HomeMy WebLinkAboutAdopted Entire Zoning Ordinance 02.28.20
City of San Ramon
Zoning Ordinance
Adopted:
October 27, 2015
Latest Revisions Effective:
February 28, 2020
City of San Ramon
7000 Bollinger Canyon Road
San Ramon, California 94583
Zoning Ordinance Table of Contents Effective February 28, 2020
2
[Page intentionally left blank]
Zoning Ordinance Table of Contents Effective February 28, 2020
3
CITY OF SAN RAMON
ZONING ORDINANCE
Contents
Division D1 - Zoning Ordinance Applicability ............................................... 1-1
Chapter I - Purpose and Applicability of Zoning Ordinance ............................................ 1-3
D1-1 - Purposes of the Zoning Ordinance ............................................................................ 1-3
D1-2 - Authority for the Zoning Ordinance ........................................................................... 1-4
D1-3 - Applicability of the Zoning Ordinance ........................................................................ 1-4
D1-4 - Responsibility for Administration ............................................................................... 1-6
D1-5 - Rules of Interpretation ............................................................................................... 1-6
Chapter II - Zoning Map ....................................................................................................... 1-7
D1-6 - Purpose ..................................................................................................................... 1-7
D1-7 - Zoning Map and Zones .............................................................................................. 1-7
Division D2 - Allowable Land Uses and Zoning Standards .......................... 2-1
Chapter I - Development and Land Use Approval Requirements ................................... 2-3
D2-1 - Purpose ..................................................................................................................... 2-3
D2-2 - General Requirements for Development and New Land Uses ................................. 2-3
D2-3 - Allowable Land Uses and Permit Requirements ....................................................... 2-3
D2-4 - Exemptions from Land Use Permit Requirements .................................................... 2-5
D2-5 - Temporary Uses ........................................................................................................ 2-6
Chapter II - Residential Zones ............................................................................................. 2-7
D2-6 - Purpose ..................................................................................................................... 2-7
D2-7 - Purposes of the Residential Zones ............................................................................ 2-7
D2-8 - Residential Zone Land Uses and Permit Requirements ........................................... 2-8
D2-9 - Residential Zone General Development Standards ................................................ 2-13
D2-10 - RC and HR Zone Clustering Requirements .......................................................... 2-17
Chapter III - Mixed Use Zones ........................................................................................... 2-19
D2-11 - Purpose ................................................................................................................. 2-19
D2-12 - Purposes of Mixed Use Zones .............................................................................. 2-19
D2-13 - Mixed Use Zone Land Uses and Permit Requirements ........................................ 2-20
D2-14 - Mixed Use Zone General Development Standards ............................................... 2-25
D2-15 - Mixed Use Zone Additional Development Standards ............................................ 2-27
Zoning Ordinance Table of Contents Effective February 28, 2020
4
Chapter IV - Commercial, Office and Industrial Zones ................................................... 2-29
D2-17 - Purpose ................................................................................................................. 2-29
D2-18 - Purposes of Commercial, Office and Industrial Zones .......................................... 2-29
D2-19 - Commercial, Office and Industrial Land Uses and Permit Requirements ............. 2-30
D2-20 - Commercial, Office, and Industrial General Development Standards ................... 2-37
D2-21 - Standards for Specific Commercial, Office and Industrial Zones .......................... 2-39
Chapter V - Special Purpose Zones.................................................................................. 2-41
D2-22 - Purpose ................................................................................................................. 2-41
D2-23 - Purposes of Special Purpose Zones ..................................................................... 2-41
D2-24 - Special Purpose Zone Land Uses and Permit Requirements ............................... 2-42
D2-25 - Special Purpose Zone General Development Standards...................................... 2-47
D2-26 - Special Purpose Zone Land Use Limitations and Additional Standards ............... 2-49
Chapter VI - Overlay Zones ............................................................................................... 2-51
D2-27 - Purpose ................................................................................................................. 2-51
D2-28 - Applicability of Overlay Zones ............................................................................... 2-51
D2-29 - Height Limit (-H) Overlay Zone .............................................................................. 2-52
D2-30 - Interim Study (-IS) Overlay Zone ........................................................................... 2-52
D2-31 - Landmark (-L) Overlay Zone ................................................................................. 2-53
D2-32 - Reserved ............................................................................................................... 2-57
D2-33 - Senior Housing (-SH) Overlay Zone ...................................................................... 2-57
Division D3 - Site Planning and Project Design Standards .......................... 3-1
Chapter I - General Property Development Standards ..................................................... 3-3
D3-1 - Purpose ..................................................................................................................... 3-3
D3-2 - Applicability ................................................................................................................ 3-3
D3-3 - Development on Substandard Parcel ........................................................................ 3-3
D3-4 - Fences, Walls, and Screening ................................................................................... 3-4
D3-5 - Hazardous Materials Storage .................................................................................... 3-8
D3-6 - Height Limits and Exceptions .................................................................................... 3-9
D3-7 - Outdoor Lighting ...................................................................................................... 3-12
D3-8 - Performance Standards ........................................................................................... 3-13
D3-9 - Relocated Structures ............................................................................................... 3-15
D3-10 - Setback Requirements and Exceptions ................................................................ 3-15
D3-11 - Solid Waste/Recyclable Materials Storage ........................................................... 3-20
D3-12 - Underground Utilities ............................................................................................. 3-22
D3-13 - Utility and Public Service Requirements................................................................ 3-24
Chapter II - Landscape Design Standards ....................................................................... 3-25
D3-14 - Purpose of Chapter................................................................................................ 3-25
D3-15 - Reserved ............................................................................................................... 3-25
D3-16 - Definitions .............................................................................................................. 3-25
D3-17 - Applicability ............................................................................................................ 3-25
D3-18 - Landscape Plan Approval Required ...................................................................... 3-26
D3-19 - Landscape Location Requirements ....................................................................... 3-27
D3-20 - Landscape Area Requirements ............................................................................. 3-28
D3-21 - Landscape Standards ............................................................................................ 3-29
D3-22 - Landscape Requirements ...................................................................................... 3-31
D3-23 - Maintenance of Landscape Areas ......................................................................... 3-31
D3-24 - Landscaping Education ......................................................................................... 3-31
Zoning Ordinance Table of Contents Effective February 28, 2020
5
Chapter III - Parking and Loading ..................................................................................... 3-33
D3-25 - Intent and Purpose of Chapter .............................................................................. 3-33
D3-26 - Applicability and Basic Requirements ................................................................... 3-34
D3-27 - General Parking Regulations ................................................................................. 3-35
D3-28 - Number of Parking Spaces Required .................................................................... 3-35
D3-29 - Disabled Parking Requirements ............................................................................ 3-45
D3-30 - Reduction of Parking Requirements ...................................................................... 3-45
D3-31 - Parking Design and Development Standards ....................................................... 3-47
D3-32 - Parking Area Screening ......................................................................................... 3-51
D3-33 - Parking Area Lighting Requirements ..................................................................... 3-51
D3-34 - Parking Lot Landscaping Standards...................................................................... 3-51
D3-35 - Garage and Carport Design and Location Requirements ..................................... 3-52
D3-36 - Additional Standards for Parking Lots and Structures ........................................... 3-53
D3-37 - Driveways and Site Access ................................................................................... 3-55
D3-38 - Bicycle and Motorcycle Parking Requirements ..................................................... 3-58
D3-39 - Loading Space Requirements ............................................................................... 3-59
D3-40 - Designation of Off-Site Parking and Loading Spaces ........................................... 3-61
D3-41 - Vehicles on Private Property ................................................................................. 3-62
Chapter IV - Signs .............................................................................................................. 3-65
D3-42 - Purpose of Chapter................................................................................................ 3-65
D3-43 - Criteria and Guidelines .......................................................................................... 3-66
D3-44 - Definitions .............................................................................................................. 3-67
D3-45 - Exempt Signs - Signs Not Requiring a Sign Permit .............................................. 3-73
D3-46 - On and Off-Site Sign Regulations and Guidelines ................................................ 3-75
D3-47 - Specific Sign Regulations ...................................................................................... 3-77
D3-48 - Miscellaneous Signs .............................................................................................. 3-84
D3-49 - Illumination of Signs............................................................................................... 3-84
D3-50 - Prohibited Locations, Sign Types, and Messages ................................................ 3-84
D3-51 - Maintenance, Abandonment, and Removal .......................................................... 3-86
D3-52 - Master Sign Program Required ............................................................................. 3-86
D3-53 - Off-Site Directional Signs ...................................................................................... 3-92
D3-54 - Approvals Required ............................................................................................... 3-93
D3-55 - Required Findings .................................................................................................. 3-93
D3-56 - Sign Permit Required............................................................................................. 3-93
D3-57 - Owner’s Consent Required ................................................................................... 3-94
D3-58 - Sign Permit Applications ........................................................................................ 3-94
D3-59 - Building Permit Required ....................................................................................... 3-94
D3-60 - Required Inventory of Illegal or Abandoned Signs ................................................ 3-94
D3-61 - Reserved ............................................................................................................... 3-94
D3-62 - Reserved ............................................................................................................... 3-94
D3-63 - Reserved ............................................................................................................... 3-94
Chapter V – Portable Outdoor Storage Units .................................................................. 3-95
D3-64 - Purpose of Chapter................................................................................................ 3-95
D3-65 - Definitions .............................................................................................................. 3-95
D3-66 - Number, Size, Duration, and Location ................................................................... 3-95
D3-67 - Signage .................................................................................................................. 3-96
D3-68 - Maintenance and Prohibition of Hazardous Materials ........................................... 3-96
D3-69 - Reserved ............................................................................................................... 3-96
D3-70 - Reserved ............................................................................................................... 3-96
D3-71 - Permits ................................................................................................................... 3-96
D3-72 - Reserved ............................................................................................................... 3-96
D3-73 - Reserved ............................................................................................................... 3-96
Zoning Ordinance Table of Contents Effective February 28, 2020
6
Division D4 - Standards for Specific Land Uses ........................................... 4-1
Chapter I - Adult Business Regulations ............................................................................. 4-3
D4-1 - Purpose ..................................................................................................................... 4-3
D4-2 - Definitions .................................................................................................................. 4-4
D4-3 - Permitted Areas and Minimum Proximity Requirements ........................................... 4-4
D4-4 - Use Permit Required ................................................................................................. 4-4
D4-5 - Application Requirements .......................................................................................... 4-5
D4-6 - Investigation and Action on Application ..................................................................... 4-6
D4-7 - Appeal ........................................................................................................................ 4-7
D4-8 - Judicial Review of Decision to Grant, Deny, or Revoke ............................................ 4-7
D4-9 - Permit Expiration ....................................................................................................... 4-7
D4-10 - Findings ................................................................................................................... 4-7
D4-11 - Registration of New Employees .............................................................................. 4-8
D4-12 - Adult-Oriented Business Development Standards .................................................. 4-9
D4-13 - Display of Permit .................................................................................................... 4-13
D4-14 - Persons Under 18 Prohibited ................................................................................ 4-13
D4-15 - Transfer of Adult-Oriented Business Regulatory Permits...................................... 4-13
D4-16 - Permit Revocation ................................................................................................. 4-13
D4-17 - Violations ............................................................................................................... 4-15
D4-18 - Applicability to Other Regulations .......................................................................... 4-15
D4-19 - Conduct Constituting a Public Nuisance ............................................................... 4-15
D4-20 - Inspections ............................................................................................................. 4-16
Chapter II - Alternative Energy Structures ....................................................................... 4-17
D4-21 - Purpose ................................................................................................................. 4-17
D4-22 - Solar Energy System ............................................................................................. 4-17
D4-23 - Wind Energy Equipment ........................................................................................ 4-18
Chapter III - Standards for Specific Land Uses ............................................................... 4-21
D4-24 - Purpose ................................................................................................................. 4-21
D4-25 - Applicability ............................................................................................................ 4-21
D4-26 - Accessory Structures ............................................................................................. 4-22
D4-27 - Bed and Breakfast Inns ......................................................................................... 4-24
D4-28 - Card Rooms ........................................................................................................... 4-28
D4-29 - Child Day Care Facilities ....................................................................................... 4-28
D4-30 - Commercial Entertainment Facilities ..................................................................... 4-29
D4-31 - Employee Eating Areas ......................................................................................... 4-30
D4-32 - Heliports ................................................................................................................. 4-30
D4-33 - Home Occupations ................................................................................................ 4-32
D4-34 - Live Entertainment ................................................................................................. 4-33
D4-35 - Outdoor Display, Storage, and Vending ................................................................ 4-34
D4-36 - Mobile Homes and Mobile Home Parks ................................................................ 4-37
D4-37 - Recycling Facilities ................................................................................................ 4-39
D4-38 - Restaurants with Take-Out Service ....................................................................... 4-44
D4-39 - Accessory Dwelling Units ...................................................................................... 4-45
D4-40 - Service Stations and Car Washes ......................................................................... 4-47
Chapter IV - Wireless Telecommunications Facilities .................................................... 4-49
D4-41 - Purpose ................................................................................................................. 4-49
D4-42 - Process and Applicability ....................................................................................... 4-50
D4-43 - Development Standards ........................................................................................ 4-52
D4-44 - Permitting Requirements ....................................................................................... 4-53
Zoning Ordinance Table of Contents Effective February 28, 2020
7
D4-45 - Performance Standards and Maintenance ............................................................ 4-57
D4-46 - Administration ........................................................................................................ 4-58
D4-47 - Reserved ............................................................................................................... 4-60
D4-48 - Reserved ............................................................................................................... 4-60
D4-49 - Reserved ............................................................................................................... 4-60
D4-50 - Reserved ............................................................................................................... 4-60
D4-51 - Reserved ............................................................................................................... 4-60
D4-52 - Reserved ............................................................................................................... 4-60
D4-53 - Reserved ............................................................................................................... 4-60
D4-54 - Reserved ............................................................................................................... 4-60
Chapter V – Homeless Shelters ........................................................................................ 4-61
D4-55 - Purpose ................................................................................................................. 4-61
D4-56 - Permit Requirements ............................................................................................. 4-61
D4-57 - Homeless Shelter Standards ................................................................................. 4-61
D4-58 - Post-Approval Procedures ..................................................................................... 4-62
D4-59 - Reserved ............................................................................................................... 4-62
D4-60 - Reserved ............................................................................................................... 4-62
D4-61 - Reserved ............................................................................................................... 4-62
D4-62 - Reserved ............................................................................................................... 4-62
D4-63 - Reserved ............................................................................................................... 4-62
D4-64 - Reserved ............................................................................................................... 4-62
D4-65 - Reserved ............................................................................................................... 4-62
Chapter VI – Reasonable Accommodations for the Disabled ....................................... 4-63
D4-66 - Purpose ................................................................................................................. 4-63
D4-67 - Process and Applicability ....................................................................................... 4-63
D4-68 - Reserved ............................................................................................................... 4-64
D4-69 - Reserved ............................................................................................................... 4-64
D4-70 - Reserved ............................................................................................................... 4-64
D4-71 - Reserved ............................................................................................................... 4-64
Chapter VII – Raising of Chickens .................................................................................... 4-65
D4-72 - Purpose ................................................................................................................. 4-65
D4-73 - Applicability and Standards ................................................................................... 4-65
D4-74 - Reserved ............................................................................................................... 4-65
D4-75 - Reserved ............................................................................................................... 4-65
Chapter VIII – Density Bonus ............................................................................................ 4-67
D4-76 - Purpose ................................................................................................................. 4-67
D4-77 - Definitions .............................................................................................................. 4-67
D4-78 - Process and Applicability ....................................................................................... 4-67
D4-79 - Application Requirements ...................................................................................... 4-68
D4-80 – Density Bonus Housing Agreement ...................................................................... 4-68
D4-81 - Reserved ............................................................................................................... 4-69
D4-82 - Reserved ............................................................................................................... 4-69
D4-83 - Reserved ............................................................................................................... 4-69
D4-84 - Reserved ............................................................................................................... 4-69
Zoning Ordinance Table of Contents Effective February 28, 2020
8
Division D5 - Resource Management ............................................................. 5-1
Chapter I - Hillside, Creek, and Ridgeline Areas ............................................................... 5-3
D5-1 - Purpose ..................................................................................................................... 5-3
D5-2 - Applicability ................................................................................................................ 5-4
D5-3 - Exemptions ................................................................................................................ 5-4
D5-4 - Hillside, Creek, and Ridgeline Area Development Standards ................................... 5-4
D5-5 - Design Guidelines ...................................................................................................... 5-7
D5-6 - Slope Methodology .................................................................................................... 5-9
Chapter II - Tree Preservation and Protection ................................................................. 5-11
D5-7 - Purpose ................................................................................................................... 5-11
D5-8 - Applicability .............................................................................................................. 5-11
D5-9 - Tree Permit Application Requirements .................................................................... 5-12
D5-10 - Tree Planting and Replacement ............................................................................ 5-13
D5-11 - Tree Permit Approval or Denial ............................................................................. 5-15
D5-12 - Post Approval Procedures ..................................................................................... 5-17
Division D6 - Planning Permit Procedures .................................................... 6-1
Chapter I - Permit Application Filing and Processing ...................................................... 6-3
D6-13 - Purpose ................................................................................................................... 6-3
D6-14 - Authority for Land Use and Zoning Decisions ......................................................... 6-3
D6-15 - Multiple Permit Applications .................................................................................... 6-5
D6-16 - Application Preparation and Filing ........................................................................... 6-5
D6-17 - Application Fees ...................................................................................................... 6-6
D6-18 - Initial Application Review ......................................................................................... 6-6
D6-19 - Environmental Assessment ..................................................................................... 6-8
D6-20 - Project Evaluation and Staff Reports....................................................................... 6-8
Chapter II - Permit Review and Decisions ......................................................................... 6-9
D6-21 - Purpose ................................................................................................................... 6-9
D6-22 - Architectural Review ................................................................................................ 6-9
D6-23 - Development Plans................................................................................................ 6-14
D6-24 - Minor Exceptions ................................................................................................... 6-16
D6-25 - Planned Development Permits .............................................................................. 6-19
D6-26 - Preliminary Plan Review ........................................................................................ 6-22
D6-27 - Temporary Use Permits ......................................................................................... 6-24
D6-28 - Use Permits and Minor Use Permits ..................................................................... 6-28
D6-29 - Variances ............................................................................................................... 6-30
D6-30 - Zoning Clearances................................................................................................. 6-32
Chapter III - Permit Implementation, Time Limits, and Extensions ............................... 6-33
D6-31 - Purpose ................................................................................................................. 6-33
D6-32 - Effective Dates ....................................................................................................... 6-33
D6-33 - Performance Guarantees ...................................................................................... 6-33
D6-34 - Time Limits and Extensions ................................................................................... 6-34
D6-35 - Changes to an Approved Project ........................................................................... 6-35
D6-36 - Permits to Run with the Land ................................................................................ 6-36
D6-37 - Resubmittals .......................................................................................................... 6-36
D6-38 - Covenants of Easements ...................................................................................... 6-36
Zoning Ordinance Table of Contents Effective February 28, 2020
9
Chapter IV - Development Agreements ............................................................................ 6-39
D6-39 - Purpose ................................................................................................................. 6-39
D6-40 - Application Requirements ...................................................................................... 6-39
D6-41 - Pre-Application Process ........................................................................................ 6-40
D6-42 - Department Review and Recommendation ........................................................... 6-40
D6-43 - Public Hearing Required ........................................................................................ 6-40
D6-44 - Commission Action ................................................................................................ 6-41
D6-45 - Council Action ........................................................................................................ 6-41
D6-46 - Annual Review ....................................................................................................... 6-42
D6-47 - Application of Existing Rules, Regulations, and Policies ....................................... 6-43
D6-48 - Modification and Termination ................................................................................ 6-43
D6-49 - Zoning Administrator’s Responsibilities ................................................................. 6-43
Division D7 - Zoning Ordinance Administration ........................................... 7-1
Chapter I - Nonconforming Uses, Structures, and Parcels .............................................. 7-3
D7-1 - Purpose ..................................................................................................................... 7-3
D7-2 - Nonconforming Uses ................................................................................................. 7-3
D7-3 - Nonconforming Structures ......................................................................................... 7-4
D7-4 - Nonconforming Parcels ............................................................................................. 7-6
D7-5 - Exemptions ................................................................................................................ 7-6
D7-6 - Unlawful Uses and Structures ................................................................................... 7-8
D7-7 - Nuisance Abatement ................................................................................................. 7-9
Chapter II - Appeals and Calls for Review ....................................................................... 7-11
D7-8 - Purpose ................................................................................................................... 7-11
D7-9 - Right of Appeal ........................................................................................................ 7-11
D7-10 - Time Limits for Appeals and Calls for Review ....................................................... 7-11
D7-11 - Initiation of Appeals and Calls for Review ............................................................. 7-12
D7-12 - Procedures for Appeals and Calls for Review ....................................................... 7-12
D7-13 - Effective Dates ....................................................................................................... 7-13
D7-14 - New Appeal ........................................................................................................... 7-13
Chapter III - Amendments .................................................................................................. 7-15
D7-15 - Purpose ................................................................................................................. 7-15
D7-16 - Initiation of Amendment ......................................................................................... 7-15
D7-17 - Application Requirements ...................................................................................... 7-16
D7-18 - Public Hearing Scope and Notice .......................................................................... 7-16
D7-19 - Duties of the Commission ...................................................................................... 7-16
D7-20 - Duties of the Council.............................................................................................. 7-17
D7-21 - Revisions of Proposed Amendments .................................................................... 7-17
D7-22 - Post Decision Procedures ..................................................................................... 7-18
Chapter IV - Public Hearings ............................................................................................. 7-19
D7-23 - Purpose ................................................................................................................. 7-19
D7-24 - Notice of Hearing ................................................................................................... 7-19
D7-25 - Scheduling of Hearing ........................................................................................... 7-20
D7-26 - Hearing Procedure................................................................................................. 7-21
D7-27 - Review Authority Decision and Notice................................................................... 7-21
D7-28 - Recommendation by Commission ......................................................................... 7-21
D7-29 - Effective Date of Decision ..................................................................................... 7-22
Zoning Ordinance Table of Contents Effective February 28, 2020
10
Chapter V - Enforcement ................................................................................................... 7-23
D7-30 - Purpose ................................................................................................................. 7-23
D7-31 - Enforcement Responsibilities ................................................................................ 7-23
D7-32 - Revocation or Modification of Discretionary Permits ............................................. 7-23
D7-33 - Violations ............................................................................................................... 7-24
D7-34 - Penalties ................................................................................................................ 7-24
Division D8 - Glossary ..................................................................................... 8-1
Chapter I - Definitions .......................................................................................................... 8-3
D8-1 - Purpose ...................................................................................................................... 8-3
D8-2 - Definitions of Specialized Terms and Phrases .......................................................... 8-4
Appendix A - Mixed Use Zone Redevelopment Guidelines .......................... 9-1
City of San Ramon Zoning Ordinance D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-1
Division D1
Zoning Ordinance Applicability
Chapter I - Purpose and Applicability of Zoning Ordinance ................................................................ 1-3
1-1 - Purposes of the Zoning Ordinance .......................................................................................... 1-3
1-2 - Authority for the Zoning Ordinance .......................................................................................... 1-4
1-3 - Applicability of the Zoning Ordinance ...................................................................................... 1-4
1-4 - Responsibility for Administration .............................................................................................. 1-6
1-5 - Rules of Interpretation .............................................................................................................. 1-6
Chapter II - Zoning Map ........................................................................................................................... 1-7
1-6 - Purpose .................................................................................................................................... 1-7
1-7 - Zoning Map and Zones ............................................................................................................ 1-7
City of San Ramon Zoning Ordinance D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-2
[Page intentionally left blank]
Purpose and Applicability of Zoning Ordinance D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-3
Chapter I - Purpose and Applicability of Zoning Ordinance
Sections:
D1-1 - Purpose of the Zoning Ordinance
D1-2 - Authority for the Zoning Ordinance
D1-3 - Applicability of the Zoning Ordinance
D1-4 - Responsibility for Administration
D1-5 - Rules of Interpretation
D1-1 - Purposes of the Zoning Ordinance
The City of San Ramon Zoning Ordinance carries out the policies of the San Ramon General Plan by
classifying and regulating the uses of land and structures within the City, consistent with the General Plan.
This Zoning Ordinance is adopted to protect and promote the public health, safety, comfort, convenience,
prosperity, and general welfare of residents, and businesses in the City. More specifically, this Zoning
Ordinance is intended to:
A. Guide the physical development of the City to:
1. Preserve and enhance the character and quality of residential neighborhoods;
2. Foster convenient, harmonious, and workable relationships among land uses;
3. Achieve the arrangement and diversity of land uses envisioned by the General Plan;
B. Promote the economic stability of existing land uses that are consistent with the General Plan and
protect them from intrusion by inharmonious or harmful land uses;
C. Ensure that development includes open space for light, air, and fire safety;
D. Promote the development of non-residential land uses consistent with the General Plan to strengthen
the City's economic base;
E. Encourage pedestrian-oriented development to the extent feasible, to assist in reducing unnecessary
vehicle trips;
F. Conserve and enhance the City's architectural and cultural resources;
G. Conserve and enhance key visual features of San Ramon's setting, including creeks, undeveloped
hillsides and ridgelines;
H. Require development to provide adequate off-street parking and loading facilities, and promote a
safe, effective traffic circulation system; and
I. Establish standards for proposed development to maintain acceptable capacities of existing streets,
utilities, or public services.
Purpose and Applicability of Zoning Ordinance D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-4
D1-2 - Authority for the Zoning Ordinance
This Zoning Ordinance is enacted based on the authority vested in the City of San Ramon by the Charter
of the City of San Ramon and by the State of California, including the California Constitution, the Planning
and Zoning Law (Government Code Section 65000 et seq.), and the California Environmental Quality Act
(Public Resources Code Section 21000 et seq.).
D1-3 - Applicability of the Zoning Ordinance
This Zoning Ordinance applies to all land uses, subdivisions, and development within the City of San
Ramon as follows.
A. Application to property. The requirements of this Zoning Ordinance apply to all land within the City
of San Ramon, including land owned by the City. The requirements of this Zoning Ordinance shall
apply to property owned by and/or under the jurisdiction of any other local, state, or federal agency
to the maximum extent allowed by law. The Zoning Map shall govern the application of regulations
to specific lots.
B. New land uses or structures, changes to land uses or structures. It shall be unlawful, and a
violation of this Zoning Ordinance for any person to establish, construct, reconstruct, alter, or replace
any use of land or structure, except in compliance with the requirements of Section D2-2 (General
Requirements for Development and New Land Uses), and Chapter D7-I (Nonconforming Uses,
Structures, and Parcels). Issuance of a Building Permit or Grading Permit by the City shall require
that the plans for proposed construction comply with all applicable requirements of this Zoning
Ordinance.
C. Subdivisions. Each proposed subdivision shall be consistent with the minimum lot size requirements
of Division D2 (Allowable Land Uses and Zoning Standards), the City's Subdivision Ordinance, and
all applicable requirements of this Zoning Ordinance.
D. Continuation of an existing land use. An existing land use is lawful and not in violation of the this
Zoning Ordinance only when operated and maintained in compliance with all applicable requirements
of this Zoning Ordinance, including Chapter D7-I (Nonconforming Uses, Structures, and Parcels).
However, these requirements do not retroactively apply to a land use that was lawfully established
before the effective date of this Zoning Ordinance or an applicable amendment, except as otherwise
provided by Chapter D7-I.
E. Effect of Zoning Ordinance changes on a project in progress.
1. Application in process. A planning permit application (see Division D6 - Planning Permit
Procedures) that has been accepted by the Department as complete prior to the effective date
of a Zoning Ordinance amendment is subject to the Zoning Ordinance requirements in effect
as of the date that the application is deemed complete. Any project revisions or amendment to
a permit application, that has been previously deemed complete, shall be subject to the Zoning
Ordinance requirements in effect as of the date that the proposed project revisions are deemed
complete. Each planning permit application shall be processed in compliance with the
requirements of the California Permit Streamlining Act (PSA).
2. Project under construction. A project that is under construction on the effective date of this
Zoning Ordinance, or any amendment, need not be changed to satisfy a new or different
requirement of this Zoning Ordinance, provided that the approved use of the site shall be
established, including the completion of all structures and other features of the project as shown
on the approved permit, before the expiration of the permit, or applicable time extension.
Purpose and Applicability of Zoning Ordinance D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-5
F. Minimum requirements. The requirements of this Zoning Ordinance are minimum requirements for
the promotion of the public health, safety, and general welfare. When this Zoning Ordinance provides
for discretion on the part of a City official or body, discretion may be exercised to impose more
stringent requirements than those in this Zoning Ordinance as may be determined by the review
authority to be necessary to promote appropriate land use and development, environmental resource
protection, and the other purposes of this Zoning Ordinance.
G. Conflicting or Combining requirements.
1. Zoning Ordinance and Municipal Code or Building Code provisions. If a conflict occurs
between requirements of this Zoning Ordinance, or between this Zoning Ordinance and
requirements of other sections of the San Ramon Municipal Code, the Building Code, or other
regulations of the City, the most restrictive shall apply. If a property condition exists that meets
two or more categorical definitions found in D8 (Glossary) of this Zoning Ordinance, then such
property condition must comply with each and every applicable definition to comply with this
Zoning Ordinance.
2. Development agreements or specific plans. If a conflict occurs between the requirements
of this Zoning Ordinance and standards adopted as part of any development agreement or
applicable specific plan, the requirements of the development agreement or specific plan shall
apply.
3. Private agreements. This Zoning Ordinance applies to all land uses and development
regardless of whether it imposes a greater or lesser restriction on the development or use of
structures or land than a private agreement or restriction (for example, CC&Rs), without
affecting the applicability of any agreement or restriction. The City shall not enforce a private
covenant or agreement unless it is a party to the covenant or agreement, or a portion of it.
H. Relationship to prior Zoning Ordinance. The requirements of this Zoning Ordinance supersede
all prior zoning ordinances, as amended, of the City of San Ramon. No requirement of this Zoning
Ordinance shall validate or legalize a land use or structure that was established, constructed, or
maintained in violation of the prior zoning ordinance, as amended, unless it is specifically authorized
by this Zoning Ordinance and is in compliance with all other applicable City ordinances and
regulations.
I. Application during local emergency. The City Council may authorize deviations from any
requirement of this Zoning Ordinance during a local emergency. These deviations shall be authorized
by City Council resolution, without notice or public hearing.
J. Other requirements may apply. Nothing in this Zoning Ordinance eliminates the need for obtaining
any other permits required by the City, or any permit, approval or entitlement required by any other
applicable special district or agency, and/or the regulations of any State or Federal agency.
K. Partial invalidation. If any division, article, chapter, section, subsection, paragraph, subparagraph,
sentence, clause, phrase or portion of this Zoning Ordinance is for any reason held to be invalid,
unconstitutional or unenforceable, that determination shall not affect the validity of the remaining
portions of this Zoning Ordinance. The Council hereby declares that this Zoning Ordinance, and
every part thereof, would have been adopted irrespective of the fact that one or more portions of this
Zoning Ordinance may be declared invalid, unconstitutional or unenforceable.
Purpose and Applicability of Zoning Ordinance D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-6
D1-4 - Responsibility for Administration
The Zoning Ordinance shall be administered by: the San Ramon City Council, referred to in this Zoning
Ordinance as the “Council;” the Planning Commission, referred to as the “Commission;” the Community
Development Director, referred to as the “Director;” the Zoning Administrator; and the San Ramon
Community Development Department, hereafter referred to as the “Department.” The Zoning Administrator
shall be designated by the City Manager.
D1-5 - Rules of Interpretation
A. Authority. The Director has the authority to interpret any provision of this Zoning Ordinance.
Whenever the Director determines that the meaning or applicability of a Zoning Ordinance
requirement is subject to interpretation, the Director may issue an official interpretation. The Director
shall keep a record of any official interpretations made in compliance with this Section and provide
the Planning Commission notification of said interpretations. The Director may also refer any issue
of interpretation directly to the Commission for its determination. Any official interpretation by the
Director or Planning Commission shall be available for public review upon request and may be
appealed pursuant to Division D7, Chapter 2.
B. Language. When used in this Zoning Ordinance, the words "shall," "must," "will," "is to," and "are to"
are always mandatory. "Should" is not mandatory but is strongly recommended; and "may" is
permissive. The present tense includes the past and future tenses; and the future tense includes the
present. The singular number includes the plural number, and the plural the singular, unless the
natural construction of the word indicates otherwise. The words "includes" and "including" shall mean
"including but not limited to . . ."
C. Time limits. Whenever a number of days is specified in this Zoning Ordinance, or in any permit,
condition of approval, or notice provided in compliance with this Zoning Ordinance, the number of
days shall be construed as consecutive calendar days. A time limit shall extend to 5 p.m. on the
following working day where the last of the specified number of days falls on a weekend or holiday.
