HomeMy WebLinkAboutDPA 2025-0003 2451 Bishop Dr. Toyota PDC Project Phase 1 and 2 v.2025 SF PDC Narrative The Toyota SF PDC project is an existing Toyota facility that Toyota is updating per current business standards. The facility will be upgrading the rear area of the building, focusing on the distribution hub. With this upgrade Toyota will be replacing and installing new access gates, fencing, turnstiles, and other security features to aid in the safety of both the facility and its workers. All proposed work will be exterior and will not affect the existing functions of the building. The proposed work will also not harm, disturb or relocate any tree life on site. All work has been created to not disturb existing trees. The scope of work will not be distrupting existing landscape on site, only hardscape that is existing. The only location that will have new hardscaping will be the ashalt area for the additional fire lane access. Any additional landscape plans can be provided as needed per the MWELO calculations as deemed necessary. Asphalt areas of the distribution hub will be removed and repoured based on revised layout. Revied striping will also be implemented based on safe access through and around the area, all striping to be in accordance with applicable codes.New sidewalks will also be provided to replace demolished existing sidewalks on site. These revised sidewalk locations will create a more secure and safe around the site. The sidewalks will also be bifurcated by a security fence to ensure pedestrians remain separate from the distribution area. Light poles will be distributed as needed by code.Existing sidewalk does not include landscaping, updated design will also not include landsaping. In addition to these safety measures the site will have three separate areas labeled Area A, Area B, and Area C. Area A will serve as the primary entry for all truck traffic to the rear of the site. This area will be outfitted with a security camera, security NEMA enclosure, two permiter security gates with security access sensors. Area B will include secure turnstil entry, ADA access gate with required ADA buttons, security camera and additional security equipment. This are serves as the ADA approach and parking area. Area C will include an 18’ double swing maintance gate. This will be used for large material drop-offs as well as alternate vehicle access as needed. The revised exterior layout will remove 65 parking spaces to facilitate the required area needed for access and egress. With this in mind, attached is a third-party parking study to review existing parking conditions. As well as the updated parking counts upon completion of the work. All facets of site and civil work has also been incorporated into the packet and meets all applicable municipal and IBC codes. v.2025 SF PDC Phase Two Project Narrative: Phase Two of the project focuses on restoring the site’s full parking capacity and ensuring compliance with all applicable site and electrical code requirements. During the initial phase, portions of the existing parking were temporarily removed to accommodate construction activities and site improvements. Although some parking was reinstated in phase one, the total number of spaces did not fully match the original site count. In this current phase, the design reinstates all original parking spaces, returning the site to its full pre-construction capacity. Additionally, Phase Two includes continued coordination with civil and electrical disciplines to ensure all new and existing site elements meet current local and national code requirements. As the project progresses, further refinements will be made to align with regulatory standards and enhance overall site functionality and safety. FACE BRICK MASONRY CONCRETE, CAST STONE NEW WALLS (PLAN VIEW), EXISTING CONSTRUCTION (SECTION VIEW) GYPSUM, GROUT, SAND (SECTION VIEW), NEW CONCRETE SLAB (PLAN VIEW) RIGID INSULATION PERIMETER INSULATION CUT STEEL FINISH WOOD WOOD BLOCKING (NOM.) PLYWOOD WOOD BLOCKING (NOT NOM.) METAL DECK BATT INSULATION EARTH GRAVEL, DRAINAGE FILL 0.00' NEW COLUMN REFERENCE INTERIOR PARTITION TYPE EXISTING COLUMN REFERENCE SECTION REFERENCE ELEVATION REFERENCE ROOM TAG REFERENCE KEYNOTE FURNITURE TAG DOOR & DOOR NUMBER ROOF TAG EXISTING CONSTRUCTION TO BE REMOVED NEW CONSTRUCTION EXISTING CONSTRUCTION TO REMAIN ROOM FINISH TAG GLAZING TAG SHEET NOTE SPOT ELEVATION REVISION AND NUMBER PLAN VIEW: NEW / EXISTING WINDOW TO REMAIN 1 M999 SIM DETAIL REFERENCE CEILING HEIGHT TAG A.F.F. TOILET ROOM ACCESSORY TAG FLOOR ELEVATION SYSTEM FURNITURE TAG 1 M999 SIM INDICATES DRAWING SHEET ON WHICH ELEVATION IS SHOWN EXTERIOR ELEVATION REFERENCE ELEVATION REFERENCE INDICATES DRAWING SHEET ON WHICH ELEVATION IS SHOWN ELEVATION REFERENCE INDICATES DRAWING SHEET ON WHICH ELEVATION IS SHOWN 00 0000 0 0.00' 0 ROOF LEVEL ROOF TYPE 0 0 WALLS IN PLAN VIEW 1 A101 NORTH ARROW ROOM NAME 101 RT: RL: 1 1i:... G1 WALL FLOOR BASE 101 A101A1'-0" 1i WS* 1i GENERAL PROJECT NOTES A. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES AND ORDINANCES. B. TESTING AND INSPECTION SERVICES FOR THE PROJECT SHALL BE PERFORMED BY AN APPROVED TESTING AND INSPECTION AGENCY AS ACCEPTABLE TO THE AUTHORITIES HAVING JURISDICTION. C. INTERIOR WALL AND CEILING FINISHES SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM E84. FINISHES SHALL BE CLASS B (FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450), FINISHES OTHER THAN TEXTILES SHALL BE TESTED IN ACCORDANCE WITH NFPA 286. THESE REQUIREMENTS MEET OR EXCEED THOSE LISTED IN THE BUILDING CODE REFERENCED ABOVE. D. CONTRACTOR SHALL SCHEDULE AND ARRANGE FOR ALL REQUIRED LEGAL INSPECTIONS. E. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE POSSIBILITY OF ASBESTOS CONTAINING MATERIALS IN THE PROJECT AREA. IN ADDITION, THE CONTRACTOR SHALL CHECK FOR THE PRESENCE OF LEAD ON PAINTED SURFACES WHENEVER WORK IS DONE WHICH COULD CREATE A POSSIBLE SOURCE OF LEAD EXPOSURE. IF ANY SUCH MATERIALS ARE ENCOUNTERED, THE OWNER SHALL BE NOTIFIED AND THE WORK SHALL CEASE UNTIL SUCH TIME THAT THE OWNER HAS REMOVED THE ASBESTOS OR HAS IMPLEMENTED APPROPRIATE LEAD- RELATED MEASURES. FURTHERMORE, THE CONTRACTOR SHALL NOT INTRODUCE ANYTHING CONTAINING ASBESTOS OR LEAD TO THE SITE. CONTRACTOR SHALL NOT USE ANY ASBESTOS OR LEAD CONTAINING PRODUCTS. F. CONTRACTOR SHALL COMPLY WITH ALL CURRENT "HAZARDOUS MATERIALS COMMUNICATIONS" (HAZCOM) REQUIREMENTS. THE CONTRACTOR SHALL OBTAIN "MATERIAL SAFETY DATA SHEETS" (MSDS) FOR ALL HAZARDOUS MATERIALS TO BE USED ON THE PROJECT. OBTAIN DATA SHEETS FROM THE MANUFACTURERS AND DELIVER TO THE OWNER'S REPRESENTATIVE PRIOR TO USING SUCH SUBSTANCES ON SITE. THE CONTRACTOR SHALL ALSO COMPLY WITH LAWS, ORDINANCES, RULES, AND REGULATIONS OF FEDERAL, STATE, REGIONAL, AND LOCAL AUTHORITIES REGARDING HANDLING, STORING, TRANSPORTING, AND DISPOSING OF HAZARDOUS MATERIALS. PRIOR TO TRANSPORTING ANY HAZARDOUS WASTES, THE APPROPRIATE SITE ENVIRONMENTAL LEADER MUST BE CONTACTED. G. CONTRACTOR SHALL NOTE THAT THE OWNER WILL OCCUPY ADJACENT AREAS FOR PERFORMANCE OF NORMAL BUSINESS ACTIVITIES DURINGCONSTRUCTION. CONTRACTORS SHALL TAKE ALL PRECAUTIONS NECESSARY TO PROTECT ADJACENT SPACES, EQUIPMENT, SERVICES, ETC., FROM DAMAGE DURING THE WORK. COORDINATE DEMOLITION AND CONSTRUCTION WORK TO ALLOW ADJACENT AREAS TO REMAIN OPERATIONAL AND SECURED. MAKE PROVISIONS TO PREVENT MIGRATION OF DEMOLITION OR CONSTRUCTION CONTAMINANTS INTO THE OCCUPIED AREAS. EMERGENCY EXIT PATHS SHALL BE MAINTAINED AT ALL TIMES. H. PENETRATIONS THROUGH STRUCTURAL MEMBERS, ROOF ASSEMBLY AND FLOOR SLABS, NOT INDICATED ON THE DRAWINGS, SHALL REQUIRE APPROVAL BY THE ARCHITECT AND OWNER PRIOR TO PERFORMING THE WORK. SEAL CONDUITS, PIPES, AND SYSTEMS WHICH PENETRATE FIRE-RATED WALLS AND PARTITIONS WITH CLASSIFIED SYSTEMS BY UNDERWRITERS LABORATORIES, INC. I. EXACT SIZE AND LOCATIONS OF ALL MECHANICAL AND ELECTRICAL ROOF AND FLOOR OPENINGS SHOWN ON THE ARCHITECTURAL AND STRUCTURAL PLANS ARE TO BE VERIFIED WITH THE MECHANICAL AND ELECTRICAL CONTRACTORS PRIOR TO CONSTRUCTION. J. THE CONTRACTOR SHALL EXAMINE THE SITE AND PORTIONS THEREOF WHICH AFFECT THE WORK AND SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS. NO ADDITIONAL EXPENSE SHALL BE ALLOWED WHICH RESULTS FROM THE FAILURE TO PERFORM THIS EXAMINATION. K. CONTRACTOR SHALL COORDINATE THE SIZE AND LOCATION OF ALL NEW M.E.P. ITEMS OR OPENINGS WITH THE APPROPRIATE CONTRACTORS. L. CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH EXISTING M.E.P. ITEMS AND COORDINATE THE DISCONNECTING, CAPPING, PLUGGING, ETC. WITH BOTH OWNER'S REPRESENTATIVE AND M.E.P. CONTRACTORS PRIOR TO STARTING DEMOLITION WORK. MAINTAIN CONTINUITY OF ALL SERVICES, CIRCUITS AND EQUIPMENT NOT SCHEDULED FOR DEMOLITION OR REWORK. MAINTAIN ALL FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. PROVIDE TEMPORARY LIGHTING FIXTURES AS REQUIRED FOR THE SAFETY, SECURITY AND PERFORMANCE OF WORK BY ALL TRADES. M. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED, REINSTALLED, OR OTHERWISE INDICATED TO REMAIN, DEMOLISHED MATERIALS SHALL BECOME CONTRACTOR'S PROPERTY AND SHALL BE IMMEDIATELY REMOVED FROM THE PROJECT SITE AND PROPERLY DEPOSED OF. STORE AND/OR DISPOSE OF MATERIAL AS INSTRUCTED BY THE OWNER'S REPRESENTATIVE. N. ALL MATERIALS, FIXTURES AND EQUIPMENT INDICATED IN THE CONSTRUCTION DOCUMENTS SHALL BE NEW, AND AS SPECIFIED, UNLESS IDENTIFIED OTHERWISE. O. NOTIFY THE OWNER PRIOR TO PROCEEDING WITH ANY WORK THAT WOULD BE AFFECTED BY UTILITIES NOTED TO BE REMOVED. P. DIMENSIONS INDICATED ON PLANS ARE TO FACE OF PARTITIONS OR COLUMN CENTERLINE UNLESS NOTED OTHERWISE. Q. EXISTING COLUMN LINE DIMENSIONS ARE TAKEN FROM THE EXISTING BUILDING PLANS AND SHALL BE VERIFIED BY THE CONTRACTOR IN THE FIELD. R. DO NOT SCALE FROM THE DRAWINGS. THE ARCHITECT SHALL BE NOTIFIED OF ANY CONFLICTS IN DIMENSIONING. S. DOOR OPENINGS NOT LOCATED BY DIMENSION SHALL BE 4" FROM THE FACE OF FINISHED WALL TO FACE OF DOOR FRAME JAMB AT HINGE SIDE OR CENTERED BETWEEN PERPENDICULAR PARTITIONS. T. PLUMBING FIXTURES: SINKS, DRINKING FOUNTAINS, WATER CLOSETS AND URINALS ARE TO BE CENTERED WITH CABINETS, BETWEEN PARTITIONS AND FRAMED OPENINGS. U. ALL NEW / EXIST. FINISHED AND PATCHED SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF IMPERFECTIONS AND IN PROPER CONDITION TO RECEIVE THE SPECIFIED FINISH. PATCHED AREAS SHALL MATCH THE ADJACENT MATERIALS CONSTRUCTION AND FINISH. V. NEW CONSTRUCTION ABUTTING EXISTING CONSTRUCTION IN THE SAME PLANE SHALL BE FLUSH UNLESS NOTED OTHERWISE. W. PATCH AND REPAIR AREAS WITHIN THE SCOPE OF THE PROJECT AND ADJACENT TO THE PROJECT LIMITS WHICH HAVE BEEN AFFECTED BY WORK. X. TAPE AND FILL ALL JOINTS IN GYPSUM WALLBOARD PANELS, READY FOR PAINTING. PAINTING ABOVE CEILINGS IS