) Off-site Roadway PM2.5T Off-Site Diesel PM2.5T(lbs) within 1,000 ft Roadways On-Site Emissions Appendix B - Orchards Project 54 WIND ROSE PLOT: DISPLAY: Livermore Airport (KLVK) Data - Construction Hours Wind Speed Wind Direction - Blowing From Direction (blowing from) NORTH 12% 9.6% 7.2% 4.8% 2.4% WEST EAST WIND SPEED (m/s) >= 11.10 8.80 - 11.10 5.70 - 8.80 SOUTH 3.60 - 5.70 2.10 - 3.60 0.50 - 2.10 Calms: 1.44% COMMENTS: Wind Rose is generated just for the hours with emissions when construction would occur or from 8 AM – 5 PM. This corresponds to the modeling hours in AERMOD. DATA PERIOD: Start Date: 1/1/2013 - 08:00 End Date: 12/31/2017 - 17:00 How to Read a Wind Rose Diagram The wind rose above shows the general wind direction and speed for the meteorological data set used in the AERMOD modeling for the project.’ The circular format of the wind rose shows the direction the winds blew from and the length of each "spoke" around the circle shows how often the wind blew from that direction. CALM WINDS: 1.44% AVG. WIND SPEED: 3.77 m/s WRPLOT View - Lakes Environmental Software Appendix B - Orchards Project 55 --D D D - Orchards Project Construction HRA – Sensitive Receptor Locations and DPM Concentrations Source Legend: Analysis Area ■ Project site ____ Receptor Legend: ●Nearby Residential Receptor ●Sensitive Receptors ▲ Maximally Exposed Individual Resident (MEIR) ▲ Maximally Exposed Individual Worker (MEIW) Appendix B - Orchards Project 56 0 , .. , .. 0 N 0 <X) '<l" 0 0 0 0 <X) '<l" 0 0 <X) 0) r--..- '<l" ..-'<l" 0 0 N 0) r-- '<l" 0 \ 0 0 0) r-- '<l" ,r 0 t 0 <X) <X) r-- '<l" ( ... ,,,/' 590800 591000 591200 591400 591600 591800 592000 592200 UTM East [m] PLOT FILE OF PERIOD VALUES AVERAGED ACROSS O YEARS FOR SOURCE GROUP: DPM Max: 1.SE-02 [ug/m"3] at (591987.77, 4179340.82) (; ... , ' ~ . .. ~... ~ . • "- p ~.....-· p p .. p pp p pp pp p ... p 592400 592600 ug/m"3 •• • FCS An ADEC Innovation Orchards Project Construction HRA – Sensitive Receptor Locations and DPM Concentrations Source Legend: Analysis Area ■ Project site ____ Receptor Legend: ●Nearby Residential Receptor ●Sensitive Receptors ▲ Maximally Exposed Individual Resident (MEIR) ▲ Maximally Exposed Individual Worker (MEIW) Appendix B - Orchards Project 57 0 0 N 0 CX) ~ '<I" 0 0 0 0 CX) ~ '<I" 0 0 CX) CJ) I'-- '<I" 0 0 ~ <.D E en ~~ ..c '<I" t: 0 z 0 ~ 0 '<I" I-CJ) :::) I'--®ffiMfflffll•tt1ttGi '<I" 0 0 N CJ) I'-- '<I" 0 0 0 CJ) ' '> • • '\, • ¥' • • • q_ • ~ ✓' L"' '( I'--. . \ . . '<I" . . . •,,. . \ . 0 0 \~ .. o,. CX) CX) I'--/' \ ---· -..L~i.'11. '<I" , ,, 591000 591200 591400 591600 591800 592000 UTM East[m] 592200 \_ "\, :pP p p p Uonf~«J flemtrtrary school ~ 592400 •' .,/ p p ,. p ... "I. j 592600 PLOT FILE OF PERIOD VALUES AVERAGED ACROSS O YEARS FOR SOURCE GROUP: PM25 Max: 0.104 [ug/mA3] at (591987. 77, 4179340.82) ~~~-1------1--t------+------+-------t--+---~ •• • FCS An ADEC Innovation Control Pathway AERMOD Total Deposition (Dry & Wet) Dry Deposition Wet Deposition Output Type Concentration Regulatory Default Non-Default Options Dispersion Options The Orchards Project Construction HRA - DPM and PM2.5 Emissions Titles Dispersion Options Population: Name (Optional): Roughness Length: Plume Depletion Dry Removal Wet Removal Output Warnings No Output Warnings Non-fatal Warnings for Non-sequential Met Data Dispersion Coefficient Urban Pollutant / Averaging Time / Terrain Options TG: Meters RE: Meters SO: Meters1 2 3 4 6 8 12 24 ElevatedFlat Hours Terrain Height Options Averaging Time Options Option not availableHalf Life of 4 hrs will be used Exponential DecayPollutant Type AnnualMonth Period PM10 Flagpole Receptors NoYes Default Height = 0.00 m Appendix B - Orchards Project 58 [:l Q [:l Q Q Q Q Q Q Q QQQQQQQQ Q [:l Q [:l Q Q [:l Control Pathway AERMOD Optional Files Re-Start File Multi-Year Analyses Event Input File Error Listing FileInit File Detailed Error Listing File Filename: ConHRA.err Appendix B - Orchards Project 59 I Q Source Pathway - Source Inputs AERMOD Appendix B - Orchards Project 60 Source Pathway - Source Inputs AERMOD Polygon Area Sources Source Type: AREA POLY Source: NGBD_DPM (Neighborhood District Area) X Coordinate for Vertices [m] Y Coordinate for Vertices [m] Base Elevation (Optional) Emission Rate [g/ (s-m^2)] Release Height [m] Initial Vertical Dim. [m] Number of Vertices (or sides) 136.05 5.00 1.40 20 591326.05 4179437.021.82E-8 591496.85 4179100.621.82E-8 592068.62 4179401.611.82E-8 592003.01 4179525.551.82E-8 591970.72 4179508.881.82E-8 591872.82 4179684.891.82E-8 591744.72 4179621.361.82E-8 591737.43 4179629.691.82E-8 591724.94 4179621.361.82E-8 591756.77 4179557.501.82E-8 591647.49 4179499.211.82E-8 591597.88 4179594.281.82E-8 591593.71 4179606.781.82E-8 591573.11 4179602.071.82E-8 591565.59 4179599.491.82E-8 591575.00 4179580.701.82E-8 591425.07 4179502.711.82E-8 591419.66 4179502.461.82E-8 591426.33 4179489.131.82E-8 591326.05 4179437.891.82E-8 Appendix B - Orchards Project 61 Source Pathway - Source Inputs AERMOD Source Type: AREA POLY Source: LOD_DPM (Limits of Disturbance Area) X Coordinate for Vertices [m] Y Coordinate for Vertices [m] Base Elevation (Optional) Emission Rate [g/ (s-m^2)] Release Height [m] Initial Vertical Dim. [m] Number of Vertices (or sides) 137.01 5.00 1.40 37 591295.95 4179517.489.64E-9 591296.66 4179510.719.64E-9 591372.83 4179337.139.64E-9 591498.41 4179100.579.64E-9 592067.47 4179404.929.64E-9 592002.62 4179526.839.64E-9 591972.14 4179511.469.64E-9 591963.89 4179526.429.64E-9 591956.38 4179528.149.64E-9 591867.33 4179691.629.64E-9 591817.23 4179665.309.64E-9 591797.80 4179702.599.64E-9 591740.94 4179671.829.64E-9 591734.12 4179683.679.64E-9 591723.92 4179690.429.64E-9 591712.05 4179688.699.64E-9 591693.42 4179681.849.64E-9 591666.32 4179668.189.64E-9 591657.84 4179668.159.64E-9 591656.15 4179666.459.64E-9 591625.59 4179678.229.64E-9 591613.70 4179683.279.64E-9 591605.23 4179678.169.64E-9 591601.89 4179664.589.64E-9 591600.21 4179657.799.64E-9 591583.22 4179667.919.64E-9 591589.92 4179691.679.64E-9 591572.95 4179696.719.64E-9 591436.03 4179622.459.64E-9 591413.80 4179609.689.64E-9 591408.28 4179610.909.64E-9 Appendix B - Orchards Project 62 Source Pathway - Source Inputs AERMOD Source Type: AREA POLY Source: LOD_DPM (Limits of Disturbance Area) X Coordinate for Vertices [m] Y Coordinate for Vertices [m] Base Elevation (Optional) Emission Rate [g/ (s-m^2)] Release Height [m] Initial Vertical Dim. [m] Number of Vertices (or sides) 137.01 5.00 1.40 37 591396.71 4179601.269.64E-9 591391.52 4179588.909.64E-9 591390.15 4179580.079.64E-9 591378.76 4179580.619.64E-9 591381.28 4179571.139.64E-9 591383.08 4179563.219.64E-9 Appendix B - Orchards Project 63 Source Pathway - Source Inputs AERMOD Source Type: AREA POLY Source: LOD_PM25 (Limits of Disturbance Area - PM2.5) X Coordinate for Vertices [m] Y Coordinate for Vertices [m] Base Elevation (Optional) Emission Rate [g/ (s-m^2)] Release Height [m] Initial Vertical Dim. [m] Number of Vertices (or sides) 137.01 0.00 1.00 37 591295.95 4179517.481.56E-7 591296.66 4179510.711.56E-7 591372.83 4179337.131.56E-7 591498.41 4179100.571.56E-7 592067.47 4179404.921.56E-7 592002.62 4179526.831.56E-7 591972.14 4179511.461.56E-7 591963.89 4179526.421.56E-7 591956.38 4179528.141.56E-7 591867.33 4179691.621.56E-7 591817.23 4179665.301.56E-7 591797.80 4179702.591.56E-7 591740.94 4179671.821.56E-7 591734.12 4179683.671.56E-7 591723.92 4179690.421.56E-7 591712.05 4179688.691.56E-7 591693.42 4179681.841.56E-7 591666.32 4179668.181.56E-7 591657.84 4179668.151.56E-7 591656.15 4179666.451.56E-7 591625.59 4179678.221.56E-7 591613.70 4179683.271.56E-7 591605.23 4179678.161.56E-7 591601.89 4179664.581.56E-7 591600.21 4179657.791.56E-7 591583.22 4179667.911.56E-7 591589.92 4179691.671.56E-7 591572.95 4179696.711.56E-7 591436.03 4179622.451.56E-7 591413.80 4179609.681.56E-7 591408.28 4179610.901.56E-7 Appendix B - Orchards Project 64 Source Pathway - Source Inputs AERMOD Source Type: AREA POLY Source: LOD_PM25 (Limits of Disturbance Area - PM2.5) X Coordinate for Vertices [m] Y Coordinate for Vertices [m] Base Elevation (Optional) Emission Rate [g/ (s-m^2)] Release Height [m] Initial Vertical Dim. [m] Number of Vertices (or sides) 137.01 0.00 1.00 37 591396.71 4179601.261.56E-7 591391.52 4179588.901.56E-7 591390.15 4179580.071.56E-7 591378.76 4179580.611.56E-7 591381.28 4179571.131.56E-7 591383.08 4179563.211.56E-7 Appendix B - Orchards Project 65 Source Pathway - Source Inputs AERMOD Source Type: AREA POLY Source: NGBD_PM25 (Neighborhood District Area - Pm2.5) X Coordinate for Vertices [m] Y Coordinate for Vertices [m] Base Elevation (Optional) Emission Rate [g/ (s-m^2)] Release Height [m] Initial Vertical Dim. [m] Number of Vertices (or sides) 136.05 0.00 1.00 20 591326.05 4179437.021.24E-8 591496.85 4179100.621.24E-8 592068.62 4179401.611.24E-8 592003.01 4179525.551.24E-8 591970.72 4179508.881.24E-8 591872.82 4179684.891.24E-8 591744.72 4179621.361.24E-8 591737.43 4179629.691.24E-8 591724.94 4179621.361.24E-8 591756.77 4179557.501.24E-8 591647.49 4179499.211.24E-8 591597.88 4179594.281.24E-8 591593.71 4179606.781.24E-8 591573.11 4179602.071.24E-8 591565.59 4179599.491.24E-8 591575.00 4179580.701.24E-8 591425.07 4179502.711.24E-8 591419.66 4179502.461.24E-8 591426.33 4179489.131.24E-8 591326.05 4179437.891.24E-8 Appendix B - Orchards Project 66 Source Pathway - Source Inputs AERMOD Line Volume Sources Source Type: LINE VOLUME Source: ROAD1_DPM (Bollinger Canyon Rd) Release Height [m] Base Elevation [m] Y Coordinate for points [m] X Coordinate for Points [m] Length of Side [m] Emission Rate [g/ s] Building Height [m] 26.00 0.00003 3.40134.914179929.09591753.74Surface-Based 3.40135.504179879.22591642.02 3.40136.634179827.35591518.34 3.40139.144179753.54591304.88 3.40143.034179647.81590997.66 Source Type: LINE VOLUME Source: ROAD1_PM25 (Bollinger Canyon Rd) Release Height [m] Base Elevation [m] Y Coordinate for points [m] X Coordinate for Points [m] Length of Side [m] Emission Rate [g/ s] Building Height [m] 26.00 0.00043 3.40134.914179929.09591753.74Surface-Based 3.40135.504179879.22591642.02 3.40136.634179827.35591518.34 3.40139.144179753.54591304.88 3.40143.034179647.81590997.66 Source Type: LINE VOLUME Source: ROAD2_DPM (Donald Doyle Highway - Nbound and Exit Ramp) Release Height [m] Base Elevation [m] Y Coordinate for points [m] X Coordinate for Points [m] Length of Side [m] Emission Rate [g/ s] Building Height [m] 14.00 0.00004 3.40140.604179719.63591276.95 3.40138.104179550.06591276.95 3.40137.364179504.18591282.94 3.40136.844179392.46591324.83 3.40136.994178819.92591608.11 Appendix B - Orchards Project 67 Source Pathway - Source Inputs AERMOD Source Type: LINE VOLUME Source: ROAD2_PM25 (Donald Doyle Highway - Nbound and Exit Ramp) Release Height [m] Base Elevation [m] Y Coordinate for points [m] X Coordinate for Points [m] Length of Side [m] Emission Rate [g/ s]Building Height [m] 14.00 0.00052 3.40140.604179719.63591276.95 3.40138.104179550.06591276.95 3.40137.364179504.18591282.94 3.40136.844179392.46591324.83 3.40136.994178819.92591608.11 Source Type: LINE VOLUME Source: ROAD3_DPM (Donald Doyle Highway Nbound OnRamp) Release Height [m] Base Elevation [m] Y Coordinate for points [m] X Coordinate for Points [m] Length of Side [m] Emission Rate [g/ s]Building Height [m] 14.00 0.00001 3.40141.344179901.17591053.52Surface-Based 3.40140.694179851.29591123.34 3.40140.144179785.46591227.08 3.40139.954179769.50591270.97 Source Type: LINE VOLUME Source: ROAD3_PM25 (Donald Doyle Highway Nbound OnRamp) Release Height [m] Base Elevation [m] Y Coordinate for points [m] X Coordinate for Points [m] Length of Side [m] Emission Rate [g/ s] Building Height [m] 14.00 0.00014 3.40141.344179901.17591053.52Surface-Based 3.40140.694179851.29591123.34 3.40140.144179785.46591227.08 3.40139.954179769.50591270.97 Appendix B - Orchards Project 68 Source Pathway - Source Inputs AERMOD Source Type: LINE VOLUME Source: ROAD4_DPM (Donald Doyle Highway -Sbound) Release Height [m] Base Elevation [m] Y Coordinate for points [m] X Coordinate for Points [m] Length of Side [m] Emission Rate [g/ s]Building Height [m] 30.00 0.00005 3.40141.324179864.29591032.73Surface-Based 3.40139.454179674.76591124.50 3.40136.164179249.81591349.95 3.40136.714178816.87591585.37 Source Type: LINE VOLUME Source: ROAD4_PM25 (Donald Doyle Highway -Sbound) Release Height [m] Base Elevation [m] Y Coordinate for points [m] X Coordinate for Points [m] Length of Side [m] Emission Rate [g/ s] Building Height [m] 30.00 0.00064 3.40141.324179864.29591032.73Surface-Based 3.40139.454179674.76591124.50 3.40136.164179249.81591349.95 3.40136.714178816.87591585.37 Appendix B - Orchards Project 69 Source Pathway - Source Inputs AERMOD Volume Sources Generated from Line Sources Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD2_DPM L0000208 591276.95 4179712.63 140.52 3.40 14.00 6.51 3.165.87E-7 L0000209 591276.95 4179698.63 140.34 3.40 14.00 6.51 3.165.87E-7 L0000210 591276.95 4179684.63 140.17 3.40 14.00 6.51 3.165.87E-7 L0000211 591276.95 4179670.63 139.83 3.40 14.00 6.51 3.165.87E-7 L0000212 591276.95 4179656.63 139.50 3.40 14.00 6.51 3.165.87E-7 L0000213 591276.95 4179642.63 139.34 3.40 14.00 6.51 3.165.87E-7 L0000214 591276.95 4179628.63 139.19 3.40 14.00 6.51 3.165.87E-7 L0000215 591276.95 4179614.63 139.02 3.40 14.00 6.51 3.165.87E-7 L0000216 591276.95 4179600.63 138.82 3.40 14.00 6.51 3.165.87E-7 L0000217 591276.95 4179586.63 138.58 3.40 14.00 6.51 3.165.87E-7 L0000218 591276.95 4179572.63 138.36 3.40 14.00 6.51 3.165.87E-7 L0000219 591276.95 4179558.63 138.20 3.40 14.00 6.51 3.165.87E-7 L0000220 591277.65 4179544.67 138.04 3.40 14.00 6.51 3.165.87E-7 L0000221 591279.46 4179530.79 137.86 3.40 