D. Zoning Map boundaries. See Section D1-7 (Zoning Map and Zones).
E. Allowable uses of land. See Section D2-3 (Allowable Land Uses and Permit Requirements).
F. State law requirements. Where this Zoning Ordinance references a State law requirement (for
example, the California Government Code, Subdivision Map Act, or Public Resources Code), the
reference shall be construed to be to the applicable State law as it may be amended from time-to-
time.
G. Conflicting requirements. See Section D1-3.G (Conflicting requirements).
Zoning Map D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-7
Chapter II - Zoning Map
Sections:
D1-6 - Purpose
D1-7 - Zoning Map and Zones
D1-6 - Purpose
This Chapter establishes the zones applied to property within the City and adopts the City's Zoning Map.
D1-7 - Zoning Map and Zones
The Council hereby adopts the City of San Ramon Zoning Map (hereafter referred to as the "Zoning Map"),
which is on file with the Department and the City Clerk. The Zoning Map is hereby incorporated into this
Zoning Ordinance by reference as though it were fully included here.
A. Zones established. The City of San Ramon shall be divided into zones that implement the San
Ramon General Plan, as follows.
1. Zoning designation system. The zones established by this Section are shown as symbols
on the Zoning Map that consist of letters and numbers, organized as follows.
a. General land use indicator. Each zone symbol includes a letter that indicates the
primary purpose of the zone in terms of land use types. For example, "RS" means that
the primary land use type is single-family residential, though certain non-residential uses
may also be allowed.
b. Residential density or dwelling type indicator. The land use symbol for a particular
zone may include a number that identifies a sub-district with a specific range of dwelling
unit densities or a type of dwelling. For example, "RS-12" identifies an area within the
single-family residential zone where the minimum lot size is 12,000 square feet.
c. Overlay zone indicator. One or more overlay zone indicators may be appended to the
primary zone indicator to identify any overlay zones that apply to a site. For example,
"RS-12-L" would identify a residentially zoned site that is subject to a "Landmark"
designation.
2. Zones. The zones shown in Table 1-1 are hereby established, and shall be shown on the
Zoning Map.
B. Interpretation of zone boundaries. If there is uncertainty about the location of any zone boundary
shown on the official Zoning Map, the location of the boundary shall be determined by the Zoning
Administrator as follows.
1. A zone boundary shown as approximately following a property line shall be construed to follow
the property line.
2. On unsubdivided land, or where a zone boundary divides a lot, the location of the boundary
shall be determined by using the scale on the Zoning Map, unless dimensions printed on the
map indicate the boundary location.
Zoning Map D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-8
3. A zone boundary shown as approximately following the right-of-way line of a freeway, street,
railroad, or other identifiable boundary line shall be construed to follow the right-of-way or other
boundary line.
4. A zone boundary shown as located within the right-of-way line of a freeway, street, railroad, or
other identifiable boundary line shall be construed to follow the centerline of the right-of-way or
boundary line.
5. If any uncertainty remains about the location of a zone boundary or other feature shown on the
zoning map, the location shall be determined by the Zoning Administrator.
C. Development on a lot divided by zone boundaries. If a lot is divided by a zone boundary, the
regulations of this Zoning Ordinance that apply to each zone shall be applied to the area within each
district, and no use other than parking serving a principal use on the site shall be located in a district
in which it is not a permitted or conditional use in Division D2 (Allowable Land Uses and Zoning
Standards).
Zoning Map D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-9
TABLE 1-1 - ZONES
Zone
Symbol
Name of Zone
General Plan Classification
Implemented by Zone
See
Chapter
Residential Zones
RC
Rural Conservation
Rural Conservation - 1 unit/5 acres
D2-II
HR
Hillside Residential
Hillside Residential - 2 units/acre
RE
Residential Estate
Single Family Low Density - 0.2 to 3 units/acre
RS
Single-Family Residential
Single Family Low Density - 0.2 to 3 units/acre
Single Family Low-Medium Density - 3 to 6
units/acre
Single Family Medium Density - 6 to 14
units/acre
RM
Medium Density Residential
Multiple Family-High Density - 14 to 30
units/acre
RMH
Medium-High Density
Residential
Multiple Family-High Density - 14 to 30
units/acre
RH
High Density Residential
Multiple Family-Very High Density - 30 to 50
units/acre
RVH
Multiple Family-Very High
Density
Multiple Family-Very High Density - 30 to 50
units/acre
Mixed Use Zones
MU
Mixed Use
Mixed Use
D2-III
CCMU
City Center Mixed Use
Mixed Use
MU-C Commercial Mixed Use Mixed Use
Commercial and Manufacturing Zones
OA
Administrative Office
Office
D2-IV
OL
Limited Office
Office
CC
Community Commercial
Retail Shopping
Mixed Use
CT
Thoroughfare Commercial
Thoroughfare Commercial
CS
Service Commercial
Commercial Services
CR
Commercial Recreation
Commercial Recreation
MW
Manufacturing/Warehousing
Manufacturing/Warehousing
Zoning Map D1
Division D1 - Zoning Ordinance Applicability – Effective February 28, 2020 1-10
TABLE 1-1 - ZONES
Zone
Symbol
Name of Zone
General Plan Classification
Implemented by Zone
See
Chapter
Special Purpose Zones
AG
Agriculture
Open Space
D2-V
OS-1
Open Space
Open Space
OS-2
Open Space
Open Space
P
Parks and Recreation
Parks GC Golf Course Golf Course
PS
Public and Semipublic
Public and Semipublic
M-1
Medical Center
Office
M-2
Health Facility
Office
PD
Planned Development
All
Overlay Zones
H
Height
All
D2-VI
IS
Interim Study
All
L
Landmark
All
SH
Senior Housing
All
City of San Ramon Zoning Ordinance D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-1
Division D2
Allowable Land Uses and Zoning Standards
TChapter I - Development and Land Use Approval RequirementsUT ...................................................... 2-3
TUD2-1 - PurposeUT................................................................................................................................. 2-3
UTD2-2 - General Requirements for Development and New Land UsesT ............................................. 2-3U
TUD2-3 - Allowable Land Uses and Permit RequirementsUT .................................................................. 2-3
TUD2-4 - Exemptions from Land Use Permit RequirementsUT ............................................................... 2-5
TUD2-5 - Temporary UsesUT ................................................................................................................... 2-6
TUChapter II - Residential ZonesUT................................................................................................................ 2-7
TUD2-6 - PurposeUT................................................................................................................................. 2-7
TUD2-7 - Purposes of the Residential ZonesUT ....................................................................................... 2-7
TUD2-8 - Residential Zone Land Uses and Permit RequirementsUT ...................................................... 2-8T
D2-9 - Residential Zone General Development Standards ........................................................... 2-13
D2-10- RC and HR Zone Clustering Requirements ....................................................................... 2-17
UChapter III - Mixed Use ZonesU .............................................................................................................. 2-19
UD2-11 - PurposeU ............................................................................................................................. 2-19
UD2-12 - Purposes of Mixed Use ZonesU .......................................................................................... 2-19
UD2-13 - Mixed Use Zone Land Uses and Permit RequirementsU .................................................... 2-20
UD2-14 - Mixed Use Zone General Development StandardsU .......................................................... 2-25
UD2-15 - Mixed Use Zone Additional Development StandardsU ....................................................... 2-27
UU
UChapter IV - Commercial, Office and Industrial ZonesU ...................................................................... 2-29
UD2-17 - PurposeU ............................................................................................................................. 2-29
UD2-18 - Purposes of Commercial, Office and Industrial ZonesU ..................................................... 2-29
UD2-19 - Commercial, Office and Industrial Land Uses and Permit RequirementsU ........................ 2-30
UD2-20 - Commercial, Office, Industrial General Development StandardsU ..................................... 2-37
UD2-21 - Standards for Specific Commercial, Office and Industrial ZonesU ..................................... 2-39
UChapter V - Special Purpose ZonesU ..................................................................................................... 2-41
UD2-22 - PurposeU ............................................................................................................................. 2-41
UD2-23 - Purposes of Special Purpose ZonesU ................................................................................. 2-41
UD2-24 - Special Purpose Zone Land Uses and Permit Requirements ........................................... 2-42U
UD2-25 - Special Purpose Zone General Development StandardsU ................................................. 2-47
D2-26 - Special Purpose Zone Land Use Limitations and Additional Standards ........................... 2-49
City of San Ramon Zoning Ordinance D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-2
Chapter VI - Overlay ZonesU ................................................................................................................... 2-51
UD2-27 - PurposeU ............................................................................................................................. 2-51
UD2-28 - Applicability of Overlay ZonesU ........................................................................................... 2-51
UD2-29 - Height Limit (-H) Overlay ZoneU ......................................................................................... 2-52
UD2-30 - Interim Study (-IS) Overlay ZoneU ...................................................................................... 2-52
UD2-31 - Landmark (-L) Overlay ZoneU ............................................................................................. 2-53
UD2-32 - ReservedU ........................................................................................................................... 2-57
UD2-33 - Senior Housing (-SH) Overlay ZoneU ................................................................................. 2-57
Development and Land Use Approval Requirements D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-3
Chapter I - Development and Land Use Approval Requirements
Sections:
D2-1 - Purpose
D2-2 - General Requirements for Development and New Land Uses
D2-3 - Allowable Land Uses and Permit Requirements
D2-4 - Exemptions from Land Use Permit Requirements
D2-5 - Temporary Uses
D2-1 - Purpose
This Chapter describes the City’s general requirements for the approval of proposed development and new
land uses. The permit requirements established by this Zoning Ordinance for specific land uses are in
Chapters D2-III through D2-V.
D2-2 - General Requirements for Development and New Land Uses
Each land use and/or structure shall be established, constructed, reconstructed, altered, moved or replaced
in compliance with the following requirements.
A. Allowable use. The land use shall be allowed by this Zoning Ordinance in the zone applied to the
site. The basis for determining whether a use is allowable is described in Section D2-3 (Allowable
Land Uses and Permit Requirements).
B. Permit and approval requirements. Any land use permit or other approval required by Section D2-
3 (Allowable Land Uses and Permit Requirements) shall be obtained before the issuance of any
required grading, building, or other construction permit, and before the proposed use is constructed,
otherwise established or put into operation, unless the proposed use is listed in Section D2-4
(Exemptions from Land Use Permit Requirements).
C. Development standards, conditions of approval. Each land use and structure shall comply with
the development standards of this Chapter, the provisions of Division D3 (Site Planning and Project
Design Standards), and any applicable conditions imposed by a previously granted land use permit.
D. Legal parcel. The site of a proposed development or new land use shall be a parcel that was legally
created in compliance with the Subdivision Map Act and the City’s Subdivision Ordinance.
D2-3 - Allowable Land Uses and Permit Requirements
A. Allowable land uses. The uses of land allowed by this Zoning Ordinance in each zone are listed in
Chapters D2-II, D2-III, D2-IV, and D2-V (Tables 2-1, 2-6, 2-8, 2-11, 2-12, 2-14, and 2-15,
respectively), together with the type of land use permit required for each use. Each land use listed in
Tables 2-1, 2-6, 2-8, 2-11, 2-12, 2-14, and 2-15 is defined in Division D8 (Glossary).
Development and Land Use Approval Requirements D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-4
1. Establishment of an allowable use.
a. Any one or more land uses identified by Tables 2-1, 2-6, 2-8, 2-11, 2-12, 2-14, and 2-15
as being allowable within a specific zone may be established on any parcel within that
zone, subject to the land use permit requirements of Subsection B, and compliance with
all applicable requirements of this Zoning Ordinance.
b. Where a single parcel is proposed for development with two or more of the land uses
listed in the tables, the overall project shall be subject to the highest permit level required
by Subsection B. for any individual use. For example, a new building proposed in the OA
zone with a bank on the ground floor and professional offices on the second floor would
require Minor Use Permit (MUP) approval because Table 2-8 requires Minor Use Permit
approval for "banks and financial services," even though an "Office - Professional" is listed
in the OA zone as a permitted use, requiring only a Zoning Clearance.
2. Use not listed. A land use that is not listed in Tables 2-1, 2-6, 2-8, 2-11, 2-12, 2-14, and 2-15,
and is determined by the Zoning Administrator to not be included in Division D8 (Glossary)
under the definition of a listed land use, is not allowed within the City, except as otherwise
provided in Subsection A.3, or Section D2-4 (Exemptions from Land Use Permit
Requirements).
3. Similar and compatible use may be allowed. The Zoning Administrator may determine that
a proposed use not listed in this Division is allowable as follows:
a. Required findings. The Zoning Administrator may determine that a proposed use is
similar to and compatible with a listed use and may be allowed, only after first making all
of the following findings:
(1) The characteristics of, and activities associated with the use are similar to one or
more of the listed uses, and will not involve a greater intensity than the uses listed
in the zone;
(2) The use will be consistent with the purposes of the applicable zone;
(3) The use will be consistent with the General Plan and any applicable Specific Plan;
(4) The use will be compatible with the other uses allowed in the zone; and
(5) The use is not listed as allowable in another zone.
A determination that a use qualifies as a “similar use” and the findings supporting the
determination shall be in writing.
b. Applicable standards and permit requirements. When the Zoning Administrator
determines that a proposed, but unlisted, use is similar to a listed use, the proposed use
will be treated in the same manner as the listed use in determining where it is allowed,
what permits are required, and what other standards and requirements of this Zoning
Ordinance apply.
c. Referral for determination. The Zoning Administrator may refer the question of whether
a proposed use qualifies as a similar and compatible use directly to the Commission for
a determination at a public meeting.
d. Appeal. A determination of similar and compatible use may be appealed in compliance
with Chapter D7-II (Appeals and Calls for Review).
B. Permit requirements. Tables 2-1, 2-6, 2-8, 2-11, 2-12, 2-14, and 2-15 within Chapters D2-III, D2-
IV, and D2-V provide for land uses that are:
Development and Land Use Approval Requirements D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-5
1. Permitted subject to compliance with all applicable provisions of this Zoning Ordinance. As
determined by the Zoning Administrator, a Zoning Clearance may be required prior to operation,
(Section D6-30). These are shown as "P" uses in the tables;
2. Allowed subject to the approval of a Minor Use Permit (Section D6-28), and shown as "MUP"
uses in the tables;
3. Allowed subject to the approval of a Use Permit (Section D6-28), and shown as "UP" uses in
the tables;
4. Allowed subject to the type of City approval required by a specific provision of Chapter D4-III
(Standards for Specific Land Uses), and shown as "S" uses in the tables; and
5. Allowed subject to compliance with all applicable provisions of this Zoning Ordinance, subject
first obtaining a Zoning Clearance (Section D6-30). These are shown as “ZC” uses in the tables;
6. Not allowed in particular zones, and shown as "—" in the tables.
Note: A land use authorized through the approval of a Zoning Clearance, Minor Use Permit, or Use
Permit may also require Architectural Review (Section D6-22), Preliminary Plan Review (Section D6-
26), a Building Permit, or other permit required by the Municipal Code.
D2-4 - Exemptions from Land Use Permit Requirements
The planning permit requirements of this Zoning Ordinance do not apply to the land uses, structures, and
activities identified by this Section. These are allowed in all zones subject to compliance with this Section.
A. General requirements for exemption. The land uses, structures, and activities identified by
Subsection B below are exempt from the land use permit requirements of this Zoning Ordinance only
when:
1. The use, activity or structure is established and operated in compliance with the setback
requirements, height limits, parking requirements, and all other applicable standards of this
Division (Allowable Land Uses and Zone Standards), Division D3 (Site Planning and Project
Design Standards), and, where applicable, Chapter D7-I (Nonconforming Uses, Structures, and
Parcels); and
2. Any permit or approval required by regulations other than this Zoning Ordinance is obtained
(for example, a Building Permit).
B. Exempt activities and land uses. The following are exempt from the land use permit requirements
of this Zoning Ordinance when in compliance with Subsection A above.
1. Decks, paths and driveways. Decks, platforms, on-site paths, and driveways that are not
required to have a Building Permit, Grading Permit, or Encroachment Permit.
2. Fences and walls. See Section D3-4 (Fences, Walls, and Screening).
3. Interior remodeling. Interior alterations that do not: (a) increase the gross floor area of the
structure; (b) increase the number of dwelling units; (c) increase the number of bedrooms to the
extent that additional parking would be required; or (d) change the permitted use of the
structure.
4. Repairs and maintenance.
Development and Land Use Approval Requirements D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-6
a. Single-family dwellings. Ordinary repairs to, and maintenance of, single-family
dwellings, that are also exempt from Architectural Review (Section D6-22).
b. Multi-family, and non-residential structures. Ordinary repairs to, and maintenance of,
multi-family residential and non residential structures, if:
(1) The work does not change the approved land use of the site or structure, or add to,
enlarge or expand the land use and/or structure;
(2) Any exterior repairs employ the same materials and design as the original
construction; and
(3) The work is exempt from Architectural Review (Section D6-22).
5. Small, portable residential accessory structures. A single portable structure per lot or unit,
limited to pre-manufactured storage sheds and similar small structures in residential zones that
are exempt from Building Permit requirements in compliance with the Municipal Code and the
Uniform Building Code. Additional structures may be approved in compliance with Section D4-
26 (Accessory Structures), where allowed by the applicable zone.
6. Solar Energy System. The installation of a solar energy system to the roof or side of a building,
provided that the system complies with applicable height limit requirements; and ground-
mounted systems comply with the setback requirements and height limitations of the applicable
zone and accessory structure requirements and are not visible from off the site to the maximum
extent feasible.
7. Utilities. The erection, construction, alteration, or maintenance by a public utility or public
agency of utilities intended to service existing or nearby approved developments shall be
permitted in any zone. These include: water; gas; electric; supply or disposal systems; including
wires, mains, drains, sewers, pipes, conduits, cables, fire-alarm boxes, police call boxes, traffic
signals, hydrants, etc., but not including new transmission lines and structures. See Section
D3-12 for utility undergrounding requirements. Satellite and wireless communications antennas
are not exempt, and are instead subject to Chapter D4-IV (Wireless Telecommunications
Facilities).
D2-5 - Temporary Uses
Requirements for establishing a temporary use (for example, a construction yard, seasonal sales lot, special
event, temporary office trailer, etc.) are in Section D6-27 (Temporary Use Permits).
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-7
Chapter II – Residential Zones
Sections:
D2-6 - Purpose
D2-7 - Purposes of the Residential Zones
D2-8 - Residential Zone Land Uses and Permit Requirements
D2-9 - Residential Zone General Development Standards
D2-10 - RC and HR Zone Clustering Requirements
D2-6 - Purpose
This Chapter lists the land uses that may be allowed within the residential zones established by Section
D1-7 (Zoning Map and Zones), determines the type of land use permit/approval required for each use, and
provides basic standards for site layout and building size.
D2-7 - Purposes of the Residential Zones
The purposes of the residential zones and the manner in which they are applied are as follows.
A. RC (Rural Conservation) zone (0.0 to 0.2 du/ac). The RC zone is applied to areas of the City
without urban services, with open space and habitat value, where rural single-family residential
development may occur at densities of up to one unit per five gross developable acres. Clustering is
encouraged to permit suitable development sites with less than 20 percent slope, where the overall
project preserves 90 percent of its site in open space. Minimum lot size for new parcels is at least
five acres. The RC zone is consistent with and implements the Rural Conservation land use
classification of the General Plan.
B. HR (Hillside Residential) zone (0.0 to 2.0 du/ac). The HR zone is applied to hillside areas of the
City appropriate for single-family dwellings, where proposed development requires special standards
to ensure resource preservation and limited visual impacts. Single-family residential development
may occur at densities of up to two units per acre. Clustering is required to permit suitable
development sites on less than 20 percent slope, and to preserve 70 percent of an overall
development site in open space. Minimum lot size for new parcels is at least five acres. The HR
zone is consistent with and implements the Hillside Residential land use classification of the General
Plan.
C. RE (Residential Estate) zone (0.2 to 3.0 du/ac). The RE zone is applied to areas of the City
appropriate for very low density residential land uses, at densities of 0.2 to 3.0 units per acre,
compatible with the topography and public service capacities. The specific allowable density for each
parcel is shown on the Zoning Map by a numerical suffix residential density designator (see Section
D2-8). Minimum lot size for new parcels ranges from 15,000 to 20,000 square feet. The RE zone is
consistent with and implements the Single Family Low Density land use classification of the General
Plan.
D. RS (Single-Family Residential) zone (3.0 to 12.0 du/ac). The RS zone is applied to areas of the
City appropriate for single-family residential land uses in neighborhoods at a density of three to six
units per net acre, subject to appropriate standards. The specific allowable density for each parcel is
shown on the Zoning Map by a numerical suffix residential density designator (see Section D2-8).
Minimum lot size for new parcels ranges from 3,500 to 12,000 square feet. Depending upon the
applicable residential density designator, the RS zone is consistent with and implements the Single
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-8
Family Low Density, Single Family Low-Medium Density, and Single Family Medium Density land use
classifications of the General Plan.
E. RM (Medium-Density Residential) zone (6.0 to 14.0 du/ac). The RM zone is applied to areas of
the City appropriate for multiple residential uses, including duplexes, townhouses, or cluster housing
with landscaped open space for residents' use at a density of 6 to 14 units per net acre. Single-family
dwellings are also permitted. Minimum lot size for new parcels is 3,500 square feet or larger. The
RM zone is consistent with and implements the Multiple Family High Density land use classification
of the General Plan.
F. RMH (Medium-High Density Residential) zone (14.0 to 22.0 du/ac). The RMH zone is applied to
areas of the City appropriate for townhouses or apartments at a density of 14 to 22 units per net acre.
Minimum lot size for new multifamily parcels is 10,000 square feet or larger. Single-family dwellings
are also permitted with a minimum lot size for new parcels of 2,000 square feet with a maximum of
3,100 based on the per acre RMH density range. The RMH zone is consistent with and implements
the Multiple Family High Density land use classification of the General Plan.
G. RH (High-Density Residential) zone (22.0 to 30.0 du/ac). The RH zone is applied to areas of the
City appropriate for compact, high density, well-designed residential development, including
apartments and town houses with a density range of 22 to 30 units per net acre. Proposed
development will reflect high quality design with integrated open space and recreational and/or
cultural amenities, as well as providing workforce housing, structured parking, and units of various
number of bedrooms, with specific attention to three and more bedroom units to achieve the overall
goal of providing diverse types of dwelling units. Minimum lot size for new parcels is 10,000 square
feet or larger. The RH zone is consistent with and implements the Multiple Family Very High Density
land use classification of the General Plan.
H. RVH (Multiple Family-Very High Density) zone (30.0 to 50.0 du/ac). The RVH zone is applied to
areas appropriate for the highest density multiple-family residential development within the City, at
densities between 30 and 50 units per net acre. Proposed development will reflect high quality design
with integrated open space and recreational and/or cultural amenities, as well as providing workforce
housing, structured parking, and units of various number of bedrooms, with specific attention to three
and more bedroom units to achieve the overall goal of providing diverse types of dwelling units.
Minimum lot size for new parcels is 10,000 square feet or larger. The RVH zone is consistent with
and implements the Multiple Family Very High Density land use classification of the General Plan.
D2-8 - Residential Zone Land Uses and Permit Requirements
A. Applicability. Table 2-1 identifies the uses of land allowed by this Zoning Ordinance in each
residential zone, and the land use permit required to establish each use, in compliance with Section
D2-3 (Allowable Land Uses and Permit Requirements).
Note: Where the last column in the table ("Specific Use Regulations") includes a section number,
the regulations in the referenced section apply to the use. Provisions in other sections of this Zoning
Ordinance may also apply.
B. Additional City review requirements. A land use that is authorized by the planning permit required
by Table 2-1 may also require Architectural Review (Section D6-22), and/or Preliminary Plan Review
(Section D6-26).
C. Temporary uses. Section D6-27 (Temporary Use Permits) establishes permit requirements and
standards for all allowable temporary uses.
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-9
TABLE 2-1
Allowed Land Uses and Permit Requirements
for Residential Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED BY DISTRICT Specific Use
Regulations RC HR RE RS RM RMH RH RVH
AGRICULTURAL & OPEN SPAC E USES
Agricultural accessory structure P P P — — — — — D4-26
Farm animal keeping - less than 1 acre — — — — — — — —
Farm animal keeping - max. 2 heads on 1 acre or greater P P P — — — — —
Farm animal keeping - 3 heads or more on 1 acre or greater MUP MUP MUP — — — — —
Crop production, horticulture, orchard, vineyard MUP MUP MUP — — — — —
RECREATION, EDUCATION & PUBLIC ASSEMBLY USES
Golf course, country club UP UP UP UP — — — —
Equestrian facilities UP UP UP — — — — —
Library, museum, gallery — — — — — — UP UP
Meeting facility, public or private UP UP UP UP UP UP UP UP
Park and recreation facilities, noncommercial UP UP UP UP UP UP UP UP
Private residential recreation facility (in project) — — MUP MUP MUP MUP MUP MUP
Schools, public or private — — UP UP — — — —
Key to Zoning District Symbols
RC Rural Conservation RM Medium Density Residential
HR Hillside Residential RMH Medium-High Density Residential
RE Residential Estate RH High Density Residential
RS Single-Family Residential RVH Multi-Family Very High Density
Notes:
(1) See Division D8 for land use definitions.
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-10
TABLE 2-1
Allowed Land Uses and Permit Requirements
for Residential Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAN D USE (1)
PERMIT REQUIRED BY DISTRICT Specific Use
Regulations RC HR RE RS RM RMH RH RVH
RESIDENTIAL USES
Animal - Wild or Exotic S(2) S(2) S(2) S(2) S(2) S(2) S(2) S(2) Muni Code B2
Animal – Domestic P P P P P P P P
Chickens, raising of P P P P — — — — D4 Chapter VII
Cottage Food Operation S S S S S S S S D4-33
Emergency shelter P P P P P P P P
Home occupation S S S S S S S S D4-33
Mobile home park UP UP UP UP UP UP UP UP D4-36
Multi-family housing — — — — P P P P
Organizational house (sorority, monastery, etc.) — — — UP UP UP UP UP
Residential accessory use or structure P P P P P P P P D4-26
Residential care, 6 or fewer clients P P P P P P P P
Residential care, 7 or more clients UP UP UP UP UP UP UP UP
Rooming or boarding house P P P P P P P P
Accessory Dwelling Unit (ADU) P P P P P P P P D4-39
Single-family dwelling P P P P P P — —
Single-room occupancy unit — — — — — — UP UP
Supportive housing P P P P P P P P
Transitional housing P P P P P P P P
Key to Zoning District Symbols
RC Rural Conservation RM Medium Density Residential
HR Hillside Residential RMH Medium-High Density Residential
RE Residential Estate RH High Density Residential
RS Single-Family Residential RVH Multi-Family Very High Density
Notes:
(1) See Division D8 for land use definitions.
(2) See San Ramon Municipal Code Division B2 for wild or exotic animal regulations.
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-11
TABLE 2-1
Allowed Land Uses and Permit Requirements
for Residential Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED BY DISTRICT Specific Use
Regulations RC HR RE RS RM RMH RH RVH
SERVICES
Child day care - Large family day care home MUP MUP MUP MUP MUP MUP MUP MUP D4-29
Child day care - Small family day care home P P P P P P P P
Day care center - Child or adult UP UP UP UP UP UP UP UP
Lodging - Bed & breakfast inn (B&B) S S S S — — — — D4-27
Lodging - Short term rental (STR) S S S S — — — — D4-27
Public safety facility UP UP UP UP UP UP UP UP
TRANSPORTATION, COMMUNICATIONS & INFRASTRUCTURE
Utility facility UP(2) UP(2) UP(2) UP(2) UP(2) UP(2) UP(2) UP(2)
Utility infrastructure P(2) P(2) P(2) P(2) P(2) P(2) P(2) P(2)
Windmill for electricity generation UP(2) UP(2) UP(2) — — — — — D4-23
Wireless telecommunications facility S(2) S(2) S(2) S(2) S(2) S(2) S(2) S(2) D4 - Chap. IV
Key to Zoning District Symbols
RC Rural Conservation RM Medium Density Residential
HR Hillside Residential RMH Medium-High Density Residential
RE Residential Estate RH High Density Residential
RS Single-Family Residential RVH Multi-Family Very High Density
Notes:
(1) See Division D8 for land use definitions.
(2) Architectural Review may also be required; see Section D6-22.
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-12
[Page intentionally left blank]
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-13
D2-9 - Residential Zone General Development Standards
Subdivisions, new land uses and structures, and alterations to existing land uses and structures, shall be
designed, constructed, and established in compliance with the requirements in Tables 2-2, 2-3, and 2-4 in
addition to the applicable standards (e.g., landscaping, parking and loading, etc.) in Division D3 of this
Zoning Ordinance.
TABLE 2-2 - RC, HR, AND RE DEVELOPMENT STANDARDS
Requirement by Zone
Development Feature RC HR RE-A RE-B
Minimum lot size Minimum area and width for parcels proposed in new
subdivisions.
Area (net) 5 ac (1) 5 ac (1) 20,000 sf 15,000 sf
Width 300 ft (1) 300 ft (1) 100 ft 100 ft
Depth 300 ft (1) 300 ft (1) 150 ft 120 ft
Setbacks Minimum setbacks required. See Section D3-10 for exceptions,
and allowed projections into setbacks.
Front 30 ft 30 ft 25 ft 20 ft
Side - Interior (each) 20 ft 20 ft 15 ft 10 ft
Side - Corner 25 ft 25 ft 20 ft 15 ft
Sides – Non-Corner Lot
Aggregate 40 ft 40 ft 35 ft 25 ft
Sides – Corner Lot Aggregate 45 ft 45 ft 35 ft 25 ft
Rear 35 ft 30 ft 15 ft 15 ft
Accessory structures See Section D4-26 (Accessory Structures)
Lot coverage, FAR Maximum percentage of total lot area that may be covered by
structures, and maximum floor area ratio (FAR).
Lot coverage N.A N.A N.A N.A
FAR N.A N.A N.A N.A
Height limit
Maximum allowable height of structures. See Section D3-6
(Height Limits and Exceptions) for height measurement
requirements, and height limit exceptions.
Maximum height 35 ft
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-14
TABLE 2-2 - RC, HR, AND RE DEVELOPMENT STANDARDS
Requirement by Zone
Development Feature RC HR RE-A RE-B
Exterior finish materials The exterior walls of all primary structures shall have a
nonmetallic finish
Landscaping See Section D3-II (Landscape Design Standards)
Driveways and Paved Area See Section D3-37 (Driveways and Site Access)
Parking See Chapter D3-III (Parking and Loading)
Signs See Chapter D3-IV(Signs)
Notes: (1) Clustering is encouraged in the RC zone and required in HR. See Section D2-10.
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-15
TABLE 2 -3 - RS DEVELOPMENT STANDARDS
Development Feature
Requirement by Zone
RS-12 RS-10 RS-7 RS-6 RS-D
Minimum lot size
Minimum area and width for parcels proposed in new
subdivisions.
Area (net) 12,000 sf 10,000 sf 7,000 sf 6,000 sf 3,500 sf
Width 100 ft 70 ft 65 ft 60 ft 40 ft
Depth 100 ft 100 ft 95 ft 90 ft 80 ft
Setbacks Minimum setbacks required. See Section D3-10 for
exceptions, and allowed projections into setbacks.
Front 20 ft 20 ft 20 ft 20 ft 15 ft (1)
Side - Interior (each) 10 ft 10 ft 5 ft 5 ft 0 ft
Side - Corner 15 ft 15 ft 15 ft 15 ft 10 ft
Sides – Non-Corner Lot
Aggregate 25 ft 20 ft 15 ft 15 ft 10 ft
Sides – Corner Lot Aggregate 25 ft 25 ft 20 ft 20 ft 10 ft
Rear 15 ft 15 ft 15 ft 15 ft 15 ft
Accessory structures See Section D4-26 (Accessory Structures)
Lot coverage, FAR Maximum percentage of total lot area that may be covered by
structures, and maximum floor area ratio (FAR).
Lot coverage N.A N.A N.A N.A N.A
FAR N.A N.A N.A N.A N.A
Height limit
Maximum allowable height of structures. See Section D3-6
(Height Limits and Exceptions) for height measurement
requirements, and height limit exceptions.
Maximum height 35 ft
Exterior finish materials The exterior walls of all primary structures shall have a
nonmetallic finish.
Landscaping See Chapter D3-II (Landscape Design Standards)
Driveways and Paved Area See Section D3-37 (Driveways and Site Access)
Parking See Chapter D3-III (Parking and Loading)
Signs See Chapter D3-IV (Signs)
Notes: (1) Driveway aprons require a minimum garage façade setback of 18 feet.
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-16
TABLE 2-4 - RM, RMH, RH, AND RVH DEVELOPMENT STANDARDS
Development Feature
Requirement by Zone
RM RMH RH RVH
Minimum lot size Minimum area and width for parcels proposed in new
subdivisions.