NOT REQUIRED. Y. PROVIDE ALL REQUIRED BLOCKING, FURRING AND BACKING FOR ANY WALL MOUNTED FIXTURES, SHELVING AND ACCESSORIES AND ALL CASEWORK / MILLWORK. Z. ALL CASEWORK AND MILLWORK TO BE SCRIBED AND/OR SEALED WHERE MEETS ADJACENT PARTITION TO MITIGATE IRREGULARITIES IN SURFACE. ALL COUNTER MATERIAL SEAMS TO BE MINIMIZED TO APPROPRIATE AMOUNT. REFER TO FINISH LEGEND FOR WOODWORK FINISHES. AA. PROVIDE BACKER ROD AND SEALANT AT ALL DISSIMILAR MATERIALS. BB. ALL WOOD BLOCKING, NAILERS, GROUNDS, PLYWOOD TO BE NON-COMBUSTIBLE. CC. PROVIDE WOOD TREATMENT FOR ALL WOOD ITEMS WHICH WILL BE A PERMANENT PART OF THE BUILDING CONSTRUCTION. TREAT WOOD ITEMS AS APPROPRIATE FOR THE LOCATION AND SEVERITY OF THE CONDITIONS IN WHICH THEY ARE INSTALLED. PROVIDE TREATMENTS WITH APPROPRIATE FIRE-RETARDANT AND EXPOSURE CLASSIFICATIONS. DD. ALL FLOORS ON EITHER SIDE OF DOORWAY OR OPENING SHALL BE LEVEL AND HAVE A MAXIMUM ELEVATION DIFFERENCE OR THRESHOLD HEIGHT OF 1/2". EE. ALL EXISTING CONCRETE FLOORS SCHEDULED TO HAVE NEW FLOORING SHALL BE LEVEL TO WITHIN 1/8" OVER 10'-0" AND MEET ALL FLOORING MANUFACTURER'S REQUIREMENTS FOR PATCHING, LEVELING AND INSTALLATION BEFORE FINISH FLOORING IS APPLIED. FF. WHERE NEW WALL CONSTRUCTION, WALL REPAIR OR INFILL WORK REQUIRES THE WALL TO BE REPAINTED, PAINT ENTIRE WALL FROM CORNER TO CORNER. GG. CONTRACTOR TO REFER TO OTHER DRAWINGS FOR ADDITIONAL GENERAL NOTES FOR OTHER DISCIPLINES. 2451 BISHOP DRIVE, SAN RAMON, CALIFORNIA 94583 ARCHITECTS ELECTRICAL ENGINEERS CIVIL ENGINEERS TOYOTA SF PDC 3470 MNT. DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549 BHDP ARCHITECTURE CMTA 2100 FRANKLIN STREET, SUITE 4C, OAKLAND, CA 94612 BKF ABBREVIATIONS VICINITY MAP BUILDING CODE ANALYSIS SYMBOLS MATERIAL SYMBOL This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.Revit Template Version 202112345678910111213141516171819 A B C D E F G H J K L M N P Q R 12345678910111213141516171819 A B C D E F G H J K L M N P Q R Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS -1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE -546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA -3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549100% CONSTRUCTION DOCUMENTAutodesk Docs://TOY0308 SF PDC/TOY0308-R25-B3-ARCH.rvt 9/8/2025 2:15:41 PM Author Approver Checker 2025.05.21 TOY03.08 G000COVER SHEETSF PDC2451 Bishop Drive, San Ramon, CA 94583FT FOOT (FEET) FP FILLER PANEL FLR FLOOR FIXT FIXTURE FIN FINISH FEC FINISH EXTINGUISHER CABINET FE FIRE EXTINGUISHER FA FIRE ALARM EXIST EXISTING EXT EXTERIOR EX'G EXISTING TO REMAIN EWC ELECTIRC WATER COOLER EQUIP EQUIPMENT EQ EQUAL EMER EMERGENCY ELEC ELECTRICAL EJ EXPANSION JOINT EDG EXPERIENTIAL GRAPHIC DESIGN EA EACH DWG DRAWING DIM DIMENSION DIA DIAMETER CORR CORRIDOR CONT CONTINUOUS CONC CONCRETE COL COUMN CMU CONCRETE MASONRY UNIT CM CONSTRUCTION MANAGER CLG CEILING CL CENTERLINE CJ CONTROL JOINT CFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED CAB CABINET BLDG BUILDING AVG AVERAGE APPROX. APPROXIMATELY ALT ALTERNATE AFF ABOVE FINISHED FLOOR ADJ ADJUSTABLE AC ACOUSTICAL CEILING TILE OPP OPPOSITE OPNG OPENING OFCI OWNER FURNISHED, CONTRACTO... OFOI OWNER FURNISHED, OWNER... OD OUTSIDE DIAMETER OC ON CENTER NTS NOT TO SCALE NOM NOMINAL MTD MOUNTED MISC MISCELLANEOUS MIR MIRROR MIN MINIMUM MFR MANUFACTURER MTL METAL MECH MECHANICAL MAX MAXIMUM MATL MATERIAL MAS MASONRY LIN LINEAR LGMF LIGHT GUAGE METAL FRAME LB POUND JT JOINT JAN JANITOR INT INTERIOR INSUL INSULATION IN INCH HVAC HEATING/VENTILATION/AIR... HT HEIGHT HORIZ HORIZONTAL HM HOLLOW METAL HDWR HARDWARE GYP GYPSUM GC GENERAL CONTRACTOR GB GRAB BAR GA GAUGE G GLAZING WT WEIGHT WD WOOD VIF VERIFY IN FIELD VEST VESTIBULE VERT VERTICAL VCT VINYL COMPOSITION TILE UNO UNLESS NOTED OTHERWISE UL UNDERWRITERS LABORATORIES TYP TYPICAL TV TELEVISION TR TRASH RECEPTACLE TPD TOILET PAPER DISPENSER TLT TOILET TEMP TEMPORARY TEL TELEPHONE TB TOWEL BAR SS STAINLESS STEEL STO STORAGE STL STEEL STD STANDARD SQYD SQUARE YARD SF SQUARE FOOT OR SQUARE FEET SPEC SPECIFICATIONS SIM SIMILAR SD SOAP DISPENSER RO ROUGH OPENING RM ROOM RB RUBBER BASE REV REVISION REQ'D REQUIRED REFR REFRIGERATOR REF REFERENCE RD ROOF DRAIN (PRIMARY) R RADIUS PT PRESSURE TREATED PLAM PLASTIC LAMINATE 307 W. TREMONT AVE., SUITE 200 CHARLOTTE, NC 28203 SITE AREA ARCHITECTURAL SHEET NUMBER CURRENT REVISION CURRENT REVISION DATE SHEET NAME CIVIL G000 COVER SHEET C1.0 EXISTING CONDITIONS C2.0 DEMOLITION PLAN C3.0 SITE PLAN C4.0 GRADING AND DRAINAGE PLAN C5.0 UTILITY PLAN C6.0 STORM WATER MANAGEMENT PLAN ELECTRICAL E1.0 PRELIMINARY SITE PLAN DRAWING INDEX C7.0 EROSION CONTROL PLAN C7.1 EROSION CONTROL DETAILS C8.0 CONSTRUCTION DETAILS C8.1 CONSTRUCTION DETAILS E2.0 PHOTOMETRIC STUDY E3.0 TITLE 24 DOCUMENTS STRUCTURAL S1.0 GENERAL NOTES AND STRUCTURAL SPECIAL INSPECTIONS AND DETAILS PROJECT NAME: TOYOTA SF PDC PROJECT TYPE: INDUSTIRAL PROJECT SCOPE DESCRIPTION: PROVIDE UPDATED BUFFER YARD EXPANSION AND SECURITY. LAYOUT REQUIRED PARKING AND ACCESS PER CURRENT OPPORATIONS. COORDINATE EXISTING AND NEW UNDERGROUND CONDUIT LOCATIONS FOR NEW ELECTRICAL EQUIPMENT. AS WELL AS PROVIDE COORDINATION WITH EXISTING AND NEW DRAINAGE ALONG UPDATED SITE. GOVERNING CODE: 2022 CALIFORNIA BUILDING STANDARDS CODE (TITLE 24) 2022 NON-RESIDENTIAL BUILDING ENERGY CODE 2022 CALIFORNIA ELECTRICAL CODE (CEC) 2022 CALIFORNIA MECHANICAL CODE (CMC) 2022 CALIFORNIA PLUMBING CODE (CPC) 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen) 2022 CALIFORNIA FIRE CODE (CFC) CLASSIFICATION: N/A ALLOWABLE BUILDING AREA BY CODE: N/A EXISTING BUILDING SF: N/A ALLOWABLE HEIGHT BY CODE: N/A EXISTING BUILDING HEIGHT: N/A EXISTING BUILDING IS SPRINKLERED: N/A FIRE RESISTIVE RATING REQUIRED: N/A STRUCTURAL ENGINEERS 546 EAST MAIN STREET, SUITE 300, LEXINGTON, KY 40508 BK VICINITY MAP SCOPE OF WORK No. Issue/Revision/Submission Date A100 OVERALL SITE PLAN GRID NORTH 40 0 40 80 120 Feet SCALE STOPSTOPLA NE BIKE BIKE LANE LANE BIKE STOPKEEPRIGHTGRID NORTH 40 0 40 80 120 Feet SCALE STOPSTOPLA NE BIKE BIKE LANE LANE BIKE STOPKEEPRIGHTEXISTING BUILDING EXISTING BUILDING EXISTING PARCEL LINE EXISTING FIRE ACCESS LANE AREA OF SCOPE EXISTING PARCEL LINE NORRIS CANYON ROAD BISHOP DRIVEEXISTING TREES EXISTING TREES EXISTING TREES This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.Revit Template Version 202112345678910111213141516171819 A B C D E F G H J K L M N P Q R 12345678910111213141516171819 A B C D E F G H J K L M N P Q R Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS -1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE -546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA -3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549100% CONSTRUCTION DOCUMENTAutodesk Docs://TOY0308 SF PDC/TOY0308-R25-B3-ARCH.rvt 9/8/2025 2:16:21 PM N. WILLIAMS B. SMERCZYNSKI D. LESSING 2025.05.21 TOY03.08 A100OVERALL SITE PLANSF PDC2451 Bishop Drive, San Ramon, CA 94583No. Issue/Revision/Submission Date 1/64" = 1'-0"A100 A14 OVERALL SITE Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSSYMBOLS & LEGEND EXISTING BLOW OFF VALVE FIRE HYDRANT BACKFLOW PREVENTION DEVICE FIRE DEPARTMENT CONNECTION POST INDICATOR VALVE RISER SIGN LIGHT POLE TREE FENCE STORM DRAIN AC ASPHALT CONCRETE BFP BACKFLOW PREVENTOR BLDG BUILDING BLRD BOLLARD BM BENCHMARK CB CATCH BASIN CO CLEAN OUT CONC CONCRETE DI DROP INLET DIA DIAMETER RD RAINWATER DOWN SPOUT DWY DRIVEWAY DYL DOUBLE YELLOW LINE E ELECTRIC ELEV ELEVATION EP EDGE OF PAVEMENT EX EXISTING FF FINISHED FLOOR FL SURFACE FLOWLINE G GAS GB GRADE BREAK GM GAS METER HDRL HANDRAIL HT HEIGHT INV BOTTOM INSIDE OF PIPE MH MANHOLE RTWL RETAINING WALL SD STORM DRAIN SDCO STORM DRAIN CLEAN OUT SDMH STORM DRAIN MANHOLE SL SITELIGHT SS SANITARY SEWER SSCO SANITARY SEWER CLEAN OUT SSMH SANITARY SEWER MANHOLE TC TOP FACE OF CURB TEL TELECOMMUNICATION LINE TF TRANSFORMER TV TELEVISION TW TOP OF WALL TYP TYPICAL UB UTILITY BOX UT UNDERGROUND UTILITY LINE VLT VAULT W WATER WL WHITE LINE WM WATER METER ABBREVIATIONS TOPOGRAPHIC NOTES UNAUTHORIZED CHANGES & USES: THE PROFESSIONAL PREPARING THIS MAP WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THIS MAP. CHANGES TO THIS MAP MUST BE REQUESTED IN WRITING AND MUST BE APPROVED BY THE PROFESSIONAL. THE LOCATIONS OF EXISTING UNDERGROUND FACILITIES SHOWN ON THESE DRAWINGS ARE APPROXIMATE AND ARE BASED ON OBSERVED TOPOGRAPHIC SURFACE FEATURES AND AVAILABLE INFORMATION. THE PROFESSIONAL PREPARING THIS MAP ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THESE FACILITIES OR FOR THE INADVERTENT OMISSION OF RELATED INFORMATION. TOPOGRAPHIC INFORMATION SHOWN HEREON WAS OBTAINED BY A FIELD SURVEY CONDUCTED BY BKF ENGINEERS. BASIS OF BEARINGS: THE BEARINGS SHOWN HEREON ARE BASED UPON THE CALIFORNIA COORDINATE SYSTEM OF 1983, CCS83, ZONE 3, EPOCH 2017.50, IN ACCORDANCE WITH CALIFORNIA PUBLIC RESOURCES CODE SECTIONS 8801-8819; SAID COORDINATES ARE BASED LOCALLY UPON FIELD-OBSERVED TIES RELATIVE TO CALIFORNIA SPATIAL REFERENCE NETWORK STATION P229. DISTANCES ARE GRID BASED. DIVIDE BY A COMBINED SCALE FACTOR OF 0.99991240 TO OBTAIN GROUND DISTANCES. VALUES SHOWN BELOW IN THE TABLE ARE IN ITRF 2014. THE BEARINGS AND DISTANCES DO NOT REFLECT A FIELD SURVEY AND DO NOT CONSTITUTE A FORMAL BOUNDARY DETERMINATION. BENCHMARK: ELEVATIONS ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM OF 1929, DERIVED FROM GPS OBSERVATION AND BASED ON NAD83(2011), EPOCH 2017.50, ELLIPSOID HEIGHTS AS PUBLISHED BY THE CALIFORNIA SPATIAL REFERENCE CENTER AND THE NGS GEOID MODEL 18. A TEMPORARY BENCHMARK IS SHOWN HEREON. LOCAL BENCHMARK: OBSERVED ON THE CONTRA COSTA COUNTY "BM3774" BEING A BRASS TAG & FASTENER SET ON TOP OF CURB AT THE EASTERLY EDGE OF A DROP INLET AT THE NORTHWESTERLY CORNER OF THE INTERSECTION OF DEERWOOD PLACE & CROW CANYON RD. PUBLISHED ELEVATION = 558.184 FT. (NGVD27) NAVD88 ELEVATION = 560.875 FT. (NAVD88) FIELD SURVEY DATE: 12/20/2024 STATION LATITUDE LONGITUDE P229 37°44'57.967297"-121°58'40.652466" SIGMA (mm)2.192.04 C1.0 EXISTING CONDITION PLANHEIGHT (m) 289.3241 5.93 Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC2.0 DEMOLITION PLAN Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC3.0 SITE PLAN Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC3.1 SITE PLAN Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC4.0 GRADING AND DRAINAGE PLAN Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC5.0 UTILITY PLAN SWMP Table AREA Impervious Area (SF) Pervious Area (SF) Effective Impervious Area (SF) Total Area (SF)BMP Treatment Area Required (SF) Treatment Area Provided (SF) Sizing Method DMA-1 9,300 5,604 9,860 14,904 Self-Retaining 4650 4,775 2:1 DMA-2 (Treated in lieu)21,617 0 21,617 21,617 NA 0 0 - DMA-3* (In-lieu Treatment for DMA-2) 21,992 1,248 22,117 23,240 