14.00 6.51 3.165.87E-7 L0000222 591281.28 4179516.91 137.68 3.40 14.00 6.51 3.165.87E-7 L0000223 591283.34 4179503.09 137.53 3.40 14.00 6.51 3.165.87E-7 L0000224 591288.26 4179489.98 137.36 3.40 14.00 6.51 3.165.87E-7 L0000225 591293.17 4179476.87 137.10 3.40 14.00 6.51 3.165.87E-7 L0000226 591298.09 4179463.76 137.02 3.40 14.00 6.51 3.165.87E-7 L0000227 591303.01 4179450.66 137.05 3.40 14.00 6.51 3.165.87E-7 L0000228 591307.92 4179437.55 137.00 3.40 14.00 6.51 3.165.87E-7 L0000229 591312.84 4179424.44 136.98 3.40 14.00 6.51 3.165.87E-7 L0000230 591317.75 4179411.33 136.94 3.40 14.00 6.51 3.165.87E-7 L0000231 591322.67 4179398.22 136.90 3.40 14.00 6.51 3.165.87E-7 Appendix B - Orchards Project 70 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD2_DPM L0000232 591328.31 4179385.43 136.85 3.40 14.00 6.51 3.165.87E-7 L0000233 591334.52 4179372.88 136.79 3.40 14.00 6.51 3.165.87E-7 L0000234 591340.73 4179360.33 136.71 3.40 14.00 6.51 3.165.87E-7 L0000235 591346.93 4179347.78 136.65 3.40 14.00 6.51 3.165.87E-7 L0000236 591353.14 4179335.23 136.59 3.40 14.00 6.51 3.165.87E-7 L0000237 591359.35 4179322.69 136.51 3.40 14.00 6.51 3.165.87E-7 L0000238 591365.56 4179310.14 136.40 3.40 14.00 6.51 3.165.87E-7 L0000239 591371.77 4179297.59 136.34 3.40 14.00 6.51 3.165.87E-7 L0000240 591377.98 4179285.04 136.28 3.40 14.00 6.51 3.165.87E-7 L0000241 591384.19 4179272.49 136.21 3.40 14.00 6.51 3.165.87E-7 L0000242 591390.39 4179259.95 136.15 3.40 14.00 6.51 3.165.87E-7 L0000243 591396.60 4179247.40 136.12 3.40 14.00 6.51 3.165.87E-7 L0000244 591402.81 4179234.85 136.06 3.40 14.00 6.51 3.165.87E-7 L0000245 591409.02 4179222.30 135.98 3.40 14.00 6.51 3.165.87E-7 L0000246 591415.23 4179209.75 135.91 3.40 14.00 6.51 3.165.87E-7 L0000247 591421.44 4179197.21 135.87 3.40 14.00 6.51 3.165.87E-7 L0000248 591427.64 4179184.66 135.81 3.40 14.00 6.51 3.165.87E-7 L0000249 591433.85 4179172.11 135.73 3.40 14.00 6.51 3.165.87E-7 L0000250 591440.06 4179159.56 135.68 3.40 14.00 6.51 3.165.87E-7 L0000251 591446.27 4179147.01 135.64 3.40 14.00 6.51 3.165.87E-7 L0000252 591452.48 4179134.46 135.58 3.40 14.00 6.51 3.165.87E-7 L0000253 591458.69 4179121.92 135.50 3.40 14.00 6.51 3.165.87E-7 L0000254 591464.90 4179109.37 135.44 3.40 14.00 6.51 3.165.87E-7 L0000255 591471.10 4179096.82 135.40 3.40 14.00 6.51 3.165.87E-7 L0000256 591477.31 4179084.27 135.37 3.40 14.00 6.51 3.165.87E-7 Appendix B - Orchards Project 71 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD2_DPM L0000257 591483.52 4179071.72 135.35 3.40 14.00 6.51 3.165.87E-7 L0000258 591489.73 4179059.18 135.35 3.40 14.00 6.51 3.165.87E-7 L0000259 591495.94 4179046.63 135.39 3.40 14.00 6.51 3.165.87E-7 L0000260 591502.15 4179034.08 135.44 3.40 14.00 6.51 3.165.87E-7 L0000261 591508.36 4179021.53 135.50 3.40 14.00 6.51 3.165.87E-7 L0000262 591514.56 4179008.98 135.58 3.40 14.00 6.51 3.165.87E-7 L0000263 591520.77 4178996.44 135.68 3.40 14.00 6.51 3.165.87E-7 L0000264 591526.98 4178983.89 135.77 3.40 14.00 6.51 3.165.87E-7 L0000265 591533.19 4178971.34 135.87 3.40 14.00 6.51 3.165.87E-7 L0000266 591539.40 4178958.79 135.97 3.40 14.00 6.51 3.165.87E-7 L0000267 591545.61 4178946.24 136.06 3.40 14.00 6.51 3.165.87E-7 L0000268 591551.81 4178933.69 136.17 3.40 14.00 6.51 3.165.87E-7 L0000269 591558.02 4178921.15 136.28 3.40 14.00 6.51 3.165.87E-7 L0000270 591564.23 4178908.60 136.34 3.40 14.00 6.51 3.165.87E-7 L0000271 591570.44 4178896.05 136.44 3.40 14.00 6.51 3.165.87E-7 L0000272 591576.65 4178883.50 136.53 3.40 14.00 6.51 3.165.87E-7 L0000273 591582.86 4178870.95 136.62 3.40 14.00 6.51 3.165.87E-7 L0000274 591589.07 4178858.41 136.71 3.40 14.00 6.51 3.165.87E-7 L0000275 591595.27 4178845.86 136.79 3.40 14.00 6.51 3.165.87E-7 L0000276 591601.48 4178833.31 136.88 3.40 14.00 6.51 3.165.87E-7 L0000277 591607.69 4178820.76 136.98 3.40 14.00 6.51 3.165.87E-7 Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD1_DPM L0000475 591741.87 4179923.79 134.92 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000476 591718.13 4179913.20 135.05 3.40 26.00 12.09 3.16Surface-Based1.10E-6 Appendix B - Orchards Project 72 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD1_DPM L0000477 591694.38 4179902.60 135.17 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000478 591670.64 4179892.00 135.27 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000479 591646.90 4179881.40 135.41 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000480 591622.97 4179871.23 135.54 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000481 591599.00 4179861.18 135.68 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000482 591575.02 4179851.12 135.98 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000483 591551.04 4179841.07 136.27 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000484 591527.06 4179831.01 136.54 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000485 591502.71 4179821.95 136.81 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000486 591478.14 4179813.45 136.99 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000487 591453.56 4179804.96 136.90 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000488 591428.99 4179796.46 136.72 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000489 591404.42 4179787.96 136.64 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000490 591379.85 4179779.46 136.90 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000491 591355.27 4179770.97 137.51 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000492 591330.70 4179762.47 138.26 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000493 591306.13 4179753.97 139.09 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000494 591281.55 4179745.51 140.24 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000495 591256.96 4179737.05 141.65 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000496 591232.38 4179728.59 143.25 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000497 591207.79 4179720.13 144.53 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000498 591183.21 4179711.67 145.46 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000499 591158.62 4179703.21 139.73 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000500 591134.04 4179694.74 139.54 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000501 591109.45 4179686.28 141.11 3.40 26.00 12.09 3.16Surface-Based1.10E-6 Appendix B - Orchards Project 73 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD1_DPM L0000502 591084.87 4179677.82 146.37 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000503 591060.28 4179669.36 145.80 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000504 591035.70 4179660.90 144.91 3.40 26.00 12.09 3.16Surface-Based1.10E-6 L0000505 591011.11 4179652.44 143.78 3.40 26.00 12.09 3.16Surface-Based1.10E-6 Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD3_DPM L0000506 591059.22 4179897.10 141.24 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000507 591070.61 4179888.96 141.07 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000508 591082.00 4179880.82 140.98 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000509 591093.39 4179872.68 140.88 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000510 591104.79 4179864.55 140.78 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000511 591116.18 4179856.41 140.61 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000512 591127.73 4179848.51 140.65 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000513 591139.55 4179841.01 140.69 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000514 591151.37 4179833.51 140.58 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000515 591163.19 4179826.00 140.51 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000516 591175.01 4179818.50 140.55 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000517 591186.83 4179811.00 140.63 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000518 591198.65 4179803.50 140.29 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000519 591210.47 4179796.00 140.19 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000520 591222.29 4179788.50 140.10 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000521 591234.91 4179782.61 140.05 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000522 591248.07 4179777.83 140.13 3.40 14.00 6.51 3.16Surface-Based5.98E-7 L0000523 591261.22 4179773.04 139.99 3.40 14.00 6.51 3.16Surface-Based5.98E-7 Appendix B - Orchards Project 74 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD4_DPM L0000524 591039.27 4179850.79 141.15 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000525 591052.34 4179823.79 140.84 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000526 591065.42 4179796.79 140.53 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000527 591078.49 4179769.79 140.22 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000528 591091.56 4179742.79 139.86 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000529 591104.64 4179715.79 139.60 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000530 591117.71 4179688.79 139.53 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000531 591131.26 4179662.03 139.19 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000532 591145.32 4179635.52 139.03 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000533 591159.38 4179609.02 138.90 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000534 591173.44 4179582.52 138.52 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000535 591187.50 4179556.02 138.38 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000536 591201.56 4179529.52 138.17 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000537 591215.62 4179503.02 137.86 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000538 591229.68 4179476.51 137.57 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000539 591243.74 4179450.01 137.36 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000540 591257.80 4179423.51 137.19 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000541 591271.86 4179397.01 137.05 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000542 591285.91 4179370.51 136.90 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000543 591299.97 4179344.01 136.75 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000544 591314.03 4179317.51 136.57 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000545 591328.09 4179291.00 136.47 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000546 591342.15 4179264.50 136.29 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000547 591356.33 4179238.07 136.12 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000548 591370.67 4179211.71 136.01 3.40 30.00 13.95 3.16Surface-Based1.28E-6 Appendix B - Orchards Project 75 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD4_DPM L0000549 591385.00 4179185.36 135.87 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000550 591399.33 4179159.00 135.70 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000551 591413.66 4179132.64 135.50 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000552 591427.99 4179106.29 135.35 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000553 591442.32 4179079.93 135.25 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000554 591456.65 4179053.58 135.19 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000555 591470.99 4179027.22 135.24 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000556 591485.32 4179000.87 135.37 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000557 591499.65 4178974.51 135.56 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000558 591513.98 4178948.16 135.81 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000559 591528.31 4178921.80 135.99 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000560 591542.64 4178895.45 136.16 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000561 591556.97 4178869.09 136.37 3.40 30.00 13.95 3.16Surface-Based1.28E-6 L0000562 591571.31 4178842.74 136.55 3.40 30.00 13.95 3.16Surface-Based1.28E-6 Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD1_PM25 L0000949 591741.87 4179923.79 134.97 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000950 591718.13 4179913.20 135.10 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000951 591694.38 4179902.60 135.22 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000952 591670.64 4179892.00 135.35 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000953 591646.90 4179881.40 135.47 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000954 591622.97 4179871.23 135.67 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000955 591599.00 4179861.18 135.89 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000956 591575.02 4179851.12 136.11 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000957 591551.04 4179841.07 136.33 3.40 26.00 12.09 3.16Surface-Based0.00001 Appendix B - Orchards Project 76 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD1_PM25 L0000958 591527.06 4179831.01 136.55 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000959 591502.71 4179821.95 136.81 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000960 591478.14 4179813.45 137.10 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000961 591453.56 4179804.96 137.39 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000962 591428.99 4179796.46 137.68 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000963 591404.42 4179787.96 137.97 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000964 591379.85 4179779.46 138.26 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000965 591355.27 4179770.97 138.55 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000966 591330.70 4179762.47 138.84 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000967 