HomeMy WebLinkAboutM. EBMUD Water Supply Assessment, dated September 9, 2025Attachment M
Cindy Yee, Senior Planner, City of San Ramon September 9, 2025
Page 2
water demand for the Project of approximately 368,000 GPD; however, this water demand estimate included only indoor domestic water use and did not account for household irrigation and other household potable outdoor uses. Therefore, the District’s water demand estimate of 453,700 GPD, which includes indoor and outdoor potable water use
was used as the basis of the WSA. EBMUD’s demand projections indicate both densification and land use changes in a few existing land use classifications, including commercial and residential land use areas. These changes increase demand for EBMUD water. EBMUD’s UWMP 2020 projects
water demands over time, accounting for estimated variations in demand usage minus conservation and recycled supply sources, as noted in the UWMP 2020, Table 3-1, 2050 Demand Projections (Table 1). Typically, EBMUD prepares a full demand study every ten years; the most recent version, the 2050 Demand Study, was completed in 2020, and the study results are incorporated into the UWMP 2020. For planning purposes, water
demands are estimated in five-year increments, but it is recognized that actual incremental amounts may occur stepwise in shorter time increments. An increase in usage by one customer in a particular customer class does not require a strict gallon-for-gallon increase in conservation by other customers in that class, as, in actuality, the amount of potable demand, conservation and recycled water use EBMUD-wide will vary somewhat. Table 1
2050 Demand Projections (UWMP 2020, Table 3-1)
Project Area
The Orchards Development Project is in the City of San Ramon, at the site of the former
Chevron Park office campus, at 6001 Bollinger Canyon Road. The Orchards Development
Project site is bounded to the north by Bollinger Canyon Road, to the east by existing office buildings and parking, to the south by single family homes on Ascot Drive, and to the west by Highway 680 and San Ramon Valley Boulevard, and consists of approximately 92 acres.
EBMUD Water Demand Projections
Since the 1970s, water demand within EBMUD’s service area has ranged from 200 to 220 million gallons per day (MGD) in non-drought years. Section 3.1 of the UWMP 2020
Cindy Yee, Senior Planner, City of San Ramon September 9, 2025
Page 3
outlines past and current EBMUD water demand, including Figure 3-1 which shows historic water use (including metered and unmetered demands) within EBMUD’s service area, along with the number of customer accounts. The 2050 water demand forecast of 297 MGD for EBMUD’s service area can be reduced to 218 MGD with the successful
implementation of water recycling and conservation programs, as outlined in the UWMP 2020. Current demand is lower than estimated in the 2050 Demand Study as a result of recent droughts. The difference is because the planning level of demand may differ from the actual demand in any given year due to water use reductions that typically occur during droughts. After droughts, a rebound effect is expected wherein demand rises back to
projected levels. Thus, the 2050 Demand Study still reflects a reasonable expectation for demands in future years, as the demands are expected to gradually increase back to 2050 projected demand levels as development and water use return to pre-drought conditions. The proposed Orchards Development Project future development and operations will not change EBMUD’s 2050 demand projection.
EBMUD Water Supply, Water Rights and the UWMP 2020
EBMUD has water right permits and licenses that allow for water delivery from the Mokelumne River to the East Bay, subject to the availability of Mokelumne River runoff and the senior water rights of other users. EBMUD’s position in the hierarchy of
Mokelumne River water users is determined by a variety of agreements between
Mokelumne River water right holders and the terms of the appropriative water right permits and licenses.
Conditions that could, depending on hydrology, restrict EBMUD’s ability to receive its full entitlement include:
• Upstream water use by senior water right holders.
• Downstream water use by riparian and senior appropriators and other downstream obligations, including protection of public trust resources.
• Variability in precipitation and runoff.
• Curtailments by State Water Resources Control Board. During prolonged severe droughts, the Mokelumne River supply cannot meet EBMUD’s projected customer demands. To address this, EBMUD has completed construction of the
Freeport Regional Water Facility and is evaluating future local groundwater projects in the
East Bay Plain Subbasin (EBP Subbasin) as part of a Groundwater Sustainability Plan (GSP), which are discussed below in the Supplemental Water Supply and Demand Management section of this assessment. EBMUD has obtained and continues to seek supplemental supplies.
The UWMP 2020, adopted on June 22, 2021, by EBMUD’s Board of Directors under Resolution No. 35234-21, is a long-range planning document used to assess current and projected water usage, water supply planning, and conservation and recycling efforts. The Water Shortage Contingency Plan (WSCP) 2020, also adopted on July 22, 2021, by
Cindy Yee, Senior Planner, City of San Ramon September 9, 2025
Page 4
EBMUD’s Board of Directors under Resolution No. 35235-21 for inclusion as Attachment 1 within the UWMP 2020, is a document used to develop a coordinated response for when water shortages occur (for example, due to drought, earthquakes, and other emergencies that could impact EBMUD’s ability to supply water to customers), and to guide EBMUD’s
planning and response through thoughtful assessment and management of the water supply.
EBMUD’s water supply sources are discussed in Section 1.4.3 of the UWMP 2020. EBMUD’s main water supply is the Mokelumne River, and EBMUD has rights to receive
up to 325 MGD of water from this source subject to the availability of runoff, senior water
rights of other users, and downstream fishery flow requirements. EBMUD also has a Long-Term Renewal Contract (Contract No. 14-06-200-5183A-LTR1) with the United States (U.S.) Bureau of Reclamation to receive water from the Central Valley Project (CVP) through the Freeport Regional Water Facility in years when EBMUD’s water supplies are
relatively low (for more details, see Section 1.4.3 of the UWMP 2020). During some dry
years, EBMUD may purchase water transfers to help meet customer demands. Section 4.2 of the UWMP 2020 discusses EBMUD’s water transfer program.
EBMUD maintains a biennial budget and five-year capital improvement program to optimize investments and maximize drinking water quality, and the reliability, safety, flexibility, and overall efficiency of the water supply system. EBMUD’s most recently
adopted budget, which includes capital expenditures for the delivery of water supplies to its customers, can be found at http://www.ebmud.com/about-us/investors/budget-and-rates/.
EBMUD complies with applicable local, state, and federal regulations in the operation of
its water supply system. Figure 1-4 of the UWMP 2020 illustrates the numerous local,
state, and federal agencies that may regulate EBMUD’s facilities and operations.
A summary of EBMUD's demand and supply projections, in five-year increments, for a 30-year planning horizon is provided in UWMP 2020 Attachment 1, WSCP, Table W-3, Supply and Demand Assessment, 2020-2050 (Table 2).
Cindy Yee, Senior Planner, City of San Ramon September 9, 2025
Page 5
Table 2
Supply and Demand Assessment, 2020-2050
(UWMP 2020, WSCP Table W-3)
EBMUD's evaluation of water supply availability accounts for the diversions of both upstream and downstream water right holders and fishery releases on the Mokelumne
River. Fishery releases are based on the requirements of a 1998 Joint Settlement Agreement (JSA) between EBMUD, U.S. Fish and Wildlife Service, and the California Department of Fish and Wildlife. The JSA requires EBMUD to make minimum flow releases from its reservoirs to the lower Mokelumne River to protect and enhance the fishery resources and ecosystem of the river. As this water is released downriver, it is,
therefore, not available for use by EBMUD’s customers. The available supply and demand shown in Table 2 were derived from EBMUD’s baseline hydrologic model with the following assumptions:
• Customer demand values are based on the 2050 Demand Study, and planning-level demands account for projected savings from water recycling and conservation programs.
• EBMUD Drought Planning Sequence assumes water years 1976, 1977 and a
modified 1978 hydrology.
• Total system storage is depleted by the end of the third year of the drought.
• EBMUD will implement its Drought Management Program (DMP) when
necessary.
• The diversions by Amador and Calaveras Counties upstream of Pardee Reservoir will increase over time, eventually reaching the full extent of their
Cindy Yee, Senior Planner, City of San Ramon September 9, 2025
Page 6
senior rights.
• Releases are made to meet the requirements of senior downstream water right holders and fishery releases, as required by the JSA.
• EBMUD allocation of CVP supply, as available each drought year based on model results generated by the Department of Water Resources, is available the first year of a drought and subsequent drought years, according to the U.S. Bureau of Reclamation’s (USBR) Municipal and Industrial Shortage Policy.
However, in some severe dry years, USBR could make a determination of
insufficient CVP water supplies and therefore limit further the allocation amounts that EBMUD would receive. During the 2014-2016 drought, EBMUD's CVP allocation went as low as 25 percent, and the extreme drought scenario in Table 2 reflects this reduced allocation.
The UWMP 2020 concludes that EBMUD has, and will have, adequate water supplies to serve existing and projected demand within the Ultimate Service Boundary during normal and wet years, but that deficits are projected for multi-year droughts. During multi-year droughts, EBMUD may require significant customer water use reductions and may also
need to acquire supplemental supplies to meet customer demand.
As discussed in the UWMP 2020 WSCP, EBMUD’s system storage generally allows EBMUD to continue serving its customers during dry-year events. EBMUD typically imposes water use restrictions based on the projected storage available at the end of
September and may also implement water use restrictions in response to a State of
California mandate. By imposing water use restrictions in the first dry year of potential drought periods, EBMUD attempts to minimize water use restrictions in subsequent years if a drought persists. Throughout dry periods, EBMUD must continue to meet its current and subsequent-year fishery flow release requirements and obligations to downstream
agencies.
The UWMP 2020 WSCP includes DMP Guidelines that establish the level of water use restrictions EBMUD may implement under varying conditions. Under the DMP Guidelines, water use restrictions may be determined based upon projected end-of-
September Total System Storage (TSS). When state-mandated water use restrictions
exceed the reductions that would otherwise be called for based upon end-of-September TSS, EBMUD’s water use reduction requirements may be guided by the applicable state mandates. Under either scenario, while EBMUD strives to keep water use reductions at or below 15 percent, if the drought is severe, mandatory water use reductions could exceed
15 percent.
Despite water savings from EBMUD’s aggressive conservation and recycling programs and water use restrictions called for in the DMP Guidelines, supplemental supplies are still needed in significant, severe, and critical droughts. The Orchards Development Project will
be subject to the same drought restrictions that apply to all EBMUD customers. In
addition, the Orchards Development Project will be subject to EBMUD’s regulations
Cindy Yee, Senior Planner, City of San Ramon September 9, 2025
Page 7
aimed at encouraging efficient water use, such as Sections 29 and 31 of EBMUD’s Regulations Governing Water Service. Section 29, “Water Use Restrictions,” promotes efficient water use by EBMUD customers and prohibits certain uses of potable water. Section 31, “Water Efficiency Requirements,” identifies the types of water efficiency
requirements (i.e., maximum flow rates for flow control devices) for water service.
Supplemental Water Supply and Demand Management
The goals of meeting projected water needs, and increased water reliability rely on
supplemental supplies, improving reliability of existing water supply facilities, water
conservation, and recycled water programs. Chapter 4 of the UWMP 2020 describes potential supplemental water supply projects that could be implemented to meet projected long-term water demands during multi-year drought periods.
The Freeport Regional Water Facility became operational in February 2011. EBMUD’s
ability to take delivery of CVP water through the Freeport Regional Water Facility is based on its Long Term Renewal Contract (LTRC) with the U.S. Bureau of Reclamation. The LTRC provides for up to 133,000 acre feet of CVP supply in a single dry year, not to exceed a total of 165,000 acre feet in three consecutive dry years. Under the LTRC, the
CVP supply is available to EBMUD only in dry years when EBMUD’s total stored water
supply is forecast to be below 500,000 total acre feet on September 30 of each year.
EBMUD is the Groundwater Sustainability Agency (GSA) for the portion of the East Bay Plain Subbasin underlying its service area, and as a GSA, is implementing a Groundwater
Sustainability Plan (GSP) that was approved by the California Department of Water
Resources in July 2023 and includes the first phase of the Bayside Groundwater Project. Construction of the first phase (Bayside Groundwater Project Phase 1) was completed in 2010, allowing EBMUD to pilot injection of treated potable water into a deep aquifer in the South East Bay Plain Groundwater Basin for later extraction, treatment, and use during
severe droughts. A permit from the Department of Public Health is required before
groundwater extraction can be piloted for municipal use. Additional information on the Bayside Groundwater Project can be found in Section 4.1.1 and the WSCP of the UWMP 2020. As part of the GSP management actions, EBMUD will collect additional data and use science-based decision making to inform whether future expansion of Bayside or other groundwater projects are necessary.