Area (net) 3,500 sf 10,000 sf 10,000 sf 10,000 sf
Width 40 ft 70 ft 70 ft 70 ft
Depth 80 ft 90 ft 90 ft 90 ft
Setbacks Minimum setbacks required. See Section D3-10 for
exceptions, and allowed projections into setbacks.
Front 15 ft (1) 15 ft (1) 15 ft 10 ft (2)
Side - Interior (each) 6 ft 6 ft 6 ft 6 ft
Side - Corner 10 ft 10 ft 10 ft 10 ft (2)
Sides - Aggregate 16 ft 16 ft 16 ft 16 ft
Rear 15 ft 15 ft 10 ft 10 ft
Accessory structures See Section D4-26 (Accessory Structures)
Non-Residential Lot
coverage, FAR
Maximum percentage of total lot area that may be covered by
structures, and maximum nonresidential floor area ratio (FAR)
for non-residential uses identified in Table 2-1.
Lot coverage
(non-residential)
25% 35% 35% 50%
FAR
(max non-residential)
0.50 0.50 0.50 0.50
Height limit
Maximum allowable height of structures. See Section D3-6
(Height Limits and Exceptions) for height measurement
requirements, and height limit exceptions.
Maximum height 35 ft 50 ft
Exterior finish materials The exterior walls of all primary structures shall have a
nonmetallic finish.
Landscaping See Chapter D3-II (Landscape Design Standards)
Driveways and Paved Area See Section D3-37 (Driveways and Site Access)
Parking See Chapter D3-III (Parking and Loading)
Signs See Chapter D3-IV (Signs)
Notes: (1) Driveway aprons require a minimum garage façade setback of 18 feet.
(2) Five feet is allowed for a Row-house façade with stoop, where the first floor is
elevated a minimum of three feet above the sidewalk.
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-17
D2-10 - RC and HR Zone Clustering Requirements
A. Applicability. Residential development including four or more units should be clustered within the
RC zone, and shall be clustered within the HR zone, in compliance with this Section.
B. Cluster development design standards. The design of a proposed cluster development shall
comply with the following standards.
1. Minimum lot area. Each clustered lot shall be a minimum of 20,000 square feet.
2. Maximum cluster size. No more than 10 dwelling units shall be within a single cluster.
3. Setback and buffer requirements. Proposed structures
shall be located on each parcel with minimum setbacks of
30 feet in the front, 20 feet on each side, and 35 feet in the
rear. A residential cluster shall be separated from each
other cluster and any roadway abutting the site by a
minimum of 100 feet.
C. Open space preservation.
1. RC zone. Clustering is encouraged to permit suitable
development sites with less than 20 percent slope, and so
that the overall project will preserve 90 percent of its site as open space.
2. HR zone. Clustering is required to permit suitable development sites with less than 20 percent
slope. The overall project shall preserve 70 percent of its site as open space.
3. Preservation requirements. The open space on the site that is preserved by clustering shall
be retained as part of an unsubdivided open space parcel or in individual open space parcels,
and shall not be eligible for future development; provided that open space parcels may include
conservation open space, community recreation open space, public access opens space, or
buffer open space.
Figure 2-1 – Location of
Residential Cluster
Residential Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-18
D. Maximum residential density. The maximum allowed residential density on a site where the
development is clustered in compliance with this Section shall be based on the percentage of total
site area that is permanently preserved as open space, as follows.
TABLE 2 -5 - MAXIMUM DENSITY IN CLUSTERED DEVELOPMENT
Percent of Site Area
Permanently Preserved as
Open Space
Maximum Allowable Density
RC Zone HR Zone
Up to 49.9%
1 unit per net 5 acres
(0.20 units per net acre)
1 unit per net 5 acres
(0.2 units per net acre)
50 to 59.9%
1 unit per 4 net acres
(0.25 units per net acre)
1 unit per 2.5 net acres
(0.4 units per net acre)
60 to 69.9%
1 unit per 3.33 net acres
(0.30 units per net acre)
1 unit per 1.25 net acres
(0.8 units per net acre)
70 to 79.9%
1 unit per 2.85 net acres
(0.35 units per net acre)
1 unit per 0.5 net acres
(2.0 units per net acre)
80% or more
1 unit per 2.50 net acres
(0.40 units per net acre)
1 unit per 0.5 net acres
(2.0 units per net acre)
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-19
Chapter III – Mixed Use Zones
Sections:
D2-11 - Purpose
D2-12 - Purposes of Mixed Use Zones
D2-13 - Mixed Use Zone Land Uses and Permit Requirements
D2-14 - Mixed Use Zone General Development Standards
D2-15 - Mixed Use Zone Additional Development Standards
D2-11 - Purpose
This Chapter lists the land uses that may be allowed within the Mixed Use zones established by Section
D1-7 (Zoning Map and Zones), determines the type of land use permit/approval required for each use, and
provides basic standards for site layout and building size.
D2-12 - Purposes of Mixed Use Zones
The purposes of the individual Mixed Use zones and the manner in which they are applied are as follows.
A. MU (Mixed Use) zone. The MU zone is applied to areas of the City appropriate for an integrated mix
of non-residential uses, including retail, services, and offices, together with residential uses with a
density range of 14 to 30 dwelling units per acre at intensities of up to 0.70 FAR. Development should
be integrated with open space and recreational and/or cultural amenities, and opportunities for
affordable housing. Structured parking may be required. Additional FAR, up to a maximum of 1.00,
may be allowed for projects that provide more than the required percent of workforce housing units
per the City’s Inclusionary Housing Ordinance and provides significant public benefit. The MU zone
is consistent with and implements the Mixed Use land use classification of the General Plan.
B. CCMU (City Center Mixed Use) zone. The CCMU zone is applied to the City Center properties in
compliance with the General Plan to develop the City Center into a cultural, recreational, and
compatible retail center that provides for a cohesive mix of civic, retail, office, and open space uses
with a density range of 22 to 50 dwelling units per acre at intensities of up to 0.70 FAR will be
permitted. Additional FAR, up to a maximum of 1.35, may be allowed for projects that include such
elements as affordable housing and significant public benefits and/or amenities such as public art
and plazas, public facilities, and/or a transit facility nearby or in close proximity to the CCMU zone.
Development should be integrated with open space and recreational and/or cultural amenities, as
well as opportunities for workforce housing. Structured parking may be required. The CCMU zone
is consistent with and implements the Mixed Use land use classification of the General Plan.
C. MU-C (Commercial Mixed Use) zone. The MU-C zone is applied to areas of the City appropriate
for an integrated mix of non-residential uses only, including retail, services, and offices at intensities
of up to 0.70 FAR. Development should be integrated with open space and recreational and/or
cultural amenities. Structured parking may be required. The MU-C zone is consistent with and
implements the Mixed Use – Commercial land use classification of the General Plan.
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-20
D2-13 - Mixed Use Zone Land Uses and Permit Requirements
Table 2-6 identifies the uses of land allowed by this Zoning Ordinance in the Mixed Use Zones, and the
land use permit required to establish each use, in compliance with Section D2-3 (Allowable Land Uses and
Permit Requirements).
Note: Where the last column in the table ("Specific Use Regulations") includes a section number, the
regulations in the referenced section apply to the use. Provisions in other sections of this Zoning Ordinance
may also apply.
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-21
TABLE 2-6
Allowed Land Uses and Permit Requirements for
Mixed Use Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Conditional Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED Specific Use
Regulations MU CCMU MU-C
INDUSTRY, MAN UFAC TURING & PROCESSING, WHOLESALING
Media production — ZC(3) ZC(3)
Recycling facility S — — D4-37
Research and development, general — MUP MUP(3)
Research and development, limited — ZC(3) ZC(3)
Laboratory, non-medical — MUP MUP(3)
RECREATION, EDUCATION & PUBLIC ASSEMBLY USES
Commercial recreation facility - Indoor UP UP UP D4-30
Conference/convention facility UP UP UP
Fitness/health facility UP UP UP
Library, museum, gallery (non-retail gallery) P P P
Meeting facility, public or private MUP MUP MUP
Night Club — MUP MUP
Park and recreation facility - Site of 2 acres or less P P P
School - Public or private UP(3) UP UP(3)
School - Specialized education or training UP(3) MUP MUP(3)
Sports and entertainment assembly facility UP UP UP
Studio - Art, dance, martial arts, music, etc. (ground floor) ZC(3) ZC(3) ZC(3)
Studio - Art, dance, martial arts, music, etc. (upper floors) P P P
Theater, movies or performing arts UP UP UP
RESIDENTI AL USES
Animal - Wild or Exotic S(4) S(4) — Municipal Code Div. B2
Animal - Domestic P P —
Emergency shelter P P P
Home occupation S S — D4-33
Live/work unit MUP MUP —
Mixed use project residential component P P —
Supportive housing UP UP UP
Transitional housing UP UP UP
Residential care, 6 or fewer P P P
Residential care, 7 or more MUP MUP —
Key to Zoning District Symbols
MU Mixed Use CCMU City Center Mixed Use MU-C Commercial Mixed Use
Notes:
(1) See Division D8 for land use definitions.
(2) Use allowed only on second or upper floors
(3) Use allowed with a Minor Use Permit or Zoning Clearance, as identified in the table above, on ground floor if non-retail uses occupy 25%
or less of the gross ground floor area. Non-retail uses exceeding 25% gross ground floor area may be authorized by a Minor Use Permit
when the economic findings in Section D4-38 Non-Retail Uses within Retail/Commercial Centers can be made.
(4) See San Ramon Municipal Code Division B2 for wild or exotic animal regulations.
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-22
TABLE 2-6
Allowed Land Uses and Permit Requirements
for M ixed Use Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Conditional Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED Specific Use
Regulations MU CCMU MU-C
RETAIL TRADE
Accessory retail and services P P P
Alcoholic Beverage Manufacturing, Micro-Brewery UP UP UP
Auto and vehicle sales and rental UP MUP(2) MUP(2)
Building/landscape materials sales - Indoor showroom P UP UP
Convenience store P P P
Drive-through retail UP UP UP
Eating and drinking establishments P P P
With wine and beer P P P
With full alcoholic beverage service MUP MUP MUP
Alcoholic Beverage Manufacturing, Brew Pub P P P
With drive-through service MUP MUP MUP
With live entertainment MUP MUP MUP D4-34
With up to 12 outdoor seats or stools P P P
With 13 or more outdoor seats or stools MUP MUP MUP
Farmer's market – Ongoing UP MUP MUP
Food and beverage sales - Chain grocery P P P
Food and beverage sales - Specialty food store P P P
Furniture, furnishings, and appliance store MUP P(3) P(3)
Mobile home, boat, or RV sales UP — —
Outdoor retail sales and activities MUP MUP MUP
D4-35
Outdoor vendor MUP MUP MUP
D4-35
Pharmacy, medical supplies P P P
Retail, general - 50,000 sf or less floor area P P P
Retail, general - over 50,000 sf of floor area UP P P
Second hand store MUP MUP MUP
Key to Zoning District Symbols
MU Mixed Use CCMU City Center Mixed Use MU-C Commercial Mixed Use
Notes:
(1) See Division D8 for land use definitions.
(2) Limited to an auto rental agency accessory to a hotel or retail sales/showroom.
(3) Allowed only accessory to department store.
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-23
TABLE 2-6
Allowed Land Uses and Permit Requirements
for M ixed Use Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Conditional Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
PERMIT REQUIRED
Specific Use
LAND USE (1) MU CCMU MU-C Regulations
SERVICES - BUSINESS, FINANCIAL, PROFESSIONAL
ATM P P P
Bank, financial services P P P
Business support service P P P
Medical services - Clinic, laboratory, urgent care (ground floor) MUP(3) MUP(3) MUP(3)
Medical services - Clinic, laboratory, urgent care (upper floors) MUP MUP MUP
Medical services - Doctor office (ground floor) ZC(3) P(2) P(2)
Medical services - Doctor office (upper floors) P P(2) P(2)
Medical services - Extended care — UP UP
Office - Accessory P P P
Office - Business/service (ground floor) ZC(3) P ZC(3)
Office - Business/service (upper floors) P P P
Office - Government (ground floor) ZC(3) P ZC(3)
Office - Government (upper floors) P P P
Office - Processing (ground floor) MUP(3) MUP MUP(3)
Office - Processing (upper floors) MUP MUP MUP
Office - Professional/administrative (ground floor) ZC(3) P ZC(3)
Office - Professional/administrative (upper floors) P P P
SERVICES - GENERAL
Adult day care — UP UP
Animal services - Boarding/training MUP(3) MUP MUP(3)
Animal services - Grooming ZC(3) ZC(3) ZC(3)
Animal services - Veterinary clinic, animal hospital MUP(3) MUP ZC(3)
Catering service — MUP(3) MUP(3)
Child day care center UP(3) UP UP(3)
Child day care center - Accessory to on-site anchor tenant MUP(3) UP UP(3)
Child day care - Small family day care home P P —
Lodging - Bed & breakfast inn (B&B) —
UP — D4-27
Lodging - Hotel or motel UP UP UP
Personal services ZC(3) ZC(3) ZC(3)
Public safety facility MUP(3) P P
Key to Zoning District Symbols
MU Mixed Use CCMU City Center Mixed Use MU-C Commercial Mixed Use
(1) See Division D8 for land use definitions.
(2) Use allowed only if it does not exceed 10% of the total office space on the site.
(3) Use allowed with a Minor Use Permit or Zoning Clearance, as identified in the table above, on ground floor if non-retail uses occupy 25%
or less of the gross ground floor area. Non-retail uses exceeding 25% gross ground floor area may be authorized by a Minor Use Permit
when the economic findings in Section D4-38 Non-Retail Uses within Retail/Commercial Centers can be made.
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-24
TABLE 2-6
Allowed Land Uses and Permit Requirements
for M ixed Use Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Conditional Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
PERMIT REQUIRED Specific Use
LAND USE (1) MU CCMU MU-C Regulations
TRANSPORTATION, COMMUNICATIONS & INFRAS TRUCTURE
Broadcasting studio MUP MUP MUP
Cogeneration facilities — UP UP
Heliport — UP —
Parking facility, public or commercial UP UP UP
Transit station UP P P
Utility facility UP UP UP
Utility infrastructure P P P
Wireless telecommunications facility S S S D4 - Chap. IV
Key to Zoning District Symbols
MU Mixed Use CCMU City Center Mixed Use MU-C Commercial Mixed Use
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-25
D2-14 - Mixed Use Zone General Development Standards
Subdivisions, new land uses and structures, and alterations to existing land uses and structures, shall be
designed, constructed, and/or established in compliance with the requirements in Table 2-7, in addition to
the applicable development standards (e.g., landscaping, parking and loading, etc.) in Division D3 of this
Zoning Ordinance.
TABLE 2-7 - MU AND CCMU DEVELOPMENT STANDARDS
Development Feature
Requirement by Zone
MU CCMU MU-C
Minimum lot size Minimum area and width for parcels proposed in new subdivisions.
Area (net) 10,000 sf Determined through
subdivision process
10,000 sf
Width 80 ft 80 ft
Depth Determined through subdivision process
Residential density
Minimum site area per dwelling unit. The actual number of units
allowed will be determined through subdivision or land use permit
approval.
Maximum density Determined by General Plan N.A.
Setbacks Minimum setbacks required. See Section D3-10 for exceptions,
and allowed projections into setbacks.
Front 15 ft
Determined through project
review and approval
15 ft
Side - Interior
(each) None None
Side - Corner 10 ft 10 ft
Rear None None
Except that a 25-foot wide side and/or rear yard shall be required abutting a residential zone, and
where a lot abuts the Interstate 680 right-of-way; and structures shall not intercept the daylight
plane required by Section D2-15.
Accessory
structures See Section D4-26 (Accessory Structures)
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-26
TABLE 2-7 - MU AND CCMU DEVELOPMENT STANDARDS
Development Feature
Requirement by Zone
MU CCMU MU-C
Lot coverage, FAR Maximum percentage of total lot area that may be covered by structures, and maximum floor area
ratio (FAR).
Lot coverage N.A. N.A. N.A.
FAR Maximum 0.70 FAR.
Additional FAR up to 1.00 may
be permitted with Use Permit
approval for a project that
incorporates more than the
required percent of workforce
housing units per the City’s
Inclusionary Housing
Ordinance and provides
significant public benefit.
Maximum 0.70 FAR. Additional
FAR up to 1.35 may be
permitted if project
incorporates and significant
public benefits/amenities
Maximum 0.70 FAR.
Height limit Maximum allowable height of structures. See Section D3-6 (Height Limits and Exceptions) for
height measurement requirements, and height limit exceptions.
Maximum height 60 ft., and as limited by
Daylight Plane Requirements
(D2-15.A) and Section D3-6
(Height Limits and Exceptions)
None, except as limited by
Daylight Plane Requirements
(D2-15.A) and Section D3-6
(Height Limits and Exceptions)
40 ft., and as limited by
Daylight Plane Requirements
(D2-15.A) and Section D3-6
(Height Limits and Exceptions)
Landscaping See Chapter D3-II (Landscape Design Standards)
Parking See Chapter D3-III (Parking and Loading)
Signs See Chapter D3-IV (Signs)
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-27
D2-15 - Mixed Use Zone Additional Development Standards
A. Daylight plane requirement. A proposed structure shall not intercept a 30-degree daylight plane
inclined inward at a residential zone property line and/or I-680 freeway property line. The 30-degree
daylight plane shall be measured from:
1. A height of 6 to 8 feet above existing grade, as required
by section D3-4.F, at the R zone property line and/or I-680
freeway property line for a site in a MU zone; and
2. A height of 12 feet above existing grade at the R zone
boundary line and/or I-680 freeway property line for a site
in the CCMU zone.
The 30-degree daylight plane shall be measured from the
required height above the existing site grade regardless of the
site grade on either side of the property line.
B. Mixed use project development standards. A mixed use
project shall comply with the following requirements. A mixed
use project combines a mix of uses on the same site. In the CCMU and MU zones, the residential
units of mixed use projects are typically located above the nonresidential uses (vertical mixed use),
but horizontal mixed use may be allowed which provides residential at ground level behind street-
fronting nonresidential uses.
1. Design considerations. A mixed use project shall be designed to achieve the following
objectives.
a. In the CCMU and MU zones, the design shall provide for internal compatibility between
the residential and non-residential uses on the site.
b. In the CCMU and MU zones, potential glare, noise, odors, traffic, and other potentially
significant impacts on residents shall be minimized to allow a compatible mix of residential
and nonresidential uses on the same site.
c. The design shall take into consideration potential impacts on adjacent properties and shall
include specific design features to minimize potential impacts.
d. In the CCMU and MU zones, the design shall ensure that the residential units are of a
residential character, and that appropriate privacy between residential units and other
uses on the site is provided.
e. Site planning and building design shall provide for convenient and attractive pedestrian
access from the public street into the nonresidential portions of the project, through such
means as courtyards, plazas, walkways, and street furniture.
f. Site planning and building design shall be compatible with and enhance the adjacent and
surrounding land uses in terms of building design, color, exterior materials, landscaping,
lighting, roof styles, scale, and signage.
2. Mix of uses. A mixed use project may combine residential uses with any other use allowed in
the MU or CCMU zone; provided that where a mixed use project is proposed with a use that is
required to have Use Permit approval, the entire mixed use project shall be subject to that
permit requirement.
3. Site layout and project design standards. Each mixed use project shall comply with the
property development standards of the applicable zone, and in the CCMU and MU zones, the
following requirements.
Figure 2-2 - Daylight Plane
Requirement
Mixed Use Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-28
a. Location of residential units. The location of residential units shall comply with the
standards prescribed in this Section.
b. Parking. To encourage the development of both residential and nonresidential uses in
mixed use zones, the use of shared parking provisions shall be incorporated into mixed
use projects.
c. Loading areas. Nonresidential loading areas shall be located away from residential units
and shall be screened from view from the residential portion of the project to the maximum
extent feasible.
d. Refuse and recycling areas. Areas for the collection and storage of refuse and
recyclable materials shall be located on the site in locations that are convenient for both
the residential and nonresidential uses.
4. Performance standards. In the CCMU and MU zones, the following requirements shall apply.
a. Lighting. Lighting for nonresidential uses shall be appropriately shielded to limit impacts
on the residential units.
b. Noise. Each residential unit shall be designed and constructed to minimize adverse
impacts from nonresidential project noise, in compliance with the City's Noise Ordinance.
c. Hours of operation. A mixed use project proposing a nonresidential component located
below or in front of a residential component that will operate outside of the hours from
7:00 a.m. to 7:00 p.m., shall require Use Permit approval to ensure that the commercial
uses will not negatively impact the residential uses within the project, or any adjacent
residential uses.
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-29
Chapter IV – Commercial, Office and Industrial Zones
Sections:
D2-17 - Purpose
D2-18 - Purposes of Commercial, Office and Industrial Zones
D2-19 - Commercial, Office and Industrial Land Uses and Permit Requirements
D2-20 - Commercial, Office and Industrial General Development Standards
D2-21 - Standards for Specific Commercial, Office and Industrial Zones
D2-17 - Purpose
This Chapter lists the land uses that may be allowed within the Commercial, Office and Industrial Zones
established by Section D1-7 (Zoning Map and Zones), determines the type of land use permit/approval
required for each use, and provides basic standards for site layout and building size.
D2-18 - Purposes of Commercial, Office and Industrial Zones
The purposes of the individual Commercial, Office and Industrial zones and the manner in which they are
applied are as follows.
A. OA (Administrative Office) zone. The OA zone is applied to areas of the City appropriate for major
office buildings, support facilities, and compatible commercial uses within landscaped environments
that are protected from the more intense levels of activity associated with retail commercial
development. Building intensity may be up to 0.45 FAR. The OA zone is consistent with and
implements the Office land use classification of the General Plan.
B. OL (Limited Office) zone. The OL zone is applied to areas of the City appropriate for offices and
limited retail uses, subject to development standards that prevent significant adverse effects on
adjacent uses. Building intensity may be up to 0.45 FAR. The OL zone is consistent with and
implements the Office land use classification of the General Plan
C. CC (Community Commercial) zone. The CC zone is applied to areas of the City appropriate for
retail shopping centers containing a wide variety of commercial establishments, including stores
selling a wide variety of products, restaurants, commercial recreation, service stations, and business,
personal and financial services. Building intensity may be up to 0.45 FAR. The CC zone is consistent
with and implements the Retail Shopping land use classification of the General Plan.
D. CT (Thoroughfare Commercial) zone. The CT zone is applied to areas near freeways, appropriate
for businesses predominately serving the needs of the community and traveling public. Appropriate
land uses within this zone include lodging, automobile service stations, restaurants, and retail uses.
Personal services may also be permitted to serve adjacent residential neighborhoods. Building
intensity may be up to 0.50 FAR. The CT zone is consistent with and implements the Thoroughfare
Commercial land use classification of the General Plan.
E. CS (Service Commercial) zone. The CS zone is applied to areas of the City appropriate for
commercial services, including automobile sales and services, building materials, contractors' yards,
warehousing, storage and similar uses. Building intensity may be up to 0.50 FAR. The CS zone is
consistent with the Commercial Services land use classification of the General Plan.
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-30
F. CR (Commercial Recreation) zone. The CR zone is applied to areas of the City appropriate for golf
courses, sports and fitness clubs, and outdoor commercial recreation facilities at intensities of up to
0.35 FAR. The CR zone is consistent with the Commercial Recreation land use classification of the
General Plan.
G. MW (Manufacturing/Warehousing) zone. The MW zone is applied to areas of the City appropriate
for general and low intensity industrial uses at up to 0.50 FAR, including manufacturing, warehousing,
distribution, research and development, etc., and supportive uses. Offices may be allowed as an
accessory use. The MW zone is consistent with the Manufacturing and Warehousing land use
classification of the General Plan.
D2-19 - Commercial, Office and Industrial Land Uses and Permit Requirements
Table 2-8 identifies the uses of land allowed by this Zoning Ordinance in the Commercial, Office and
Industrial zones, and the land use permit required to establish each use, in compliance with Section D2-3
(Allowable Land Uses and Permit Requirements).
Note: Where the last column in the table ("Specific Use Regulations") includes a section number, the
regulations in the referenced section apply to the use. Provisions in other sections of this Zoning Ordinance
may also apply.
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-31
TABLE 2-8
Allow ed Land Uses and Permit Requirements
for Commercial, Office & Industrial Zones
P Permitted Use, Zoning Clearance may be required prior to operation
MUP Minor Use Permit required
UP Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations OA OL CC CT CS CR MW
INDUSTRY, MANUFACTURING & PROCESSING, WHOLESALING
Alcoholic Beverage Manufacturing, Micro-Brewery — — UP
UP
MUP — MUP
Alcoholic Beverage Manufacturing, Distillery — — UP UP
MUP — MUP
Construction contractor base - Indoor — — MUP(3) — P — MUP
Construction contractor base - Outdoor storage — — — — MUP — MUP
Industry, custom — — MUP(3) — UP — P
Industry, general — — — — — — P
Industry, limited — — — — UP — P
Industry, limited, small-scale — — — — MUP — P
Media production MUP MUP MUP(3) — — — UP
Recycling facility — — S S S S S D4-37
Research and development, general MUP MUP — — P — P
Research and development, limited ZC ZC — — P — P
Laboratory, non-medical MUP MUP — — P — P
Storage - Outdoor — — MUP MUP MUP — MUP D4-35
Storage - Personal storage facility (mini-storage) — — — — UP — UP
Storage - Warehouse, indoor storage, limited — — — — P — P
Wholesaling and distribution — — — — MUP — P
Wholesaling and distribution - Small scale — — — — P — P
RECREATION, EDUCATION & PUBLIC ASSEMBLY USES
Adult business — — — — — — UP D4-I
Commercial recreation facility - Indoor — UP UP(3) MUP MUP P MUP D4-30
Commercial recreation facility - Outdoor — — — — — UP UP D4-30
Conference/convention facility UP UP UP(3) UP — UP —
Equestrian facility — — — — — MUP —
Fitness/Health facility UP — UP(3) UP MUP(2) UP —
Golf course — — — — — UP —
Library, museum, art gallery UP P UP(3) — — UP —
Meeting facility, public or private MUP MUP UP UP UP — —
Park and recreation facility - Site of 2 acres or less P — P — — P P
School - Public or private UP UP UP(3) — — — —
School – Specialized education or training UP — UP(3) UP UP MUP —
Sports and entertainment assembly facility — — — UP — UP —
Key to Zone Symbols
OA Administrative Office CS Service Commercial OL Limited Office
CR Commercial Recreation CC Community Commercial MW Manufacturing/Warehousing
CT Thoroughfare Commercial
Notes:
(1) See Division D8 for land use definitions.
(2) Use allowed only on second or upper floors with a Minor Use Permit.
(3) Use allowed with a Minor Use Permit or Zoning Clearance, as identified in the table above, on ground floor if non-retail uses occupy gross ground floor
area. Non-retail uses exceeding 25% gross ground floor area may be authorized by a Minor Use Permit when the economic findings in Section D4-38
Non-Retail Uses within Retail/Commercial Centers can be made.
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-32
.
TABLE 2-8
Allow ed Land Uses and Permit Requirements
for Commercial, Office & Industrial Zones
P Permitted Use, Zoning Clearance may be required prior to operation
MUP Minor Use Permit required
UP Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations OA OL CC CT CS CR MW
RECREATION, EDUCATION & PUBLIC ASSEMBLY USES - Cont.
Studio - Art, dance, martial arts, music, etc. (ground floor) MUP MUP MUP(5) MUP(5) MUP MUP MUP
Studio - Art, dance, martial arts, music, etc. (upper floors) MUP MUP P MUP MUP MUP MUP
Theater, movies or performing arts UP — UP UP — UP —
RESIDENTIAL USES
Caretaker Quarters — — — — — — MUP
Emergency shelter P P P P P P P
Homeless shelter — — — P — — — D4-55
Live/work unit — — — UP UP — —
Residential care, 7 or more clients — — UP — — — —
Supportive housing UP UP UP UP UP UP UP
Transitional housing UP UP UP UP UP UP UP
RETAIL TRADE
Accessory retail and services P P P P P P P
Alcoholic Beverage Manufacturing, Brew Pub — — P P — — —
Auto and vehicle sales and rental — — MUP MUP MUP — MUP
Building/landscape materials sales - Indoor showroom — — P — P — P
Building/landscape materials sales - Outdoor — — MUP — MUP — MUP
Construction and heavy equipment sales and rental — — — — — — UP
Convenience store — — MUP MUP — — —
Drive-through retail — — MUP MUP — — —
Eating and drinking establishments ZC(4) ZC(4) P P ZC(2) MUP(3) MUP(3)
With wine and beer ZC(4) ZC(4) P P MUP — —
With full alcoholic beverage service MUP(4) MUP(4) MUP MUP — — —
With drive-through service — — MUP MUP — — —
With live entertainment MUP(4) MUP(4) MUP MUP — — — D4-34
With up to 12 outdoor seats or stools ZC(4) ZC(4) P P P — —
With 13 or more outdoor seats or stools MUP(4) MUP(4) MUP MUP MUP — —
Key to Zone Symbols
OA Administrative Office CS Service Commercial OL Limited Office
CR Commercial Recreation CC Community Commercial MW Manufacturing/Warehousing
CT Thoroughfare Commercial
Notes:
(1) See Division D8 for land use definitions.
(2) Only allowed as ancillary use complimentary to adjacent CS uses, as determined by the Zoning Administrator.
(3) Accessory use only, limited to 1,000 sf, or to 10% of the total gross floor area on site with a Minor Use Permit.
(4) Use allowed on the ground floor if occupying 25% or less of the gross ground floor area. Not permitted on the upper floors.
(5) Use allowed with a Minor Use Permit or Zoning Clearance, as identified in the table above, on ground floor if non-retail uses occupy gross ground
floor area. Non-retail uses exceeding 25% gross ground floor area may be authorized by a Minor Use Permit when the economic findings in
Section D4-38 Non-Retail Uses within Retail/Commercial Centers can be made.
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-33
TABLE 2-8
Allow ed Land Uses and Permit Requirements
for Commercial, Office & Industrial Zones
P Permitted Use, Zoning Clearance may be required prior to operation
MUP Minor Use Permit required
UP Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations OA OL CC CT CS CR MW
RETAIL TRADE - Cont.
Farmer's market, Ongoing MUP MUP MUP — — — —
Farm supply and feed store — — — — UP — UP
Food and beverage sales - Chain grocery — — MUP MUP MUP — —
Food and beverage sales - Specialty food store — — P P P — —
Fuel dealer (propane for home and farm use, etc.) — — MUP MUP MUP — MUP
Furniture, furnishings, and appliance store — — P P — — —
Mobile home, boat, or RV sales — — MUP UP P — UP
Outdoor retail sales and activities — — MUP — — MUP — D4-35
Outdoor vendor MUP MUP MUP MUP MUP MUP — D4-35
Pharmacy, medical supplies MUP MUP P P — — —
Plant nursery — — MUP — MUP — —
Retail, general - 50,000 sf or less floor area — — P P — — —
Retail, general - over 50,000 sf of floor area — — UP UP UP — —
Second hand store — — P — — — —
SERVICES - BUSINESS, FINANCIAL, PROFESSIONAL
ATM P P P P P P P
Bank, financial services MUP MUP P P — — —
Business support service P MUP P — MUP — —
Medical services - Clinic, lab., urgent care (ground floor) MUP MUP MUP(3) MUP(3) MUP — —
Medical services - Clinic, lab., urgent care (upper floors) MUP MUP MUP MUP MUP — —
Medical services - Doctor office (ground floor) P P MUP(3) — — — —
Medical services - Doctor office (upper floors) P P P — — — —
Medical services - Extended care UP UP — — — — —
Office – Accessory P(4) P(4) P(4) P(4) P(4) P(4) P(4)
Office - Business/service (ground floor) P P ZC(3) ZC(3) MUP(2) — —
Office - Business/service (upper floors) P P P P MUP(2) — —
Office - Government (ground floor) P P ZC(3) ZC(3) MUP(2) — —
Office - Government (upper floors) P P P P MUP(2) — —
Key to Zone Symbols
OA Administrative Office CS Service Commercial OL Limited Office
CR Commercial Recreation CC Community Commercial MW Manufacturing/Warehousing
CT Thoroughfare Commercial
Notes:
(1) See Division D8 for land use definitions.
(2) Use allowed only on second or upper floors with a Minor Use Permit.
(3) Use allowed with a Minor Use Permit or Zoning Clearance, as identified in the table above, on ground floor if non-retail uses occupy gross ground
floor area. Non-retail uses exceeding 25% gross ground floor area may be authorized by a Minor Use Permit when the economic findings in
Section D4-38 Non-Retail Uses within Retail/Commercial Centers can be made
(4) Accessory use only, limited to 1,000 sf, or to 10% of the total gross floor area on site with a Minor Use Permit.