591306.13 4179753.97 139.13 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000968 591281.55 4179745.51 139.44 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000969 591256.96 4179737.05 139.75 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000970 591232.38 4179728.59 140.06 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000971 591207.79 4179720.13 140.37 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000972 591183.21 4179711.67 140.68 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000973 591158.62 4179703.21 140.99 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000974 591134.04 4179694.74 141.30 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000975 591109.45 4179686.28 141.61 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000976 591084.87 4179677.82 141.93 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000977 591060.28 4179669.36 142.24 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000978 591035.70 4179660.90 142.55 3.40 26.00 12.09 3.16Surface-Based0.00001 L0000979 591011.11 4179652.44 142.86 3.40 26.00 12.09 3.16Surface-Based0.00001 Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD2_PM25 L0000980 591276.95 4179712.63 140.50 3.40 14.00 6.51 3.167.49E-6 Appendix B - Orchards Project 77 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD2_PM25 L0000981 591276.95 4179698.63 140.29 3.40 14.00 6.51 3.167.49E-6 L0000982 591276.95 4179684.63 140.08 3.40 14.00 6.51 3.167.49E-6 L0000983 591276.95 4179670.63 139.88 3.40 14.00 6.51 3.167.49E-6 L0000984 591276.95 4179656.63 139.67 3.40 14.00 6.51 3.167.49E-6 L0000985 591276.95 4179642.63 139.46 3.40 14.00 6.51 3.167.49E-6 L0000986 591276.95 4179628.63 139.26 3.40 14.00 6.51 3.167.49E-6 L0000987 591276.95 4179614.63 139.05 3.40 14.00 6.51 3.167.49E-6 L0000988 591276.95 4179600.63 138.85 3.40 14.00 6.51 3.167.49E-6 L0000989 591276.95 4179586.63 138.64 3.40 14.00 6.51 3.167.49E-6 L0000990 591276.95 4179572.63 138.43 3.40 14.00 6.51 3.167.49E-6 L0000991 591276.95 4179558.63 138.23 3.40 14.00 6.51 3.167.49E-6 L0000992 591277.65 4179544.67 138.01 3.40 14.00 6.51 3.167.49E-6 L0000993 591279.46 4179530.79 137.79 3.40 14.00 6.51 3.167.49E-6 L0000994 591281.28 4179516.91 137.57 3.40 14.00 6.51 3.167.49E-6 L0000995 591283.34 4179503.09 137.35 3.40 14.00 6.51 3.167.49E-6 L0000996 591288.26 4179489.98 137.29 3.40 14.00 6.51 3.167.49E-6 L0000997 591293.17 4179476.87 137.23 3.40 14.00 6.51 3.167.49E-6 L0000998 591298.09 4179463.76 137.17 3.40 14.00 6.51 3.167.49E-6 L0000999 591303.01 4179450.66 137.11 3.40 14.00 6.51 3.167.49E-6 L0001000 591307.92 4179437.55 137.05 3.40 14.00 6.51 3.167.49E-6 L0001001 591312.84 4179424.44 136.99 3.40 14.00 6.51 3.167.49E-6 L0001002 591317.75 4179411.33 136.93 3.40 14.00 6.51 3.167.49E-6 L0001003 591322.67 4179398.22 136.87 3.40 14.00 6.51 3.167.49E-6 L0001004 591328.31 4179385.43 136.84 3.40 14.00 6.51 3.167.49E-6 L0001005 591334.52 4179372.88 136.85 3.40 14.00 6.51 3.167.49E-6 Appendix B - Orchards Project 78 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD2_PM25 L0001006 591340.73 4179360.33 136.85 3.40 14.00 6.51 3.167.49E-6 L0001007 591346.93 4179347.78 136.85 3.40 14.00 6.51 3.167.49E-6 L0001008 591353.14 4179335.23 136.85 3.40 14.00 6.51 3.167.49E-6 L0001009 591359.35 4179322.69 136.86 3.40 14.00 6.51 3.167.49E-6 L0001010 591365.56 4179310.14 136.86 3.40 14.00 6.51 3.167.49E-6 L0001011 591371.77 4179297.59 136.86 3.40 14.00 6.51 3.167.49E-6 L0001012 591377.98 4179285.04 136.87 3.40 14.00 6.51 3.167.49E-6 L0001013 591384.19 4179272.49 136.87 3.40 14.00 6.51 3.167.49E-6 L0001014 591390.39 4179259.95 136.87 3.40 14.00 6.51 3.167.49E-6 L0001015 591396.60 4179247.40 136.88 3.40 14.00 6.51 3.167.49E-6 L0001016 591402.81 4179234.85 136.88 3.40 14.00 6.51 3.167.49E-6 L0001017 591409.02 4179222.30 136.88 3.40 14.00 6.51 3.167.49E-6 L0001018 591415.23 4179209.75 136.89 3.40 14.00 6.51 3.167.49E-6 L0001019 591421.44 4179197.21 136.89 3.40 14.00 6.51 3.167.49E-6 L0001020 591427.64 4179184.66 136.89 3.40 14.00 6.51 3.167.49E-6 L0001021 591433.85 4179172.11 136.90 3.40 14.00 6.51 3.167.49E-6 L0001022 591440.06 4179159.56 136.90 3.40 14.00 6.51 3.167.49E-6 L0001023 591446.27 4179147.01 136.90 3.40 14.00 6.51 3.167.49E-6 L0001024 591452.48 4179134.46 136.91 3.40 14.00 6.51 3.167.49E-6 L0001025 591458.69 4179121.92 136.91 3.40 14.00 6.51 3.167.49E-6 L0001026 591464.90 4179109.37 136.91 3.40 14.00 6.51 3.167.49E-6 L0001027 591471.10 4179096.82 136.92 3.40 14.00 6.51 3.167.49E-6 L0001028 591477.31 4179084.27 136.92 3.40 14.00 6.51 3.167.49E-6 L0001029 591483.52 4179071.72 136.92 3.40 14.00 6.51 3.167.49E-6 L0001030 591489.73 4179059.18 136.93 3.40 14.00 6.51 3.167.49E-6 Appendix B - Orchards Project 79 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD2_PM25 L0001031 591495.94 4179046.63 136.93 3.40 14.00 6.51 3.167.49E-6 L0001032 591502.15 4179034.08 136.93 3.40 14.00 6.51 3.167.49E-6 L0001033 591508.36 4179021.53 136.94 3.40 14.00 6.51 3.167.49E-6 L0001034 591514.56 4179008.98 136.94 3.40 14.00 6.51 3.167.49E-6 L0001035 591520.77 4178996.44 136.94 3.40 14.00 6.51 3.167.49E-6 L0001036 591526.98 4178983.89 136.95 3.40 14.00 6.51 3.167.49E-6 L0001037 591533.19 4178971.34 136.95 3.40 14.00 6.51 3.167.49E-6 L0001038 591539.40 4178958.79 136.95 3.40 14.00 6.51 3.167.49E-6 L0001039 591545.61 4178946.24 136.96 3.40 14.00 6.51 3.167.49E-6 L0001040 591551.81 4178933.69 136.96 3.40 14.00 6.51 3.167.49E-6 L0001041 591558.02 4178921.15 136.96 3.40 14.00 6.51 3.167.49E-6 L0001042 591564.23 4178908.60 136.97 3.40 14.00 6.51 3.167.49E-6 L0001043 591570.44 4178896.05 136.97 3.40 14.00 6.51 3.167.49E-6 L0001044 591576.65 4178883.50 136.97 3.40 14.00 6.51 3.167.49E-6 L0001045 591582.86 4178870.95 136.98 3.40 14.00 6.51 3.167.49E-6 L0001046 591589.07 4178858.41 136.98 3.40 14.00 6.51 3.167.49E-6 L0001047 591595.27 4178845.86 136.98 3.40 14.00 6.51 3.167.49E-6 L0001048 591601.48 4178833.31 136.99 3.40 14.00 6.51 3.167.49E-6 L0001049 591607.69 4178820.76 136.99 3.40 14.00 6.51 3.167.49E-6 Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD3_PM25 L0001050 591059.22 4179897.10 141.29 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001051 591070.61 4179888.96 141.18 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001052 591082.00 4179880.82 141.07 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001053 591093.39 4179872.68 140.97 3.40 14.00 6.51 3.16Surface-Based7.63E-6 Appendix B - Orchards Project 80 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD3_PM25 L0001054 591104.79 4179864.55 140.86 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001055 591116.18 4179856.41 140.76 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001056 591127.73 4179848.51 140.67 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001057 591139.55 4179841.01 140.60 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001058 591151.37 4179833.51 140.54 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001059 591163.19 4179826.00 140.48 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001060 591175.01 4179818.50 140.42 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001061 591186.83 4179811.00 140.35 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001062 591198.65 4179803.50 140.29 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001063 591210.47 4179796.00 140.23 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001064 591222.29 4179788.50 140.17 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001065 591234.91 4179782.61 140.11 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001066 591248.07 4179777.83 140.05 3.40 14.00 6.51 3.16Surface-Based7.63E-6 L0001067 591261.22 4179773.04 139.99 3.40 14.00 6.51 3.16Surface-Based7.63E-6 Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD4_PM25 L0001068 591039.27 4179850.79 141.19 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001069 591052.34 4179823.79 140.92 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001070 591065.42 4179796.79 140.65 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001071 591078.49 4179769.79 140.39 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001072 591091.56 4179742.79 140.12 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001073 591104.64 4179715.79 139.85 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001074 591117.71 4179688.79 139.59 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001075 591131.26 4179662.03 139.35 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001076 591145.32 4179635.52 139.15 3.40 30.00 13.95 3.16Surface-Based0.00002 Appendix B - Orchards Project 81 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD4_PM25 L0001077 591159.38 4179609.02 138.94 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001078 591173.44 4179582.52 138.74 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001079 591187.50 4179556.02 138.53 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001080 591201.56 4179529.52 138.33 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001081 591215.62 4179503.02 138.12 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001082 591229.68 4179476.51 137.92 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001083 591243.74 4179450.01 137.71 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001084 591257.80 4179423.51 137.50 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001085 591271.86 4179397.01 137.30 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001086 591285.91 4179370.51 137.09 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001087 591299.97 4179344.01 136.89 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001088 591314.03 4179317.51 136.68 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001089 591328.09 4179291.00 136.48 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001090 591342.15 4179264.50 136.27 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001091 591356.33 4179238.07 136.17 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001092 591370.67 4179211.71 136.21 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001093 591385.00 4179185.36 136.24 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001094 591399.33 4179159.00 136.28 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001095 591413.66 4179132.64 136.31 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001096 591427.99 4179106.29 136.34 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001097 591442.32 4179079.93 136.38 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001098 591456.65 4179053.58 136.41 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001099 591470.99 4179027.22 136.44 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001100 591485.32 4179000.87 136.48 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001101 591499.65 4178974.51 136.51 3.40 30.00 13.95 3.16Surface-Based0.00002 Appendix B - Orchards Project 82 Source Pathway - Source Inputs AERMOD Line Source ID Volume Source ID X Coordinate [m] Y Coordinate [m] Base Elevation [m] Release Height [m[ Emission Rate [g/s] Length of Side [m] Building Height [m] Initial Lateral Dimencion [m] Initial Vertical Dimencion [m] ROAD4_PM25 L0001102 591513.98 4178948.16 136.54 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001103 591528.31 4178921.80 136.58 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001104 591542.64 4178895.45 136.61 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001105 591556.97 4178869.09 136.64 3.40 30.00 13.95 3.16Surface-Based0.00002 L0001106 591571.31 4178842.74 136.68 3.40 30.00 13.95 3.16Surface-Based0.00002 Appendix B - Orchards Project 83 Source Pathway AERMOD Option not in use Building Downwash Information Emission Rate Units for Output For Concentration Concentration Unit Label: Emission Unit Label: Unit Factor:1E6 GRAMS/SEC MICROGRAMS/M**3 PM25 List of Sources in Group (Source Range or Single Sources)Source Group ID: ROAD1_PM25 ROAD3_PM25 ROAD2_PM25 ROAD4_PM25 NGBD_PM25 LOD_PM25 DPM List of Sources in Group (Source Range or Single Sources)Source Group ID: ROAD1_DPM ROAD3_DPM ROAD2_DPM ROAD4_DPM NGBD_DPM LOD_DPM ALL List of Sources in Group (Source Range or Single Sources)Source Group ID: All Sources Included Source Groups Variable Emissions Appendix B - Orchards Project 84 Source Pathway AERMOD Hour-of-Day / Day-of-Week Emission Rate Variation Scenario: Scenario 1 ROAD1_DPMSource ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 ROAD3_DPMSource ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 ROAD2_DPMSource ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 ROAD4_DPMSource ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 Appendix B - Orchards Project 85 Source Pathway AERMOD Scenario: Scenario 1 ROAD4_DPMSource ID: 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 NGBD_DPMSource ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 LOD_DPMSource ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 ROAD1_PM25Source ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 86 Source Pathway AERMOD Scenario: Scenario 1 ROAD1_PM25Source ID: Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 ROAD3_PM25Source ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 ROAD2_PM25Source ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 ROAD4_PM25Source ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 87 Source Pathway AERMOD Scenario: Scenario 1 NGBD_PM25Source ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 LOD_PM25Source ID: Weekdays Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 1.00 1.00 1.00 1.00 Day 13 - 18 0.00 1.00 1.00 1.00 1.