SF PDC Narrative
The Toyota SF PDC project is an existing Toyota facility that Toyota is updating per current business
standards. The facility will be upgrading the rear area of the building, focusing on the distribution hub.
With this upgrade Toyota will be replacing and installing new access gates, fencing, turnstiles, and
other security features to aid in the safety of both the facility and its workers. All proposed work will be
exterior and will not affect the existing functions of the building. The proposed work will also not harm,
disturb or relocate any tree life on site. All work has been created to not disturb existing trees. The
scope of work will not be distrupting existing landscape on site, only hardscape that is existing. The
only location that will have new hardscaping will be the ashalt area for the additional fire lane access.
Any additional landscape plans can be provided as needed per the MWELO calculations as deemed
necessary.
Asphalt areas of the distribution hub will be removed and repoured based on revised layout. Revied
striping will also be implemented based on safe access through and around the area, all striping to be
in accordance with applicable codes.New sidewalks will also be provided to replace demolished
existing sidewalks on site. These revised sidewalk locations will create a more secure and safe
around the site. The sidewalks will also be bifurcated by a security fence to ensure pedestrians
remain separate from the distribution area. Light poles will be distributed as needed by code.Existing
sidewalk does not include landscaping, updated design will also not include landsaping.
In addition to these safety measures the site will have three separate areas labeled Area A, Area B,
and Area C. Area A will serve as the primary entry for all truck traffic to the rear of the site. This area
will be outfitted with a security camera, security NEMA enclosure, two permiter security gates with
security access sensors. Area B will include secure turnstil entry, ADA access gate with required ADA
buttons, security camera and additional security equipment. This are serves as the ADA approach
and parking area. Area C will include an 18’ double swing maintance gate. This will be used for large
material drop-offs as well as alternate vehicle access as needed.
The revised exterior layout will remove 65 parking spaces to facilitate the required area needed for
access and egress. With this in mind, attached is a third-party parking study to review existing parking
conditions. As well as the updated parking counts upon completion of the work. All facets of site and
civil work has also been incorporated into the packet and meets all applicable municipal and IBC
codes.
v.2025
SF PDC Phase Two Project Narrative:
Phase Two of the project focuses on restoring the site’s full parking capacity and
ensuring compliance with all applicable site and electrical code requirements. During
the initial phase, portions of the existing parking were temporarily removed to
accommodate construction activities and site improvements. Although some parking
was reinstated in phase one, the total number of spaces did not fully match the original
site count.
In this current phase, the design reinstates all original parking spaces, returning the site
to its full pre-construction capacity. Additionally, Phase Two includes continued
coordination with civil and electrical disciplines to ensure all new and existing site
elements meet current local and national code requirements. As the project
progresses, further refinements will be made to align with regulatory standards and
enhance overall site functionality and safety.
FACE BRICK
MASONRY
CONCRETE, CAST STONE
NEW WALLS (PLAN VIEW),
EXISTING CONSTRUCTION (SECTION VIEW)
GYPSUM, GROUT, SAND (SECTION VIEW),
NEW CONCRETE SLAB (PLAN VIEW)
RIGID INSULATION
PERIMETER INSULATION
CUT STEEL
FINISH WOOD
WOOD BLOCKING (NOM.)
PLYWOOD
WOOD BLOCKING (NOT NOM.)
METAL DECK
BATT INSULATION
EARTH
GRAVEL, DRAINAGE FILL
0.00'
NEW COLUMN
REFERENCE
INTERIOR PARTITION TYPE
EXISTING COLUMN
REFERENCE
SECTION REFERENCE
ELEVATION REFERENCE ROOM TAG
REFERENCE KEYNOTE
FURNITURE TAG
DOOR & DOOR NUMBER
ROOF TAG
EXISTING CONSTRUCTION TO
BE REMOVED
NEW CONSTRUCTION
EXISTING CONSTRUCTION TO
REMAIN
ROOM FINISH TAG
GLAZING TAG
SHEET NOTE
SPOT ELEVATION
REVISION AND NUMBER
PLAN VIEW: NEW / EXISTING
WINDOW TO REMAIN
1
M999
SIM
DETAIL REFERENCE
CEILING HEIGHT TAG A.F.F.
TOILET ROOM ACCESSORY TAG
FLOOR ELEVATION
SYSTEM FURNITURE TAG
1
M999
SIM
INDICATES DRAWING SHEET ON
WHICH ELEVATION IS SHOWN
EXTERIOR ELEVATION REFERENCE
ELEVATION REFERENCE
INDICATES DRAWING SHEET ON
WHICH ELEVATION IS SHOWN
ELEVATION REFERENCE
INDICATES DRAWING SHEET ON
WHICH ELEVATION IS SHOWN
00 0000 0
0.00'
0
ROOF LEVEL
ROOF TYPE
0
0
WALLS IN PLAN VIEW
1
A101
NORTH ARROW
ROOM NAME
101
RT:
RL:
1
1i:...
G1
WALL
FLOOR
BASE
101
A101A1'-0"
1i
WS*
1i
GENERAL PROJECT NOTES
A. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE FEDERAL,
STATE AND LOCAL CODES AND ORDINANCES.
B. TESTING AND INSPECTION SERVICES FOR THE PROJECT SHALL BE PERFORMED BY AN APPROVED
TESTING AND INSPECTION AGENCY AS ACCEPTABLE TO THE AUTHORITIES HAVING JURISDICTION.
C. INTERIOR WALL AND CEILING FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM E84.
FINISHES SHALL BE CLASS B (FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450), FINISHES OTHER
THAN TEXTILES SHALL BE TESTED IN ACCORDANCE WITH NFPA 286. THESE REQUIREMENTS MEET OR
EXCEED THOSE LISTED IN THE BUILDING CODE REFERENCED ABOVE.
D. CONTRACTOR SHALL SCHEDULE AND ARRANGE FOR ALL REQUIRED LEGAL INSPECTIONS.
E. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE POSSIBILITY OF ASBESTOS CONTAINING
MATERIALS IN THE PROJECT AREA. IN ADDITION, THE CONTRACTOR SHALL CHECK FOR THE
PRESENCE OF LEAD ON PAINTED SURFACES WHENEVER WORK IS DONE WHICH COULD CREATE A
POSSIBLE SOURCE OF LEAD EXPOSURE. IF ANY SUCH MATERIALS ARE ENCOUNTERED, THE OWNER
SHALL BE NOTIFIED AND THE WORK SHALL CEASE UNTIL SUCH TIME THAT THE OWNER HAS REMOVED
THE ASBESTOS OR HAS IMPLEMENTED APPROPRIATE LEAD- RELATED MEASURES. FURTHERMORE,
THE CONTRACTOR SHALL NOT INTRODUCE ANYTHING CONTAINING ASBESTOS OR LEAD TO THE SITE.
CONTRACTOR SHALL NOT USE ANY ASBESTOS OR LEAD CONTAINING PRODUCTS.
F. CONTRACTOR SHALL COMPLY WITH ALL CURRENT "HAZARDOUS MATERIALS COMMUNICATIONS"
(HAZCOM) REQUIREMENTS. THE CONTRACTOR SHALL OBTAIN "MATERIAL SAFETY DATA SHEETS"
(MSDS) FOR ALL HAZARDOUS MATERIALS TO BE USED ON THE PROJECT. OBTAIN DATA SHEETS FROM
THE MANUFACTURERS AND DELIVER TO THE OWNER'S REPRESENTATIVE PRIOR TO USING SUCH
SUBSTANCES ON SITE. THE CONTRACTOR SHALL ALSO COMPLY WITH LAWS, ORDINANCES, RULES,
AND REGULATIONS OF FEDERAL, STATE, REGIONAL, AND LOCAL AUTHORITIES REGARDING
HANDLING, STORING, TRANSPORTING, AND DISPOSING OF HAZARDOUS MATERIALS. PRIOR TO
TRANSPORTING ANY HAZARDOUS WASTES, THE APPROPRIATE SITE ENVIRONMENTAL LEADER MUST
BE CONTACTED.