Chapter 4 of the UWMP 2020 also lists other potential supplemental water projects, including Northern California water transfers, Bayside Groundwater Project Expansion, and others that could be implemented to meet the projected long-term water supplemental
need during multi-year drought periods. The UWMP 2020 identifies a broad mix of
projects, with inherent scalability and the ability to adjust implementation schedules for particular components, which will allow EBMUD to pursue the necessary supplemental supplies while minimizing the risks associated with future uncertainties, such as project implementation challenges,
Cindy Yee, Senior Planner, City of San Ramon September 9, 2025
Page 8
evolving regulatory requirements, and global climate change. The Environmental Impact Report that EBMUD certified for the Water Supply Management Program 2040 examined the impacts of pursuing these supplemental supply projects at a program level. Separate project-level environmental documentation will be prepared, as appropriate, for specific
components as they are developed in further detail and implemented in accordance with EBMUD’s water supply needs. In addition to pursuing supplemental water supply sources, EBMUD also maximizes resources through continuous improvements in the delivery and transmission of available
water supplies and investments in ensuring the safety of its existing water supply facilities. These programs, along with emergency interties and planned water recycling and conservation efforts, would ensure a reliable water supply to meet projected demands for current and future EBMUD customers within the current service area. Water Conservation and Recycled Water Considerations The Orchards Development Project presents opportunities to incorporate water conservation measures. Conditions of approval for the implementation of the Orchards Development Project should require that the project sponsor comply with the California
Model Water Efficient Landscape Ordinance (Division 2, Title 23, California Code of Regulations, Chapter 2.7, Sections 490 through 495). EBMUD staff would appreciate the opportunity to meet with the City and project sponsor to discuss conservation measures. This meeting will explore early opportunities to expand water conservation via EBMUD's conservation programs and best management practices applicable to the Orchards
Development Project. Conservation strategies will be required to achieve water use reduction goals and restrictions, including compliance with Sections 29 and 31, described above, of EBMUD’s Regulations Governing Water Service, and all other legally mandated water conservation
requirements. The State of California has established a new regulatory framework for urban water conservation based on two policy bills, Senate Bill 606 and Assembly Bill 1668, passed in 2018 which became effective on January 1, 2025. These bills established water use efficiency targets for urban water agencies based on indoor residential water use, outdoor water use, and distribution systems. EBMUD will continue to comply with State
water conservation regulations as they are developed. The Orchards Development Project is located within the boundaries of the Dublin San Ramon Services District-EBMUD Recycled Water Authority (DERWA) San Ramon Valley Recycled Water Program service area. Per EBMUD Policy 9.05 and Section 30 of
EBMUD’s Regulations Governing Nonpotable Water Service, the project sponsor, at their expense, will be required to use non-potable water, including recycled water, for non-potable purposes including, but not limited to, irrigation of the public landscaping and parks. The project sponsor may be required to plan for and extend new recycled water mains within the Orchards Development Project site, at their expense. Extension of potable
City Council 973-2530 City Clerk: 973-2539 Parks & Community Services: 973-3200 Planning Department: 973-2560 City Manager: 973-2530 Employee Services: 973-2503 Police Services: 973-2700 Public Services: 973-2800 City Attorney: 973-2549 Finance Department: 973-2609 Economic Development: 973-2554 Engineering Services: 973-2670
7000 BOLLINGER CANYON RD. SAN RAMON, CALIFORNIA 94583 PHONE: (925) 973-2500 WEB SITE: WWW.SANRAMON.CA.GOV APPLICATION NOTICE
July 15, 2025
Mr. David Rehnstrom, Manager of Water Distribution Planning
East Bay Municipal Water District Distribution Planning Department. Mail Stop 701 375 11th Street Oakland, CA 94607
Sent via Email to: drehnstrom@ebmud.com
RE: Water Supply Assessment Request for the Orchards Development Project (Applications: PHD 2025-0004, MJ 2024-0004, DP 2024-0006, DA 2024-0001, AR 2024-0013, TRP 2024-0009) in the City of San Ramon
Pursuant to Section 15155 of the California Environmental Quality Act Guidelines, and Sections 10910-10915 of the California Water Code, the City of San Ramon is formally requesting preparation of a Water Supply Assessment (WSA) by the East Bay Municipal Utility District (District) with respect to the proposed Orchards Development Project. The assessment is required in order to determine whether
adequate water supply is available to meet the projected water demand of the proposed Orchards
Development Project, which encompasses an approximately 92-acre planning area located in the City of San Ramon, as shown on Exhibit 1 (Vicinity Map). The Project area is designated as “Downtown Mixed Use – South” by the City of San Ramon General Plan 2040 and zoned Downtown Mixed Use – South (DMU-S) by the San Ramon Zoning Ordinance.
The Orchards Development Project is being analyzed under the exemption in State CEQA Guidelines 15183 for projects consistent with the development density established in the General Plan. The analysis will be contained within a consistency checklist that follows the topical areas contained within Appendix G to the State CEQA Guidelines. The consistency checklist will analyze the current development
proposal for the Neighborhood District, at the project-level and the remaining portions of the project
site; and the Mixed-Use District and Multi-Family District, at a programmatic level. The consistency checklist is being prepared by the City as lead agency. The Orchards Development has a 20-year buildout horizon. The buildout potential of the Master Plan includes up to 2,510 dwelling units (including 58 accessory dwelling units) in a variety of housing types; 125,000 square feet of commercial, retail, and
entertainment uses; and 15 acres of parks and open space, including a 2.5-acre centralized park space
Enclosure 1
Applications: Orchards (former Chevron Park) Development Project (PHD 2025-0004, MJ 2024-0004, DP 2024-0006, DA 2024-0001, AR 2024-0013, TRP 2024-0009)
Page 2 of 2
and additional pocket parks and recreational amenities. Attached, please find a copy of the Applicant’s Project Water Demand Technical Memorandum for your reference.
The City will use the information regarding water demand and supply provided in the WSA as a resource for completing the exemption analysis. The City's primary consultant for preparation of the exemption analysis is First Carbon Solutions.
The City appreciates the District's attention to this request and looks forward to working with the District
through this process. The City will provide additional information as it becomes available Please feel free to contact me directly at (925) 973-2562 or cyee@sanramon.ca.gov.
Sincerely,
Cindy Yee Senior Planner
A: Orchards Project Water Demand Technical Memorandum, dated June 13, 2025
CIVIL ENGINEERS I SURVEYORS I PLANNERS
June 13, 2025
Job No.: 3740-000
M E M O R A N D U M
TO:
FROM:
Stephanie Hill, Sunset Development
Jason J. Neri, P.E., Principal
Evan M. Dambacher, P.E., QSD, Project Manager
SUBJECT: Project Water Demand
Orchards (Chevron Park)
San Ramon, California
INTRODUCTION
Sunset Development Company is redeveloping the former Chevron Park commercial
office campus located in San Ramon, California, into a pedestrian-oriented, mixed-use
community (named Orchards) that includes concentrated commercial, residential, and
recreation uses that are integrated with Bishop Ranch and City Center.
The innovative Orchards (“Project”) plan proposes redeveloping the existing 92-acre office
campus into a new walkable mixed-use community with three districts comprising of residential,
commercial and recreational/open space uses. The Project will contain 2,510 residential units and
125,000 square feet of ground-floor commercial/retail uses. Refer to Attachment A for proposed
land uses, density and site layout.
The potable water for the former Chevron Park property is currently provided by East Bay
Municipal Utility District (EBMUD). EBMUD obtains approximately 90 percent of its water
supply from the Mokelumne River Watershed in the Sierra Nevada Mountains. The remaining 10
percent is provided by local runoff collected in its five terminal reservoirs.
With the proposed land uses, the Project is anticipated to increase the demand for water
consumption from existing levels. As such, the Project is required to evaluate if the existing water
supply system is adequate to support the Project. The purpose of this technical memorandum is to
document the estimated demand for potable water to assist EBMUD in evaluating regional water
supply sources to support the Project.
2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322
1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456
www.cbandg.com
P:\3700 - 3799\3740-000\Memos\Memo-001 Water Demand.docx
Revised August 19, 2025
Orchards (Chevron Park) – Project Water Demand
Page 2 of 3
June 13, 2025
Job No.: 3740-000
P:\3700 - 3799\3740-000\Memos\Memo-001 Water Demand.docx
EXISTING WATER DISTRIBUTION SYSTEM
EBMUD provides water to San Ramon customers from four pressure zones that correspond to
elevation ranges. The Project site is within the Amador Pressure Zone (450 to 650 feet). Potable
water destined for San Ramon is treated at the Walnut Creek Water Treatment Plant and conveyed
south down a transmission line within the Iron Horse Trail right-of-way through Alamo and
Danville.
All Bishop Ranch parcels, including Chevron Park, have existing connections to the EBMUD
potable water distribution system. EBMUD’s system maps show the Project property is currently
being served by two (2) potable water services:
A 10-inch potable water service and meter from the existing 16-inch potable water
distribution line along the Project’s fronting street, Bollinger Canyon Road (north side of
Project).
An 8-inch potable water service and meter from the existing 12-inch potable water
distribution line located at the intersection of Ascot Dr / Dunbarton Circle / Broadmoor
Drive (south side of Project).
Refer to Attachment B for EBMUD’s existing distribution system layout.
In addition to potable water, EBMUD and the Dublin San Ramon Services District (DSRSD)
jointly provide and distribute recycled municipal water in San Ramon through the San Ramon
Valley Recycled Water Program. The program is administered by a joint powers authority
DSRSD-East Bay MUD Recycled Water Authority (DERWA).
EBMUD’s water system maps show the Project property is currently being served by one (1) non-
potable recycled water service:
An 8-inch non-potable water service and meter from the existing 16-inch non-potable water
distribution line along the Project’s fronting street, Bollinger Canyon Road (north side of
Project).
Revised August 19, 2025
Orchards (Chevron Park) – Project Water Demand
Page 3 of 3
June 13, 2025
Job No.: 3740-000
P:\3700 - 3799\3740-000\Memos\Memo-001 Water Demand.docx
WATER DEMAND ESTIMATES
The Project water consumption includes both indoor and outdoor uses. Indoor water consumption
primarily includes water used in restrooms, bathrooms, kitchen, laundry, cleaning and by cooling
appliances. Outdoor uses include irrigation and cleaning/washing-down hardscape areas. The City
of San Ramon Ordinance (No. 218) requires that water conservations features be incorporated into
landscaping plans. It is anticipated that all outdoor landscaped areas will be irrigated with recycled
water from the existing DERWA system.
Estimated indoor water use for the Project has been projected utilizing EBMUD’s 2015 Urban
Water Management Plan and industry-standard average daily water demand factors for the
proposed project land uses (55 gpcd). In addition, estimated indoor water use has also been
projected based on State water conservation legislation and objectives aimed at adopting long-term
standards for efficient water use. A joint study by DWR and the State Water Resources Control
Board (prepared in August 2021)1 recommended from 2030 onward, a reduced indoor residential
consumption standard of 42 gpcd (a 23±% reduction). Refer to the attached Tabel I for summary
of estimated indoor water demands by the Project’s proposed land use areas.
Lastly, for reference, the historical potable water usage for the existing property has been derived
from provided EBMUD billing information (2012-2023). Refer to the attached Tabel II for
summary of historical indoor use.
CONCLUSION
We recommend the included Project water demands be shared with EBMUD for preparation of a
Water Supply Assessment to evaluate the availability, quality, reliability, and sustainability of
water sources to meet current and future water needs and to provide requirements for water
distribution and servicing related to the proposed Project.
ATTACHMENTS
Table 1: Indoor Water Use (Proposed Project)
Table 2: Illustrative Water Use (Historical Usage – Existing Property)
Attachment A: Orchards Innovative Plan Development Program
Attachment B: EBMUD Water System Maps
1.California Department of Water Resources, August 2021, Results of the Indoor Residential Water Use Study - A Report the Legislature
Prepared pursuant to Water Code Section 10609.4(b).