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-34
TABLE 2-8
Allow ed Land Uses and Permit Requirements
for Commercial, Office & Industrial Zones
P Permitted Use, Zoning Clearance may be required prior to operation
MUP Minor Use Permit required
UP Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations OA OL CC CT CS CR MW
SERVICES – GENERAL
Office - Processing (ground floor) MU
MU
MU
MU
MU
— MU
Office - Processing (upper floors) MU
MU
MU
MU
MU
(2)
— MU
Office - Professional/administrative (ground floor) P P ZC(2) ZC(2) MU
— —
Office - Professional/administrative (upper floors) P P P P MU
— —
Adult day care UP UP UP — UP — —
Animal services - Boarding/training — MUP MUP(2) — MUP — —
Animal services – Grooming — MUP P — P — —
Animal services - Veterinary clinic, animal hospital — MUP MUP(2) — MUP — MUP
Catering service MUP MUP P — P — P
Child day care center MUP MUP MUP(2) MUP(2) MUP — —
Child day care center - Accessory to on-site employer MUP MUP MUP(2) MUP(2) MUP — MUP
Drive-through service MUP MUP MUP(2) MUP(2) — — —
Equipment rental - Indoor only — — P — P — —
Equipment rental - With outdoor storage — — MUP(2) — MUP — —
Laundry, dry cleaning plant — — MUP(2) MUP(2) MUP — MUP
Lodging - Bed & breakfast inn (B&B) — — UP UP — — —
Lodging - Hotel or motel — — UP UP — — —
Maintenance and repair service — — — — MUP — P
Maintenance and repair service - No outdoor storage — — P — P — P
Maintenance and service facility — — — — P — P
Mortuary, funeral home - Full service — — UP — UP — —
Mortuary, funeral home - Partial service — — MUP(2) — MUP — —
Personal services MUP MUP P P P — —
Personal services – Restricted — — MUP(2) MUP(2) MUP — —
Public safety facility P P P P P P P
Printing and publishing — — — — UP — UP
Repair Service - Equipment, large appliances, etc. — — — — P — P
Vehicle services - Major repair/body work — — — — P — P
Vehicle services - Minor maintenance/repair — — MUP(2) MUP(2)
P — P
Vehicle services - Service station — — MUP MUP MUP — MUP D4-40
Vehicle services - Towing and storage — — — — MUP — MUP
Vehicle services - Washing, attended — — MUP(2) MUP(2) P — — D4-40
Vehicle services - Washing, unattended — — MUP(2) MUP(2) MUP — — D4-40
Key to Zone Symbols
OA Administrative Office CS Service Commercial OL Limited Office
CR Commercial Recreation CC Community Commercial MW Manufacturing/Warehousing
CT Thoroughfare Commercial
Notes:
(1) See Division D8 for land use definitions.
(2) Use allowed with a Minor Use Permit or Zoning Clearance, as identified in the table above, on ground floor if non-retail uses occupy gross ground
floor area. Non-retail uses exceeding 25% gross ground floor area may be authorized by a Minor Use Permit when the economic findings in
Section D4-38 Non-Retail Uses within Retail/Commercial Centers can be made
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-35
TABLE 2-8
Allow ed Land Uses and Permit Requirements
for Commercial, Office & Industrial Zones
P Permitted Use, Zoning Clearance may be required prior to operation
MUP Minor Use Permit required
UP Use Permit required
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
— Use not allowed
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations OA OL CC CT CS CR MW
TRANSPORTATION, COMMUNICATIONS & INFRASTRUCTURE
Broadcasting studio MUP MUP P — P — P
Cogeneration facilities UP UP UP UP UP UP UP
Heliport UP — — — — — UP D4-32
Parking facility, public or commercial MUP MUP MUP MUP MUP — —
Solid waste transfer station — — — — — — UP
Transit station UP — — — — — —
Transportation service dispatch facility — — — — MUP — MUP
Utility facility UP UP UP UP UP UP UP
Utility infrastructure P P P P P P P
Wireless telecommunications facility S S S S S S S D4 - Chap. IV
Key to Zone Symbols
OA Administrative Office CS Service Commercial OL Limited Office
CR Commercial Recreation CC Community Commercial MW Manufacturing/Warehousing
CT Thoroughfare Commercial
Notes:
(1) See Division D8 for land use definitions.
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-36
[Page intentionally left blank]
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-37
D2-20 - Commercial, Office and Industrial General Development Standards
Subdivisions, new land uses and structures, and alterations to existing land uses and structures, shall be
designed, constructed, and/or established in compliance with the requirements in Tables 2-9 and 2-10, in
addition to the applicable development standards (e.g., landscaping, parking and loading, etc.) in Division
D3 of this Zoning Ordinance.
TABLE 2-9 - OA, OL, CC, AND CT DEVELOPMENT STANDARDS
Development Feature
Requirement by Zone
OA OL CC CT
Minimum lot size Minimum area and width for parcels proposed in new subdivisions.
Area (net) 5 acres 15,000 sf 10,000 sf 10,000 sf
Width 325 ft 100 ft 80 ft 80 ft
Depth Determined through subdivision process
Setbacks Minimum setbacks required. See Section D3-10 for exceptions, and
allowed projections into setbacks.
Front 35 ft 20 ft 15 ft 15 ft
Side - Interior
(each)
30 ft 10 ft None None
Side - Corner 35 ft 20 ft 10 ft 15 ft
Rear 20 ft 15 ft None None
Except that a 25-foot wide side and/or rear yard shall be required
abutting a residential zone, and where a lot abuts the Interstate 680
right-of-way. Structures shall not intercept the daylight plane
required by Section D2-21 except where a lot abuts the Interstate
680 right-of-way.
Accessory structures See Section D4-26 (Accessory Structures)
Lot coverage, FAR Maximum percentage of total lot area that may be covered by
structures, and maximum nonresidential floor area ratio (FAR).
Lot coverage 25% 30% 30% 30%
FAR 0.45 0.45 0.35 0.50
Height limit Maximum allowable height of structures. See Section D3-6
(Height Limits and Exceptions) for height measurement
requirements, and height limit exceptions.
Maximum height 55 ft 40 ft 35 ft 50 ft
Landscaping See Chapter D3-II (Landscape Design Standards)
Parking See Chapter D3-III (Parking and Loading)
Signs See Chapter D3-IV (Signs)
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-38
TABLE 2-10 - CR, CS, AND MW DEVELOPMENT STANDARDS
Development Feature
Requirement by Zone
CR CS MW
Minimum lot size Minimum area and width for parcels proposed in new
subdivisions.
Area (net) 5 acres 7,500 sf 10,000 sf
Width 325 ft 70 ft 70 ft
Depth Determined through the subdivision process.
Setbacks Minimum setbacks required. See Section D3-10 for exceptions,
and allowed projections into setbacks.
Front 35 ft 10 ft 10 ft
Side - Interior (each) 30 ft None None
Side - Corner 35 ft 10 ft 10 ft
Rear 20 ft None None
Except that a 25-foot wide side and/or rear yard shall be required
abutting a residential zone, and where a lot abuts the Interstate
680 right-of-way. Structures shall not intercept the daylight plane
required by Section D2-21, except where a lot abuts the Interstate
680 right-of-way.
Accessory structures See Section D4-26 (Accessory Structures)
Lot coverage, FAR Maximum percentage of total lot area that may be covered by
structures, and maximum nonresidential floor area ratio (FAR).
Lot coverage 25% 40% 40%
FAR 0.35 0.50 0.50
Height limit Maximum allowable height of structures. See Section D3-6
(Height Limits and Exceptions) for height measurement
requirements, and height limit exceptions.
Maximum height 35 ft 35 ft 35 ft
Landscaping See Chapter D3-II (Landscape Design Standards)
Parking See Chapter D3-III (Parking and Loading)
Signs See Chapter D3-IV (Signs)
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-39
D2-21 - Standards for Specific Commercial, Office and Industrial Zones
A. Daylight plane requirement – Commercial, Office and Manufacturing / Warehousing zones.
Where required by the applicable commercial, office or industrial zone, a proposed structure shall not
intercept a 30-degree daylight plane inclined inward at the residential zone property line. The 30-
degree daylight plane shall be measured from:
1. A height of six to eight feet above existing grade, as required
by section D3-4.F, at the R zone property line for a site in a
commercial zone; and
2. A height of 12 feet above existing grade at the R zone
property line for a site in the MW zone.
The 30-degree daylight plane shall be measured from the required
height above the existing site grade regardless of the site grade
on either side of the property line.
Figure 2-3 - Daylight Plane
Requirement
Commercial, Office, and Industrial Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-40
[Page intentionally left blank]
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-41
Chapter V- Special Purpose Zones
Sections:
D2-22 - Purpose
D2-23 - Purposes of Special Purpose Zones
D2-24 - Special Purpose Zone Land Uses and Permit Requirements
D2-25 - Special Purpose Zone General Development Standards
D2-26 - Special Purpose Zone Land Use Limitations and Additional Development Standards
D2-22 - Purpose
This Chapter lists the land uses that may be allowed within the special purpose zones established by
Section D1-7 (Zoning Map and Zones), determines the type of land use permit/approval required for each
use, and provides basic standards for site layout and building size.
D2-23 - Purposes of Special Purpose Zones
The purposes of the Special Purpose zones and the manner in which they are applied are as follows.
A. AG (Agriculture) zone. The AG zone is applied to areas of the City appropriate for large-scale
agricultural operations and related open-space uses, where non-agricultural uses are limited to those
incidental to agricultural operations and to mining activities, and where residential development is
permitted only at very low density, compatible with low-intensity agriculture and keeping of livestock.
Building intensity may be up to 0.10 FAR, and residential density is limited to one dwelling unit per
20 acres. The AG zone is consistent with and implements the Open Space land use classification of
the General Plan.
B. OS-1 (Open Space) zone. The OS-1 zone is applied to areas of the City with large public or private
sites of at least two contiguous acres, to be permanently designated for open-space use to maintain
their natural unaltered state. The OS zone is consistent with and implements the Open Space land
use classification of the General Plan.
C. OS-2 (Open Space) zone. The OS-2 zone is applied to areas of the City where privately owned land
is suitable for passive recreational and limited agricultural purposes, and/or where lands subject to
flooding, landslide, or other hazards should remain in open space. Building intensity may be up to
0.10 FAR, and residential density is limited to one dwelling unit per 20 acres. The OS zone is
consistent with and implements the Open Space land use classification of the General Plan.
D. P (Parks and Recreation) zone. The P zone is applied to areas of the City with public and private
recreation sites and facilities. Building intensity may be up to 0.10 FAR. The P zone is consistent
with and implements the Parks land use classification of the General Plan.
E. GC (Golf Course) zone. The GC zone is applied to sites developed and used as golf courses, for
the purpose of maintaining each site in golf course use, including closely related and supporting uses
as allowed by Table 2-12. The GC zone implements and is consistent with the Golf Course
designation of the General Plan.
F. PS (Public and Semi-Public) zone. The PS zone is applied to areas of the City with schools,
hospitals and related medical offices, public and private meeting facilities, utilities, and quasi-public
uses. Building intensity may be up to 0.35 FAR. The PS zone is consistent with and implements the
Public and Semipublic land use classification of the General Plan.
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-42
G. M-1 (Medical Center) zone. The M-1 zone is applied to sites within the City of at least two acres,
that are appropriate for clustered medical facilities that include an acute care hospital licensed in
compliance with Health and Safety Code Section 1520 et seq., other inpatient medical care facilities,
doctor's offices, and related services. Building intensity may be up to 0.35 FAR. The M-1 zone is
consistent with and implements the Public and Semipublic land use classification of the General Plan.
H. M-2 (Health Facility) zone. The M-2 zone is applied to sites within the City of at least two acres, that
are appropriate for facilities for outpatient medical services, excluding an acute care hospital as
defined by the Health and Safety Code. Building intensity may be up to 0.35 FAR. The M-1 zone is
consistent with and implements the Public and Semipublic land use classification of the General Plan.
I. PD (Planned Development) zone. The PD zone is applied to large parcels of land in order to reduce
or eliminate the rigidity, delays, and conflicts that otherwise would result from application of zoning
standards and procedures designed primarily for small parcels, and to:
1. Ensure orderly and thorough planning and review procedures that will result in quality urban
design;
2. Encourage variety and avoid monotony in large developments by allowing greater freedom in
selecting the means to provide access, light, open space, and amenity;
3. Provide a mechanism whereby the City may authorize desirable developments consistent with
the General Plan without inviting speculative rezoning applications, which, if granted, often
could deprive other owners of development opportunities without resulting in construction of the
proposed facilities;
4. Encourage allocation and improvement of common open space in residential areas, and
provide for open space maintenance at the expense of those who will directly benefit from it;
and
5. Encourage the assembly of properties that might otherwise be developed in unrelated
increments to the detriment of surrounding neighborhoods.
Building intensity may be up to the maximum required by the General Plan land use classification
applicable to the site. The PD zone is consistent with and implements all land use classifications of
the General Plan.
D2-24 - Special Purpose Zone Land Uses and Permit Requirements
A. AG, OS-1, OS-2, P, GC, PS, M-1, and M-2 zones. Tables 2-11 and 2-12 identify the uses of land
allowed by this Zoning Ordinance in the Special Purpose zones, and the land use permit required to
establish each use, in compliance with Section D2-3 (Allowable Land Uses and Permit
Requirements).
Note: Where the last column in the table ("Specific Use Regulations") includes a section number,
the regulations in the referenced section apply to the use. Provisions in other sections of this Zoning
Ordinance may also apply.
B. PD zone. Any permitted or conditional use allowed by this Zoning Ordinance may be authorized on
a site in the PD zone through the approval of a Planned Development Permit in compliance with
Section D6-25 (Planned Development Permits), or a Specific Plan, consistent with the General Plan
land use designations applicable to the site. Prior to the approval of a Planned Development Permit
or Specific Plan, the use of a site within the PD zone shall be limited to the uses existing as of the
date the site was rezoned to apply the PD designation.
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-43
TABLE 2-11
Allowed Uses and Permit Requirements
for Special Purpose Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Conditional Use Permit required
— Use not allowed
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations AG OS-1 OS-2 P
AGRICULTURE & OPEN SPACE USES
Agricultural product processing MUP — — —
Animal husbandry UP — UP —
Animal husbandry - Grazing only P MUP MUP —
Crop production, horticulture, orchard, vineyard P — MUP MUP
Surface mining UP — — —
INDUSTRY, MANUFACTURING & PROCESSING, WHOLESAL ING
Storage - Personal storage facility (mini-storage) — — — UP D2-26
RECREATION, EDUCATION & PUBLIC ASSEMBLY USES
Commercial recreation facility - Indoor — — — MUP D4-30
Commercial recreation facility - Outdoor — — — UP D4-30
Equestrian facility P — — UP
Fitness/health facility — — — UP
Golf course — — UP UP
Library, museum, gallery — — — P
Meeting facility, public or private UP — — UP
Park and recreation facilities, public or private — — — UP
Sports and active recreation facility — — — UP
RESIDENTIAL USES
Caretaker Quarters MUP — — —
Residential care - 6 or fewer clients P — P —
Single-family dwelling P — MUP —
Key to Zoning District Symbols
AG Agriculture P Parks and Recreation
OS-1, 2 Open Space
Notes:
(1) See Division D8 for land use definitions.
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-44
TABLE 2-11
Allowed Uses and Permit Requirements
for Special Purpose Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Conditional Use Permit required
— Use not allowed
S Permit requirement set by Specific Use Regulations
ZC Zoning Clearance required
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations AG OS-1 OS-2 P
RETAIL TRADE
Accessory retail and services — — — P
Eating and drinking establishment - Accessory — — — MUP D2-26
Farmer's market, Ongoing — — — MUP
SERVICES - BUSINESS, FINANCIAL , PROFESSIONAL
Office – Accessory — — — MUP
Office – Government — — — UP
SERVICES - GENERAL
Child day care center — — — UP
Lodging - Bed and breakfast inn MUP — — — D4-27
Maintenance and service facility — — — UP
Public safety facility UP — — UP
TRANSPORTATION, COMMUNICATIONS & INFRASTRUCTURE
Utility facility UP UP UP UP
Utility infrastructure P UP UP P
Wireless telecommunications facility S S S S D4 -Chap. IV
Key to Zoning District Symbols
AG Agriculture P Parks and Recreation
OS-1, 2 Open Space
Notes:
(1) See Division D8 for land use definitions.
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-45
TABLE 2-12
Allowed Uses and Permit Requirements
for Special Purpose Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Conditional Use Permit required
— Use not allowed
S Permit requirement set by Specific Use
Regulations
ZC Zoning Clearance required
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations GC PS M-1 M-2
INDUSTRY, MANUFACTURING & PROCESSING, WHOLESAL ING
Media production — UP — —
RECREATION, EDUCATION & PUBLIC ASSEMBLY USES
Golf course UP UP — —
Library, museum, gallery — MUP — —
Meeting facility, public or private — MUP — —
Park and recreation facilities, public or private — MUP — —
Park and recreation facilities, public or private - 2 ac. or less UP MUP — —
School - Public or private — MUP — —
School - Specialized education/training — MUP — —
RESIDENTIAL USES
Caretaker Quarters — MUP — —
Residential care - 7 or more clients — UP — —
RETAIL TRADE
Accessory retail and services UP P P P
Eating and drinking establishment - Accessory — MUP MUP MUP
Farmer's market, Ongoing — MUP — —
Pharmacy, medical supplies — — P P
Retail, general — — P(2) P(2)
SERVICES - BUSINESS, FINANCIAL , PROFESSIONAL
Medical services - Clinic, laboratory, urgent care — UP P MUP
Medical services - Doctor Office — MUP P P
Medical services - Extended care — UP P P
Medical services - Hospital, acute care — UP P —
Medical services - Hospital, physical rehabilitation — — P P
Medical services - Hospital, psychiatric/chemical dependency — — P P
Office - Accessory UP P — —
Office - Government — UP — —
Key to Zoning District Symbols
GC Golf Course M-1 Medical Center
PS Public and Semipublic M-2 Health Facility
Notes:
(1) See Division D8 for land use definitions.
(2) Limited to ground floor of hospital or medical office building, with no establishment exceeding 1,000 square feet.
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-46
TABLE 2-12
Allowed Uses and Permit Requirements
for Special Purpose Zones
P Permitted Use, Zoning Clearance may be
required prior to operation
MUP Minor Use Permit required
UP Conditional Use Permit required
— Use not allowed
S Permit requirement set by Specific Use
Regulations
ZC Zoning Clearance required
LAND USE (1)
PERMIT REQUIRED BY ZONE Specific Use
Regulations GC PS M-1 M-2
SERVICES - GENERAL
Adult day care — UP — —
Child day care center — UP UP UP
Lodging - Bed and breakfast inn — — — —
Maintenance and service facility — UP — —
Public safety facility — P P UP
TRANSPORTATION, COMMUNICATIONS & INFRASTRUCTURE
Heliport — UP UP UP D4-32
Solid waste transfer station — UP — —
Transportation service dispatch facility — — P MUP(3)
Transit station — UP — —
Utility facility — UP UP UP
Utility infrastructure — P P P
Wireless telecommunications facility S S S S D4 -Chap. IV
Key to Zoning District Symbols
GC Golf Course M-1 Medical Center
PS Public and Semipublic M-2 Health Facility
Notes:
(1) See Division D8 for land use definitions.
(2) Limited to ground floor of hospital or medical office building, with no establishment exceeding 1,000 square feet.
(3) Minor Use Permit required if located within 1,000 feet of an R zone or site occupied by a school or park. Conditions may limit vehicle
speed and/or the use of sirens.
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-47
D2-25 - Special Purpose Zone General Development Standards
A. AG, OS-1, OS-2, P, and PS zones. Subdivisions, new land uses and structures, and alterations to
existing land uses and structures, shall be designed, constructed, and/or established in compliance
with the requirements specified by the Use Permit required for the project by Tables 2-11 and 2-12;
except that if the Use Permit does not regulate a development feature that is regulated by an abutting
primary zone, or if a Use Permit is not required, the regulations of the abutting primary zone shall
apply to each adjacent portion of an AG, OS-1, OS-2, P, or PS zone, as applicable. The applicable
development standards (e.g., landscaping, parking and loading, etc.) in Division D3 of this Zoning
Ordinance shall also apply to proposed development and new land uses in the AG, OS-1, OS-2, P,
or PS zones.
B. GC zone development standards. Subdivisions, new land uses and structures, and alterations to
existing land uses and structures shall be designed, constructed, and/or established in compliance
with the requirements specified by the Use Permit required for the project by Table 2-12, except as
identified in Subsections B.1 and B.2, below. The applicable development standards (e.g.,
landscaping, parking, signs, etc.) in Division D3 of this Zoning Ordinance shall also apply to
development and new land uses proposed in the GC zone.
1. Height limit. No structure shall exceed a height of one story or 24 feet.
2. Floor area ratio. The maximum allowable floor area ratio (FAR) for all structures on the project
site shall not exceed 0.10.
C. PD zone development standards.
1. Minimum site area. The minimum net area of a PD zone shall be 10 acres, provided that a
PD zone may be subdivided in compliance with an approved Planned Development Permit or
Specific Plan. A site that does not meet the minimum acreage or lot width requirement may be
developed, provided that the development proposal includes adjoining parcels which
collectively meet the minimum development standards. It is not necessary for the collective
properties to be under the same control and/or ownership. The review authority may reduce
the 10 acre requirement where it determines that the proposed project will provide substantial
public benefit.
2. Residential density. Except where a density bonus is granted in compliance with the City's
density bonus regulations, the total number of dwelling units in a PD zone shall not exceed the
maximum number permitted by the General Plan density for the total area of parcels designated
for residential use and for open space excluding area devoted to public and private streets,
areas with a slope of 20 percent or more, areas with a maximum elevation of 40 feet and areas
with a minimum contiguous area of three acres.
3. Other development regulations. Other development regulations shall be as prescribed by
the PD Plan, provided that the minimum setback requirements for front, corner-side, side and
rear yards may not be reduced by more than 20 percent from those of the base zone that would
otherwise apply.
4. Mixed use component. Each PD development proposal shall consider a mixed use
development strategy. This strategy should include a horizontal and/or vertical integration of
project types (i.e., residential adjacent to commercial/office or residential above commercial).
If this approach is determined to be infeasible by the applicant it shall be the obligation of the
applicant to substantiate this before the Commission.
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-48
D. M-1 and M-2 zone development standards. Subdivisions, new land uses and structures, and
alterations to existing land uses and structures, shall be designed, constructed, and/or established in
compliance with the requirements in Table 2-13, in addition to the applicable development standards
(e.g., landscaping, parking and loading, etc.) in Division D3 of this Zoning Ordinance.
TABLE 2 -13 - M-1 AND M-2 DEVELOPMENT STANDARDS
Development Feature
Requirement by Zone
M-1 M-2
Minimum lot size Minimum area and width for parcels proposed in new subdivisions.
Area (net) 10 acres 2 acres
Width 650 ft 150 ft
Depth Determined through subdivision process.
Setbacks Minimum setbacks required. See Section D3-10 for exceptions,
and allowed projections into setbacks.
Front 35 ft 20 ft
Side - Interior (each) 30 ft 15 ft
Side - Corner 35 ft 20 ft
Rear 20 ft 15 ft
Accessory structures See Section D4-26 (Accessory Structures)
Lot coverage, FAR Maximum percentage of total lot area that may be covered by
structures, and maximum floor area ratio (FAR).
Lot coverage 30% N.A.
FAR 0.35 0.35
Height limit Maximum allowable height of structures. See Section D3-6
(Height Limits and Exceptions) for height measurement
requirements, and height limit exceptions.
Maximum height 40 ft 35 ft
Landscaping See Chapter D3-II (Landscape Design Standards)
Parking See Chapter D3-III (Parking and Loading)
Signs See Chapter D3-IV (Signs)
Special Purpose Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-49
D2-26 - Special Purpose Zone Land Use Limitations and Additional Standards
A. Self-storage - P zone requirements - Self-storage. Self-storage facilities are limited to appropriate
portions of the Southern Pacific right-of-way in the P zone which feasibly combine adequate public
access and visual compatibility with surrounding land uses, and the Iron Horse Trail. The review
authority may impose conditions of approval including screening and buffering, landscaping, lighting,
and security to ensure compatibility with surrounding land uses.
B. Eating and drinking establishment - M-1, M-2, P and PS zone requirements. An eating and
drinking establishment is permitted as an accessory use in a cultural, park, commercial recreation
and entertainment facility or medical institution, occupying no more than 10,000 square feet on any
individual site in the P zone and 5,000 square feet in the PS zone, if there is no separate entrance or
sign along a street frontage. An additional 10,000 square feet of space may be allowed for banquet
rooms and conference facilities in the P zone with Use Permit approval.
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-50
[Page intentionally left blank]
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-51
Chapter VI - Overlay Zones
Sections:
D2-27 - Purpose
D2-28 - Applicability of Overlay Zones
D2-29 - Height Limit (-H) Overlay Zone
D2-30 - Interim Study (-IS) Overlay Zone
D2-31 - Landmark (-L) Overlay Zone
D2-32 - Reserved
D2-33 - Senior Housing (-SH) Overlay Zone
D2-27 - Purpose
This Chapter regulates new and existing structures and land uses in the overlay zones established by
Section D1-7 (Zoning Map and Zones). The provisions of this Chapter provide guidance for development
in addition to the standards and regulations of the primary zones, where important site, environmental,
safety, compatibility, or design issues require particular attention in project planning.
D2-28 - Applicability of Overlay Zones
The provisions of this Chapter apply to proposed land uses and development in addition to all other
applicable requirements of this Zoning Code. Any perceived conflict between the provisions of this Chapter
and any other provision of this Zoning Ordinance shall be resolved in compliance with Section D1-5 (Rules
of Interpretation).
A. Mapping of overlay zones. The applicability of any overlay zone to a specific site is shown by the
overlay zone Zoning Map symbol established by Section D1-7 (Zoning Map and Zones), being
appended as a suffix to the symbol for the primary zone on the Zoning Map.
B. Application of overlay zones to property. The overlay zones are applied to property through the
rezoning process in compliance with Chapter D7-III (Amendments), subject to any specific rezoning
requirements of the applicable overlay zone. The rezoning of property to apply an overlay zone may
be initiated by either the City or the property owner, except where initiation is otherwise restricted by
this Chapter for a specific overlay zone.
C. Allowed land uses, permit requirements, development standards. Except as may be otherwise
provided by this Chapter for a specific overlay zone:
1. Any land use normally allowed in the primary zone by this Chapter may be allowed within an
overlay zone, subject to any additional requirements of the overlay zone;
2. Development and new land uses within an overlay zone shall obtain the land use permits
required by this Chapter for the primary zone; and
3. Development and new land uses within an overlay zone shall comply with all applicable
development standards of the primary zone, except as modified by this Chapter.
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-52
D2-29 - Height Limit (-H) Overlay Zone
A. Purpose. The Height Limit (-H) overlay zone is intended to control the location of structures which
exceed the height limits of a primary zone, and to ensure that the appearance and effects of
commercial and office buildings are harmonious with the character of their surroundings, and to
minimize the impact of commercial and office development on adjacent Residential Zones.
B. Applicability. The -H overlay zone shall be applied to each parcel in the OA zone that has an existing
and/or approved but unbuilt structure that exceeds 55 feet in height, and to each parcel in a
commercial zone with an existing and/or approved structure that exceeds 50 feet in height as of the
effective date of the ordinance establishing this overlay zone.
C. Development regulations. Proposed development and new land uses within the -H overlay shall
comply with the development regulations of the applicable primary zone, except as follows.
1. A major department store within a retail center of a regional context providing a minimum
400,000 gross square feet of retail shall be allowed a maximum height of up to 70 feet.
2. An office building may be allowed a maximum height of up to 75 feet provided that building
architecture incorporates a varying roof plane to add variation in the structures' appearance.
3. An existing structure with a height in excess of 55 feet, shall not be permitted to increase its
height except through the approval of a Variance in compliance with Section D6-29.
4. Each approved but unbuilt structure with an entitlement and/or development agreement to build
at a height over 55 feet, shall be built only to the maximum height permitted by the conditions
of approval of its entitlement and/or development agreement.
D2-30 - Interim Study (-IS) Overlay Zone
A. Purpose. The Interim Study (-IS) overlay zone is intended to allow discretionary review of
development proposals in areas where changes in the General Plan or zoning regulations are
contemplated or under study.
B. Applicability. The -IS overlay may be combined with any primary zone established by Section D1-
7 (Zoning Map and Zones).
C. Application to property.
1. Prior to approving an amendment reclassifying land to an -IS zone, the Commission and Council
shall approve a study plan that identifies regulatory problems and identifies the land use and
development issues to be resolved for the area proposed for rezoning to the -IS overlay zone.
2. An ordinance applying the -IS overlay shall contain a provision terminating the -IS designation
two years from its effective date. An ordinance establishing an -IS zone may be amended,
reenacted, or superseded by a zoning map amendment adopted in compliance with Chapter
D7-III (Amendments).
D. Permit requirements. Use Permit approval shall be required for establishment of any new or
expanded use allowed in the primary zone. A Use Permit application that has been denied, or
approved subject to conditions unacceptable to the applicant, may be resubmitted on or after the
effective date of a zoning map and/or text amendment that supersedes an -IS overlay zone
designation.
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-53
E. Required findings. In addition to the findings required for Use Permit approval by Section D6-28
(Use Permits and Minor Use Permits), and any additional findings that may be required by the study
plan required by Subsection C. for a specific use type, Use Permit approval shall require a finding
that the proposed use will not conflict with the land use and development policies established for the
area at the time the -IS zone was adopted.
F. Development regulations. Proposed development and new land uses shall comply with the
development regulations of the primary zone in addition to any requirements imposed through Use
Permit conditions of approval.
D2-31 - Landmark (-L) Overlay Zone
A. Purpose. The Landmark (-L) overlay zone is intended to implement the General Plan by:
1. Preventing the demolition, destruction, alteration, misuse, or neglect of historic or architecturally
significant buildings that form an important link to San Ramon's past.
2. Promote the conservation, preservation, protection, and enhancement of each landmark
district.
3. Stimulate the economic health and visual quality of the community and stabilize and enhance
the value of property.
4. Encourage development tailored to the character and significance of each landmark district
through a Conservation Plan that includes goals, objectives, and design guidelines and
development criteria.
5. Provide a mechanism to resolve conflicts in an orderly fashion between goals of landmark
preservation and alternative land uses.
B. Applicability.
1. Primary zones. The -L overlay zone may be combined with any zone established by Section
D1-7 (Zoning Map and Zones).
2. Exempt projects. The requirements of this Section shall not apply to a project initiated prior
to the effective date of an ordinance establishing an -L overlay zone or designating a landmark.
a. The project shall be considered a nonconforming use, subject to Chapter D7-I
(Nonconforming Uses, Structures, and Parcels).
b. For the purposes of this Subsection, a project shall be deemed initiated if an application,
plans, and materials for concept or development plan review have been filed and accepted
as complete.
C. Definitions. Definitions of technical terms and phrases used in this Section may be found in Division
D8 (Glossary) under "Landmark."
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-54
D. Procedure for designating property. An area of the community, a site, and/or a structure may be
designated with the -L overlay zone in compliance with the following requirements.
1. Eligibility for designation. An area within the City may be designated with the -L overlay as
a landmark district, and/or a site or individual structure may be designated with the -L overlay
as a landmark, if one or more of the following criteria are met, as rigorously applied and
supported by findings of historical or architectural significance.
a. The area possesses character, interest, or value as part of the heritage of the City;
b. The area is the location of a significant historical event;
c. The area is identified with a person or group that contributed significantly to the culture
and development of the City;
d. Structures within the area exemplify a particular architectural style or way of life important
to the City, or are the best remaining examples of an architectural style in a neighborhood;
e. The area or its structures are identified as the work of a person or group whose work has
influenced the heritage of the City, the state or the United States; and/or
f. The area has potential for yielding information of archaeological interest.
Portions of an area within the City that do not meet the above criteria may be included within
an -L overlay zone if inclusion is found to be essential to the integrity of the district.
2. Landmark conservation plan required. Prior to filing an application for rezoning to apply the
-L overlay, the applicant shall prepare a Landmark District Conservation Plan with the
assistance of the Department. Each Landmark Conservation Plan shall contain:
a. A map and description of the proposed district, including boundaries; the age, setting, and
character of structures; urban design elements and streetscapes; major public
improvements; and proposed objectives to be achieved;
b. A statement of the architectural or historical significance of the proposed district;
c. A list of specific alterations that should be subject to Architectural Review in order to
protect the architectural or historical character of the proposed district;
d. A set of specific development guidelines for new construction and alterations necessary
to preserve the character of the proposed district; and
e. Proposed rules and regulations for Architectural Review.