G. CONTRACTOR SHALL NOTE THAT THE OWNER WILL OCCUPY ADJACENT AREAS FOR PERFORMANCE
OF NORMAL BUSINESS ACTIVITIES DURINGCONSTRUCTION. CONTRACTORS SHALL TAKE ALL
PRECAUTIONS NECESSARY TO PROTECT ADJACENT SPACES, EQUIPMENT, SERVICES, ETC., FROM
DAMAGE DURING THE WORK. COORDINATE DEMOLITION AND CONSTRUCTION WORK TO ALLOW
ADJACENT AREAS TO REMAIN OPERATIONAL AND SECURED. MAKE PROVISIONS TO PREVENT
MIGRATION OF DEMOLITION OR CONSTRUCTION CONTAMINANTS INTO THE OCCUPIED AREAS.
EMERGENCY EXIT PATHS SHALL BE MAINTAINED AT ALL TIMES.
H. PENETRATIONS THROUGH STRUCTURAL MEMBERS, ROOF ASSEMBLY AND FLOOR SLABS, NOT
INDICATED ON THE DRAWINGS, SHALL REQUIRE APPROVAL BY THE ARCHITECT AND OWNER PRIOR
TO PERFORMING THE WORK. SEAL CONDUITS, PIPES, AND SYSTEMS WHICH PENETRATE FIRE-RATED
WALLS AND PARTITIONS WITH CLASSIFIED SYSTEMS BY UNDERWRITERS LABORATORIES, INC.
I. EXACT SIZE AND LOCATIONS OF ALL MECHANICAL AND ELECTRICAL ROOF AND FLOOR OPENINGS
SHOWN ON THE ARCHITECTURAL AND STRUCTURAL PLANS ARE TO BE VERIFIED WITH THE
MECHANICAL AND ELECTRICAL CONTRACTORS PRIOR TO CONSTRUCTION.
J. THE CONTRACTOR SHALL EXAMINE THE SITE AND PORTIONS THEREOF WHICH AFFECT THE WORK
AND SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS. NO ADDITIONAL EXPENSE SHALL BE
ALLOWED WHICH RESULTS FROM THE FAILURE TO PERFORM THIS EXAMINATION.
K. CONTRACTOR SHALL COORDINATE THE SIZE AND LOCATION OF ALL NEW M.E.P. ITEMS OR OPENINGS
WITH THE APPROPRIATE CONTRACTORS.
L. CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH EXISTING M.E.P. ITEMS AND COORDINATE THE
DISCONNECTING, CAPPING, PLUGGING, ETC. WITH BOTH OWNER'S REPRESENTATIVE AND M.E.P.
CONTRACTORS PRIOR TO STARTING DEMOLITION WORK. MAINTAIN CONTINUITY OF ALL SERVICES,
CIRCUITS AND EQUIPMENT NOT SCHEDULED FOR DEMOLITION OR REWORK. MAINTAIN ALL FIRE
PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. PROVIDE TEMPORARY
LIGHTING FIXTURES AS REQUIRED FOR THE SAFETY, SECURITY AND PERFORMANCE OF WORK BY ALL
TRADES.
M. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED, REINSTALLED, OR OTHERWISE
INDICATED TO REMAIN, DEMOLISHED MATERIALS SHALL BECOME CONTRACTOR'S PROPERTY AND
SHALL BE IMMEDIATELY REMOVED FROM THE PROJECT SITE AND PROPERLY DEPOSED OF. STORE
AND/OR DISPOSE OF MATERIAL AS INSTRUCTED BY THE OWNER'S REPRESENTATIVE.
N. ALL MATERIALS, FIXTURES AND EQUIPMENT INDICATED IN THE CONSTRUCTION DOCUMENTS SHALL
BE NEW, AND AS SPECIFIED, UNLESS IDENTIFIED OTHERWISE.
O. NOTIFY THE OWNER PRIOR TO PROCEEDING WITH ANY WORK THAT WOULD BE AFFECTED BY
UTILITIES NOTED TO BE REMOVED.
P. DIMENSIONS INDICATED ON PLANS ARE TO FACE OF PARTITIONS OR COLUMN CENTERLINE UNLESS
NOTED OTHERWISE.
Q. EXISTING COLUMN LINE DIMENSIONS ARE TAKEN FROM THE EXISTING BUILDING PLANS AND SHALL BE
VERIFIED BY THE CONTRACTOR IN THE FIELD.
R. DO NOT SCALE FROM THE DRAWINGS. THE ARCHITECT SHALL BE NOTIFIED OF ANY CONFLICTS IN
DIMENSIONING.
S. DOOR OPENINGS NOT LOCATED BY DIMENSION SHALL BE 4" FROM THE FACE OF FINISHED WALL TO
FACE OF DOOR FRAME JAMB AT HINGE SIDE OR CENTERED BETWEEN PERPENDICULAR PARTITIONS.
T. PLUMBING FIXTURES: SINKS, DRINKING FOUNTAINS, WATER CLOSETS AND URINALS ARE TO BE
CENTERED WITH CABINETS, BETWEEN PARTITIONS AND FRAMED OPENINGS.
U. ALL NEW / EXIST. FINISHED AND PATCHED SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF
IMPERFECTIONS AND IN PROPER CONDITION TO RECEIVE THE SPECIFIED FINISH. PATCHED AREAS
SHALL MATCH THE ADJACENT MATERIALS CONSTRUCTION AND FINISH.
V. NEW CONSTRUCTION ABUTTING EXISTING CONSTRUCTION IN THE SAME PLANE SHALL BE FLUSH
UNLESS NOTED OTHERWISE.
W. PATCH AND REPAIR AREAS WITHIN THE SCOPE OF THE PROJECT AND ADJACENT TO THE PROJECT
LIMITS WHICH HAVE BEEN AFFECTED BY WORK.
X. TAPE AND FILL ALL JOINTS IN GYPSUM WALLBOARD PANELS, READY FOR PAINTING. PAINTING ABOVE
CEILINGS IS NOT REQUIRED.
Y. PROVIDE ALL REQUIRED BLOCKING, FURRING AND BACKING FOR ANY WALL MOUNTED FIXTURES,
SHELVING AND ACCESSORIES AND ALL CASEWORK / MILLWORK.
Z. ALL CASEWORK AND MILLWORK TO BE SCRIBED AND/OR SEALED WHERE MEETS ADJACENT
PARTITION TO MITIGATE IRREGULARITIES IN SURFACE. ALL COUNTER MATERIAL SEAMS TO BE
MINIMIZED TO APPROPRIATE AMOUNT. REFER TO FINISH LEGEND FOR WOODWORK FINISHES.
AA. PROVIDE BACKER ROD AND SEALANT AT ALL DISSIMILAR MATERIALS.
BB. ALL WOOD BLOCKING, NAILERS, GROUNDS, PLYWOOD TO BE NON-COMBUSTIBLE.
CC. PROVIDE WOOD TREATMENT FOR ALL WOOD ITEMS WHICH WILL BE A PERMANENT PART OF THE
BUILDING CONSTRUCTION. TREAT WOOD ITEMS AS APPROPRIATE FOR THE LOCATION AND SEVERITY
OF THE CONDITIONS IN WHICH THEY ARE INSTALLED. PROVIDE TREATMENTS WITH APPROPRIATE
FIRE-RETARDANT AND EXPOSURE CLASSIFICATIONS.
DD. ALL FLOORS ON EITHER SIDE OF DOORWAY OR OPENING SHALL BE LEVEL AND HAVE A MAXIMUM
ELEVATION DIFFERENCE OR THRESHOLD HEIGHT OF 1/2".