Revised August 19, 2025
CIVIL ENGINEERS I SURVEYORS I PLANNERS
2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322
1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456
www.cbandg.com
Job No.: 3740-000
Revised August 19, 2025
TABLE I. INDOOR WATER USE (PROPOSED PROJECT)
Preliminary Land Use Plan
District (Land Use)Residential Units
(DU's)
Commercial / Retail
(SF)
Average
Day Demand
(gpd)
Maximum
Day Demand
(gpd)
Peak Hour
Demand
(gpd)
Average
Day Demand
(gpd)
Maximum
Day Demand
(gpd)
Peak Hour
Demand
(gpd)
Neighborhood District (Residential)
Single Family Court Homes 42 n/a 6,930 13,860 16,632 5,292 10,584 12,701
Single Family Court Homes - ADU's 10 n/a 550 1,100 1,320 420 840 1,008
Single Family Homes 130 n/a 21,450 42,900 51,480 16,380 32,760 39,312
Single Family Row Homes 58 n/a 9,570 19,140 22,968 7,308 14,616 17,539
Attached Row Townhomes 138 n/a 22,770 45,540 54,648 17,388 34,776 41,731
Attached Row Townhomes - ADU's 48 n/a 2,640 5,280 6,336 2,016 4,032 4,838
Multi-Family District (Residential)
Multi-Family Units (inc. Affordable Housing)1,465 n/a 201,438 402,875 483,450 153,825 307,650 369,180
Mixed-Use District
(Residential / Commercial / Retail)
Multi-Family Units 619 n/a 85,113 170,225 204,270 64,995 129,990 155,988
Neighborhood Commercial/Retail n/a 125,000 17,500 35,000 42,000 17,500 35,000 42,000
TOTALS 2,510 125,000 367,960 735,920 883,104 285,124 570,248 684,298
TABLE II. INDOOR WATER USE (HISTORICAL USAGE - EXISTING PROPERTY)
Existing Property Commerical
Building Area (SF)
Chevron Park - Ex .Commercial (15 bldgs.)1,928,000
Water Demand Factors:
Single Family (Detached)165 gpd per unit (based on 55 gallons per capita per day @ average 3.0 residents per unit)
Single Family (Attached)165 gpd per unit (based on 55 gallons per capita per day @ average 3.0 residents per unit)
Single Family/Townhome (ADU's)55 gpd per unit (based on 55 gallons per capita per day @ average 1.0 resident per unit)
Multi-Family Apartments / Condominiums 137.5 gpd per unit (based on 55 gallons per capita per day @ average 2.5 residents per unit)
Commercial / Retail 0.14 gpd per square foot
Maximum Day Peak Factor 2.0 (x Average Day Demand)
Peak Hour Factor 2.4 (x Average Day Demand)
Notes:
1. Project development land use information based on Orchards Vesting Tentative Map - Subdivision 9693, dated January 21, 2025.
2. Residential water demands are based on per capita demand values per EBMUD 2015 Urban Water Management Plan.
3. Reduced residential water demands are based on per capita demand values per DWR and State Water Board Study August 2021 (Year 2030).
4. Summary does not include existing site water demands for facilities no longer in use.
5. Summary does not include projected site outdoor water demands for irrigation purposes.
6. Summary does not include projected fire flow demands for fire hydrant and building sprinkler purposes.
7. Water usage derived from historic EBMUD biling information (2012-2023) provided by Sunset Development.
Average Daily Usage (gpd)
62,142
ORCHARDS (CHERVON PARK)
SUMMARY OF PROJECTED INDOOR WATER DEMANDS
SAN RAMON, CALIFORNIA
June 12, 2025
Historic Potable Water Usage
(2012-2023) 7
District Data Indoor Potable Water Demand
(2015 UWMP)
Indoor Potable Water Demand
(Reduced Demand Factors – 42 gpcpd)
\\dl2023a\P-Drive\3700 - 3799\3740-000\Engineering\Water\EBMUD Demands_001_2025-06-12 - REV.xlsx
CIVIL ENGINEERS I SURVEYORS I PLANNERS
2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322
1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456
www.cbandg.com
June 13, 2025 Job No.: 3740-000
EBMUD WATER BILLING DATA (2012-2023)
Meter Address (Location)Meter Size
(Meter #)
EBMUD
Account Number Total Usage (Gallons)Average Monthly Usage
(Gallons/Month)
Average Daily Usage
(Gallons/Day)
6001 Bollinger Canyon Road
(@ Bollinger Canyon Rd approx. 915' west of entry)
10"
(25813675)13036100001 242,458,651 1,822,997 59,866
6001 Bollinger Canyon Road
(@ Ascot/Dunbarton/Broadmoor approx.150' north of
intersection)
8"
(18233213)51127700001 9,141,943 69,257 2,275
251,600,594 1,892,255 62,142
6001 Bollinger Canyon Road
(@ Bollinger Canyon Rd approx. 445' east of entry)
8"
(R5014633)56645800001 410,540,257 3,133,895 103,099
410,540,257 3,133,895 103,099
Note:
1. Water usage derived from historic EBMUD biling information (2012-2023) provided by Sunset Development.
ORCHARDS (CHEVRON PARK)HISTORIC SITE WATER USAGE SAN RAMON, CALIFORNIA
TOTALS NON-POTABLE / RECLAIMED USAGE
Potable / Domestic
Non-Potable / Reclaimed
TOTAL POTABLE / DOMESTIC USAGE
P:\3700 - 3799\3740-000\Engineering\Water\Historical Info\6001BollingerCanyonRoad_BillHistory_230301125904_CBG.xlsx
Attachment A
2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322
1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456
www.cbandg.com
CIVIL ENGINEERS I SURVEYORS I PLANNERS
Attachment B
680
R/
W
4
4
7
3
R/W 555
2
R/
W
&
C
O
N
S
T
D
W
G
S
-
9
0
9
&
S
-
1
1
9
8
20'
R
/
W
2
7
2
5
DW
G
9
8
7
9
-
G
DWG
6
4
9
2
-
G
PARCEL
3DWG 4
0
7
9
-
B
T
56
'
D
100
'
VALDIV
I
A
PAMPL
O
N
A
R
CARDO
N
A
ROA
T
A
N
17'
L
DR
TALAV
E
R
A
A
56
'
D
CIR
52'
RA
M
O
N
17'
BOLLING
E
R
DR
IN
T
E
R
S
T
A
T
E
RD
17'
CT
V
TALAV
E
R
A
TA
L
A
V
E
R
A
DR
C
O
N
A
CIR
CA
R
D
O
N
A
CT
12
4
'
B
L
V
D
D
R
124'
BI
S
H
O
P
T
A
L
A
V
E
R
A
A
5
6
'
A
60'
56
'
VALDIV
I
A
BOLLINGE
R
D
6
0
'
CT
52
'
CIR
68'
F
W
Y
RD
DR
R
56
'
S
DR
R
SABA
C
R
A
M
O
N
S
A
N
CANYON
D
R
A
DR
R
DR
CT
CI
R
LORCA
B
L
V
D
I
RD
VA
L
L
E
Y
SAN
R
A
M
O
N
V
A
L
L
E
Y
BI
S
H
O
P
SU
N
S
E
T
52'
E
DR
D
R
T N
56'
A
CANYON
V
A
L
L
E
Y
SA
N
IN
T
E
R
S
T
A
T
E
BOLLINGE
R
C
A
N
Y
O
N
R
D
BL
V
D
BLV
D
12
4
'
A
10
0
'
T
A
L
A
V
E
R
A
N
E
100'
56'
52
'
R
CT
S
A
N
CANYON
BOLLINGE
R
12
4
'
%
%
%
%
%
%
"!
+
+
+
R 2600 D2994
0
6N016
6SMB0
1
6
6N0162009696
,&C
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅàÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
"±
"±
F4A
F5B
f
F4A
F5B
f
F5Bf
DWG
7
6
0
4
-
G
1195
BOL
L
I
N
G
E
R
R
C
S
A
5
2
0
4
9
A
5
2
0
4
6
1"
A50692
3
3
10
0
A51831
2414
A5
0
7
4
7
A5
0
7
4
9
40
8
40
6
1"
1
"
1"
1
"
2
4
6
7
605
A5
2
0
6
3
1"
A52105
1"
3
0
2401
28
A
5
0
2
6
4
A5
0
7
4
1
A54407
1
8
8
A5
2
0
6
5
A5
2
0
8
9
11
3
1
1
6
A
5
0
7
3
9
1
"
2300
A
5
2
0
6
6
29
2
4
8
2
A35
7
7
9
297
0
A5
2
1
0
6
1
8
4
2
5
A5
4
2
8
3
17
7
2325
2329
A
5
2
0
8
0
389
1"
1
7
6
2
4
8
9
18
A52146
A
5
4
2
8
1
A5
1
9
4
0
A
5
2
0
7
8
136
134
A52138
A5
2
1
4
7
A5
2
1
5
0
138
A52148
A5214
9
1
6
6
A51955
148
154
368
158
340
A52117
18000
IRR
17900
1"
1.5"
A7
8
2
5
3
6"
26
0
0
B0
9
0
3
5
26
1
0
4"
150
2
6
6
3
10"FS
2
A
5
2
0
5
8
2428
4
1
2
1"
2
4
5
5
1"
A
5
2
0
6
0
2402
24
6
8
1"
24
6
5
1
0
5
1
0
8
1"
1
"
6
0
4
1"
A5
2
0
8
8
A5
0
7
4
0
A5
0
6
5
4
4"
8"FS
2302
24
7
5
2
4
11
8
2
2
1
2
0
2301
A521
3
3
1
2
2
1
"
A5
0
6
5
2
392
A54284
3
0
4
A5
1
9
3
7
A5
2
0
7
0
A5
0
6
5
1
A54288
A54287
30
5
A5
2
1
0
8
1
7
8
A5
2
0
7
1
1"
1.
5
"
A5
1
9
3
9
1"
384
3
0
9
31
2
A50731
385
A5
2
0
7
4
A52
1
1
1
A
5
1
9
4
4
320
152
A52125
A52116
A5194
7
A52
1
1
5
39
B15074
A357
8
9
18050
6"FS
8"F
S
26
1
0
B090
3
8
A6
4
5
5
0
1"
8"FS
120
120
A67425
8"FS
B22951
100
1"
A50691
2432
3
5
1"2422
6
2
0
A51832
A
5
0
7
4
6
1
"
1"
2410
1
0
4
1"
A
5
0
7
5
2
A5
1
9
3
2
1"
10
9
11
0
A5
0
7
4
2
1"
11
4
A5
1
9
3
3
1
8
6
A
5
0
7
3
8
A
5
1
9
3
5
17
9
A5
0
7
6
0
2333
3
0
1
18
0
A5
2
0
8
2
1
2
4
A5
0
7
3
5
A52
1
3
1
2317
A54286
1"
25
0
0
17
4
A52145
A5
2
0
7
3
1
6
9
A50730
1
7
0
A
5
1
9
4
2
13
132
A52142
A5
2
1
1
0
1
6
5
140
A5
2
1
2
8
345
339
A51953
A5
2
1
2
7
364
A52123
336
35
B172578"FS
18000
C10954
B16120
IRR
1.
5
"
60
0
1
25
9
6
B22954
150
150
2600
A5
1
9
2
6
2
4
6
4
A
5
0
6
6
1
1"
1"
2
4
6
1
A
5
0
6
6
3
4
0
4
A
5
0
7
4
4
A5
1
9
3
0
A52102
60
8
2405A52104
A
5
2
0
8
7
2300
1
8
9
1"
24
7
3
A5
0
7
5
5
A
5
0
6
6
5
1
8
7
26
A5
0
2
6
3
18
5
1
1
5
24
7
7
1.
