Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appendix H - Noise Supporting Information COMBINED
Orchards Project CEQA Guidelines Section 15183 Consistency Checklist FCS Appendix H: Noise Supporting Information THIS PAGE INTENTIONALLY LEFT BLANK Project Number:Sheet of Project Name: Test Personnel: NOISE MEASUREMENT SURVEY Site Number: Date:Time: From to Site Location: Primary Noise Sources: Measurement Results Observed Noise Sources/Events dBA Time Noise Source/Event dBA Leq Lmax Lmin Lpeak L5 L10 L50 L90 SEL dBA Comments: Equipment: Settings: A-Weighted Other Measured Difference: Slow Fast Windscreen •• • FCS An ADEC Innovation 1 2491.0040 Orchards Tanay Pradhan 10/31/2025 Southern Corner of the Project Site Traffic Noise from 1-680 Freeway 67.6 70.4 63.5 83.7 69.1 68.8 67.6 65.8 97.2 [l] □ 1 2 11 :41 AM 11 :56~ [l] □ [l] Atmospheric Conditions Maximum Wind Velocity (mph) Average Wind Velocity (mph) Temperature (F) Relative Humidity (%) Comments: Photos Taken Photo Number Location/Description Traffic Description Roadway # Lanes Posted Speed Average Speed NB/EB Counts SB/WB Counts •• • FCS An ADEC Innovation 1 2 3 4 7 2 67 72 Facing southeast (toward residences) Facing southwest (toward 1-680 Freeway) Facing northwest Facing northeast Project Number:Sheet of Project Name: Test Personnel: NOISE MEASUREMENT SURVEY Site Number: Date:Time: From to Site Location: Primary Noise Sources: Measurement Results Observed Noise Sources/Events dBA Time Noise Source/Event dBA Leq Lmax Lmin Lpeak L5 L10 L50 L90 SEL dBA Comments: Equipment: Settings: A-Weighted Other Measured Difference: Slow Fast Windscreen •• • FCS An ADEC Innovation 2 2491.0040 Orchards Tanay Pradhan 10/31/2025 11 :16 AM Eastern Corner of the Project Site Parking lot noise at the adjacent parking lot Landscape noise at residences nearby 43.1 53.1 39.7 75.7 46.1 44.9 42.3 40.8 72.7 [l] □ [l] 2 2 11 :31 ~ □ [l] Atmospheric Conditions Maximum Wind Velocity (mph) Average Wind Velocity (mph) Temperature (F) Relative Humidity (%) Comments: Photos Taken Photo Number Location/Description Traffic Description Roadway # Lanes Posted Speed Average Speed NB/EB Counts SB/WB Counts •• • FCS An ADEC Innovation 1 2 3 4 7 2 67 72 Facing southeast (toward residences) Facing southwest (toward 1-680 Freeway) Facing northwest Facing northeast Mobile Construction Activity Noise Calculation Equipment Description Lmax Lmax Leq Grader 85 1 40 50 1 0 85.0 81.0 126491106 Excavator 85 1 40 100 1 0 76.0 72.0 15811388.3 Dozer 85 1 40 100 1 0 76.0 72.0 15811388.3 Front End Loader 80 1 40 100 1 0 71.0 67.0 5000000 Backhoe 80 1 40 100 1 0 71.0 67.0 5000000 Notes:Lmax[5]85 Leq 82 [1] Percentage of time activity occurs each hour based on FHWA usage factors [2] Distance assumes one piece of equipment adjacent to project boundary and others at the closest reasonable operating distance away [3] Soft ground terrain between project site and receptor. [4] Shielding due to terrain or structures [5] Calculated Lmax is the loudest value. Distance to Receptor (feet) Time Hourly Leq Leq' 0.1*Leq antiLog Night 12:00 AM 0.0 10.0 1 10 1:00 AM 0.0 10.0 1 10 2:00 AM 0.0 10.0 1 10 3:00 AM 0.0 10.0 1 10 4:00 AM 0.0 10.0 1 10 5:00 AM 0.0 10.0 1 10 6:00 AM 0.0 10.0 1 10 Day 7:00 AM 0.0 0.0 0 1 50 8:00 AM 82.3 82.3 8.225603579 168113883 100 9:00 AM 77.6 77.6 7.759170311 57434164.9 150 10:00 AM 72.3 72.3 7.230896534 17017530.3 200 11:00 AM 68.6 68.6 6.856080324 7179270.61 Lunch break 12:00 PM 0.0 0.0 0 1 250 1:00 PM 65.7 65.7 6.565350285 3675786.55 300 2:00 PM 63.3 63.3 6.327806547 2127191.29 350 3:00 PM 61.3 61.3 6.126966178 1339572.36 400 4:00 PM 59.5 59.5 5.952990337 897408.827 5:00 PM 0.0 0.0 0 1 6:00 PM 0.0 0.0 0 1 Evening 7:00 PM 0.0 5.0 0.5 3.16227766 8:00 PM 0.0 5.0 0.5 3.16227766 9:00 PM 0.0 5.0 0.5 3.16227766 Night 10:00 PM 0.0 10.0 1 10 11:00 PM 0.0 10.0 1 10 Sum 257784911 Sum/8 32223113.9 Log10(Sum/8)7.50816751 10*Log10(Sum/8)75.0816751 8 Hour Average 75 Equipment Description Lmax Lmax Leq Grader 85 1 40 100 1 0 79.0 72.0 15811388.3 Excavator 85 1 40 100 1 0 79.0 72.0 