EE. ALL EXISTING CONCRETE FLOORS SCHEDULED TO HAVE NEW FLOORING SHALL BE LEVEL TO WITHIN
1/8" OVER 10'-0" AND MEET ALL FLOORING MANUFACTURER'S REQUIREMENTS FOR PATCHING,
LEVELING AND INSTALLATION BEFORE FINISH FLOORING IS APPLIED.
FF. WHERE NEW WALL CONSTRUCTION, WALL REPAIR OR INFILL WORK REQUIRES THE WALL TO BE
REPAINTED, PAINT ENTIRE WALL FROM CORNER TO CORNER.
GG. CONTRACTOR TO REFER TO OTHER DRAWINGS FOR ADDITIONAL GENERAL NOTES FOR OTHER
DISCIPLINES.
2451 BISHOP DRIVE,
SAN RAMON, CALIFORNIA 94583
ARCHITECTS
ELECTRICAL ENGINEERS
CIVIL ENGINEERS
TOYOTA
SF PDC
3470 MNT. DIABLO BLVD.,
SUITE A305 LAFAYETTE, CA 94549
BHDP ARCHITECTURE
CMTA
2100 FRANKLIN STREET,
SUITE 4C, OAKLAND, CA 94612
BKF
ABBREVIATIONS
VICINITY MAP
BUILDING CODE ANALYSIS
SYMBOLS
MATERIAL SYMBOL
This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.Revit Template Version 202112345678910111213141516171819
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R 12345678910111213141516171819
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS -1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE -546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA -3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549100% CONSTRUCTION DOCUMENTAutodesk Docs://TOY0308 SF PDC/TOY0308-R25-B3-ARCH.rvt 9/8/2025 2:15:41 PM
Author
Approver
Checker
2025.05.21
TOY03.08
G000COVER SHEETSF PDC2451 Bishop Drive, San Ramon, CA 94583FT FOOT (FEET)
FP FILLER PANEL
FLR FLOOR
FIXT FIXTURE
FIN FINISH
FEC FINISH EXTINGUISHER CABINET
FE FIRE EXTINGUISHER
FA FIRE ALARM
EXIST EXISTING
EXT EXTERIOR
EX'G EXISTING TO REMAIN
EWC ELECTIRC WATER COOLER
EQUIP EQUIPMENT
EQ EQUAL
EMER EMERGENCY
ELEC ELECTRICAL
EJ EXPANSION JOINT
EDG EXPERIENTIAL GRAPHIC DESIGN
EA EACH
DWG DRAWING
DIM DIMENSION
DIA DIAMETER
CORR CORRIDOR
CONT CONTINUOUS
CONC CONCRETE
COL COUMN
CMU CONCRETE MASONRY UNIT
CM CONSTRUCTION MANAGER
CLG CEILING
CL CENTERLINE
CJ CONTROL JOINT
CFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
CAB CABINET
BLDG BUILDING
AVG AVERAGE
APPROX. APPROXIMATELY
ALT ALTERNATE
AFF ABOVE FINISHED FLOOR
ADJ ADJUSTABLE
AC ACOUSTICAL CEILING TILE
OPP OPPOSITE
OPNG OPENING
OFCI OWNER FURNISHED, CONTRACTO...
OFOI OWNER FURNISHED, OWNER...
OD OUTSIDE DIAMETER
OC ON CENTER
NTS NOT TO SCALE
NOM NOMINAL
MTD MOUNTED
MISC MISCELLANEOUS
MIR MIRROR
MIN MINIMUM
MFR MANUFACTURER
MTL METAL
MECH MECHANICAL
MAX MAXIMUM
MATL MATERIAL
MAS MASONRY
LIN LINEAR
LGMF LIGHT GUAGE METAL FRAME
LB POUND
JT JOINT
JAN JANITOR
INT INTERIOR
INSUL INSULATION
IN INCH
HVAC HEATING/VENTILATION/AIR...
HT HEIGHT
HORIZ HORIZONTAL
HM HOLLOW METAL
HDWR HARDWARE
GYP GYPSUM
GC GENERAL CONTRACTOR
GB GRAB BAR
GA GAUGE
G GLAZING
WT WEIGHT
WD WOOD
VIF VERIFY IN FIELD
VEST VESTIBULE
VERT VERTICAL
VCT VINYL COMPOSITION TILE
UNO UNLESS NOTED OTHERWISE
UL UNDERWRITERS LABORATORIES
TYP TYPICAL
TV TELEVISION
TR TRASH RECEPTACLE
TPD TOILET PAPER DISPENSER
TLT TOILET
TEMP TEMPORARY
TEL TELEPHONE
TB TOWEL BAR
SS STAINLESS STEEL
STO STORAGE
STL STEEL
STD STANDARD
SQYD SQUARE YARD
SF SQUARE FOOT OR SQUARE FEET
SPEC SPECIFICATIONS
SIM SIMILAR
SD SOAP DISPENSER
RO ROUGH OPENING
RM ROOM
RB RUBBER BASE
REV REVISION
REQ'D REQUIRED
REFR REFRIGERATOR
REF REFERENCE
RD ROOF DRAIN (PRIMARY)
R RADIUS
PT PRESSURE TREATED
PLAM PLASTIC LAMINATE
307 W. TREMONT AVE., SUITE 200
CHARLOTTE, NC 28203
SITE AREA
ARCHITECTURAL
SHEET
NUMBER
CURRENT
REVISION
CURRENT
REVISION
DATE
SHEET NAME
CIVIL
G000 COVER SHEET
C1.0 EXISTING CONDITIONS
C2.0 DEMOLITION PLAN
C3.0 SITE PLAN
C4.0 GRADING AND DRAINAGE PLAN
C5.0 UTILITY PLAN
C6.0 STORM WATER MANAGEMENT PLAN
ELECTRICAL
E1.0 PRELIMINARY SITE PLAN
DRAWING INDEX
C7.0 EROSION CONTROL PLAN
C7.1 EROSION CONTROL DETAILS
C8.0 CONSTRUCTION DETAILS
C8.1 CONSTRUCTION DETAILS
E2.0 PHOTOMETRIC STUDY
E3.0 TITLE 24 DOCUMENTS
STRUCTURAL
S1.0 GENERAL NOTES AND STRUCTURAL SPECIAL INSPECTIONS AND DETAILS
PROJECT NAME: TOYOTA SF PDC
PROJECT TYPE: INDUSTIRAL
PROJECT SCOPE DESCRIPTION: PROVIDE UPDATED BUFFER YARD EXPANSION AND SECURITY.
LAYOUT REQUIRED PARKING AND ACCESS PER CURRENT
OPPORATIONS. COORDINATE EXISTING AND NEW
UNDERGROUND CONDUIT LOCATIONS FOR NEW ELECTRICAL
EQUIPMENT. AS WELL AS PROVIDE COORDINATION WITH
EXISTING AND NEW DRAINAGE ALONG UPDATED SITE.