Bio-1 885 906 4% Total 52,909 6,852 -59,761 -5,535 5,681 - * DMA-3 includes 71 SF replaced imprevious area to be treated by BIO-3 and 21,921 SF in-lieu treatment for DMA-2 Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC6.0 STORM WATER MANAGEMENT PLAN Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC7.0 EROSION CONTROL PLAN Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC7.1 EROSION CONTROL DETAILS VAN ACCESSIBLE MINIMUM FINE $250 MINIMUM FINE $250 ’ ’ ’ Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC8.0 CONSTRUCTION DETAILS BIORETENTION SECTION (LONGITUDINAL)BIORETENTION DETAIL (TRANSVERSE) FIRE HYDRANT GATE VALVE POST INDICATOR VALVE Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163408/28/2025 SW IB IB 2025.04.09 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com 100% CONSTRUCTION DOCUMENTSC8.1 CONSTRUCTION DETAILS SEE ARCH DWGS FOR ELEVATION SEE ARCH DWGS FOR ELEVATION STRUCTURAL SPECIAL INSPECTIONS CHART COMPONENT TEST OR SPECIAL INSPECTION PERIODICINSPECT FORMWORK FOR SHAPE, LOCATION, AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED. PERIODICVERIFY THE USE OF THE PROPER DESIGN MIX. PERIODICVERIFY USE OF PROPER GRADE AND ASTM DESIGNATION OF REINFORCING STEEL. PERIODICPERFORM INSPECTION ON PLACEMENT, SPACING, CLEAR COVER, NUMBER, AND SPLICE LAP LENGTHS OF REINFORCING STEEL. CONTINUOUSMONITOR CONCRETE QUALITY BY MEANS OF SITE AND LABORATORY TESTS. THE INSPECTION AGENCY IS AUTHORIZED TO REJECT PLASTIC CONCRETE NOT CONFORMING TO SPECIFICATIONS. IMMEDIATELY INFORM THE CONTRACTOR, THE ARCHITECT AND THE STRUCTURAL ENGINEER OF INADEQUACIES IN CONCRETE QUALITY. SAMPLING AND TESTING FOR QUALITY CONTROL DURING CONCRETE PLACEMENT SHALL INCLUDE THE FOLLOWING: 1. TESTING OF COMPOSITE SAMPLES OF FRESH CONCRETE OBTAINED ACCORDING TO ASTM C 172 SHALL BE PERFORMED ACCORDING TO THE FOLLOWING REQUIREMENTS: a. TESTING FREQUENCY: OBTAIN ONE COMPOSITE SAMPLE FOR EACH DAY'S POUR OF EACH CONCRETE MIXTURE EXCEEDING 5 CU. YD., BUT LESS THAN 25 CU. YD., PLUS ONE SET FOR EACH ADDITIONAL 50 CU. YD. OR FRACTION THEREOF. b. SLUMP: ASTM C 143; ONE TEST AT POINT OF PLACEMENT FOR EACH COMPOSITE SAMPLE, BUT NOT LESS THAN ONE TEST FOR EACH DAY'S POUR OF EACH CONCRETE MIXTURE. PERFORM ADDITIONAL TESTS WHEN CONCRETE CONSISTENCY APPEARS TO CHANGE. c. AIR CONTENT: ASTM C 231, PRESSURE METHOD, FOR NORMAL-WEIGHT CONCRETE; ONE TEST FOR EACH COMPOSITE SAMPLE, BUT NOT LESS THAN ONE TEST FOR EACH DAY'S POUR OF EACH CONCRETE MIXTURE. d. CONCRETE TEMPERATURE: ASTM C 1064; ONE TEST HOURLY WHEN AIR TEMPERATURE IS 40 DEG F AND BELOW OR 80 DEG F AND ABOVE, AND ONE TEST FOR EACH SET OF COMPOSITE SAMPLE e. COMPRESSION TEST SPECIMEN: ASTM C 31; ONE SET OF FOUR STANDARD 6” DIAMETER BY 12”OR FIVE STANDARD 4”DIAMETER BY 8”CYLINDERS FOR EACH COMPRESSIVE-STRENGTH TEST, UNLESS OTHERWISE DIRECTED. MOLD AND STORE CYLINDERS FOR LABORATORY-CURED TEST SPECIMENS EXCEPT WHEN FIELD-CURED TEST SPECIMENS ARE REQUIRED. f. COMPRESSIVE-STRENGTH TESTS: ASTM C 39; TEST ONE SPECIMEN AT 7 DAYS, TWO 6”x12”OR THREE 4”x8”SPECIMENS TESTED AT 28 DAYS, AND ONE SPECIMEN RETAINED IN RESERVE FOR LATER TESTING IF REQUIRED. ADDITIONAL CYLINDER TESTS (SUCH AS AT 14 DAYS) FOR CONTRACTOR CONVENIENCE AND SCHEDULING SHALL BE PAID FOR BY THE CONTRACTOR. A COMPRESSIVE-STRENGTH TEST SHALL BE THE AVERAGE COMPRESSIVE STRENGTH FROM A SET OF SPECIFIED NUMBER SPECIMENS OBTAINED FROM SAME COMPOSITE SAMPLE AND TESTED AT AGE INDICATED. g. WHEN FREQUENCY OF TESTING WILL PROVIDE FEWER THAN FIVE STRENGTH TESTS FOR A GIVEN CLASS OF CONCRETE, CONDUCT TESTING FROM AT LEAST FIVE RANDOMLY SELECTED BATCHES OR FROM EACH BATCH IF FEWER THAN FIVE ARE USED. h. WHEN STRENGTH OF FIELD-CURED CYLINDERS IS LESS THAN 85 PERCENT OF COMPANION LABORATORY-CURED CYLINDERS, CONTRACTOR SHALL EVALUATE OPERATIONS AND PROVIDE CORRECTIVE PROCEDURES FOR PROTECTING AND CURING THE IN-PLACE CONCRETE. i. STRENGTH OF EACH CONCRETE MIXTURE WILL BE SATISFACTORY IF EVERY AVERAGE OF ANY THREE CONSECUTIVE COMPRESSIVE-STRENGTH TESTS EQUALS OR EXCEEDS SPECIFIED COMPRESSIVE STRENGTH AND NO COMPRESSIVE-STRENGTH TEST VALUE FALLS BELOW SPECIFIED COMPRESSIVE STRENGTH BY MORE THAN 500 PSI. 2. TEST RESULTS SHALL BE REPORTED IN WRITING TO ARCHITECT, STRUCTURAL ENGINEER, READY-MIX PRODUCER, AND CONTRACTOR WITHIN 48 HOURS OF TESTING. REPORTS OF COMPRESSIVE-STRENGTH TESTS SHALL CONTAIN THE PROJECT IDENTIFICATION NAME AND NUMBER, DATE OF CONCRETE PLACEMENT, NAME OF CONCRETE TESTING AND INSPECTING AGENCY, CONCRETE TYPE AND CLASS, LOCATION OF CONCRETE BATCH IN STRUCTURE, DESIGN COMPRESSIVE STRENGTH AT 28 DAYS, CONCRETE MIXTURE PROPORTIONS AND MATERIALS, COMPRESSIVE BREAKING STRENGTH, AND TYPE OF BREAK FOR BOTH 7-AND 28- DAY TESTS. CONTINUOUSPERFORM INSPECTION OF CONCRETE PLACEMENT TO VERIFY PROPER APPLICATION TECHNIQUES, INCLUDING BUT NOT LIMITED TO SLABS ON GRADE AND FOOTINGS. PERIODICPERFORM INSPECTION OF CONCRETE CURING PROCEDURES TO VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE, PROTECTION, AND TECHNIQUES. ----NONDESTRUCTIVE TESTING: IMPACT HAMMER, SONOSCOPE, OR OTHER NONDESTRUCTIVE DEVICE MAY BE PERMITTED BUT SHALL NOT BE USED AS THE SOLE BASIS FOR ACCEPTANCE OR REJECTION. ----ADDITIONAL TESTS: TESTING AND INSPECTING AGENCY SHALL MAKE ADDITIONAL TESTS OF CONCRETE WHEN TEST RESULTS INDICATE THAT SLUMP, AIR ENTRAINMENT, COMPRESSIVE STRENGTHS, OR OTHER REQUIREMENTS HAVE NOT BEEN MET, AS DIRECTED BY ARCHITECT. TESTING AND INSPECTING AGENCY MAY CONDUCT TESTS TO DETERMINE ADEQUACY OF CONCRETE BY CORED CYLINDERS COMPLYING WITH ASTM C 42 OR BY OTHER METHODS AS DIRECTED BY ARCHITECT. 