3. Application requirements.
a. Eligibility for filing. An application for rezoning to apply an -L overlay zone or landmark
designation may be initiated by the Commission, Council, or the property owner.
b. Application contents. The application shall include a proposed Landmark Conservation
Plan for the district in compliance with Subsection D.2, and the following information:
(1) A map showing the location of the building or structure and building plans or
photographs of the building exterior;
(2) A statement of the architectural or historical significance of the proposed building
and description of the particular features that should be preserved; and
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-55
(3) The consent of the owner or authorized agent to the proposed designation. For
purposes of this Section, each condominium owners' association shall be deemed
the property owner of common areas.
Prior to accepting the application as complete, the Zoning Administrator may request
additional information, plans or materials deemed necessary to support the application.
4. Review and approval.
a. Preliminary review, neighborhood workshop. The Commission shall consider the
proposed designation and make a preliminary determination based on any documentation
that the Commission may require.
(1) If the Commission determines that the process of designating the property should
proceed, it shall conduct a neighborhood workshop in the proposed district to
explain the proposal and the amendment process to neighborhood residents.
(2) Notice of the workshop shall be given in compliance with Chapter D7-IV (Public
Hearings). After the workshop, the Commission shall decide whether to proceed
with the -L designation.
b. Public hearing. If the Commission determines that an -L designation may be appropriate
and complies with the criteria in Subsection D.1, the proposed district shall be the subject
of public hearings before the Commission and the Council. The hearings shall be set,
noticed, and conducted in compliance with Chapter D7-IV.
In addition to the information required in a public hearing notice by Chapter D7-IV, notice
of a public hearing to establish an -L district or designation of a landmark shall include a
statement that original petitioners have the right to withdraw their support of the district at
any time prior to the hearing, and that property owners who have not signed the petition
have the right to do so prior to the date of the hearing.
c. Required findings. In addition to the findings for the approval of a rezoning by Chapter
D7-III (Amendments), a rezoning to apply the -L designation shall require that the
Commission and Council shall also first find that the proposed district or historical site has
a significant architectural or historical character that can be preserved and enhanced
through appropriate controls on new development and alterations to existing buildings
and landscaping.
d. Adoption of Landmark Conservation Plan. An ordinance establishing an -L district
shall include a Landmark District Conservation Plan, in the form submitted or as revised
by the Commission or Council.
(1) The development guidelines included within the plan may modify the land use and
development regulations of the primary zone, but shall not significantly alter the
regulations.
(2) A guideline shall be found to be a significant alteration of primary zone regulations
if it substantially prevents property from being used in compliance with the
provisions of the primary zone, or creates a substantial number of nonconforming
uses or structures.
e. Amendment of Landmark Conservation Plan. An adopted Landmark Conservation
Plan shall be amended only in compliance with Chapter D7-III (Amendments).
E. Land use and development regulations. Proposed development and new land uses within an -L
overlay zone shall comply with all applicable requirements of the primary zone, except:
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-56
1. Where modified by another overlay zone;
2. Where the Commission grants an exception to the land use regulations of the primary zone
through Use Permit approval, where the Commission first determines that the exception is
necessary to permit the preservation or restoration of a historic or architecturally significant
building, structure or site; or
3. In the event of a conflict between the requirements of the primary zone or another overlay zone
and the -L zone Landmark Conservation Plan, the requirements of the -L zone Landmark
Conservation Plan shall control.
F. Demolition and Design Review procedures.
1. Review authority. Except as modified by an adopted Landmark Conservation Plan, Design
Review in an -L zone, or of a proposed alteration, enlargement or demolition of a designated
historical site shall be conducted in compliance with Chapter D6-II (Permit Review and
Decisions), provided that Design Review shall be the responsibility of the Commission.
2. Permit issuance. Commission approval shall be required in compliance with this Subsection
prior to the issuance by the Chief Building Inspector of a permit for the construction, alteration,
enlargement, or demolition of a building or structure located in an -L zone, or of a designated
historical site.
3. Design Review criteria.
a. In addition to the requirements for Architectural Review in Chapter D6-II the Commission
shall consider the proposed demolition, new construction, or alteration in the context of
the adopted Landmark Conservation Plan and the architectural or historical value and
significance of the site and structure in relation to the Overlay Zone.
b. Commission considerations shall include the visual relationship of proposed architectural
design elements to the surrounding area, including scale, height, rhythm of spacing,
pattern of windows and doorways, building siting and relationship to landscaping, roof
pitch, architectural style, and structural details, materials, colors, and textures.
4. Demolition requirements. If, after review of demolition permit application, the Commission
determines that the structure has historical, architectural or cultural interest or value, the
Commission may withhold approval for demolition for 180 calendar days from the date of
Commission action, or until environmental review is completed, whichever occurs later.
a. During the 180 days, the Commission may direct the Department to consult with
recognized historic preservation organizations and other civic groups, public agencies
and interested citizens, make recommendations for acquisition of property by public or
private bodies or agencies, explore the possibility of moving one or more structures or
other features, and take any other reasonable measures.
b. At the end of the 180 days, the demolition permit shall be issued if environmental review
determines there will not be a significant impact on the environment and all requirements
of the zoning ordinance are met or, if there may be substantial environmental damages,
that specific economic, social or other considerations make infeasible the mitigation
measures or alternatives identified during environmental review.
If, after review of the request for a demolition permit, the Commission determines that the
building or structure has no substantial historical, architectural, or cultural interest or value, a
Building Permit for demolition may be issued.
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-57
5. New construction and alteration requirements. The Commission shall not grant
Architectural Review approval for new construction or alterations unless it finds that the
proposed new construction or alteration will be compatible with, and help achieve the purposes
of the -L zone.
6. Landscape material requirements. Director approval shall be required for the removal or
alteration of landscape materials identified as significant resources by a Landmark District
Conservation Plan. Removal or alteration of the landscape materials shall require a finding that
the proposed removal or alteration will not affect the character of the -L zone, or that the safety
or persons or property requires the removal or alteration. This Subsection does not restrict the
routine maintenance of landscape materials.
7. Effective date. A decision of the Commission in compliance with this Section shall become
effective on the 10th day after the date of the decision, unless appealed in compliance with
Chapter D7-II (Appeals and Calls for Review).
G. Maintenance of structures and sites. Each owner of property within an -L Overlay Zone, and owner
of a designated landmark, shall maintain all their structures and premises within the -L overlay in good
repair at all times. Structures and premises in good repair shall present no material variance in
apparent condition from surrounding structures in compliance with this Section. Good repair includes
and is defined as the level of maintenance that ensures the continued availability of the structure and
site for a lawfully permitted use, and prevents deterioration, dilapidation, and decay of the exterior
portions of the structure and premises.
D2-32 - Reserved
D2-33 - Senior Housing (SH) Overlay Zone
A. Purpose. The Senior Housing (-SH) overlay zone is intended to encourage the production of housing
which meets the special needs of senior citizens, and provide standards to ensure that senior citizen
housing will be compatible with existing neighborhood character, and will provide appropriate
guidance for achieving densities above General Plan levels. A Senior Housing Development in the
-SH overlay zone must include a minimum of 35 dwelling units that are developed for, or substantially
rehabilitated or renovated for senior citizens.
B. Applicability. The -SH Overlay Zone may be combined with any residential primary zone established
by Section D1-7 (Zoning Map and Zones).
C. Definitions. Definitions of technical terms and phrases used in this Section may be found in Division
D8 (Glossary) under "Senior Housing."
D. Occupancy restrictions. Residents within a -SH zone shall be age 55 years or older, and/or a
qualifying resident along with a senior citizen 55 years of age or older or a guest of a senior citizen or
qualifying resident on a temporary basis, in compliance with Civil Code Section 51.3.
Overlay Zones D2
Division D2 – Allowable Land Uses and Zone Standards – Effective February 28, 2020 2-58
[Page intentionally left blank]
City of San Ramon Zoning Ordinance D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-1
Division D3
Site Planning and Project Design Standards
Chapter I - General Property Development Standards ......................................................................... 3-3
D3-1 - Purpose ............................................................................................................................... 3-3
D3-2 - Applicability ......................................................................................................................... 3-3
D3-3 - Development on Substandard Parcel ................................................................................. 3-3
D3-4 - Fences, Walls, and Screening ............................................................................................ 3-4
D3-5 - Hazardous Materials Storage.............................................................................................. 3-8
D3-6 - Height Limits and Exceptions .............................................................................................. 3-9
D3-7 - Outdoor Lighting ................................................................................................................ 3-12
D3-8 - Performance Standards .................................................................................................... 3-13
D3-9 - Relocated Structures ......................................................................................................... 3-15
D3-10 - Setback Requirements and Exceptions ............................................................................ 3-15
D3-11 - Solid Waste/Recyclable Materials Storage ....................................................................... 3-20
D3-12 - Underground Utilities ......................................................................................................... 3-22
D3-13 - Utility and Public Service Requirements ........................................................................... 3-24
Chapter II - Landscape Design Standards ........................................................................................... 3-25
D3-14 - Purpose of Chapter ........................................................................................................... 3-25
D3-15 - Reserved ........................................................................................................................... 3-25
D3-16 - Definitions.......................................................................................................................... 3-25
D3-17 - Applicability ....................................................................................................................... 3-25
D3-18 - Landscape Plan Approval Required ................................................................................. 3-26
D3-19 - Landscape Location Requirements .................................................................................. 3-27
D3-20 - Landscape Area Requirements ........................................................................................ 3-28
D3-21 - Landscape Standards ....................................................................................................... 3-29
D3-22 - Landscape Requirements ................................................................................................. 3-31
D3-23 - Maintenance of Landscape Areas .................................................................................... 3-31
D3-24 - Landscaping Education ..................................................................................................... 3-31
Chapter III - Parking and Loading ......................................................................................................... 3-32
D3-25 - Intent and Purpose of Chapter .......................................................................................... 3-33
D3-26 - Applicability and Basic Requirements ............................................................................... 3-34
D3-27 - General Parking Regulations ............................................................................................ 3-35
D3-28 - Number of Parking Spaces Required ............................................................................... 3-35
D3-29 - Disabled Parking Requirements ....................................................................................... 3-45
D3-30 - Reduction of Parking Requirements ................................................................................. 3-45
D3-31 - Parking Design and Development Standards ................................................................... 3-47
D3-32 - Parking Area Screening .................................................................................................... 3-51
D3-33 - Parking Area Lighting Requirements ................................................................................ 3-51
D3-34 - Parking Lot Landscaping Standards ................................................................................. 3-51
D3-35 - Garage and Carport Design and Location Requirements ................................................. 3-52
D3-36 - Additional Standards for Parking Lots and Structures ...................................................... 3-53
D3-37 - Driveways and Site Access ............................................................................................... 3-55
D3-38 - Bicycle and Motorcycle Parking Requirements................................................................. 3-58
D3-39 - Loading Space Requirements ........................................................................................... 3-59
D3-40 - Designation of Off-Site Parking and Loading Spaces ....................................................... 3-61
D3-41 - Vehicles on Private Property ............................................................................................. 3-62
City of San Ramon Zoning Ordinance D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-2
Chapter IV - Signs .................................................................................................................................. 3-65
D3-42 - Purpose of Chapter ........................................................................................................... 3-65
D3-43 - Criteria and Guidelines ...................................................................................................... 3-66
D3-44 - Definitions.......................................................................................................................... 3-67
D3-45 - Exempt Signs - Signs Not Requiring a Sign Permit .......................................................... 3-73
D3-46 - On and Off-Site Sign Regulations and Guidelines ............................................................ 3-75
D3-47 - Specific Sign Regulations ................................................................................................. 3-77
D3-48 - Miscellaneous Signs ......................................................................................................... 3-84
D3-49 - Illumination of Signs .......................................................................................................... 3-84
D3-50 - Prohibited Locations, Sign Types, and Messages ............................................................ 3-84
D3-51 - Maintenance, Abandonment, and Removal ...................................................................... 3-86
D3-52 - Master Sign Program Required ........................................................................................ 3-86
D3-53 - Off-Site Directional Signs .................................................................................................. 3-89
D3-54 - Approvals Required ........................................................................................................... 3-92
D3-55 - Required Findings ............................................................................................................. 3-93
D3-56 - Sign Permit Required ........................................................................................................ 3-93
D3-57 - Owner’s Consent Required ............................................................................................... 3-93
D3-58 - Sign Permit Applications ................................................................................................... 3-94
D3-59 - Building Permit Required .................................................................................................. 3-94
D3-60 - Required Inventory of Illegal or Abandoned Signs ........................................................... 3-94
D3-61 - Reserved ........................................................................................................................... 3-94
D3-62 - Reserved ........................................................................................................................... 3-94
D3-63 - Reserved ........................................................................................................................... 3-94
Chapter V – Portable Outdoor Storage Units ...................................................................................... 3-95
D3-64 - Purpose of Chapter ........................................................................................................... 3-95
D3-65 - Definitions.......................................................................................................................... 3-95
D3-66 - Number, Size, Duration, and Location .............................................................................. 3-95
D3-67 - Signage ............................................................................................................................. 3-96
D3-68 - Maintenance and Prohibition of Hazardous Materials ...................................................... 3-96
D3-69 - Reserved ........................................................................................................................... 3-96
D3-70 - Reserved ........................................................................................................................... 3-96
D3-71 - Permits .............................................................................................................................. 3-96
D3-72 - Reserved ........................................................................................................................... 3-96
D3-73 - Reserved ........................................................................................................................... 3-96
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-3
Chapter I - General Property Development Standards
Sections:
D3-1 - Purpose
D3-2 - Applicability
D3-3 - Development on Substandard Parcel
D3-4 - Fences, Walls, and Screening
D3-5 - Hazardous Materials Storage
D3-6 - Height Limits and Exceptions
D3-7 - Outdoor Lighting
D3-8 - Performance Standards
D3-9 - Relocated Structures
D3-10 - Setback Requirements and Exceptions
D3-11 - Solid Waste/Recyclable Materials Storage
D3-12 - Underground Utilities
D3-13 - Utility and Public Service Requirements
D3-1 - Purpose
This Chapter expands upon the standards established by Division D2 (Allowable Land Uses and Zone
Standards) for each zone, by addressing additional details of site planning, project design, and the
operation of land uses. These standards are intended to ensure that proposed development is compatible
with existing and future development on neighboring properties, and produces an environment of stable
and desirable character, consistent with the General Plan and any applicable specific plan.
D3-2 - Applicability
The requirements of this Chapter shall apply to all proposed development and new land uses, except as
specified in Chapter D7-I (Nonconforming Uses, Structures, and Parcels). The requirements of this Chapter
shall be considered along with the standards for the applicable zone in Division D2 (Allowable Land Uses
and Zone Standards) and those in Divisions D4 (Standards for Specific Land Uses) and D5 (Resource
Management).
D3-3 - Development on Substandard Parcel
A. Minimum area and width required. A legally created parcel with an area or width less than required
for the applicable zone by Division D2 (Allowable Land Uses and Zone Standards) may be occupied
by a permitted or conditional use if the parcel has an area of at least 2,500 square feet and a width
of at least 25 feet, and if on the effective date of the regulations that made the parcel substandard,
the parcel was in single ownership, separate from any abutting parcel.
B. One dwelling unit may be allowed. One dwelling unit may be located on a substandard residentially
zoned parcel that meets the requirements of this Section, but only if constructed in compliance with
the City adopted Uniform Building Code.
C. Setback and density requirements. A substandard parcel shall comply with the same setback and
density requirements in Division D2 (Allowable Land Uses and Zone Standards) as a standard parcel.
D. No further reductions allowed. A substandard parcel shall not be further reduced in area or width.
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-4
D3-4 - Fences, Walls, and Screening
A. Applicability. The requirements of this Section apply to all fences and walls unless otherwise stated.
1. Fences or wall in flood hazard area. A fence or wall in an area subject to flooding identified
on a Federal Flood Insurance Rate Map (FIRM) on file in the Engineering Services, Public
Works Department shall require a Building Permit.
2. Exemptions. These regulations do not apply to fences or walls required by a State or Federal
agency, or by the City for public safety.
B. Height limits.
1. General height limit. Each fence and/or wall shall comply with the height limits shown in Table
3-1 for Residential zoned properties or Table 3-2 for Non-Residential zoned properties. Fencing
between different land uses shall be provided in compliance with Subsection F. (Screening),
below.
TABLE 3-1
HEIGHT OF RESIDENTIAL
FENCES AND WALLS
Location Maximum Height
Along a front property line and/or within
a required front setback 3 ft
Alongside or rear property lines and/or
within required setbacks
7 ft. (6 ft. solid with 1 ft. lattice) 1
6 ft. (with architectural feature),
see Subsection B.3 below.
Outside of required side or rear
setbacks
See Accessory Structures, D4-26
1 Fence height - No permit required. The Zoning Administrator may allow
the height of a fence along a side or rear property line and/or within a side
or rear setback to be a maximum of seven feet without a Minor Use Permit
if the top one foot is constructed of open lattice subject to the approval of
the Zoning Administrator; provided that the fence complies with all other
applicable requirements of this Section, including the fence material
limitations in Subsection E. (Prohibited materials). Open lattice shall be
50% or more air-penetrable and constructed of like material to the fence.
See Figure 3-2.
TABLE 3-2
HEIGHT OF NON-RESIDENTIAL FENCES AND WALLS
Location Maximum Height
Along a front property line and/or within
a required front setback 3 ft
Alongside or rear property lines and/or
within required setbacks
8 ft. (8 ft. solid)
Outside of required side or rear
setbacks
See Accessory Structures, D4-26
Figure 3-1 - Fence Height
Figure 3-2 – Additional Height
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-5
2. Increased fence or wall height - Permit required. The maximum fence or wall height allowed
by Table 3-1 or Table 3-2 may be increased with Minor Exception or Variance approval, subject
to the required findings in D6-24 (Minor Exceptions) or D6-29 (Variances) and the following
requirements.
a. Each fence or wall shall comply with the traffic safety visibility area requirements in
Section D3-6.F., below.
b. The Zoning Administrator may require conditions of approval to address aesthetic issues
and concerns.
3. Architectural Feature. An architectural feature may be constructed a maximum of 2 ft. above
a 6 ft. high fence. The architectural feature may project a maximum 18 inches from the posts,
but shall not extend beyond a property line. See Figure 3-3 and Figure 3-4.
C. Measurement of fence and wall height.
1. Fence height shall be measured as the vertical distance between the finished grade at the base
of the fence and the top edge of the fence material. Grade may not be modified in order to
increase fence height.
2. The height of fencing atop a wall shall be measured from the base of the wall and measured
from the side with the lowest natural grade and shall not exceed the maximum height required
by this section. See Figure 3-1
3. Where the elevation of the finished grade within six feet of the base of the fence differs from
one side of the fence to the other (as when a fence is placed at the top of a slope or on a
retaining wall), the height shall be measured from the side with the lowest natural grade. In
order to maximize the height of the wall and fence, the fence will need to be offset from the wall.
See Figure 3-1.
D. Specific fence and wall requirements.
1. Fencing between different land uses. Fencing between different land uses shall be provided
in compliance with Subsection F. (Screening), below.
2. Outdoor equipment, storage, and work areas. Nonresidential outdoor uses and equipment
adjacent to a residential use shall be screened in compliance with Subsection F. (Screening),
below.
Figure 3-4 – Architectural
Feature Projection
Figure 3-3 – Architectural Feature
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-6
3. Retaining walls. An embankment to be retained that is over 48 inches in height shall be
benched so that no individual retaining wall exceeds a height of 48 inches above finished grade,
and each bench has a minimum depth of 24 inches. See Figure 3-5.
4. Swimming pools, spas, and similar features. Swimming pools/spas and other similar water
features shall be fenced in compliance with City adopted Uniform Building Code (UBC)
requirements, regardless of the other requirements of this Section.
5. Temporary fencing. Temporary fencing may be required by a Zoning Administrator where
necessary to protect archaeological or historic resources, trees, or other similar sensitive
features, and the general public from construction activities during site preparation and
construction.
E. Prohibited materials. The following fence materials are prohibited in all zones unless approved by
the Zoning Administrator for animal control, special security needs, or required by a City, State, or
Federal law or regulation. Note: open wire fencing is permitted on property abutting open space.
1. Barbed wire, or electrified fence;
2. Razor or concertina wire in conjunction with a fence or wall, or by itself; and
3. Chain link fencing within a front or street side yard.
F. Screening. This Subsection establishes screening standards between different land uses for
mechanical equipment, loading docks, refuse areas, and outdoor storage areas.
1. Screening between different land uses. A commercial or industrial land use proposed on a
site abutting to a residential zone shall provide screening at the parcel boundary as follows.
The Zoning Administrator may also require other nonresidential uses adjacent to a residential
use to comply with these requirements.
a. The screen shall consist of plant materials and a solid, decorative wall of masonry or
similar durable material, a minimum of six feet in height.
b. The screen shall consist of plant materials and a solid, decorative wall of masonry or
similar durable material, a minimum of six feet in height.
c. The maximum height of the wall shall comply with the provisions of Subsection B. (Height
limits), above.
Figure 3-5 - Retaining Wall Design
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-7
d. The decorative wall shall be architecturally treated on both sides, subject to Zoning
Administrator approval.
e. A landscaping strip with a minimum width of five feet shall be installed adjacent to a
screening wall, except that 10 feet of landscaping shall be provided between a parking
lot and a screening wall, in compliance with Section D3-19 (Landscape Location
Requirements).
f. The Zoning Administrator may waive, or approve a substitute for the requirements of this
Subsection F.1, if the Zoning Administrator first determines that:
(1) The relationship of the proposed uses makes screening unnecessary;
(2) The intent of this Section can be successfully met by alternative screening methods;
(3) Physical characteristics and/or constraints on the site make the required screening
infeasible or unnecessary.
2. Mechanical equipment. Mechanical equipment shall be screened as follows.
Telecommunications equipment and antennas shall be screened in compliance with Chapter
D4-IV (Wireless Telecommunications Facilities).
a. Screening required.
(1) Except as provided in following Subparagraph (3), all exterior mechanical
equipment shall be screened from view on all sides.
(2) Equipment to be screened shall include air conditioning, ductwork, heating,
plumbing lines, refrigeration equipment, and transformers.
(3) Screening of the top of the equipment may be required by the Zoning Administrator,
if necessary to protect views from a neighboring residential zone.
b. Roof-mounted equipment. Roof-mounted mechanical equipment (e.g., air conditioning,
ductwork, heating, plumbing lines, etc.) shall be screened in compliance with Subsection
F.2.a, above.
c. Utility meters. Utility meters shall be:
(1) Enclosed within subsurface vaults when located within a required front setback or
in a street side setback; and
(2) Screened from view from public rights-of-way, but need not be screened on top or
when located within the interior side setback of a single-family dwelling.
d. Screening specifications.
(1) Screening materials may be solid concrete, wood, or other opaque material and
shall effectively screen the mechanical equipment so that it is not visible from a
street or adjoining parcel subject to the determination of the Zoning Administrator.
(2) The method of screening shall be architecturally compatible with other on-site
development in terms of colors, materials, and architectural style.
3. Loading docks and refuse areas. Loading docks and refuse storage areas shall be screened
from public view from adjoining public streets and rights-of-way and adjoining areas zoned for
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-8
residential uses. The method of screening shall be architecturally compatible with other on-
site development in terms of colors, materials, and architectural style. Refuse storage areas
shall comply with all applicable requirements of Section D3-11 (Solid Waste/Recyclable
Materials Storage).
4. Screening for other activities and land uses. Screening shall also be provided in
compliance with applicable standards in Division D3, Chapter III (Parking and Loading), and
Division D4 (Standards for Specific Land Uses), as applicable.
D3-5 - Hazardous Materials Storage
A. Purpose. The requirements of this Section are intended to ensure that the use, handling, storage,
and transport of hazardous substances comply with all applicable requirements of the California
Health and Safety Code, and that the City is notified of emergency response plans, unauthorized
releases of hazardous substances, and any substantial changes in facilities or operations that could
affect the public health, safety, or welfare. It is not the intent of this Section to impose additional
restrictions on the management of hazardous wastes.
B. Definitions. For purposes of this Section, "hazardous substances" shall include all substances on
the comprehensive master list of hazardous substances compiled and maintained by the California
Department of Health Services in compliance with State law (Health and Safety Code Section 25282).
C. Permit requirement. Use Permit approval shall be required for any new commercial, industrial, or
institutional use or accessory use, or major addition or alternative to an existing use that involves the
handling, manufacture, processing, or storage of hazardous substances in sufficient quantities that
would require permits as hazardous chemicals under the Uniform Fire Code adopted by the City, with
the following exceptions:
1. Underground storage of bulk flammable and combustible liquids is allowed in compliance with
Subsection E. (Underground storage tanks), below; and
2. Hazardous substances in container sizes of 10 gallons or less that are stored or maintained for
the purposes of retail or wholesale sales are exempt from these regulations.
D. Hazardous Materials Release Response Plan required.
1. Each business within the City that is required by Health and Safety Code Chapter 6.95 to
prepare a Hazardous Materials Release Response Plan shall submit the plan, including any
corrected or revised plans, to the Zoning Administrator at the same time the plan is submitted
to the public agency responsible for administering these provisions.
2. The submittal of the Hazardous Materials Release Response Plan shall be a condition of
approval of a zoning permit for the following:
a. New development where space may be occupied by a business; and
b. Any alteration or addition to an existing structure occupied by a business that is subject
to Health and Safety Code Chapter 6.95.
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-9
E. Underground storage tanks. The underground storage of hazardous substances shall comply with
all applicable requirements of State law (Health and Safety Code Chapter 6.7) and Section 79.113(a)
of the Uniform Fire Code.
1. Any business located in the City that uses underground storage tanks shall:
a. Notify the Fire Chief of any unauthorized release of hazardous substances within 24 hours
after the release has been detected and the steps taken to control the release; and
b. Notify the Fire Chief and the Zoning Administrator of any proposed abandoning, ceasing
operation, or closing of any underground storage tank and the actions to be taken to
dispose of any hazardous substances.
2. These notification requirements shall apply to the following:
a. New development that involves the installation of an underground tank; and
b. Any alteration or addition to an existing structure on a site where an underground storage
tank exists.
F. Above-ground storage tanks prohibited. Above-ground storage tanks containing hazardous
substances are prohibited within the City.
G. Appeals. A decision of the Zoning Administrator may be appealed to the Planning Commission in
compliance with Chapter D7-II (Appeals and Calls for Review).
D3-6 - Height Limits and Exceptions
A. Purpose. This Section describes the required methods for measuring the height of structures in
compliance with the height limits established by this Zoning Ordinance, and exceptions to those
height limits.
B. Maximum height outside the City Center project. Notwithstanding anything to the contrary in this
Code, no building outside the area identified on the Assessment Roll as APN 213-133-063, APN 213-
133-086, APN 213-120-010, APN 213-120-013, APN 213-120-017 and APN 213-120-018 and as
shown on the Vesting Tentative Map for Subdivision 9217 (San Ramon City Center Project), approved
by the City Council on December 11, 2007, shall be permitted to exceed the greater of five (5) stories
or eighty-five feet (85’) in height, including mechanical, unless approved by the electors of San
Ramon.
C. Maximum height of structures. No structure shall exceed the height limit established for the
applicable zone by Division D2 (Allowable Land Uses and Zone Standards), except as otherwise
provided by this Section, or by Division D4 (Standards for Specific Land Uses).
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-10
D. Height measurement. The maximum allowable height shall be measured as the vertical distance
from the average point of the plane connecting the highest and lowest points where the exterior walls
touch the natural grade of the site to the midpoint of a pitched roof, or to the highest point on a flat
roof. See Figure 3-6. The location of natural grade shall be determined by the Zoning Administrator,
and shall not be artificially raised to gain additional structure height.
E. Exceptions to height limits. The following structures and structural features may exceed the height
limits of this Zoning Ordinance as noted:
1. Architectural features.
a. A chimney, cupola, mechanical equipment, monument, or vent may exceed the height
limits by a maximum of three feet.
b. An elevator penthouse, spire, theater scenery loft, tower, or roof-mounted water tank may
exceed the height limits by eight feet.
2. Telecommunications facilities. The height of communications facilities, including antennas,
poles, towers, and necessary mechanical appurtenances shall comply with Chapter D4-IV
(Wireless Telecommunications Facilities).
F. Height limit at street corners and driveways. Proposed and existing development adjacent to a
public or private street or alley intersection, or the intersection of a driveway with a street shall be
designed to provide a traffic safety visibility area for pedestrian and traffic safety. See Figures 3-7
and 3-8.
1. Measurement of visibility area. A traffic
safety visibility area is a triangle measured
as follows, and may include private
property and/or public right-of-way.
a. Street intersections. The visibility
area shall be defined by measuring
25 feet from the intersection of the
front and street side right-of-way
lines (e.g., edge of pavement or
curb), and connecting the lines
across the property.
Figure 3-7 – Required Traffic Safety
Visibility Area for Street Intersections
Figure 3-6 – Height Limits
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-11
b. Driveways. The visibility area shall
be defined by measuring 15 feet
along the driveway from the
intersection of the driveway with the
face of curb, and 15 feet along the
street line at the face of curb, away
from the driveway, and connecting
the lines across the intervening
property. The 15 foot dimension shall
follow the contour of the face of curb
along curves and cul-de-sacs.
2. Height limit.
a. No structure, sign, or landscape element shall exceed 30 inches in height within the traffic
safety visibility area, unless approved by the Engineering Services Director.
b. This limitation shall not apply to existing public utility poles, traffic signs and signals, trees
with their canopy trimmed to a minimum of seven feet above grade, or corners where the
contour of the land itself prevents visibility.
G. Height limit for accessory structures.
1. Measured as the vertical distance from average point of the plane connecting the highest and
lowest points where the exterior walls touch the natural grade of the site to the midpoint of a
pitched roof, or to the highest point on a flat roof. See Figure 3-9.
2. Height limit does not include architectural features such as chimneys.
3. Height of decks is measured as the vertical distance from the average point of the plane
connecting the highest and lowest points where the exterior walls/posts touch the natural grade
of the site to the top of the flooring material (i.e. not railing) See Figure 3-10.
Figure 3-8 – Required Traffic Safety Visibility
Area for Driveways
Figure 3-9 – Accessory Structure Height Limit
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-12
D3-7 - Outdoor Lighting
A. Applicability. The requirements of this Section apply in all zones except where noted otherwise.
B. Conformance with security measures. The outdoor lighting for the project shall conform to the
security measures identified in Municipal Code Title C, Division 12, Chapter X (Building Security),
and any other security measures required by the Chief Building Official and the Chief of Police. These
measures shall include lighting within parking areas and the structures’ perimeter.
C. Comprehensive lighting plan required. A comprehensive lighting plan for the project shall be
submitted to the Planning Department for approval with the project application.
D. Illumination of entrance areas. All lighting shall adequately illuminate the main entrance areas and
other structure entrance areas.
E. Low-level and vandal resistant. On-site lighting in all other areas shall be low-level and vandal
resistant.
F. Maximum height of lighting. An outdoor light fixture, not including parking area lighting structures,
shall be limited to a maximum height of 18 feet. An outdoor light fixture within the public right-of-way
or within a Park zone is exempt from this height limit because of site specific requirements.
G. Energy-efficient fixtures required. Outdoor lighting shall utilize energy-efficient (high pressure
sodium, low pressure sodium, hard-wired compact fluorescent, or other lighting technology that is of
equal or greater energy efficiency) fixtures and lamps.
H. Shielded or recessed lighting required. Lighting fixtures shall be shielded or recessed to reduce
light bleed to adjoining properties, by:
1. Ensuring that the light source (e.g., bulb, etc.) is not visible from off the site; and
2. Confining glare and reflections within the boundaries of the site to the maximum extent feasible.
Each light fixture shall be directed downward and away from adjoining properties and public rights-
of-way, so that no on-site light fixture directly illuminates an area off the site.
Figure 3-10 – Deck Height Limit
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-13
I. Maximum illumination level. No lighting shall produce an illumination level greater than one foot
candle at the property line with a residential zone except on the site of the light source.
J. No blinking or flashing lights allowed. No permanently installed lighting shall blink, flash, or be of
unusually high intensity or brightness, as determined by the Zoning Administrator.
D3-8 - Performance Standards
A. Purpose. This Section provides performance standards to minimize various potential operational
impacts of land uses and development within the City, and promote compatibility with adjoining areas
and land uses.
B. Applicability. The requirements of this Section apply to all new and existing land uses, including
permanent and temporary uses in all zones, unless an exemption is specifically provided. A land use
existing on the effective date of this Section shall not be altered or modified thereafter to conflict with
these standards.
C. Combustibles and explosives. The use, handling, storage, and transportation of combustibles and
explosives shall comply with the provisions of Municipal Code Title B, Division 4 (Fire Prevention),
and any other applicable laws.