GOVERNING CODE: 2022 CALIFORNIA BUILDING STANDARDS CODE (TITLE 24)
2022 NON-RESIDENTIAL BUILDING ENERGY CODE
2022 CALIFORNIA ELECTRICAL CODE (CEC)
2022 CALIFORNIA MECHANICAL CODE (CMC)
2022 CALIFORNIA PLUMBING CODE (CPC)
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen)
2022 CALIFORNIA FIRE CODE (CFC)
CLASSIFICATION: N/A
ALLOWABLE BUILDING AREA BY CODE: N/A
EXISTING BUILDING SF: N/A
ALLOWABLE HEIGHT BY CODE: N/A
EXISTING BUILDING HEIGHT: N/A
EXISTING BUILDING IS SPRINKLERED: N/A
FIRE RESISTIVE RATING REQUIRED: N/A
STRUCTURAL ENGINEERS
546 EAST MAIN STREET,
SUITE 300, LEXINGTON, KY 40508
BK
VICINITY MAP
SCOPE OF WORK No. Issue/Revision/Submission Date
A100 OVERALL SITE PLAN
GRID NORTH
40 0 40 80 120 Feet
SCALE
STOPSTOPLA
NE
BIKE
BIKE
LANE
LANE
BIKE
STOPKEEPRIGHTGRID NORTH
40 0 40 80 120 Feet
SCALE
STOPSTOPLA
NE
BIKE
BIKE
LANE
LANE
BIKE
STOPKEEPRIGHTEXISTING BUILDING
EXISTING
BUILDING
EXISTING PARCEL LINE
EXISTING FIRE ACCESS LANE
AREA OF SCOPE
EXISTING PARCEL LINE
NORRIS CANYON ROAD
BISHOP DRIVEEXISTING TREES
EXISTING TREES
EXISTING TREES
This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.Revit Template Version 202112345678910111213141516171819
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R 12345678910111213141516171819
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS -1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE -546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA -3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549100% CONSTRUCTION DOCUMENTAutodesk Docs://TOY0308 SF PDC/TOY0308-R25-B3-ARCH.rvt 9/8/2025 2:16:21 PM
N. WILLIAMS
B. SMERCZYNSKI
D. LESSING
2025.05.21
TOY03.08
A100OVERALL SITE PLANSF PDC2451 Bishop Drive, San Ramon, CA 94583No. Issue/Revision/Submission Date
1/64" = 1'-0"A100
A14 OVERALL SITE
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSSYMBOLS & LEGEND
EXISTING
BLOW OFF
VALVE
FIRE HYDRANT
BACKFLOW PREVENTION DEVICE
FIRE DEPARTMENT CONNECTION
POST INDICATOR VALVE
RISER
SIGN
LIGHT POLE
TREE
FENCE
STORM DRAIN
AC ASPHALT CONCRETE
BFP BACKFLOW PREVENTOR
BLDG BUILDING
BLRD BOLLARD
BM BENCHMARK
CB CATCH BASIN
CO CLEAN OUT
CONC CONCRETE
DI DROP INLET
DIA DIAMETER
RD RAINWATER DOWN SPOUT
DWY DRIVEWAY
DYL DOUBLE YELLOW LINE
E ELECTRIC
ELEV ELEVATION
EP EDGE OF PAVEMENT
EX EXISTING
FF FINISHED FLOOR
FL SURFACE FLOWLINE
G GAS
GB GRADE BREAK
GM GAS METER
HDRL HANDRAIL
HT HEIGHT
INV BOTTOM INSIDE OF PIPE
MH MANHOLE
RTWL RETAINING WALL
SD STORM DRAIN
SDCO STORM DRAIN CLEAN OUT
SDMH STORM DRAIN MANHOLE
SL SITELIGHT
SS SANITARY SEWER
SSCO SANITARY SEWER CLEAN OUT
SSMH SANITARY SEWER MANHOLE
TC TOP FACE OF CURB
TEL TELECOMMUNICATION LINE
TF TRANSFORMER
TV TELEVISION
TW TOP OF WALL
TYP TYPICAL
UB UTILITY BOX
UT UNDERGROUND UTILITY LINE
VLT VAULT
W WATER
WL WHITE LINE
WM WATER METER
ABBREVIATIONS
TOPOGRAPHIC NOTES
UNAUTHORIZED CHANGES & USES: THE PROFESSIONAL PREPARING THIS MAP WILL NOT BE
RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THIS MAP.
CHANGES TO THIS MAP MUST BE REQUESTED IN WRITING AND MUST BE APPROVED BY THE
PROFESSIONAL.
THE LOCATIONS OF EXISTING UNDERGROUND FACILITIES SHOWN ON THESE DRAWINGS ARE
APPROXIMATE AND ARE BASED ON OBSERVED TOPOGRAPHIC SURFACE FEATURES AND
AVAILABLE INFORMATION. THE PROFESSIONAL PREPARING THIS MAP ASSUMES NO
RESPONSIBILITY FOR THE ACCURACY OF THESE FACILITIES OR FOR THE INADVERTENT
OMISSION OF RELATED INFORMATION.
TOPOGRAPHIC INFORMATION SHOWN HEREON WAS OBTAINED BY A FIELD SURVEY
CONDUCTED BY BKF ENGINEERS.
BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED UPON THE CALIFORNIA
COORDINATE SYSTEM OF 1983, CCS83, ZONE 3, EPOCH 2017.50, IN ACCORDANCE WITH
CALIFORNIA PUBLIC RESOURCES CODE SECTIONS 8801-8819; SAID COORDINATES ARE BASED
LOCALLY UPON FIELD-OBSERVED TIES RELATIVE TO CALIFORNIA SPATIAL REFERENCE
NETWORK STATION P229. DISTANCES ARE GRID BASED. DIVIDE BY A COMBINED SCALE
FACTOR OF 0.99991240 TO OBTAIN GROUND DISTANCES. VALUES SHOWN BELOW IN THE
TABLE ARE IN ITRF 2014.
THE BEARINGS AND DISTANCES DO NOT REFLECT A FIELD SURVEY AND DO NOT CONSTITUTE
A FORMAL BOUNDARY DETERMINATION.
BENCHMARK: ELEVATIONS ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM OF
1929, DERIVED FROM GPS OBSERVATION AND BASED ON NAD83(2011), EPOCH 2017.50,
ELLIPSOID HEIGHTS AS PUBLISHED BY THE CALIFORNIA SPATIAL REFERENCE CENTER AND THE
NGS GEOID MODEL 18. A TEMPORARY BENCHMARK IS SHOWN HEREON.
LOCAL BENCHMARK: OBSERVED ON THE CONTRA COSTA COUNTY "BM3774" BEING A BRASS
TAG & FASTENER SET ON TOP OF CURB AT THE EASTERLY EDGE OF A DROP INLET AT THE
NORTHWESTERLY CORNER OF THE INTERSECTION OF DEERWOOD PLACE & CROW CANYON
RD.
PUBLISHED ELEVATION = 558.184 FT. (NGVD27)
NAVD88 ELEVATION = 560.875 FT. (NAVD88)
FIELD SURVEY DATE: 12/20/2024
STATION LATITUDE LONGITUDE
P229 37°44'57.967297"-121°58'40.652466"
SIGMA (mm)2.192.04
C1.0 EXISTING CONDITION PLANHEIGHT (m)
289.3241
5.93
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC2.0 DEMOLITION PLAN
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC3.0 SITE PLAN
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC3.1 SITE PLAN
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC4.0 GRADING AND DRAINAGE PLAN
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC5.0 UTILITY PLAN
SWMP Table
AREA Impervious
Area (SF)
Pervious
Area (SF)
Effective
Impervious
Area (SF)
Total Area
(SF)BMP
Treatment Area
Required
(SF)
Treatment Area
Provided
(SF)
Sizing
Method
DMA-1 9,300 5,604 9,860 14,904 Self-Retaining 4650 4,775 2:1
DMA-2
(Treated in lieu)21,617 0 21,617 21,617 NA 0 0 -
DMA-3*
(In-lieu Treatment for
DMA-2)
21,992 1,248 22,117 23,240 Bio-1 885 906 4%
Total 52,909 6,852 -59,761 -5,535 5,681 -
* DMA-3 includes 71 SF replaced imprevious area to be treated by BIO-3 and 21,921 SF in-lieu treatment for DMA-2
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC6.0 STORM WATER MANAGEMENT PLAN
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC7.0 EROSION CONTROL PLAN
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC7.1 EROSION CONTROL DETAILS
VAN
ACCESSIBLE
MINIMUM
FINE $250
MINIMUM
FINE $250
’
’
’
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC8.0 CONSTRUCTION DETAILS
BIORETENTION SECTION (LONGITUDINAL)BIORETENTION DETAIL (TRANSVERSE)
FIRE HYDRANT
GATE VALVE
POST INDICATOR VALVE
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025
SW
IB
IB
2025.04.09
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
100% CONSTRUCTION DOCUMENTSC8.1 CONSTRUCTION DETAILS
SEE ARCH DWGS
FOR ELEVATION
SEE ARCH DWGS
FOR ELEVATION
STRUCTURAL SPECIAL INSPECTIONS CHART
COMPONENT TEST OR SPECIAL INSPECTION
PERIODICINSPECT FORMWORK FOR SHAPE, LOCATION, AND DIMENSIONS OF THE CONCRETE
MEMBER BEING FORMED.
