Loading...
HomeMy WebLinkAboutAppendix 11-D Table D-2Lower Moderate Above- Moderate Crow Canyon 3130 Crow Canyon Pl 2.13E+08 3.3 Office MU NCRSP – Destination Retail Mixed Use MU NCRSP - MU 20 40 40 0 60 45 6 9 Private Yes, 5th Yes 1.93 Adj. to freeway 45% Canyon Commons Corporate offices; Capacity based on development of parking lot to max density and maintaining the existing office building. Developer interest in the NCRSP area, including adjacent parcels to the subject property. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates the use of shared structured parking with a mixed use development pattern. Residential development is anticipated on the existing surface parking lot area. Crow Canyon 3160 Crow Canyon Pl 2.13E+08 1.9 Office MU NCRSP – Destination Retail Mixed Use MU NCRSP - MU 20 40 40 0 45 33 4 8 Private Yes, 5th Yes 2.95 Adj. to freeway Yes 100% Crow Canyon Place; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density; adjacent development trend, Previous interest from property owner to redevelop during SRVSP update (2020). Developer and previous property owner interest in the NCRSP area, including the subject property and adjacent parcels. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. The office buildings on parcels 213-010-046, -047, 059 and -060 are all owned under the same ownership group and built in the early 1980s. A number of vacancies in the building have led to developer inquiries related to the redevelopment of the sites. Crow Canyon 3170 Crow Canyon Pl 2.13E+08 1.9 Office MU NCRSP – Destination Retail Mixed Use MU NCRSP - MU 20 40 40 0 45 33 4 8 Private Yes, 5th Yes 2.97 None Yes 100% Crow Canyon Place: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density; adjacent development trend, Previous interest from property owner to redevelop during SRVSP update (2020). Developer and previous property owner interest in the NCRSP area, including the subject property and adjacent parcels. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. The office buildings on parcels 213-010-046, -047, 059 and -060 are all owned under the same ownership group and built in the early 1980s. A number of vacancies in the building have led to inquiries related to the redevelopment of the sites. Crow Canyon 3150 Crow Canyon Pl 2.13E+08 1.4 Office MU NCRSP - Destination Retail Mixed Use MU NCRSP - MU 20 40 40 0 33 24 3 6 Private Yes, 5th Yes 3.07 None Yes 100% Crow Canyon Place: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density; adjacent development trend, Previous interest from property owner to redevelop during SRVSP update (2020). Developer and previous property owner interest in the NCRSP area, including the subject property and adjacent parcels. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. The office buildings on parcels 213-010-046, -047, 059 and -060 are all owned under the same ownership group and built in the early 1980s. A number of vacancies in the building have led to inquiries related to the redevelopment of the sites. Crow Canyon 3180 Crow Canyon Pl 2.13E+08 1.9 Office MU NCRSP - Destination Retail Mixed Use MU NCRSP - MU 20 40 40 0 45 33 4 8 Private Yes, 5th Yes 3.04 None Yes 100% Crow Canyon Place: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density; adjacent development trend, Previous interest from property owner to redevelop during SRVSP update (2020). Developer and previous property owner interest in the NCRSP area, including the subject property and adjacent parcels. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. The office buildings on parcels 213-010-046, -047, 059 and -060 are all owned under the same ownership group and built in the early 1980s. A number of vacancies in the building have led to developer inquiries related to the redevelopment of the sites. Crow Canyon Crow Canyon Rd 2.13E+08 1.7 Parking Lot MU NCRSP – Office Mixed Use MU NCRSP - MU 20 40 40 0 40 30 4 6 Private Yes, 5th Yes 0 Adjacent to arterial road 100% SRV Conference Center: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. The subject parcel constitutes part of the PG&E San Ramon Conference Center (APNs: 213-011-002; 213-011-003; 213-020-053; and 213-020-054) and serves as a training center for PG&E employees and includes accommodations for overnight stays and on-site meal service. In 2022, PG&E closed their office location on the property adjacent to the Conference Center HOS, consolidating their operations which allowed the Iron Horse Village application for 117 residential units. The trend in San Ramon continues to see less demand for offices, meeting centers, and conference spaces and interest in PG&E to reduce their operating footprint. As part of the City’s rezone program, Zoning Amendments such as parking reductions, flexibility for residential development on Mixed Use zones, and FAR increases allows for increased development opportunities for this site and incentivize owners like PG&E to redevelop. The City will also be adopted Objective Design Standards as part of the Zoning Ordinance update to facilitate new development opportunities. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac. City anticipates a mixed use development pattern that would allow existing uses to remain if desired. Crow Canyon 3301 Crow Canyon Rd 2.13E+08 10.7 Office and Learning Center MU NCRSP – Office Mixed Use MU NCRSP - MU 20 40 40 0 256 38 25 193 Private Yes, 5th Yes 0 None 100% SRV Conference Center: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. The subject parcel constitutes part of the PG&E San Ramon Conference Center (APNs: 213-011-002; 213-011-003; 213-020-053; and 213-020-054) and serves as a training center for PG&E employees and includes accommodations for overnight stays and on-site meal service. In 2022, PG&E closed their office location on the property adjacent to the Conference Center HOS, consolidating their operations which allowed the Iron Horse Village application for 117 residential units. The trend in San Ramon continues to see less demand for offices, meeting centers, and conference spaces and interest in PG&E to reduce their operating footprint. As part of the City’s rezone program, Zoning Amendments such as parking reductions, flexibility for residential development on Mixed Use zones, and FAR increases allows for increased development opportunities for this site and incentivize owners like PG&E to redevelop. The City will also be adopted Objective Design Standards as part of the Zoning Ordinance update to facilitate new development opportunities. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac. Due to PG&E's recent reorganization/facility restructuring and their consolidation of office use in San Ramon as well as the underutilized nature of the facility, the site is ideally situated in the near term for mixed use development that would allow existing uses to remain if desired. Crow Canyon Crow Canyon Rd 2.13E+08 2.7 Parking Lot MU NCRSP – Office Mixed Use MU NCRSP - MU 20 40 40 0 64 48 6 10 Private Yes, 5th Yes 0 None 100% SRV Conference Center: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. The subject parcel constitutes part of the PG&E San Ramon Conference Center (APNs: 213-011-002; 213-011-003; 213-020-053; and 213-020-054) and serves as a training center for PG&E employees and includes accommodations for overnight stays and on-site meal service. In 2022, PG&E closed their office location on the property adjacent to the Conference Center HOS, consolidating their operations which allowed the Iron Horse Village application for 117 residential units. The trend in San Ramon continues to see less demand for offices, meeting centers, and conference spaces and interest in PG&E to reduce their operating footprint. As part of the City’s rezone program, Zoning Amendments such as parking reductions, flexibility for residential development on Mixed Use zones, and FAR increases allows for increased development opportunities for this site and incentivize owners like PG&E to redevelop. The City will also be adopted Objective Design Standards as part of the Zoning Ordinance update to facilitate new development opportunities. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac. Due to PG&E's recent reorganization/facility restructuring and their consolidation of office use in San Ramon as well as the underutilized nature of the facility, the site is ideally situated in the near term for mixed use development that would allow existing uses to remain if desired. Improvement to Land Ratio Constraints Property Owner Interest Percent of Property Notes Included in Previous Cycle HE Infra- structure Proposed Zoning Min Density (du/ac) Max Density (du/ac) Realistic Density (du/ac) Existing Units Table D-2: Rezone Sites Realistic Zoned Capacity Income Distribution Owner- ship Planning Subarea Site Address APN Zoning Proposed GPGross Acres Current Use GP Page 1 of 6 Lower Moderate Above- Moderate Improvement to Land Ratio Constraints Property Owner Interest Percent of Property Notes Included in Previous Cycle HE Infra- structure Proposed Zoning Min Density (du/ac) Max Density (du/ac) Realistic Density (du/ac) Existing Units Realistic Zoned Capacity Income Distribution Owner- ship Planning Subarea Site Address APN Zoning Proposed GPGross Acres Current Use GP Crow Canyon Crow Canyon Rd 2.13E+08 1.3 Parking Lot MU NCRSP – Office Mixed Use MU NCRSP - MU 20 40 40 0 31 23 3 5 Private Yes, 5th Yes 0 Adj. to arterial roadway 100% SRV Conference Center: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. The subject parcel constitutes part of the PG&E San Ramon Conference Center (APNs: 213-011-002; 213-011-003; 213-020-053; and 213-020-054) and serves as a training center for PG&E employees and includes accommodations for overnight stays and on-site meal service. In 2022, PG&E closed their office location on the property adjacent to the Conference Center HOS, consolidating their operations which allowed the Iron Horse Village application for 117 residential units. The trend in San Ramon continues to see less demand for offices, meeting centers, and conference spaces and interest in PG&E to reduce their operating footprint. As part of the City’s rezone program, Zoning Amendments such as parking reductions, flexibility for residential development on Mixed Use zones, and FAR increases allows for increased development opportunities for this site and incentivize owners like PG&E to redevelop. The City will also be adopted Objective Design Standards as part of the Zoning Ordinance update to facilitate new development opportunities. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac. Due to PG&E's recent reorganization/facility restructuring and their consolidation of office use in San Ramon as well as the underutilized nature of the facility, the site is ideally situated in the near term for mixed use development that would allow existing uses to remain if desired. Crow Canyon Crow Canyon Rd 2.13E+08 1.6 Parking Lot MU NCRSP – Office Mixed Use MU NCRSP - MU 20 40 40 0 38 28 3 7 Private Yes, 5th Yes 0.06 Adj. to arterial road 100% SRV Conference Center: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. The subject parcel constitutes part of the PG&E San Ramon Conference Center (APNs: 213-011-002; 213-011-003; 213-020-053; and 213-020-054) and serves as a training center for PG&E employees and includes accommodations for overnight stays and on-site meal service In 2022, PG&E closed their office location on the property adjacent to the Conference Center HOS, consolidating their operations which allowed the Iron Horse Village application for 117 residential units. The trend in San Ramon continues to see less demand for offices, meeting centers, and conference spaces and interest in PG&E to reduce their operating footprint. As part of the City’s rezone program, Zoning Amendments such as parking reductions, flexibility for residential development on Mixed Use zones, and FAR increases allows for increased development opportunities for this site and incentivize owners like PG&E to redevelop. The City will also be adopted Objective Design Standards as part of the Zoning Ordinance update to facilitate new development opportunities. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac. Due to PG&E's recent reorganization/facility restructuring and their consolidation of office use in San Ramon as well as the underutilized nature of the facility, the site is ideally situated in the near term for mixed use development that would allow existing uses to remain if desired. Crow Canyon 12855 Alcosta Blvd 2.13E+08 0.8 Commercial Service— Building Materials MU NCRSP – Multifamily Mixed Use MU NCRSP - MU 20 40 40 0 19 14 1 4 Private Yes, 4th and 5th Yes 0.57 None 100% Alcosta at Norris Canyon: Underutilized warehouse/industrial; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Developer interest in the NCRSP area, including residential development constructed on the adjacent parcel in 2015 and the Iron Horse Village Preliminary Housing Development application submitted in 2022. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). The existing development (constructed in 1982) includes a single engineering contractor with an underutilized site (25% lot coverage) and low Improvement to Land Ratio. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipate a mixed use development pattern that would allow existing uses to remain if desired. Opportunity to combine with adjacent parcels for redevelopment. Crow Canyon 4750 Norris Canyon Rd 2.13E+08 0.7 Commercial Service— Auto Repair, Office, and Building Materials MU NCRSP – Multifamily Mixed Use MU NCRSP 20 40 40 0 16 12 1 3 Private Yes, 4th and 5th Yes 2.73 None 100% Alcosta at Norris Canyon: Underutilized warehouse/industrial; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Developer interest in the NCRSP area, including residential development constructed on the adjacent parcel in 2015 and the Iron Horse Village Preliminary Housing Development application submitted in 2022. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). The existing development (constructed in 1977), including light industrial tenants, is an older and underutilized site (APN: 213-020-016). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipate a mixed use development pattern that would allow existing uses to remain if desired. Opportunity to combine with adjacent parcels for redevelopment. Crow Canyon 12821 Alcosta Blvd 2.13E+08 0.7 Commercial Service— Office and Building Materials MU NCRSP – Multifamily Mixed Use MU NCRSP 20 40 40 0 16 12 1 3 Private Yes, 4th and 5th Yes 2.81 100% Alcosta at Norris Canyon: Underutilized warehouse/industrial; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Developer interest in the NCRSP area, including residential development constructed on the adjacent parcel in 2015 and the Iron Horse Village Preliminary Housing Development application submitted in 2022. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). The existing development (constructed in 1979), including light industrial tenants, is an older and underutilized site (APN: 213-020-017). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipate a mixed use development pattern that would allow existing uses to remain if desired. Opportunity to combine with adjacent parcels for redevelopment. Crow Canyon 2481 Deerwood Dr.2.09E+08 4.4 Office Office OA Multifamily Medium Density Medium-High Density Residential 6 14 10.5 0 61 5 4 52 Private No Yes - Current 0.24 Yes 100%2481 Deerwood Dr; Capacity based on buildable area developed at 75% of max density and previous concept. Property currently for sale; developer has filed a current development application for housing which is in entitlement review. Crow Canyon 2110 Omega Rd 2.08E+08 0.9 Office Mixed Use SRVSP: C/SC Mixed Use SRVSP – Res. Overlay 22 35 26.25 0 23 17 2 4 Private Yes, 4th and 5th Yes - Current 1.66 Yes 100% Small office building; Owner/Developer interest; Capacity based on entire site developed at 75% of max density. Developer interest in the SRVSP area. Previous interest expressed by owner for redevelopment, but zoning needed to be amended. Property owner owns 4th cycle HOS (APN: 208-250-083) but did not have ability to aggregate site without this parcel due to non-residential zoning. HE Update will facilitate rezone to allow housing. Adjacent property approved for residential redevelopment in 2021. Existing office development was constructed in 1982/1983 and due to age of the building, redevelopment is expected to occur in near term. Crow Canyon 2120 Omega Rd 2.08E+08 0.3 Childcare Mixed Use SRVSP: C/SC Mixed Use SRVSP – Res. Overlay 22 35 26.25 0 7 7 Private Yes, 4th and 5th Yes - Current 0.85 100% Owner/Developer interest; Capacity based on entire site developed at 75% of max density. HE Update will facilitate rezone to allow housing. Recent redevelopment trend in this neighborhood. Adjacent property approved for residential redevelopment in 2021. Existing commercial building was constructed in 1960 and due to age of the building low improvement tot land value ratio, and low lot coverage (18%), redevelopment is expected to occur in near term. Crow Canyon 18 Crow Canyon Ct 2.08E+08 2.91 Office MU SRVSP - BMU MF High Density Multi-Family 20 30 22.5 0 65 48 6 11 Private No Yes - Current 1.4 100% Centerpointe: Capacity based on entire site developed at 75% of max density. Developer interest in the SRVSP area and recent redevelopment within the neighborhood converting office to residential homes. Building constructed in 1985 with low lot coverage (29%); with vacancy rates higher due to reduced office demand as a result of the pandemic. Across the street from City-owned future park site to serve residents. Dougherty Hills 680 Bollinger Canyon Way 2.14E+08 0.8 Event Center Retail Shopping CC MF High Density Multi-Family 20 30 22.5 0 18 13 1 4 Private No Yes - Current 0.74 Yes 100%Canyon View Dining Hall; Property owner initiated contact with City on redevelopment of site; Capacity based on buildable area developed at 75% of max density. Previous interest expressed by owner/developer for redevelopment, but zoning needed to be amended. HE Update will facilitate rezone to allow housing. Dougherty Hills 680 Bollinger Canyon Way 2.14E+08 1.5 Surface Parking Retail Shopping CC MF High Density Multi-Family 20 30 22.5 0 32 24 3 5 Private No Yes - Current 0 Yes 100%Canyon View Dining Hall; Property owner initiated contact with City on redevelopment of site; Capacity based on buildable area developed at 75% of max density. Previous interest expressed by owner/developer for redevelopment, but zoning needed to be amended. HE Update will facilitate rezone to allow housing. Dougherty Hills 500 Bollinger Canyon Ln 2.14E+08 7.1 Tennis Court CR CR MF High Density Multi-Family 20 30 22.5 0 67 10 6 51 Private No Yes - Current 0 Yes 100% Tennis Courts: Capacity based on buildable area developed at 75% of max density. Property owner has expressed interest in redevelopment and requested to be a HOS for 6th cycle as part of the stakeholder interviews of the HE update. HE Update will rezone to facilitate redevelopment by allow housing. Property has low improvement to value ratio and adjacent to existing residential development. Dougherty Hills 500 Bollinger Canyon Ln 2.14E+08 2.4 Vacant CR CR MF High Density Multi-Family 20 30 22.5 0 22 3 2 17 Private No No 0 Yes 100%Tennis Courts: Capacity based on buildable area developed at 75% of max density. See site notes above (500 Bollinger Canyon Lane). Bishop Ranch 4600 Norris Canyon 2.13E+08 5.8 Light Industrial/ Warehouse MU NCRSP - TCMU MU MU 20 40 30 0 75 56 7 12 Private Yes, 5th Yes 0.72 Yes Norris Tech Center: Ad Hoc and Property Owner express interest in residential redevelopment. Acreage assumes building on parking; Additional capacity with office demolition. Previous interest expressed by owner/developer for redevelopment. HE Update will facilitate rezone to allow housing with greater density range. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). The site is across the street from the City Village project which under construction with the demolition of office buildings and replaced with residential uses and redevelopment in the neighborhood is expected in the near term. Page 2 of 6 Lower Moderate Above- Moderate Improvement to Land Ratio Constraints Property Owner Interest Percent of Property Notes Included in Previous Cycle HE Infra- structure Proposed Zoning Min Density (du/ac) Max Density (du/ac) Realistic Density (du/ac) Existing Units Realistic Zoned Capacity Income Distribution Owner- ship Planning Subarea Site Address APN Zoning Proposed GPGross Acres Current Use GP Bishop Ranch 2301 Camino Ramon 2.13E+08 11.1 Medical Office MU NCRSP – Multifamily Mixed Use Downtown MU Downtown MU 20 60 45 0 499 74 49 376 Private Yes, 4th and 5th Yes - Current 0.59 Yes 100% Bishop Ranch No. 11; Medical Center: Capacity estimate based on redevelopment of entire site to residential at 75% max density with a 15% low income allotment per inclusionary housing ordinance. Since the CityWalk project was presented in 2019 and approved in 2020, the COVID-19 pandemic has significantly impacted the office market and reduced the demand for office space. As an example, Bishop Ranch 6 which is not located in the CityWalk Master Plan, was sold to a housing developer, and approved in November 2021 for 404 units, replacing 564,000 SF of leased office space. Bishop Ranch 7, 8, and 11 were added as 6th cycle HOS specifically at the request of the property owner after considering the demand for housing, the City-initiated rezoning which will increase density allowance, and their expectation of office turnover, consolidation, and/or infill on these parcels. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). Redevelopment in the neighborhood is expected in the near term. Bishop Ranch 2527 Camino Ramon 2.13E+08 12.6 Office Office OA Downtown MU Downtown MU 20 60 45 0 568 85 56 427 Private No Yes - Current 11.33 Yes 100% Bishop Ranch No. 7; Property owner-identified HOS for future redevelopment; Capacity based on redevelopment of entire site to 75% of max density with a 15% low income allotment per inclusionary housing ordinance. Since the CityWalk project was presented in 2019 and approved in 2020, the COVID-19 pandemic has significantly impacted the office market and reduced the demand for office space. As an example, Bishop Ranch 6 which is not located in the CityWalk Master Plan, was sold to a housing developer, and approved in November 2021 for 404 units, replacing 564,000 SF of leased office space. Bishop Ranch 7, 8, and 11 were added as 6th cycle HOS specifically at the request of the property owner after considering the demand for housing, the City-initiated rezoning which will increase density allowance, and their expectation of office turnover, consolidation, and/or infill on these parcels. Redevelopment in the neighborhood is expected in the near term. Bishop Ranch 3000 Executive Parkway 2.13E+08 9.9 Office Office OA-H Downtown MU Downtown MU 20 60 45 0 445 333 44 68 Private No Yes - Current 16.65 Yes 100% Bishop Ranch No. 8; Capacity based on entire site developed to 75% max density. Since the CityWalk project was presented in 2019 and approved in 2020, the COVID-19 pandemic has significantly impacted the office market and reduced the demand for office space. As an example, Bishop Ranch 6 which is not located in the CityWalk Master Plan, was sold to a housing developer, and approved in November 2021 for 404 units, replacing 564,000 SF of leased office space. Bishop Ranch 7, 8, and 11 were added as 6th cycle HOS specifically at the request of the property owner after considering the demand for housing, the City-initiated rezoning which will increase density allowance, and their expectation of office turnover, consolidation, and/or infill on these parcels. Redevelopment in this neighborhood is expected in the near term. Bishop Ranch 4000 Executive Parkway 2.13E+08 8.1 Office Office OA-H Downtown MU Downtown MU 20 60 45 0 363 272 36 55 Private No Yes - Current 16.7 Yes 100% Bishop Ranch No. 8; Capacity based on entire site developed to 75% max density. Since the CityWalk project was presented in 2019 and approved in 2020, the COVID-19 pandemic has significantly impacted the office market and reduced the demand for office space. As an example, Bishop Ranch 6 which is not located in the CityWalk Master Plan, was sold to a housing developer, and approved in November 2021 for 404 units, replacing 564,000 SF of leased office space. Bishop Ranch 7, 8, and 11 were added as 6th cycle HOS specifically at the request of the property owner after considering the demand for housing, the City-initiated rezoning which will increase density allowance, and their expectation of office turnover, consolidation, and/or infill on these parcels. Redevelopment in this neighborhood is expected in the near term. Bishop Ranch 5000 Executive Parkway 2.13E+08 9.3 Office Office OA-H Downtown MU Downtown MU 20 60 45 0 209 156 20 33 Private No Yes - Current 16.33 Yes 100% Bishop Ranch No. 8; Capacity based on entire site developed to 75% max density. Since the CityWalk project was presented in 2019 and approved in 2020, the COVID-19 pandemic has significantly impacted the office market and reduced the demand for office space. As an example, Bishop Ranch 6 which is not located in the CityWalk Master Plan, was sold to a housing developer, and approved in November 2021 for 404 units, replacing 564,000 SF of leased office space. Bishop Ranch 7, 8, and 11 were added as 6th cycle HOS specifically at the request of