HomeMy WebLinkAboutB. City Council Resolution No. 2026-040 with Exhibits A through CResolution No. 2026-040
Page 1 of 17
RESOLUTION NO. 2026-040
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAMON
DENYING THE APPEAL FILED BY BRIAN SWANSON; AND APPROVING
THE ORCHARDS MASTER PLAN AND NEIGHBORHOOD DISTRICT
DEVELOPMENT PROJECT INCLUDING
MAJOR SUBDIVISION/VESTING TENTATIVE MAP 9693 (MJ 2024-0004);
DEVELOPMENT PLANS (DP 2024-0006 & DP 2024-0008); ARCHITECTURAL
REVIEW (AR 2024-0013); TREE REMOVAL PERMIT (TRP 2024-0009); AND
ENVIRONMENTAL REVIEW (ENVR 2025-0003)
FILED BY BR6001, LLC
(PROPERTY OWNER)
SUNSET DEVELOPMENT COMPANY
(APPLICANT)
LOCATED AT
6001 BOLLINGER CANYON ROAD
(APN: 213-701-002)
WHEREAS, in 2022 and 2023, the City held a series of public study sessions on the
potential redevelopment of 6001 Bollinger Canyon Road (“Orchards”) with various bodies
including the City Council, Planning Commission, Economic Development Advisory Committee,
and Housing Advisory Committee (December 6, 2022, January 24 and 31, 2023, March 7 and 8,
2023, April 13, 2023, and July 18, 2023); and
WHEREAS, on December 12, 2023, the San Ramon City Council approved the General Plan
2040 (GP 2040) Update and the GP 2040 Environmental Impact Report (GP 2040 EIR), which
included amending the land use designation and rezoning of Orchards from Administrative Office
(OA) to Downtown Mixed Use – South (DMU-S); and
WHEREAS, GP 2040 Policy No. 4.7.I-5 includes a DMU-S and Orchards program
description and land use diagram identifying up to 2,900 units in the DMU-S project area, a landscape
corridor to serve as a buffer to the existing neighborhood to the south, connectivity to the Iron Horse
Trail, a variety of housing typologies, residential and nonresidential vertical mixed-use configuration
closer to Bollinger Canyon Road, a minimum of 125,000 sq. ft. of new retail/commercial/
entertainment uses, a 2.5-acre centralized park space, additional pocket parks with recreational
amenities and pedestrian pathways throughout the project area, and the preservation of the site’s
heritage oak trees; and
WHEREAS, on November 18 and 21, 2024, Sunset Development Company submitted and
paid, respectively, for formal applications for the approval of the Orchards Master Plan (“Master
Plan”) and Neighborhood District Development Project which included a General Plan Amendment
(GPA) to amend the DMU-S Minimum Sitewide Floor Area Ratio (FAR) from 1.25 to 0.5; a Zoning
Ordinance Text Amendment (TA) to amend the DMU-S Minimum Sitewide FAR from 1.25 to 0.5;
Major Subdivision/Vesting Tentative Map, two Development Plan applications, Development
Agreement, Architectural Review, Tree Removal Permit, and Environmental Review; and
Attachment B
Resolution No. 2026-040
Page 2 of 17
WHEREAS, on December 20, 2024, the subject applications were deemed incomplete,
and the City requested revised project plans and additional items from the Applicant; and
WHEREAS, on January 22, 24, and 30, February 20 and 24, and March 26, 2025, the
Applicant submitted revised project plans and additional items for the subject applications; and
WHEREAS, on March 26, 2025, the General Plan Amendment, Zoning Ordinance Text
Amendment, and development applications were deemed complete for processing; and
WHEREAS, on May 1, May 8, and June 5, 2025, the Architectural Review Board (ARB)
reviewed and discussed the proposed Master Plan and Neighborhood District Development
Project and recommended final architectural review approval and provided comments for the
Applicant’s and Planning Commission’s consideration; and
WHEREAS, on June 20, 2025, the Applicant rescinded their applications for a General
Plan Amendment and Zoning Ordinance Text Amendment to modify the DMU-S zone, and
submitted a Preliminary Housing Development application (PHD 2025-0004) for the Orchards
Master Plan and Neighborhood District Development Project with no modifications to the original
Project’s proposed units, site design, vesting map, and site improvements; and
WHEREAS, on June 24, 2025, the City accepted the Preliminary Housing Development
application (PHD 2025-0004); and
WHEREAS, on July 15, 2025, the Planning Commission held a study session and
provided feedback on PHD 2025-0004 and the revised Project applications; and
WHEREAS, on July 15, 2025, the revised development applications were deemed
complete; and
WHEREAS, on July 23, 2025, the Applicant submitted a Project Vehicle Miles Traveled
(VMT) Analysis;
WHEREAS, on August 11, 2025, the Applicant submitted a Project Economic and Fiscal
Impacts report; and
WHEREAS, on August 13, 2025, the Applicant resubmitted revised project plans and a
response letter to staff and ARB comments; and
WHEREAS, on August 15, 2025, the Planning Services Division, within 60 days of the
completeness determination, based on the Project application, qualified State Density Bonus Law
(SDBL) concessions and waivers (Gov. Code, §65915 et seq) and administrative record to date,
determined that the Project applications were not consistent and compliant with the applicable
objective standards or criteria contained within the City plans, programs, policies, ordinances,
standards, requirements, or similar provisions pursuant to Government Code Section 65589.5,
subdivision (j)(2) and requested additional information to determine consistency with SDBL; and
WHEREAS, on August 20, 2025, the Applicant resubmitted revised project plans and a
Resolution No. 2026-040
Page 3 of 17
response letter to staff comments; and
WHEREAS, on September 9, 2025, the East Bay Municipal Utility District (EBMUD)
provided a Water Supply Assessment for the Orchards Development Project; and
WHEREAS, on September 9 and November 19, 2025, the Applicant resubmitted revised
Orchard Design Guidelines; and
WHEREAS, on September 9 and December 4, 2025, the Applicant resubmitted revised
Affordable Housing Plan including additional information on their SDBL waiver request; and
WHEREAS, on November 10, 2025, the Applicant resubmitted an updated Project
Economic and Fiscal Impacts report and VMT Analysis; and
WHEREAS, on December 4, 2025, the Applicant resubmitted an updated Traffic
Operations Report;
WHEREAS, on December 4, 2025, the Applicant resubmitted a revised Orchards
Affordable Housing Plan identifying the need for six waivers:
• waiver from the 1.25 minimum sitewide Floor Area Ratio (FAR) to 0.79,
• waiver to use the Orchards Design Guidelines dated November 14, 2025 in lieu of the
City’s Objective Design and Development Standards (ODDS),
• waiver from Zoning Ordinance standard for Landscaping (D3-21) Plant Materials
Trees,
• waiver from Zoning Ordinance standard for Landscaping (D3-21) Plant Materials
Shrubs,
• waiver from Zoning Ordinance standard for Parking and Circulation (D3-37-B.1), and
• waiver from Zoning Ordinance standard for Parking and Circulation (D3-37-B.6); and
WHEREAS, on December 4, 2025, the Planning Services Division, based on the revised
Project submittals, determined that the Project applications are consistent and compliant with the
applicable objective standards or criteria contained within the City plans, programs, policies,
ordinances, standards, requirements, or similar provisions pursuant to Government Code Section
65589.5, subdivision (j)(2); and
WHEREAS, the proposed Project plans, as revised in response to the ARB comments, does
not result in significant changes to the development profile and remains consistent with the project
scope vested by the SB 330 Preliminary Housing application accepted on June 24, 2025; and
WHEREAS, the Master Plan area encompasses the 92-acre site at 6001 Bollinger Canyon
Road (formerly Chevron Office Park, APN: 213-120-008) and is surrounded by commercial
developments within Bishop Ranch to the north and east, I-680 freeway to the west, and residential
development to the south; and
WHEREAS, the subject property is currently developed with an approximately 1.3 million
sq. ft. office campus including office buildings, surface parking, and associated landscaping; and
Resolution No. 2026-040
Page 4 of 17
WHEREAS, the proposed Master Plan is anticipated to be developed over 20 years and
includes 1) up to 619 dwelling units within the Mixed Use District with 125,000 sq. ft. of ground
floor retail, entertainment and commercial uses, 2) 1,465 dwelling units within the Multi-Family
District that may be developed into apartments, condominiums, senior or affordable housing, and
3) a lower-density neighborhood of 368 single-family townhomes and detached homes plus 58
optional Accessory Dwelling Units (ADUs) within the Neighborhood District, along with
privately-owned and maintained park space, landscaping, bioretention swales, and drainage basins
(Exhibit C); and
WHEREAS, the proposed Master Plan commits to 16.2% (397 units) of the 2,452 units
as deed restricted units for very low, low, and moderate income households with a minimum of
5% of overall units to very low-income households, qualifying Orchards for State Density Bonus
which includes the ability for concessions and waivers, as well as a reduction in parking
requirements; and
WHEREAS, the Master Plan area is currently served, and would continue to be served by
existing utilities and public services; and
WHEREAS, the Master Plan will build on the existing City Center and CityWalk approvals,
respond to recent changes to the General Plan, and reflect the City Council goal to prioritize mixed
use and housing growth in the City core; and
WHEREAS, the Project site is an urbanized area, to which all required utilities and public
services are available, the Project site does not present unusual circumstances for an urban site, and
would not cause significant environmental impacts due to any unusual circumstance. Additionally,
no habitat value for endangered, rare, or threatened species has been identified in the Project site and
the Project would not result in significant effects to traffic, VMT, noise, air quality, or water quality
as documented by the technical studies provided; and
WHEREAS, CEQA Guidelines Section 15183 provides a specific CEQA review process
for qualifying projects that are consistent with a general plan, community plan, or zoning, and
under these regulations (reflected in California Public Resources Code (PRC) Section 21083.3 and
CEQA Guidelines Section 15183), projects that are consistent with the development density of
existing zoning, community plan or general plan policies for which an Environmental Impact
Report (EIR) was certified, shall be exempt from additional CEQA analysis except as may be
necessary to determine whether there are project-specific significant effects that are peculiar to the
project or site that would otherwise require additional CEQA review; and
WHEREAS, the Project proposes 46.3 dwelling units per net acre and does not propose
an increase in density over the existing DMU-S land use designation where a maximum density of
60 units per net acre is permitted; and
WHEREAS, the Project is consistent with the impacts evaluated in the 2040 General Plan
Update (GPU) EIR and as required by CEQA, the City prepared a Final EIR, which analyzed the
environmental impacts of the 2040 GPU (SCH No. 2022060549) and certified the EIR on
December 13, 2023; and
Resolution No. 2026-040
Page 5 of 17
WHEREAS, staff prepared the Orchards Project CEQA Guidelines Section 15183
Consistency Checklist to determine whether there are project-specific significant effects that are
peculiar to the Project or to the site; and
WHEREAS, the Orchards Project CEQA Consistency Checklist examined the Project’s
potential for project-specific environmental effects that are peculiar to the Project or its site within
the parameters outlined at CEQA Guidelines Section 15183(b) and impacts that were analyzed in
the 2040 GPU EIR are not peculiar to the Project or its site and do not require further review; and
WHEREAS, all GP 2040 Final EIR mitigation measures identified in the Orchards
Project CEQA Guidelines Section 15183 Consistency Checklist shall be implemented, as
appropriate, and are incorporated by reference as conditions of approval; and
WHEREAS, on December 5, 2025, a notice of the December 16, 2025 public hearing
was mailed to property owners in the project vicinity that exceeded the minimum 300-ft. mailing
radius of the subject property, which complies with, and exceeds, the standards set forth in
Government Code Section 65091 (a)(4) and Section D7-24 of the Municipal Code of the City of
San Ramon; and
WHEREAS, on December 16, 2025, the Planning Commission held a duly noticed public
hearing (the first of a maximum of five public meetings allowed under Senate Bill (SB) 330 for
housing projects) on the subject applications and received the staff report, plans, a presentation by
the Applicant, other pertinent documents, and public testimony relating to the proposed Project
applications were heard and considered; and
WHEREAS, on December 16, 2025, the Planning Commission continued the public hearing
to consider the proposed project applications to January 20, 2026; and
WHEREAS, on January 20, 2026, the Planning Commission held a continued public
hearing (the second of a maximum of five public meetings allowed under SB 330 for housing
projects) to consider the proposed Project applications, received public comment testimony,
provided Project comments and feedback to staff and the Applicant, and continued the public
hearing to February 3, 2026 for further discussion; and
WHEREAS, on February 3, 2026, the Planning Commission held a continued public
hearing (the third of a maximum of five public meetings allowed under SB 330 for housing
projects) to consider the proposed Project applications, received public comment testimony, and
closed the public hearing; and
WHEREAS, on February 3, 2026, the Planning Commission, in the exercise of its
independent judgment, and based upon all the evidence in the record (including but not limited to
all application materials, the written and oral staff reports, and oral and written comments received
by the City), approved two Development Plan applications (DP 2024-0006 and DP 2024-0008),
an Architectural Review application (AR 2024-0013), a Major Subdivision/Vesting Tentative Map
application (MJ 2024-0004), a Tree Removal Permit (TRP 2024-0009), and an Environmental
Review application (ENVR 2025-0003) based on the required findings; and
Resolution No. 2026-040
Page 6 of 17
WHEREAS, on February 6, 2026, a Notice of Exemption was filed with the Contra Costa
County Clerk Recorder, in accordance with the California Environmental Quality Act (CEQA) of
1970, as amended, and the State CEQA Guidelines (California Code of Regulations, Title 14,
Sections 15000 et seq.); and
WHEREAS on February 12, 2026, Brian Swanson filed an appeal of the Planning
Commission decision challenging the Planning Commission’s approval of the Orchards
Development Project, including the Master Plan and the Neighborhood District approvals, and
challenges the City’s related California Environmental Quality Act (CEQA) determination to treat
the Orchards Development Project as exempt from further CEQA review based on CEQA
Guidelines Section 15183; and
WHEREAS on February 13, 2026, Brian Swanson submitted a supplemental
(“Supplement #1”) appeal document to be included as part of his Statement of Appeal and
Supporting Grounds; and
WHEREAS on March 27, 2026, a notice of the April 7, 2026 City Council public hearing
was mailed to property owners in the project vicinity that exceeded the minimum 300-ft. mailing
radius of the subject property, which complies with, and exceeds, the standards set forth in
Government Code Section 65091 (a)(4) and Section D7-24 of the Municipal Code of the City of
San Ramon; and
WHEREAS on March 30, 2026, Brian Swanson submitted eight exhibits for inclusion as
part of the Appellant’s Exhibits; and
WHEREAS, on April 7, 2026, the City Council held a duly noticed public hearing and
after receiving the Staff Report, and testimony from the Appellant, Applicant and the public, the
Council closed the public hearing, deliberated; and
WHEREAS, the Housing Accountability Act (Government Code Section 65589.5)
prohibits the City from denying the Project or lowering its density on the basis of alleged
inconsistencies with the City’s development standards unless those standards are objective, and
the Housing Accountability Act deems the Project consistent with the City’s development
standards so long as there is evidence in the record that is sufficient for a reasonable person to
conclude that the Project is consistent, even if other conclusions are also possible.