PERIODICVERIFY THE USE OF THE PROPER DESIGN MIX.
PERIODICVERIFY USE OF PROPER GRADE AND ASTM DESIGNATION OF REINFORCING STEEL.
PERIODICPERFORM INSPECTION ON PLACEMENT, SPACING, CLEAR COVER, NUMBER, AND SPLICE LAP
LENGTHS OF REINFORCING STEEL.
CONTINUOUSMONITOR CONCRETE QUALITY BY MEANS OF SITE AND LABORATORY TESTS. THE
INSPECTION AGENCY IS AUTHORIZED TO REJECT PLASTIC CONCRETE NOT CONFORMING TO
SPECIFICATIONS. IMMEDIATELY INFORM THE CONTRACTOR, THE ARCHITECT AND THE
STRUCTURAL ENGINEER OF INADEQUACIES IN CONCRETE QUALITY. SAMPLING AND TESTING
FOR QUALITY CONTROL DURING CONCRETE PLACEMENT SHALL INCLUDE THE FOLLOWING:
1. TESTING OF COMPOSITE SAMPLES OF FRESH CONCRETE OBTAINED ACCORDING
TO ASTM C 172 SHALL BE PERFORMED ACCORDING TO THE FOLLOWING
REQUIREMENTS:
a. TESTING FREQUENCY: OBTAIN ONE COMPOSITE SAMPLE FOR EACH DAY'S
POUR OF EACH CONCRETE MIXTURE EXCEEDING 5 CU. YD., BUT LESS THAN
25 CU. YD., PLUS ONE SET FOR EACH ADDITIONAL 50 CU. YD. OR FRACTION
THEREOF.
b. SLUMP: ASTM C 143; ONE TEST AT POINT OF PLACEMENT FOR EACH
COMPOSITE SAMPLE, BUT NOT LESS THAN ONE TEST FOR EACH DAY'S POUR
OF EACH CONCRETE MIXTURE. PERFORM ADDITIONAL TESTS WHEN
CONCRETE CONSISTENCY APPEARS TO CHANGE.
c. AIR CONTENT: ASTM C 231, PRESSURE METHOD, FOR NORMAL-WEIGHT
CONCRETE; ONE TEST FOR EACH COMPOSITE SAMPLE, BUT NOT LESS THAN
ONE TEST FOR EACH DAY'S POUR OF EACH CONCRETE MIXTURE.
d. CONCRETE TEMPERATURE: ASTM C 1064; ONE TEST HOURLY WHEN AIR
TEMPERATURE IS 40 DEG F AND BELOW OR 80 DEG F AND ABOVE, AND ONE
TEST FOR EACH SET OF COMPOSITE SAMPLE
e. COMPRESSION TEST SPECIMEN: ASTM C 31; ONE SET OF FOUR STANDARD 6”
DIAMETER BY 12”OR FIVE STANDARD 4”DIAMETER BY 8”CYLINDERS FOR
EACH COMPRESSIVE-STRENGTH TEST, UNLESS OTHERWISE DIRECTED.
MOLD AND STORE CYLINDERS FOR LABORATORY-CURED TEST SPECIMENS
EXCEPT WHEN FIELD-CURED TEST SPECIMENS ARE REQUIRED.
f. COMPRESSIVE-STRENGTH TESTS: ASTM C 39; TEST ONE SPECIMEN AT 7
DAYS, TWO 6”x12”OR THREE 4”x8”SPECIMENS TESTED AT 28 DAYS, AND ONE
SPECIMEN RETAINED IN RESERVE FOR LATER TESTING IF REQUIRED.
ADDITIONAL CYLINDER TESTS (SUCH AS AT 14 DAYS) FOR CONTRACTOR
CONVENIENCE AND SCHEDULING SHALL BE PAID FOR BY THE CONTRACTOR.
A COMPRESSIVE-STRENGTH TEST SHALL BE THE AVERAGE COMPRESSIVE
STRENGTH FROM A SET OF SPECIFIED NUMBER SPECIMENS OBTAINED FROM
SAME COMPOSITE SAMPLE AND TESTED AT AGE INDICATED.
g. WHEN FREQUENCY OF TESTING WILL PROVIDE FEWER THAN FIVE STRENGTH
TESTS FOR A GIVEN CLASS OF CONCRETE, CONDUCT TESTING FROM AT
LEAST FIVE RANDOMLY SELECTED BATCHES OR FROM EACH BATCH IF
FEWER THAN FIVE ARE USED.
h. WHEN STRENGTH OF FIELD-CURED CYLINDERS IS LESS THAN 85 PERCENT OF
COMPANION LABORATORY-CURED CYLINDERS, CONTRACTOR SHALL
EVALUATE OPERATIONS AND PROVIDE CORRECTIVE PROCEDURES FOR
PROTECTING AND CURING THE IN-PLACE CONCRETE.
i. STRENGTH OF EACH CONCRETE MIXTURE WILL BE SATISFACTORY IF EVERY
AVERAGE OF ANY THREE CONSECUTIVE COMPRESSIVE-STRENGTH TESTS
EQUALS OR EXCEEDS SPECIFIED COMPRESSIVE STRENGTH AND NO
COMPRESSIVE-STRENGTH TEST VALUE FALLS BELOW SPECIFIED
COMPRESSIVE STRENGTH BY MORE THAN 500 PSI.
2. TEST RESULTS SHALL BE REPORTED IN WRITING TO ARCHITECT, STRUCTURAL
ENGINEER, READY-MIX PRODUCER, AND CONTRACTOR WITHIN 48 HOURS OF
TESTING. REPORTS OF COMPRESSIVE-STRENGTH TESTS SHALL CONTAIN THE
PROJECT IDENTIFICATION NAME AND NUMBER, DATE OF CONCRETE PLACEMENT,
NAME OF CONCRETE TESTING AND INSPECTING AGENCY, CONCRETE TYPE AND
CLASS, LOCATION OF CONCRETE BATCH IN STRUCTURE, DESIGN COMPRESSIVE
STRENGTH AT 28 DAYS, CONCRETE MIXTURE PROPORTIONS AND MATERIALS,
COMPRESSIVE BREAKING STRENGTH, AND TYPE OF BREAK FOR BOTH 7-AND 28-
DAY TESTS.
CONTINUOUSPERFORM INSPECTION OF CONCRETE PLACEMENT TO VERIFY PROPER APPLICATION
TECHNIQUES, INCLUDING BUT NOT LIMITED TO SLABS ON GRADE AND FOOTINGS.
PERIODICPERFORM INSPECTION OF CONCRETE CURING PROCEDURES TO VERIFY MAINTENANCE OF
SPECIFIED CURING TEMPERATURE, PROTECTION, AND TECHNIQUES.
----NONDESTRUCTIVE TESTING: IMPACT HAMMER, SONOSCOPE, OR OTHER NONDESTRUCTIVE
DEVICE MAY BE PERMITTED BUT SHALL NOT BE USED AS THE SOLE BASIS FOR ACCEPTANCE
OR REJECTION.
----ADDITIONAL TESTS: TESTING AND INSPECTING AGENCY SHALL MAKE ADDITIONAL TESTS OF
CONCRETE WHEN TEST RESULTS INDICATE THAT SLUMP, AIR ENTRAINMENT, COMPRESSIVE
STRENGTHS, OR OTHER REQUIREMENTS HAVE NOT BEEN MET, AS DIRECTED BY
ARCHITECT. TESTING AND INSPECTING AGENCY MAY CONDUCT TESTS TO DETERMINE
ADEQUACY OF CONCRETE BY CORED CYLINDERS COMPLYING WITH ASTM C 42 OR BY
OTHER METHODS AS DIRECTED BY ARCHITECT.