5
"
A5
2
0
6
7
A
5
2
0
8
4
A5
0
7
3
7
596
A
5
1
9
3
6
A
5
2
0
8
3
2
0
A
5
2
0
9
2
A52134
A54285
A5
2
1
0
7
2
1
12
1
A5
0
2
5
9
2
4
8
5
2321
1
2
6
A
5
0
7
3
4
1
7
A5
0
7
3
3
A5
2
1
3
0
17
1
15
A
5
2
0
9
6
14
A50729
25
316
A5
2
0
7
6
A51957
146
37
6
A51952
1
6
2
A51949
344
38
A51948
A52114
2905
4"
6"FS
IR
R
A73
3
6
0
IR
R
B090
3
9
A6
3
6
6
4
8"FS
B22953
34
1"
4
0
9
A51859
A
5
1
9
2
7
40
7
1"
40
5
A51884
A51885
A5
0
2
6
9
A5
0
2
6
8
40
2
2413
A52101
A5
0
2
6
7
4
0
0
10
7
A
5
0
7
5
4
11
2
A54408
C17672
A
5
1
9
3
4
1
8
3
18
1
A5
2
0
6
8
2
7
A5
0
2
6
1
2
4
7
9
1
8
2
A5
0
7
3
6
2
4
8
6
A
5
0
7
6
1
2
4
9
0
1"
17
5
1
2
3
A5
0
2
5
8
A5
0
7
6
2
IR
R
A52
1
3
5
A5
2
0
7
2
A5
2
0
9
5
A
5
0
2
5
7
28
A507
3
2
15
24
1
6
7
A5
2
0
7
5
A50728
38
0
A
5
2
1
3
7
351
A52143
A51950
328
156
B16620
B21701
1"
25
8
5
B0
9
0
3
7
8"FS
8"FS
B22952
1.5"
29
6
2
1
"
A5
0
6
5
9
A
5
2
0
4
8
A51833
4
1
0
2418
10
2
A
5
0
7
1
4
A
5
2
0
6
1
A5
0
6
5
7
A
5
1
9
2
9
4
0
3
A
5
2
0
6
2
A
5
0
7
5
1
2
4
7
2
A
5
0
6
5
6
1"
1"
A5
0
7
4
3
8"FS
A5
0
7
5
3
24
7
1
24
7
4
A85048
1"
24
7
8
IRR
A5
2
0
8
6
A5
0
7
5
6
B28
7
9
1
A
5
2
0
9
0
A
5
0
6
5
3
3
0
0
A
5
2
0
6
9
A
5
0
2
6
0
1"
A5
4
2
8
2
A5
2
0
9
4
12
5
24
8
7
B
1
4
7
6
1
1
7
3
A5
2
0
7
9
1"
A5
0
7
6
3
29
12
A52
1
4
4
359
329
142
16
4
A5
1
9
4
5
150
A52124
356
352
A52119
A52
1
1
3
A52118
2"A54385
2585
B16119
B0
9
0
3
6
2"
IR
R
A63
7
9
0
2610
25
9
6
10
"
29
6
1
A
5
1
9
2
5
A
5
2
0
5
9
1"
A
5
0
6
5
8
1"
A
5
2
0
4
7
1"
6
1
6
61
1
A
5
1
9
2
8
A5
0
7
5
0
A52100
2421
1
0
3
A5
0
7
1
5
2417
A
5
0
6
6
4
2409
1"
A
5
0
2
6
6
A
5
0
6
5
5
A5
2
0
6
4
A
5
0
2
6
5
11
1
A5
2
0
8
5
A
5
0
2
6
2
1"
50
0
1
A
5
2
0
9
1
A
5
0
7
5
8
2
4
8
1
11
9
A5
0
7
5
9
2
4
8
3
18
A
5
2
0
9
3
388
A
5
1
9
3
8
19
128
A52
1
4
1
A
5
2
0
7
7
A
5
1
9
4
3
A51954
34
A
5
1
9
4
6
A52121
332
18000
17900
1.5"
18050
1.
5
"
26
1
0
2"
1"B22955
1"
2"
100
3
4
A50690
2424
A5
0
7
4
8
A5
0
6
6
2
2406
10
1
A5
0
7
4
5
24
6
3
61
2
1
0
6
A5
1
9
3
1
4
0
1
A52103
1"
24
6
9
4"
2300
3
1
1"
60
0
A
5
0
6
6
6
2"
A5
0
7
5
7
IRR
1
1
7
1"
A52132
24
9
2
1"
2313
23
A5
2
0
8
1
A5
4
3
8
6
3
0
8
1
6
1
4
A52
1
3
6
A52140
A5
2
1
0
9
1
7
2
130
A521
3
9
A5
1
9
4
1
A5
2
1
2
9
37
3
317
1
6
8
A51956
144
A
5
2
1
1
2
A51951
37
2
A52126
360
A52122
348
A52120
160
B21702
18000
260
0
A78
2
5
4
2"
2610
2"
2600
B22950
B22956
A67423
A
6
3
6
7
3
H-1331
0
H-13291
H
-
1
3
2
8
8
H-
1
3
2
8
5
H-13284
H-
1
3
2
8
1
H-
1
3
2
6
8
H-
1
4
8
1
2
H-14811
H-
1
3
2
7
7
H-1538
1
H-13279
H-1
3
2
8
6
H-14808
FH-1001
8
FH-10017
H-
1
3
2
7
8
H-132
7
2
H-13270
H-13292
H-13290
H
-
1
3
2
7
6
H-13289
H-
1
5
4
9
8
H-1327
4
H-1
3
2
8
7
H-
1
3
2
8
0
H-
1
3
2
8
3
FH
-
1
1
0
0
6
H-1481
5
H-1327
1
H-1328
2
H-13269
H-
1
4
8
0
9
H-14813
FH-1166
5
8
A
7
9
45031-T
8
A
7
9
450
3
1
-
Q
450
3
1
-
C
45
8
7
6
4664
4
16SMM
B
7
6
45030-A
45
0
3
1
-
O
45031-E
8A79
6A79
6A79
45031-E
45031-R
8
A
8
1
24
S
M
M
6
5
43934
439
3
4
-
A
P
4
5
7
4
1
6
A
7
9
45031-A
4
5
0
3
0
4
5
0
3
0
6
A
7
9
39
2
7
1
2
4
S
M
M
6
5
16SMMB7
6
45876
8
H
0
1
7
45
0
3
1
-
A
6A79
45031-A
6A79
45031-B
43935
45031-D
392
7
1
P415168SMB
16SM
B
7
6
46667
24SM
M
6
5
43934-B
8A81
6A79
45031-
E
8A
7
9
6A79
45031-F
6A
7
9
6A
7
9
6A7
9
39
2
7
1
12SMMB76
8
A
8
1
24S
M
M
6
5
43934
16S
M
M
B
7
6
43934
45
8
7
6
6
A
7
9
45030-A
6
A
7
9
450
3
0
6A79
6A79
6A79
3
6
S
M
M
6
5
45
0
3
1
-
B
3
9
2
7
0
2
4
S
M
M
6
5
43935
16SM
B
8
4
46646
8A
8
1
45876
45
0
3
1
-
A
6A79
45
0
3
1
-
E
12SMMB76
466
4
4
3
9
2
7
1
39271
16SMB85
8A81
12SMMB76
8A79
4
5
0
3
1
-
A
45031-B
6A79
45
8
7
6
16S
M
B
8
4
16SMMB7
6
16S
M
M
B
7
6
15
7
8
B
4
6
2
15
7
5
B
4
6
2
1578B462
1578B464
1578B462
1578B460
15
7
2
B
4
6
2
15
7
5
B
4
6
2
1572B464
1572B462
1572B460
1575B462
1575B464
1575B462
1575B460
15
7
5
B
4
6
4
15
7
8
B
4
6
4
15
7
2
B
4
6
0
15
7
5
B
4
6
0
15
7
8
B
4
6
0
15
7
5
B
4
6
0
F
4
A
F5Bf
F5Bf
F5
B
f
F5Bf
F5Bf
F5
B
f
F5B
f
F5Bf
F
5
B
f
F5Bf
F5Bf
F4
A
F4A
F4A
F5Bf
F4
A
F5Bf
F
5
B
f
Potable Distribution System
Potable Pipeline
Service Lateral
àÅ System Valve (OL = Opens Left)
I3 Check Valve
"±Zone Valve
Change of Pipe ID
&,C Rate Control Station
&,R Regulator
",P Pressure Reducing Station
G¥Flow Meter
+Manhole
Service Connection
!Hydrant
Facility
a Pumping Plant
Recycled Distribution System
Recycled Pipeline
Service Lateral
Service Connection
Landbase
EBMUD Right of Way
±
0 250 500125
Feet
Date Printed: 3/2/2023
This information is furnished as a public service by East BayMunicipal Utility District. The District makes every effort to produceand publish the most current and accurate information possible.This information must be accepted and used by the recipient withthe understanding that the District makes no warranties, expressedor implied, concerning the accuracy, completeness, reliability, orsuitability for the use of this information. Furthermore, the Districtassumes no liability associated with the use or misuse of suchinformation. Please notify the District if discrepancies are found.
By receipt of requested documents, the DOCUMENT RECIPIENTagrees that he or she, and/or any other authorized representativesof the DOCUMENT RECIPIENT, will provide no copy (nor partialcopy) to any other person or agency, will not redistribute anydocument to any other entity, business or individual, nor use thedocument for other than the specified purpose. At the point thedocument is no longer required for use by the DOCUMENTRECIPIENT, the data shall be returned to the District or destroyed.
1575B4621575B462
PROJECT SITE
DWG 40
7
9
-
B
5
2
'
R
/
W
3
6
6
1
D
W
G
7
9
2
9
-
G
40
'
R
/
W
3
6
5
3
25' R/W
3
6
6
1
DWG 7929-
G
DWG
7
6
6
3
-
G
R/W 555
2
DWG 91
5
2
-
G
1
5
'
R
/
W
3
8
9
0
-
B
15' R/
W
3
8
9
0
-
A
DW
G
7
9
2
9
-
G
R/W
3
4
7
9
15'
R
/
W
3
4
7
9
PARCEL
2
25' R
/
W
3
6
6
1
DWG 40
7
9
-
B
PARCEL
1R/W 555
2
DWG 79
2
9
-
G
DWG 915
2
-
G
26' R/W 36
6
5
DW
G
7
9
1
5
-
G
5
2
'
R
/
W
3
6
6
1
DW
G
7
9
1
5
-
G
PARCEL
3
R/W 55
5
2
DW
G
9
1
5
2
-
G
DWG 915
2
-
G
DW
G
9
1
5
2
-
G
R/
W
3
6
6
5
DWG 7
9
1
5
-
G
DWG 4
0
7
9
-
B
15' R/W
3
8
9
0
-
D
15' R/W
3
8
9
0
-
C
26
'
R
/
W
3
6
6
5
25' R/W
3
6
6
1
DWG 791
5
-
G
R/
W
3
4
7
9
1
5
'
R
/
W
3
8
9
0
-
E
DWG 7
9
1
5
-
G
DWG 7
6
6
3
-
G
2
5
'
R
/
W
3
6
6
1
6
8
'
R
A
M
O
N
A
E
R
A
RD
17'
CANYON
BOLL
I
N
G
E
R
C
A
N
Y
O
N
T
RD
100'
K
T
M
10
0
'
T
A
L
C
O
S
T
A
CIR
25
'
100'
CIR
M
K
BISHO
P
100'
1
0
0
'
M
BOLL
I
N
G
E
R
C
A
N
Y
O
N
100'
E
100'
Y
84'
E
L
M
A
N T O
REFLE
C
T
I
O
N
S
WINT
E
R
CANYON
D
R
DR
C
A
M
I
N
O
84'
12
4
'
1
0
0
'
P
R
E
F
L
E
C
T
I
O
N
S
B
L
V
D
P
60'
T
WINTE
R
W
I
N
D
42'
SU
N
S
E
T
R
40'
M
WI
N
T
E
R
S
I
D
E
B
L
V
D
25'
37'
L
R
A
L
C
O
S
T
A
NA
O
C
12
4
'
RD
K
90'
REFLE
C
T
I
O
N
S
G Y
E
L
D
E
12
4
'
BOLLING
E
R
60'
O
C
I
R
R
S
S
P
R
I
N
G
F
I
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
"!
àÅ
àÅ
àÅ
àÅ àÅ
àÅ
àÅ
àÅ
àÅ
2019DERWAPUMP STATION R200A
FAC 1879
R
R
R
R
R
R
R
R
R
D
3
5
9
4
0
2600 D2994
0
2633
6
6
4
0
D
4
0
0
8
2
D
4
5
9
4
8
6
3
9
1
2665
60
0
0
D
4
1
4
2
0
C2
0
1
5
2
D34525
60
0
1
6
1
0
1
D34541
3
3
5
1
C
1
6
3
4
7
16SMB0
5
6N016
6SMB
16N05
16N0
0
9
1
6
N
0
1
6
1006
4
9
2
1
0
0
5
0
1
8
-
A
10
0
5
0
1
8
-
A
100649
2
2
0
0
9
6
9
2
20
0
9
6
9
3
16SM
B
0
5
1
6
N
0
1
6
1
6
N
0
1
6
-
R
J
6SMB
0
5
6N05
10064
9
2
1
0
0
5
0
1
8
-
A
1
6
N
0
1
6
-
R
J
1
6
S
M
B
0
1
6
1
6
N
0
1
6
-
R
J
20
0
9
7
0
5
1006492
6N05
1
6
S
M
B
0
5
16N00
9
2
0
0
9
6
9
3
-
A
1
6
S
M
B
0
1
6
16SM
B
0
5
6SMB01
6
8
S
M
B
0
5
1
6
S
M
B
0
5
2005696
10064
9
2
6N
1
6
S
M
B
0
5
6N016
8N
0
1
1
2
0
0
9
6
9
2
-
A
8N
0
1
1
1
6
N
0
1
6
-
R
J
20
0
2
4
3
5
16
N
0
1
6
-
R
J
10064
9
2
1
6
N
0
1
6
6SMB0
1
6
200969
6
20
0
9
6
9
2
10064
9
2
6N016
16N05
1
6
N
0
1
6
1
6
N
0
1
6
2
0
0
9
6
9
2
-
A
1
6
S
M
B
0
1
6
2009696
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅàÅ
àÅ
àÅ
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
"±F4
A
F5
B
f
R4S2
2
6
6
3
10"FS
2
A3
5
7
8
1
60
0
0
-
D
5
D4
5
0
9
3
D4
5
0
9
4
4
2"
2"
A63661
B
2
8
7
1
6
7
0
0
0
6"
F
S
1
0
8
1
A87359
1.5"
A80614
200
2
0
0
1
.