NOW, THEREFORE, BE IT RESOLVED, that the City Council in the exercise of its
independent judgment, and based upon all the evidence in the record, within the objective
standard constraints of the Housing Accountability Act, (including but not limited to all
application materials, all related technical studies/documents, the written and oral staff reports,
the written and oral comments received by the City, Conditions of Approval, minutes of
meetings, documents relied upon or prepared by City staff relating to the Project, all
correspondence submitted or delivered to the City in connection with the public hearings on the
Project, and all other relevant documents contained in the administrative record), does hereby
make the following findings in accordance with the Housing Accountability Act and the
standards of review:
Resolution No. 2026-040
Page 7 of 17
a) The recitals above are true and correct and are incorporated herein by reference.
b) The Orchards Project CEQA Guidelines Section 15183 Consistency Checklist is
the appropriate environmental document for this Project.
c) The Project is consistent with the General Plan policies and land use designations
for the Project site, as described more fully below.
Regarding Brian Swanson’s Appeal:
Based on all material and testimony in the record, past Planning Commission record of decision,
and information presented to the City Council, the City Council hereby finds the following:
a) The Planning Commission findings for the Project, based on the record of decision
and conditions of approval, are correct in that they address all aspects of the
project design and operation through the combined findings related to two
Development Plans, Major Subdivision/Vesting Tentative Map, Architectural
Review, Tree Removal, and Environmental Review applications, consistency
with the General Plan, Zoning Ordinance, and State Density Bonus, and Measure
“J” compliance.
b) The City analyzed, evaluated, and provided a detailed response in the April 7,
2026 City Council staff report to the appeal grounds, and determined the appeal
provides no new information that was not previously considered as part of the
record of decision.
c) The Project is exempt from CEQA and the design of the Project and all materials
submitted as part of the application were deemed complete and sufficient for the
Planning Commission to review and act on the subject applications based on the
information in the record.
Regarding General Plan and Zoning Ordinance Consistency
a) The recitals above are true and correct and are incorporated herein by reference.
b) The City Council finds that based on the whole administrative record, and subject
to the Conditions of Approval and CEQA Findings, which are incorporated herein
by reference, the Project is consistent with the objectives, policies, general land
uses, and programs specified in the GP 2040, as amended, (the “General Plan”)
because the Project documents for development are consistent with the General
Plan land use designation for the Project site of DMU-S and with the General Plan
policies. Specifically, the Project is consistent with the following General Plan
DMU-S land use policies:
DMU-S and Orchards Concept: General Plan 2040 Policy No. 4.7.I-5 includes the
following land use diagram (Figure 1) and program description for DMU-S and
Orchards:
Resolution No. 2026-040
Page 8 of 17
Figure 1: General Plan DMU-S Land Use Diagram
DMU-South Zoning District:
• Up to 2,900 units in the DMU-South project area including Orchards and
Bishop Ranch 1
• A landscape corridor (a minimum of 60’ with an average of 75’) to serve as a
buffer to the existing neighborhood to the south
• Provide connectivity to the Iron Horse Trail and as an extension of the Walking
District
Orchards:
• A variety of housing typologies such as multi-family apartments, stacked flats,
townhomes, single-family homes, and vertical mixed-use units.
• A minimum of 125,000 sq. ft. of new retail/commercial/entertainment uses.
• Residential and nonresidential vertical mixed-use configuration closer to
Bollinger Canyon Road, including a retail lined boulevard to the centralized
park.
• A centralized park space of approximately 2.5 acres.
• Additional pocket parks with recreational amenities and pedestrian pathways,
running in a north/south and east/west direction, throughout the project area.
• The preservation of the site’s heritage oak trees, consistent with City standards
and arborist’s recommendations.
The Orchard Master Plan implements GP 2040 Policy No. 4.7.I-5, promotes infill
development and a compact urban form as articulated in the General Plan Land Use
Resolution No. 2026-040
Page 9 of 17
Element, and promotes the City goals for locating housing in the City core thereby
removing development pressure from neighborhood shopping centers and existing
open space.
Further, development of the proposed Orchards Master Plan area as shown in
Exhibit C is envisioned by the General Plan as a vibrant, integrated, and cohesive
mix of retail, residential, parks, and open space uses that promotes a walkable
environment in the core of the City. The Master Plan development profile is
consistent with the General Plan vision.
Zoning Ordinance Consistency
DMU-S: The 92-acre site that makes up the Master Plan area (6001 Bollinger
Canyon Road) are zoned as DMU-S by the San Ramon Zoning Ordinance. The
proposed mix of retail, residential, parks, and open space uses are consistent with
allowable uses within the DMU-S zoning designation and would further facilitate
the development of the Master Plan area into “a broad mix of uses which
incorporates a transition of primarily commercial uses adjacent to the freeway and
Bollinger Canyon Road, with residential uses located behind or above the primary
commercial uses in close proximity to transportation networks” as defined by the
Zoning Ordinance.
Density: The proposed Project’s 46.3 dwelling units per net acre meets the DMU-
S zoning standard of a minimum of 20 to a maximum of 60 units per net acre, per
Division D2-14 of the San Ramon Zoning Ordinance
Height: The proposed structures within the Orchards Master Plan will be subject
to a maximum height of 85 feet, per Division D2-14 of the San Ramon Zoning
Ordinance.
Other Development Standards: In addition, each future phase of the proposed
Master Plan would be subject to the City’s Development Plan and Architectural
Review approval process to ensure consistency with the Zoning Code.
Furthermore, the proposed Master Plan’s landscape design, integrated open space,
amenities, and housing would be consistent with the DMU-S zoning district
standards.
Regarding the Major Subdivision/Vesting Tentative Map
a) The recitals above are true and correct and are incorporated herein by reference.
b) The City Council finds that based on the whole administrative record, and subject
to the Conditions of Approval and CEQA Findings, which are incorporated herein
by reference, the proposed Major Subdivision/Vesting Tentative Map (“VTM”) and
the Project, together with the provisions for its design and improvement, as
conditioned, are consistent with the General Plan, all applicable provisions of law,
and all applicable requirements of Division C5 (Subdivision Procedures) of the City
of San Ramon Municipal Code.
Resolution No. 2026-040
Page 10 of 17
c) The VTM is consistent with the objectives, policies, general land uses, and
programs specified in the General Plan in that the VTM result in the subdivision of
land necessary for the orderly implementation of the Master Plan as more fully
described in the sections above.
d) The General Plan and the Zoning Ordinance calculates FAR based on the project
site as a whole. To determine the Project’s FAR under the General Plan and Zoning
Ordinance, the floor area of all Project buildings is divided by the Project site area,
resulting in a Project FAR of 0.79. In accordance with SDBL, the Project is granted
a waiver from the General Plan and Zoning minimum sitewide FAR requirements
of 1.25; and
e) The site is physically suitable for the type of development proposed by the Master
Plan. At approximately 92 acres, the Project area is sufficiently large to incorporate
the various mixed-use elements, including retail, commercial, residential uses and
support amenities, within the context of Bishop Ranch. As infill development, the
conversion of surface parking lots and office to housing and other amenities
represents a more efficient use of the land and supports smart growth policies.
Further, the Project is not within an Alquist-Priolo Earthquake Fault Zone, and no
known faults cross the Project site or are oriented toward the Project site.
f) The site is physically suitable for the proposed density of development. The
approximately 92-acre Master Plan site will accommodate 2,452 residential units
at a density of approximately 46.3 units per net acre, 125,000 sq. ft. of commercial
uses, a publicly accessible centralized park of 2.5 acres, and other public facilities.
While this density and building heights are greater than other areas of San Ramon,
they are suitable for the site given the context of the building and surrounding
development within Bishop Ranch.
g) The design of the subdivision and the proposed improvements is not likely to cause
substantial damage or substantially and unavoidably injure fish or wildlife or their
habitat because all potential impacts related to fish and wildlife have been evaluated
in the Orchards Project CEQA Guidelines Section 15183 Consistency Checklist.
No sensitive species have been observed on or near the Project site.
h) The design of the subdivision and type of improvements is not likely to cause
serious public health problems because the Project will not involve the use, storage,
or disposal of hazardous materials nor engage in hazardous activities. The design
of the subdivision ensures the development of adequate water, sewer, and solid
waste services within the Project.
i) The design of the subdivision and the type of improvements will not conflict with
easements, acquired by the public at large, for access through or use of property
within the proposed subdivision.
j) The VTM conforms to the provisions of Division C5 (Subdivision Procedures) of
the City of San Ramon Municipal Code.
Resolution No. 2026-040
Page 11 of 17
Regarding CEQA
a) The recitals above are true and correct and are incorporated herein by reference.
b) The Project is exempt from the California Environmental Quality Act Guidelines
(CEQA) of 1970, as amended, pursuant to Section 15183 because the Orchards
Project CEQA Guidelines Section 15183 Consistency Checklist examined the
project’s potential for project-specific environmental effects that are peculiar to the
Project or its site within the parameters outlined at CEQA Guidelines Section
15183(b). Impacts that were analyzed in the 2040 General Plan Update EIR are not
peculiar to the Project or its site and do not require further review. The Project
would not result in significant effects to traffic, noise, air quality, or water quality
as documented by the technical studies provided.
c) The Project also is exempt from the California Environmental Quality Act
Guidelines (CEQA) of 1970, as amended, pursuant to Section 15183 because the
Project is consistent with the development density established in the General Plan
for which an EIR was certified (SCH No. 2022060549). There are no potentially
significant off-site impacts or cumulative impacts which were not analyzed in the
2040 General Plan Update EIR, nor previously identified significant effect which,
as a result of substantial new information which was not known at the time the 2040
General Plan Update EIR was certified, would have a more severe adverse effect
than discussed in the 2040 General Plan Update EIR. Furthermore, pursuant to
CEQA Guidelines Sections 15162 and 15163, none of the circumstances requiring
preparation of a subsequent or supplemental EIR have occurred.
Regarding the Master Plan Development Plan Application
a) The recitals above are true and correct and are incorporated herein by reference.
b) The Applicant is processing a Development Plan for the layout of the Master Plan.
The Plan area is divided into three Districts, each with a residential component and
support amenities and neighborhoods in proximity to the existing City Center
Bishop Ranch and includes a commercial component to support the buildout of the
Master Plan.
c) The City Council finds with respect to the Development Plan based on the whole
administrative record, and subject to the Conditions of Approval and CEQA
Findings, which are incorporated herein by reference, that the Master Plan
envisioned by the Development Plan will not be detrimental to the health, safety,
and general welfare of persons residing or working in the neighborhood of the
proposed development. The Orchards Project CEQA Guidelines Section 15183
Consistency Checklist examined the project’s potential for project-specific
environmental effects that are peculiar to the Project or its site. Construction related
activities will be temporary and will not have long-term detrimental impacts to the
health, safety and general welfare of persons residing or working in the area. The
Resolution No. 2026-040
Page 12 of 17
Project will result in an increase in population and housing consistent with the
General Plan projections, and will also provide housing close to jobs, include
affordable housing units, and promote pedestrian, bicycle, and transit connectivity.