1. ADDITIONAL TESTING AND INSPECTING, AT CONTRACTOR'S EXPENSE, WILL BE
PERFORMED TO DETERMINE COMPLIANCE OF REPLACED OR ADDITIONAL WORK
WITH SPECIFIED REQUIREMENTS.
NOTES ON SPECIAL INSPECTIONS CHART:
1. REFER TO 014110 SPECIFICATION FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES.
2. SPECIAL INSPECTIONS AS DEFINED IN SECTIONS 1704 AND 1705 OF THE CALIFORNIA
BUILDING CODE ARE REQUIRED. ALL REFERENCES SHOWN ARE TO THE CBC 2022 / IBC 2021.
3. SPECIAL INSPECTIONS SHALL BE PERFORMED BY A QUALIFIED TESTING AGENCY APPROVED
BY THE ARCHITECT AND THE STRUCTURAL ENGINEER AND PAID FOR BY THE OWNER.
4. THE INSPECTOR SHALL OBSERVE WORK FOR CONFORMANCE WITH THE APPROVED
STRUCTURAL DRAWINGS AND SPECIFICATIONS AND PREPARE INSPECTION REPORTS
STATING THEIR OBSERVATIONS. COPIES OF THE INSPECTION REPORTS SHALL BE
SUBMITTED TO THE CONTRACTOR, THE ARCHITECT AND THE STRUCTURAL ENGINEER.
5. ALL DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND THE WORK BEING
PERFORMED SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR
CORRECTION. IF THE DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF ARCHITECT AND THE STRUCTURAL ENGINEER PRIOR
TO THE COMPLETION OF THAT PHASE OF THE WORK.
6. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT OF INSPECTIONS DOCUMENTING
COMPLETION OF ALL REQUIRED SPECIAL INSPECTIONS AND CORRECTION OF ANY
DISCREPANCIES NOTED IN THE INSPECTIONS.
7. NON-STRUCTURAL SPECIAL INSPECTIONS MAY BE REQUIRED AND ARE SPECIFIED
ELSEWHERE IF APPLICABLE.CONCRETE CONSTRUCTION(IBC 1705.3)PERIODIC OR
CONTINUOUS
ACCEPTABLE
QUALIFICATIONS
DESIGNATION REQUIRED CERTIFICATION
ACI-2 ACI CERTIFIED CONCRETE FIELD TESTING TECHNICIAN LEVEL 2,
PLUS 2-YEARS' RELATED EXPERIENCE
NICET-1 NICET LEVEL 1, MINIMUM 2-YEARS' RELATED EXPERIENCE
NICET-2C CURRENT NICET CONCRETE LEVEL II CERTIFICATION PLUS 4-YEARS'
RELATED EXPERIENCE
RCSI, ACI-2,
NICET-2C
RCSI, ACI-2,
NICET-2C
RCSI, ACI-2,
NICET-2C
RCSI, NICET-2C
RCSI, ACI-2,
NICET-1
RCSI, ACI-2,
NICET-1
RCSI, ACI-2,
NICET-1
RCSI ICC CERTIFIED REINFORCED CONCRETE SPECIAL INSPECTOR
SEE CIVIL/SITE DWGS
FOR GRADING/PAVING
TYPICAL
30"ø CONCRETE FOUNDATION
USE SONOTUBE CONCRETE FORM
AS REQUIRED IN LOOSE SOILS
ANCHOR BOLT BY
CAMERA MANUF
CAMERA POLE ASSEMBLY AND BASE PLATE BY
CAMERA POLE MANUF
NOTE: FINISHED ASSEMBLY HEIGHT SHALL NOT
EXCEED 16 FT ABOVE GROUND SURFACE
6'-0" MIN18" LAP
C POLE, FOUNDATIONL
C POLE, FOUNDATIONL#4 TIES @ 12" O.C.
(9) #6 VERTICAL REINFORCING3" CLR2'-6"
B B
SECTION B-B 3"2"6"NOTES:
1. DO NOT MOUNT POLE FIXTURES UNTIL CONCRETE HAS REACHED 90% OF
DESIGN STRENGTH.
2. ALTERNATE POLE SYSTEMS REQUIRING DEVIATION FROM SPECIFIED DESIGN
CRITERIA, OR REQUIRING ALTERNATE METHOD OF SUPPORT, REQUIRE
FOUNDATION SUPPORT SYSTEM TO BE PROVIDED BY ALTERNATE POLE
SYSTEM VENDOR. SUCH SYSTEM SHALL CONFORM TO THE GOVERNING
BUILDING CODE FOR APPLICABLE WIND & SEISMIC FORCES AND SHALL BE
APPROPRIATE FOR THE SITE'S SPECIFIC GEOTECHNICAL CONDITIONS.
ADDITIONAL GEOTECHNICAL INVESTIGATION REQUIRED FOR SUCH SYSTEM IS
AT THE EXPENSE OF SYSTEM VENDOR. FABRICATION DRAWINGS SHALL BE
SUBMITTED TO ARCHITECT/ENGINEER FOR APPROVAL.
3. SEE MANUFACTURER'S SPECIFICATIONS AND INSTALLATION INSTRUCTIONS
FOR ADDITIONAL REQUIREMENTS.
4. SEE ARCHITECTURAL, SITE, & ELECTRICAL DRAWINGS FOR TYPE, NUMBER,
AND LOCATIONS OF POLES.
5. INCREASE DIAMETER OF FOUNDATION AS REQUIRED TO FIT POLE ANCHOR
BOLTS INSIDE FOUNDATION REINFORCING.
3'-3"3'-3"
6'-6"
M ANU F. DW GSSEE G ATESECTION A-A
A A
FOR ANCHOR LOCATIONS
SEE GATE MANUF DWGS
NOTES:
1. MAT FOOTING SHALL BE SUPPORTED ON UNDISTURBED SOIL AS REQUIRED IN THE GEOTECHNICAL REPORT, FIELD VERIFY.
2. COORDINATE SLAB EXTENTS WITH THE GATE MANUFACTURER.
3. SEE ARCH DRAWINGS FOR PLAN LOCATION OF SLAB.
ALUMINIUM GATE ASSEMBLY
SEE GATE MANUF DWGS
ANCHOR BOLT
BY GATE MANUF
TYPICAL
5" CONCRETE SLAB
W/ #4@8" O.C. EACH WAY
AT MID-DEPTH
CENTERLINE OF GATE ASSEMBLY
SEE GATE MANUF DWGS
PREFABRICATED BASE PLATE
SEE GATE MANUF DWGS
TYPICAL
SEE CIVIL/SITE DWGS
FOR GRADING/PAVING
TYPICAL3'-0"3'-0"6'-0"(2) #4 CONT
ALL 4 SIDES OF SLAB W/
24"x24" CORNER BARS 1'-0"1'-0"1'-0"1'-0"4" OF AGGREGATE BASE
IN ACCORDANCE W/
GEOTECH REPORT
CONCRETE TURNDOWN SLAB
SEE SECTION BELOW
TURNDOWN
TYPICAL 4 SIDES
C 89921GISTEREDPROFESSIONAL
E
NGI
NEERKYLERO
S
H
BERGM A T T H EW
ANROFILACFOETATSICIVILER 3675 Mt. Diablo Blvd., Suite 300 | Lafayette, CA 94549 |925.283.4891 | cmta.comThis document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.Revit Template Version 202112345678910111213141516171819
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R 12345678910111213141516171819
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112(408) 467-9100www.bkf.com100% CONSTRUCTION DOCUMENT4/25/2025
C:\_REVIT_Locals\24325 - Toyota SFPDC Buffer Yard - Struct R25_Alexy..rvt 4/25/2025 10:55:29 AM
TK
MC
KR
2025.04.25
TOY03.08
S100GENERAL NOTES AND STRUCTURAL SPECIALINSPECTIONS AND DETAILSSF PDC2451 Bishop Drive, San Ramon, CA 94583NOT TO SCALES100
B TYPICAL CAMERA POLE FOUNDATION DETAIL
NOT TO SCALES100
A TURNSTILE FOUNDATION PLAN
NOTE:
REFER TO SPECIFICATIONS FOR FOUNDATIONS FOR SITE STRUCTURES NOT
SHOWN, SUCH AS LIGHT POLES, SECURITY ARMS, ACCESS GATES, ETC.No. Issue/Revision/Submission DateNOT FOR
CONSTRUCTI
ON
NOT F
OR
CONSTRU
CTI
ONCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100www.bkf.com3675 Mt. Diablo Blvd., Suite 300 | Lafayette, CA 94549 |925.283.4891 | cmta.comCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112(408) 467-9100www.bkf.comBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100www.bkf.com3675 Mt. Diablo Blvd., Suite 300 | Lafayette, CA 94549 |925.283.4891 | cmta.comCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112(408) 467-9100www.bkf.comBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945493/12/2025
C8.1
4/25/2025 1:40:37 PM
G000
C 89921GISTEREDPROFESSIONAL
E
NGI
NEERKYLERO
S
HBERGM A T T HEW
ANROFILACFOETA
TS ICIVILERNOT FOR
CONSTRUCTI
O
N
NOT FO
R
CONSTRUCTI
ON
100% CONSTRUCTION DOCUMENTCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100www.bkf.comCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100www.bkf.comCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945494/25/2025 1:40:37 PM
G000
4/25/2025 1:40:37 PM
G000
3/12/2025
C8.1
4/25/2025 1:40:37 PM
G000
4PULL BOX DETAIL6125WPERHEAD277V1P4AP4 40K 80CRI T3M DDBXDD-Series Size 1 Area Luminaire P4 Performance Package 4000k CCT80 CRI Type 3 Medium Dark Bronze - FINISH TO MATCH EXISTINGLP-16-FT5-11G-D-TLAPA Industries16 FEET2RISER DIAGRAM(E)PANEL'LPB'(E)20A/3PTO EXISTINGELECTRICALDISTRIBUTIONEJ2EE1(N) POLELIGHTLPB-261LEGENDEXISTING TO REMAINNEW WORK#SHEET NOTES1. PROVIDE 1"C, 2#6 CONDUCTORS, 1#6 GND AND FEED NEW POLE FIXTURES FROM CIRCUIT LPB-26.2. EXISTING IN-GROUND RATED JUNCTION BOX.(N) POLELIGHTLPB-26(N) POLELIGHTLPB-26(N) POLELIGHTLPB-26(N) POLELIGHTLPB-26(N) POLELIGHTLPB-26E,N,11VD2VD1VD3VD4VD6VD52342457211013259750P4AP4BP4B_T1SP4BP4BP4BD2E1 PROVIDE NEW TWO HEAD LED POLE MOUNTED FIXTURE CONNECTED TO EXISTING CIRCUIT. E2 PROVIDE NEW SINGLE HEAD LED POLE MOUNTED FIXTURE. CONNECTED TO EXISTING CIRCUIT.E3 EXISITNG UNDER GROUND FIBER AND ELECTRICAL RACEWAY TO REMAIN.E4 PROVIDE 8"x8"x8" NEMA 4X ENCLOSURE AND (2) 2" CONDUITS ROUTED TO NEW GATE LOCATION.E5 INTERCEPT AND EXTEND EXISTING GATE MOTOR CIRCUIT AND PROVIDE NEW 1" CON AND MAKE CONNECTION TO NEW VMAG GATE LOCATIONS.E6 PROVIDE 1"CON. WITH PULLSTRING FOR CAMERA. E7 PROVIDE 2"CON. AND PULLSTRING FOR DUAL HEIGHT PEDESTALS. FIELD COORDINATE LOCATION.E8 PROVIDE TEMPORARY POLE FOR SALVAGED CAMERA TO BE MOUNTED AND REMAIN IN USE DURING CONSTRUCTION.E9 PROVIDE 1"CON. AND PULLSTRING ACCESS CONTROL.E10 PROVIDE 10"X12" FLUSH MOUNTED PULL BOX. HUBBELL QUAZITE PC SERIES WITH OPEN BOTTOM TEIR 15 COVER OR EQUAL.E11 PRIVDE NEMA 4X ENCLOSURE MOUNTED TO UNITSRUT. FIELD VERIFY LOCATION ON THE SECURE SIDE OF THE FENCE.E12 PROVIDE (4)1"CON. TO LOW VOLTAGE SYSTEMS AND DOOR HARDWARE. FIELD VERIFY LOCATIONS.LPB-26LPB-26LPB-26LPB-26LPB-26LPB-26E1E1E1E1E1PHOTOMETRICSSITE ELECTRICAL PLAND. ANY EXISTING UNDERGROUND UTLITIES AND LOW VOLTAGE SYSTEMS,FiBER AND TELECOM CABLING NOT EXPLICITLY CALLED OUT FOR DEMOLITION ARE TO REMAIN IN PLACE AND IN GOOD WORKING ORDER. COORDINATE ANY DIGGING WITH CIVIL PLANS AND CUSTOMER TO INSURE NO INTERUPTION IS MADE TO EXISTING SYSTEMS.NEW ELECTRICAL SITEFORD2E3XLSL,,STRIP FIXTURECROSS-HATCHING INDICATES LIGHT IS POWERED FROM THE EMERGENCY-CRITICAL BRANCHPARALLEL-HATCHING INDICATES LIGHT IS POWERED FROM THE EMERGENCY-LIFE SAFETY BRANCHSURGICAL/EXAM LIGHTEXIT LIGHT (CEILING, END, WALL MOUNT)LIGHTINGREFER TO LUMINAIRE SCHEDULE FOR EXACT FIXTURE SPECIFICATIONS, MOUNTING HEIGHTS, ETC.,SURFACE OR SUSPENDED CEILING FIXTURE (SLASH INDICATES RECESSED)POLE MOUNTED AREA LIGHT, ,,,EMERGENCY BATTERY WALL-PACKWALL MOUNT FIXTURE,FLOODLIGHTDESCRIPTIONDRAWING SYMBOLMOUNTING HEIGHT (TO CENTER OF BOX)POWER OUTLETSJJUNCTION BOX, CEILING OR WALL,JD3D3D3D3PANEL: LOCATION: INTERIOR WAREHOUSE 480 Y/ 277P:3 W: 4 AIC RATING:AMP: 225 MLO X MCB X SURFACE FLUSHTYPE: X NEW PANELBOARD 100% CKT P CIR P CIR P CKTTYPE KVA BKR # H # BKR KVA TYPE2011 A 21 202013 B 41 202015 C 61 202017 A 81 202019 B 101 2020111 C 121 2020113 A 141 2020115 B 161 2020117 C 181 2020119 A 201 2020121 B 221 2020123 C 241 2020125 A 263 201.37 LTG20127 B 28- -20129 C 30- -20131 A 321 2020133 B 341 2020135 C 361 2020137 A 381 2020139 B 401 2020141 C 421 201.4 KVA 1.7 KVA (125%)0.0 KVA 0.0 KVA (100/35/25%) 1.370.0 KVA 0.0 KVA (100/35/25%) 0.00KVA 0.0 KVA (125%) 0.000.0 KVA 0.0 KVA (100%)0.0 KVA 0.0 KVA (50% > 10KVA)COMPUTER REC 0.0 KVA 0.0 KVA (100%)EQUIP/OTHER 0.0 KVA 0.0 KVA (100%)HEATING 0.0 KVA 0.0 KVA (100%)ELEVATOR 0.0 KVA 0.0KITCHEN EQPT 0.0 KVA 0.0101.3 KVA 101.3102.7 KVA 103.0 KVA123.5 AMP 123.9 AMPTOTALS:OVERALL REDUCTION OF LOAD 0.025 KVA OR 0.03 AMPS @480VELEV KVA (100%) REMOVAL OF 7 EXISTING POLE HEADS @ 0.2KVA = 1.4 KVAEXISTING LOAD KVA (100%)MISCMISCMISCLOAD SUMMARY KITCH KVA (100%) NEW COSTICTION ADDITIONAL 11 POLE HEADS @ 0.125 = 1.375 KVAREMAINING MOTORS MTRGEN PURPOSE REC RECSMALL APPLIANCE RES PHASE B: KVALARGEST MOTOR MTR PHASE C: KVALIGHTING LTG CONNECTED PHASE LOADINGRESIDENT LTG/REC RES PHASE A: KVAESTIMATED MAXIMUM DEMAND (EMD) CALCULATIONSLOAD SUMMARY: LOAD TYPE CONNECTED NEC DEMAND(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) POLE LIGHTS(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (N) POLE LIGHTS(E) LIGHTING (E) POLE LIGHTS(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING LOADCIRCUIT DESCRIPTION(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTINGCIRCUIT DESCRIPTION LOADVOLTAGE: 14 kAPANELBOARD SCHEDULE(E) PANEL LPB(E ) DISTMOUNTING:EXISTING STYLE: NEUTRAL: FED FROM:E4D2E7E8E6E3E3D2E5JE5JJE10JE6JE4E11E12E5POLENEW CONDUIT RUNEXISTING CONDUIT RUNCONDUITEELIGHTING FIXTURE SCHEDULE6125WPERHEADWATTAGE277VVOLTAGE1P4AP4BP4 40K 80CRI T3M DDBXDD-Series Size 1 Area Luminaire P4 Performance Package 4000k CCT80 CRI Type 3 Medium Dark Bronze - FINISH TO MATCH EXISTINGD-Series Size 1 Area Luminaire P4 Performance Package 4000k CCT80 CRI Type 3 Medium Dark Bronze -FINISH TO MATCH EXISTINGLP-16-FT5-11G-D-TLAPA Industries16 FEETLP-30-FT5-11G-D-TLAPA Industries30 FEET4125WPERHEADLP-16-FT5-11G-D-TLAPA Industries16 FEETE2#APPROXIMATELOCATIONEXISTING PANEL 'LPB'SAFED OFF.P4 40K 80CRI T1S DDBXDD-Series Size 1 Area Luminaire P4 Performance Package 4000k CCT80 CRI Type 1 Short Dark Bronze -FINISH TO MATCH EXISTINGP4B_T1S1POLEDSX1_LEDP4_40K_80CRI_T1S.IES2277Vcmta.com PULL RINGSCONDUIT ENTRIES PER CONTRACTORLABEL#4 CRUSHED STONENOTES:A. BOXES TO BE SIZED PER NEC 314.28 BASED UPON FIELD CONFIGURATION OF CONDUIT ENTRIES. PROVIDE EXTENSIONS WHERE REQUIRED.B. BOX AND LID TO BE CONSTRUCTED OF POLYMER CONCRETE. LID TIER RATING PER INSTALLED LOCATION.C. REFER TO SPECIFICATIONS FOR RELATED INFORMATION.GRADECAPTIVE ANCHORSOPENGRADE16' -0"2' -0"5' -0"LIGHT HEAD PER SCHEDULEHAND HOLE3/4" THREADED HUB FOR SECURITY CAMERA 3/4" LFNC. SEE RACEWAY SPECIFICATIONS, (ONE PER CAMERA)WHERE APPLICABLE6" STRAIGHT ROUND STEEL POLE2' -0"HANDHOLE3/8" x 8'-0" COPPER CLAD GROUND ROD WITH CLAMP#4 BARE STRANDED CU TO POLE GROUND LUG1" CHAMFERFULL BASE COVERPOLE GROUND LUGANCHOR BOLTS PER POLE MNFCT1" SPARE CONDUIT, CAP AT BOTH ENDS2' -0" MIN(4) #6 VERTICAL REBAR#3 TIE BARS, 11" SPACING, (2) SPACED 3" AT TOPLINE VOLTAGE CIRCUITSFO CABLINGCURVED LID J-BOX, SEE NOTES FOR SIZESNOTES:A. PROVIDE WEATHERPROOF, NONMETALLIC CURVED LID J-BOX CAST IN POLE BASE. POLES WITHOUT CAMERAS PROVIDE 8" x 8" x 4" (CARLON: E88C24 OR EQUAL). POLES WITH CAMERAS PROVIDE 12" x 12" x 4" BOX WITH LOW VOLTAGE DIVIDER (CARLON: E1212C24 / E1212DIV OR EQUAL) .B. PROVIDE 2 STRAND MM FO CABLE FROM TELECOMM ROOM TO EACH MEDIA CONVERTER AND CAT 6 CABLE IN LFNC FROM J-BOX TO CAMERA HUB (CAMERA BY OTHERS). COIL ADDITIONAL LENGTH OF CABLING IN BOX. CAP IF NOT USED18' -0"MAXIMUM LIGHTING FIXTURE HEIGHT PER CITY REQUIREMENTS3POLE LIGHT DETAILINDICATES RECESSED)POLE MOUNTED AREA LIGHT,,EMERGENCY BATTERY WALL-PACKPOWER OUTLETSPULL BOX
Original Fire Access Plan
SEE PLAN FOR ADJUSTMENTS TO
HYDRANT LOCATION
SEE PLAN FOR ADJUSTMENTS TO
HYDRANT LOCATION
PREVIOUS FIRE ACCESS PATH
NEW FIRE ACCESS PATH
20'-0"R=25'
R=25'
C1.1 EXISTING CONDITION PLANDrawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026
MC
IB
IB
2026.03.13
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
STATION
REMOVE EX. PARKING STRIPINGDrawnProject ManagerCheckedInitial Drawing DateProject NumberCINCINNATI
COLUMBUS
RALEIGH
CHARLOTTE
www.bhdp.com
BHDP ARCHITECTURE
302 WEST THIRD STREET
SUITE 500
CINCINNATI, OHIO 45202
PHONE 513.271.163403/11/2026MCIBIB2026.03.13TOY03.08SF PDC
BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112
BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508
CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549
2451 Bishop Drive, San Ramon, CA 94583
No.Issue/Revision/Submission Date BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112(408) 467-9100www.bkf.comC2.1DEMOLITION PLAN
SD
SDSDSDSDSDSDSD
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026
MC
IB
IB
2026.03.13
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
C3.1 IMPROVEMENT PLAN - SITE PLAN
SD
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026
MC
IB
IB
2026.03.13
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
C3.2 IMPROVEMENT PLAN - GRADING
SD
SDSDSDSDSDSDSWMP Table
AREA Impervious
Area (SF)
Pervious
Area (SF)
Effective
Impervious
Area (SF)
Total
Area (SF)BMP
Treatment Area
Required
(SF)
Treatment Area
Provided
(SF)
Sizing
Method
DMA-1 24,480 4,869 24,967 29,349 BIO-1 979 1,184 4%
DMA-2 9,582 0 9,582 9,582 BIO-2 383 392 4%
Total 34,062 4,869 -38,931 -1,362 1,576 -
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026
MC
IB
IB
2026.03.13
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
C4.1 STORM WATER MANAGEMENT PLAN
SD
SDSDSDSDSDSDDrawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026
MC
IB
IB
2026.03.13
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
C5.1 EROSION CONTROL PLAN
Drawn
Project Manager
Checked
Initial Drawing Date
Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026
MC
IB
IB
2026.03.13
TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS
1730 N. FIRST STREET
SUITE 600
SAN JOSE, CA 95112
(408) 467-9100
www.bkf.com
C5.2 EROSION CONTROL DETAILS