5
"
6"FS
1"
1"
1"
A80621
30
0
1
0
0
1
8"FS
4"
F
S
77
5
40
3
A
7
9
2
9
4
A8
0
6
0
9
A8318
9
A8
0
6
1
0
A80627
A83188
7
8
3
4
4
5
A7
9
2
8
9
4
5
0
40
5
A8
3
1
9
7
1
.
5
"
A
8
3
2
3
2
A8319
9
42
A79285
79
4
1
0
5
B22951
100
D4
3
3
6
2
60
0
0
-
D
3
,
7
,
9
A
3
,
A
4
,
A
5
,
A
6
6
0
0
0
60
0
0
A6
3
3
8
3
D
4
5
1
0
0
D
4
5
0
9
8
6
1
0
1
2"
D
2
5
1
4
1
1
0
7
1
1
0
9
1
1
.
5
"
6"FS
2"
4"
B0
0
2
5
9
6"FS
1"
1.5"
1"
161
A80683
1"
A79306
1.5"
8"FS
A8
0
6
8
1
A7
9
2
9
2
1.5"
490
1
"
2"
1
.
5
"
772A83190
8"FS
A8
3
1
9
5
A
7
9
2
9
6
1.
5
"
8"FS
A8
3
2
2
7
33
8
A8
3
2
3
4
A
7
9
3
0
4
5
0
0
7
8
6
44
A8
3
2
3
6
A
8
3
2
3
7
79
2
3
1
5
4"FS
120
A
8
3
1
6
7
A8
3
2
3
8
A8
3
2
0
4
1.
5
"
2600
2"
6
0
0
0
1.
5
"
60
0
0
D
4
5
0
9
5
D4
5
1
0
1
61
2
1
2
"
1
0
"
F
S
B0
1
0
5
1
B
0
0
4
5
5
IRR
1061
1061
A87357
A8
0
6
1
6
A8250
8
12501
8"FS
A87328
A87358
A87360
A80622
A8
8
8
4
5
8"
F
S
1
.
5
"
A80635
4
0
1
A80633
IR
R
A8
3
1
9
6
A
7
9
2
8
8
1
.
5
"
1.5"
78
2
5
0
1
7
8
8
1
.
5
"
A7
9
2
8
7
A
8
3
2
2
3
A7
9
2
9
9
A79286
A
8
3
2
2
1
33
1
14
A832
1
9
A832
2
0
800
13
0
A
7
9
2
8
4
8"FS
B22953
IR
R
2"
2"
4
2683
D
2
5
1
4
0
A87356
1
0
7
1
B
0
1
0
5
2
1.
5
"
8"
F
S
A80615
290
A80612
A80613
100
1.5"
A80682
IRR
4
1
5
1
0
0
1
77
3
A
7
9
2
9
1
1"
A80634
A8
0
6
3
0
1
.
5
"
800
770
1.
5
"
A8062
8
491
A
8
3
2
2
8
3
4
0
3
2
5
A
8
3
2
2
5
3
2
5
1
.
5
"
A8
0
6
3
1
33
4
3
3
0
A8
3
2
4
0
A
8
3
2
0
5
A
7
9
2
7
7
1
.
5
"
1.5"
D4
3
3
6
0
2"
A1
,
A
2
6
0
0
0
-
C
1
2"
2"
D4
5
0
9
9
B
2
8
7
1
9
2
"
2"
4"
F
S
1041
A768
6
2
12555
10
8
1
2"
1061
1061-A
A8
0
6
8
4
A8061
8
1.5"
4
"
D
S
427
130
IR
R
7
7
7
A
8
3
1
9
3
3
6
5
4
2
5
12
5
401
768
77
6
7
8
1
400
1.5"
1.5"
A8
3
2
3
1
77
8
1.
5
"
A
8
3
2
3
3
7
8
4
A8320
0
A8320
1
A
8
3
2
2
2
3
3
3
12
1
.
5
"
60
0
0
-
D
1
,
1
0
,
2
,
8
1.
5
"
D
4
3
3
6
1
2"
D
4
3
3
4
8
6
0
0
0
C
6
,
7
,
9
,
1
0
60
0
0
1
2
1
6
,
1
2
1
7
,
C
3
,
C
5
70
0
0
A87329
1041
B
0
1
0
7
2
131
1"
A80620
375
600
A80629
A
8
0
6
2
4
A8
3
1
9
1
700
A8062
5
7
7
9
A
7
9
2
9
5
4
3
5
401
1
.
5
"
A
8
0
6
3
2
1
6
3
3
5
1
.
5
"
A
7
9
3
0
0
A8
0
6
8
6
6"
F
S
33
6
33
2
A
8
3
2
0
2
1.5"
A
8
3
2
0
3
A
7
9
2
7
6
IR
R
2
8
5
110
A
8
3
1
6
6
A8
3
2
3
9
2"
100
3
4
32
0
0
B27343
8
"
F
S
2633
4
D
4
5
0
9
7
2
"
60
0
0
-
C
8
B
2
8
7
1
8
6
1
0
1
B2
8
7
1
7
A87330
1"
6"
F
S
6"FS
A88892
10
0
19
0
A8061
7
1021 1"
157
131
A
8
7
3
9
5
390
A
8
8
7
9
4
1"
1
.
5
"
A
8
3
1
9
2
1
.
5
"
A
7
9
3
0
3
10
1
35
5
A
7
9
2
9
0
A80687
A80626
A
8
3
2
3
0
600
400
A
8
3
2
2
9
7
8
5
43
45
A8
3
2
2
4
1
0
0
79
0
1.5"
7
9
9
A
7
9
3
0
5
A67423
A
6
3
6
7
3
60
0
0
2
"
4
B1
,
B
2
,
B
3
,
B
4
16
1
2
,
2
6
0
1
,
B
7
,
B
8
2
"
6
0
0
0
4
1"
6
1
1
1
4"
250
1021-B
A806
8
0
A8
0
6
1
9
1021
375A7929
3
40
5
R
2
A
7
9
3
0
8
A80611
101
391
3
0
0
4
2
5
A
8
3
1
9
4
1
.
5
"
A80685
18
A8319
8
3
4
5
2"I
R
R
78
0
A
7
9
2
9
7
IR
R
A8
3
2
2
6
30
5
A8
3
2
3
5
A
7
9
2
9
8
79
5
1
.
5
"
D23080
1
.
5
"
7
9
7
309
2
8
5
A
8
3
1
6
5
5
1
H-1830
8
H-172
3
4
H-
1
7
2
3
1
H-1738
6
H-1720
8
H-18
3
0
7
H
-
1
8
3
1
2
H-
1
7
2
3
2
H-
1
7
2
2
9
FH-1001
8
FH-10017
F
H
-
1
3
8
2
2
H-
1
8
3
1
0
H-
1
8
3
1
1
H-172
3
6
H-17235
H-18309
H-17228
H-172
0
7
H-
1
7
2
2
7
H-1
6
0
4
2
H-
1
8
5
3
6
H-
1
7
2
3
0
H-
1
7
3
8
9
H-14816
H-
1
7
5
7
6
H-1
7
2
0
9
H-1721
1
H-1720
1
H-1481
5
H-1
6
0
4
3
H-1738
0
H-
1
7
2
9
5
H-15119
H-
1
4
8
0
5
H-
1
7
2
3
3
FH-10
8
6
6
H-
1
7
2
1
0
H-17212
H-
1
7
1
6
2
43934-
B
8N89
4685
1
12SM
B
8
5
16SM
B
8
5
8N8747530-
B
8N88
12SM
B
8
7
8N88
47655
4693
0
-
C
P
4
5
7
4
1
45
8
7
5
16SM
M
B
7
6
12
S
M
B
8
8
48
2
9
8
-
A
8N88
43934
-
B
12SM
B
8
5
12SMB8
8
8N88
8SMB
8
8
P405
8
6
46
8
5
1
6N87
46
8
5
1
8
H
0
1
7
45
8
7
5
48
2
9
8
47
5
8
3
8N89
46851
1
2
S
M
B
8
7
47
5
3
1
8N87
47654
8SM
B
8
5
16SMMB
7
6
8
N
8
9
4
7
5
3
0
-
B
4
7
5
8
4
-
D
2
0
S
M
T
W
8
5
6
N
8
7
47584
20
S
M
T
W
8
5
8N
8
7
1
2
S
M
B
8
1
8
N
8
9
4393
4
-
B
4758
4
-
A
8
N
8
8
8N88
47584
-
A
4697
4
-
B
8N87
8
N
8
8
47584
-
A
46
9
3
0
-
C
45876
43934-B
45876
48298
16SM
M
B
7
6
20SM
M
8
5
47584-E
2
0
S
M
T
W
8
5
47583
47584
8N87
46
8
5
1
8A
8
5
6A8
5
47654
8N87
47530-
B
8N87
47584-
B
8N88
8A85
8A81
1
2
S
M
B
8
1
48298-A
46
8
5
1
47530-
B
47
5
8
4
8S
M
B
8
5
1
2
S
M
B
8
7
8A81
8N
8
8
475
8
4
-
C
16SM
M
B
7
6
8
N
8
7
4
7
6
5
5
-
C
47530
469
3
1
-
I
475
3
0
15
7
8
B
4
6
2
15
7
5
B
4
6
2
1578B462
1578B464
1578B462
1578B460
15
7
8
B
4
6
2
15
8
1
B
4
6
2
15
8
1
B
4
6
0
1575B462
1575B464
1575B462
1575B460
15
7
5
B
4
6
4
15
7
8
B
4
6
4
15
8
1
B
4
6
4
15
7
8
B
4
6
0
15
7
5
B
4
6
0
F
4
A
F4A
F
4
A
F4A
F4
A
F5Bf
F
4
A
F4A
F4A
F4A
F4A
F4A
F
4
A
F4A
F4A
F4
A
F4
A
F4A
Potable Distribution System
Potable Pipeline
Service Lateral
àÅ System Valve (OL = Opens Left)
I3 Check Valve
"±Zone Valve
Change of Pipe ID
&,C Rate Control Station
&,R Regulator
",P Pressure Reducing Station
G¥Flow Meter
+Manhole
Service Connection
!Hydrant
Facility
a Pumping Plant
Recycled Distribution System
Recycled Pipeline
Service Lateral
Service Connection
Landbase
EBMUD Right of Way
±
0 250 500125
Feet
Date Printed: 3/2/2023
This information is furnished as a public service by East BayMunicipal Utility District. The District makes every effort to produceand publish the most current and accurate information possible.This information must be accepted and used by the recipient withthe understanding that the District makes no warranties, expressedor implied, concerning the accuracy, completeness, reliability, orsuitability for the use of this information. Furthermore, the Districtassumes no liability associated with the use or misuse of suchinformation. Please notify the District if discrepancies are found.
By receipt of requested documents, the DOCUMENT RECIPIENTagrees that he or she, and/or any other authorized representativesof the DOCUMENT RECIPIENT, will provide no copy (nor partialcopy) to any other person or agency, will not redistribute anydocument to any other entity, business or individual, nor use thedocument for other than the specified purpose. At the point thedocument is no longer required for use by the DOCUMENTRECIPIENT, the data shall be returned to the District or destroyed.