The Master Plan development will not involve the use, storage, or disposal of
hazardous materials nor engage in hazardous activities, and thus does not pose a
public health concern. The design of the Master Plan will ensure that the
development has adequate water, sewer, and solid waste services and other utilities
and services.
d) The Project will not be injurious or detrimental to property or improvements in the
neighborhood or will not be injurious to the general welfare of the City because the
Project will improve the overall aesthetic of the area by creating a series of
identifiable Districts, with locally serving amenities, including pedestrian and
bicycle connectivity, access to landscape spaces, and nearby commercial uses.
Thus, the Project will not be injurious or detrimental to the general welfare of the
City.
e) As described more fully above, the Project is consistent with the policies and goals
of the General Plan and the purposes of the Zoning Ordinance, including Division
6, Chapter II, Section D6-23 (“Development Plan”).
f) The Master Plan development is architecturally compatible with other
developments in the same vicinity, both inside and outside of the subject zone.
Land uses in Bishop Ranch can be characterized as a mix of residential and
commercial uses including multi-story structures and multi-level parking garages.
The massing and architectural features associated with the Project would be
generally consistent with that of the existing buildings located directly adjacent to
the site and throughout Bishop Ranch. The massing of the Project would be
consistent with the majority of the massing of the existing surrounding structures.
The Orchards Design Guidelines provides for uniform application on design
principles to ensure consistency within the Master Plan and in relation to Bishop
Ranch.
Regarding the Neighborhood District Development Plan Application
a) The recitals above are true and correct and are incorporated herein by reference.
b) The Project is not detrimental to the health, safety and general welfare of persons
residing or working in the neighborhood of the proposed development because the
development will replace an existing office complex with a new 368-unit residential
development, and as conditioned and considering the proposed State Density
Bonus, the Project complies with all applicable standards of the General Plan,
Zoning Ordinance, and the development of the site has been contemplated in the
GP 2040.
c) The Project is not injurious or detrimental to property or improvements in the
neighborhood because the proposed Project including State Density Bonus waivers,
and as conditioned, complies with the applicable standards in the General Plan,
Zoning Ordinance, and Municipal Code, is required to mitigate any negative
Resolution No. 2026-040
Page 13 of 17
impacts to City services through the Project design and through the payment of
development impact fees, will continue to improve the overall aesthetic of the area
by constructing a project that is consistent with the vision of the approved General
Plan and enhance the connectivity and integration of the development pattern with
the surrounding properties, and the Walking District.
d) The Project is not injurious or detrimental to the general welfare of the City in that
the Project is an in-fill development project and will have no significant
environmental impacts as a result of the Project, the Project site landscaping and
roadways will be maintained by private property owners, and the Project is required
to address any significant negative fiscal impacts to the City by establishing a
funding mechanism to offset any additional costs associated with providing City
services and facilities to the new residential units; and
e) The proposed Project, as envisioned by the architecture and site plan, is
architecturally compatible with other developments in the vicinity because the
proposed Project, as conditioned, has been reviewed and recommended for final
architectural review approval, with comments, by the ARB for the proposed
architectural building design and landscape design; and the Applicant has
responded to those comments as part of the administrative record and as part of
their revised project plans dated September 5, 2025; furthermore, the proposed
Project massing, height, size, architectural design, architectural features, building
materials, and color scheme are compatible with the surrounding look and scale of
the surrounding development.
Regarding the Architectural Review Application
a) The recitals above are true and correct and are incorporated herein by reference.
b) The Architectural Review Board held design review meetings on May 1, May 8,
and June 5, 2025. The meetings included a presentation of the Project’s design by
the Applicant, including detailed discussions of the proposed land uses, districts,
circulation systems, and Orchards Design Guidelines. Additionally, there were
discussions and comments regarding promoting physical and visual connections
between Master Plan elements, pedestrian connectivity to the Iron Horse Trail, and
consideration of sun and wind with building orientation.
c) Regarding the architecture, landscape and signage, the Architectural Review Board
recommended considering defining District characteristics with a wider variety of
plant types, pedestrian pathways, and architecture.
d) As discussed in more detail above, the City Council finds that the Master Plan is
consistent with the goals and objectives of the General Plan and the purposes of the
Zoning Ordinance, including Division 6, Chapter II, Section D6-22 (“Architectural
Review”).
e) The Architectural Review Board in reviewing the Master Plan and Design
Guidelines considered each of the factors listed in Zoning Ordinance as applicable,
understanding that each future phase will be subject to its own Architectural
Resolution No. 2026-040
Page 14 of 17
Review. The City Council has also considered the factors and role of the Master
Plan and Design Guidelines and finds them to provide a rational process to ensure
that compatible design features are considered during the development of future
phases of the Master Plan. In particular, the City Council finds:
i. The Master Plan layout and Design Guidelines contain provisions to address
the area, bulk of and height of the buildings, structures at a maximum height
of 85 feet, and a residential density of 46.3 units per net acre all of which is
consistent with the existing development within Bishop Ranch and DMU-S.
ii. The Design Guidelines contains policies for façade design that rely on material
contrast, the use of color and material variation to reinforce massing, and other
design features. Further, the Master Plan envisions a range of building types
to accommodate the uses within the Plan area.
iii. The architectural and physical relationship of the proposed structures in the
Master Plan, as infill development, are both internally cohesive and consistent
with the larger Bishop Ranch and City setting as the Master Plan blends within
the existing roadway circulation system while providing new connections to
surrounding areas within the City; and
iv. Location, orientation, and site layout of the structures within the Master Plan
are integrated with the open space areas, circulation, topography, and the
Design Guidelines include sustainability considerations for energy efficiency
and solar orientation; and
v. The Design Guidelines provide guidance regarding landscape zones and the
colors, height, and materials for screen planting are provided as part of the
landscape palette; and
vi. The general location of landscape zones, parkways, and open spaces is
identified in the Master Plan with the general plant palette, setback areas for
landscape zones and buffers for streetscapes and parking areas; and
vii. Appropriateness of sign design is primarily addressed through the Conditions
of Approval that require approval of a Master Sign Program or sign specific
review. The Design Guidelines contain direction for pedestrian scale lighting
and maintaining energy efficiency; and
f) General site considerations, including site layout, open space and topography,
orientation and location of structures, vehicular circulation and parking, height,
public safety, setbacks, pedestrian and bicycle access, and similar elements have
been addressed in the Master Plan and Design Guidelines to provide a desirable
environment for the Project area.
g) General architectural considerations, including the character, scale and quality of
the design, the architectural relationship with the site and other structures, building
materials, colors, exterior lighting and signs, screening of exterior appurtenances,
Resolution No. 2026-040
Page 15 of 17
and similar elements have been addressed in the Master Plan and Design Guidelines
to ensure the compatibility of the development with its design concept and the
character of adjacent structures within Bishop Ranch.
h) General landscape considerations, including the location, color, coverage, size
texture, and type of plant materials, provisions for irrigation, maintenance, and
protection of landscaped areas and similar elements have been considered as part
of the Master Plan and Design Guidelines and include a defined plant palette suited
to the site conditions, intended to ensure visual relief, to complement structures,
and to provide an attractive environment for the enjoyment of the public; and
i) The Master Plan fosters a “sense of place” by the mix of land uses, pedestrian and
bicycle resources, public spaces, nearby retail services and existing employment
base; and is in the best interest of the public health, safety, and general welfare of
the community of San Ramon.
Regarding State Density Bonus
a) The recitals above are true and correct and are incorporated herein by reference;
and
b) The City’s Inclusionary Housing Ordinance requires the proposed Project to
provide 15% of the 2,452 total units (368 units) as affordable units and is proposed
by the Applicant to provide 16.2% (397 units) with at least 5% very low-income
homes project-wide, qualifying the Project for State Density Bonus as identified
in the Applicant’s written Affordable Housing Plan which includes a request for
waivers of development standards, dated December 4, 2025. The Multi-Family and
Mixed-Use Districts will be developed with rental and for-sale housing and in
those Districts, the percentage of very low-income units would exceed 6%.
c) The affordable housing proposal qualifies under San Ramon Municipal Code
Section C4-179 (E) by exceeding the minimum 15% requirement for affordable
units and providing units at deeper affordability with the following breakdown:
163 Very Low-Income, 212 Very-Low Income, and 22 Moderate Income units.
d) The Project’s affordable housing proposal qualifies the Project for a density bonus
under Government Code Section 65915(b)(1)(B) as a minimum of 5% of the total
units of the project will be affordable to very low-income households as defined
in Section 50105 of the Health and Safety Code, said bonus qualifies for
concessions per Government Code Section 65915(d)(2)(A) and waivers of
development standards per Government Code Section 65915(e)(1).
e) Government Code Section 65915 (e)(1) prohibits the City from applying any
development standard that will have the effect of physically precluding the
construction of a development meeting the criteria of subdivision (b) at the
densities or with the concessions or incentives permitted by this Section.
f) Government Code Section 65915(p)(3) establishes maximum parking standards
Resolution No. 2026-040
Page 16 of 17
for qualified residential developments, however, the Neighborhood District
Development Project will meet the Zoning Ordinance parking standards.
Regarding the Tree Removal Permit
a) The recitals above are true and correct and are incorporated herein by reference.
b) The approval of the Tree Removal Permit (TRP) will not be detrimental to the
public health, safety or welfare, and approval of the TRP is consistent with the
applicable provisions of the Zoning Ordinance for the removal of ornamental and
protected trees on the Project site which are subject to mitigation. The Project is
conditioned to provide an updated tree removal survey prior to the tree removal to
address nesting bird and tree mitigation. Further, the Project would establish a new
tree palette based on the landscape plan for the project.
c) The Project includes provisions to replace the trees through the landscape plan
consistent with Zoning Ordinance Section D5-10 (D).
Regarding Growth Management Plan – Measure “J” Compliance
a) The recitals above are true and correct and are incorporated herein by reference.
b) In accordance with the City’s General Plan Growth Management Program and
General Plan Policy 3.1-I-4, the City has reviewed the proposed Project and
documented as part of the administrative record the ability to provide urban
services based on the adopted performance guidelines for Community Centers,
Fire Protection Services, Flood Control, Parks, Police, Sanitation, Schools, and
Water.
NOW, THEREFORE, BE IT FUTHER RESOLVED, that the City Council hereby
denies the February 12, 2026 appeal filed by Brian Swanson, and the February 13, 2026 appeal
supplement filed by Brian Swanson; and
NOW, THEREFORE, BE IT FUTHER RESOLVED, that pursuant to Government
Code Section 66020(d)(1), the Applicant is hereby given notice that the 90-day period in which
the Applicant may protest any fees, dedications, reservations or other exactions imposed on the
development project and stated in the Conditions of Approval attached hereto shall commence
upon passage of this Resolution; and
NOW, THEREFORE BE IT FURTHER RESOLVED, that the City Council, in the
exercise of its independent judgment, and based upon all the evidence in the record (including but
not limited to all application materials, the written and oral staff reports, and oral and written
comments received by the City), does hereby approve the proposed Development Plan
applications (DP 2024-0006 and DP 2024-0008), Architectural Review application (AR 2024-
0013), Major Subdivision/Vesting Tentative Map 9693 application (MJ 2024-0004), Tree
Removal Permit (TRP 2024-0009), and Environmental Review application (ENVR 2025-0003)
to construct a new 2,452 unit residential development plus 58 optional accessory dwelling units
and 125,000 sq. ft. of new retail/commercial/entertainment uses, along with associated
Resolution No. 2026-040
Page 17 of 17
improvements on a 92-acre property located at 6001 Bollinger Canyon Road (APN: 213-120-008)
based on the plans dated “September 5, 2025” for the Project site based on conformance with
State Density Bonus Law, the General Plan, the Zoning Ordinance, Orchards Design Guidelines,
and the required findings and subject to the Orchards Master Plan Conditions of Approval (Exhibit
A), Neighborhood District Conditions of Approval (Exhibit B), and Orchards Master Plan Layout
(Exhibit C).
PASSED, APPROVED AND ADOPTED on this 7th day of April 2026, by the following
vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
__________________________________
Mark Armstrong, Mayor
ATTEST:
_______________________________
Joan Snashall, City Clerk
ATTACHMENTS:
Exhibit A: Orchards Master Plan Conditions of Approval
Exhibit B: Orchards Neighborhood District
Exhibit C: Orchards Master Plan Layout
Orchards Master Plan
City Council Conditions of Approval Page 1 of 16
Exhibit A
ORCHARDS MASTER PLAN
CONDITIONS OF APPROVAL
April 7, 2026 The term Applicant(s) shall refer to the owner or lessee of the property or anyone acting as
authorized agent for the property owner or lessee for the purpose of development, construction or satisfaction of conditions of approval referenced herein. The proposed project and compliance with these conditions of approval shall be based on substantial compliance with the Orchards Master Plan submitted by BR6001 LLC c/o Sunset
Development and the City of San Ramon dated September 5, 2025 and the Orchards Design Guidelines dated November 14, 2025; approved by the San Ramon Planning Commission on February 3, 2026 Resolution No. 02-26; and approved by the City Council on April 7, 2026 Resolution No. 2026-040.