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Saturday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Sunday Hour 1 - 6 0.00 0.00 0.00 0.00 0.00 0.00 of 7 - 12 0.00 0.00 0.00 0.00 0.00 0.00 Day 13 - 18 0.00 0.00 0.00 0.00 0.00 0.00 19 - 24 0.00 0.00 0.00 0.00 0.00 0.00 Appendix B - Orchards Project 88 Receptor Pathway AERMOD Receptor Networks Note: Terrain Elavations and Flagpole Heights for Network Grids are in Page RE2 - 1 (If applicable) Generated Discrete Receptors for Multi-Tier (Risk) Grid and Receptor Locations for Fenceline Grid are in Page RE3 - 1 (If applicable) Discrete Receptors Discrete Cartesian Receptors X-Coordinate [m]Y-Coordinate [m]Terrain Elevations Flagpole Heights [m] (Optional) Record Number Group Name (Optional) 591503.25 4178801.77 142.001UCART1 591636.89 4178869.89 132.202UCART1 591681.43 4178892.60 131.763UCART1 591725.98 4178915.31 133.264UCART1 591770.53 4178938.01 133.665UCART1 591815.07 4178960.72 131.436UCART1 591859.62 4178983.43 131.337UCART1 591904.16 4179006.14 131.208UCART1 591948.71 4179028.84 130.179UCART1 591993.26 4179051.55 129.7210UCART1 592037.80 4179074.26 130.1111UCART1 592082.35 4179096.96 130.3312UCART1 592126.90 4179119.67 129.7113UCART1 592171.44 4179142.38 129.1414UCART1 592215.99 4179165.09 129.1915UCART1 592260.54 4179187.79 128.9316UCART1 592305.08 4179210.50 129.0517UCART1 591435.99 4178823.61 143.0918UCART1 591480.54 4178846.32 142.7819UCART1 591614.18 4178914.44 132.7520UCART1 591658.73 4178937.15 132.4721UCART1 591703.27 4178959.85 133.0822UCART1 591747.82 4178982.56 133.1023UCART1 591792.36 4179005.27 130.7224UCART1 591836.91 4179027.97 130.7025UCART1 591881.46 4179050.68 130.4126UCART1 591926.00 4179073.39 130.8627UCART1 591970.55 4179096.10 131.0228UCART1 592015.10 4179118.80 129.9629UCART1 592059.64 4179141.51 129.1830UCART1 Appendix B - Orchards Project 89 Receptor Pathway AERMOD 592104.19 4179164.22 128.7631UCART1 592148.74 4179186.93 128.9032UCART1 592193.28 4179209.63 129.6533UCART1 592237.83 4179232.34 129.7534UCART1 592282.37 4179255.05 128.5535UCART1 592326.92 4179277.75 128.2536UCART1 591368.74 4178845.45 144.4137UCART1 591413.29 4178868.16 143.8938UCART1 591457.83 4178890.86 143.6039UCART1 591591.47 4178958.98 133.1540UCART1 591636.02 4178981.69 132.8941UCART1 591680.56 4179004.40 134.0142UCART1 591725.11 4179027.11 132.2743UCART1 591769.66 4179049.81 132.1544UCART1 591814.20 4179072.52 131.3145UCART1 591858.75 4179095.23 131.6746UCART1 591903.30 4179117.94 130.4347UCART1 591947.84 4179140.64 130.8848UCART1 591992.39 4179163.35 129.9149UCART1 592036.94 4179186.06 130.5450UCART1 592081.48 4179208.76 130.4251UCART1 592126.03 4179231.47 130.0252UCART1 592170.57 4179254.18 129.1953UCART1 592215.12 4179276.89 129.0654UCART1 592259.67 4179299.59 129.4455UCART1 592304.21 4179322.30 129.7556UCART1 592348.76 4179345.01 129.8157UCART1 591301.49 4178867.29 145.2758UCART1 591346.03 4178889.99 143.6659UCART1 591390.58 4178912.70 142.5260UCART1 591435.13 4178935.41 141.9961UCART1 591568.76 4179003.53 133.6462UCART1 591613.31 4179026.24 133.4763UCART1 591657.86 4179048.95 133.3264UCART1 591702.40 4179071.65 132.3465UCART1 591746.95 4179094.36 132.5166UCART1 591791.50 4179117.07 132.2567UCART1 591836.04 4179139.77 132.2568UCART1 Appendix B - Orchards Project 90 Receptor Pathway AERMOD 591880.59 4179162.48 130.9969UCART1 591925.14 4179185.19 131.2570UCART1 591969.68 4179207.90 130.3471UCART1 592014.23 4179230.60 130.9972UCART1 592058.77 4179253.31 130.7673UCART1 592103.32 4179276.02 130.4974UCART1 592147.87 4179298.73 130.4675UCART1 592192.41 4179321.43 128.7476UCART1 592236.96 4179344.14 128.4677UCART1 592281.51 4179366.85 129.1478UCART1 592326.05 4179389.55 129.1379UCART1 592370.60 4179412.26 128.5180UCART1 591278.78 4178911.83 145.6881UCART1 591323.33 4178934.54 143.5282UCART1 591367.87 4178957.25 141.8283UCART1 591412.42 4178979.96 141.5684UCART1 591546.06 4179048.08 134.1485UCART1 591590.60 4179070.78 133.2686UCART1 591635.15 4179093.49 133.5987UCART1 591679.70 4179116.20 132.3688UCART1 591724.24 4179138.91 132.5589UCART1 591768.79 4179161.61 132.9790UCART1 591813.34 4179184.32 132.6191UCART1 591857.88 4179207.03 131.4892UCART1 591902.43 4179229.74 131.7993UCART1 591946.97 4179252.44 130.9794UCART1 591991.52 4179275.15 131.2795UCART1 592036.07 4179297.86 130.6596UCART1 592080.61 4179320.56 130.2097UCART1 592125.16 4179343.27 129.7498UCART1 592169.71 4179365.98 129.1499UCART1 592214.25 4179388.69 129.63100UCART1 592258.80 4179411.39 130.02101UCART1 592303.35 4179434.10 130.46102UCART1 592347.89 4179456.81 129.59103UCART1 591256.07 4178956.38 143.42104UCART1 591300.62 4178979.09 143.03105UCART1 591345.16 4179001.79 140.31106UCART1 Appendix B - Orchards Project 91 Receptor Pathway AERMOD 591389.71 4179024.50 140.34107UCART1 592191.55 4179433.23 129.42108UCART1 592236.09 4179455.94 129.86109UCART1 592280.64 4179478.65 130.16110UCART1 592325.18 4179501.35 130.06111UCART1 591233.36 4179000.93 144.30112UCART1 591277.91 4179023.63 142.59113UCART1 591322.46 4179046.34 138.98114UCART1 591367.00 4179069.05 139.40115UCART1 591210.66 4179045.47 144.80116UCART1 591255.20 4179068.18 141.25117UCART1 591299.75 4179090.89 137.60118UCART1 591344.30 4179113.59 136.01119UCART1 591187.95 4179090.02 145.34120UCART1 591232.50 4179112.73 143.39121UCART1 591277.04 4179135.43 138.77122UCART1 591321.59 4179158.14 138.66123UCART1 591165.24 4179134.57 144.28124UCART1 591209.79 4179157.27 144.10125UCART1 591254.33 4179179.98 140.66126UCART1 591298.88 4179202.69 140.68127UCART1 592056.17 4179588.71 131.84128UCART1 592100.72 4179611.42 131.74129UCART1 592145.26 4179634.13 131.54130UCART1 591142.53 4179179.11 146.24131UCART1 591187.08 4179201.82 144.70132UCART1 591231.63 4179224.53 142.65133UCART1 591276.17 4179247.23 142.10134UCART1 592033.46 4179633.26 131.74135UCART1 592078.01 4179655.96 131.74136UCART1 592122.55 4179678.67 131.83137UCART1 591119.83 4179223.66 146.01138UCART1 591164.37 4179246.37 144.41139UCART1 591208.92 4179269.07 143.20140UCART1 591253.47 4179291.78 142.41141UCART1 592010.75 4179677.80 131.65142UCART1 592055.30 4179700.51 131.65143UCART1 592099.85 4179723.22 131.89144UCART1 Appendix B - Orchards Project 92 Receptor Pathway AERMOD 591097.12 4179268.20 142.42145UCART1 591141.67 4179290.91 141.70146UCART1 591186.21 4179313.62 140.87147UCART1 591074.41 4179312.75 142.38148UCART1 591118.96 4179335.46 141.21149UCART1 591051.71 4179357.30 142.03150UCART1 591096.25 4179380.00 141.04151UCART1 591029.00 4179401.84 142.19152UCART1 591919.93 4179855.99 132.84153UCART1 591964.47 4179878.70 132.92154UCART1 592009.02 4179901.40 133.34155UCART1 592053.56 4179924.11 134.00156UCART1 592098.11 4179946.82 134.26157UCART1 591897.22 4179900.54 133.41158UCART1 591941.76 4179923.24 133.92159UCART1 591986.31 4179945.95 134.48160UCART1 592030.86 4179968.66 135.08161UCART1 592075.40 4179991.36 134.86162UCART1 591874.51 4179945.08 134.02163UCART1 591919.06 4179967.79 135.02164UCART1 591963.60 4179990.50 135.84165UCART1 592008.15 4180013.20 135.56166UCART1 592052.70 4180035.91 135.51167UCART1 591561.82 4179897.93 135.85168UCART1 591829.10 4180034.17 134.24169UCART1 591873.64 4180056.88 135.72170UCART1 591918.19 4180079.59 135.85171UCART1 591962.74 4180102.30 135.84172UCART1 592007.28 4180125.00 135.27173UCART1 591405.47 4179874.36 139.32174UCART1 591450.02 4179897.06 139.04175UCART1 591494.56 4179919.77 138.86176UCART1 591539.11 4179942.48 136.49177UCART1 591628.20 4179987.89 137.06178UCART1 591672.75 4180010.60 137.07179UCART1 591717.30 4180033.31 137.05180UCART1 591761.84 4180056.01 137.07181UCART1 591806.39 4180078.72 134.73182UCART1 Appendix B - Orchards Project 93 Receptor Pathway AERMOD 591850.94 4180101.43 136.04183UCART1 591895.48 4180124.14 136.32184UCART1 591940.03 4180146.84 136.54185UCART1 591516.40 4179987.02 137.12186UCART1 591560.95 4180009.73 136.82187UCART1 591605.50 4180032.44 137.05188UCART1 591650.04 4180055.15 136.99189UCART1 591694.59 4180077.85 136.99190UCART1 591739.14 4180100.56 137.04191UCART1 591783.68 4180123.27 134.70192UCART1 591828.23 4180145.97 136.28193UCART1 591872.77 4180168.68 136.41194UCART1 591181.87 4179872.62 140.74195UCART1 591226.42 4179895.33 140.82196UCART1 591270.96 4179918.03 140.77197UCART1 591493.70 4180031.57 139.03198UCART1 591538.24 4180054.28 137.68199UCART1 591582.79 4180076.98 137.04200UCART1 591627.34 4180099.69 137.06201UCART1 591671.88 4180122.40 137.04202UCART1 591716.43 4180145.11 137.06203UCART1 591760.97 4180167.81 135.21204UCART1 591805.52 4180190.52 136.57205UCART1 591850.07 4180213.23 136.94206UCART1 591114.62 4179894.46 140.32207UCART1 591159.16 4179917.17 139.94208UCART1 591203.71 4179939.87 140.90209UCART1 591248.26 4179962.58 140.93210UCART1 591292.80 4179985.29 140.67211UCART1 591337.35 4180007.99 139.92212UCART1 591381.90 4180030.70 139.91213UCART1 591426.44 4180053.41 139.21214UCART1 591470.99 4180076.12 139.05215UCART1 591515.54 4180098.82 137.97216UCART1 591560.08 4180121.53 137.72217UCART1 591604.63 4180144.24 137.24218UCART1 591649.17 4180166.95 136.90219UCART1 591693.72 4180189.65 136.14220UCART1 Appendix B - Orchards Project 94 Receptor Pathway AERMOD 591738.27 4180212.36 135.77221UCART1 591091.91 4179939.00 140.62222UCART1 591136.46 4179961.71 141.45223UCART1 591181.00 4179984.42 141.33224UCART1 591225.55 4180007.13 141.13225UCART1 591270.10 4180029.83 140.59226UCART1 591314.64 4180052.54 140.96227UCART1 591549.14 4179110.59 134.14228RES 591567.01 4179092.73 133.93229RES 591592.81 4179120.51 133.89230RES 591604.72 4179140.36 133.60231RES 591632.50 4179154.25 133.27232RES 591654.33 4179164.18 133.01233RES 591690.06 4179178.07 132.72234RES 591707.92 4179189.98 132.75235RES 591733.72 4179199.90 133.02236RES 591761.51 4179207.84 133.24237RES 591779.37 4179213.80 133.12238RES 591805.18 4179223.72 133.00239RES 591825.02 4179231.66 132.76240RES 591844.87 4179243.57 132.52241RES 591872.66 4179255.48 132.23242RES 591892.51 4179271.36 131.89243RES 591910.37 4179283.26 131.64244RES 591928.23 4179293.19 131.46245RES 591946.09 4179311.05 131.18246RES 591971.90 4179322.96 130.91247RES 591987.77 4179340.82 130.60248RES 592011.59 4179348.76 130.22249RES 592037.39 4179366.62 129.96250RES 592061.21 4179378.53 129.89251RES 592092.97 4179390.44 129.69252RES 592110.83 4179404.33 129.62253RES 592132.66 4179416.24 129.67254RES 591997.10 4179581.37 131.92255NON-RES 592027.47 4179596.56 131.96256NON-RES 591973.48 4179640.42 131.99257NON-RES 591951.55 4179680.91 132.04258NON-RES Appendix B - Orchards Project 95 Receptor Pathway AERMOD 591417.29 4179850.21 139.21259NON-RES 591444.30 4179869.32 139.12260NON-RES 591475.87 4179866.59 139.07261NON-RES 591022.37 4179572.04 140.20262NON-RES 591054.13 4179556.16 140.16263NON-RES 591075.96 4179544.26 140.16264NON-RES 591141.46 4179474.79 138.21265NON-RES 591166.65 4179449.75 138.33266NON-RES 591185.13 4179423.18 138.20267NON-RES 591062.07 4179478.76 139.60268NON-RES 591511.32 4179881.17 138.93269NON-RES 591487.79 4179897.98 138.97270NON-RES Plant Boundary Receptors Receptor Groups Group DescriptionGroup IDRecord Number UCART1 Receptors generated from Uniform Cartesian Grid1 RES Residential2 NON-RES Worker3 Appendix B - Orchards Project 96 Meteorology Pathway AERMOD Met Input Data Surface Met Data Profile Met Data ..\Met\KLVK.SFC Default AERMET format Filename: Format Type: Filename: Format Type: ..\Met\KLVK.PFL Potential Temperature Profile Base Elevation above MSL (for Primary Met Tower):119.80 [m] Wind Direction Rotation Adjustment [deg]: Meteorological Station Data Upper Air Station No. Year Station Name Surface Stations X Coordinate [m] Y Coordinate [m] 2013 Livermore Airport (KLVK) 2013 OAKLAND/WSO AP Default AERMET format Wind Speed Wind Speeds are Vector Mean (Not Scalar Means) Data Period Start Date:End Date:1/1/2013 12/31/2017Start Hour:End Hour: 241 Data Period to Process 10.8 8.23 5.14 3.09 1.54 No Upper Bound Wind Speed [m/s]Stability CategoryWind Speed [m/s] F E D C B A Stability Category Wind Speed Categories Appendix B - Orchards Project 97 I I I I Results Summary The Orchards Project Construction HRA - DPM and PM2.5 Emissions PM10 - Concentration - Source Group: DPM Averaging Period Rank Peak X (m) Y (m) ZELEV (m) ZHILL (m) Peak Date, Start HourZFLAG (m)Units PERIOD 0.01520 591987.77 4179340.82 130.60 0.00 130.60ug/m^3 PM10 - Concentration - Source Group: PM25 Averaging Period Rank Peak X (m) Y (m) ZELEV (m) ZHILL (m) Peak Date, Start HourZFLAG (m)Units PERIOD 0.10390 591987.77 4179340.82 130.60 0.00 130.60ug/m^3 Appendix B - Orchards Project 98 Sensitive Receptor Summary The Orchards Project Construction HRA - DPM and PM2.5 Emissions PM10 - Concentration - Source Group: DPM Averaging Period Rank Peak X (m) Y (m) ZELEV (m) ZHILL (m) Peak Date, Start HourZFLAG (m)Units Receptor ID PERIOD 0.00053 591181.87 4179872.62 140.74 0.00 225.04ug/m^3 PERIOD 0.00757 591549.14 4179110.59 134.14 0.00 306.92ug/m^3 PERIOD 0.00478 591567.01 4179092.73 133.93 0.00 306.92ug/m^3 PERIOD 0.00809 591592.81 4179120.51 133.89 0.00 306.92ug/m^3 PERIOD 0.01124 591604.72 4179140.36 133.60 0.00 306.92ug/m^3 PERIOD 0.01217 591632.50 4179154.25 133.27 0.00 306.92ug/m^3 PERIOD 0.01250 591654.33 4179164.18 133.01 0.00 306.92ug/m^3 PERIOD 0.01239 591690.06 4179178.07 132.72 0.00 306.92ug/m^3 PERIOD 0.01328 591707.92 4179189.98 132.75 0.00 306.92ug/m^3 PERIOD 0.01311 591733.72 4179199.90 133.02 0.00 306.92ug/m^3 PERIOD 0.01237 591761.51 4179207.84 133.24 0.00 306.92ug/m^3 PERIOD 0.01201 591779.37 4179213.80 133.12 0.00 306.92ug/m^3 PERIOD 0.01170 591805.18 4179223.72 133.00 0.00 303.74ug/m^3 PERIOD 0.01148 591825.02 4179231.66 132.76 0.00 132.76ug/m^3 PERIOD 0.01181 591844.87 4179243.57 132.52 0.00 132.52ug/m^3 PERIOD 0.01155 591872.66 4179255.48 132.23 0.00 132.23ug/m^3 PERIOD 0.01234 591892.51 4179271.36 131.89 0.00 131.89ug/m^3 PERIOD 0.01271 591910.37 4179283.26 131.64 0.00 138.67ug/m^3 PERIOD 0.01278 591928.23 4179293.19 131.46 0.00 138.64ug/m^3 