D. Dust. Activities that may generate dust emissions (e.g., commercial gardening, construction,
grading, and similar operations) shall be conducted to limit the emissions beyond the site boundary
to the maximum extent feasible. Recycled water shall be used unless it is not available, not feasible
(additional cost is not the primary determination regarding feasibility), or if there is an environmental
concern (e.g. adjacent to a creek, protected habitat, etc.) as determined by the Zoning Administrator.
Recycled water shall also be utilized for other construction-related activities, including but not limited
to washing equipment, and street cleaning, in compliance with all applicable regulations and permits,
including the City’s Storm Water Permit.
The Zoning administrator, in determining feasibility of the use of recycled water shall look at the
availability of reclaimed water, distance of transportation, impacts of transit on the road system, site
specific constraints, and scale of development.
Appropriate methods of dust management shall include the following, subject to approval by the City
Engineer and/or Building Official.
1. Scheduling. Grading shall be designed and grading activities shall be scheduled to ensure
that repeat grading will not be required, and that completion of the dust-generating activity (e.g.,
construction, paving, or planting) will occur as soon as possible.
2. Limited hours for grading. Grading operations shall occur only between the hours of 7:00
a.m. and 7:00 p.m. to the extent feasible, consistent with the City’s Grading Ordinance, and
noise levels shall not exceed those allowed by the City’s Noise Ordinance. The hours for
grading operations may be further restricted when determined by the Zoning Administrator or
the City Engineer to be necessary because of the proximity of dust- and noise-sensitive uses.
3. Operations during high winds. Clearing, earth-moving, excavation operations, or grading
activities shall cease when the wind speed exceeds 25 miles per hour averaged over one hour.
4. Limiting the area of disturbance. The area disturbed by clearing, demolition, earth-moving,
excavation operations, or grading shall be minimized at all times.
5. Dust control. Dust emissions shall be controlled by a combination of the following:
a. Watering on-site construction roads a minimum of twice a day;
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-14
b. Paving or use of other treatments of permanent on-site roads
c. Covering of truck loads to contain dust sources
d. Use of other dust prevention measures as necessary based on site conditions, (e.g.
hydro-seeding)
6. Revegetation. Graded areas shall be revegetated as soon as possible, within no longer than
30 days, once grading is complete, to minimize dust and erosion. Disturbed areas of the
construction site that are to remain inactive longer than 90 days shall be seeded and watered
until grass cover is grown and maintained; and
7. Containment. Appropriate facilities shall be constructed to contain dust within the subject site
as required by the City Engineer.
E. Ground vibration. No activity, process, or use shall generate ground vibrations that are perceptible
without instruments by a reasonable person at the property lines of the subject site.
F. Hazardous and extremely hazardous materials. The handling (e.g., recycling, storage,
transportation, etc.) of hazardous and extremely hazardous materials shall comply with the
requirements of the California Hazardous Materials Regulations (California Administrative Code, Title
22, Division 4), Section D3-5 (Hazardous Materials Storage ), above, and any other applicable laws.
G. Heat and humidity. Activities, processes, and uses shall not produce any unreasonable, disturbing,
or unnecessary emissions of heat or humidity, at the property line of the subject site that cause
material distress, discomfort, or injury to a reasonable person.
H. Hours of operation. In a commercial zone, a nonresidential use with outdoor parking located within
100 feet of a residential zone shall not operate between the hours of 10:00 p.m. and 7:00 a.m., unless
authorized by Use Permit approval, granted in compliance with Section D6.28 (Use Permits and Minor
Use Permits).
I. Light and glare. Outdoor lighting shall comply with the requirements of Section D3-7 (Outdoor
Lighting), above.
J. Liquid waste. No liquid shall be discharged into a public or private body of water, sewage system,
watercourse, or into the ground, except in compliance with applicable regulations of the State
Regional Water Quality Control Board.
K. Noise. Noise emanating from the subject site shall comply with the City’s Noise Ordinance.
L. Odor. No activity, process, or use shall produce obnoxious or objectionable odors or fumes that are
perceptible without instruments by a reasonable person at the property line of the subject site.
M. Radioactivity, electrical disturbance, or electromagnetic interference.
1. The handling, storage, transportation, and use of radioactive materials shall comply with the
provisions of the California Radiation Control Regulations (California Administrative Code, Title
17), and any other applicable laws.
2. Activities, processes, and uses shall not cause electrical disturbance or electromagnetic
interference with normal radio or television reception in any residential zones, or with the
function of other electronic equipment beyond the property line of the subject site.
N. Traffic Control. Activities that require lane closures or deviation from originally planned traffic flow
shall comply with the most recent edition of the Caltrans Manual for Traffic Control or as approved by
the City.
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-15
D3-9 - Relocated Structures
A. Permit requirement. In addition to the requirements of Municipal Code Title C, Division 14 (Housing
Moving), a Minor Use Permit shall first be required for the relocation of any structure within the City.
B. Conditions to be established by Zoning Administrator. The Minor Use Permit shall establish
conditions necessary to ensure that the relocated structure will be compatible with its surroundings in
terms of architectural character, height and bulk, and quality of exterior appearance.
C. Appeals. A decision of the Zoning Administrator may be appealed to the Planning Commission in
compliance with Chapter D7-II (Appeals and Calls for Review).
D3-10 - Setback Requirements and Exceptions
A. Purpose. This Section provides standards for the location, required size, and allowable uses of
setbacks. Setback standards provide open areas around structures for: access to and around
structures; access to natural light, separation between potentially conflicting activities; ventilation and
direct sunlight; visibility and traffic safety; and space for privacy, landscaping, and recreation.
B. Setback requirements.
1. Minimum setbacks for all structures.
a. Each structure shall comply with the front, street side, interior side, and rear setback
requirements of the applicable zone, except:
(1) Where a different setback requirement is established for a specific land use by
Division D4 (Standards for Specific Land Uses);
(2) Where a different setback requirement is established by Division D5 (Resource
Management); and
(3) As otherwise provided by this Section.
b. No portion of any structure, including eaves or roof overhangs, shall extend beyond a
property line, or into an access easement, or street right-of-way, except as provided by
this Section.
2. Exemptions from setback requirements. The minimum setback requirements of this Zoning
Ordinance do not apply to the following.
a. A projection into a required setback allowed by Subsection E. (Allowed projections into
setbacks), below.
b. A fence or wall in compliance with Section D3-4 (Fences, Walls, and Screening).
c. A deck, earthwork, step, terrace, and other site design element that is placed directly
upon grade and does not exceed a height of 18 inches above the surrounding grade at
any point.
d. A sign in compliance with Division D3, Chapter IV (Signs).
e. A retaining wall less than 48 inches in height above finished grade. An embankment to
be retained that is over 48 inches in height shall be benched in compliance with Section
D3-4.D (Specific fence and wall requirements).
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-16
C. Measurement of setbacks. Setbacks shall be measured and applied as follows, except that different
setback measurement methods may be required where the Zoning Administrator determines that
unusual parcel configuration makes the following infeasible or ineffective. See Figure 3-11.
1. Front setback. A front setback shall be measured at right angles from the nearest point on the
front property line of the parcel (or edge of access easement on a private street) to the nearest
point of the wall of the structure, except as follows. The front property line on a corner lot is the
most narrow lot line abutting a street, except as provided by Subsection C.2 (Street side
setback), below. The front setback area excludes the public right-of-way (i.e. sidewalks, utility
easements, and/or landscape strips). See Figure 3-12.
a. Mapped street with future improvements. If the City has established a plan that
identifies a right-of-way for the future construction of a new street or the widening of an
existing street, the required front or street side setback shall be measured from the plan
line.
b. Infill development within previously approved project. Where the City has
established specific setback requirements for individual vacant parcels through the
approval of a specific plan, subdivision map, or other entitlement, those setbacks shall
apply to continuing development within the approved project instead of the setbacks
required by this Zoning Ordinance.
Figure 3-11 – Location & Measurement
of Setbacks
Figure 3-12– Typical Front Yard Cross Section
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-17
c. Flag lot. For a parcel with a fee ownership strip
extending from a street or right-of-way to the
building area of the parcel, the front setback
shall be measured from the nearest point of the
wall of the structure to the point where the
access strip meets the bulk of the parcel;
establishing a setback line parallel to the lot line
nearest to the public street or right-of-way. See
Figure 3-13.
d. Corner lot. The front setback shall be measured from the nearest point of the wall of the
structure to the nearest point of the side street property line. If the property lines on both
street frontages are of the same length, the property line to be used for front setback
measurement shall be that to which the City has assigned the street address of the parcel.
e. Double frontage lot. The Director shall determine the location of a required front setback
on a double-frontage lot.
2. Street side setback. The side setback on the street side of a corner parcel shall be measured
from the nearest point on the side property line abutting the street right-of-way, or the edge of
an easement for a private road, or the inside edge of the sidewalk, or a plan line established as
described in Subsection C.1.b., above, whichever results in the greatest setback from the
existing or future roadway.
3. Side (interior) setback. The interior side setback shall be measured at right angles from the
nearest point on the side property line of the parcel to the nearest point of the wall of the
structure; establishing a setback line parallel to the side property line, which extends between
the front and rear setbacks.
4. Rear setback. The rear setback shall be measured at right angles from the nearest point on
the rear property line to the nearest line of the structure, establishing a setback line parallel to
the rear property line.
a. The Zoning Administrator shall determine the location of the required rear setback on a
double-frontage parcel.
b. Where a parcel has no rear lot line because its side lot lines converge to a point, a
presumed line 10 feet long within the parcel, parallel to, and at a maximum distance from
the front lot line, shall be deemed to be the rear lot line for the purpose of determining the
depth of the required rear setback. See Figures 3-14 and 3-15.
Figure 3-13 – Flag Lot Front
Setback
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-18
D. Limitations on the use of setbacks.
1. Structures. A required setback area shall not be occupied by a structure other than those
identified by Subsection B. 2. (Exemptions from setback requirements), above as being exempt
from the setback requirements of this Section.
2. Storage. No front, rear, side or street side setback shall be used for the accumulation,
placement, or storage of automobiles or other motor vehicles, building materials, junk,
machinery, or scrap, except for the following:
a. Automobiles and trucks, not in excess of one-ton capacity, regularly in use, with current
registration, able to move under their own power and be legally driven on a public street,
that are parked within a designated driveway; and
b. Building materials stored on-site required for construction on the subject parcel,
immediately before and during a construction project.
c. A recreational vehicle stored in compliance with Section D3-41.E. (Vehicles on Private
Property)
3. Parking. A required residential parking space shall not be located within a required setback
area. Accessory Dwelling Unit (ADU) parking shall comply with California Government Code
Section 65852.2l as outlined in Section D4-39 “Accessory Dwelling Units”
4. Mechanical and utility equipment. See Subsection F. 5. (Mechanical equipment) below.
5. Accessory structures. Accessory structures shall comply with the setback requirements
established by Section D4-26 (Accessory Structures).
E. Allowed projections into setbacks. Where allowed in the applicable zone an architectural feature
attached to a primary structure may extend beyond the wall of the structure and into a required front,
street side, side, or rear setback in compliance with Table 3-3. These requirements do not apply to
accessory structures, which are instead subject to Section D4-26 (Accessory Structures).
Figure 3-15 – Rear Setback - Irregular Lot
Figure 3-14 – Rear Setback - Irregular Lot
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-19
TABLE 3-3
ALLOWED PROJECTIONS INTO SETBACKS
Allowed Projection into Required Setback
Projecting Feature Front/Street
Side Setback
Interior
Side Setback Rear Setback
Awnings and canopies 6 ft 30 in (1) 6 ft (1)
Balcony, landing, porch, stairway - Uncovered and unenclosed 25% of setback
Balcony, landing, porch, stairway - Covered and enclosed by roof
and walls Not allowed in any setback
Balcony, landing, porch, stairway - Covered but unenclosed 6 ft 30 in (1) 6 ft (1)
Bay window, or similar projecting feature 30 in
The greater of 30 in
or 20% of setback
(1) 30 in
Chimney/fireplace, 6 ft. or less in breadth, media niche 24 in 24 in (1) 24 in (1)
Chimney/fireplace, more than 6 ft. in breadth, media niche Not allowed 24 in (1) 24 in (1)
Cornice, eave, mechanical equipment, roof overhang 24 in 24 in (1) 24 in (1)
Notes: (1) Feature may project and additional 6 inches if the setback is greater than 5 feet.
F. Setback requirements for specific structures:
1. Accessory structures. See Section D4-26 (Accessory Structures).
2. Fences. See Section D3-4 (Fences, Walls, and Screening).
3. Decks and other site design elements. A deck, freestanding solar device, steps, terrace, or
other site design element that is placed directly upon the grade, and that exceeds a height of
18 inches above the surrounding grade at any point, shall comply with the setback requirements
of this Zoning Ordinance for detached accessory structures. (Note: A site design element less
than 18 inches above grade is exempt from setback requirements.)
4. Swimming pool, hot tub, etc. A swimming pool, hot tub, or spa shall be set back a minimum
of five feet from side and rear property lines to the water's edge, and shall not be located within
a front setback. Equipment less than six feet in height that is associated with a pool, hot tub
and/or spa shall be set back a minimum of 36 inches from all property lines.
5. Mechanical equipment. Ground-mounted mechanical equipment less than six feet in height
located outside of a structure shall be setback a minimum of 36 inches from all property lines.
Ground-mounted mechanical equipment greater than six feet in height located outside of a
structure shall maintain a setback equal to the height less three feet from all property lines.
Examples of this equipment include: air conditioning, heating, swimming pool pumps and filters,
ventilation, and similar equipment; and cable television distribution boxes, transformers, and
similar utility equipment that is not installed underground.
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-20
Figure 3-16 – Solid Waste Enclosure
D3-11 - Solid Waste/Recyclable Materials Storage
A. Purpose. This Section provides standards which recognize the City's support for and compliance
with the California Solid Waste Reuse and Recycling Access Act (Public Resources Code Sections
42900 through 42911).
B. Applicability. These requirements shall apply to all new multi-family residential and nonresidential
developments, or changes to existing multi-family residential or nonresidential development that
increase gross floor area by at least 25 percent.
C. Extent of storage area required. Solid waste and recyclables storage areas shall meet or exceed
minimum requirements provided in tables D3-11.A and D3-11B. Additional storage areas may be
required, as deemed necessary by the Zoning Administrator. The storage area shall be designed to
accommodate standard size containers and to be accessible by occupants and standard collection
vehicles.
D. Enclosure requirements.
1. Applicable laws. The design, construction, and location of solid waste and recycling areas
shall not be in conflict with any applicable Federal, state, or local laws relating to fore, building,
access, transportation, circulation or safety.
2. Location. Developments and transportation corridors adjacent to recycling areas shall be
adequately protected for any adverse impacts such as noise, odor, vectors, or glare through
measures including, but not limited to maintaining adequate separation, fencing, and
landscaping. Material storage areas in a commercial development shall be located at least 25
feet from any pedestrian and/or vehicular access points.
3. Access. Driveways and/or travel aisles shall, at a minimum, conform to local building code
requirements, driveways and/or travel aisles should provide unobstructed access for collection
vehicles and personnel.
4. Enclosure required. Storage areas shall be fully enclosed by a minimum six-foot high
decorative masonry wall or other solid enclosure that is architecturally compatible with adjacent
structures, Tables 3-3 and 3-4, and approved by the Zoning Administrator.
5. Roof covering required. All storage areas shall be provided solid covers, shall be no more
than 12 feet in height, and shall be constructed of materials which are architecturally compatible
with adjacent structures and approved by the Zoning Administrator.
6. Gates required. Gates shall be solid and continuously maintained in proper working order.
7. Concrete apron required. A concrete apron shall
be engineered to withstand a minimum of 20,000
pounds of direct force from a single truck axle.
8. Landscaping required. Landscaping shall be
provided to soften and screen the storage areas in
compliance with Division D3, Chapter II
(Landscaping Design Regulations). See Figure 3-
16.
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-21
E. Multi-family residential storage requirements. All new multi-family residential development
shall provide interior and exterior refuse and recycling storage areas as approved by the Zoning
Administrator. Guidelines for the areas to be provided are in Table 3-4.
1. Interior storage. Each dwelling unit shall be equipped with an interior refuse and recyclable
material storage area of at least six cubic feet. The storage area shall consist of at least three
cubic feet for recycling and at least three cubic feet for non-recyclable materials.
2. Exterior storage. Each structure containing dwelling units shall be provided at least one
exterior storage area. The minimum size of the total of all storage areas shall be based on the
number of dwelling units in the development as shown in Table 3-4, as approved by the Zoning
Administrator.
TABLE 3-4
MINIMUM EXTERIOR SOLID WASTE AND RECYCLABLE MATERIAL
STORAGE AREAS FOR MULTIPLE UNIT RESIDENTIAL DEVELOPMENT
Number of
Dwelling Units
Per Development
Minimum Refuse
Storage Area Per
Development
(Square Feet)
Minimum Recyclable
Material Storage Area
Per Development
(Square Feet)
Total Minimum Storage
Area Per Development
(Square Feet)
2 – 7 16 16 32
7 – 15 32 32 64
16 – 25 64 64 128
26 – 50 128 128 256
51 - 75 192 192 384
76 – 100 256 256 512
101 – 125 320 320 640
126 – 150 384 384 768
151 – 175 448 448 896
176 – 200 512 512 1024
201 +
512
plus 64 square feet for
every 25 dwelling units
above 201
512
plus 64 square feet for
every 25 dwelling units
above 201
1024
plus 128 square feet for
every 25 dwelling units
above 201
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-22
F. Commercial and industrial storage requirements. All new commercial and industrial
development shall provide at least one exterior refuse and recyclable material storage area for each
building. The minimum size of the area is based on the gross floor area of the buildings on the
premises as shown in Table 3-5.
TABLE 3-5
MINIMUM EXTERIOR SOLID WASTE AND RECYCLABLE MATERIAL
STORAGE AREAS FOR COMMERCIAL AND INDUSTRIAL DEVELOPMENT
Gross Floor Area
Per Development
(Square Feet)
Minimum Refuse
Storage Area Per
Development
(Square Feet)
Minimum Recyclable
Material Storage Area
Per Development
(Square Feet)
Total Minimum Area
Per Development
(Square Feet)
0 – 5,000 16 16 32
5,001 – 10,000 32 32 64
10,001 – 25,000 64 64 128
25,001 – 50,000 128 128 256
50,001 – 75,000 192 192 384
75,001 – 100,000 256 256 512
100,001 +
256
plus 64 square feet for
every 25,000 square feet
of building area above
100,001
256
plus 64 square feet for
every 25,000 square feet
of building area above
100,001
512
plus 128 square feet for
every 25,000 square feet
of building area above
100,001
D3-12 - Underground Utilities
Existing and new overhead utility facilities shall be converted to, or installed as, underground utilities in
compliance with this Section.
A. Applicability. No Zoning Clearance shall be issued for a new structure or land development unless
the applicant's plans comply with the requirements of this Section, or until the applicant has obtained
a waiver of requirements of this Section.
B. Definitions. Definitions of the technical or specialized terms and phrases used in this Section may
be found in Division D8 (Glossary) under "Utility Facility” and “Utility Infrastructure."
C. Requirements for undergrounding.
1. All utilities servicing a new structure or servicing any existing structure located on the same
parcel of land as a new structure shall be installed or relocated underground, except as
otherwise exempted by Subsection D. (Exemptions from undergrounding requirements), below.
2. Relocation of existing overhead utility service to an off-site location is not allowed.
3. Utility lines, including, but not limited to electric distribution (under 33,000 volts),
communications, street lighting and cable television, shall be placed underground by the
applicant, who shall make the necessary arrangements with the utility companies for the
installation of the facilities.
4. Existing utility poles on the project site shall be removed and undergrounding of all overhead
service not directly affecting service to adjacent sites shall be accomplished to the nearest off-
site pole as determined by the City Engineer.
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-23
5. New poles may be set only in special instances where no other feasible solution is available as
determined by the utility company.
D. Exemptions from undergrounding requirements. The following types of facilities are exempt from
the undergrounding requirements of this Section.
1. Poles, overhead wires, and associated utility services used for electricity transmission at a
nominal voltage of 33,000 volts or higher and any appurtenant structures and equipment,
including surface mounted transformers, pedestal-mounted terminal boxes and meter cabinets.
2. Temporary poles, overhead wires, and associated utility services used or to be used in
conjunction with a construction project.
3. Temporary poles, overhead wires, and associated utility services for a temporary use, when a
Temporary Use Permit has been issued in compliance with Section D6-27, and when the permit
requires removal of the temporary utility service upon completion of the temporary use.
4. Public utilities doing work governed by the rules, regulations, and tariffs of the California Public
Utilities Commission.
5. Emergency poles, overhead wires, and utility services to be installed and maintained for a
period not to exceed 10 days, with the approval of the City Engineer.
6. Whenever an unreasonable hardship has been established by the Commission in compliance
with Subsection F. (Hardship waiver - In-lieu fees), below.
E. In-lieu fee. When a project does not qualify for one of the exemptions listed in Subsection D., above,
and the Commission has granted relief from undergrounding in conjunction with a request for
construction in compliance with Subsection F., below, an in-lieu fee may be established based on
front footage costs estimated by the utility company serving the subject site. The City Engineer shall
collect the in-lieu fees and manage and adjust the fees for inflation as deemed necessary.
F. Hardship waiver - In-lieu fees. If the cost of placing utility services underground is so great as to
constitute an unreasonable hardship, the property owner subject to the undergrounding requirement
may apply in writing to the Commission for relief from the provisions of this Section. The request
shall include a detailed description of the overhead utility services proposed to be placed underground
and separate itemized cost estimates of construction of the project if the utilities were placed or
relocated underground or above ground.
1. Unreasonable hardship findings. After considering the request for relief, the Commission
may grant relief as may be deemed proper under the circumstances, including in-lieu fees or
the indefinite deferral of the undergrounding requirement. The Commission may grant this relief
only if all of the following findings can first be made:
a. The cost of placing existing utilities underground is either so exorbitant or disproportionate
to the total cost of construction as to constitute an unreasonable hardship in compliance
with Subparagraph F.1.d., below;
b. No new utility poles are to be erected;
c. There is another overhead utility service in the immediate vicinity which would remain
even if no waiver is granted;
d. The cost of undergrounding exceeds 20 percent of the project valuation as determined
by the currently adopted valuation tables of the City’s Building Official; and
General Property Development Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-24
e. The granting of the hardship waiver would not be inconsistent with the intent and
purposes of this Zoning Ordinance.
2. Appeal of Commission decision. Any decision of the Commission concerning a hardship
waiver request under this Section may be appealed by any interested person to the Council in
compliance with Chapter D7-II (Appeals and Calls for Review), and in the following manner.
a. Appeal requirements. The appeal shall contain the following information:
(1) A detailed description of the overhead utility services proposed to be placed
underground;
(2) A separate itemized cost estimate for: the construction valuation of the project
certified by the City’s Building Official; the construction costs of the utilities to be
placed underground; and, if applicable, the construction costs of utilities to be
relocated aboveground; and
(3) The grounds for the appeal.
b. Granting of the appeal. Upon consideration of the appeal, the Council may grant relief
as it may deem proper under the circumstances, including indefinite deferral of the
undergrounding requirement. The appeal may be granted based upon the unreasonable
hardship findings and required conditions in Subparagraph F.1. (Unreasonable hardship
findings), above.
D3-13 - Utility and Public Service Requirements
A. Agency permits required. Each applicant shall comply with any applicable requirements of, and
obtain all necessary approvals from each of the following affected agencies before issuance of a
Building Permit:
1. The Contra Costa County Health Services Department Environmental Health Division;
2. The Central Contra Costa Sanitary District, or Dublin San Ramon Sanitary District;
3. The San Ramon Valley Fire Protection District;
4. The East Bay Municipal Utility District (EBMUD), or Dublin-San Ramon Services District; and
5. San Ramon Valley Unified School District.
B. Abandonment of septic tanks or water wells. The abandonment and destruction of a septic tank
or water well shall comply with the requirements of the Contra Costa County Health Services
Department.
C. Sewer facility plans. Construction plans involving work on the public sewer system shall be
reviewed and approved by the Central Contra Costa Sanitary District or the Dublin San Ramon
Sanitary District, as applicable. Plans for any required work shall be submitted to the permitting office
of each sanitary district for processing.
D. Underground utilities. Utilities serving a proposed subject project site shall be placed underground
in compliance with Section D3-12 (Underground Utilities) and the requirements of the City Engineer.
Landscape Design Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-25
Chapter II - Landscape Design Standards
Sections:
D3-14 - Purpose of Chapter
D3-15 - Reserved
D3-16 - Definitions
D3-17 - Applicability
D3-18 - Landscape Plan Approval Required
D3-19 - Landscape Location Requirements
D3-20 - Landscape Area Requirements
D3-21 - Landscape Standards
D3-22 - Landscape Requirements
D3-23 - Maintenance for Landscape Areas
D3-24 - Landscaping Education
D3-14 - Purpose of Chapter
This Chapter provides landscape standards for proposed development to improve the livability and
attractiveness of the City, and to protect the public comfort, health, safety, and welfare by:
A. Preserving and enhancing the visual character of the community, and providing cooling shade;
B. Enhancing and increasing compatibility between abutting land uses and public rights-of-way by
providing landscape screening and buffers;
C. Providing for the conservation and safeguard of water resources through the efficient use of water,
appropriate use of plant materials, and regular maintenance of landscaped areas; and
D. Ensuring that landscape installations do not create hazards for motorists or pedestrians.
D3-15 - Reserved
D3-16 - Definitions
See Municipal Code section C4-121.
D3-17 - Applicability
A. Applicable projects. The requirements of this Chapter are applicable to the following projects.
1. All new construction, with the exception of new single family residences on individual parcels,
including the following:
a. Commercial developments;
b. Industrial developments;
Landscape Design Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-26
c. Model homes;
d. Public projects;
e. Residential developments (single-family subdivisions and multi-family dwelling units); and
f. Temporary developments;
2. All rehabilitated landscaping for existing commercial, industrial, and multi-family dwelling units.
B. Non-applicable projects. These requirements shall not apply to individual single-family residential
parcels.
C. Timing of Landscape Plan submittal and implementation. See Municipal Code section C4-122.
D3-18 - Landscape Plan Approval Required
A. Landscape Plan. A Landscape Plan shall be submitted as part of an application for a land use
entitlement for new development, or the significant expansion or redevelopment of an existing use.
The Zoning Administrator shall determine if a Landscape Plan shall be submitted for ARB review and
approval.
1. For the purposes of this Section, "significant expansion" means a 25 percent or greater increase
in the ground floor footprint of a building, or a 25 percent or greater increase in the total floor
area of a development or land use.
2. For residential developments the plan shall cover areas of the site visible from public streets;
for other development, the plan shall cover all areas of the site required to be landscaped by
Section D3-19 (Landscape Location Requirements), below.
No Building Permit shall be issued and no construction activity shall commence on the site until the
Zoning Administrator has verified that the Landscape Plan submitted with the Building Permit
application is as approved.
B. Content. A Landscape Plan shall contain all of the information identified in the Department handout
for preparing Landscape Plans, and required by Municipal Code section C4-122 and the California
State Model Water Efficient Landscape Ordinance (MWELO), Sections 490 – 495, Chapter 2.7,
Division 2, Title 23 in the California Code of Regulations.
C. Statement of surety. Landscaping is the final phase of a project, and the one most often
underdeveloped. To insure completion, the Zoning Administrator may require that a statement of
surety in the form of cash, performance bond, letter of credit, or certificate of deposit shall be posted
with the City, in an amount equal to 150 percent of the total value, or another amount determined by
the Zoning Administrator, of all plant materials, installation, irrigation, and maintenance, for a two-
year period. The cost of materials shall be provided by the Registered Landscape Architect
responsible for the project. The Zoning Administrator may require statements of surety for phased
projects, a legitimate delay in landscape installation due to seasonal requirements (including adverse
weather conditions) and similar circumstances where it may not be advisable or desirable to install
all of a project's landscaping before occupancy of the site.
D. Minor changes to approved plans. Landscape Plan approval may include the Zoning Administrator
authorizing minor changes from the requirements of this Chapter.
Landscape Design Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-27
D3-19 - Landscape Location Requirements
Landscaping shall be provided in the locations specified below.
A. Unused areas. All areas of a project site not intended for a specific use shall be landscaped except
where landscaping would adversely affect existing drainage or erosion control plans, or it is
determined by the Zoning Administrator that landscaping is not necessary to fulfill the purposes of
this Chapter.
B. Parking areas. Parking areas shall be landscaped in compliance with the following requirements.
Parking lot landscaping, may be counted toward fulfilling the landscape area requirements identified
in Section D3-20 below
1. Landscape materials. Landscape materials shall be evenly-distributed throughout the parking
lot using a combination of trees, shrubs, ground cover, mulch, gravel, and other xeriscape areas
as approved by the review authority. At the time of planting, the size of the shrubs and trees
shall be in compliance with D3-21(B).
2. Curbing. Areas containing plant materials should be bordered by a concrete curb at least six
inches high and six inches wide. Alternative barrier design to protect landscaped areas from
damage by vehicles and/or to filter/retain runoff on site may be approved by the Zoning
Administrator.
3. Runoff. Parking lot landscaped areas shall be designed to filter/retain runoff on site.
4. Location of landscaping. To the extent possible, parking lot landscaping should be located
so that pedestrians are not required to cross landscaped areas to reach structure entrances
from parked cars. This should be achieved through proper orientation of the landscaped fingers
and islands. If parking lot landscaping must be located in a manner that requires pedestrian
access across landscaped areas, pedestrian access shall be accommodated.
5. Bumper overhang areas. To increase the parking lot landscaped area, a maximum of two
feet of the parking stall depth may be landscaped with low-growth, hearty materials in lieu of
paving, allowing a two-foot bumper overhang while maintaining the required parking
dimensions.
6. Parking lot perimeter landscaping. Parking area perimeters shall be landscaped as follows.
The Zoning Administrator may adjust the tree spacing requirements of this Subsection based
upon the growth characteristics and proper maintenance practices for the species of trees
proposed.
a. Location and size of landscape areas.
(1) Adjacent to streets. Parking areas for nonresidential uses adjoining a public street
shall be designed to provide a 10-foot landscaped planting strip between the street
right-of-way and parking area. Parking areas for residential uses shall not be
located within the required setback areas and the minimum width of the landscape
planting strip shall be equal to the required setbacks.
(2) Screening plant materials. The landscaping shall be designed and maintained to
screen cars from view from the street and shall be a height of between 30 and 36
inches. Screening materials may include a combination of plant materials, earth
berms, solid masonry walls, raised planters, or other screening devices to meet the
intent of this requirement; however, screening materials may not use only solid
masonry walls without plant cover.
Landscape Design Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-28
(3) Shade trees. Shade trees shall be provided at a minimum rate of one for every 30
linear feet of landscaped area, and may include areas of clustered trees.
b. Adjacent to side or rear property lines. Parking areas for nonresidential uses shall
provide a perimeter landscaped strip at least five feet wide (inside dimension) where the
parking area adjoins a side or rear property line. Trees shall be provided at the rate of
one for each 30 linear feet of landscaped area.
c. Adjacent to structures. When parking areas are located adjacent to nonresidential
structures, a minimum five-foot wide landscape strip (inside dimension) shall be provided
adjacent to the side and rear of the structure and shall include trees planted at the rate of
one for each 30 linear feet of landscaped area.
d. Adjacent to residential use. Parking areas for nonresidential uses adjoining residential
uses shall provide a landscaped buffer with a minimum 10-foot width between the parking
area and the common property line bordering the residential use. A solid masonry wall
or fence and landscape buffer shall be provided along the property line to address land
use compatibility issues (e.g., glare, light, or nuisance noise). One tree shall be provided
for each 30 linear feet of landscaped area.
7. Interior parking lot landscaping. Landscaping is required within parking lots to provide
shade, reduce pavement heat gain and adjacent building heating during the summer, soften
the appearance of large paved areas, and serve as storm water treatment areas.
a. Shading requirement. Canopy trees shall be provided throughout the parking area and
perimeter at the equivalent of one tree for every four spaces, to provide shade. Palms
and other small canopied trees are not considered shade trees.
b. Planter dimensions. Planters with trees shall have a minimum interior dimension of five
feet by five feet. All ends of parking lanes shall be separated from drive aisles by
landscaped islands.
c. Larger projects. Parking lots with more than 100 spaces shall provide a concentration
of landscape elements at primary entrances, including specimen trees, flowering plants,
enhanced paving, and project identification.
D. Pools and Patios. The surface area of a permanent swimming pool or spas, or uncovered patios
may be counted toward meeting the landscape requirement for multi-family uses.
D3-20 - Landscape Area Requirements
Landscaping shall be provided in the locations and amounts specified in this Section, except for single-
family dwellings located on individual single-family residential parcels.