• Major Subdivision - MJ 2024-0004 (Vesting Tentative Map 9693)
• Development Plan - DP 2024-0006 (Orchards Neighborhood District)
• Development Plan - DP 2024-0008 (Master Plan)
• Architectural Review - AR 2024-0013
• Tree Removal - TRP 2024- 0009
• Environmental Review - ENVR 2025-0003 PROJECT APPROVAL 1. The Project authorized with this action consists of the approval of the Orchards Master Plan
comprised of three Districts totaling up to 2,452 dwelling units and 58 optional accessory dwelling units (ADUs) at an overall sitewide residential density of 46.3 dwelling units per net acre (without ADUs) and 125,000 sq. ft. of ground floor retail, entertainment and commercial uses as approved by the City Council on April 7, 2026 by Resolution No. 2026-040. All future development actions or phases shall be in substantial conformance with the
Master Plan and Vesting Tentative Map plans date-received September 5, 2025, and the Orchards Design Guidelines date-received November 14, 2025, as amended or modified by the conditions herein or by subsequent action. Each District will be designed as follows:
• Mixed-Use District: 619 dwelling units with 125,000 sq. ft. of ground floor retail,
entertainment and commercial uses complementary to City Center Bishop Ranch across Bollinger Canyon;
• Multi-Family District: 1,465 dwelling units that may be developed into apartments, condominiums, senior and/or affordable housing, offering a variety of housing
options; and
Orchards Master Plan
City Council Conditions of Approval Page 2 of 16
• Neighborhood District: a lower-density neighborhood of 368 single-family
townhomes and detached homes plus 58 optional ADUs oriented along a network of
streets, mews and pocket parks. 2. The approval(s) authorized by this action shall expire only if the approved Vesting Tentative Map expires per the City Subdivision Ordinance and California Subdivision Map Act, or as
defined by the terms of any Development Agreement subsequently approved for the Master
Plan or any portion thereof. 3. Failure of the Applicant to implement, follow and adhere to these conditions may result in revocation hearing proceedings or modification of the project before the Zoning
Administrator or Planning Commission.
4. The Applicant (including any assignee or successor-in-interest) shall defend, indemnify, and hold harmless the City of San Ramon (City) and its agents, elected officials, officers, and employees from any claim, action or proceeding against the City or its agents, elected
officials, officers, and employees to attack, set aside, void or annul any part of the City’s
approval of the Applicant’s project. The City will promptly notify the Applicant of any such claim, action or proceeding, and cooperate in the defense. SPECIAL CONDITIONS
Future Process 5. Development Plan and Architectural Review applications are required for each building or phase of the Orchards Master Plan. Those developments will be subject to the standard Staff
review process including development review by City Departments, outside agencies and
utilities. Each building or phase will be subject to review in accordance with Zoning Ordinance Sections D6-22 Architectural Review and D6-23 Development Plans. 6. Each future Development Plan and Architecture Review approval shall be subject to its own
project specific conditions of approval based on the specifics of the design proposal and
consistent with these Master Plan conditions of approval. In addition, each Development Plan and Architecture Review will require verification of service capacity from local utilities (Water, Sewer, etc.).
7. Prior to any site work and/or occupancy, the Applicant shall obtain all required permits,
including but not limited to, from the Engineering Services Division, Building and Safety Services Division, and the San Ramon Valley Fire Protection District. 8. The Applicant shall pay the building permit plan check fee in accordance with the current
established Fee Resolution at the time of building permit submittal, and the building permit
invoice fee in accordance with the current established Fee Resolution at the time of building permit issuance for the residential unit(s).
Orchards Master Plan
City Council Conditions of Approval Page 3 of 16
9. All buildings and improvements shall conform to the minimum development standards of the Downtown Mixed Use, South (DMU-S) Zoning District and DMU-S General Plan land
use designation as generally shown on the approved project plans, unless authorized by this
approval or the conditions herein. 10. Prior to the issuance of a building permit, each future phase of the Master Plan that is relying on shared parking resources shall enter into a shared parking agreement in a form acceptable
to the City. The agreement shall be recorded on the affected properties and spell-out the
specific assumptions and obligations. 11. All GP 2040 FEIR mitigation measures identified in the Orchards Project CEQA Guidelines Section 15183 Consistency Checklist (Exhibit C) shall be implemented, as appropriate, and
are incorporated by reference as conditions of approval.
12. Pursuant to General Plan 2040 Policy 12.6-I-3, all construction and grading activities shall include particulate emissions reduction measures to limit fugitive dust and particulate pollution related to equipment, as recommended by the Bay Area Air Quality Management
District (BAAQMD).
13. The Applicant, unless determined to be infeasible by the Zoning Administrator based on written documentation provided by the Applicant, shall utilize reclaimed water for grading and dust suppression and other construction activities appropriate for reclaimed water use.
14. The Applicant shall utilize reclaimed water, if available, for the proposed landscape irrigation system as appropriate for the landscape materials and consistent with stormwater regulations. Absent the immediate availability of reclaimed water, the Applicant shall install reclaimed water infrastructure (ie. purple pipe, etc.) in anticipation of future reclaimed water
availability. Irrigation plans shall be reviewed and approved prior to the issuance of a
Building Permit. Further, recycled water shall be used to clean public streets, sidewalks and construction equipment, if possible. 15. All future project signage shall require a separate sign permit. Building permit applications
are to be reviewed and approved by Planning Services Division and Building and Safety
Services Division. The Applicant shall submit detailed sign plans that comply with the regulations of the San Ramon Zoning Ordinance, including the appropriate review process. A Master Sign Program may be proposed for all site signage as appropriate.
16. During the buildout period, the Applicant shall manage and maintain the parking lots, open
space, and landscape in the Project area where construction is inactive (i.e. interim phase areas). 17. The Applicant shall submit a set of annotated conditions elaborating on the compliance status
of each condition for the proposed Project and noting how each condition has been satisfied
for the following benchmarks:
Orchards Master Plan
City Council Conditions of Approval Page 4 of 16
• Prior to site development permit issuance
• Prior to building permit issuance
• 72 hours prior to final building occupancy request Construction Sale Tax Sub-Permit
18. As applicable, prior to the construction of any portion of the Project, the Project proponent shall use commercially reasonable efforts to require that all qualifying contractors and subcontractors providing bulk lumber, concrete, structural steel, asphalt, and pre-fabricated building components such as roof trusses with a contract value of $5,000,000 or more, to
exercise their option to obtain a Board of Equalization sub-permit for the jobsite and allocate all eligible use tax payments to the City of San Ramon. The Project proponent will use commercially reasonable efforts to require that any such contractor or subcontractor provide San Ramon with either a copy of their Board of Equalization account number and sub-permit (or such other documentation as is reasonably acceptable), or a statement that use tax does
not apply to their portion of the Project. Funding City Services 19. Prior to issuing the first Certificate of Occupancy, or as may be agreed to in a subsequent
approval of a Development Agreement, the Applicant shall provide a funding mechanism to offset the additional costs associated with providing City services to the Project. Appropriate funding mechanisms for compliance with this condition of approval includes but is not limited to, a Community Facilities District (CFD), a Landscape and Lighting District, or other mechanism acceptable to the Applicant and City. The Applicant shall be responsible
for associated administrative costs of establishing said funding mechanism. Park and Open Space Obligations and Fees 20. The Applicant(s) shall develop the Project’s open space areas in accordance with the
Orchards Design Guidelines, dated November 14, 2025 which include development of a 2.5-acre centralized park, perimeter greenway, heritage oak tree parks, retail plazas, and neighborhood parks. The Project shall fulfill their Parkland Dedication Ordinance obligation and payment of applicable Park Facilities fees in accordance with City’s Ordinance(s). As an alternative, the City may consider alternative compliance methods that further General
Plan policies for park and recreation facilities, including but not limited to public access to private park and recreation facilities, existing park facility improvements or dedication of land or facilities to the City. Any alternative compliance method shall be approved, prior to the issuance of a building permit, by a separate agreement or other instruments demonstrating that the parkland and fee obligations have been met to satisfaction of the City. The timing
for development and requirements may be addressed by subsequent approval of a Development Agreement.
Orchards Master Plan
City Council Conditions of Approval Page 5 of 16
Police Services
21. Prior to occupancy of the 950th residential unit, the Applicant shall have in place an
agreement with the City for funding of police staff and facilities necessary to address the proportionate population increase associated with the proposed Master Plan. The specific terms of the agreement may include, impact fees, a special district, dedication of facilities (such as police substation), or other measures acceptable to the City to support the City
standard of .8 officers per 1,000 residents and meet the related police facility needs. The
requirements may be addressed by subsequent approval of a Development Agreement. Housing
22. Prior to the issuance of the building permit for the first building or phase of construction, the
Applicant shall enter into an Affordable Housing Agreement demonstrating compliance with the City’s Inclusionary Housing Ordinance and in accordance with the Applicant’s written Affordable Housing Plan, dated December 4, 2025. Each residential phase shall be required to provide its proportionate requirement of affordable units at the designated income levels
unless an alternative standard is approved and documented by a separate agreement approved
by the City. 23. The Applicant(s)/owner shall provide sale or lease disclosure for each residential unit including a statement as to the nature of mixed use developments and relationship between
residential and commercial components of the project. The disclosure shall include
acknowledgement of the fact that there is potential for noise and related impacts associated with the proximity to commercial uses and construction activities. The content of the disclosure statement shall be review and approved by the Zoning Administrator.
24. In conformance with Fair Housing laws and as part of the Affordable Housing Agreement,
the Applicant shall work with the City to establish a priority access system for the rental of the affordable units to affordable households in-line with the goals of the City’s Housing Element and meeting State housing law requirements.
25. The affordability controls and minimum periods of affordability shall be binding upon the
initial developer and successors in interest and operator(s) of the project. 26. The Affordable Housing Agreement shall include compliance monitoring provisions to ensure on-going compliance with the Affordable Housing Agreement requirements and that
all costs of compliance monitoring shall be borne by the Applicant.
27. Interior features and finishes in affordable units shall be durable, of good quality and consistent with contemporary standards for new housing.
28. At full buildout, the Orchards Community will provide at least 5% very low-income homes
project-wide, qualifying the Project for State Density Bonus as identified in the Applicant’s written Affordable Housing Plan, dated December 4, 2025. The Multi-Family and Mixed-
Orchards Master Plan
City Council Conditions of Approval Page 6 of 16
Use Districts will be developed with rental and for-sale housing and in those districts the percentage of very low-income units would exceed 6% as shown in the table below:
Construction Noise
29. Applicant(s) shall submit and obtain City approval of a Construction Noise Plan for all equipment that emits noise levels above the City’s threshold prior to construction. This plan shall address anticipated construction noises generated by the Project and how to minimize the impact of these noises (i.e. limiting the hours of equipment use, use of mufflers, distance
to sensitive receptors, etc.). 30. Prior to the first residential occupancy of each of the Master Plan residential neighborhoods, construction activities shall be regulated by Municipal Code Section B6-100 limiting construction activities to 7:30 AM and 7:00 PM Monday through Friday, 9:00 AM and 6:00
PM on Saturday and Sundays; and prohibiting work on federal holidays. 31. Initial residential occupancy of the Master Plan neighborhoods, prior to the execution of a lease or sales document, the Applicant shall provide future tenants a Construction Noise Disclosure form that informs the future occupants of ongoing construction activities that are
outstanding in the area/neighborhood and allowable construction hours. The disclosure shall be provided to Planning Services for review and approval prior to dissemination. 32. After initial residential occupancy of the Master Plan neighborhoods, construction activity shall be limited to the hours between 7:30 AM and 6:00 PM Monday through Friday, 9:00
AM and 5:00 PM on Saturdays. Construction shall be prohibited on Sundays and federal holidays. 33. The City may impose more restrictive construction days/hours if determined to be necessary
to protect the public well-being. The Applicant shall designate a "Noise Disturbance
Coordinator" to respond to any local complaints about construction noise and work closely
Orchards Master Plan
City Council Conditions of Approval Page 7 of 16
with Planning Services Staff in resolving complaints. A notice shall be sent to property owners and tenants/residents within a 500-foot radius of the site prior to start of site grading
or construction. The Notice shall contain the Noise Disturbance Coordinator’s contact
information along with approved hours of construction. 34. 72-hours prior to the start of pile driving or other high noise/vibration threshold activities, associated with any of the phases of construction, the Applicant shall send notice of those
activities to property owners and tenants/residents within a 300-foot radius of the
construction site. The Notice shall contain the Noise Disturbance Coordinator’s contact information along with a schedule related to the pile driving or other high noise/vibration threshold activities and approved hours of construction.
Central Contra Costa County Sanitation District (Central San)
(Compliance with this condition is subject to Central San approval) 35. As indicated in the January 2025 will serve letter, a public sewer extension is required for this project and the point of connection to Central Sans public sewer has not been determined
at this time. The proposed development is expected to contribute additional wastewater flow
to a sewershed with anticipated sewer service capacity constraints. This development may be responsible for paying for a portion of a capacity improvement project. Capacity is not reserved until the development is permitted by Central San. Subsequent capacity review may be required as part of the sewer service permit plan review process. The Applicant shall
reimburse Central San for the actual costs to complete any necessary inspection, cleaning,
and sewer improvement work from the development. East Bay Municipal Utility District (EBMUD) (Compliance with this condition is subject to EBMUD approval)
36. Water service for new multi-unit structures shall be individually metered or sub-metered in compliance with Section 537 of California's Water Code & Section 1954.201-219 of California's Civil Code, which encourages conservation of water in multi-family residential and mixed-use multi-family and commercial buildings by requiring metering infrastructure
for each dwelling unit, including appropriate water billing safeguards for both tenants and
landlords. EBMUD water services shall be conditioned for all development projects that are subject to these metering requirements and will be released only after the project sponsor has satisfied all requirements and provided evidence of conformance with Section 537 of California's Water Code & Section 1954.201-2019 of California's Civil Code.