1. ADDITIONAL TESTING AND INSPECTING, AT CONTRACTOR'S EXPENSE, WILL BE PERFORMED TO DETERMINE COMPLIANCE OF REPLACED OR ADDITIONAL WORK WITH SPECIFIED REQUIREMENTS. NOTES ON SPECIAL INSPECTIONS CHART: 1. REFER TO 014110 SPECIFICATION FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES. 2. SPECIAL INSPECTIONS AS DEFINED IN SECTIONS 1704 AND 1705 OF THE CALIFORNIA BUILDING CODE ARE REQUIRED. ALL REFERENCES SHOWN ARE TO THE CBC 2022 / IBC 2021. 3. SPECIAL INSPECTIONS SHALL BE PERFORMED BY A QUALIFIED TESTING AGENCY APPROVED BY THE ARCHITECT AND THE STRUCTURAL ENGINEER AND PAID FOR BY THE OWNER. 4. THE INSPECTOR SHALL OBSERVE WORK FOR CONFORMANCE WITH THE APPROVED STRUCTURAL DRAWINGS AND SPECIFICATIONS AND PREPARE INSPECTION REPORTS STATING THEIR OBSERVATIONS. COPIES OF THE INSPECTION REPORTS SHALL BE SUBMITTED TO THE CONTRACTOR, THE ARCHITECT AND THE STRUCTURAL ENGINEER. 5. ALL DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND THE WORK BEING PERFORMED SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF THE DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF ARCHITECT AND THE STRUCTURAL ENGINEER PRIOR TO THE COMPLETION OF THAT PHASE OF THE WORK. 6. THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT OF INSPECTIONS DOCUMENTING COMPLETION OF ALL REQUIRED SPECIAL INSPECTIONS AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS. 7. NON-STRUCTURAL SPECIAL INSPECTIONS MAY BE REQUIRED AND ARE SPECIFIED ELSEWHERE IF APPLICABLE.CONCRETE CONSTRUCTION(IBC 1705.3)PERIODIC OR CONTINUOUS ACCEPTABLE QUALIFICATIONS DESIGNATION REQUIRED CERTIFICATION ACI-2 ACI CERTIFIED CONCRETE FIELD TESTING TECHNICIAN LEVEL 2, PLUS 2-YEARS' RELATED EXPERIENCE NICET-1 NICET LEVEL 1, MINIMUM 2-YEARS' RELATED EXPERIENCE NICET-2C CURRENT NICET CONCRETE LEVEL II CERTIFICATION PLUS 4-YEARS' RELATED EXPERIENCE RCSI, ACI-2, NICET-2C RCSI, ACI-2, NICET-2C RCSI, ACI-2, NICET-2C RCSI, NICET-2C RCSI, ACI-2, NICET-1 RCSI, ACI-2, NICET-1 RCSI, ACI-2, NICET-1 RCSI ICC CERTIFIED REINFORCED CONCRETE SPECIAL INSPECTOR SEE CIVIL/SITE DWGS FOR GRADING/PAVING TYPICAL 30"ø CONCRETE FOUNDATION USE SONOTUBE CONCRETE FORM AS REQUIRED IN LOOSE SOILS ANCHOR BOLT BY CAMERA MANUF CAMERA POLE ASSEMBLY AND BASE PLATE BY CAMERA POLE MANUF NOTE: FINISHED ASSEMBLY HEIGHT SHALL NOT EXCEED 16 FT ABOVE GROUND SURFACE 6'-0" MIN18" LAP C POLE, FOUNDATIONL C POLE, FOUNDATIONL#4 TIES @ 12" O.C. (9) #6 VERTICAL REINFORCING3" CLR2'-6" B B SECTION B-B 3"2"6"NOTES: 1. DO NOT MOUNT POLE FIXTURES UNTIL CONCRETE HAS REACHED 90% OF DESIGN STRENGTH. 2. ALTERNATE POLE SYSTEMS REQUIRING DEVIATION FROM SPECIFIED DESIGN CRITERIA, OR REQUIRING ALTERNATE METHOD OF SUPPORT, REQUIRE FOUNDATION SUPPORT SYSTEM TO BE PROVIDED BY ALTERNATE POLE SYSTEM VENDOR. SUCH SYSTEM SHALL CONFORM TO THE GOVERNING BUILDING CODE FOR APPLICABLE WIND & SEISMIC FORCES AND SHALL BE APPROPRIATE FOR THE SITE'S SPECIFIC GEOTECHNICAL CONDITIONS. ADDITIONAL GEOTECHNICAL INVESTIGATION REQUIRED FOR SUCH SYSTEM IS AT THE EXPENSE OF SYSTEM VENDOR. FABRICATION DRAWINGS SHALL BE SUBMITTED TO ARCHITECT/ENGINEER FOR APPROVAL. 3. SEE MANUFACTURER'S SPECIFICATIONS AND INSTALLATION INSTRUCTIONS FOR ADDITIONAL REQUIREMENTS. 4. SEE ARCHITECTURAL, SITE, & ELECTRICAL DRAWINGS FOR TYPE, NUMBER, AND LOCATIONS OF POLES. 5. INCREASE DIAMETER OF FOUNDATION AS REQUIRED TO FIT POLE ANCHOR BOLTS INSIDE FOUNDATION REINFORCING. 3'-3"3'-3" 6'-6" M ANU F. DW GSSEE G ATESECTION A-A A A FOR ANCHOR LOCATIONS SEE GATE MANUF DWGS NOTES: 1. MAT FOOTING SHALL BE SUPPORTED ON UNDISTURBED SOIL AS REQUIRED IN THE GEOTECHNICAL REPORT, FIELD VERIFY. 2. COORDINATE SLAB EXTENTS WITH THE GATE MANUFACTURER. 3. SEE ARCH DRAWINGS FOR PLAN LOCATION OF SLAB. ALUMINIUM GATE ASSEMBLY SEE GATE MANUF DWGS ANCHOR BOLT BY GATE MANUF TYPICAL 5" CONCRETE SLAB W/ #4@8" O.C. EACH WAY AT MID-DEPTH CENTERLINE OF GATE ASSEMBLY SEE GATE MANUF DWGS PREFABRICATED BASE PLATE SEE GATE MANUF DWGS TYPICAL SEE CIVIL/SITE DWGS FOR GRADING/PAVING TYPICAL3'-0"3'-0"6'-0"(2) #4 CONT ALL 4 SIDES OF SLAB W/ 24"x24" CORNER BARS 1'-0"1'-0"1'-0"1'-0"4" OF AGGREGATE BASE IN ACCORDANCE W/ GEOTECH REPORT CONCRETE TURNDOWN SLAB SEE SECTION BELOW TURNDOWN TYPICAL 4 SIDES C 89921GISTEREDPROFESSIONAL E NGI NEERKYLERO S H BERGM A T T H EW ANROFILACFOETATSICIVILER 3675 Mt. Diablo Blvd., Suite 300 | Lafayette, CA 94549 |925.283.4891 | cmta.comThis document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.Revit Template Version 202112345678910111213141516171819 A B C D E F G H J K L M N P Q R 12345678910111213141516171819 A B C D E F G H J K L M N P Q R Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112(408) 467-9100www.bkf.com100% CONSTRUCTION DOCUMENT4/25/2025 C:\_REVIT_Locals\24325 - Toyota SFPDC Buffer Yard - Struct R25_Alexy..rvt 4/25/2025 10:55:29 AM TK MC KR 2025.04.25 TOY03.08 S100GENERAL NOTES AND STRUCTURAL SPECIALINSPECTIONS AND DETAILSSF PDC2451 Bishop Drive, San Ramon, CA 94583NOT TO SCALES100 B TYPICAL CAMERA POLE FOUNDATION DETAIL NOT TO SCALES100 A TURNSTILE FOUNDATION PLAN NOTE: REFER TO SPECIFICATIONS FOR FOUNDATIONS FOR SITE STRUCTURES NOT SHOWN, SUCH AS LIGHT POLES, SECURITY ARMS, ACCESS GATES, ETC.No. Issue/Revision/Submission DateNOT