PERIOD 0.01408 591946.09 4179311.05 131.18 0.00 138.64ug/m^3 Appendix B - Orchards Project 99 Sensitive Receptor Summary The Orchards Project Construction HRA - DPM and PM2.5 Emissions PM10 - Concentration - Source Group: DPM Averaging Period Rank Peak X (m) Y (m) ZELEV (m) ZHILL (m) Peak Date, Start HourZFLAG (m)Units Receptor ID PERIOD 0.01369 591971.90 4179322.96 130.91 0.00 130.91ug/m^3 PERIOD 0.01520 591987.77 4179340.82 130.60 0.00 130.60ug/m^3 MEIR PERIOD 0.01419 592011.59 4179348.76 130.22 0.00 130.22ug/m^3 PERIOD 0.01457 592037.39 4179366.62 129.96 0.00 129.96ug/m^3 PERIOD 0.01414 592061.21 4179378.53 129.89 0.00 129.89ug/m^3 PERIOD 0.01259 592092.97 4179390.44 129.69 0.00 129.69ug/m^3 PERIOD 0.01156 592110.83 4179404.33 129.62 0.00 129.62ug/m^3 PERIOD 0.00988 592132.66 4179416.24 129.67 0.00 129.67ug/m^3 PERIOD 0.01395 591997.10 4179581.37 131.92 0.00 131.92ug/m^3 MEIW PERIOD 0.01051 592027.47 4179596.56 131.96 0.00 131.96ug/m^3 PERIOD 0.01101 591973.48 4179640.42 131.99 0.00 131.99ug/m^3 PERIOD 0.00883 591951.55 4179680.91 132.04 0.00 132.04ug/m^3 PERIOD 0.00069 591417.29 4179850.21 139.21 0.00 139.21ug/m^3 PERIOD 0.00067 591444.30 4179869.32 139.12 0.00 139.12ug/m^3 PERIOD 0.00077 591475.87 4179866.59 139.07 0.00 139.07ug/m^3 PERIOD 0.00063 591022.37 4179572.04 140.20 0.00 306.92ug/m^3 PERIOD 0.00073 591054.13 4179556.16 140.16 0.00 306.92ug/m^3 PERIOD 0.00082 591075.96 4179544.26 140.16 0.00 306.92ug/m^3 PERIOD 0.00149 591141.46 4179474.79 138.21 0.00 306.92ug/m^3 PERIOD 0.00192 591166.65 4179449.75 138.33 0.00 306.92ug/m^3 Appendix B - Orchards Project 100 Sensitive Receptor Summary The Orchards Project Construction HRA - DPM and PM2.5 Emissions PM10 - Concentration - Source Group: DPM Averaging Period Rank Peak X (m) Y (m) ZELEV (m) ZHILL (m) Peak Date, Start HourZFLAG (m)Units Receptor ID PERIOD 0.00239 591185.13 4179423.18 138.20 0.00 306.92ug/m^3 PERIOD 0.00100 591062.07 4179478.76 139.60 0.00 306.92ug/m^3 PERIOD 0.00080 591511.32 4179881.17 138.93 0.00 138.93ug/m^3 PERIOD 0.00065 591487.79 4179897.98 138.97 0.00 138.97ug/m^3 Appendix B - Orchards Project 101 Sensitive Receptor Summary The Orchards Project Construction HRA - DPM and PM2.5 Emissions PM10 - Concentration - Source Group: PM25 Averaging Period Rank Peak X (m) Y (m) ZELEV (m) ZHILL (m) Peak Date, Start HourZFLAG (m)Units Receptor ID PERIOD 0.00546 591181.87 4179872.62 140.74 0.00 225.04ug/m^3 PERIOD 0.06084 591549.14 4179110.59 134.14 0.00 306.92ug/m^3 PERIOD 0.03154 591567.01 4179092.73 133.93 0.00 306.92ug/m^3 PERIOD 0.05534 591592.81 4179120.51 133.89 0.00 306.92ug/m^3 PERIOD 0.08429 591604.72 4179140.36 133.60 0.00 306.92ug/m^3 PERIOD 0.08875 591632.50 4179154.25 133.27 0.00 306.92ug/m^3 PERIOD 0.08894 591654.33 4179164.18 133.01 0.00 306.92ug/m^3 PERIOD 0.08436 591690.06 4179178.07 132.72 0.00 306.92ug/m^3 PERIOD 0.09132 591707.92 4179189.98 132.75 0.00 306.92ug/m^3 PERIOD 0.08798 591733.72 4179199.90 133.02 0.00 306.92ug/m^3 PERIOD 0.08073 591761.51 4179207.84 133.24 0.00 306.92ug/m^3 PERIOD 0.07759 591779.37 4179213.80 133.12 0.00 306.92ug/m^3 PERIOD 0.07502 591805.18 4179223.72 133.00 0.00 303.74ug/m^3 PERIOD 0.07335 591825.02 4179231.66 132.76 0.00 132.76ug/m^3 PERIOD 0.07562 591844.87 4179243.57 132.52 0.00 132.52ug/m^3 PERIOD 0.07381 591872.66 4179255.48 132.23 0.00 132.23ug/m^3 PERIOD 0.07949 591892.51 4179271.36 131.89 0.00 131.89ug/m^3 PERIOD 0.08228 591910.37 4179283.26 131.64 0.00 138.67ug/m^3 PERIOD 0.08288 591928.23 4179293.19 131.46 0.00 138.64ug/m^3 PERIOD 0.09305 591946.09 4179311.05 131.18 0.00 138.64ug/m^3 Appendix B - Orchards Project 102 Sensitive Receptor Summary The Orchards Project Construction HRA - DPM and PM2.5 Emissions PM10 - Concentration - Source Group: PM25 Averaging Period Rank Peak X (m) Y (m) ZELEV (m) ZHILL (m) Peak Date, Start HourZFLAG (m)Units Receptor ID PERIOD 0.09012 591971.90 4179322.96 130.91 0.00 130.91ug/m^3 PERIOD 0.10390 591987.77 4179340.82 130.60 0.00 130.60ug/m^3 MEIR PERIOD 0.09481 592011.59 4179348.76 130.22 0.00 130.22ug/m^3 PERIOD 0.09957 592037.39 4179366.62 129.96 0.00 129.96ug/m^3 PERIOD 0.09614 592061.21 4179378.53 129.89 0.00 129.89ug/m^3 PERIOD 0.08386 592092.97 4179390.44 129.69 0.00 129.69ug/m^3 PERIOD 0.07724 592110.83 4179404.33 129.62 0.00 129.62ug/m^3 PERIOD 0.06603 592132.66 4179416.24 129.67 0.00 129.67ug/m^3 PERIOD 0.09607 591997.10 4179581.37 131.92 0.00 131.92ug/m^3 MEIW PERIOD 0.07199 592027.47 4179596.56 131.96 0.00 131.96ug/m^3 PERIOD 0.07823 591973.48 4179640.42 131.99 0.00 131.99ug/m^3 PERIOD 0.06530 591951.55 4179680.91 132.04 0.00 132.04ug/m^3 PERIOD 0.00634 591417.29 4179850.21 139.21 0.00 139.21ug/m^3 PERIOD 0.00593 591444.30 4179869.32 139.12 0.00 139.12ug/m^3 PERIOD 0.00695 591475.87 4179866.59 139.07 0.00 139.07ug/m^3 PERIOD 0.00533 591022.37 4179572.04 140.20 0.00 306.92ug/m^3 PERIOD 0.00619 591054.13 4179556.16 140.16 0.00 306.92ug/m^3 PERIOD 0.00704 591075.96 4179544.26 140.16 0.00 306.92ug/m^3 PERIOD 0.01402 591141.46 4179474.79 138.21 0.00 306.92ug/m^3 PERIOD 0.01841 591166.65 4179449.75 138.33 0.00 306.92ug/m^3 Appendix B - Orchards Project 103 Sensitive Receptor Summary The Orchards Project Construction HRA - DPM and PM2.5 Emissions PM10 - Concentration - Source Group: PM25 Averaging Period Rank Peak X (m) Y (m) ZELEV (m) ZHILL (m) Peak Date, Start HourZFLAG (m)Units Receptor ID PERIOD 0.02208 591185.13 4179423.18 138.20 0.00 306.92ug/m^3 PERIOD 0.00873 591062.07 4179478.76 139.60 0.00 306.92ug/m^3 PERIOD 0.00713 591511.32 4179881.17 138.93 0.00 138.93ug/m^3 PERIOD 0.00562 591487.79 4179897.98 138.97 0.00 138.97ug/m^3 Appendix B - Orchards Project 104 Orchards Project Health Risk Summary of HARP2 Results Residential Exposure Construction - DPM Emissions Maximum Risk RISK_SUM Cancer Risk/million MAXHI NonCancer Chronic MAXHI NonCancer Acute 6.43E-06 6.4312 0.00304 0 Maximally Exposed Individual Receptor X Y MEI UTM 406256.64 4535581.5 HARP File Name *HARP - HRACalc v22118 11/18/2025 11:11:29 AM - Cancer Risk - Input File: F:\Jobs\24910040\ConHRA\HARP2\ResRiskHRAInput.hra RECEPTOR X Y CONC RISK_SUM SCENARIO CHRONIC HI 1 406256.64 4535581.5 0.0152 6.43E-06 4.84YrCancerRMP_Inh_FAH16to70 0.00304 \ Appendix B - Orchards Project 105 Column1 HARP2 - HRACalc (dated 22118) 11/18/2025 11:11:29 AM - Output Log GLCs loaded successfully Pollutants loaded successfully ********************************** RISK SCENARIO SETTINGS Receptor Type: Resident Scenario: Cancer Calculation Method: HighEnd ********************************** EXPOSURE DURATION PARAMETERS FOR CANCER Start Age: -0.25 Total Exposure Duration: 4.84 Exposure Duration Bin Distribution 3rd Trimester Bin: 0.25 0<2 Years Bin: 2 2<9 Years Bin: 2.84 2<16 Years Bin: 0 16<30 Years Bin: 0 16 to 70 Years Bin: 0 ********************************** PATHWAYS ENABLED NOTE: Inhalation is always enabled and used for all assessments. The remaining pathways are only used for cancer and noncancer chronic assessments. Inhalation: True Soil: False Dermal: False Mother's milk: False Water: False Fish: False Homegrown crops: False Beef: False Dairy: False Pig: False Chicken: False Egg: False ********************************** INHALATION Daily breathing rate: RMP **Worker Adjustment Factors** Worker adjustment factors enabled: NO **Fraction at time at home** 3rd Trimester to 16 years: OFF 16 years to 70 years: ON ********************************** TIER 2 SETTINGS Tier2 adjustments were used in this assessment. Please see the input file for details. Tier2 - What was changed: ED or start age changed| Calculating cancer risk Cancer risk saved to: F:\Jobs\24910040\ConHRA\HARP2\ResRiskCancerRisk.csv HRA ran successfully Appendix B - Orchards Project 106 Orchards Project Health Risk Summary of HARP2 Results Worker Exposure Construction - DPM Emissions Maximum Risk RISK_SUM Cancer Risk/million MAXHI NonCancer Chronic MAXHI NonCancer Acute 7.70E-07 0.77036 0.00279 0 Maximally Exposed Individual Receptor X Y MEI UTM 591997.1 4179581 HARP File Name *HARP - HRACalc v22118 11/19/2025 5:09:55 AM - Cancer Risk - Input File: F:\Jobs\24910040\ConHRA\HARP2\WkrRiskHRAInput.hra RECEPTOR X Y CONC RISK_SUM SCENARIO CHRONIC HI 1 591997.1 4179581.37 0.01395 7.70E-07 5.09YrCancerDerived_Inh 0.00279 \ Appendix B - Orchards Project 107 Column1 HARP2 - HRACalc (dated 22118) 11/19/2025 5:09:55 AM - Output Log GLCs loaded successfully Pollutants loaded successfully ********************************** RISK SCENARIO SETTINGS Receptor Type: Worker Scenario: Cancer Calculation Method: Derived ********************************** EXPOSURE DURATION PARAMETERS FOR CANCER Start Age: 16 Total Exposure Duration: 5.09 Exposure Duration Bin Distribution 3rd Trimester Bin: 0 0<2 Years Bin: 0 2<9 Years Bin: 0 2<16 Years Bin: 0 16<30 Years Bin: 5.09 16 to 70 Years Bin: 0 ********************************** PATHWAYS ENABLED NOTE: Inhalation is always enabled and used for all assessments. The remaining pathways are only used for cancer and noncancer chronic assessments. Inhalation: True Soil: False Dermal: False Mother's milk: False Water: False Fish: False Homegrown crops: False Beef: False Dairy: False Pig: False Chicken: False Egg: False ********************************** INHALATION Daily breathing rate: Moderate8HR **Worker Adjustment Factors** NOTE: The worker adjustment factors below are only used for cancer assessments. However, the GLC adjustment factor is also applied to 8-hr noncancer chronic assessments. Worker adjustments factors enabled: YES GLC adjustment factor: 4.2 Exposure frequency: 250 **Fraction at time at home** 3rd Trimester to 16 years: OFF 16 years to 70 years: OFF ********************************** TIER 2 SETTINGS Tier2 adjustments were used in this assessment. Please see the input file for details. Tier2 - What was changed: ED or start age changed| Calculating cancer risk Cancer risk saved to: F:\Jobs\24910040\ConHRA\HARP2\WkrRiskCancerRisk.csv HRA ran successfully Appendix B - Orchards Project 108 Bay Area Air District Stationary Source Screening Map - Orchards Pr… Area of Interest (AOI) Information Area: 16,668,896.79 ft² Date: Tue Nov 18 2025 12:47:06 GMT-0800 (Pacific Standard Time) Esri Community Maps Contributors, California State Parks, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS | OEHHA, CalEPA | 40 CFR, Chapter I Section 81, et seq., and California Health and Safety Code, Section 40000 et seq. Shapefile coverage. | https://www.baaqmd.gov/~/media/files/planning-and- research/ceqa/ceqa-guidelines-2022/appendix-e-recommended-methods-for-screening- and-modeling-local-risks-and-hazards_final-pdf.pdf? rev=b8917a27345a4a629fc18fc8650951e4&sc_lang=en Powered by Esri Permitted Stationary Sources Bay Area Air District Boundary Overburdened Communities Appendix B - Orchards Project 109 • Bo linger Canyon School Park • □ • Sa Ramon C ntral Pa k • Permitted Stationary Sources | Total count: 5 #OBJECTID FacilityID FacilityName 1 560 7237 Bishop Ranch (Sunset Properties) 2 9494 109766-1 Chevron Products Company 3 4726 21793 Pacific Gas & Electric Company 4 1503 14094 San Ramon Marriott Hotel 5 2184 15850 Target Corporation- Store T-949 #Address City State 1 6001 Bollinger Canyon Rd Bldg J San Ramon CA 2 18060 San Ramon Valley Blvd San Ramon CA 3 6121 Bollinger Canyon Rd San Ramon CA 4 2600 Bishop Drive San Ramon CA 5 2610 Bishop Drive San Ramon CA #Zip County Latitude 1 94583 Contra Costa 37.758903 2 94583 Contra Costa 37.759164 3 94583 Contra Costa 37.759894 4 94583 Contra Costa 37.762931 5 94583 Contra Costa 37.762177 #Longitude SourceType NAICS 1 -121.959897 No data 237210 2 -121.967238 Nonretail Gas Station 457110 3 -121.954466 Generator 486210 4 -121.964884 Generator 721110 5 -121.964363 Generator 455110 #NAICS Sector NAICS Subsector NAICS Industry 1 Construction Heavy and Civil Engineering Construction Land Subdivision 2 Retail Trade Gasoline Stations Gasoline Stations with Convenience Stores 3 Transportation and Warehousing Pipeline Transportation Pipeline Transportation of Natural Gas 4 Accommodation and Food Services Accommodation Hotels (except Casino Hotels) and Motels 5 Retail Trade Miscellaneous Store Retailers Department Stores #CancerRisk ChronicHI PM25 Throughput_Gal/yr 1 34 0.01 0.76 No data 2 19 0.09 0.00 No data 3 14 0.00 0.02 No data 4 17 0.00 0.02 No data 5 0 0.00 0.00 No data Appendix B - Orchards Project 110 Bay Area Air District - Mobile Source Screening Tool Receptor Risk Assessment Results Prepared by: FirstCarbon Solutions Date of Analysis: 2025-11-18 Raster Files Used (BAAQMD Update Dates): Road Cancer Risk: raster\cancrsk_onroad_carb_trk_frac.tif (Last Updated: December 8, 2022) Road Chronic HI: raster\chronhi_onroad_carb_trk_frac.tif (Last Updated: December 8, 2022) Road PM2.5: raster\PM25_onroad_carb_trk_frac.tif (Last Updated: December 8, 2022) Rail Cancer Risk: raster\rail_all_cancrsk.tif (Last Updated: August 25, 2025) Rail Chronic HI: raster\rail_all_chronhi.tif (Last Updated: August 25, 2025) Rail PM2.5: raster\rail_all_pm25.tif (Last Updated: August 25, 2025) Results Table: Receptor ID UTMX UTMY Road Cancer Risk Road Chronic HI Road PM2.5 Rail Cancer Risk Rail Chronic HI Rail PM2.5 MEIR 591987.770000 4179340.820000 12.630353 0.032780 0.232331 0.000000 0.000000 0.000000 MEIW 591997.100000 4179581.370000 11.681828 0.030008 0.196604 0.000000 0.000000 0.000000 Data provided by: BAAQMD as raster file (.tif) datasets Page 1 Appendix B - Orchards Project 111 CITY OF SAN RAMON CALIFORNIA ENVIRONMENTAL QUALITY ACT GREENHOUSE GAS EMISSIONS ANALYSIS COMPLIANCE CHECKLIST San Ramon Climate Action Plan Consistency Checklist for Future Development1 Version: October 16, 2025 On June 10, 2025, the City of San Ramon adopted the San Ramon Climate Action Plan (CAP), which establishes 