37. Once the property is subdivided, separate meters for each lot will be required. Separate structures on the same property require separate water meters. A main extension at the project sponsor's expense will be required to serve the proposed development.
38. Off-site pipeline improvements at the project sponsor’s expense, may be required to serve
the proposed development. Off-site pipeline improvements include, but are not limited to, replacement of existing pipelines to the project site.
Orchards Master Plan
City Council Conditions of Approval Page 8 of 16
39. A parallel water main, to be installed at the project sponsor’s expense, may be required to
serve the property and shall be design in accordance with EBMUD’s pipeline design criteria.
Prior to Final Map/Parcel Map Approval 40. Applicant(s) shall offer to the City at time of each Final Map approval all abutting road rights
of way and easements not previously accepted by the City or Contra Costa County, as the
case may be, for all past, existing, and intended public improvements and any necessary quitclaims or abandonment of easements. 41. The Applicant shall provide all necessary easements for public access, emergency vehicle
access, sewer, storm drain, water, and other utilities, as required by the City or serving utility.
42. The Applicant shall provide ownership and maintenance responsibility for all easements and improvements related to fences, drainage facilities, landscape, and decorative elements on the Final Map or by separate instrument.
43. The Applicant shall provide site visibility easements to ensure clear visibility at Project roadway intersections as required the Zoning Ordinance and by the City Engineer. 44. The Applicant shall enter into a Subdivision Improvement Agreement pursuant to the
requirements of the City’s Subdivision Ordinance. GENERAL CONDITIONS (Applicable to all Future Development) Building Permits and Construction
45. The Applicant shall obtain building permits for each building/phased based on the most current and applicable California Building Code, California Mechanical Code, California Plumbing Code, California Electrical Code and other related codes as referenced in the City of San Ramon's Municipal Code Building Ordinances.
46. Prior to the issuance of a building permit for each phase of development, the applicant shall provide documentation, in a form acceptable to the Building Official, of all additional required approvals from the Fire District, East Bay Municipal Utility District Sanitary District, Contra Costa County Health Department, or other agency, as applicable.
47. Prior to issuance of building permits for each phase of construction, the project Applicant shall demonstrate that all proposed parking lots or parking structures meet or exceed Building Code standards for on‐site Electric Vehicles (EV) charging stations as well as EV parking provisions as required by California Green Building Standards. The placement of EV
charging stations shall consider overall site efficiency and effective access for residents,
visitors, and customers of commercial properties.
Orchards Master Plan
City Council Conditions of Approval Page 9 of 16
48. Prior to the issuance of a building permit, a final lighting plan and photometrics shall be reviewed and approved by the Planning Services Division. These plans shall conform to
provisions of the City of San Ramon Zoning Ordinance, Security Ordinance, and Orchards
Design Guidelines. All lighting shall be shielded from abutting properties with cut-offs (shields) so as to limit nuisance or annoyance. No lighting shall be of the type or in a location such that it constitutes a hazard to vehicular traffic, either on private property or on abutting streets. The spacing and height of the standards and luminars shall be approved by the City
Engineer and Community Development Director. Additionally, as part of the proposed
landscape plan, the Applicant shall consider landscape and design features that account for design goals while allowing for maximum surveillance and illumination. 49. All parking structures shall be reviewed by Police Services and required to ensure adequate
illumination and surveillance to maintain a safe environment (Police Services).
50. Prior to the issuance of a building permit for any building or phased of the Master Plan Approval, the Applicant(s) shall pay all applicable fees including, but not limited to Childcare, City Beautification, General Plan and Zoning Ordinance Recovery, Aerial
Mapping and Document Imaging per the City adopted Fee Resolution or as approved by the
Vesting Tentative Map or specified by an approved Development Agreement. 51. Final conditions of approval shall be printed on the cover page of the building permit plan submittal.
52. Applicant(s) to comply with all of the requirements of the Contra Costa County Health Services pursuant to the design, installation and maintenance of any water feature designed for use and contact with humans.
53. Require tribal monitor(s) during all activities in areas with cultural resources of interest to
local Native American Tribes, when requested. Cultural resources of interest include a sanctified cemetery, place of worship, religious or ceremonial site, or sacred shrine. Monitors shall observe grading, ground-disturbing, and other earthmoving activities.
54. If cultural resources are encountered during ground-disturbing activities for a project, work
in the immediate area shall be halted and an Archaeologist meeting the Secretary of the Interior’s Professional Qualification Standards for archaeology in either prehistoric or historic archaeology shall be contacted immediately to evaluate the find. If necessary, the evaluation may require preparation of a treatment plan and archaeological testing for Cultural
Resource Historical Resources (CRHR) eligibility. If the discovery proves to be significant
under CEQA and cannot be avoided by a project, additional work such as excavating the cultural deposit to fully characterize its extent, and collecting and curating artifacts may be warranted to mitigate any significant impacts to cultural resources. In the event that archaeological resources of Native American origin are identified during project
construction, a qualified Archaeologist will consult with the City to begin Native American
consultation procedures.
Orchards Master Plan
City Council Conditions of Approval Page 10 of 16
55. In the event that cultural resources of Native American origin are identified during construction of a project implemented under the 2040 General Plan, all earth-disturbing work
in the vicinity of the find shall be temporarily suspended or redirected until an Archaeologist
has evaluated the nature and significance of the find as a cultural resource and an appropriate local Native American representative is consulted. If the City, in consultation with local Native Americans, determines that the resource is a Tribal Cultural Resource and, thus, significant under CEQA, a mitigation plan shall be prepared and implemented in accordance
with State guidelines and in consultation with local Native American group(s). The
mitigation plan shall include avoidance of the resource or, if avoidance of the resource is infeasible, the plan shall outline the appropriate treatment of the resource in coordination with the appropriate local Native American Tribal representative and, if applicable, a qualified Archaeologist. Examples of appropriate mitigation for Tribal Cultural Resources
include, but are not limited to, protecting the cultural character and integrity of the resource,
protecting traditional use of the resource, protecting the confidentiality of the resource, or heritage recovery. Public Services Division
56. The Applicant shall submit 1) Waste Management Plan (WMP) estimating all waste to be hauled away from the project site, and 2) Summary Report for review and approval by the Public Services Division. These shall be submitted to City via http://SanRamon.WasteTracking.com/ (Green Halo).
57. The Applicant shall reuse or recycle at least 65% (by weight) of the construction and demolition debris generated by the project, as per CALGreen requirements (2017). Keep receipts from processors of all waste materials for submittal of WMP and Summary Report. Note: Mixed boxes of construction and demolition debris (C&D) can be separated by a 3rd
party waste processor, as is commonly done. In such cases, project owner should ensure that
the selected waste processor has at least a 65% recycling rate, as the project/permit will be penalized for dropping below the required recycling rate. 58. The Applicant shall submit a site plan and conceptual drawings of the solid waste and
recycling enclosures, showing the number, size, and locations of the enclosures and
containers for solid waste, recycling, and organic waste. Enclosures shall be designed and located to be accessible to standard automated refuse and recycling collection vehicles. 59. All trees removed from the project shall be recycled as mulch, compost, or biomass fuel, and
should be reported as part of the WMP.
60. The Applicant shall submit a Waste Collection Plan (WCP) and demonstrate waste collection access by curbside collection trucks used by San Ramon’s current Franchised Waste Hauler. Applicant should plan for at least three (3) trucks per week to accommodate Trash,
Recycling, and Organics collection, and anticipate that collection trucks are equipped with
backup alarms.
Orchards Master Plan
City Council Conditions of Approval Page 11 of 16
San Ramon Valley Fire Protection District (Compliance with these conditions is subject to Fire District approval)
61. Each phase of Master Plan construction and individual buildings shall comply with current code requirements including District Ordinance at the time of building permit issuance. 62. Access to the Master Plan project phases and individual buildings shall comply with current
code requirements including District Ordinance at the time of building permit issuance.
63. Street names shall be submitted to SRVFD for approval. 64. Access and water supply for Master Plan project phases or individual buildings shall be
approved, completed, and signed off before construction commences. San Ramon Valley Unified School District (Compliance with this condition is subject to San Ramon Valley Unified School District review)
65. Projects developed within the boundaries of the San Ramon Valley Unified School District
will be subjected to developer fees. The payment fee shall be verified prior to the issuance of Building Permits based on the Permit square footages. Please contact the San Ramon Valley Unified School District for an estimate of applicable fees.
Engineering Services Division
66. The Project shall comply with all applicable standards in the current Engineering Design, Grading, and Procedures Manual.
67. The Applicant shall pay all outstanding review fees that were incurred while processing the
development applications through the Planning Commission, prior to any additional Engineering permits being granted. 68. All off-site improvements and mitigation required for the Project shall comply with the latest
requirements of the Americans with Disabilities Act (ADA).
69. The Applicant shall obtain an encroachment permit for all work conducted within the City right-of-way or easement.
70. The Applicant shall obtain a grading permit and/or site development permit for all remedial
and corrective grading work, and all site improvements associated with all future development within the Master Plan area, including, but not limited to, grading and drainage facilities, roadway, sidewalk and landscape.
71. The Applicant shall provide all final studies, reports, agreements, and other project
documents in PDF format or City-approved alternate. As-built plans shall be provided in PDF and AutoCAD format, or City-approved alternate.
Orchards Master Plan
City Council Conditions of Approval Page 12 of 16
72. All modifications or improvements within the public right of way shall be subject to approval
by the City. Transportation Services Division 73. The Applicant is required to promote TDM program strategies for both commercial and
residential properties aimed at reducing peak hour commute trips and contribute to regional
air quality improvements by participating in the City’s 511 Contra Costa Transportation Demand Management Program(s). TDM program components include carpooling, vanpooling, transit, telecommuting, walking, bicycling, and/or telecommute policies.
74. The Applicant is required to promote local bus service to and from regional transit lines and
when applicable; consult with the City and local transit providers for changes to routes and/or service. 75. The Applicant is required to maintain 5% parking for rideshare services, on-demand, carpool,
and vanpool parking. Additional compliance standards for residential component of the
project shall be considered on a case by case basis with the goal of meeting or exceeding the 5% standard for the Master Plan Area as a whole. 76. The Applicant shall take necessary steps to support a maximum 80% Drive Alone Rate
(minimum 20% rideshare standard) for the commercial component of the project with the
goal of further expanding the ride share percentages associated with the residential component of the Master Plan. 77. The Applicant is required to survey employees of the Mixed-Use District to determine Drive
Alone Rate. Survey can be done in concert with Citywide travel demand survey and take
place every three years. The survey should include the residential components of the Master Plan for an assessment of VMT reduction rate associated with housing in relation to the Bishop Ranch employment base.
78. As part of each phase of development, the Applicant is shall designate bicycle parking
consistent with City Standards. 79. The Applicant is required to provide on-site bike-share programs for tenants (residential and commercial) and retail businesses within the Master Plan area
Prior to Grading Permit/Site Development Permit Issuance 80. The Applicant shall pay applicable plan check, inspection, drainage mitigation, creek study fees, and other development impact fees pursuant to the Municipal Code and established in
the City’s current fee schedule.
Orchards Master Plan
City Council Conditions of Approval Page 13 of 16
81. The Applicant shall pay all peer review fees for consultant review of project documents as established by the City’s current fee schedule.
82. The Applicant shall provide surety in the amount and form approved by the City Engineer with the surety company licensed to do business in the State of California and acceptable to the City of San Ramon.
83. The Project grading and improvements shall be in general conformance with that indicated
on the Vesting Tentative Map as amended by the conditions herein unless otherwise approved by the City. Staff approval of final reports, analyses, and construction plans for each block, parcel, and/or project (subject to future entitlements) may result in additional work that may modify the ultimate design and location of proposed Project components. If
grading or improvements are phased, then the phasing and timing of grading and construction
of improvements for each phase shall be reviewed as part of the grading and/or site development permit process. 84. The Applicant shall submit final geotechnical reports for each block, parcel, and/or project
of the Vesting Tentative Map which comply with the requirements set forth in the City’s
current Subdivision and Grading Ordinances and Engineering Design, Grading and Procedures Manual. The final geotechnical reports shall be updated to reflect the proposed development for each block, parcel, and/or project (subject to future entitlements) at the time of filing of the Final Map.
85. The Applicant shall submit a final hydrology and hydraulic study for each block, parcel, and/or project (subject to future entitlements) which complies with the requirements set forth in the City’s current Subdivision Ordinance and the Engineering Design, Grading and Procedures Manual. Final studies shall include additional analyses, as required by
Engineering Division staff, to mitigate the additional runoff, and provide design
recommendations on how each project will meet both regional and local drainage requirements, and shall be approved by the Engineering Division. Staff approval of all final studies may result in additional improvements not currently shown or proposed, and shall be subject to further review upon future project entitlements.