15811388.3 Dozer 85 1 40 100 1 0 79.0 72.0 15811388.3 Front End Loader 80 1 40 100 1 0 74.0 67.0 5000000 Backhoe 80 1 40 100 1 0 74.0 67.0 5000000 Leq 78 Equipment Description Lmax Lmax Leq Grader 85 1 40 150 1 0 75.5 66.7 4684855.79 Excavator 85 1 40 150 1 0 75.5 66.7 4684855.79 Dozer 85 1 40 150 1 0 75.5 66.7 4684855.79 Front End Loader 80 1 40 150 1 0 70.5 61.7 1481481.48 Backhoe 80 1 40 150 1 0 70.5 61.7 1481481.48 Leq 72 Notes: *Equipment is measured as operating across the project site Ground Effect[3] Shielding (dBA)[4] Calculated (dBA) Energy Receiving residential land use Reference (dBA) 50 ft Quantity Usage factor[1] Distance to Receptor [2] Receiving residential land use Shielding (dBA)[4] Calculated (dBA) Energy Reference (dBA) 50 ft Quantity Usage factor[1] Distance to Receptor [2] Ground Effect[3] Receiving residential land use Reference (dBA) 50 ft Quantity Usage factor[1] Distance to Receptor [2] 8 Hour Average Calculation Ground Effect[3] Shielding (dBA)[4] Calculated (dBA) Energy Equipment Description Lmax Lmax Leq Grader 85 1 40 200 1 0 73.0 63.0 1976423.54 Excavator 85 1 40 200 1 0 73.0 63.0 1976423.54 Dozer 85 1 40 200 1 0 73.0 63.0 1976423.54 Front End Loader 80 1 40 200 1 0 68.0 58.0 625000 Backhoe 80 1 40 200 1 0 68.0 58.0 625000 Leq 69 Equipment Description Lmax Lmax Leq Grader 85 1 40 250 1 0 71.0 60.1 1011928.85 Excavator 85 1 40 250 1 0 71.0 60.1 1011928.85 Dozer 85 1 40 250 1 0 71.0 60.1 1011928.85 Front End Loader 80 1 40 250 1 0 66.0 55.1 320000 Backhoe 80 1 40 250 1 0 66.0 55.1 320000 Leq 66 Equipment Description Lmax Lmax Leq Grader 85 1 40 300 1 0 69.4 57.7 585606.974 Excavator 85 1 40 300 1 0 69.4 57.7 585606.974 Dozer 85 1 40 300 1 0 69.4 57.7 585606.974 Front End Loader 80 1 40 300 1 0 64.4 52.7 185185.185 Backhoe 80 1 40 300 1 0 64.4 52.7 185185.185 Leq 63 Equipment Description Lmax Lmax Leq Grader 85 1 40 350 1 0 68.1 55.7 368778.736 Excavator 85 1 40 350 1 0 68.1 55.7 368778.736 Dozer 85 1 40 350 1 0 68.1 55.7 368778.736 Front End Loader 80 1 40 350 1 0 63.1 50.7 116618.076 Backhoe 80 1 40 350 1 0 63.1 50.7 116618.076 Leq 61 Equipment Description Lmax Lmax Leq Grader 85 1 40 400 1 0 66.9 53.9 247052.942 Excavator 85 1 40 400 1 0 66.9 53.9 247052.942 Dozer 85 1 40 400 1 0 66.9 53.9 247052.942 Front End Loader 80 1 40 400 1 0 61.9 48.9 78125 Backhoe 80 1 40 400 1 0 61.9 48.9 78125 Leq 60 Ground Effect[3] Shielding (dBA)[4] Calculated (dBA) Energy Ground Effect[3] Shielding (dBA)[4] Calculated (dBA) Energy Ground Effect[3] Shielding (dBA)[4] Calculated (dBA) Energy Energy Ground Effect[3] Shielding (dBA)[4] Receiving residential land use Reference (dBA) 50 ft Quantity Usage factor[1] Distance to Receptor [2] Receiving residential land use Reference (dBA) 50 ft Quantity Usage factor[1] Distance to Receptor [2] Receiving residential land use Reference (dBA) 50 ft Quantity Usage factor[1] Distance to Receptor [2] Receiving residential land use Reference (dBA) 50 ft Quantity Usage factor[1] Distance to Receptor [2] Calculated (dBA) Energy Usage factor[1] Distance to Receptor [2] Ground Effect[3] Shielding (dBA)[4] Calculated (dBA) Receiving residential land use Reference (dBA) 50 ft Quantity Residential-Grade Mechanical Equipment Noise Calculation Noise Level Calculation Prior to Implementation of Noise Attenuation Requirements Equipment Description Lmax Lmax Leq Residential grade mechanical ventilation equipment 70 1 80 120 1 0 21.9 21.0 125 Residential grade mechanical ventilation equipment 70 1 80 145 1 0 19.5 18.5 70.851613 Residential grade mechanical ventilation equipment 70 1 80 170 1 0 17.4 16.4 43.964991 Residential grade mechanical ventilation equipment 70 1 80 195 1 0 15.6 14.6 29.130633 Notes:Leq 24 [1] Percentage of time activity occurs each hour [2] Soft ground terrain between project site and receptor. [3] Shielding due to structural/soundwall shielding Ground Effect[2] Shielding (dBA)[3] Calculated (dBA) Energy Receiving residential land use Reference (dBA) 3 ft Quantity Usage factor[1] Distance to Receptor THIS PAGE INTENTIONALLY LEFT BLANK