2030 and 2045 greenhouse gas (GHG) emissions reduction targets and provides measures and actions to reduce GHG emissions within the community and achieve those targets. The CAP includes specific measures and actions to achieve the communitywide GHG emissions reduction target of a 40 percent reduction below 1990 per capita GHG emissions levels by 2030 and make substantial progress towards the 2045 target for carbon neutrality. This meets California’s goal of reducing GHG emissions by 40 percent below 1990 levels by 2030 (pursuant to Senate Bill 32, 2016) and provides substantial progress towards achieving the State’s GHG reduction goal of carbon neutrality by 2045 (pursuant to Assembly Bill 1279, 2023). The San Ramon City Council, City staff, and community will continue to develop an approach to meet the State’s 2045 goal of carbon neutrality. Pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15183.5, a lead agency may determine that a project's or plan’s incremental contribution to a GHG emissions cumulative effect is not cumulatively considerable if the project or plan complies with the requirements in an adopted plan or mitigation program for the purpose of reducing GHG emissions under specified circumstances. For the CAP to be considered a qualified GHG reduction strategy and provide for CEQA streamlining of GHG emissions analysis for future development, the CAP must identify those measures and actions that are applicable to future development projects. Specifically, the CAP includes measures and actions that are applicable to existing development, as well as proposed new development and major remodels. GHG reduction programs that are applicable to new development and major remodel projects are summarized in the following CEQA GHG Emissions Analysis Compliance Checklist (referred to herein as the CEQA GHG Checklist). This CEQA GHG Checklist identifies applicable measures from the CAP that, in some instances, may be the same as State and local sustainability regulations and 1 Future development refers to any project or plan that is subject to discretionary review and triggers environmental review pursuantto CEQA. Projects with published Notice of Preparations, submitted application packages, and/or other official documentation that pre-date the adoption of the CAP and CEQA GHG Emissions Thresholds are not required to utilize this CEQA GHG Checklist and/or the CEQA GHG Emissions Thresholds, at the discretion of the City as the CEQA Lead Agency. Appendix B - Orchards Project 112 requirements. The purpose of the CEQA GHG Checklist is to assist with determining project or plan consistency with the CAP and provide a streamlined review process for proposed future projects and plans that are subject to discretionary review and trigger environmental review pursuant to CEQA. This CEQA GHG Checklist contains measures and actions that are essential to be implemented on a project-by-project basis, as applicable, to meet the specified GHG emissions targets identified in the CAP. Implementation of these measures and actions would demonstrate that future development and major remodel projects are consistent with CAP assumptions and assist San Ramon in achieving its identified GHG reduction targets. Projects or plans that are consistent with the CAP (as determined through the use of this CEQA GHG Checklist) may rely on the San Ramon 2040 General Plan Environmental Impact Report for the respective project- and cumulative-level GHG emissions impacts analysis. Land-use types that may streamline CEQA GHG emissions analysis using this CEQA GHG Checklist include residential, commercial (e.g. retail, office, mixed-use developments, restaurants, hotels, shopping centers, entertainment venues, schools, hospitals, research centers, etc.),2 and municipal uses. Industrial projects and emissions generated by those sources are regulated separately by the California Air Resources Board (CARB) and are not under the City’s direct operational control and, therefore, such industrial emissions were also not included in the CAP GHG inventory, forecast, targets, or reduction measures quantification. Therefore, this checklist does not apply to industrial projects. Inconsistency with any of the applicable measures and actions in this CEQA GHG Checklist would make a plan/project potentially inconsistent with the overall CAP. Projects that are identified as potentially inconsistent with the CAP via this CEQA GHG Checklist must prepare a project- specific analysis of GHG emissions, including quantification of existing and projected GHG emissions compared to San Ramon CEQA GHG Emissions Thresholds adopted on June 10, 2025, and incorporate the CAP measures and actions in this CEQA GHG Checklist to the extent feasible.3 The process for determining whether a project or plan may utilize this CEQA GHG Checklist for streamlining or whether a quantitative GHG emissions analysis is required is illustrated in Figure 1, below. 2 Warehouses may not streamline CEQA GHG emissions analysis using this CEQA GHG Checklist, because warehouses are considered to be outside the purview of the San Ramon CAP. Gas and electric utilities typically classify facilities into residential, commercial, and industrial categories based on the type of activity performed and level of energy consumption. While warehouses primarily engage in commercial activities, they can consume electricity at high rates and are often part of industrial real estate. The gas and electric utilities serving San Ramon did not confirm whether warehouses are included in the commercial use category in their energy reporting. Because industrial uses (and associated natural gas and electricity consumption) are excluded from the CAP’s GHG inventory and it is unknown how the utilities categorize warehouses, warehouses have been considered to be outside the purview of this CAP to remain conservative. 3 The San Ramon CEQA GHG Emissions Thresholds and Guidance Report on the preparation of quantitative GHG emissions analyses is available at https://www.sanramon.ca.gov/our_city/departments_and_divisions/community_development/planning_services/climate_action_plan. Appendix B - Orchards Project 113 Figure 1 Determining Consistency with the San Ramon CAP Is the project consistent with General Plan land use and zoning designations? Can the project streamline from the CAP per CEQA Guidelines Section 15183.5 by illustrating compliance with the CEQA GHG Emissions Analysis Compliance Checklist? Is the project equal or less GHG-intensive than existing on-site development?* *Quantitative modeling may be required to determine this. Use CEQA GHG Emissions Analysis Quantitative Thresholds CEQA GHG Emissions Analysis Complete YES NO YES NO YES NO Appendix B - Orchards Project 114 APPLICATION SUBMITTAL REQUIREMENTS This CEQA GHG Compliance Checklist is required to accompany the Application Materials submitted to the City for all projects and plans subject to CEQA review that are not deemed statutorily or categorically exempt. The CEQA GHG Checklist is designed to assist the applicant and the City in identifying the minimum CAP and other applicable climate-focused requirements specific to a proposed project or plan. However, it may be necessary to supplement the completed CEQA GHG Checklist with supporting information, materials, calculations, or certifications to demonstrate compliance with CAP and other applicable climate-focused requirements. If the minimum CAP and other applicable climate-focused requirements are not already clearly committed to as part of the CEQA project description, the completed CEQA GHG Checklist shall be included in the respective project or plan description and referenced in the respective conditions of approval. Definitions All Project Types: “All Project Types” refers to all new developments or major remodels for residential, mixed-use, commercial, and institutional land uses. Industrial projects and emissions generated by such sources are regulated by CARB and are not under the City’s direct operational control. Therefore, this checklist does not apply to industrial projects, including warehouse projects. Dual Drainage Plumbing: A "Dual drainage plumbed system" or "dual drainage plumbing" means a system that utilizes separate piping systems for recycled water and potable water within a facility and where the recycled water is used for landscape irrigation and plumbing outlets (e.g., toilets, urinals) within a building. Industrial Projects: “Industrial Projects” refer to all new developments or major remodels whose operating emissions would be regulated by CARB under the Cap-and-Trade Program or whose energy demand during operation would cause them to be classified as an industrial customer by the Pacific Gas & Energy Company or Marin Clean Energy. Major Remodels: Qualifying “major remodels” should be determined based on the California Building Code. Chapter 2 of the California Building Code defines substantial improvements as any repair, reconstruction, rehabilitation, alteration, addition or other improvement of a building or structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the improvement or repair is started. Refer to: https://codes.iccsafe.org/content/CABC2022P4/chapter-2-definitions. Micro-Transit Services: “Micro-transit services” are a flexible form of shared transportation, often using smaller vehicles and app-based scheduling, operating on-demand or along dynamic routes within a defined service area. Natural Lands: “Natural Lands” are areas of land or water that are essentially unimproved, including forests, grasslands, shrublands, woodlands, wetlands, and riparian areas. Open Space: Pursuant to the City of San Ramon General Plan, “Open Space” is any parcel or area of land or water that is essentially unimproved and devoted to an open space use for the Appendix B - Orchards Project 115 purposes of (1) the preservation of natural resources, (2) the managed production of resources, (3) outdoor recreation, or (4) public health and safety.4 4 City of San Ramon. 2023. San Ramon General Plan 2040. Available at: https://cdnsm5-hosted.civiclive.com/UserFiles/Servers/Server_10826046/File/Our%20City/Departments/Community%20Development/Planning/General%20Plan%202040%20Update/RESO2023-133_GeneralPlan2040Update_Compressed.pdf Appendix B - Orchards Project 116 GENERAL PROJECT INFORMATION Project or Plan Name: Address: Assessor’s Parcel Number(s): Date Submitted: Applicant Name: ___________________________ Company Name (if applicable): ____________________ Company Address: ____________________________ Contact Phone: _________________________ Contact Email: __________________________ Was a consultant retained to complete this checklist? Yes☐ No☐ If Yes, complete the following: Consultant Name: ___________________________ Company Name: ____________________________ Company Address: ____________________________ Contact Phone: _________________________ Contact Email: __________________________ Project Information (description summary) What is the size of the project site or plan area (acres)? Gross: _________________________ Net: ___________________________ If proposing a Major Renovation:5 Cost of renovation: Market value of existing development: Identify all applicable proposed land uses: ☐ Residential (indicate # of single-family dwelling units): ______________________________________________________________________________ ☐ Residential (indicate # of multi-family dwelling units): ______________________________________________________________________________ ☐ Commercial (indicate total square footage, gross and net): ______________________________________________________________________________ ☐ Municipal (indicate total square footage, gross and net): 5 Please provide details regarding the calculation of cost of renovation and market value of existing development as an attachment to this checklist. Orchards Project 6001 Bollinger Canyon Road, San Ramon 213-120-008 x Jackie Winkel FirstCarbon Solutions 2999 Walnut Creek, Suite 250 925-357-2562 jwinkel@fcs-intl.com 91.5 acres x x 130 single family detached homes, 42 single family court homes, 58 single family row homes 138 attached row townhomes, 58 ADUs Appendix B - Orchards Project 117 ______________________________________________________________________________ ☐ Other (describe): ______________________________________________________________________________ Project description. This description shall be consistent with the project description that will be used for the CEQA compliance review document. The description may be attached to the CEQA GHG Checklist if there are space constraints. ______________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________________ See attachment. Appendix B - Orchards Project 118 COMPLIANCE CHECKLIST TABLE 6 Every question included in this CEQA GHG Checklist is required to be answered with explanation of either: 1) how it will be achieved, 2) why it will not be achieved, or 3) why it is not applicable. References to the plan set page number or other project description detail should be provided to demonstrate compliance. Section 1: LAND USE CONSISTENCY Regulation Requirements Project/Plan Compliance Required Explanation6 San Ramon 2040 General Plan 1a. Does the Project/Plan include a General Plan Amendment? Yes☐ No☐ N/A☐ _________________________________ _________________________________ _________________________________ _________________________________ San Ramon Zoning Code 1b. Does the Project/Plan include a Zoning Map Amendment/Rezoning, and/or Zoning Text Amendment that results in a different land use than analyzed in the certified General Plan 2040 EIR? If “No” for questions 1a. and 1b., proceed to Section 2: CAP Measures Consistency. If “Yes” to either question 1a or 1.b, the applicant shall prepare a Project/Plan-specific analysis of GHG emissions, including quantification of existing and projected GHG emissions compared to the San Ramon CEQA GHG Emissions Thresholds, and incorporate the CAP measures in this CEQA GHG Checklist to the extent feasible. Yes☐ No☐ N/A☐ _________________________________ _________________________________ _________________________________ _________________________________ As discussed in the Project Description (attached) the proposed project would notinclude a General Plan Amendment. As discussed in the Project Description,(attached) the proposed project would notinclude a General Plan Amendment. Appendix B - Orchards Project 119 X X Section 2: CAP MEASURES CONSISTENCY CAP Measure No. Requirements Project/Plan Compliance7 Required Explanation Building Energy Building Decarbonization and Energy Efficiency Measure E-1 1. All Project Types – 100% Renewable Electricity. Will the Project/Plan enroll in (or encourage future occupants to enroll in) Marin Clean Energy’s Deep Green electricity option or a similar electricity option providing 100 percent renewable and carbon-free electricity? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ Measures E-2, E-3, and E-4 2. All Project Types – Energy-Efficient Design. Will the Project/Plan comply with the latest version of the Building Energy Efficiency Standards (Title 24, Part 6),8 CALGreen Code,9 and any applicable San Ramon Building Energy Appliance Reach Codes or Energy Score Ordinances ? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ Measure E-2 3.All New Project Types – Building Decarbonization. Will the Project/Plan include all-electric appliances for new construction, including for heating, cooking, and water heating? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ 7 “No” responses to checklist items, except for those that include “as an option” in the language, indicate that a quantitative GHG emissions analysis shall be required for the Plan/Project. Checklist items that include “as an option” in the language are voluntary in nature. 8 As of the date of this current CEQA GHG Checklist, the 2022 Building Energy Efficiency Standards are in effect. Beginning January 1, 2026, the 2025 Building Energy Efficiency Standards will apply. For more information visit: https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency-standards. 9 As of the date of this current CEQA GHG Checklist, the 2022 CALGreen Code is in effect. Beginning January 1, 2026, the 2025 CALGreen Code will apply. For more information visit: https://www.dgs.ca.gov/BSC/CALGreen. The proposed project involvesthe development of several hundredhousing units including single family homes, townhomes, and ADUs, whichwill be privately owned. The electricityoption selected will be at the discretionof each owner/occupant. However, the project proponent will encourage futureoccupants to enroll in the Deep Greenoption through an awareness campaign. The proposed project would be required tocomply with all relevant ordinances and standards, including the latest version of the Building Energy Efficiency Standards. The proposed project will be designedand constructed as all-electric and willtherefore include all-electric appliancesincluding for heating, cooking and waterheating. Appendix B - Orchards Project 120 X X X Measure E-2 4. OPTIONAL: Major Remodels – Building Decarbonization. Will the Project/Plan include all-electric appliances for major remodels, including for heating, cooking, and water heating? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ Measures E-3 and E-4 5.OPTIONAL: All Project Types – Energy-Efficient Air Conditioning. As an option, will the Project/Plan include central air conditioning unit installations and replacements that are two-way, providing both heating and cooling with a single unit? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ Renewable Energy Measure E-5 6. OPTIONAL: All Project Types – Solar and Battery Storage Requirements. As an option, will the Project/Plan include installation of a solar photovoltaic (PV) and battery storage system in accordance with the Tier 2 Voluntary Standards of the current version of the California Green Building Standards Code (Title 24, Part 11; CALGreen)?10 Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ Transportation Active Transportation and Transit Measures T-1 and T-2 7. All Project Types – Bicycle Parking. Will the Project/Plan comply with the latest version of the San Ramon Municipal Code Section D3-3811 or CALGreen Code,12 whichever has the greater requirement, for provision of bicycle parking? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ 10 As of the date of this current CEQA GHG Checklist, the 2022 California Green Building Standards Code is in effect. Beginning January 1, 2026, the 2025 California Green Building Standards Code will apply. Available at: https://www.dgs.ca.gov/bsc/calgreen 11 Available at: https://online.encodeplus.com/regs/sanramon-ca/doc-viewer.aspx?secid=4624#secid-4624 12Available at: https://www.dgs.ca.gov/bsc/calgreen The proposed project entails new construction,and is not a remodel. Therefore this measureis not applicable. The proposed project does not includeplans for central air conditioning unitinstallations and replacements that are two-wayat the time of this writing. The proposed project does not includeplans for solar or battery storage beyond the requirements of the current version of the California Green Building StandardsCode. The proposed project would be requiredto comply with all relevant and applicableordinances and codes. Appendix B - Orchards Project 121 X X X X Measures T-1 and T-2 8. All Project Types – Bicycle and Pedestrian Facilities. Will the Project/Plan design the project site or plan area to include development of bike and/or pedestrian infrastructure such as bike lanes, bike repair stations, traffic calming features, wayfinding signage, sidewalks, and pedestrian crosswalks consistent with the guidelines of the San Ramon Bicycle Master Plan13 and Walking District Master Plan,14 as applicable? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ Measure T-3 9. OPTIONAL: All Project Types – Micro-transit. As an option, will the Project/Plan include micro-transit services or shuttles to connect residents and commuters to the active transportation and public transit system? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ Vehicle and Off-road Equipment Decarbonization Measures T-5, T-6, and T-7 10. OPTIONAL: Multi-Family Projects – Electric Vehicle Chargers. As an option, will the Project/Plan comply with the CALGreen15 Tier 2 Voluntary Standards for electric vehicle (EV) charging parking spaces? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ 13 Available a: https://www.sanramon.ca.gov/our_city/departments_and_divisions/public_works/transportation/studies/bicycle_master_plan 14 Available at: https://cdnsm5-hosted.civiclive.com/UserFiles/Servers/Server_10826046/File/Our%20City/Departments/Parks%20&%20Comm%20Srvs/Walking%20District/Walking%20District%20Master%20Plan%20including%20Errata.pdf 15 Available at: https://www.dgs.ca.gov/bsc/calgreen As stated in the Project Description (attached) the proposed project would include connectionsto a greenway and multi-use trail that wouldwrap the perimeter of the project site. The proposed project does not includeplans to offer micro-transit services,however, the proposed project will connectto the existing neighborhood throughconnections to the existing streetsand sidewalks and to a greenway andmulti-use trail. The proposed project would comply withthe requirements for EV-charging infrastructure. Appendix B - Orchards Project 122 X X X Measure T-9 11. All Project Types – Off-Road Equipment Decarbonization. Will the Project/Plan include the use of zero- emission (e.g., electric, renewable diesel) off-road construction equipment, landscaping equipment (e.g., mowers, chippers, tractors), and portable generators? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ ________________________ ________________________ Solid Waste Reduction and Composting Measures W-1 and W-2 12. All Project Types – Landfill Diversion. Will the Project/Plan meet current legislation (e.g., California SB 1383 [2016], AB 1276 [2021]) for inclusion of solid waste sorting and disposal receptacles to support the CAP and Statewide goals to sort, recycle, and collect recyclables and organic waste and reduce landfilled garbage? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ ________________________ Water Conservation and Efficiency Measure WW-1 13. OPTIONAL: All Project Types – Dual Drainage Plumbing. As an option, will the Project/Plan include development that is built with dual drainage plumbing or graywater ready plumbing that can utilize recycled water or graywater for landscape watering and toilets? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ Measure WW-2 14. All Project Types – Water Conservation. Will the Project/Plan meet the water-efficiency standards established by the latest version of the CALGreen16 code by including water efficient fixtures and appliances? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ Measure WW-2 15. All Project Types – Water Efficient Landscaping. Will the Project/Plan comply with the requirements of the Model Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ 16 Available at: https://www.dgs.ca.gov/bsc/calgreen The proposed project's build-out is assumedto be 2031, at which time the use of zero-emissionlandscaping equipment would be requried byARB's SORE regulation (which begins phasingout small off-road engines (less than 25 hp)beginning in 2024. The proposed project would be required tocomply with all relevant and applicableordinances and regulations including forsolid waste and landfill diversion. The proposed project does not include plansto include dual drainage plumbing. The proposed project would be required tocomply with all relevant and applicableordinances including those related to waterconservation. The proposed project would be required tocomply with all relevant and applicableordinances including those related to waterconservation. Appendix B - Orchards Project 123 X X X X X Water Efficient Landscape Ordinance17 by including water efficient landscaping and landscaping irrigation systems? Open Space Conservation and Urban Forest Measure C-1 16. All Project Types – Open Space Conservation. Will the Project/Plan result in the conservation and management of existing open space, natural lands, or trails? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ Measure CS-1 17. All Project Types – Tree Planting. Will the Project/Plan include new climate-adaptive/drought-tolerant trees and landscaping,18 as applicable, in order to increase the Citywide urban forest? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ Measure CS-1 18. All Project Types – Tree Replacement. Will the Plan/Project comply with the tree replacement requirements of San Ramon Municipal Code Division D5, Chapter II (Tree Preservation and Protection),19 as applicable? Yes☐ No☐ N/A☐ ________________________ ________________________ ________________________ 17 Available at: https://www.sanramon.ca.gov/our_city/departments_and_divisions/public_works/storm_drainage_water/water_conservation/MWELO 18 Refer to the California Native Plant Society’s Planting Guides for examples: https://www.cnps.org/gardening/choosing-your-plants/native-planting-guides. Other resources are available at: https://www.cal-ipc.org/solutions/prevention/landscaping/dpp/?region=bayarea and https://ccuh.ucdavis.edu/wucols 19 Available at: https://online.encodeplus.com/regs/sanramon-ca/doc-viewer.aspx?secid=4856#secid-4854 Section 3: Summary and Signature Final Consistency Determination Does the Project/Plan incorporate all applicable and non-optional checklist items? If no, Project/Plan requires quantitative GHG emissions assessment. Yes☐ No☐ The proposed project involves the redevelopment of an existing office parklocated in an infill location of the City of San Ramon. It will include open spaceand connections to trails, however theproject site is currently developed and thereforedoes not involve the conservation of open space. The proposed project would include treeplanting throughout the project site. The proposed project would be required tocomply with all relevant and applicable ordinancesand municipal codes. Appendix B - Orchards Project 124 X X X X Checklist Prepared by: _________________________________ (Name/Title/Organization) Checklist Prepared by: _________________________________ (Signature) Checklist Prepared on: _________________________________ (Date) Signature(s) Signatures for the checklist preparer and/or Project/Plan applicant/sponsor should be added below to indicate that this checklist has been filled out accurately and the Project/Plan has committed to including the Checklist Items above marked with “Yes” in the Project/Plan design. Jackie Winkel, Senior Air Quality Scientist, FirstCarbon Solutions November 18, 2025 Appendix B - Orchards Project 125 X The approximately 91.5-acre site is located at 6001 Bollinger Canyon Road in the City of San Ramon (City), in Contra Costa County (County), California. The project site is bounded by Bollinger Canyon Road to the north, existing commercial and office development to the east, existing residential development to the south, and Interstate 680 (I-680) to the west. The project site corresponds to Assessor’s Parcel Number (APN) 213-120-008 (Exhibits 1 and 2). The proposed project is