86. The Applicant shall submit a final stormwater control plan for each block, parcel, and/or project (subject to future entitlements) which complies with the requirements set forth in the City’s current Stormwater C.3 Guidebook and Municipal Regional Stormwater Permit issued by the San Francisco Bay Regional Water Quality Control Board. Final reports include
additional calculations, as required by Engineering Division staff, to address stormwater
treatment and provide design recommendations on how each project will meet stormwater treatment requirements for both the private and public facilities, and shall be approved by the Engineering Division. Staff approval of all final plans may result in additional improvements not shown or proposed, and shall be subject to further review upon future
project entitlements.
Orchards Master Plan
City Council Conditions of Approval Page 14 of 16
87. The Applicant shall obtain all required permits and approvals from federal, state, and local agencies having jurisdiction over the project, including but not limited to, the United States
Army Corps of Engineers, the Federal Emergency Management Agency, the California
Department of Fish and Wildlife, the San Francisco Bay Regional Water Quality Control Board, and the East Bay Regional Parks District. Copies of these permits shall be provided to the Engineering Division. Permits and approvals by these agencies may result in additional work or modifications to the proposed Project improvements.
88. The Project shall have all new utilities installed underground. This includes, but is not limited to, electrical, gas, telephone, and cable television services in accordance with City policies and ordinances. All utilities shall be located within public utility easements or public streets.
89. The Applicant shall submit to the City a letter certifying that sight and distance triangles (as
adopted in the Zoning Ordinance) have been reviewed for clear visibility based on proposed design amenities at all intersections as deemed appropriate by the City Engineer. 90. Prior to site development of each District, the Applicant will implement Potential Pedestrian
Safety Options identified in the Operations Report as deemed appropriate and acceptable by
the City’s Traffic Engineer. During Construction
91. The Applicant(s) shall maintain the area surrounding the project in a clean and orderly
manner at all times. All litter shall be picked up at the end of each day of construction activity. The Applicant(s) shall be responsible for all corrective measures necessary to contain all trash, construction debris and materials on-site until disposal off-site can be arranged. If deemed necessary, the Zoning Administrator may request that a trash
management plan be submitted for review and approval.
92. With the exception of authorized construction, no use activity or process shall produce vibrations that are perceptible without instruments by a reasonable persons at the property lines of a site.
93. With the exception of authorized construction, no use, process or activity shall produce objectionable odors that are perceptible without instruments by a reasonable persons at the property lines of a site.
94. With the exception of authorized construction, uses, activities, and processes shall not
produce unreasonable, disturbing, or unnecessary emissions of heat or humidity, at the property line of the site on which they are situated, that cause material distress, discomfort, or injury.
Orchards Master Plan
City Council Conditions of Approval Page 15 of 16
Prior to Building Occupancy
95. Prior to occupancy, the Applicant shall implement the three traffic mitigation measure as
identified in the Bishop Ranch Orchards Traffic Operations Report dated November 10, 2025. 96. All required landscaping/irrigation shall be installed in accordance with the Orchards Design
Guidelines dated November 14, 2025 and approved plans. The required landscaping/
irrigation along the street frontages shall also be installed in connection with the respective phase unless the City Engineer delays the installation to facilitate street improvements (this applies prior to building occupancy OR building occupancy of the last building within the respective phase).
97. Landscaping shall meet the requirements of landscaping, irrigation and hydroseeding of the City's Zoning Ordinance, and the State Model Water Efficient Landscape Ordinance (MWELO) as applicable.
98. After written verification by a certified landscape architect has been provided to Planning
Services Division, the Applicant shall request inspection of the final Landscape and Irrigation Plan from Planning Services Division, Public Services, and Engineering Services at least 72 hours prior to building occupancy inspection.
99. The applicant shall submit to the Planning Services Division three executed and notarized
copies each of a Landscape Maintenance Agreement and/or Building Exteriors and Parking Lot Maintenance Agreement that shall be recorded as a deed restriction on all common areas. 100. The project Applicant(s) shall effectively screen from view all rooftop equipment ducts,
meters, air conditioning equipment, refrigeration equipment, plumbing, transformers,
wireless telecommunication equipment and other mechanical equipment, whether open to the structure, on the ground, or on the roof, with materials architecturally compatible with other buildings. Screening details shall be shown on the plans submitted for issuance of building permits, the adequacy of which shall be determined by the City. All required
screening shall be provided prior to occupancy.
101. The Applicant(s) shall install a public art feature in accordance with the Art in Public Places Guiding Procedures and in accordance with the approved project plans.
102. The Applicant is required to distribute, at least quarterly, TDM program information to
tenants and retail businesses. In addition, the Applicant shall provide each future residential tenant TDM program information at the time they enter into a lease agreement or occupy their unit. Program information is available through the City’s 511 Contra Costa TDM program and the Regional Rideshare Program.
Orchards Master Plan
City Council Conditions of Approval Page 16 of 16
103. The Applicant is required to provide kiosks or display racks for TDM program information in the lobbies or similar entry points to residential and commercial components of the Master
Plan.
Orchards Neighborhood City Council Conditions of Approval Page 1 of 17
EXHIBIT B
CONDITIONS OF APPROVAL DEVELOPMENT PLAN DP 2024-0006; ARCHITECTURAL REVIEW AR 2024-0013; MAJOR SUBDIVISION MJ 2024-0004; TREE REMOVAL PERMIT TRP 2024-0009; ENVIRONMENTAL REVIEW ENVR 2025-0003 ORCHARDS NEIGHBORHOOD DISTRICT RESIDENTIAL DEVELOPMENT PROJECT (6001 BOLLINGER CANYON RD, APN: 213-120-008)
APPLICANT/PROPERTY OWNER: BR6001, LLC
Special Conditions
Planning Services Division: 1. The Project authorized with this action, consists of approximately 368 residential units and 58 optional accessory dwelling units (ADUs), including 230 single-family homes and 138 multi-family townhomes within the Neighborhood District of the Orchards Development Master Plan community (APN: 213-120-008), shall be in substantial conformance with the project description dated June 18, 2025, and project plans dated “Received September 5, 2025” as approved by the City Council on April 7, 2026. 2. All development impact fees, including but not limited to Parkland Dedication, Park and Recreation Facility, local and regional traffic impact fees, school impact fees, public
services fees, and beautification fees, shall be assessed for the proposed Project phase and shall be paid at the time of building permit issuance, as applicable to the Project.
3. Prior to Final Map approval, the Applicant shall prepare a fiscal analysis to determine whether the Project’s new residential units will generate sufficient General Fund revenues to offset the additional costs associated with providing City services and
facilities to the new residential units. Should the fiscal analysis determine that sufficient
revenues will not be generated, prior to Final Map approval, the Applicant shall provide an appropriate funding mechanism. Appropriate funding mechanisms for compliance with this Condition of Approval include but are not limited to, an existing or new Community Facilities District (CFD), a Landscape and Lighting District, or other
mechanism acceptable to the Applicant and City. The Applicant shall be responsible for
associated administrative costs of establishing said funding mechanism or opting into the existing CFD (CFD 2014-1).
Orchards Neighborhood City Council Conditions of Approval Page 2 of 17
4. As applicable, prior to the construction of any portion of the Project, the Project proponent shall use commercially reasonable efforts to require that all qualifying
contractors and subcontractors providing bulk lumber, concrete, structural steel, asphalt,
and pre-fabricated building components such as roof trusses with a contract value of $5,000,000 or more, to exercise their option to obtain a Board of Equalization sub-permit for the jobsite and allocate all eligible use tax payments to the City of San Ramon. The Project proponent will use commercially reasonable efforts to require that any such
contractor or subcontractor provide San Ramon with either a copy of their Board of
Equalization account number and sub-permit (or such other documentation as is reasonably acceptable), or a statement that use tax does not apply to their portion of the Project.
5. The Applicant (including any assignee or successor-in-interest) shall defend, indemnify,
and hold harmless the City of San Ramon (City) and its agents, elected officials, officers,
and employees from any claim, action or proceeding against the City or its agents, elected officials, officers, and employees to attack, set aside, void or annul any part of the City’s approval of the Applicant’s project. The City will promptly notify the Applicant of any such claim, action or proceeding, and cooperate in the defense.
6. The Applicant, unless determined to be infeasible by the Zoning Administrator based on written documentation provided by the Applicant, shall utilize reclaimed water for grading and dust suppression and other construction activities appropriate for reclaimed water use.
7. The Applicant shall utilize reclaimed water, if available, for the proposed landscape irrigation system as appropriate for the landscape materials and consistent with stormwater regulations. Absent the immediate availability of reclaimed water, the Applicant shall install reclaimed water infrastructure (ie. purple pipe, etc.) in anticipation
of future reclaimed water availability. Irrigation plans shall be reviewed and approved prior to the issuance of a Building Permit. Further, recycled water shall be used to clean public streets, sidewalks and construction equipment, if possible. CEQA
8. All GP 2040 FEIR mitigation measures identified in the Orchards Project CEQA
Guidelines Section 15183 Consistency Checklist (Exhibit C) shall be implemented, as
appropriate, and are incorporated by reference as conditions of approval.
Affordable Housing
9. Prior to the issuance of the first residential unit building permit, the Applicant shall have
a fully executed Affordable Housing Agreement with the City demonstrating compliance with the Inclusionary Housing Ordinance and in accordance with the Applicant’s written Affordable Housing Plan, dated December 4, 2025. The Agreement shall provide for the development of ninety-nine (99) affordable housing units and one manager’s unit. Of the
ninety-nine (99) affordable units, a minimum of twenty-five (25) affordable units shall
be offered for-rent to very low-income households and seventy-four (74) affordable units
Orchards Neighborhood City Council Conditions of Approval Page 3 of 17
shall be offered for-rent to low-income households. All affordable units must meet the State of California’s Department of Housing and Community Development requirements
and count towards the City’s fair share housing production of the applicable very-low,
low, and moderate income units as assigned by the Association of Bay Area Governments (ABAG). 10. In conformance with Fair Housing laws and as part of the Affordable Housing
Agreement, the Applicant shall work with the City to establish a priority access system
for the rental of the affordable units to affordable households in-line with the goals of the City’s Housing Element and meeting State housing law requirements. 11. The affordability controls and minimum periods of affordability shall be binding upon
the initial developer and successors in interest and operator(s) of the project.
12. The Affordable Housing Agreement shall include compliance monitoring provisions to ensure on-going compliance with the Affordable Housing Agreement requirements and that all costs of compliance monitoring shall be borne by the Applicant.
13. Interior features and finishes in affordable units shall be durable, of good quality and consistent with contemporary standards for new housing. Engineering Services:
14. Prior to occupancy, the Applicant shall implement the following three traffic mitigation measures as identified in the Bishop Ranch Orchards Traffic Operations Report dated November 10, 2025:
• Increase the northbound left-turning storage capacity at Chevron Drive-Sunset Drive/Bollinger Canyon Road, restripe the northbound approach from Left, Left-Through, Right to Left, Left, Through-Right.
• Improve traffic progression mainly in the westbound direction along Bollinger Canyon Road, in the AM peak hour, add I-680 SB Ramps/Bollinger Canyon Road and I-680 NB Ramps/Bollinger Canyon Road to the adaptive signal system.
• To reduce delays and queuing at the I-680 southbound off-ramp intersection,
improving throughput of westbound traffic, adjust traffic signal’s vehicle detection settings for the westbound approach at San Ramon Valley Boulevard/Bollinger Canyon Road. General Conditions
Planning Services Division:
15. The approval(s) associated with a Vesting Tentative Map shall expire only if the Vesting
Tentative Map expires per the California Subdivision Map Act, or as defined by the terms
Orchards Neighborhood City Council Conditions of Approval Page 4 of 17
of any Development Agreement subsequently approved for the Orchards Master Plan or
any portion thereof.
16. Prior to any site work and/or occupancy, the Applicant shall obtain all required permits,
including but not limited to, from the Engineering Services Division, Building and Safety
Services Division, and the San Ramon Valley Fire Protection District. 17. Failure of the Applicant to implement, follow and adhere to these conditions may result in revocation hearing proceedings or modification of the project before the Zoning
Administrator or Planning Commission.
18. Within 60 days of the effective date of the project approval or prior to building permit issuance, whichever is earlier, the Applicant shall pay all outstanding permit review fees for City services incurred with staff time for processing the development application in
accordance with the established Fee Resolution.
19. The Applicant shall pay the building permit plan check fee in accordance with the current established Fee Resolution at the time of building permit submittal, and the building permit invoice fee in accordance with the current established Fee Resolution at the time
of building permit issuance for the residential unit(s).
20. All buildings and improvements shall conform to the minimum development standards of the Downtown Mixed Use, South (DMU-S) Zoning District and DMU-S General Plan land use designation as generally shown on the approved project plans, unless authorized
by this approval or the conditions herein.
21. Any changes to the operation, additional activities, and/or approved plans, other than those required by these conditions, require prior City review and approval. The Zoning Administrator shall determine the appropriate review authority for any revision or
modification to the Project. Minor changes may be approved by the Zoning
Administrator.