1578B4621578B462
PROJECT SITE
680
3
0
'
R
/
W
2
8
7
2
D
W
G
7
9
4
1
-
G
R/
W
3
6
8
8
25' R
/
W
3
6
6
1
DWG 7
9
1
5
-
G
25' R/W
3
6
6
1
DWG 791
5
-
G
DW
G
3
0
1
7
-
B
56'
C O
CT
52'
52'
CIR
L
O
M
O
N
D
52'
D
LOMON
D
O
DUNBA
R
T
O
N
C
I
R
56'
5
2
'
S
T
52'CIR
CI
R
R
S
H
E
T
L
A
N
D
52'
56
'
5
2
'
N
E
100'
CI
CR
CIR
DR 52'
52'
C
H
A
U
C
E
R
C
T
CT
B
D
5
6
'
CI
R
52
'
CT
CT
60'
R
52'
52'
52'
C
H
A
U
C
E
R
5
2
'
U
R
O
52
'
DR
DUNBA
R
T
O
N
D
R
REFLE
C
T
I
O
N
S
I
FALLE
N
C
I
R
WINT
E
R
IN
T
E
R
S
T
A
T
E
MAINPR
I
C
E
C
T
CI
R
52'
BURNS
C
T
D
5
2
'
LOMON
D
R
E
F
L
E
C
T
I
O
N
S
5
2
'
WI
N
T
E
R
W
I
N
D
FO
X
B
O
R
O
WINTE
R
W
I
N
D
C
H
A
U
C
E
R
52'
R
WI
N
T
E
R
S
I
D
E
52
'
25'
C
I
R
ASCOT C
T
A
C
A
M
E
R
O
N
C
A
M
E
R
O
N
ASCO
T
52'
60'
D
A
WINTE
R
S
I
D
E
PI
N
K
E
R
T
O
N
B
U
R
N
S
52'
C
I
R
E
M
O
DUNBA
R
T
O
N
C
I
R
45'
56
'
%
%
%
%
%
%
%
%
%
%
%
àÅ
àÅ
àÅ
àÅ
àÅ
2019DERWAPUMP STATION R200A
FAC 1879
R
R
RR
555
581
C17
0
8
0
62
5
D13803
13000
C17
0
7
9
C17325
1
0
0
5
0
1
8
-
A
10
0
5
0
1
8
-
A
100649
2
4N04
20
0
0
2
1
9
1
6
S
M
B
0
5
16N00
9
100541
7
1
0
0
5
4
1
8
10
0
5
0
1
8
-
A
1
6
S
M
B
0
5
8
S
M
B
0
5
8
N
0
4
10
0
5
4
1
9
4
N
0
4
4
N
0
4
1
6
S
M
B
0
5
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
283
8
4
0
A
5
0
0
8
5
28
2
0
2
8
2
5
A5
0
0
6
7
A5
0
0
8
3
2
8
1
4
A5007
5
1.
5
"
374
65
356
27
23
21
A
5
6
2
8
9
332
316
2
7
6
6
532
313
321
495
2
7
4
8
55
0
A552
2
5
A
5
6
2
8
2
4
8
4
43
A
6
4
6
2
2
454
462
603
A64616
457
606
461
A55002
30
A
6
4
6
0
4
602
14
16
40
7
7
A6
4
5
6
6
A64636
627
A
5
1
8
4
5
A64637
A6
4
5
6
9
4017
77
5
A64572
A
7
9
2
9
4
13000
A8318
9
11
0
A64575
A83188
7
8
3
10
0
4000
A8
3
1
9
7
1
.
5
"
A83180
756
A
8
3
2
3
2
A8319
9
752
344
A456
7
2
1"IRR
42
5
8
5
79
4
7
3
3
351
3
7
35
A5
0
0
6
4
28
3
2
A500
7
9
1
"
4
4
375A5007
6
368
A
5
4
8
5
2
A5
6
2
8
6
A55236
A54848
2
7
7
8
A5
4
8
4
2
3
3
8
326
2
7
6
0
A
5
5
2
3
3
27
5
9
A5
6
2
9
3
493
54
4
A57264
A5
6
2
9
5
2
7
4
1
494
2
7
3
0
A5
6
2
9
7
A5
6
2
8
3
568
450
609
A55010
A6
4
5
6
0
A64608
A6
4
5
6
1
A64624
2
6
9
3
40
9
5
31A64632
12
A6
4
6
0
3
A64
6
2
8
60
5
8
633
A
6
4
5
7
8
4
0
7
1
A
6
4
5
8
7
A6
4
5
9
8
20
A6
4
5
8
6
A64
5
9
7
3
0
7
4
A
5
1
8
4
7
5
3
A79306
1.5"
3
9
9
9
4038
4042
3
0
9
7
772A83190
A3
5
4
0
2
A8
3
1
9
5
A83183
A
7
9
2
9
6
1.
5
"
A8
3
2
2
7
C17324
A
8
3
1
5
1
33
8
A8
3
2
3
4
A
7
9
3
0
4
A83176
7
8
6
44
10094
7
4
1
7
3
9
33
7
A8
3
2
3
6
A
8
3
2
3
7
79
2
3
1
5
10
0
7
4
7
3
7
347
A
8
3
1
6
7
A8
3
2
3
8
A8
3
2
0
4
A83300
IR
R
36
A50058
2
8
2
6
380
IR
R
362
A5
4
8
4
9
A5
6
2
8
8
A5
7
2
5
8
A5
6
2
9
1
A57257
2
7
6
5
A56279
13
27
3
6
A55223
A5501
9
A57272
557
561
4
8
0
2
7
1
8
44
A55009
A64617
60
0
1
-
A
465A64609
A8
0
7
5
4
A64625
A6
4
5
6
2
A
5
1
8
5
5
A6
4
5
6
3
A64630
6
2
40
8
9
A6
4
6
0
2
3
0
5
5
A64629
A5
1
8
5
7
37
A6
4
6
0
1
40
7
8
A6
4
5
6
5
A
5
1
8
5
8
640
A6
4
5
9
2
A6464
0
56
A6
4
5
9
9
A6
4
5
6
7
2
1
A
6
4
6
4
1
A
6
4
5
9
4
A64
5
7
0
A8250
9
4024
A
5
1
8
5
0
12"FS
A83187
A8
3
1
9
6
A64577
A64576
78
2
750
A83173
A
8
3
1
5
2
A83178
7
8
8
1.
5
"
A8
3
1
5
3
354
A
8
3
2
2
3
A7
9
2
9
9
A
4
5
6
7
3
A83169
A
8
3
2
2
1
A45705
33
1
14
A832
1
9
A832
2
0
800
A50
0
6
3
2870
A5
0
0
8
1
A5
0
0
7
7
5
2
A5
0
0
6
8
A
5
0
0
8
2
A
5
6
2
8
4
A5
0
0
2
9
A55237
A
5
4
8
5
1
A55235
A50116
A54
8
4
3
A54845
2
7
7
1
A57262
A57263
A55228
496
27
2
9
A6
4
5
5
6
573A55015
A55007
46
42
40
27
0
0
2
6
9
9
608
A64623
A
6
4
6
0
5
17
A64
6
1
1
A
6
4
6
1
4
1.5"
A6809
3
A6
4
6
2
7
30
6
1
A64634
A64635
A6
4
6
0
0
A6
4
5
9
3
4
0
6
6
A64638
3
9
8
1
40
6
5
2
5
A
6
4
6
4
2
52
A6
4
5
8
5
30
8
0
A64584
IRR
A
5
1
8
4
8
A64571
77
3
4036
770
3
0
9
2
A
8
3
2
2
8
A83179
A83175
A83174
3
4
0
3
2
5
348
346
A
8
3
2
2
5
3
2
5
10
0
7
8
33
4
A83171
3
3
0
10089
A83299
353
A8
3
2
4
0
A
8
3
2
0
5
A
5
4
3
1
6
39
2864
2
8
0
7
350
27
9
6
2
7
9
0
A55234
A54847
A5
0
1
1
7
A5
7
2
6
0
A54853
A57261
A56280
A5
5
2
2
7
A5
6
2
9
6
A56277
556
47
A57
2
7
0
A64620
A64621
A57266
A64619
A64618
27
0
5
A6
4
6
0
6
8
"
A6
4
6
1
0
34
3
0
4
9
40
9
0
A64631
A
6
4
5
6
4
A6
4
5
9
1
A646
3
9
5
9
4
0
6
0
A
6
4
6
4
5
39
8
7
A
6
4
5
6
8
404
7
3
0
8
5
22
130
A3
5
4
0
4
A
6
4
5
8
2
30
8
6
A5
1
8
2
8
7
7
7
A
8
3
1
9
3
3
6
5
4018
768
766
77
6
7
8
1
4006
764
A83185
A8
3
2
3
1
77
8
754
758
1.
5
"
74
7
A
8
3
2
3
3
7
8
4
A83373
581
5
8
1
350
A8320
0
A8320
1
A45668
A
8
3
2
6
7
5
8
3
A
8
3
2
6
8
A
8
3
2
2
2
A
8
3
1
5
4
A
8
3
1
5
5
A83170
3
3
3
A
8
3
1
5
6
12
1"
2856
34
41
A
5
0
0
7
8
2
8
0
2
A500
7
4
2
8
0
1
27
9
5
25
A54
8
3
9
28
24A54841
312
A5
6
2
9
0
A54844
A
5
6
2
9
2
317
A54854
27
5
4
498
2
7
4
2
A5
5
2
2
6
492
488
27
2
4
A6
4
5
5
7
565
569
A55008
A
6
4
5
5
8
A6
4
5
5
9
A55006
470
466
A55005
610
604
40
9
6
600
A646
2
6
33
A5
1
8
5
6
A64
6
3
3
A6
4
5
8
9
40
7
2
3
9
7
5
54
A
5
1
8
4
6
5
5
A6
4
5
9
5
A
6
4
6
4
4
A646
4
3
A6
4
5
9
6
404
8
375
A8
3
1
9
1
A
5
1
8
4
9
4011
A64574
A64573
7
7
9
A
7
9
2
9
5
1
6
3
3
5
13000
352A83177
33
6
33
2
A
8
3
2
0
2
A
8
3
2
0
3
A4
5
6
7
4
A
8
3
1
6
6
A83164
A8
3
2
3
9
A50
0
6
1
A5
0
0
6
5
A
5
0
0
6
6
2
8
3
1
A
5
0
0
8
4
369
6
3
A50072
A50071
A50073
29
A548
3
8
A54840
26
27
7
2
320
A
5
7
2
5
9
53
8
329
325 A57265
A56278
A55224
A56276
2
7
3
5
45
A57271
A
5
7
2
7
4
A55016
A57267
458
27
0
6
605
607
A55011
2
6
9
4
A55004
A55021
1
0
A
6
4
6
1
5
36
A64613
20
40
8
4
35
A
6
4
5
9
0
4
0
8
3
634
6
1
658
A
6
4
5
7
9
57
3
0
6
8
A6
4
5
8
0
40
5
4
A
6
4
6
4
6
A5
1
8
2
7
1
.
5
"
12
0
A
8
3
1
9
2
1
.