the property owner after considering the demand for housing, the City-initiated rezoning which will increase density allowance, and their expectation of office turnover, consolidation, and/or infill on these parcels. Redevelopment in this neighborhood is expected in the near term. The rezoning proposed is a residential overlay to the underlying PS zone and development standards set to facilitate residential development at 6 to 14 du/ac with parking and height standards in line with density ranges of the surrounding neighborhood. Twin Creeks 19001 San Ramon Valley Blvd.2.11E+08 5.4 Religious Assembly PS PS PS/Res. Overlay PS/Res. Overlay 6 14 10.5 0 28 0 0 28 Private No Yes - Current 3.8 Yes 50% Church of the Valley; Previously unsuccessful Senior Care Facility; may be open to residential opportunity; capacity based preserving existing primary building and landscaped portions of site and developing remaining area to 75% of max density. Property owner/developer has been seeking development opportunities on the property, with most recent plan in 2019 for a senior assisted living facility. HE update will facilitate rezone to allow housing land use and provide more flexibility that will not require a use permit for residential homes. Bishop Ranch 2451 Bishop Dr.2.13E+08 29.6 Warehouse and Undeveloped MU NCRSP – TCMU & DRMU Downtown MU Downtown MU 20 60 60 0 1066 159 106 801 Private Yes, 4th and 5th Yes - Current 2.07 Yes 100% Toyota site; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Mixed income site meeting requirements of inclusionary housing ordinance; Recent trends within this neighborhood show viable opportunities for redevelopment and replacement of office/warehouse space that has a high improvement to land ratio. The realistic capacity considers that the existing Toyota operation could remain while the remainder vacant portion of the property. Toyota will be installing a sidewalk on their property in the next two years to connect to the new residential development next door (City Village project) which will create additional opportunities for site planning and a walkable mixed use project. As part of the City’s rezone program, Zoning Amendments such as parking reductions, flexibility for residential development on Mixed Use zones, and FAR increases allows for increased development opportunities for this site. The City will also be adopted Objective Design Standards as part of the Zoning Ordinance update to facilitate new development opportunities. Recent discussions with property owner on long term opportunities on the property as part of the stakeholder interviews of the HE update, and redevelopment in this neighborhood is expected in the near term. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). Crow Canyon 2190 Camino Ramon 2.18E+08 0.9 Bank MU-C NCRSP - CMU MU MU 20 40 40 0 21 15 2 4 Private Yes, 5th Yes - Current 0.7 Yes 100% US Bank: Owner/Developer interest; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Property owner has expressed interest in redevelopment as part of the stakeholder interviews of the HE update and requested to be a HOS for 6th cycle. Property ownership of this parcel and adjacent parcels has recently been consolidated into one ownership group. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). Crow Canyon 3130 Crow Canyon Rd.2.18E+08 0.4 Office MU-C NCRSP - CMU MU MU 20 40 40 0 9 0 9 0 Private Yes, 5th Yes - Current 0.23 Yes 100% North of Crow Canyon office/warehouse: Developer Interest; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Property owner has expressed interest in redevelopment and requested to be a HOS for 6th cycle. Property ownership of this parcel and adjacent parcels has recently been consolidated into one ownership group. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). Crow Canyon 3120 Crow Canyon Rd.2.18E+08 1 Warehouse MU-C NCRSP - CMU MU MU 20 40 40 0 24 18 2 4 Private Yes, 5th Yes - Current 0.05 Yes 100% North of Crow Canyon office/warehouse: Developer Interest; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Property owner has expressed interest in redevelopment and requested to be a HOS for 6th cycle. Property ownership of this parcel and adjacent parcels has recently been consolidated into one ownership group. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). Crow Canyon 2001 Crow Canyon Pl.2.18E+08 1.4 Parking Lot MU-C NCRSP - CMU MU MU 20 40 40 0 33 24 3 6 Private Yes, 5th Yes - Current 0.04 Yes 100% North of Crow Canyon Magnolia Square Parking: Developer Interest; Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Property owner has expressed interest in redevelopment and requested to be a HOS for 6th cycle as part of the stakeholder interviews of the HE update. Property has low improvement to value ratio and is located within walking distance to services and neighborhood amenities. The subject parcel is located in the North Camino Ramon Specific Plan (NCRSP) area, which is designated a Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). Page 3 of 6 Lower Moderate Above- Moderate Improvement to Land Ratio Constraints Property Owner Interest Percent of Property Notes Included in Previous Cycle HE Infra- structure Proposed Zoning Min Density (du/ac) Max Density (du/ac) Realistic Density (du/ac) Existing Units Realistic Zoned Capacity Income Distribution Owner- ship Planning Subarea Site Address APN Zoning Proposed GPGross Acres Current Use GP Crow Canyon 2551 San Ramon Valley Blvd.2.09E+08 3.8 Shopping Center MU MU MU MU 20 40 40 0 72 54 7 11 Private No Yes - Current 1.28 47% SRV Office/Retail Plaza (Erik's Deli): Capacity based on preserving existing buildings and developing parking area (over 60% of parcel area) at max density. Tenancy has shifted in the last several years to high percentage of non-retail uses with lesser parking demand needed and thus allows for easier redevelopment of parking area. Adjacent property owner has expressed interest in redeveloping as a HOS in the 6th cycle and has high development potential where shared parking facilities could be utilized. Parcel is adjacent to an established neighborhood pattern of higher density apartment uses. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. Opportunity to combine with adjacent parcels for redevelopment. Crow Canyon 2525 San Ramon Valley Blvd.2.09E+08 2.5 Movie Theater MU MU MU MU 20 40 40 0 59 44 5 10 Private No Yes - Current 0.94 Yes 100% SRV Theater: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Property owner has expressed interest in redevelopment as part of the stakeholder interviews of the HE update and requested to be a HOS for 6th cycle. Parcel is adjacent to an established neighborhood pattern of higher density apartment uses. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. Opportunity to combine with adjacent parcels for redevelopment. Crow Canyon 2710 Crow Canyon Rd.2.08E+08 1.3 Shopping Center MU PD MU PD/Res. Overlay 20 30 22.5 0 22 16 2 4 Private No Yes - Current 2.43 100% Staples: Capacity estimate based on redeveloping buildable area to 75% of maximum density. Recent consolidation of office supply uses anticipates a shift of near term redevelopment potential on this parcel. Parcel is across the street from existing residential neighborhood and adjacent to a vacant lot that could be consolidated for increased development area. HE Update will facilitate rezone to allow housing. Crow Canyon 2730 Crow Canyon Rd.2.08E+08 0.9 Parking Lot MU PD MU PD/Res. Overlay 20 30 22.5 0 11 0 11 0 Private No Yes - Current 0 100%Auxiliary Parking Lot Adjacent to Staples: Capacity estimate based on redeveloping buildable area to 75% of maximum density. Vacant parcel that has garnered interest from developers for development in the past. HE Update will rezone parcel to facilitate the redevelopment to allow housing. Crow Canyon 2610 Crow Canyon Rd.2.08E+08 1.9 Office Office OA MF Very High Density Multi-Family 30 50 37.5 0 70 10 7 53 Private No Yes - Current 1.66 Yes 100% Property owners have expressed recent interest in residential redevelopment; Capacity based on entire site redevelopment to 75% of max density. Property owner has expressed interest in redevelopment as part of the stakeholder interviews of the HE update and requested to be a HOS for 6th cycle. Property owner has been working on conceptual development designs; HE Update will rezone parcel to facilitate the redevelopment to allow housing. Crow Canyon 2701 Old Crow Canyon Rd 2.08E+08 1.1 Meeting Facility, Business Support, Office and Commercial Services MU SRVSP - Multiple Family Res.MF High Density Multi-Family 20 30 22.5 0 24 18 2 4 Private Yes, 4th and 5th Yes - Current 0.54 None Yes 100% Ryan Industrial: Capacity based on entire site redeveloped to 75% of max density. Property owner interest in redevelopment of site and participated in Specific Plan update in 2019 to include site for residential use. Building constructed in 1971; low improvement to land ratio; low lot coverage (19%); recent redevelopment of townhomes at the end of cul-de-sac. Across the street from City-owned future park site to serve residents. Crow Canyon 110 Ryan Industrial Ct 2.08E+08 1 Office MU SRVSP – Multiple Family Res.MF High Density Multi-Family 20 30 22.5 0 22 16 2 4 Private Yes, 4th and 5th Yes – Current 0.91 None 100% Ryan Industrial: Capacity based on entire site redeveloped to 75% of max density. Building constructed in 1975; low improvement to land ratio; low lot coverage (17%); recent redevelopment of townhomes at the end of cul-de-sac. Recent update of Specific Plan with higher density range to incentivize redevelopment. Near City-owned future park site to serve residents. Crow Canyon 101 Ryan Industrial Ct 2.08E+08 0.9 Office and Studio Use MU SRVSP – Multiple Family Res.MF High Density Multi-Family 20 30 22.5 0 20 15 2 3 Private Yes, 4th and 5th Yes – Current 0.53 None 100% Ryan Industrial: Capacity based on entire site redeveloped to 75% of max density. Building constructed in 1978; low improvement to land ratio; low lot coverage (19%); recent redevelopment of townhomes at the end of cul-de-sac. Recent update of Specific Plan with higher density range to incentivize redevelopment. Across the street from City-owned future park site to serve residents. Crow Canyon 115 Ryan Industrial Ct 2.08E+08 1.3 Office MU SRVSP – Multiple Family Res.MF High Density Multi-Family 20 30 22.5 0 29 21 2 6 Private Yes, 4th and 5th Yes – Current 1.75 None 100% Ryan Industrial: Capacity based on entire site redeveloped to 75% of max density. Building constructed in 1979; low improvement to land ratio; low lot coverage (19%); recent redevelopment of townhomes at the end of cul-de-sac. Recent update of Specific Plan with higher density range to incentivize redevelopment. Near City-owned future park site to serve residents. Southern San Ramon 200 Montgomery St 2.14E+08 3.6 Retail— Shopping Center MU MU MU MU 20 40 40 0 24 18 2 4 Private Yes, 4th and 5th Yes 0.73 Adjacent to arterial road Yes 100% Marketplace (North): Residential redevelopment on parking at max density; maintain retail. Developer and property owner interest. The subject parcel (APN: 213-701-004) is part of an existing retail center (Marketplace, constructed in 1988) with an underutilized site and a low Improvement to Land Ratio. The Center has approximately 50% vacancy, including the loss of an anchor grocery store and various restaurant/retail tenants. Redevelopment of the subject parcel likely given the City has reviewed in 2021 a Preliminary Housing Development application for mixed use development (including residential uses) on the adjacent parcel (APN: 213-701-002). The site is adjacent to the Iron Horse Regional Trail, a major arterial roadway (Bollinger Canyon Road), and the approved CityWalk Master Plan development. The subject parcel is located in a designated Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates the use of shared structured parking with a mixed use development pattern. Residential development is anticipated on the existing surface parking lot area, while preserving retail opportunities on-site. Southern San Ramon 1071 Market Place 2.14E+08 2.79 Hotel MU MU MU MU 20 40 40 0 66 49 6 11 Private Yes, 4th and 5th Yes - Current 3.16 None 100% Marketplace (West) Residence Inn: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Parcel to the east recently submitted preliminary applications for housing development. Prime location for residential due to access to parking, shopping, walking distance to services, adjacent to regional trail. Parcel to the west is the CityWalk project where residential care facility was recently approved, and future multi-family housing. Existing hotel is built for extended stay and can be easily converted to units. Southern San Ramon 1021 Market Place 2.14E+08 0.21 Shopping Center MU MU