22. All general construction activity shall be limited to the hours between 7:30 AM and 7:00
PM Monday through Friday, 9:00 AM and 6:00 PM on Saturdays and Sundays.
Construction shall be prohibited on Federal holidays. The City may impose more
restrictive construction days/hours if determined to be necessary to protect the public
welfare and safety. See Condition of Approval No. 69 for construction work hours for
Site Development Permit activities.
23. The City may impose more restrictive construction days/hours if reasonably determined to be necessary to protect the public well-being. The Applicant shall designate a "Noise Disturbance Coordinator" to respond to any local complaints about construction noise and work closely with Planning Services staff in resolving complaints, as reasonably
feasible. A notice shall be sent to property owners and tenants/residents within a 500-foot radius of the site prior to start of grading and site development containing Coordinator contact information along with approved hours of construction.
Orchards Neighborhood City Council Conditions of Approval Page 5 of 17
24. To the extent feasible, the site plan shall provide utility meters, transformers, irrigation control boxes, backflow devices, valves, etc. to be screened by buildings, fencing and/or
landscaping so as to harmonize with building design and recognize setback requirements.
25. No individual unit shall be occupied until the immediately adjoining area is safe and until all reasonable expected services and amenities are provided to the unit to be occupied as deemed appropriate by the City.
26. All rooftop equipment, which includes, but not limited to, air conditioning, heating, refrigeration equipment, plumbing lines, ductwork and transformers, shall be screened from views on all sides.
27. All proposed signage shall require a separate sign permit. Building permit applications
are to be reviewed and approved by Planning Services Division and Building and Safety Services Division. The Applicant shall submit detailed sign plans that comply with the regulations of the San Ramon Zoning Ordinance, including the appropriate review process. A Master Sign Program may be proposed for all site signage as appropriate.
28. The Applicant shall submit a set of annotated conditions elaborating on the compliance
status of each condition for the proposed Project and noting how each condition has been
satisfied for the following benchmarks:
• Prior to site development permit issuance
• Prior to building permit issuance
• 72 hours prior to final building occupancy request
29. Require tribal monitor(s) during all activities in areas with cultural resources of interest to local Native American Tribes, when requested. Cultural resources of interest include
a sanctified cemetery, place of worship, religious or ceremonial site, or sacred shrine.
Monitors shall observe grading, ground-disturbing, and other earthmoving activities. 30. If cultural resources are encountered during ground-disturbing activities for a project, work in the immediate area shall be halted and an Archaeologist meeting the Secretary
of the Interior’s Professional Qualification Standards for archaeology in either
prehistoric or historic archaeology shall be contacted immediately to evaluate the find. If necessary, the evaluation may require preparation of a treatment plan and archaeological testing for Cultural Resource Historical Resources (CRHR) eligibility. If the discovery proves to be significant under CEQA and cannot be avoided by a project,
additional work such as excavating the cultural deposit to fully characterize its extent,
and collecting and curating artifacts may be warranted to mitigate any significant impacts to cultural resources. In the event that archaeological resources of Native American origin are identified during project construction, a qualified Archaeologist will consult with the City to begin Native American consultation procedures.
31. In the event that cultural resources of Native American origin are identified during construction of a project implemented under the 2040 General Plan, all earth-disturbing
Orchards Neighborhood City Council Conditions of Approval Page 6 of 17
work in the vicinity of the find shall be temporarily suspended or redirected until an Archaeologist has evaluated the nature and significance of the find as a cultural resource
and an appropriate local Native American representative is consulted. If the City, in
consultation with local Native Americans, determines that the resource is a Tribal Cultural Resource and, thus, significant under CEQA, a mitigation plan shall be prepared and implemented in accordance with State guidelines and in consultation with local Native American group(s). The mitigation plan shall include avoidance of the resource
or, if avoidance of the resource is infeasible, the plan shall outline the appropriate
treatment of the resource in coordination with the appropriate local Native American Tribal representative and, if applicable, a qualified Archaeologist. Examples of appropriate mitigation for Tribal Cultural Resources include, but are not limited to, protecting the cultural character and integrity of the resource, protecting traditional use
of the resource, protecting the confidentiality of the resource, or heritage recovery. Engineering Services Division: 32. The Project shall comply with all applicable standards in the current Engineering Design,
Grading, and Procedures Manual.
33. The Applicant shall pay all outstanding review fees that were incurred while processing the development applications through the Planning Commission, prior to any additional Engineering permits being granted.
34. The Project shall comply with the latest requirements of the Americans with Disabilities Act (ADA) including all on-site improvements, as well as all off-site improvements required for the Project.
35. The Applicant shall obtain an encroachment permit for all work conducted within the
public right-of-way or easement.
36. The Applicant shall obtain a grading permit and/or site development permit for all grading work, and all site improvements within the development area, including, but not limited to, drainage facilities, roadway, sidewalk and landscape improvements.
37. The Applicant shall provide all final studies, reports, agreements, and other project documents in PDF format. As-built plans shall be provided in PDF and AutoCAD format. 38. The Applicant shall coordinate and work closely with the existing property owners
adjacent to the Project to provide adequate access during construction, and minimize dust, debris, and noise for the existing properties. Parks and Community Services:
39. The Project shall fulfill the Parkland Dedication Ordinance requirement through payment of in-lieu fees, paid at the time of building permit issuance, or as defined by the terms of a Development Agreement subsequently approved for the Orchards Master Plan or any portion thereof. In-lieu fees shall be calculated based upon the Parkland Dedication
Orchards Neighborhood City Council Conditions of Approval Page 7 of 17
Ordinance in effect on June 24, 2025, when the associated Preliminary Housing Development application was submitted, and the City Fee Schedule adopted with City
Council Resolution No. 2024-051.
Central Contra Costa County Sanitary District: 40. A public sewer extension is required for this project and the point of connection to
Central Sans public sewer has not been determined at this time. A pre-application
meeting is required and can be requested by emailing permits@centralsan.org. Per Central San District Code, each lot / parcel will need its own connection to Central San’s public sewer main, and Central San permit(s) will be required for the side sewer work.
41. No existing or future improvements that constitute an encroachment as defined by
District Code may reside within Central San’s easements. 42. Central San’s minimum required width for trunk sewer easements is 20 ft. Adequate land rights should be dedicated.
43. The proposed development is expected to contribute additional wastewater flow to a sewershed with anticipated sewer service capacity constraints. This development may be responsible for paying for a portion of a capacity improvement project. Capacity is not reserved until the development is permitted by Central San. Subsequent capacity review
may be required as part of the sewer service permit plan review process.
San Ramon Valley Fire District:
44. The Applicant shall provide the following submittals for San Ramon Valley Fire District (SRVFD) review:
a. Site Apparatus Access and Site Improvement documentation (final roadway design, parking and signage design, fire hydrant location) b. Construction New (for each plan type) c. Fire Department Water Supply (for commercial, fire sprinklers which may or may not apply)
d. Fire Sprinkler (for each lot) e. Fire Alarm (depending on fire sprinkler design in attached row townhouses) 45. Impact Mitigation Measures may be applied for this project.
46. Street names shall be submitted to SRVFD for approval. 47. Approved roadways and fire water shall be installed and inspected prior to the delivery of combustible materials to the construction site.
48. Fire Lanes and parking restrictions shall be in accordance with Fire District Standards.
Orchards Neighborhood City Council Conditions of Approval Page 8 of 17
49. Facilities, buildings, or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an
asphalt, concrete, or other approved all-weather driving surface capable of supporting
the imposed load of fire apparatus weighing at least 74,000 pounds (34,473 kg) in accordance with Caltrans Design Standard HS- 20-44. 50. Engineering calculations will be required for decorative paving.
51. The minimum fire flow required shall be determined as specified by the current adopted edition of the California Fire Code Appendix B with adopted Amendments. 52. Hydrant location shall be approved by the Fire District.
53. Due to the proximity of this project to existing utility infrastructure, the Fire District will require public fire hydrants provided by East Bay Municipal Utility District (EBMUD). 54. Based on a minimum unobstructed width of 20 feet, a fire apparatus access roadway shall
be capable of providing a minimum standard turning radius of 25 feet (7,620 mm) inside
and 45 feet (13,716 mm) outside. 55. Fire apparatus access roads less than 28 feet wide shall be posted on both sides as a fire lane.
56. Fire apparatus access roads 28 feet wide or greater, but less than 36 feet wide, shall be posted on one side of the road as a fire lane. 57. Where the vertical distance between the grade plane and the highest roof surface exceeds
30 feet (9,144 mm), approved aerial fire apparatus access roads shall be provided. For
purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater.
58. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet
(7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. 59. One or more of the required access routes meeting this condition shall be located not less
than 15 feet (4572 mm) and not greater than 30 feet (9144 mm) from the building and
shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official.
60. Overhead utility and power lines shall not be located over the aerial fire apparatus access
road or between the aerial fire apparatus road and the building. Other obstructions shall be permitted to be placed with the approval of the fire code official.
Orchards Neighborhood City Council Conditions of Approval Page 9 of 17
Prior to Final Map Approval
Planning Services Division: 61. Prior to Final Map approval, street names and address assignments shall be subject to the review and approval of the Planning Services Division. Proposed names/addresses shall be submitted to the Planning Services Division by the Applicant at least thirty (30)
days prior to filing a Final Map.
62. Homeowners association(s) shall be established for the Orchards Neighborhood Project and shall be created with Covenants, Conditions and Restrictions (CC&Rs) covering each included lot and all common areas (including tot lots). Such CC&Rs shall be subject
to review and approval by the Community Development Director. Said document shall
be submitted for the City’s review at least thirty (30) days prior to submission by the Applicant of materials requesting Final Map approval. CC&Rs for said association shall typically include the following provisions as appropriate:
(a) Failure to pay dues and assessments shall be both a lien against the assessed
land and a personal obligation of each property owner. (b) The association shall keep the Planning Services Division informed of the current name, address and phone number of the association’s official
representative.
(c) The association shall conform with the design and color/materials of the fences and walls within the subdivision approved by the City of San Ramon. The Community Development Director may authorize minor deviations prior
to such improvements.
(d) The association shall implement a program to ensure that garages are available to park the resident’s vehicles and that guest parking spaces are utilized for guest parking only. The program may include, and is not limited
to, HOA vehicle registration, sticker programs, guest permits for overnight
stays, and periodic inspections to ensure that the garage parking spaces accommodate the vehicles associated with the household. (e) Parking of boats or recreational vehicles on the driveways, guest parking
spaces, and/or private streets is prohibited.
(f) Guest parking shall be appropriately signed as “guest parking only” and maintained available for guests only.
(g) In the event the common areas or facilities are not properly maintained,
repaired or replaced according to the approved plans, each property owner shall be responsible for their proportionate share of these costs to bring the common area or facilities back to its original condition, secured by a lien on the property in favor of the HOA, in accordance with the HOA procedures.
Orchards Neighborhood City Council Conditions of Approval Page 10 of 17
(h) The association shall be responsible for the long-term Project maintenance
and upkeep of all common areas related to the association.
(i) The association shall maintain all building and site improvements in accordance with the final approved color and materials board for this Project as approved and accepted by the City of San Ramon. The Community
Development Director may authorize minor deviations to such improvements
if deemed appropriate. (j) All amendments to the CC&Rs shall be submitted to the Planning Services Division at least forty-five (45) days for review prior to recordation.
(k) The association shall provide for proper management and maintenance of association-owned open space and improved common areas, including all private recreation areas, walkways, landscaped areas, identification/directional signs, and retaining walls as described herein. As
part of this requirement, all landscaping within the common area(s) shall be
maintained and replaced on a 1:1 basis. (l) The association shall be responsible for maintenance of any required public access easement(s) and improvements within said easement(s) which may be
required herein.
(m) The association shall maintain City-approved documents relevant to the subject subdivision for inspection by property owners, including but not necessarily limited to, City Council Resolution No. 2026-040, Project Plans
(referenced herein), and Project Construction Plans (known as “as built”
plans); and deed restrictions required by this action. (n) Post Construction funding for the installation of traffic calming measures along private streets, such as speed humps, will be provided by the
Homeowners Association. Traffic calming features must be consistent with
the City’s overall transportation network and with nationally recognized standard traffic engineering safety practices and procedures, specifically the Institute of Transportation Engineers (ITE).
63. A Utilities Plan shall be submitted and approved by the Community Development
Director. The Utilities Plan shall be submitted sixty (60) days before the submission of materials requesting approval of the Final Map. The Utilities Plan shall provide for undergrounding of all wet utilities to the extent feasible. Said utilities shall be located outside of the required front setback and shall be placed in underground vaults, screened
by landscaping or buildings, fencing or painted in a manner which reflects the building
and landscaping design and setback requirements. If utility providers determine that no practical alternative exists upon consultation with the City, utilities may be located within front setback if undergrounded or screened accordingly as allowed by the utility providers and approved by the Planning Services Division and Engineering Services
Orchards Neighborhood City Council Conditions of Approval Page 11 of 17
Division. It is acknowledged that certain above ground water system appurtenances, such as backflow preventors, fire connections, etc., must be above ground.