A. Specific zone landscaping requirements.
1. Each development shall provide and maintain landscaped areas in compliance with Table 3-6
below for the applicable zone. Landscaped areas are inclusive of the landscaping required by
Section D3-19 (Landscape location requirements), above, and inclusive of any pedestrian-
oriented open space (e.g., courtyards, plazas, etc.). Additional landscaping may be required
through the development review process to provide visual relief or contrast, or to screen
incompatible features.
Landscape Design Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-29
2. All required landscaping, irrigation, and equipment shall be installed prior to final inspection
unless a bond or other surety is provided in compliance with Section D6-33 (Performance
Guarantees).
B. New single-family developments. New single-family developments, except for single-family
dwellings located on individual single-family residential parcels, shall provide landscaping with an
automatic irrigation system for the area of the site between the street curb and the front of the
structure from side property line to side property line. The landscape design shall include trees,
shrubs, and ground cover and shall emphasize water-conserving plant materials and irrigation to the
greatest extent feasible. Turf areas shall be limited to 50 percent of the total landscaped area.
D3-21 - Landscape Standards
Landscape areas and materials shall be designed, installed, and maintained in compliance with this Section
and Section D3-23 (Maintenance of Landscape Areas), below.
A. General design standards. The following features shall be incorporated into the design of the
proposed landscape and shown on the required Landscape Plans:
1. Landscaping shall be planned as an integral part of the overall project design and not simply
located in excess space after parking areas and structures have been planned;
2. Pedestrian access to sidewalks or structures shall be considered in the design of all landscaped
areas;
3. Landscaping adjacent to driveways and parking shall be protected from vehicle damage
through the provision of minimum six-inch high and six-inch wide concrete curbs or other types
of barriers approved by the Zoning Administrator (exception from curb requirements may be
granted by the Zoning Administrator for storm water treatment purposes);
4. Landscaped planter areas shall have a minimum inside width of five feet where trees are
provided and four feet where turf or shrubs are provided;
5. Landscaped areas shall be irrigated and designed to filter/retain runoff in compliance with
Municipal Code section C4-122;
6. Hardscaped areas shall only be as large as necessary to provide for efficient pedestrian
circulation through a required landscaped area; and
TABLE 3-6 - MINIMUM LANDSCAPED AREA BY ZONE
Zone Percentage of Lot
RM, RMH, RH, and RVH 15%
OA, OL, CC, CR, M-1, and M-2 20%
MU, CT, CS, CCMU and MW 15%
RC, HR, RE, RS 50%
CC-R, CT-R, CS-R 30%
Landscape Design Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-30
7. Where fences or walls are provided as required screening, a minimum 10-foot wide landscaped
area shall be located on the residential side of the fence or wall. If the commercial side of the
fence or wall is visible from a street or adjacent property, a five-foot wide landscaped area shall
be provided adjacent to the fence or wall. If adjacent to a parking area, the area may be counted
towards meeting the required interior parking lot landscaping.
B. Plant materials. Plant materials shall be selected and installed to comply with the following
requirements:
1. A mix of plant materials shall be provided in compliance with the following:
• Trees. Thirty percent of the mix of trees shall come in 24 inch boxes and 70% shall come
in 15 gallon containers.
• Shrubs. Twenty-five percent of the mix of shrubs should come in five gallon containers and
the balance in one gallon containers.
• Groundcover. One hundred percent coverage should occur within two years.
• Calculations documenting the required mix shall be shown on the Landscape Plan;
2. Plant materials shall be selected for: energy efficiency and drought tolerance; adaptability and
relationship to San Ramon environment; color, form and pattern; ability to provide shade; soil
retention, fire resistiveness, etc. The overall landscape plan shall be integrated with all
elements of the project, such as buildings, parking lots and streets, to achieve desirable
microclimate and minimize energy demand.
3. Plant materials shall emphasize drought-tolerant and/or native species;
4. Trees and shrubs shall be planted and maintained so that they do not interfere with service
lines and traffic safety sight areas;
5. Trees planted near public sidewalks or curbs shall be of a species and maintained in a manner
which prevents physical damage to the curbs, gutters, sidewalks, and other public
improvements;
6. Ground cover shall be of live plant material. Bark, colored rock, gravel, and similar materials
may be used in combination with a living ground cover. Non-plant materials may be approved
for use in limited areas by the Zoning Administrator;
7. If existing landscaping is to be retained, a note shall be provided on the Landscape Plan stating
that any existing landscaping indicated on the approved Landscape Plan for retention that is
damaged or removed during construction shall be repaired or replaced subject to the approval
of the Zoning Administrator;
8. Maximize energy efficiency by incorporating drought tolerant canopies, deciduous vines, and
trellises to shade south and westward facing walls, to cool them in summer months.
C. Irrigation. Irrigation systems shall comply with the following standards and as required by Municipal
Code section C4-122 and the California State Model Water Efficient Landscape Ordinance (MWELO),
Sections 490 – 495, Chapter 2.7, Division 2, Title 23 in the California Code of Regulations.
1. Recycled water, if available, shall be utilized for landscape irrigation systems as appropriate
for the landscape materials and consistent with storm water regulations. Absent the immediate
availability of recycled water, recycled water infrastructure (i.e. purple pipe, etc.) shall be
installed if recycled water is reasonably available to the project site in 15 years.
2. An irrigation system may include graywater subject to Chapter 15 of the California Plumbing
Code.
Landscape Design Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-31
D3-22 - Landscape Requirements
See Municipal Code section C4-122 and as required with the California State Model Water Efficient
Landscape Ordinance (MWELO), Sections 490 – 495, Chapter 2.7, Division 2, Title 23 in the California
Code of Regulations.
D3-23 - Maintenance of Landscape Areas
A. Maintenance required. All landscaped areas shall be permanently maintained in a healthful and
sound condition at all times, in compliance with the approved Landscape Plan. Irrigation systems
and their components shall be maintained in a fully functional manner consistent with the originally
approved design and the provisions of this Chapter. The maintenance required by this Section shall
include adjusting, checking, and repairing irrigation equipment; resetting automatic controllers;
aerating and de-thatching turf areas; adding/replenishing fertilizer, mulch, and soil amendments;
insect control; the replacement of dead or diseased plants; pruning; watering; and weeding all
landscaped areas.
B. Water waste prohibited. Water waste in existing developments resulting from inefficient landscape
irrigation leading to excessive runoff, low head drainage, overspray, and other similar conditions
where water flows onto adjacent property, non-irrigated areas, roadways, structures, or walks is
prohibited.
D3-24 - Landscaping Education
The project applicant shall provide information to prospective buyers of new single-family homes regarding
water-efficient landscaping techniques. A sample of the information to be provided shall be submitted to
the Zoning Administrator for approval prior to issuance of a Building Permit.
Landscape Design Standards D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-32
[Page intentionally left blank]
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-33
Chapter III - Parking and Loading
Sections:
D3-25 - Intent and Purpose of Chapter
D3-26 - Applicability and Basic Requirements
D3-27 - General Parking Regulations
D3-28 - Number of Parking Spaces Required
D3-29 - Disabled Parking Requirements
D3-30 - Reduction of Parking Requirements
D3-31 - Parking Design and Development Standards
D3-32 - Parking Area Screening
D3-33 - Parking Area Lighting Requirements
D3-34 - Parking Lot Landscaping Standards
D3-35 - Garage and Carport Design and Location Requirements
D3-36 - Additional Standards for Parking Lots and Structures
D3-37 - Driveways and Site Access
D3-38 - Bicycle and Motorcycle Parking Requirements
D3-39 - Loading Space Requirements
D3-40 - Designation of Off-Site Parking and Loading Spaces
D3-41 - Vehicles on Private Property
D3-25 - Intent and Purpose of Chapter
A. Intent. The requirements of this Chapter are intended to ensure that sufficient off-street parking is
provided for all uses and structures, and that parking facilities are attractive, properly designed, and
located to be unobtrusive, generally to the rear of the site, while meeting the needs of the specific use
or structure.
B. Purpose. More specifically, the purposes of the off-street parking and loading provisions are to:
1. Ensure that off-street parking and loading facilities are provided for new land uses and for major
alterations and enlargements of existing uses in direct proportion to the need for the facilities
created by each use;
2. Establish parking standards for residential and commercial uses consistent with need and with
the feasibility of providing parking on specific sites; and
3. Ensure that off-street parking and loading facilities are designed in a manner that will ensure
efficiency, protect the public safety, and, where appropriate, insulate surrounding land uses
from adverse impacts.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-34
D3-26 - Applicability and Basic Requirements
A. Applicability. Each land use and structure, including a change or expansion of a land use or
structure shall be provided continuously maintained off-street parking and loading areas in
compliance with this Chapter. A land use shall not be commenced and a structure shall not be
occupied until the improvements required by this Chapter are satisfactorily completed.
B. When required.
1. Off-street parking and loading facilities shall be provided in compliance with this Chapter at the
time of initial occupancy of a site, construction of a structure, or major alteration or enlargement
of a site or structure.
2. For the purposes of these requirements, "major alteration or enlargement" shall mean a change
of use or an addition that would increase the number of parking or loading spaces required by
10 percent or more of the total number required before the alteration or enlargement.
C. Joint use. Off-street parking and loading facilities required by this Chapter for a use shall not be
considered as providing parking or loading spaces for any other use, except in compliance with
Section D3-30 (Reduction of Parking Requirements).
D. Nonconforming parking or loading. No existing use of land or structure shall be deemed to be
nonconforming solely because of the lack of off-street parking or loading facilities required by this
Chapter; provided, the facilities being used for off-street parking and loading as of the date of adoption
of this Chapter shall not be reduced in number to less than that required by this Chapter. See Section
D3-28.D (Number of Parking Spaces Required – Nonconforming parking) regarding changes to
structures with nonconforming parking.
E. Location and ownership.
1. Residential uses. Parking required to serve a residential use shall be on the same site as the
use served.
2. Nonresidential uses. Parking required to serve a nonresidential use may be on the same or
a different site under the same or different ownership as the use served; provided, the parking
shall be within the following maximum distances of the use served, measured from the nearest
corner of the parking facility to the main public entrance of the use served via the shortest
pedestrian route, as shown in Table 3-7 (Maximum Distances for Off-Site Parking for
Nonresidential uses), below.
TABLE 3-7 - MAXIMUM DISTANCES FOR OFF-SITE
PARKING FOR NONRESIDENTIAL USES
Type of Parking Spaces Maximum Distance Allowed
Customer Spaces 200 feet
Visitor Spaces 200 feet
Employee Spaces 400 feet
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-35
F. Life of facility.
1. Facilities for off-site parking shall be restricted to that use by a recorded agreement, deed, or
lease for a minimum period of 10 years from the date a permit or approval requiring the parking
is first issued.
2. The Zoning Administrator may waive this restriction upon first finding that substitute parking
facilities meeting the requirements of this Chapter are provided.
3. No use shall be continued if the parking is removed unless substitute parking facilities are
provided to the satisfaction of the Zoning Administrator.
G. Computation of spaces required rounding off of spaces. If, in the application of the requirements
of this Chapter, a fractional number is obtained, one parking or loading space shall be required for a
fraction of more than one-half, and no space shall be required for a fraction of one-half or less.
H. Land banking. Upon a determination of the Zoning Administrator, a portion of the required parking
improvements may be deferred if it is first found that all of the spaces are not needed immediately
and that a Minor Use Permit could be granted in compliance with Section D6.28 (Use Permits and
Minor Use Permits).
D3-27 - General Parking Regulations
A. Timing of installation. A new or altered structure shall not be occupied, and a new land use not
requiring a structure shall not be established, until all off-street parking and loading facilities required
by this Chapter are in place and approved by the City.
B. Parking and loading spaces to be permanent. Each parking and loading space shall be
permanently available, marked, and maintained for parking or loading purposes for the use it is
intended to serve. The approval of a Temporary Use Permit (Section D6.27) may allow the temporary
use of a parking or loading space for other purposes.
C. Parking and loading to be unrestricted. An owner, lessee, tenant, or other person having control
of the operation of premises for which parking or loading spaces are required by this Chapter shall
not prevent, prohibit, or restrict authorized persons from using the spaces without the prior approval
of the Zoning Administrator.
D3-28 - Number of Parking Spaces Required
Each land use shall be provided the number of off-street parking spaces required by this Section. See
Section D3-38 for off-street parking requirements for bicycles and motorcycles.
A. Parking requirements by land use. Each land use shall provide the number of off-street parking
spaces required by Table 3-8, except where more spaces are required through discretionary permit
review, or where a reduction of parking is granted in compliance with Section D3-30 (Reduction of
Parking Requirements).
1. Use of site not identified. Where the land use that will occupy a proposed development is not
identified at the time of permit application, the Zoning Administrator shall determine the
probable use and the number of parking and loading spaces required. In order to make this
determination, the Zoning Administrator may require the submittal of data from the applicant or
collected at the applicant's expense.
2. Floor area. W here Table 3-8 establishes a parking requirement based on floor area in square
feet (e.g., 1 space for each 1,000 sf of floor area), the floor area shall be construed to mean
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-36
gross interior floor area unless otherwise specified, and shall include all locations of shared
halls, lobby areas, and rest rooms, but shall not include areas for vertical circulation, elevators,
or stairs.
3. Accessory uses. A single use with accessory components shall provide parking for primary
use, and each component. For example, a hotel with a meeting room shall provide the parking
spaces required by Table 3-8 for a hotel (e.g., the guest rooms), and for a meeting room.
4. Spaces required for alteration or enlargement. The number of parking or loading spaces
required for an alteration or enlargement of an existing use or structure, or for a change of
occupancy, shall be in addition to the number of spaces existing before the alteration,
enlargement, or change of occupancy unless the more spaces exist than the total required by
this Chapter. In this case, the number of spaces in excess of the minimum shall be counted in
determining the required number of spaces.
5. Multi-tenant sites. A site with multiple tenants shall provide the aggregate number of parking
spaces required for each separate use; except that where the site is developed as an integrated
center with shared parking and no spaces reserved for a particular use, parking shall be
provided as required by Table 3-8 for a retail complex. When a multi-tenant center includes
one or more uses that will need more parking than retail uses (for example, a fitness center,
office uses, or theater) additional parking shall be required for the non-retail use unless a
parking reduction is approved in compliance with D3-30 (Reduction of Parking Requirements).
B. Excessive parking. The City discourages a land use being provided more off-street parking spaces
than required by this Chapter, to avoid the inefficient use of land, unnecessary pavement, and
excessive storm water runoff from paved surfaces.
1. The provision of off-street parking spaces in excess of the requirements in Table 3-8 is allowed
and may be compact sized spaces measuring 8.5 feet by 18 feet, but only up to a maximum of
10 percent, and only when additional landscaping and pedestrian amenities are also provided
to the satisfaction of the Zoning Administrator.
2. The provision of off-street parking spaces in excess of the requirements in Table 3-8 is allowed
and may be compact sized spaces measuring 8.5 feet by 18 feet, but only up to a maximum of
25 percent, with Use Permit approval in compliance with Section D6.28 (Use Permits and Minor
Use Permits), and only when additional landscaping and pedestrian amenities are also
provided to the satisfaction of the Zoning Administrator.
C. Bench or bleacher seating. Where fixed seating (e.g., benches, bleachers, pews, or similar seating)
is provided, a seat shall be defined as 18 inches of bench space for the purpose of calculating the
number of required parking spaces as provided in Table 3-8.
D. Nonconforming parking. A structure with nonconforming off-street parking may be physically
changed or undergo a change in use subject to the following provisions.
1. Residential uses. No additional parking spaces shall be required; provided, the change does
not increase the floor area, nor increase the number of dwelling units, nor eliminate the only
portion of the site that can be used for the required or existing parking or access.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-37
2. Nonresidential uses. The number of existing parking spaces shall be maintained on the site
and additional parking shall be provided in compliance with this Chapter for any additional floor
area. If the use of the structure is changed to one that requires more parking than the previous
use, the difference between the parking spaces required for the previous use and the new use
shall be provided.
3. Waiver by Commission. The Commission may waive covered parking requirements when a
nonconforming structure is proposed for rehabilitation if the Commission determines, in
compliance with Section D6.28 (Use Permits and Minor Use Permits), that the existing structure
location, lot size, or topography renders the requirement infeasible.
TABLE 3-8 - PARKING REQUIREMENTS BY LAND USE
Land Use Type:
Manufacturing Processing and
Warehousing
Vehicle Spaces Required
All industry, media, and warehousing uses,
except as follows.
1 space for each 250 sf of office area;
1 space for each 1,000 sf of ground and/or
building area devoted to other than office.
Alcoholic Beverage Manufacturing, Micro-
Brewery.
1 space for each 250 sf of office area;
1 space for each 1,000 sf of ground and/or
building area devoted to other than office; and
1 space for each 100 sf of tasting room area
Industrial limited 1 space for each 750 sf of floor area.
Industrial research and development,
laboratories 1 space for each 500 sf of floor area.
Recycling facilities
Medium collection facilities Determined by Minor Use Permit.
Small collection facilities Determined by Minor Use Permit
Wholesaling/distribution and storage 1 space for each 800 sf of floor area.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-38
TABLE 3-8 - PARKING REQUIREMENTS BY LAND USE (Continued)
Land Use Type:
Recreation, Education, Public Assembly Vehicle Spaces Required
Adult businesses 1 space for each 250 sf of floor area.
Bar/tavern, night club (not within a retail complex) 1 space for each 100 sf of seating
area and waiting/lounge area
exclusive of dance floor, and 1 space
for each 30 sf of dance floor.
Child day care facilities
1 space for each 6 children the
facility is licensed to accommodate.
Commercial recreation facilities - Indoor
Arcade/Electronic Game Centers 1 space for each 200 sf of floor area.
Bowling alley 6 spaces for each lane.
Indoor play areas (e.g. rock climbing center, inflatable
party places) 1 space for each 200 sf of floor area
Pool and billiard room 2 spaces for each table.
Skating rink 1 space for 5 fixed seats, or 1 space
for each 35 sf of seating area if there
are no fixed seats; plus 1 space for
each 250 sf of floor area not used for
seating.
Swimming pool - Lap pool 1 space for each lap lane.
Swimming pool - Recreational 1 space for each 35 sf of pool area.
Commercial recreation facilities - Outdoor Determined by Zoning Administrator
Equestrian facilities 1 space for each 5 horses boarded.
Golf courses and country clubs 4 spaces for each hole, plus as
required by this table for accessory
uses (e.g., pro shop, bar, restaurant)
Fitness/health facilities
Aerobics/studio classes 1 space for each 250 sf of floor area.
Gymnasium area 1 space for each 250 sf of floor area.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-39
TABLE 3-8 - PARKING REQUIREMENTS BY LAND USE (Continued)
Land Use Type:
Recreation, Education, Public Assembly Vehicle Spaces Required
Nautilus 1 space for each 250 sf of floor area.
Office/administration 1 space per office.
Pool See above requirements.
Racquetball/tennis courts 2 spaces per court.
Library, museum, gallery 1 space for each 300 sf of floor area.
Meeting facility (e.g., clubs, lodges, places of worship),
public or private
1 space for each 4 fixed seats or 1
space for each 40 sf of floor area
used for seating, plus 1 space for
each classroom or office.
Schools (public or private)
Kindergarten and nursery schools
1 space for each 3 employees
(including administrators and
teachers) and 1 space for each 10
children.
Elementary/middle schools 1 space for each employee plus 1
space for each 8 students.
Secondary (high) schools 1 space for each employee plus 1
space for each 4 students.
Colleges and universities (including trade
and business schools) 1 space for each 1.5 students.
Studio - Art, dance, martial arts, music, etc.
Art, dance, martial arts, music, etc. 1 space for each 300 sf of floor area
Small-scale tutoring centers, etc. 1 space for each 250 sf of floor area
Tennis/racquetball/handball or other courts 2 spaces for each court, plus 1
space for each 300 sf of floor area
for accessory uses.
Theaters, movies or performing arts 1 space for each 4 seats.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-40
TABLE 3-8 - PARKING REQUIREMENTS BY LAND USE (Continued)
Land Use Type:
Residential Vehicle Spaces Required
Live/work units 2 spaces for each unit.
Mobile homes
Individual mobile homes
2 spaces for each unit; at least 1 within a
garage/carport.
Mobile home parks 2 spaces for each mobile home, plus 1
additional space for each 4 mobile homes
shall be provided for guest parking, which
shall be dispersed throughout the park.
Multi-family dwellings
Studio units and one-bedroom units 1 covered space within a garage/carport
for each unit. Parking requirements may
be modified by the review authority for
affordable housing, mixed use, or senior
housing projects.
Two- and three-bedroom units 2 spaces for each unit; at least 1 within a
garage/carport.
Four-bedroom units and above 3 spaces for each unit, at least 1 shall be
within a garage/carport.
Guest parking 1 space for each 4 units.
Residential care homes
Six or fewer clients 2 covered spaces within a garage/carport.
Seven or more clients 1 space for each 3 beds the facility is
licensed to accommodate; plus 1 space
for each 4 units for guests and
employees.
Rooming or boarding houses
1 covered or uncovered space for each
bedroom.
Accessory Dwelling Unit (ADU) As required by California Government
Code Section 65852.2
Single-family dwellings
With up to four bedrooms 2 covered spaces within a garage.
With five bedrooms 3 covered spaces within a garage.
With six or more bedrooms 4 covered spaces within a garage.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-41
TABLE 3-8 - PARKING REQUIREMENTS BY LAND USE (Continued)
Land Use Type:
Retail Trade Vehicle Spaces Required
All “Retail Trade” uses listed in Division D2, except the
following:
1 space for each 225 sf of floor area with
up to and including 50,000 sf and 1 space
for each 250 over 50,000 sf; plus 1 space
for each 200 sf of outdoor sales area.
Animal Sales 1 space for each 250 sf of floor area.
Artist’s studio 1 space for each 1,000 sf of floor area.
Auto and vehicle sales and rental 1 space for each 400 sf of floor area for
office, 1 space for each 225 sf of area
used for repairs and services, and 1 space
for each 2,000 sf of indoor showroom area
and/or outdoor display area.
All customer parking shall be clearly
marked and not to be used for parking of
unregistered vehicles. No damaged,
inoperative, wrecked, or abandoned
vehicles shall be stored in any exterior
area for more than five days.
Building and landscape materials 1 space for each 400 sf of indoor display
area for first 10,000 sf, 1 space for each
1,000 sf of indoor display area over
10,000, and 1 space for each 500 sf of
outdoor storage and display area.
Convenience stores 1 space for each 250 sf of floor area.
Furniture, furnishings, and appliance store 1 space for each 400 sf of floor area.
Horticulture, limited sales 1 space for each 2 acres.
Pawn shops 1 space for each 250 sf of floor area.
Plant nursery, garden supply stores 1 space for each 500 sf of outdoor display
lathe house area; plus 1 space for each
250 sf of interior floor area.
Retail complexes/shopping centers 1 space for each 225 sf of floor area for
complexes of up to and including 50,000
sf, and 1 space for each 250 sf for
complexes over 50,000 sf.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-42
TABLE 3 -8 - PARKING REQUIREMENTS BY LAND USE (Continued)
Land Use Type:
Services Vehicle Spaces Required
Transportation service dispatch facility 1 space for each 500 sf of floor area; plus
2 storage spaces
Alcoholic Beverage Manufacturing, Brew Pub (not
within a retail complex)
1 space for each 100 sf of floor area
accessible to customers; plus 1 space for
each 2 employees on the largest shift.
Animal services (e.g., boarding, grooming, hospitals) 1 space for each 400 sf of floor area.
Banks, financial services
(not within a retail complex) 1 space for each 200 sf of floor area.
Banks, financial services (not within a retail complex)
with Drive-Through Service
1 space for each 200 sf of floor area, plus
queue spaces for 5 vehicles for each teller
station.
Catering services 1 space for each 400 sf of floor area.
Communication facilities 1 space for each 500 sf of floor area.
Eating and drinking establishments (e.g., cocktail
lounges, with or without live entertainment) (not within
a retail complex)
1 space for each 100 sf of floor area
accessible to customers; plus 1 space for
each 2 employees on the largest shift.
Eating and drinking establishments with take-out
services (not within a retail complex)
1 space for each 50 sf of floor area; plus
queue space for 5 vehicles for drive-
through service.
Equipment rental
1 space for each 300 sf of floor area, plus
1 space for each 1,000 sf of outdoor
storage and rental area.
Food and beverage sales 1 space for each 200 sf of floor area.
Furniture repair 1 space for each 400 sf of floor area.
Heliports Determined by Use Permit
Laboratories 1 space for each 50 sf of floor area.
Laundry - Dry cleaning pick-up facilities and
Laundromats 1 space for each 250 sf of floor area.
Laundry - Laundries and dry cleaning plants 1 space for each 1,000 sf of floor area.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-43
TABLE 3-8 - PARKING REQUIREMENTS BY LAND USE (Continued)
Land Use Type:
Services (Continued) Vehicle Spaces Required
Lodging
Bed and breakfast inns 1 space for each guest room, plus 2
covered spaces for the resident family.
Hotels, motels, and time share facilities 1.2 spaces for each guest room or rental
unit; plus 1 space for each 50 sf of
banquet seating area; plus required
spaces for accessory uses.
Maintenance and repair services 1 space for each 400 sf of floor area; plus
1 space for each 500 sf of outdoor
storage area.
Medical services
Clinics and laboratories, urgent care
1 space for each 200 sf of floor area or 4
spaces for each doctor, whichever would
result in more spaces.
Doctor Offices (e.g., dental and medical) 1 space for each 200 sf of floor area.
Extended care
1 space for each 3 patient beds the facility
is licensed to accommodate.
Hospitals
1 space for each 1.5 patient beds the
facility is licensed to accommodate.
Mortuaries, funeral homes, internment services 1 space for each 4 seats or 1 space for
each 35 sf of floor area used for seating, if
no fixed seating is provided, whichever
would result in more spaces.
Offices
Administrative, business, government, professional,
and service
1 space for each 250 sf of floor area
Processing
1 space for each 150 sf of floor area
(see also Section D3-30 (F))
Outdoor Seating (13 or more seats, within and not
within a retail complex)
1 space for every 3 seats
Personal services 1 space for each 250 sf of floor area
Public utility structure or installation, bus depot/station
1 space for each 3 employees, plus
additional spaces required by the
Commission.
Research and development services, laboratories 1 space for each 400 sf of floor area.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-44
TABLE 3-8 - PARKING REQUIREMENTS BY LAND USE (Continued)
Land Use Type:
Services (Continued) Vehicle Spaces Required
Storage (Personal storage/mini-storage facilities)
Indoor storage units
1 space for each 1,500 sf of floor area,
plus 2 spaces for manager's office
Separately accessible storage units 4 spaces for manager's office.
Vehicle/Equipment services - All except the following
(All customer parking shall be clearly
marked and not to be used for parking of
unregistered vehicles. No abandoned,
damaged, inoperative, or wrecked
vehicles shall be stored in any exterior
area for more than five days.)
4 spaces for each service bay or 1 space
for each 225 sf of floor area, whichever
would result in more spaces; plus spaces
for any office as required by this Section
for offices.
Vehicle services - Rentals 1 space for each 400 sf of floor area; plus
2 storage spaces.
Vehicle services – Storage 1 space for each 500 sf of floor area
Vehicle services – Washing, unattended 1 drying space for each stall.
Vehicle services – Washing, attended 10 spaces; plus 6 spaces for each wash
lane/station for queuing and drying area
Vehicle/Equipment repair 4 spaces for each service bay or 1 space
for each 225 sf of floor area, whichever
would result in more spaces.
Vehicle/Equipment sales and rentals 1 space for each 400 sf of floor area; plus
1 space for each 500 sf of outdoor display
area
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-45
D3-29 - Disabled Parking Requirements
A. Accessibility requirements. Parking facilities shall be properly designed, constructed, and
maintained to provide for access by the physically disabled from public rights-of-way, across
intervening parking spaces, and into structures, including parking spaces specifically designed and
located for the use of the disabled/handicapped. Standards for the facilities shall be based on the
standards of the American Standards Association and/or other applicable guidelines.
B. Number and location of and access to spaces required. Parking spaces for the disabled shall be
provided in compliance with the Uniform Building Code (UBC), the Federal Accessibility Guidelines,
the California Code of Regulations (Title 24, Part 2, Chapter 2-71), and with the sign requirements of
the California Vehicle Code, Section 22507.8., as applicable. Parking spaces required for the
disabled shall count toward compliance with the number of off-street parking spaces required by
Section D3-28 (Number of Parking Spaces Required).
D3-30 - Reduction of Parking Requirements
A. Shared Collective parking. Where two or more adjacent nonresidential uses have distinct and
differing peak parking usage periods, (e.g. a theater and a bank), a reduction in the required number
of parking spaces may be allowed through Minor Use Permit or Use Permit approval.
1. Shared Collective parking requirements.
a. The Zoning Administrator may reduce the number of parking spaces required by Section
D3-28 (Number of Parking Spaces Required) and D3-39 (Loading Space Requirements)
by up to 25 percent with approval of a Minor Use Permit. Parking reductions greater than
25 percent may be allowed with approval of a Use Permit by the Planning Commission.
b. An application for a Minor Use Permit or Use Permit for Shared Collective parking may
be required to submit survey data substantiating a request for reduced parking
requirements.
c. A Minor Use Permit or Use Permit for Shared Collective parking shall describe the limits
of any area subject to reduced parking requirements and the reduction applicable to each
use.
d. In retail centers, office uses and medical uses which require additional parking beyond
that required for retail uses may be allowed; provided, their total combined gross square
footage does not exceed 25 percent of the gross floor area of the retail center.
2. Findings. A Minor Use Permit or Use Permit may be approved to allow shared/collective
parking serving more than one use or site and located in a zone in which parking for the uses
served is an allowed use. A Minor Use Permit or Use Permit for shared/collective off-street
parking may reduce the total number of spaces required by this Chapter only if the following
findings are first made:
a. The spaces to be provided would be available as long as the uses requiring the spaces
are in operation;
b. The peak hours of parking demand from all uses do not coincide so that peak demand is
greater than the parking provided;
c. The adequacy of the quantity and efficiency of parking provided will equal or exceed the
level that can be expected if collective parking is not provided; and
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-46
d. A written agreement between landowner(s) and the City, in a form satisfactory to the City
Attorney, is approved by the Zoning Administrator. This agreement shall be in the form
capable of and subject to being recorded to constitute a covenant running with the land
and shall include:
(1) A guarantee that there will be no substantial alteration in the uses that will create a
greater demand for parking;
(2) A guarantee among the landowner(s) for access to and use of the shared parking
facilities;
(3) A provision that the City may require parking facilities in addition to those originally
approved upon finding by the Zoning Administrator that adequate parking to serve
the use(s) has not been provided; and
(4) A provision stating that the City, acting through the Zoning Administrator, may for
due cause and upon notice and hearing, unilaterally amend, modify, or terminate
the agreement at any time.
B. Reduction of parking. The Zoning Administrator may reduce the number of parking spaces required
by Sections D3-28 (Number of Parking Spaces Required) and D3-39 (Loading Space Requirements)
by up to 15 percent through a Minor Exception approval (Section D6-24 Minor Exceptions), or
between 15.1 percent to 25 percent through a Minor Use Permit approval based on the finding below,
justifiable cause beyond simply the desire for less parking and based on the reasonable existing and
future use of the property. Parking reductions greater than 25 percent may be allowed with approval
of a Use Permit by the Planning Commission.
1. Findings. A Minor Exception, Minor Use Permit, or Use Permit may be approved to reduce the
number of spaces to less than the number identified in this Chapter; provided, the following
findings are first made:
a. The parking demand would be less than the requirements identified in Table 3-8 (Parking
Requirements by Land Use ) and Table 3-14 (Loading Spaces Required), below; and
b. The probable long-term occupancy of the structure, based on its design, would not
generate additional parking demand.
2. Consideration of survey data. In reaching a decision, the Zoning Administrator shall consider
survey data submitted by the applicant or collected at the applicant's request and expense that
documents the need for fewer spaces (e.g., sales receipts, documentation of customer
frequency, information on parking standards required for the proposed land use by other cities,
etc.).
3. Land banking. Upon a determination of the Zoning Administrator, Land banking may be
required and a portion of the required parking may be deferred if it is first found that all of the
spaces are not needed immediately and that a Minor Use Permit could be granted in compliance
with Section D6.28 (Use Permits and Minor Use Permits). Land set aside for future parking
areas shall be maintained in a use that can be easily converted to parking area when needed
(i.e. Landscaping). Land banking parking areas shall not include permanent buildings, major
utilities or required circulation areas that would prohibit the future installation of required
parking,
C. Reduced parking for restricted senior housing projects. The review authority may reduce the
number of parking spaces required by Section D3-28 (Number of Parking Spaces Required) for senior
housing projects, for persons aged 55 and over, based on quantitative information provided by the
applicant that documents the need for fewer spaces for these types of residential development
projects.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-47
D. Waiver of covered parking requirement for affordable housing units. The review authority may
waive the requirement that parking be covered for affordable housing units in compliance with the
City’s density bonus regulations.