within the City of San Ramon General Plan 2040 Planning Area. 2.1.2 - Environmental Setting Existing Land Use Activities The project site is currently developed with the Chevron Park Campus, which consists of 13 vacant commercial office buildings, one vacant mechanical/maintenance building, and a telecommunications tower, totaling approximately 1,927,000 square feet. The Chevron Campus Park includes paved parking, driveways, and walkway areas throughout the site. The project site also includes various landscaped areas and a man-made pond near the center of the site. Surrounding Land Uses The project site is surrounded by commercial uses to the north, commercial uses, a parking lot, and a senior living home to the east, residential uses to the south, and Highway I-680 and residential and commercial uses to the west. Exhibit 2 shows an aerial view of the site and surrounding uses. 2.1.3 - Land Use Designation and Zoning The project site is currently designated Downtown Mixed-Use South (DMU-S) in both the General Plan and zoning code (Exhibits 3 and 4). The purpose of the DMU-S land use is to encourage a mixed-use neighborhood, extending the activity of City Center across Bollinger Canyon Road with shops, offices, and a diversity of housing opportunities with walkable streets, parks and trails. General Plan Policy 4.7.I-5 indicates that the DMU-S zone envisions up to 2,900 residential units, including both the proposed project and Bishop Ranch 1 as well as a landscape corridor to serves as a buffer to the existing neighborhood to the south and connectively to the Iron Horse Trail as an extension of the City’s Walking District. This zoning district allows for a density of 20-60 dwelling units per acre and a minimum floor area ratio (FAR) of 1.25. As described in further detail below, the proposed project is requesting a waiver of the minimum FAR through the State Density Bonus Law. 2.2 - Project Background 2.2.1 - General Plan The City certified the General Plan EIR (State Clearinghouse Number 2022060549) and adopted the City of San Ramon General Plan 2040 on December 12, 2023. The General Plan includes eleven respective General Plan elements, amendment to the San Ramon Village Specific Plan, repeal of the North Camino Ramon Specific Plan, and the San Ramon Zoning Ordinance update (collectively referred to in the General Plan EIR as the 2040 General Plan). The 2040 General Plan elements include: Land Use; Housing; Traffic and Circulation; Safety; Open Space Appendix B - Orchards Project 126 and Conservation; Parks and Recreation; Public Facilities and Utilities; Noise, Air Quality and GHG Emissions, Growth Management, and Economic Development. It also included updates to the San Ramon Zoning Ordinance to ensure consistency with the updated General Plan. The 2040 General Plan serves as the long-term blueprint for development across the Planning Area. 2.3 - Project Characteristics 2.3.1 - Project Summary Project Overview The proposed project consists of three districts: the Neighborhood District, Mixed-Use District, and the Multi-Family District, which would include a multi-family affordable housing building (Exhibit 5). Each district would be developed in phases. All three districts combined would total approximately 2,510 residential units (including multi-family apartments, stacked flats, townhomes, single-family homes, vertical mixed-use units, and accessory dwelling units), 125,000 square feet of new retail, commercial, and entertainment uses, and approximately 15 acres of open space, including a 2.5-acre centralized park space and additional pocket parks and recreational amenities. For the purposes of this document, development of the Neighborhood District as well as demolition, grading, and hydroseeding of an ‘Interim Area’ (Exhibit 6) would be analyzed at a project-level as a first phase (Phase 1 or Project-level analysis). The Interim Area is located on part of the Mixed-Use and Multi-Family Districts. It would be demolished, graded, and hydroseeded to support future development of the Mixed-Use and Mult-Family Districts, with the development of those districts not being approved as part of this project. The Mixed-Use District and Multi-Family District would be analyzed at a program-level, as specific site plans for these districts would be developed in later phases and are too speculative to evaluate at this time. 2.3.2 - Designation of Multi-Family District and Mixed-Use District The program level analysis in this document includes designation of the Multi-Family and Mixed-Use Districts. Future development under the Mixed-Use District and Multi-Family District combined would not exceed 2,084 residential units. Mixed-Use District The 11.3-acre Mixed-Use District, located in the northeast portion of the project site, would consist of residential communities with ground floor retail, entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon Road. The Mixed-Use District would have two retail-lined streets, one north-south and one east-west, leading to Orchards Park. The retail streets have wide sidewalks and are lined with active, pedestrian-oriented uses including retail shops, restaurants and outdoor seating. This programmatic analysis of the Mixed-Use District accounts for a maximum of 619 residential units, 388,097 square feet of mixed-use development, 35,717 square feet of open space, and 69,303 square feet of private streets. Appendix B - Orchards Project 127 Multi-Family District The 26.0-acre Multi-Family District, located in the northwest portion of the project site, would consist of communities that may be developed into apartments, condominiums, senior or affordable housing, offering a variety of housing options and would include Orchards Park, a 2.5-acre park that would serve as a gathering place for residents and visitors. It is activated by the retail district and offers playground amenities for children and a flexible lawn allowing for a variety of uses. A wide, multi-use pathway along Sunset Drive connects the Mixed-Use and Multi-Family Districts with the Neighborhood District to the south. This programmatic analysis of the Multi-Family District accounts for a maximum of 1,465 residential units, 711,164 square feet of multi-family residential development, including the proposed multifamily affordable housing building (Building H), 210,861 square feet of open space (including a 2.5-acre centralized park), and 214, 407 square feet of private streets. 2.3.3 - Neighborhood District plus Grading of Interim Area The project level analysis in this document evaluates the follow project elements: 1. Demolition of the Neighborhood District of the Interim Area 2. Grading and hydroseeding of the Interim Area 3. Complete construction of the Neighborhood District Development Interim Area The Interim Area, as shown in Exhibit 6 would be demolished, graded, and hydroseeded, in preparation for later phases of development under the Mixed-Use and Multi-Family District. While the demolition and grading will be approved as part of the project level analysis, future development in this area is only being analyzed at the program level. The Existing to Remain area shown in Exhibit 6 will not undergo any demolition, tree removal, grading, and will remain as is until a future project under the Mixed-Use and/or Multi-Family District is approved. Neighborhood District The proposed project includes the construction of 54.0-acre Neighborhood District, located in the southern portion of the project site that would total 368 residential dwelling units, including single- family homes, townhomes, single-family homes, and vertical mixed-use units, as shown in Table 1. Up to 58 accessory dwelling units (ADUs) would also be constructed. The Neighborhood District Development would have an FAR of 0.41. As shown in Exhibit 4 the attached Row Townhomes would be located in the northern portion of the Neighborhood District, Single-Family Detached Homes would be located at the east and west ends of the Neighborhood District, Single-Family Row Homes would be located in the center of the Neighborhood District, and Single-Family Court Homes would be located along the southern portion of the Neighborhood District. Exhibit 5 depicts the proposed layout; Exhibit 6 depicts the proposed housing types. Appendix B - Orchards Project 128 Table 1: Neighborhood District Unit Mix Unit Type Number of Units ADUs Total Residential Units Single-Family Court Homes 42 10 52 Single Family Detached Homes 130 - - Single-Family Row Homes 58 - - Attached Row Townhomes 138 48 186 Total 368 58 426 Source: William Hezmalhalch Architects, Inc. DBA WHA. 2025. Amenities The Neighborhood District would include three publicly accessible parks and open space amenities in addition to private open space, for a total of 419,870 sq ft, or 9.64 acres of parkland. A greenway and multi-use trail would wrap the perimeter of the proposed project with connections to the Heritage Oak Tree Parks, which are designed around the existing heritage oak trees on site. The pathway includes passive and active recreational activities. Additionally, the Neighborhood District would include two pocket parks within the Townhome community. Circulation The main access to the Neighborhood District would be provided by the existing Chevron Drive. Another access point would be provided via a connection to the office building parking lot to the east of the project site. Sidewalks are proposed along all roadways. The proposed Greenway multi-use trail would be a new addition to the City’s Walking District. Parking Parking in the Neighborhood District would be provided as shown in Table 2. Table 2: Neighborhood District Parking Unit Type Covered Spaces in Garage/DU Uncovered Space in Driveway/DU Total Covered & Uncovered Spaces Guest Parking Total Spaces Provided On- Street EV/ADA Single-Family Court Homes 3 2 210 64 - 274 Single-Family Detached Homes 2 2 520 161 - 681 Single-Family Row Homes 2 - 116 101 - 217 Attached Row Homes 2 - 368 35 2 405 Total - - 1,214 361 2 1577 Appendix B - Orchards Project 129 Unit Type Covered Spaces in Garage/DU Uncovered Space in Driveway/DU Total Covered & Uncovered Spaces Guest Parking Total Spaces Provided On- Street EV/ADA Source: William Hezmalhalch Architects, Inc. DBA WHA. 2025. Storm Drainage Bio-treatment areas for stormwater would be provided throughout the east and west greenways of the project site. These were designed in accordance with the applicable C.3 guidelines within the Conta Costa County Clean Water Program (CCCWP). Utilities Water Potable water service would be provided by East Bay Municipal Utilities District (EBMUD) via existing water lines at the project site. Wastewater Wastewater treatment services would be provided by Central Contra Costa Sanitary District via existing sanitary sewer lines at the project site. Electricity and Natural Gas Electricity would be provided by Marin Clean Energy (MCE) via existing PG&E power lines, unless individual residents elect to have PG&E provided. Natural gas would be provided by PG&E via existing gas lines. 2.3.4 - Affordable Housing The proposed project would comply with the City’s Inclusionary Housing Ordinance and would also qualify for the benefits provided by State Density Bonus Law by providing sufficient on-site affordable housing; the Neighborhood District’s on-site affordable housing is fulfilled through a standalone affordable housing development within the Multi-Family Affordable Housing on a 1.8 acre parcel in the Multi-Family District. A multi-family affordable housing building is proposed at the northwest portion of the project site. State Density Bonus Waivers Because the development includes 100 affordable units, the proposed project is also entitled to unlimited waivers under the State Density Bonus Law and would utilize a waiver for minimum FAR. The proposed project’s density would be 47.2 dwelling units per net acre, which exceeds the applicable minimum General Plan residential density of 20 dwelling units per acre. The proposed Neighborhood District Development would have an FAR of 0.41 and therefore would request a waiver under the State Density Bonus Law of the required minimum sitewide FAR of 1.25 in DMU-South zone as compliance with this development standard would make construction of the proposed project physically infeasible. Appendix B - Orchards Project 130 The proposed project is also requesting to waive the City’s Objective Design Standards for Multi- Family Residential and Mixed-Use Development.1 2.3.5 - Phasing and Construction Orchards will be developed over a 20-year period beginning with the Neighborhood District Development and followed by the affordable multi-family housing units within the Multi-Family District. The Mixed-Use District and the remainder of the Multi-Family District will be phased over time to allow for residential absorption. Phasing will be subject to market conditions. 2.4 - Approvals The proposed project requires the following discretionary approvals from the City: Development Plan Vesting Tentative Map Architectural Review Permit Tree Removal Permit Development Agreement The following administrative actions would also be required from the City: Grading Permits Building Permits Certificates of Occupancy; and Other City approvals as necessary to develop the proposed project. Other agencies with permitting or regulatory authority over the proposed project include: EBMUD San Francisco Bay Regional Water Quality Control Board (San Francisco Bay RWQCB) Bay Area Air District 1 City of San Ramon. 2024. Objective Design Standards for Multi-Family Residential and Mixed-Use Development. November 12. Appendix B - Orchards Project 131