FOR CONSTRUCTI ON NOT F OR CONSTRU CTI ONCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100www.bkf.com3675 Mt. Diablo Blvd., Suite 300 | Lafayette, CA 94549 |925.283.4891 | cmta.comCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112(408) 467-9100www.bkf.comBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100www.bkf.com3675 Mt. Diablo Blvd., Suite 300 | Lafayette, CA 94549 |925.283.4891 | cmta.comCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112(408) 467-9100www.bkf.comBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945493/12/2025 C8.1 4/25/2025 1:40:37 PM G000 C 89921GISTEREDPROFESSIONAL E NGI NEERKYLERO S HBERGM A T T HEW ANROFILACFOETA TS ICIVILERNOT FOR CONSTRUCTI O N NOT FO R CONSTRUCTI ON 100% CONSTRUCTION DOCUMENTCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100www.bkf.comCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100www.bkf.comCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDPARCHITECTURE302WESTTHIRDSTREETSUITE500CINCINNATI,OHIO45202PHONE513.271.1634ENGEOINC.BKFENGINEERSPALMERENGINEERINGBERKELEYCEMENTINC.BKFENGINEERS1730N.FIRSTSTREETSUITE600SANJOSE,CA95112(408)467-9100CINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.1634BKF ENGINEERS1730 N. FIRST STREETSUITE 600BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945494/25/2025 1:40:37 PM G000 4/25/2025 1:40:37 PM G000 3/12/2025 C8.1 4/25/2025 1:40:37 PM G000 4PULL BOX DETAIL6125WPERHEAD277V1P4AP4 40K 80CRI T3M DDBXDD-Series Size 1 Area Luminaire P4 Performance Package 4000k CCT80 CRI Type 3 Medium Dark Bronze - FINISH TO MATCH EXISTINGLP-16-FT5-11G-D-TLAPA Industries16 FEET2RISER DIAGRAM(E)PANEL'LPB'(E)20A/3PTO EXISTINGELECTRICALDISTRIBUTIONEJ2EE1(N) POLELIGHTLPB-261LEGENDEXISTING TO REMAINNEW WORK#SHEET NOTES1. PROVIDE 1"C, 2#6 CONDUCTORS, 1#6 GND AND FEED NEW POLE FIXTURES FROM CIRCUIT LPB-26.2. EXISTING IN-GROUND RATED JUNCTION BOX.(N) POLELIGHTLPB-26(N) POLELIGHTLPB-26(N) POLELIGHTLPB-26(N) POLELIGHTLPB-26(N) POLELIGHTLPB-26E,N,11VD2VD1VD3VD4VD6VD52342457211013259750P4AP4BP4B_T1SP4BP4BP4BD2E1 PROVIDE NEW TWO HEAD LED POLE MOUNTED FIXTURE CONNECTED TO EXISTING CIRCUIT. E2 PROVIDE NEW SINGLE HEAD LED POLE MOUNTED FIXTURE. CONNECTED TO EXISTING CIRCUIT.E3 EXISITNG UNDER GROUND FIBER AND ELECTRICAL RACEWAY TO REMAIN.E4 PROVIDE 8"x8"x8" NEMA 4X ENCLOSURE AND (2) 2" CONDUITS ROUTED TO NEW GATE LOCATION.E5 INTERCEPT AND EXTEND EXISTING GATE MOTOR CIRCUIT AND PROVIDE NEW 1" CON AND MAKE CONNECTION TO NEW VMAG GATE LOCATIONS.E6 PROVIDE 1"CON. WITH PULLSTRING FOR CAMERA. E7 PROVIDE 2"CON. AND PULLSTRING FOR DUAL HEIGHT PEDESTALS. FIELD COORDINATE LOCATION.E8 PROVIDE TEMPORARY POLE FOR SALVAGED CAMERA TO BE MOUNTED AND REMAIN IN USE DURING CONSTRUCTION.E9 PROVIDE 1"CON. AND PULLSTRING ACCESS CONTROL.E10 PROVIDE 10"X12" FLUSH MOUNTED PULL BOX. HUBBELL QUAZITE PC SERIES WITH OPEN BOTTOM TEIR 15 COVER OR EQUAL.E11 PRIVDE NEMA 4X ENCLOSURE MOUNTED TO UNITSRUT. FIELD VERIFY LOCATION ON THE SECURE SIDE OF THE FENCE.E12 PROVIDE (4)1"CON. TO LOW VOLTAGE SYSTEMS AND DOOR HARDWARE. FIELD VERIFY LOCATIONS.LPB-26LPB-26LPB-26LPB-26LPB-26LPB-26E1E1E1E1E1PHOTOMETRICSSITE ELECTRICAL PLAND. ANY EXISTING UNDERGROUND UTLITIES AND LOW VOLTAGE SYSTEMS,FiBER AND TELECOM CABLING NOT EXPLICITLY CALLED OUT FOR DEMOLITION ARE TO REMAIN IN PLACE AND IN GOOD WORKING ORDER. COORDINATE ANY DIGGING WITH CIVIL PLANS AND CUSTOMER TO INSURE NO INTERUPTION IS MADE TO EXISTING SYSTEMS.NEW ELECTRICAL SITEFORD2E3XLSL,,STRIP FIXTURECROSS-HATCHING INDICATES LIGHT IS POWERED FROM THE EMERGENCY-CRITICAL BRANCHPARALLEL-HATCHING INDICATES LIGHT IS POWERED FROM THE EMERGENCY-LIFE SAFETY BRANCHSURGICAL/EXAM LIGHTEXIT LIGHT (CEILING, END, WALL MOUNT)LIGHTINGREFER TO LUMINAIRE SCHEDULE FOR EXACT FIXTURE SPECIFICATIONS, MOUNTING HEIGHTS, ETC.,SURFACE OR SUSPENDED CEILING FIXTURE (SLASH INDICATES RECESSED)POLE MOUNTED AREA LIGHT, ,,,EMERGENCY BATTERY WALL-PACKWALL MOUNT FIXTURE,FLOODLIGHTDESCRIPTIONDRAWING SYMBOLMOUNTING HEIGHT (TO CENTER OF BOX)POWER OUTLETSJJUNCTION BOX, CEILING OR WALL,JD3D3D3D3PANEL: LOCATION: INTERIOR WAREHOUSE 480 Y/ 277P:3 W: 4 AIC RATING:AMP: 225 MLO X MCB X SURFACE FLUSHTYPE: X NEW PANELBOARD 100% CKT P CIR P CIR P CKTTYPE KVA BKR # H # BKR KVA TYPE2011 A 21 202013 B 41 202015 C 61 202017 A 81 202019 B 101 2020111 C 121 2020113 A 141 2020115 B 161 2020117 C 181 2020119 A 201 2020121 B 221 2020123 C 241 2020125 A 263 201.37 LTG20127 B 28- -20129 C 30- -20131 A 321 2020133 B 341 2020135 C 361 2020137 A 381 2020139 B 401 2020141 C 421 201.4 KVA 1.7 KVA (125%)0.0 KVA 0.0 KVA (100/35/25%) 1.370.0 KVA 0.0 KVA (100/35/25%) 0.00KVA 0.0 KVA (125%) 0.000.0 KVA 0.0 KVA (100%)0.0 KVA 0.0 KVA (50% > 10KVA)COMPUTER REC 0.0 KVA 0.0 KVA (100%)EQUIP/OTHER 0.0 KVA 0.0 KVA (100%)HEATING 0.0 KVA 0.0 KVA (100%)ELEVATOR 0.0 KVA 0.0KITCHEN EQPT 0.0 KVA 0.0101.3 KVA 101.3102.7 KVA 103.0 KVA123.5 AMP 123.9 AMPTOTALS:OVERALL REDUCTION OF LOAD 0.025 KVA OR 0.03 AMPS @480VELEV KVA (100%) REMOVAL OF 7 EXISTING POLE HEADS @ 0.2KVA = 1.4 KVAEXISTING LOAD KVA (100%)MISCMISCMISCLOAD SUMMARY KITCH KVA (100%) NEW COSTICTION ADDITIONAL 11 POLE HEADS @ 0.125 = 1.375 KVAREMAINING MOTORS MTRGEN PURPOSE REC RECSMALL APPLIANCE RES PHASE B: KVALARGEST MOTOR MTR PHASE C: KVALIGHTING LTG CONNECTED PHASE LOADINGRESIDENT LTG/REC RES PHASE A: KVAESTIMATED MAXIMUM DEMAND (EMD) CALCULATIONSLOAD SUMMARY: LOAD TYPE CONNECTED NEC