5
"
35
5
4012
A83186
A
8
3
2
3
0
A3
5
4
0
1
762
760
A
8
3
2
2
9
7
8
5
A83182
43
45
2"
A8
3
2
2
4
A45669
10090
79
0
A
8
3
2
6
9
7
9
9
A45704
A83172
A50
0
6
2
A50059
A5
0
0
6
0
A50057
A5
0
0
8
0
2837
45
48
A50069
2
8
0
8
A
5
0
0
8
9
A50070
A
5
6
2
8
5
A5
4
8
5
0
A
5
6
2
8
7
27
8
9
27
8
4
308
A54846
A54856
A54855
A
5
6
2
9
4
491
489
487
A
5
6
2
8
1
562
A5
7
2
7
5
A57273
A55017
A55018
48
27
2
3
A5726
9
27
1
2
611
A57268
A64607
A55003
32
15051
38
A64612
39
628
30
6
7
646
A6
4
5
8
8
30
6
2
652
375A7929
3
3
9
9
3
A
6
4
5
8
1
5
0
30
9
1
24
A64650
A3
5
4
0
3
A64583
A
8
3
1
9
4
A83184
18
A8319
8
3
4
5
A83181
78
0
A
7
9
2
9
7
IR
R
A8
3
2
2
6
A45670
A45671
10086
1008
2
74
5
A8
3
2
3
5
A
7
9
2
9
8
A
8
3
1
6
8
79
5
349
33
5
7
9
7
578
5
8
7
7
3
5
A
8
3
1
6
5
5
1
H-13077
H-
1
3
4
1
5
H-13412
H-
1
3
4
1
3
H-12547
H-15128
H-
1
3
7
1
6
H-15136
H-15134
H-1738
6
H-
1
7
3
8
5
H-1720
8
H-
1
2
5
4
9
H-17387
H-
1
3
7
1
3
H-
1
5
1
3
8
H-15139
H-15132
H-1513
7
H-
1
1
4
5
3
H-
1
7
3
4
8
H-1
3
0
7
6
H-13081
H-13702
H-
1
3
7
0
8
H
-
1
3
4
1
4
H-172
0
7
H-13080
H-
1
3
7
0
3
H-1370
4
H-137
0
7
H-13
7
1
5
H-
1
5
1
2
9
H-1
7
8
5
5
H-
1
7
3
8
9
H-
1
3
0
7
9
H-1370
6
H
-
1
3
7
1
4
H-1513
0
H-15133
H-1
7
2
0
9
H-13701
H-1308
4
H-
1
3
7
0
5
H-
1
3
7
0
9
H-1513
1
H-1738
0
H-13712
H-1371
0
H-1371
1
H-
1
7
2
1
0
H
-
1
5
1
3
5
8A7
9
44
9
5
2
-
A
6
A
7
9
6
A
7
9
8A83
4627
2
-
B
46
2
7
0
46272-
E
8
A
8
3
8
S
M
B
8
3
6A84
6A
8
3
46272
45106
8SMB7
9
46
2
7
2
8N8747530-
B
4
5
1
0
6
-
A
8
A
7
7
47655-E
8N87
47655
8
N
8
7
44953-E
4
4
9
5
2
-
A
6
A
7
9
45248-
C
45
2
4
8
-
D
6A83
4
6
2
7
1
46273
46273
-
B
4N83
8A
8
3
4
6
2
7
1
44052
6A75
45
1
0
6
-
A
44
0
5
1
6N87
8A79
6A79
6A79
6
A
7
9
6
A
7
9
46271-A
45
2
4
8
-
B
6
A
7
9
46
2
7
3
-
C
8S
M
B
8
3
6
A
7
9
46272-A
47654
6A79
8
A
7
9
6A79
6
A
7
9
6A7
9
4
5
2
4
8
-
C
6
A
7
9
46271-A
6A
7
9
6A
8
3
6A83
6
A
8
3
4N
8
3
8A
8
3
4
7
5
3
0
-
B
6SMB7
9
8A79
8S
M
M
B
7
5
8A
7
9
47
6
5
4
8
A
7
5
6
N
8
7
8S
M
B
7
9
449
5
3
6
A
7
9
452
4
8
-
B
6A79
46
2
7
2
-
B
4
N
8
3
46
2
7
3
-
A
46
2
7
2
-
D
8
A
7
9
6
N
8
7
449
5
2
-
A
45249
4
5
2
4
8
-
D
6
A
7
9
45
2
4
8
-
A
6A83
4
6
2
7
2
-
C
462
7
1
46
2
7
1
8N87
47654
8N87
47530-
B
8N87
44952
-
A
44953-D
4
4
9
5
3
-
F
44
9
5
3
-
F
45248
8A79
45248-E
46272-
D
4
5
1
0
7
-
A
46
2
7
1
46272
46
2
7
1
45
1
0
7
6A84
45106-
A
8
A
8
3
4
4
0
5
1
44
7
2
9
47654
47
6
5
2
1
2
S
M
B
8
7
8A79
6
A
7
9
4
5
2
4
8
-
E
45249
8A83
4
5
2
4
8
-
F
1
2
S
M
B
8
3
4N84
6A84
8
N
8
7
45107
6
A
8
4
8
N
8
7
6N87
4
7
6
5
5
-
C
4
7
6
5
5
15
7
8
B
4
6
2
15
7
5
B
4
6
2
1578B462
1578B460
15
8
1
B
4
6
2
15
8
1
B
4
6
0
15
7
8
B
4
6
0
1581B458
1575B462
1575B460
15
7
8
B
4
5
8
15
7
5
B
4
5
8
1578B458
1578B460
1575B458
1575B460
15
7
8
B
4
6
0
15
7
5
B
4
6
0
F
4
A
F
4
A
F4A
F4A
F4A
F4A
F4A
F4
A
F4A
F
4
A
F4A
F4
A
F4A
F
4
A
F4A
F4A
F4A
F
4
A
F4
A
F4A
F4A
Potable Distribution System
Potable Pipeline
Service Lateral
àÅ System Valve (OL = Opens Left)
I3 Check Valve
"±Zone Valve
Change of Pipe ID
&,C Rate Control Station
&,R Regulator
",P Pressure Reducing Station
G¥Flow Meter
+Manhole
Service Connection
!Hydrant
Facility
a Pumping Plant
Recycled Distribution System
Recycled Pipeline
Service Lateral
Service Connection
Landbase
EBMUD Right of Way
±
0 250 500125
Feet
Date Printed: 3/2/2023
This information is furnished as a public service by East BayMunicipal Utility District. The District makes every effort to produceand publish the most current and accurate information possible.This information must be accepted and used by the recipient withthe understanding that the District makes no warranties, expressedor implied, concerning the accuracy, completeness, reliability, orsuitability for the use of this information. Furthermore, the Districtassumes no liability associated with the use or misuse of suchinformation. Please notify the District if discrepancies are found.
By receipt of requested documents, the DOCUMENT RECIPIENTagrees that he or she, and/or any other authorized representativesof the DOCUMENT RECIPIENT, will provide no copy (nor partialcopy) to any other person or agency, will not redistribute anydocument to any other entity, business or individual, nor use thedocument for other than the specified purpose. At the point thedocument is no longer required for use by the DOCUMENTRECIPIENT, the data shall be returned to the District or destroyed.
1578B4601578B460
PROJECT SITE
680
680
DW
G
7
3
4
5
-
G
8' R/W
3
6
6
3
DWG 987
9
-
G
15' R
/
W
3
3
6
7
R/W 4582
R/
W
3
3
6
7
DWG
7
3
4
5
-
G
R/
W
3
3
6
7
DWG 73
4
5
-
G
R/
W
S
-
9
0
9
&
S
-
1
1
9
8
R/W
3
3
6
7
C
O
N
S
T
D
W
G
S
-
1
1
9
8
DW
G
7
3
4
5
-
G
DWG 73
4
5
-
G
L
52
'
R
52'
100
'
C
E
R
H
T
56'
A
ES
S
A NE
R
CI
R
CI
I
N
D
52'
A
60'
R
N
DR
HA
R
N
E
S
S
H
BLV
D
BOLLING
E
R
B
HAR
N
E
S
S
IN
T
E
R
S
T
A
T
E
DR
56'
P
A P H
TA
L
A
V
E
R
A
DR
C
52'
O
N
A
CIR
12
4
'
E
124'
DR
R
HARNE
S
S
C
T
28'
56'
TRAILV
I
E
W
CT
BARNW
O
O
D
A
60'
BOLLINGE
R
C
A
C R
CT
N
S
M
B
R
I
D
L
E
P
A
T
H
RD
52'
56'
56'
A
HO
P
I
C
T
MO
R
G
A
N
A
R
CH
E
R
O
K
E
E
52'
A
H
A
HA
28'
R S
O
R
O
S
O
M
B
R
E
R
O
52
'
52'
36'
R
IN
T
E
R
S
T
A
T
E
A
H
I
56'
TWN
O
LORCA
RD
LN
S
O
U
T
H
56'
CIR
56
'
F
W
Y
A
R
56'
A
P
CANYON
R
SS
BOLLINGE
R
C
A
N
Y
O
N
R
D
R
A
M
O
N
36'
28'
HA
R
N
E
S
S
D
S
E R
C
T
56'
S
A
N
R
A
M
O
N
V
A
L
L
E
Y
S
O
M
B
R
E
R
O
B
L
V
D
S
A
N
R
A
M
O
N
ASCOT C
T
O
10
0
'
R O
CT
E
S
C
I
D
56'
S
A
N
H
V
A
L
L
E
Y
LN
N
O
R
T
H
HA
R
N
E
S
S
CANYON
L
O
N
G
H
O
R
N
56'
C
R
%
%
%
%
%
%
%
+
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅàÅ àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
àÅ
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
"±F4AF5Bf
A6643
6
A66409
A66410
57
A66
3
2
0
A664
3
8
2905
A66
4
3
9
135
A6
6
4
4
1
A35
7
7
9
297
0
289
0
A6
6
4
4
3
14
6
389
287
5
20
150
24
2871
A52138
A6
6
4
4
8
15
8
A663
0
6
1170-A
368
16
0
A6
6
4
4
9
4
0
A68679
A68678
A686
5
9
1180
A68541
A68647
1130
A686
4
8
1140
1171
1190-A
A68547
A685
5
2
1091
A68
6
7
1
A685
5
4
A685
5
5
1091
A68
6
6
4
1161
1.5"
A686
2
9
1121
1171
-
A
1121
1151
970
A686
3
7
1141
A6
8
5
7
3
9
9
0
1021
A686
1
2
1151
2936
A6
8
5
7
8
A56474
A685
2
9
A68
6
2
5
2956
2
8
9
2
IR
R
A68
5
9
6
A68
6
2
2
A6
8
6
2
0
2960
2939
A6
8
5
8
5
1020
A6
8
5
8
1
4"
102
0
A63864
28
28
7
6
IRR
A6
8
5
3
1
A68592
A68593
1041
A63885
2987
28
6
5
A5
6
4
5
2
285
1
70
A63898
2821
2805
A56444
A63904
3127
2806
A63915
80
8
3111
A5
6
4
3
4
A
5
6
4
3
7
3107
8
0
0
IRR12201
1.
5
"
3104
283
8
126
A6642
6
118
A66
3
1
9
A6
6
4
2
4
A66
4
1
8
290
2
34
289
1
A6
6
4
5
7
2301
A521
3
3
23
392
A54288
384
A663
0
8
385
2861
IRR
A52125
A68674
A68673
1150
A68676
1150
1120-A
1150
A68540
1171
1"
1081
A685
4
9
1"
A686
5
2
IRR
18050
6"FS
A
6
8
5
5
7
A686
2
8
A6855
8
1151
970
A686
1
9
1151
2928
980
1090
A686
1
5
A
6
8
5
7
2
1061
A68
6
2
7
B05
3
7
5
A68
6
2
6
180
7
0
A
5
6
4
6
1
100
0
A68
6
0
6
101
0
A63871
10
5
3
-
A
A68
6
1
1
A68
6
0
9
A68
6
2
1
A63870
2925A56483
A6
8
5
8
7
A68
5
9
9
1030
2980A63866
A68
6
0
3
A5
6
4
5
6
IR
R
5
4
A
5
6
5
0
2
2
8
6
4
A68590
A68595
A63886
A63
8
7
6
A
5
6
4
9
4
A5
6
5
0
3
62
A
6
3
8
8
0
A63899
2839
39
A56510
2813
A56448
A56512
2844
42
2801
A56441
36
40
8
1
2
3119
3101
A63831
A5
6
4
3
2
3120
A6
4
5
5
0
B0
5
3
7
6
3096
3
7
35
A5
0
0
6
4
28
3
2
A664
1
4
291
8
A664
2
8
122
A6
6
4
6
2
A6
6
4
4
0
A6
6
4
6
0
11
0
A
6
6
4
5
9
289
3
A6
6
4
2
2
A6
6
4
6
4
A6
6
4
4
2
A52
1
3
1
2317
A66452
A66
3
1
0
A5
2
1
2
8
A5
2
1
2
7
A6630
5
364
A52123
A68660
A68677
1180 #131
1120
A68644
A68545
1171
1171
1091A685
4
8
C10954
A685
5
0
1130
1130
B16120
IRR
A6
8
5
6
2
1091
A686
3
0
1080
-
A
A685
6
0
IRR
A686
1
6
1021
2920
2916
A68571
IRR
103
0
-
A
A68
5
3
8
A56471
103
1
A
5
6
4
6
2
A68
6
0
4
2952
10
6
0
IRR
A68
6
1
0
A
5
6
4
5
8
A6
8
5
8
6
10
6
0
A68
5
9
8
1.5"
A68532
10201030
2976
A5649
2
A56491
1"
A6
3
8
7
5
A56500
1051
1051
25
A5
6
4
5
1
A56507
A56
4
5
0
285
2
A63
9
0
0
A6
3
9
0
1
A56443
2824
3123
2812
2816
A56440
A5
6
4
3
6
A59545
80
5
A
5
6
4
3
8
60
0
1
A63835
IR
R
36
A50058
A664
0
8
A66
3
2
1
45
A664
2
7
136
2910
138
A66461
A66
4
1
7
2906
290
1
10
9
140
1.