64. The Applicant shall prepare a single, separate page disclosure to the future purchaser of residential units describing parking rules, programs, and regulations. The disclosure shall be provided to Planning Services Division for review at least forty-five (45) days prior to filing of Final Map. The disclosure shall be provided to all purchasers of residential
units for review and acknowledgement.
65. The Applicant shall prepare and record a “Blanket Deed Restriction” in favor of the Homeowners Association reinforcing use of the garage for the primary purpose of parking vehicles as designed (see also CC&R requirements contained herein). The draft
deed restriction shall be provided to Planning Services Division for review at least forty-
five (45) days prior to filing of Final Map. 66. The Applicant shall prepare a single, separate page disclosure to the future purchaser of residential units advising them that no new public school will be built within the Project
and to check with the San Ramon Valley Unified School District in advance of
purchasing a unit to determine which public schools are designated for said unit. The disclosure will state the City and the Applicant makes no representation regarding which public schools children residing in the Project will attend. The disclosure shall be provided to Planning Services Division for review at least 45 days prior to filing a Final
Map. The disclosure shall be provided to all purchasers of residential units for review
and acknowledgement prior to the close of escrow. Engineering Services Division:
67. The Applicant shall provide all necessary easements for public access, emergency
vehicle access, sewer, storm drain, water, and other utilities, as required by the City or serving utility. 68. The Applicant shall provide ownership and maintenance responsibility for all easements
and improvements related to fences, drainage facilities, landscape, and decorative
elements on the Final Map or by separate instrument. 69. The Applicant shall provide site visibility easements to ensure clear visibility at Project roadway intersections as required the Zoning Ordinance and by the City Engineer.
70. The Project shall include only private roads and access easements (no public roads). 71. The Applicant shall enter into a Subdivision Improvement Agreement pursuant to the requirements of the City’s Subdivision Ordinance.
Orchards Neighborhood City Council Conditions of Approval Page 12 of 17
Prior to Site Development/ Grading Permit Issuance
Engineering Services Division:
72. Construction hours under Site Development/Grading Permit work shall be limited to 7:30 am to 5:00 pm Monday through Friday and 9:00 am to 5:00 pm on Saturday. No work under the Site Development Permit/Grading Permit is allowed on Sunday and City holidays. Modifications to these hours may be considered by the City Engineer upon formal request.
73. The Applicant shall pay applicable plan check, inspection, drainage mitigation, and creek
study fees pursuant the City’s current fee schedule.
74. The Applicant shall pay all peer review fees for consultant review of project documents
as established by the City’s current fee schedule.
75. The Applicant shall provide surety in the amount and form approved by the City
Engineer with the surety company licensed to do business in the State of California and
acceptable to the City of San Ramon. Surety is applicable to public and private
improvements (excluding buildings) associated with project.
76. The Applicant shall provide evidence of approvals from utility providers, including but
not limited to, East Bay Municipal Utility District, Central Contra Costa Sanitary
District, Dublin San Ramon Services District, AT&T, and PG&E.
77. The Project grading and improvements shall be in general conformance with that
indicated on the Vesting Tentative Map as amended by the conditions herein unless
otherwise approved by the City. If grading or improvements are phased, then the phasing
and timing of grading and construction of improvements for each phase shall be reviewed
as part of the grading and/or site development permit process.
78. The Applicant shall obtain all required permits and approvals from federal, state, and
local agencies having jurisdiction over the project, including but not limited to, the
United States Army Corps of Engineers, the Federal Emergency Management Agency,
the California Department of Fish and Wildlife, the San Francisco Bay Regional Water
Quality Control Board, and the East Bay Regional Parks District. Copies of these permits
shall be provided to the Engineering Services Division.
79. The Project shall have all new utilities installed underground. This includes, but is not
limited to, electrical, gas, telephone, and cable television services in accordance with
City policies and ordinances. All utilities shall be located within public utility easements
or public streets.
Orchards Neighborhood City Council Conditions of Approval Page 13 of 17
80. The Applicant shall obtain the necessary rights-of-entry and/or easements to construct
temporary and permanent off-site improvements. Copies of these instruments shall be
provided to the Engineering Services Division.
81. The Applicant shall provide access easements to City maintained facilities.
82. The Applicant shall submit to the City Engineer for review and approval a final
Stormwater Control Plan consistent with the requirements of the latest edition of the
Contra Costa Clean Water Program Stormwater C.3 Guidebook.
83. The Applicant shall submit to the City Engineer for review and approval a final
hydrology study, consistent with the requirements of the current Public Works Standards.
84. The Applicant shall install drainage improvements to mitigate new development related
run-off consistent with the requirements of the hydrology study. All storm water
facilities shall accommodate a 25-year storm event, equal to pre-development conditions.
Runoff from the development shall not increase the 100-year peak flow in the City’s
flood control channels.
85. The Applicant shall obtain a General Construction Permit from the Regional Water Quality Control Board if the project will disturb one acre or more of land.
86. The Project shall include installation of full trash capture devices (make and model to be approved by the City Engineer) on all storm drain inlets, including overflows located within stormwater treatment devices. All inlets shall include “Only Rain Down the Drain” markers, per City Standard Detail M-1.
87. The Applicant shall submit final design of all off-site improvements, including, but not limited to, proposed new sidewalks, walkways, accessible ramps, traffic improvements, signing and striping to the City Engineer for review and approval.
88. The Applicant shall incorporate Green Infrastructure (GI) facilities to the maximum extent practicable. The design of the GI facilities shall be consistent with the City’s Design Guidelines unless approved otherwise by the City Engineer. 89. The Applicant shall submit final traffic signing and striping plans to the Engineering
Services Division for review and approval. 90. The Applicant shall submit to the City a letter certifying that sight and distance triangles (as adopted in the Zoning Ordinance) have been reviewed for clear visibility based on proposed design amenities at all intersections as deemed appropriate by the
City Engineer. 91. The Applicant shall include on the plans the installation of drainage markers on all on-site and off-site drainage inlets in accordance with City standards. These markers, if
Orchards Neighborhood City Council Conditions of Approval Page 14 of 17
located on private property, shall be maintained by the Applicant or owner in a manner acceptable to the City, pursuant to City Ordinance.
92. The Applicant shall submit plans and obtain approval from the City Engineer on all proposed improvements on Bollinger Canyon Road. Final design may include revisions to meet City standards
Public Services Division:
93. The Applicant shall submit 1) Waste Management Plan (WMP) estimating all waste to be hauled away from the project site, and 2) Summary Report for review and approval by the Public Services Division. These shall be submitted to City via http://SanRamon.WasteTracking.com/ (Green Halo).
94. The Applicant shall reuse or recycle at least 65% (by weight) of the construction and
demolition debris generated by the project, as per CALGreen requirements (2017).
Keep receipts from processors of all waste materials for submittal of WMP and Summary Report. Note: Mixed boxes of construction and demolition debris (C&D) can be separated by a 3rd party waste processor, as is commonly done. In such cases, project owner should ensure that the selected waste processor has at least a 65%
recycling rate, as the project/permit will be penalized for dropping below the required recycling rate.
95. All trees removed from the project shall be recycled as mulch, compost, or biomass fuel, and should be reported as part of the WMP.
96. The Applicant shall submit a Waste Collection Plan (WCP) and demonstrate waste
collection access by curbside collection trucks used by San Ramon’s current Franchised Waste Hauler. Applicant should plan for at least three (3) trucks per week to accommodate Trash, Recycling, and Organics collection, and anticipate that collection trucks are equipped with backup alarms.
97. Pursuant to General Plan 2040 Policy 12.6-I-3, all construction and grading activities
shall include particulate emissions reduction measures to limit fugitive dust and particulate pollution related to equipment, as recommended by the Bay Area Air Quality Management District (BAAQMD).
Prior to Building Permit Issuance
Planning Services Division:
98. Final conditions of approval shall be printed on the cover page of the building permit plan submittal. 99. Prior to Building Permit issuance, the Applicant will demonstrate that the proposed
Project is compliant with applicable noise and air quality standards.
Orchards Neighborhood City Council Conditions of Approval Page 15 of 17
100. A Final Landscape/Irrigation Plan, including an open space fencing plan, shall be reviewed and approved by the Community Development Director for consistency with
the approved Development Plan. Such Final Landscape/Irrigation Plan shall address
all plantable areas out to the curb and within common areas if required. 101. Landscaping shall meet the requirements of landscaping, irrigation and hydroseeding of the City's Zoning Ordinance, and the State Model Water Efficient Landscape
Ordinance (MWELO) as applicable.
102. A final lighting plan and photometrics shall be reviewed and approved by the Planning Services Division. These plans shall conform to provisions of the City of San Ramon Zoning Ordinance, Security Ordinance, and Orchards Design Guidelines. All lighting
shall be shielded from abutting properties with cut-offs (shields) so as to limit nuisance
or annoyance. No lighting shall be of the type or in a location such that it constitutes a hazard to vehicular traffic, either on private property or on abutting streets. The spacing and height of the standards and luminars shall be approved by the City Engineer and Community Development Director.
103. The design and placement of any Project fencing, shall be reviewed and approved by the Planning Services Division for substantial conformity to the approved Development Plan. Said fencing shall be of a high quality and compatible with quality building design.
104. The Applicant shall provide one model unit incorporating a program of sustainable building technology options that will be available for buyers to choose for installation. The sustainable building options will be reviewed by the Planning Services Division prior to building permit issuance and should include energy efficient building
technologies, recycled building materials, installation of a Level II vehicle charging
station, and other state of the art technologies, materials and construction techniques associated with green residential development. Transportation Services Division:
105. The Applicant shall pay all applicable traffic impact fees, after any applicable credits granted for the existing development on the project site, as established by City Council Resolutions and Ordinances, including the following:
a. San Ramon Traffic Impact Fee b. Southern Contra Costa Sub-regional Fee
c. Southern Contra Costa Regional Fee d. Tri-Valley Transportation Development Fee San Ramon Valley Unified School District: 106. Prior to the issuance of a building permit, the Applicant shall pay all applicable San Ramon Valley Unified School District development impact fee(s) for the Project.
Orchards Neighborhood City Council Conditions of Approval Page 16 of 17
Central Contra Costa Sanitary District: 107. Additional capacity fees will be due for the conversion of existing office space to mixed
use. The applicant should promptly submit full-size improvement plans for Central San
Permit staff to review and pay all applicable fees prior to receiving a building permit. For more information, the applicant should contact the Central San Permit Section. Prior to Building Occupancy
Planning Services Division:
108. After written verification by a certified landscape architect has been provided to
Planning Services Division, the Applicant shall request inspection of the final
Landscape and Irrigation Plan from Planning Services Division, Public Services, and
Engineering Services at least 72 hours prior to building occupancy inspection.
109. Prior to final inspection of the Landscape and Irrigation Plan, the Applicant shall
submit to the Planning Services Division for review a Certificate of Completion as required by the State Model Water Efficient Landscape Ordinance. Engineering Services Division:
110. The Applicant shall complete improvements to provide access to public areas which
are impacted by occupancy and do not currently meet City Public Works standards.
The scope of these improvements include, but are not limited to, new street lighting,
and traffic improvements such as signing, striping, paved roads, crosswalks, sidewalks,
storm drains, and related work to install these improvements (e.g. utility relocations).
111. The Applicant shall provide a letter from a registered Traffic Engineer verifying any
approved changes that were made affecting the sight distance triangles within the
Project development and that all traffic signal and roadway improvements/striping are
complete and fully functioning.
112. The Applicant shall provide a letter from the project Geotechnical Engineer attesting that
grading and foundations were constructed in accordance with their recommendations for
the project.
113. The Applicant shall submit, for the review and approval of the City, a Stormwater Operation and Maintenance Plan consistent with the requirements set forth in the City’s
current Stormwater C.3 Guidebook, and execute any agreements necessary for the
transfer of ownership and long-term maintenance of stormwater treatment and/or hydrograph modification facilities. 114. The Applicant shall perform roadway surface improvements, such as slurry seal or
microsurface, on all adjacent public roads, as required by the City Engineer, in order to mitigate damage due to heavy construction traffic from civil and building improvements.
Orchards Neighborhood City Council Conditions of Approval Page 17 of 17
115. The Applicant shall submit record as-built drawings to the City with each page stamped as such in an electronic format acceptable to City staff.
116. The Applicant shall provide a supplemental cash bond reflecting 150% of the full value of any on-site or off-site improvements not completed at issuance of the first Certificate of Occupancy.
Transportation Services Division:
117. Prior to occupancy of the first residence, implement the following Transportation Demand Management requirement: a. Coordinate with Transportation Services Division and local transit provider to develop and/or support existing local public transit service.
b. Distribute City TDM Commuter program information to homeowners, Homeowners Association(s), and non-residential sites. 118. Prior to occupancy, the Project shall implement Transportation Demand Management
(TDM) to reduce VMT generated by the Project. Developer will implement a Community-Based Travel Plan which will include distributing TDM information for carpool, transit, vanpool incentive programs and transit schedules. In addition, Clipper Card information for public transit should also be included. The developer may contact the City’s Transportation Services Division for information. Police Services Department: 119. Trees and shrubs shall not block nor interfere with light sources throughout the property.
EXHIBIT C:
ORCHARDS MASTER PLAN LAYOUT