MU MU 20 40 40 0 8 0 8 0 Private Yes, 4th and 5th Yes - Current 1.46 Yes 100% Marketplace (West) Retail Strip: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. "Developer and property owner interest. The subject parcel (APN: 213-702-006) constitutes a part of the larger Marketplace Business Center development as a Housing Opportunity Site (Parcels 213- 703-002, -004, -006, -007, & -008), all built in the late 1980s/early 1990s. As a whole, the Development is underutilized and is made up of a retail sporting goods store, an extended stay hotel, professional offices, and restaurants. The site is adjacent to the Iron Horse Regional Trail, a major arterial roadway (Bollinger Canyon Road), and the approved CityWalk Master Plan development. Redevelopment of the subject parcel likely given the City has reviewed in 2021 a Preliminary Housing Development application for mixed use development (including residential uses) on the adjacent parcel (APN: 213-701-002) at the Marketplace Center. The subject parcel is located in a designated Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. Opportunity to combine with adjacent parcels for redevelopment." Southern San Ramon 1081 Market Pl 2.14E+08 1.1 Office MU MU MU MU 20 40 40 0 26 19 2 5 Private Yes, 4th and 5th Yes 1.14 Adj. to arterial road Yes 100% Premier Physicians: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. "Developer and property owner interest. The subject parcel (APN: 213-702-004) constitutes a part of the larger Marketplace Business Center development as a Housing Opportunity Site (Parcels 213- 703-002, -004, -007, & -008), all built in the late 1980s/early 1990s. As a whole, the Development is underutilized and is made up of a retail sporting goods store, an extended stay hotel, professional offices, and restaurants. The site is adjacent to the Iron Horse Regional Trail, a major arterial roadway (Bollinger Canyon Road), and the approved CityWalk Master Plan development. Redevelopment of the subject parcel likely given the City has reviewed in 2021 a Preliminary Housing Development application for mixed use development (including residential uses) on the adjacent parcel (APN: 213-701-002) at the Marketplace Center. The subject parcel is located in a designated Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. Opportunity to combine with adjacent parcels for redevelopment." Page 4 of 6 Lower Moderate Above- Moderate Improvement to Land Ratio Constraints Property Owner Interest Percent of Property Notes Included in Previous Cycle HE Infra- structure Proposed Zoning Min Density (du/ac) Max Density (du/ac) Realistic Density (du/ac) Existing Units Realistic Zoned Capacity Income Distribution Owner- ship Planning Subarea Site Address APN Zoning Proposed GPGross Acres Current Use GP Southern San Ramon 1041 Market Pl 2.14E+08 4 Retail— Shopping Center MU MU MU MU 20 40 40 0 96 72 9 15 Private Yes, 4th and 5th Yes 1.25 Adj. to arterial road Yes 100% Sports Basement Center: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. "Developer and property owner interest. The subject parcel (APN: 213-702-007) constitutes a part of the larger Marketplace Business Center development as a Housing Opportunity Site (Parcels 213- 703-002, -004, -007, & -008), all built in the late 1980s/early 1990s. As a whole, the Development is underutilized and is made up of a retail sporting goods store, an extended stay hotel, professional offices, and restaurants. The site is adjacent to the Iron Horse Regional Trail, a major arterial roadway (Bollinger Canyon Road), and the approved CityWalk Master Plan development. Redevelopment of the subject parcel likely given the City has reviewed in 2021 a Preliminary Housing Development application for mixed use development (including residential uses) on the adjacent parcel (APN: 213-701-002) at the Marketplace Center. The subject parcel is located in a designated Priority Development Area (PDA) by the Association of Bay Area Governments (ABAG). HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired. Opportunity to combine with adjacent parcels for redevelopment." Southern San Ramon 9130 Alcosta Blvd.2.11E+08 0.68 Shopping Center MU MU MU MU 20 40 40 0 16 12 1 3 Private Yes, 4th and 5th Yes - Current 2.9 None Yes 100% Country Club Village: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Developer and property owner interest in the past. The Housing Opportunity Site is comprised of three parcels (out of five existing parcels with four office buildings and parking lot areas). The existing buildings/parking was constructed in the 1960s/1970s and currently include a mix of professional offices and learning studios. Redevelopment anticipated due to the old age of the development and the low Improvement to Land Ratio. The site is located along a major arterial roadway (Alcosta Boulevard) and is adjacent to the Sunny Glen Senior Community area. The site is within walking distance to neighborhood-serving businesses, bus transit, and the senior center. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired, incorporating shared parking with the adjacent existing uses. Opportunity to combine with adjacent parcels for redevelopment. Southern San Ramon 9150 Alcosta Blvd.2.11E+08 0.81 Shopping Center MU MU MU MU 20 40 40 0 19 14 1 4 Private Yes, 4th and 5th Yes - Current 2.92 None Yes 100% Country Club Village: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Developer and property owner interest in the past. The Housing Opportunity Site is comprised of three parcels (out of five existing parcels with four office buildings and parking lot areas). The existing buildings/parking was constructed in the 1960s/1970s and currently include a mix of professional offices and learning studios. Redevelopment anticipated due to the old age of the development and the low Improvement to Land Ratio. The site is located along a major arterial roadway (Alcosta Boulevard) and is adjacent to the Sunny Glen Senior Community area. The site is within walking distance to neighborhood-serving businesses, bus transit, and the senior center. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired, incorporating shared parking with the adjacent existing uses. Opportunity to combine with adjacent parcels for redevelopment. Southern San Ramon 9120 Alcosta Blvd 2.11E+08 2.5 Retail— Shopping Center MU MU MU MU 20 40 40 0 56 42 5 9 Private Yes, 4th and 5th Yes 1.58 None Yes 56% Country Club Village (West Side): Capacity based on residential development on parking lot at max density; Maintain retail. Developer and previous property owner interest. The subject parcel (APN: 210-520-051) is part of an existing retail center (Country Club Village, constructed in 1995) with underutilized surface parking lot areas. This site is located along a major arterial roadway (Alcosta Boulevard) and the Iron Horse Regional Trail. In recent years, approximately 10,000 sq. ft. of tenant space remains vacant, signaling a potential for redevelopment opportunities. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates the use of shared parking with a mixed use development pattern. Residential development is anticipated on the existing surface parking lot area, while preserving retail opportunities on-site. Southern San Ramon 9260 Alcosta Dr 2.1E+08 0.8 Office MU MU-SH MU Mixed Use/ Senior Housing 20 40 40 0 19 14 1 4 Private Yes, 4th and 5th Yes 1 Limited to senior housing Yes 100% South San Ramon Offices: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Developer and property owner interest in the past. The Housing Opportunity Site is comprised of three parcels (out of five existing parcels with four office buildings and parking lot areas). The existing buildings/parking was constructed in the 1960s/1970s and currently include a mix of professional offices and learning studios. Redevelopment anticipated due to the old age of the development and the low Improvement to Land Ratio. The site is located along a major arterial roadway (Alcosta Boulevard) and is adjacent to the Sunny Glen Senior Community area. The site is within walking distance to neighborhood-serving businesses, bus transit, and the senior center. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired, incorporating shared parking with the adjacent existing uses. Opportunity to combine with adjacent parcels for redevelopment. Southern San Ramon 9260 Alcosta Dr 2.1E+08 1 Office MU MU-SH MU Mixed Use/ Senior Housing 20 40 40 0 24 18 2 4 Private Yes, 4th and 5th Yes 0.58 Limited to senior housing Yes 100% South San Ramon Offices: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Developer and property owner interest in the past. The Housing Opportunity Site is comprised of three parcels (out of five existing parcels with four office buildings and parking lot areas). The existing buildings/parking was constructed in the 1960s/1970s and currently include a mix of commercial uses. Redevelopment in near term due to the age of the development and the low Improvement to Land Ratio. The site is located along a major arterial roadway (Alcosta Boulevard) and is adjacent to the Sunny Glen Senior Community area. The site is within walking distance to neighborhood-serving businesses, bus transit, and the senior center. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired, incorporating shared parking with the adjacent existing uses. Opportunity to combine with adjacent parcels for redevelopment. Southern San Ramon 9260 Alcosta Dr 2.1E+08 0.9 Parking Lot MU MU-SH MU Mixed Use/ Senior Housing 20 30 40 0 21 15 2 4 Private Yes, 4th and 5th Yes 0.04 Limited to senior housing Yes 100% South San Ramon Offices: Capacity estimate based on redeveloping entire site 40/60 commercial/residential at max residential density. Developer and previous property owner interest. The Housing Opportunity Site is comprised of three parcels (out of five existing parcels with four office buildings and parking lot areas). The existing buildings/parking was constructed in the 1960s/1970s and currently include a mix of professional offices and learning studios. Redevelopment anticipated due to the old age of the development and the low Improvement to Land Ratio. The site is located along a major arterial roadway (Alcosta Boulevard) and is adjacent to the Sunny Glen Senior Community area. Redevelopment in near term due to the age of the development and the low Improvement to Land Ratio. The site is located along a major arterial roadway (Alcosta Boulevard) and is adjacent to the Sunny Glen Senior Community area. The site is within walking distance to neighborhood-serving businesses, bus transit, and the senior center. HE Update will facilitate redevelopment with an increased density range between 20 to 40 du/ac and anticipates a mixed use development pattern that would allow existing uses to remain if desired, incorporating shared parking with the adjacent existing uses. Opportunity to combine with adjacent parcels for redevelopment. Dougherty Valley Bollinger Canyon Rd.2.22E+08 6.6 Vacant MU MU/ DVSP - MU MU DVSP 20 40 40 0 120 18 42 60 Private Yes, 4th and 5th Yes - Current 0 Yes 100%Requires DV SP plan amendment to add more units after Deer creek south is completed. Property owner has expressed interest and requested to be a HOS in 6th cycle. Owner is currently exploring site design to incorporate a mix of residential and commercial uses. Vacant parcel. Dougherty Valley Bollinger Canyon Rd.2.22E+08 6.8 Vacant MU MU DVSP - MU MU DVSP 20 40 40 0 120 18 42 60 Private Yes, 4th and 5th Yes - Current 0 Yes 100%Requires DV SP plan amendment to add more units after Deer creek south is completed. Property owner has expressed interest and requested to be a HOS in 6th cycle. Owner is currently exploring site design to incorporate a mix of residential and commercial uses. Vacant parcel. MU-SH = Mixed Use – Senior Housing Overlay C/SC = Commercial/Service Commercial DRMU = Destination Retail Mixed Use DVSP = Dougherty Valley Specific Plan MU = Mixed Use MU-C = Mixed Use – Commercial BMU = Business Mixed Use CC = Community Commercial CMU – Commercial Mixed Use CR = Commercial Recreation Page 5 of 6 Lower Moderate Above- Moderate Improvement to Land Ratio Constraints Property Owner Interest Percent of Property Notes Included in Previous Cycle HE Infra- structure Proposed Zoning Min Density (du/ac) Max Density (du/ac) Realistic Density (du/ac) Existing Units Realistic Zoned Capacity Income Distribution Owner- ship Planning Subarea Site Address APN Zoning Proposed GPGross Acres Current Use GP NCRSP = North Camino Ramon Specific Plan OA = Administrative Office OA-H = Administrative Office - Height Limit Overlay PD = Planned Development PS = Public and Semipublic SRVSP = San Ramon Village Specific Plan TCMU = The Commons Mixed Use WSP = Westside Specific Plan Page 6 of 6