DEMAND(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) POLE LIGHTS(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (N) POLE LIGHTS(E) LIGHTING (E) POLE LIGHTS(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING LOADCIRCUIT DESCRIPTION(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTING(E) LIGHTING (E) LIGHTINGCIRCUIT DESCRIPTION LOADVOLTAGE: 14 kAPANELBOARD SCHEDULE(E) PANEL LPB(E ) DISTMOUNTING:EXISTING STYLE: NEUTRAL: FED FROM:E4D2E7E8E6E3E3D2E5JE5JJE10JE6JE4E11E12E5POLENEW CONDUIT RUNEXISTING CONDUIT RUNCONDUITEELIGHTING FIXTURE SCHEDULE6125WPERHEADWATTAGE277VVOLTAGE1P4AP4BP4 40K 80CRI T3M DDBXDD-Series Size 1 Area Luminaire P4 Performance Package 4000k CCT80 CRI Type 3 Medium Dark Bronze - FINISH TO MATCH EXISTINGD-Series Size 1 Area Luminaire P4 Performance Package 4000k CCT80 CRI Type 3 Medium Dark Bronze -FINISH TO MATCH EXISTINGLP-16-FT5-11G-D-TLAPA Industries16 FEETLP-30-FT5-11G-D-TLAPA Industries30 FEET4125WPERHEADLP-16-FT5-11G-D-TLAPA Industries16 FEETE2#APPROXIMATELOCATIONEXISTING PANEL 'LPB'SAFED OFF.P4 40K 80CRI T1S DDBXDD-Series Size 1 Area Luminaire P4 Performance Package 4000k CCT80 CRI Type 1 Short Dark Bronze -FINISH TO MATCH EXISTINGP4B_T1S1POLEDSX1_LEDP4_40K_80CRI_T1S.IES2277Vcmta.com PULL RINGSCONDUIT ENTRIES PER CONTRACTORLABEL#4 CRUSHED STONENOTES:A. BOXES TO BE SIZED PER NEC 314.28 BASED UPON FIELD CONFIGURATION OF CONDUIT ENTRIES. PROVIDE EXTENSIONS WHERE REQUIRED.B. BOX AND LID TO BE CONSTRUCTED OF POLYMER CONCRETE. LID TIER RATING PER INSTALLED LOCATION.C. REFER TO SPECIFICATIONS FOR RELATED INFORMATION.GRADECAPTIVE ANCHORSOPENGRADE16' -0"2' -0"5' -0"LIGHT HEAD PER SCHEDULEHAND HOLE3/4" THREADED HUB FOR SECURITY CAMERA 3/4" LFNC. SEE RACEWAY SPECIFICATIONS, (ONE PER CAMERA)WHERE APPLICABLE6" STRAIGHT ROUND STEEL POLE2' -0"HANDHOLE3/8" x 8'-0" COPPER CLAD GROUND ROD WITH CLAMP#4 BARE STRANDED CU TO POLE GROUND LUG1" CHAMFERFULL BASE COVERPOLE GROUND LUGANCHOR BOLTS PER POLE MNFCT1" SPARE CONDUIT, CAP AT BOTH ENDS2' -0" MIN(4) #6 VERTICAL REBAR#3 TIE BARS, 11" SPACING, (2) SPACED 3" AT TOPLINE VOLTAGE CIRCUITSFO CABLINGCURVED LID J-BOX, SEE NOTES FOR SIZESNOTES:A. PROVIDE WEATHERPROOF, NONMETALLIC CURVED LID J-BOX CAST IN POLE BASE. POLES WITHOUT CAMERAS PROVIDE 8" x 8" x 4" (CARLON: E88C24 OR EQUAL). POLES WITH CAMERAS PROVIDE 12" x 12" x 4" BOX WITH LOW VOLTAGE DIVIDER (CARLON: E1212C24 / E1212DIV OR EQUAL) .B. PROVIDE 2 STRAND MM FO CABLE FROM TELECOMM ROOM TO EACH MEDIA CONVERTER AND CAT 6 CABLE IN LFNC FROM J-BOX TO CAMERA HUB (CAMERA BY OTHERS). COIL ADDITIONAL LENGTH OF CABLING IN BOX. CAP IF NOT USED18' -0"MAXIMUM LIGHTING FIXTURE HEIGHT PER CITY REQUIREMENTS3POLE LIGHT DETAILINDICATES RECESSED)POLE MOUNTED AREA LIGHT,,EMERGENCY BATTERY WALL-PACKPOWER OUTLETSPULL BOX Original Fire Access Plan SEE PLAN FOR ADJUSTMENTS TO HYDRANT LOCATION SEE PLAN FOR ADJUSTMENTS TO HYDRANT LOCATION PREVIOUS FIRE ACCESS PATH NEW FIRE ACCESS PATH 20'-0"R=25' R=25' C1.1 EXISTING CONDITION PLANDrawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026 MC IB IB 2026.03.13 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com STATION REMOVE EX. PARKING STRIPINGDrawnProject ManagerCheckedInitial Drawing DateProject NumberCINCINNATI COLUMBUS RALEIGH CHARLOTTE www.bhdp.com BHDP ARCHITECTURE 302 WEST THIRD STREET SUITE 500 CINCINNATI, OHIO 45202 PHONE 513.271.163403/11/2026MCIBIB2026.03.13TOY03.08SF PDC BKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112 BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508 CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 94549 2451 Bishop Drive, San Ramon, CA 94583 No.Issue/Revision/Submission Date BKF ENGINEERS1730 N. FIRST STREETSUITE 600SAN JOSE, CA 95112(408) 467-9100www.bkf.comC2.1DEMOLITION PLAN SD SDSDSDSDSDSDSD Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026 MC IB IB 2026.03.13 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C3.1 IMPROVEMENT PLAN - SITE PLAN SD Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026 MC IB IB 2026.03.13 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C3.2 IMPROVEMENT PLAN - GRADING SD SDSDSDSDSDSDSWMP Table AREA Impervious Area (SF) Pervious Area (SF) Effective Impervious Area (SF) Total Area (SF)BMP Treatment Area Required (SF) Treatment Area Provided (SF) Sizing Method DMA-1 24,480 4,869 24,967 29,349 BIO-1 979 1,184 4% DMA-2 9,582 0 9,582 9,582 BIO-2 383 392 4% Total 34,062 4,869 -38,931 -1,362 1,576 - Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026 MC IB IB 2026.03.13 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C4.1 STORM WATER MANAGEMENT PLAN SD SDSDSDSDSDSDDrawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026 MC IB IB 2026.03.13 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C5.1 EROSION CONTROL PLAN Drawn Project Manager Checked Initial Drawing Date Project NumberCINCINNATICOLUMBUSRALEIGHCHARLOTTEwww.bhdp.comBHDP ARCHITECTURE302 WEST THIRD STREETSUITE 500CINCINNATI, OHIO 45202PHONE 513.271.163403/11/2026 MC IB IB 2026.03.13 TOY03.08SF PDCBKF ENGINEERS - 1730 N. FIRST STREET, SUITE 600, SAN JOSE, CA 95112BKSE - 546 EAST MAIN STREET, SUITE 300 LEXINGTON, KY 40508CMTA - 3470 MOUNT DIABLO BLVD., SUITE A305 LAFAYETTE, CA 945492451 Bishop Drive, San Ramon, CA 94583No.Issue/Revision/SubmissionDateBKF ENGINEERS 1730 N. FIRST STREET SUITE 600 SAN JOSE, CA 95112 (408) 467-9100 www.bkf.com C5.2 EROSION CONTROL DETAILS