5
"
A66444
21
A52134
A6
6
4
6
7
A66
3
1
1
A5
2
1
3
0
A6
6
4
4
6
20
A664
6
9
14
A6
6
4
5
1
A663
0
7
37
6
2868
1170
A66302
1"
1120
A68645
1160-A
A68668
1084-A
A686
5
0
A68666
A685
3
9
IRR
1081
1081
A686
5
4
116
1
#
1
2
4
1161
A6852
8
A685
6
1
1071
A
6
8
5
5
6
1153
-
A
A6855
9
A686
4
0
1"IR
R
980
A68566
1"I
R
R
A6857
6
B15
3
5
4
2940
A
5
6
4
6
3
1061
109
9
IRR
180
7
0
6"F
S
2944
A68
6
0
5
110
0
110
0
180
8
0
101
0
B15
3
5
3
2"
A63869
A564
8
4
28
9
5
28
8
4
1"
2
8
8
9
10
6
0
1
0
5
0
A686
0
1
103
0
B15
1
5
7
A63865
2
8
8
5
2
8
8
0
1"
103
0
A
6
3
8
7
2
24
28
7
7
A
5
6
5
0
1
28
7
2
1
0
4
5
-
A
1"
A
5
6
4
5
4
1051A68591
2983
A56498
21
A56497
A56
5
0
4
A63878
71
2817
2825
284
8
2809
A56446
A56447
A56445
A639
0
3
A63905
3115
A63914
A
5
6
4
3
1
3112
7
9
9
A50
0
6
3
2870
41
A6
6
4
3
7
291
4
A
6
6
4
6
3
A66
3
1
7
3
3
A664
2
0
14
4
10
5
23
21
10
1
26
A52
1
3
5
24
2876
38
0
A
5
2
1
3
7
15
4
A664
7
1
A68661
1170
A68675
1170
A66303
A68662
2848
A686
5
7
A65353
A685
5
1
1"
A686
4
9
A68669
A685
5
3
105
0
-
A
A685
4
4
1"IRR 971-A
A6
8
5
6
3
A686
3
3
1131
A686
4
2
A685
4
2
1071
A686
1
7
1021
A686
3
6
A56465
A56
4
6
4
A686
1
8
A686
1
4
A68
5
3
7
A56469
970
9
9
0
-
A
A686
1
3
1021
1141
2
9
0
0
A
6
8
5
7
9
B15
3
5
5
1070
-
A
B15
3
5
6
2"
A6
8
5
8
4
100
0
8"F
S
A56481
2909
A68
5
3
4
B15
1
5
6
2972A63868
2968
A68
6
0
0
2955
10
6
0
A6
3
8
8
3
53
57
36
A68594
IRR
40
2
8
7
3
A68588
1041
2991
28
6
0
35
66
41
A564
4
9
2836
2828
38
A63833
A63832
8
0
1
3116
3100
A
5
4
3
1
6
39
2864
A66411
29
6
2
1
"
A664
1
5
2913
A66
4
1
6
125
12
1
A6
6
4
2
3
289
7
A66
3
1
6
10
7
A66
4
5
8
B28
7
9
1
100
A6
6
4
5
5
10
3
A66
3
1
2
A6
6
4
4
5
A664
6
8
287
2
359
2864
A52124
356
1160
1170
A68672
A
6
5
3
5
4
1160
1180 #132
A66301
1150
2844
IRR
1120
IRR
1120
1"IRR
A68667
A686
5
3
1130
B16119
1071
-
A
A686
5
5
A68
6
7
0
98
1
A686
3
1
1140
1071
A686
3
41131
A686
3
5
1"
1121
A68568
1071
A56467
290
8
980
1"
1141
A56468
2
9
0
4
99
0
A6
8
5
2
7
A686
3
9
99
0
A68
6
0
7
1.5"
A56475
2948
A6857
5
100
0
A68
6
2
4
101
0
100
0
110
0
103
1
103
1
A56482
2935
A5
6
4
8
5
A5
6
4
5
9
A63867
A56478
A56480
A5
6
4
8
6
A6
8
5
8
0
180
9
0
2951
A56477
A5
6
4
8
7
1024-A
5
1
32
104
3
-
A
A
6
3
8
8
2
A6
3
8
7
4
61
A68589
1051
1041
5
8
A6
3
8
8
1
4
4
65
A638
7
7
39
31
A63879
A56509
A63918
A63906
A5
6
4
3
5
A63916
A63913
A63912
10
"
A63834
A63838
A63836
1"
2856
34
29
6
1
124
61
A663
1
8
A66
4
1
9
10
8
14
2
289
4
14
3
A6
6
4
6
5
A663
1
4
50
0
1
A66456
A
6
6
4
6
6
388
A6
6
4
4
7
2865
1
6
1
A6
6
4
5
0
A68546
A6630
4
2860
2856
1160
1160
A68
6
5
6
A68646
1"
1081
1140
18050
IRR
1131
A686
3
2
A68
5
4
3
9
8
1
9
8
1
1121
#
8
1
A686
4
3
1141
A686
4
1
A68565
980
1090
1090
A56470
A68567
A56472
99
0
1090
103
1
A6857
4
1061
B15
3
5
7
180
8
0
A56476
A6
8
5
3
0
10
5
0
A6
8
6
0
8
180
8
0
2964
10
5
0
A56479
2943
1"IRR
180
9
0
2984
A56488
A6
8
5
8
3
A56490
A68
5
3
3
2
8
6
8
A63884
A
5
6
4
5
3
1041
A56499
A56495
A56496
28
5
6
A56506
A565
0
5
45
A56511
A56508
2840
A6
3
9
0
2
2820
A63917
A56439
81
3
80
9
1.5"
A5
6
4
3
3
A63839
A50
0
6
1
A5
0
0
6
5
63 A66
4
2
5
290
9
11
4
2898
A663
1
5
2"
A6
6
4
2
1
IRR
A52132
A66
3
1
3
1"
2313
A6
6
4
5
4
A66453
A663
0
9
25
A52
1
3
6
A521
3
9
A664
7
0
A5
2
1
2
9
37
3
15
7
1"
37
2
A52126
360
A68663
A686
5
8
1180
2852
A686
5
1
1140
18000
A685
3
6
1130
-
A
A686
6
5
98
1
116
1
IR
R
105
1
-
A
1"
2912
A56466
A68564
A68569
A68570
A686
3
8
2932
2924
970
A6857
7
101
0
A56473
28
9
6
110
0
A68
6
2
3
1.5"
A
5
6
4
6
0
1061
1"
B15
1
5
8
28
8
8
102
0A68
5
9
7
103
5
-
A
180
9
0
IRR
2947
A68
6
0
2
20
A56489
A5
6
4
5
7
10
5
0
A6
8
5
8
2
8"F
S
50
A6
3
8
7
3
A5
6
4
5
5
A5
6
4
9
3
29
2829
4
4
A56513
2832
A56442
8
0
4
A63911
3124
A63837
3108
IR
R
A50
0
6
2
A50059
A5
0
0
6
0
A50057
A5
0
0
8
0
H-1
5
3
8
4
H-15382
H-1550
5
H-14
1
8
8
H-
1
3
7
3
8
H-
1
4
8
9
0
H-
1
3
7
3
5
H-
1
4
8
8
4
H-1550
4
H-15502
H-
1
3
7
3
4
H-1538
1
H-1
3
2
8
6
H-1539
8
H-1
5
5
0
0
H-1
5
5
0
8
H-15
5
0
3
H-15
4
9
9
H-1
3
0
7
6
H-1
5
3
9
7
H-13292
H-13739
H-13733
H-1
5
3
8
3
H-15400
H-15
3
8
5
H-
1
5
4
9
8
H-15507
H-
1
4
8
8
9
H-
1
4
1
8
7
H-15393
H-1
3
2
8
7
H-
1
5
3
8
6
FH
-
1
1
0
0
6
H-
1
5
5
0
1
H-
1
3
7
4
0
H-
1
4
8
8
5
H-13269
H-
1
5
5
0
6
46
4
4
9
450
3
1
-
Q
24SMM6
5
8A83
6A8
3
4652
2
6
A
8
0
452
4
1
-
C
8A80
8A7
9
44
9
5
2
-
A
6A
8
4
461
3
9
6A
8
4
46449-B
24
S
M
M
6
5
465
2
2
-
A
8A
8
3
465
2
3
45241-B
6
A
8
0
4
5
2
4
1
-
A
6A
8
0
45
2
4
1
8SMB80
44953-E
6A
8
4
4
6
4
4
9
1
2
S
M
B
8
3
46
1
3
9
39
2
7
1
465
2
2
-
A
46523
-
A
6A
8
3
46620
46
0
3
0
8
A
8
0
45240 39
2
7
1
6A84
464
4
9
-
B
4
N
8
4
464
5
0
-
B
46
4
5
0
-
C
45031-B
464
4
9
43935
6
A
8
4
392
7
1
6A
8
3
465
2
2
-
D
6
S
M
P
E
8
7
8SMPE
8
7
6A
8
1
6A
8
0
45240
20
S
M
M
6
5
6A79
8
A
7
9
4N
8
4
46449-B
8A
7
9
4N
8
4
6A
7
9
6A
7
9
12SMMB76
24S
M
M
6
5
6A
8
3
6A80
460314N81
2
4
S
M
M
6
5
39
2
7
2
8S
M
B
7
9
46
4
5
0
-
E
46449
-
B
464
4
9
450
3
0
464
5
0
-
A
45
0
3
1
-
B
43935
465
2
2
-
C
39271
6A
8
3
465
2
2
46646
45
2
4
0
-
A
45240
449
5
2
-
A
12SM
B
8
3
4N
8
4
12SMMB76
46522-B6A83
8A
8
3
465
4
3
8N
P414
6
0
4
5
2
4
1
16SMB85
8A80
12SMMB76
6A84
6A8
4
46
4
5
0
-
D
6A84
12S
M
B
8
3
4N8
4
6A79
6A84
6A
8
3
465
2
3
-
B
8SM
B
8
3
4
6
6
2
0
15
7
8
B
4
6
2
15
7
5
B
4
6
2
1578B462
1578B460
15
7
2
B
4
6
2
15
7
5
B
4
6
2
1572B462
1572B460
1575B462
1575B460
15
7
8
B
4
5
8
15
7
5
B
4
5
8
1572B458
15
7
2
B
4
6
0
15
7
5
B
4
6
0
1575B458
1575B460
15
7
8
B
4
6
0
15
7
5
B
4
6
0
F4
A
F4A
F4
A
F5B
f
F4A
F4
A
F4
A
F4A
F4
A
F5Bf
F5Bf
F4A
F7
F
1
F
7
F
1
F4A
F4
A
F4A
F
7
F
1
F7
F
1
F7F
1
F
4
A
F5Bf
F5Bf
F5Bf
F5
B
f
Potable Distribution System
Potable Pipeline
Service Lateral
àÅ System Valve (OL = Opens Left)
I3 Check Valve
"±Zone Valve
Change of Pipe ID
&,C Rate Control Station
&,R Regulator
",P Pressure Reducing Station
G¥Flow Meter
+Manhole
Service Connection
!Hydrant
Facility
a Pumping Plant
Landbase
EBMUD Right of Way
±
0 250 500125
Feet
Date Printed: 3/2/2023
This information is furnished as a public service by East BayMunicipal Utility District. The District makes every effort to produceand publish the most current and accurate information possible.This information must be accepted and used by the recipient withthe understanding that the District makes no warranties, expressedor implied, concerning the accuracy, completeness, reliability, orsuitability for the use of this information. Furthermore, the Districtassumes no liability associated with the use or misuse of suchinformation. Please notify the District if discrepancies are found.
By receipt of requested documents, the DOCUMENT RECIPIENTagrees that he or she, and/or any other authorized representativesof the DOCUMENT RECIPIENT, will provide no copy (nor partialcopy) to any other person or agency, will not redistribute anydocument to any other entity, business or individual, nor use thedocument for other than the specified purpose. At the point thedocument is no longer required for use by the DOCUMENTRECIPIENT, the data shall be returned to the District or destroyed.
1575B4601575B460
PROJECT SITE