E. Parking in-lieu payments.
1. Cash in-lieu payment. Within designated parking districts established by the City Council and
shown on the zoning map, a parking requirement serving nonresidential uses on a site may be
met by a cash in-lieu payment to the City before issuance of a Building Permit, or a Certificate
of Occupancy, if no Building Permit is required.
2. Fee to provide off-street parking. The fee shall be collected and spent in order to provide
public off-street parking in the vicinity of the use.
3. City may set limitations. In establishing the parking districts, the City may set limitations on
the number of spaces or the maximum percentage of parking spaces required for which an in-
lieu fee may be collected.
F. Parking for large office complexes. The review authority may authorize the use of parking spaces
measuring 8.5 feet by 18 feet for required parking if demonstration of participation within a
Transportation Demand Management (TDM) program is provided.
D3-31 - Parking Design and Development Standards
Required parking areas shall be designed, constructed, and properly maintained in compliance with this
Section.
A. Location of parking. Off-street parking areas shall be located as follows:
1. Residential parking. Parking for a residential use shall be located on the same parcel as each
residential unit served; except for mixed use projects developed in compliance with this
Chapter.
2. Nonresidential parking. Parking for a nonresidential use shall be located in compliance with
Subsection D3-26.E. (Location and ownership), above.
3. Location of off-street parking spaces.
a. Required off-street parking spaces may occupy any part of the property in a
nonresidential zone (e.g., commercial, industrial, etc.), except for the minimum
perimeter plant strip required in compliance with Section D3-19.C.6, and the traffic
safety visibility area with Section D3-6.F.
b. In any residential zone, required off-street parking for the main unit shall not be provided
within any setback area or the traffic safety visibility area with Section D3-6.F.
However, parking may be allowed within that portion of any setback area used for
driveway access to required parking areas.
B. Access to parking. Access to parking shall be provided as follows for all parking areas other than
for individual single-family residences. Site design shall minimize the amount of paved surfaces and
driveway lengths while providing for safe and suitable access for vehicular circulation.
1. Parking areas shall provide suitable maneuvering area so that vehicles exit to a street in a
forward direction. Parking lots shall be designed to prevent access at any point other than at
designated access drives. Single-family residences are exempt from this requirement.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-48
2. A nonresidential use that is designed to provide 20 or more parking spaces shall have access
driveways that are not intersected by a parking aisle, parking space, or another access driveway
for a minimum distance of 20 feet from the street right-of-way, to provide a stacking area for
vehicles entering and exiting the parking area.
3. A minimum unobstructed clearance height of 14 feet shall be maintained above non-structured
parking areas accessible to vehicles. Structured parking areas (i.e., garage parking) shall
provide a minimum vertical clearance as required by Zoning Ordinance Section D3-36.H
C. Access to adjacent sites. The City may require the design of a parking area to provide vehicle and
pedestrian connections to parking areas on adjacent properties, to provide for convenience, safety,
and efficient circulation. Where provided, a joint access agreement running with the land shall be
recorded by the owners of the abutting properties, as approved by the Zoning Administrator, to
guarantee the continued availability of the shared access between the properties.
D. Parking stall dimensions.
1. Minimum dimensions. Each off-street parking stall shall comply with the minimum dimension
requirements in Table 3-9. Residential garages and carports shall comply with Subsections
D3-35 B. (Minimum dimensions for residential enclosed garages) and D. (Minimum
requirements for residential carports), below.
TABLE 3-9 - MINIMUM PARKING STALL DIMENSIONS
Type of Use Type of Space Standard Space
(feet)
Residential
Space in a
garage or
carport
See Subsections D3-35 B.
(Minimum dimensions for
residential enclosed garages)
and D. (Minimum requirements
for residential carports), below
Uncovered 9 by 19
Nonresidential Angle spaces 9 by 19
All Parallel spaces 9 by 23
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-49
2. Vehicle parking space requirements. See Figure 3-17
a. Residential development. All required residential parking spaces shall be standard
vehicle spaces provided and maintained in compliance with Table 3-10.
b. Nonresidential developments. All required non-residential parking spaces shall be
standard vehicle spaces provided and maintained in compliance with Table 3-10 unless
authorized under Section D3-30F.
E. Minimum parking dimensions.
1. Parking lot circulation requirements.
a. Within a parking lot, circulation shall ensure that a vehicle entering the parking lot need
not enter the street to reach another aisle.
b. No backing into public streets is allowed; vehicles shall not enter a public street in a
backward motion.
c. Single-family detached residences or a duplex residence, where each unit is served by
an individual driveway, may allow vehicles to back out into a public or private street.
TABLE 3-10 - PARKING FACILITY DIMENSIONS (feet)
ANGLE OF PARKING PARALLEL 20O 30O 40O 45O* 50O 60O 70O 80O 90O
"A"
Curb Length
Per Vehicle
Standard 23'0" 26'4" 18'0" 14'0" 12'9" 11'9" 10'5" 9'8" 9'2" 9'0"
"B"
Stall Depth Standard 9'0" 15'0" 17'4" 19'2" 19'10" 20'5" 20'5" 21'0" 20'5" 19'0"
"C"
Aisle Width All 12'6" 12'0" 12'0" 12'0" 13'0" 15'0" 18'0" 20'0" 25'0" 25'0"
"D"
Depth of Two
Stalls
Standard -- 21'5" 26'10" 31'4" 33'2" 34'11" 37'5" 38'9" 39'0" 38'0"
"E"
Two Stalls
Plus Aisle
Standard 30'0" 42'0" 46'8" 50'4" 53'8" 55'10" 60'0" 62'0" 65'8" 63'0"
Figure 3-17 – Parking Facility Dimensions Diagram
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-50
2. Drop-off areas required. Each child day care center, institutional, preschool, private
educational, or public recreational land use located in a residential zone, or a commercial
recreational facility shall provide a drop-off area that may be adjacent to a primary access or
aisle.
3. Access widths. Minimum access widths are 12 feet for one-way traffic and 25 feet for two-
way traffic.
F. Relation to aisles.
1. Each parking space adjoining a column, wall, or other obstruction higher than six inches shall
be increased by two feet on each side of the adjoining column, wall, or other obstruction;
provided, the increase may be reduced by three inches for each foot of unobstructed distance
from the edge of a required aisle, measured parallel to the depth of the parking space. See
Figure 3-18.
2. At the end of a row of parking spaces, the perpendicular parking drive aisle providing access to
the row of parking spaces shall extend two feet beyond the required width of the parking space.
3. A parking aisle width may be reduced as shown in Table 3-11 provided the adjacent parking
spaces are increased in width as applicable.
(1) Note: Table 3-11 does not apply to public or private street parking.
TABLE 3-11 - MINIMUM AISLE WIDTH FOR SPECIFIED PARKING
ANGLES (1) (feet)
Increase in Parking
Space Widths (feet) 90o 75o 60o 45o or less
0.00 25 22.5 18 13
0.25 24 21.5 - -
0.50 23 20.5 - -
0.75 22 19.5 - -
1.00 or more 21 - -
Figure 3-18 – Parking space clearance
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-51
D3-32 - Parking Area Screening
A. Parking area screening required. A parking area for five or more vehicles serving a nonresidential
use shall be screened from an adjoining residential zone or a ground-floor residential use by a solid
concrete, solid wood, or masonry wall six feet in height, and constructed to withstand a 15-pound per
square foot wind load, except that the height of a wall adjoining a required front setback in a residential
zone shall be three feet.
B. Carport or open parking area screening required. A carport or open parking area for five or more
vehicles serving a residential use shall be screened from an adjoining parcel in a residential zone or
a ground-floor residential use by a solid wall or fence six feet in height, except that the height of a
wall or fence adjoining a required front setback in a residential zone shall be three feet.
D3-33 - Parking Area Lighting Requirements
A. Outdoor lighting requirements. Outdoor parking area lighting shall not employ a light source higher
than 18 feet, shall create no cone of direct illumination greater than 60 degrees from a light source
higher than six feet, and shall not directly shine onto an adjacent street or property.
B. Maximum average illumination. Maximum average illumination at ground level within the project
boundary shall be in compliance with Table 3-12 Maximum Average Illumination, below.
TABLE 3-12 - MAXIMUM AVERAGE ILLUMINATION
Type of Surface Type of Use
Maximum Average
Illumination within the
Project Boundary
(Foot Candles)
Maximum
Illumination at
Property Line
Light colored surface
(e.g., concrete)
Residential 0.3 0.3
Nonresidential 5.0 0.5
Dark colored surface
(e.g., asphalt/black top)
Residential 0.5 0.5
Nonresidential 7.0 0.5
D3-34 - Parking Lot Landscaping Standards
See Division D3, Chapter II (Landscape Design Standards).
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-52
D3-35 - Garage and Carport Design and Location Requirements
Garages and carports in residential zones shall comply with the requirements of this Section, whether they
are accessory structures or part of a principal structure.
A. Residential garages.
1. Minimum interior dimensions for side-by-side garages. Residential enclosed side-by-side
garages shall provide the following clear interior minimum dimensions.
a. One-car garage. A minimum of 10 feet wide by 22 feet deep (with 9-foot door opening).
b. Two-car garage. A minimum of 20 feet wide by 22 feet deep (with a 16-foot door opening
or two 9-foot door openings).
c. Three-car garage. A minimum of 30 feet wide by 22 feet deep (with 9-foot and 16-foot
door openings, or multiple 9-foot door openings).
d. Four-car garage. A minimum of 40 feet wide by 22 feet deep (with multiple 9-foot and/or
16-foot door openings).
2. Tandem Parking. Tandem parking may be permitted through issuance of a Minor Use Permit
in compliance with Section D6-28 (Use Permits and Minor Use Permits) and shall be designed
to meet the following minimum standards.
a. Two-car tandem dimension. A clear interior minimum dimension of 10 feet wide by 40
feet deep (with 9-foot door opening).
b. A minimum of 200 cubic feet of storage area in or adjacent to garage.
3. Interior door openings. No interior door shall open into a garage space unless the door will
fully open without encroaching into the above specified areas.
B. Residential carports.
1. Carport screening required. Carports shall be designed and located to meet setbacks and
so that parked vehicles are screened and not visible from a street.
2. Minimum requirements for residential carports.
a. Each carport shall have minimum dimensions of 9 feet wide by 19 feet deep.
b. The width of the carport shall be measured from the inside face of support to inside face
of opposite support.
c. The carport solid, waterproof roof shall cover the entire 19-foot length of the space.
C. Setback requirements for garages and carports. Carports and garages shall comply with the
setback requirements of the applicable zone.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-53
D3-36 - Additional Standards for Parking Lots and Structures
Parking lots and structures shall have directional signs, drainage, fire equipment, lighting, litter collection
containers, paving/surfacing, ramp grades, space markings, wheel stops, Electric Vehicle (EV) Charging
Stations (accessory), and queuing space for drive-in facilities or ticket dispensing booths or machines in
compliance with this Section and which shall be subject to the review and approval of the Zoning
Administrator.
A. Sales, storage, etc. prohibited. The parking areas may not be used for the vehicle dismantling,
leasing, renting, repair work, sales, storage, or outdoor open sales displays.
B. Drainage. Surface water shall be discharged to natural or engineered off-site drainage facilities and
may not drain off or across public or private pedestrian sidewalks, walkways, or areas not designed
as drainage facilities. All drainage issues must comply with California Regional Water Quality Control
Board Provision C.3.
C. Surfacing requirements.
1. For driveways serving only one single-family dwelling, the parking area shall be surfaced with
a minimum of two inches of asphalt concrete over six inches of aggregate base or comparable
pavement.
2. For driveways serving more than one single-family dwelling or multi-family unit, the parking area
shall be surfaced with a minimum of two inches of asphalt concrete over six inches of aggregate
base or comparable concrete pavement.
3. For heavy traffic (e.g. truck) and commercial driveways, the driveway shall be surfaced with a
minimum of nine inches thick of class 6 concrete over twelve inches thick of Class 2 aggregate
base.
4. All driveways shall be graded and drained to dispose of all surface water accumulated in the
area.
5. All parking spaces and maneuvering areas required by this Chapter, and as shown on the
approved plans, shall be graded and well-drained in compliance with California Regional Water
Quality Control Board Provision C.3, and permanently maintained in a dust-free manner.
D. Double line striping. Each large vehicle parking space shall measure a minimum of nine feet from
center to center, with double stripes two feet apart.
E. Markings, striping, and identification. All parking-related markings, striping, and identification shall
be clearly outlined with four-inch wide lines painted on the parking surface in compliance with this
Subsection.
1. Each parking space and parking facility shall be clearly identified by surface markings and shall
be maintained in a manner so as to be readily visible and accessible at all times. The markings
shall be arranged to provide for orderly and safe parking, loading/unloading, and storage of
vehicles. Markings required to be maintained in a highly visible condition include directional
arrows, lettering on signs and in disabled-designated areas, striping, and field color.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-54
2. One-way and two-way accesses into required parking facilities shall be identified by directional
arrows. Any two-way access located at any angle other than 90 degrees to a street shall be
marked with a traffic separation stripe the length of the access. This requirement does not
apply to drive aisles.
3. Where the exit may not be clearly recognizable, directional signs shall be provided to the
satisfaction of the Zoning Administrator.
F. Wheel stops/curbing.
1. Continuous concrete curbing at least six inches high and six inches wide shall be provided for
parking spaces located adjacent to fences, landscaped areas, property lines, structures, or
walls.
2. Individual wheel stops may be provided in lieu of curbing when the parking is adjacent to a
landscaped area, and the drainage is directed to the landscaped area, subject to the review
and approval of the Zoning Administrator.
3. The curbing or individual wheel stops shall be placed two and one-half feet from the adjoining
fence, landscaped area, property line, structure, or wall.
4. When provided, individual wheel stops shall be placed to allow for two feet of vehicle overhang
area within the dimension of the parking space.
G. Electric Vehicle (EV) Charging Stations (accessory). Parking lots for commercial, mixed-use,
office, or multi-family developments that are available for use by the public are permitted to provide
up to 5 percent of the total number of on-site parking spaces with EV Charging Stations. An approved
Minor Use Permit is required to exceed 5 percent of the total number of on-site parking spaces with
EV Charging Stations, unless the higher EV Charging Stations percentage is required by the State
(California Green Building Standards) or local code.
New Construction: New construction of commercial properties exceeding 100 parking spaces or
multifamily properties exceeding 100 units shall require the installation of a minimum of 1 EV charging
station that can be shared by two parking spaces. For Multifamily developments, the location of the
EV charging stations shall be located in common or guest parking areas. If a fee is charged for
charging vehicles, the fee shall be based on market conditions for similar EV charging stations within
the community.
H. Vertical clearance. Vertical clearance for parking spaces shall be a minimum of seven feet, except
that an entrance may be six and two-thirds feet and the front five feet of a parking space serving a
residential use may be four and one-half feet.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-55
D3-37 - Driveways and Site Access
Each driveway providing site access from a street, alley, or other public right-of-way shall be designed,
constructed, and permanently maintained in compliance with this Section.
A. Number of driveways.
1. Single-family dwellings.
a. Each parcel with a single-family dwelling shall:
(1) Be allowed only one driveway, except as allowed by Subparagraphs b and c.,
below; and
(2) Have a driveway with a minimum length of 20 feet measured from the back of the
sidewalk, or the edge of the right-of-way where there is no sidewalk. The minimum
width shall be 10 feet and the maximum driveway throat width shall be 12 feet for a
one-car garage, 24 feet for a two-car side-by-side garage, and 36 feet for a three-
car or greater side-by-side garage. For garages with a tandem car configuration,
the maximum driveway throat width shall be based on the number of side-by-side
vehicle spaces with unobstructed driveway access.
b. A parcel within the RC and RE zones with a frontage of 200 feet or more may have two
separate driveways, or one circular driveway, provided the resulting curb cuts are
separated by a minimum distance of 100 feet, or a lesser distance approved by the City
Engineer based on consideration of site topography and traffic safety.
c. Total front yard paved area (e.g., driveway, parking areas) shall not exceed 50 percent of
the required front setback area.
2. Multi-family and nonresidential projects.
a. A multi-family or nonresidential project shall have no more than two driveways, unless the
Zoning Administrator determines that more than two driveways are required to
accommodate anticipated project traffic, based on a traffic study.
b. Whenever a property has access to more than one street, access shall generally be
limited to the lowest volume street, to minimize the traffic impacts of the project.
c. The minimum width of driveways providing access to multi-family and nonresidential
parking spaces shall be in compliance with Table 3-13 (Minimum Driveway Widths),
below. The maximum driveway width shall be 30 feet, exclusive of the width of a median
divider.
B. Location of driveways. Driveways shall meet the following standards in all zoning districts, except
as approved by the City Engineer.
1. Distance from street corner. No driveway shall be located less than 150 feet from the nearest
street intersection, as measured from the centerline of the driveway to the centerline of the
nearest travel lane of the intersecting street. A lesser distance may be approved by the City
Engineer for parcels with street frontages of less than 150 feet.
2. Driveway spacing. Driveways shall be separated along the street frontage as follows:
a. Single-family residential development. Driveways shall be separated by at least six
feet, unless a shared, single driveway is approved by the Zoning Administrator. The six-
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-56
foot separation does not include the transition or wing sections on each side of the
driveway; and
b. Multi-family and nonresidential development. Where two or more driveways serve
the same or adjacent multi-family or nonresidential development, the centerline of the
driveways shall be separated by a minimum of 50 feet. Exceptions to this standard shall
be subject to the review and approval of the City Engineer.
c. Parking access from street. Each residential development must access its own parking
directly from the street or alley, except where single-family residential parcels share a
driveway.
3. Spaces shall be accessible without re-entering a public right-of-way.
a. All spaces in a parking facility shall be accessible without re-entering a public right-of-
way.
b. The review authority may grant a Minor Use Permit in compliance with Section D6-28
(Use Permits and Minor Use Permits) to allow an exception to the prohibition identified in
Subparagraph D3-37.B.3.a., above, but only when it is physically impossible to provide
the required access.
c. An alley may be used as maneuvering space for access to off-street parking.
4. Access drive required.
a. Where an area used for off-street parking does not abut a public street, an access drive
shall be provided in compliance with Table 3-13 (Minimum Driveway Widths), below,
connecting the off-street parking area with a public street.
b. The access drive shall be paved in the manner required for off-street parking lots and
may not traverse property in a residential zone unless the drive provides access to a
parking area serving a use in that residential zone.
c. An access drive shall have a turnaround with an interior radius of 35 feet.
5. Approval of City Engineer required. Entrances and exits including the location, width, and
length are subject to the review and approval of the City Engineer.
6. Median strip required.
a. An entrance to a parking area accommodating more than 25 vehicles shall include a
median strip.
b. The design of the strip shall be subject to the review and approval by the traffic division,
and the strip shall be located to eliminate possible cross-traffic within the parking area
within 50 feet of the public right-of-way.
c. The applicant may request Zoning Administrator approval of Minor Use Permit modifying
this requirement based on the size of the parking area, the circulation plan, and sight and
safety considerations of the specific site.
C. Driveway widths and clearances.
1. Driveway widths. Driveways shall have the minimum widths at the gutterline in compliance
with Table 3-13 (Minimum Driveway Widths), below, plus a minimum of one foot additional
clearance on each side of any vertical obstruction exceeding six inches in height.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-57
Note: Minimum widths of two-way driveways for nonresidential uses are for streets
with speed limits greater than 25 m.p.h. (i.e. collectors and arterials).
2. Additional requirements by Zoning Administrator.
a. The Zoning Administrator, in consultation with the City Engineer, may require driveways
in excess of the above widths where unusual grade, site, or traffic conditions prevail.
b. The Zoning Administrator may also require driveways to be constructed with full curb
returns and handicapped ramps as opposed to simple curb depressions.
c. Driveways which serve the same parking facility shall be located at least 25 feet apart.
D. Clearances from obstruction. The nearest edge of a driveway curb cut shall be at least three feet
from the nearest property line, the centerline of a fire hydrant, light standard, traffic signal, utility pole,
or other similar facility. Driveways shall have a minimum overhead clearance of 14 feet in height,
except within a parking structure, where clearance may be reduced to 6 feet, 7 inches.
E. Driveway visibility. The visibility of a driveway at its intersection with a street right-of-way shall not
be blocked between a height of 30 inches and seven feet, unless approved by the Engineering
Services Director, as required by Section D3-6.F (Height limit at street corners and driveways).
F. Surfacing. All access driveways required by this Section, and as shown on the approved plans, shall
be graded and properly drained, shall be permanently maintained in a dust-free manner, and shall be
paved with at least two inches of asphalt, concrete, or paving units.
1. The Zoning Administrator may authorize the use of other all-weather surfacing, where the
Zoning Administrator determines, in consultation with the City Engineer, that the driveway is not
needed for pedestrian access, and that the alternative surfacing will not impair accessibility for
emergency vehicles. For the purposes of this Section, alternative all-weather surfacing includes
turf block and/or other surfacing materials that provide for water infiltration into the ground while
providing adequate support for vehicles.
2. Driveways with a slope of 10 percent or greater shall be paved with asphalt or concrete in all
cases.
TABLE 3-13 - MINIMUM DRIVEWAY WIDTHS (feet)
Type of Use
Served
Number of Parking
Spaces to be
Served
Minimum Width
of One-Way
Driveways
Minimum Width of
Two-Way Driveways
Residential Uses 6 or fewer spaces 10 feet ---
7 to 24 spaces 12 feet 20 feet
25 or more spaces 15 feet 26 feet
Nonresidential
Uses
24 or fewer spaces 12 feet 24 feet*
25 or more spaces 15 feet 30 feet*
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-58
D3-38 - Bicycle and Motorcycle Parking Requirements
A. Bicycle Parking. Each multi-family project and nonresidential land use shall provide bicycle parking
in compliance with this Section.
1. Number of bicycle spaces required. Multi-family, retail commercial, and office uses shall
provide bicycle parking spaces equal to a minimum of one bicycle space for every 10 motor
vehicle spaces, with a minimum of two bicycle spaces.
2. Bicycle parking space location. Bicycle spaces shall be conveniently located near the primary
entrance of each structure they are intended to serve.
3. Bicycle parking design and devices. Each bicycle parking space shall include a stationary
parking device to adequately secure the bicycle, shall be a minimum of two feet in width and
six feet in length, installed and maintained in compliance with City standards. Overhead
clearance shall be a minimum of seven feet.
B. Motorcycle parking. Each parking lot with 50 or more motor vehicle parking spaces shall provide
motorcycle parking spaces conveniently located near the primary entrance of a structure, accessed
by the same aisles that provide access to the motor vehicle parking spaces in the parking lot.
1. Number of spaces required. A minimum of one motorcycle parking space shall be provided
for each 50 motor vehicle spaces or fraction thereof.
2. Space dimensions. A motorcycle parking space shall have minimum dimensions of four feet
by seven feet.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-59
D3-39 - Loading Space Requirements
A. Number of loading spaces required. Nonresidential uses shall provide off-street loading spaces in
compliance with Table 3-14 (Loading Spaces Required), below. Requirements for uses not listed
shall be determined by the Zoning Administrator based upon the requirements for comparable uses.
TABLE 3-14 - LOADING SPACES REQUIRED
Type of Land Use Loading Spaces
Required
Retail and service commercial activities, eating and drinking establishments, personal
service establishments, retail stores, repair shops, and wholesale establishments
0 - 3,000 sq ft 0 space
3,001 - 30,000 sq ft 1 space
30,001 - 60,000 sq ft 2 spaces
60,001 - 100,000 sq ft 3 spaces
100,001 sq ft and above As required by the Zoning
Administrator.
Lodging (hotel or motel)
0 - 5,000 sq ft 0 space
5,001 - 50,000 sq ft 1 space
50,001 - 100,000 sq ft and above 2 spaces
Manufacturing, storage facility, warehouse, or other industrial uses
0 - 5,000 sq ft 0 space
5,001 - 30,000 sq ft 1 space
30,001 - 60,000 sq ft 2 spaces
60,001 - 100,000 sq ft 3 spaces
100,001 sq ft and above As required by the Zoning
Administrator.
Meeting, office, public, and club uses
0 - 5,000 sq ft 0 space
5,001 - 50,000 sq ft 1 space
50,001 - 100,000 sq ft and above 2 spaces
Public building, installation, service structure, or utility; art
gallery, auditorium, bus depot, college, library, museum,
school, theater, transit station, or other place of public
assembly or use which requires recurring delivery of
goods by truck.
1 space, plus as required
by the Zoning
Administrator.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-60
B. Standards for loading areas. Off-street loading areas shall comply with the Building Code
specifications and requirements for off-street loading facilities, and shall comply with the following
requirements. The Zoning Administrator may reduce these standards and the requirements of
Subsection A., Table 3-14, and/or require an On-site Delivery Plan, where the Zoning Administrator
first determines that the delivery, operating, and shipping characteristics of the use do not require the
number or type of loading spaces required by this Section. An On-site Delivery Plan shall identify an
on-site loading area (Minimum 12 feet wide, 35 feet long, and 14 feet vertical clearance) and limit the
delivery hours to non-business hours of the on-site tenant(s) at the loading area.
1. Location.
a. Loading spaces shall be on the same site for which the loading spaces are required, or
an adjoining parcel, and shall be located:
(1) Outside of all required setbacks and not facing a public street;
(2) As near as possible to the primary structure and within the rear two-thirds of the
parcel;
(3) To ensure that loading, unloading, and vehicle maneuvers take place on-site; and
(4) To avoid adverse impacts upon neighboring residential properties.
b. On a site adjoining an alley, a required loading space shall be accessible from the alley
unless alternative access is approved by the Zoning Administrator.
c. Common loading facilities.
(1) The off-street loading facilities required by this Section may be satisfied by the
permanent allocation of the identified number of spaces for each use in a common
truck loading facility; provided, the total number of spaces shall not be less than the
sum of the individual requirements.
(2) As a requirement of approval, an attested copy of a contract between the parties
concerned providing an agreement to joint use of the common truck loading facility
shall be filed with the application for the permit or approval.
2. Not backing across street property lines. A required loading space shall be accessible
without backing a truck across a street property line unless the Zoning Administrator determines
that the provision of turn-around space is infeasible and approves the alternative access.
3. Shall not prevent access to parking spaces. An occupied loading space shall not prevent
access to a required off-street parking space.
4. Dimensions. Loading spaces shall be a minimum of 12 feet in width, 35 feet in length with 14
feet of vertical clearance.
5. Lighting. Loading areas shall have lighting adequate for security and safety. Lighting shall be
installed and maintained in compliance with Sections D3-33 (Parking Area Lighting) and D3-7
(Outdoor Lighting).
6. Screening and landscaping required.
a. Loading areas shall be screened from abutting properties and streets with dense
landscaping and/or solid decorative masonry walls with a design and height subject to
the review and approval of the Zoning Administrator.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-61
b. Where a loading area abuts a street or another site, a landscaped strip of at least eight
feet in width shall be planted for screening, and permanently maintained with plant
materials subject to the review and approval of the Zoning Administrator; except that
within 50 feet of a street intersection, the height of plant materials other than trees shall
not exceed 36 inches.
c. The Zoning Administrator may require additional screening and/or landscaping.
7. Surfacing. All loading spaces, access driveways, and maneuvering areas required by this
Chapter, and as shown on the approved plans, shall be graded and properly drained, shall be
permanently maintained with dust-free surfacing, and shall be paved with two inches of
asphaltic concrete, or other all-weather surfacing approved by the City Engineer.
8. Striping. All loading spaces shall be clearly striped and identified by the words "Loading Only"
painted on the paved surface of the space in four-inch wide white block letters. These markings
shall be maintained in a highly visible condition at all times.
9. Loading ramps. Plans for loading ramps and truck wells shall be accompanied by a profile
drawing showing the ramp, ramp transitions, and overhead clearances, and shall require City
Engineer and Planning review and approval.
10. Air Quality. Delivery vehicles shall be prohibited from idling their engine during loading and/or
unloading activities. An electrical connection system may be provided as an alternative to allow
for operation of refrigeration systems or other delivery vehicle functions during loading and/or
unloading activities.
11. Vehicle repair prohibited. Off-street loading facilities and areas required by this Section shall
be maintained for the duration of the use requiring the area, and no repair work or servicing of
vehicles shall be allowed in the loading areas.
D3-40 - Designation of Off-Site Parking and Loading Spaces
If off-site parking and/or loading facilities are approved by the City in compliance with Subsection D3-26 E.
(Location and ownership) above, a recordable covenant, easement, or other agreement (hereafter referred
to as the "agreement"), acceptable to the City Attorney, shall be recorded in the County Recorder’s Office
to ensure the continued availability of the parking and/or loading facilities.
A. Parties to agreement. The parties to the agreement shall include the owner of the off-site parking/
loading spaces and the owner of the site requiring the parking/loading.
B. Contents. The agreement shall include:
1. Covenants reflecting the City's conditions of approval for the use requiring the parking and/or
loading, and the off-site parking and/or loading plan approved by the City;
2. A requirement that the off-street parking and/or loading facilities shall not be used for any other
purpose unless the restriction is removed by resolution of the Commission, in compliance with
Subsection E., below.
C. Certificate of Occupancy. No Certificate of Occupancy shall be issued until an attested copy of the
recorded agreement has been filed with the Department.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-62
D. Loss of off-site spaces.
1. Notification of City. The owner or operator of a business that uses approved off-site spaces
to satisfy the parking/loading requirements of this Chapter shall immediately notify the Zoning
Administrator of any change of ownership or use of the property where the spaces are located,
or of the property for which the spaces are required, and of any termination or default of the
agreement between the parties.
2. Effect of termination of agreement. Upon notification that the agreement for the required off-
site parking/loading spaces has terminated, the Zoning Administrator shall establish a
reasonable time in which one of the following shall occur:
a. Substitute parking/loading is provided that is acceptable to the Zoning Administrator; or
b. The size or capacity of the use is reduced in proportion to the parking/loading spaces lost.
E. Commission's action to remove restriction. Upon submission of satisfactory evidence that other
off-street parking and/or loading spaces have been provided in compliance with the requirements of
this Chapter, or that the use has ceased, or the structure has been removed or altered so as to no
longer require the off-site parking and/or loading spaces, the Commission shall remove the restriction.
D3-41 - Vehicles on Private Property
A. Parking limit in residential zones. No "heavy duty" commercial vehicle shall be parked for more
than three hours on private property in a residential zone except:
1. While loading or unloading goods or materials and the time required to complete the work
exceeds the three-hour period; or
2. When the vehicle is parked in connection with and in aid of providing a service to or on a
property in the block in which the vehicle is parked and time in addition to the three-hour period
is necessary to complete the service.
B. Parking limits in non-residential zones. A "heavy duty" commercial vehicle may only be parked
on private property within a nonresidential zone when the vehicle is:
1. Parked in an approved off-street parking space or an approved outdoor storage or activity area;
2. Used in connection with and is owned or leased by an approved business located in a
nonresidential zone; or
3. The vehicle is loading or unloading goods in connection with a business and is parked for not
more than 48 hours.
C. Heavy duty defined. For the purposes of this Section a "heavy duty" commercial vehicle shall mean
a single vehicle or combination of vehicles having more than two axles, or a single vehicle or
combination of vehicles having a manufacturer's gross vehicle weight rating of 12,000 pounds or
more.
D. Parking limits on landscape areas. Vehicles shall not be parked within landscape areas.
E. Storage of trailers, RVs, and larger trucks prohibited. No trailer, recreational vehicle, as defined
in Division D8, and/or truck not customarily used for personal use shall be stored or parked within a
required front setback area; except in a nonresidential zone where limited display areas are
authorized through Minor Use Permit approval (see Section D6-28). A recreational vehicle may be
stored within an interior side or corner side yard setback if located behind a seven foot fence, thus
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-63
screened to the maximum extent feasible from the view of the street and adjacent parcels. Temporary
parking within the driveway or carport, for the purposes of loading or unloading before or after a trip,
shall not exceed a period of 72 consecutive hours. Recreational vehicle owners who have their
recreational vehicles parked on the San Ramon property where they reside as of August 25, 2006
may continue to park their recreational vehicles on a paved area within the front yard setback,
provided that the following requirements are met:
a. Each owner shall register their vehicle with the City, including submittal of any applicable
documentation and payment of any applicable processing fees.
b. The parking of each vehicle shall comply with applicable Municipal Code requirements
including not overhanging the sidewalk or right-of-way, and this Zoning Ordinance,
including required front yard landscaping and sight distance requirements.
c. Each vehicle shall be registered with the City in compliance with this Section within six
months of August 25, 2006.
d. The registration with the City shall pertain to the registrant of the vehicle, not the vehicle
itself.
e. The owner of the vehicle must be a San Ramon resident and must be a resident of the
property or the owner of the property where the vehicle is stored.
f. Upon sale of the property, no further recreational vehicle storage will be allowed within the
front yard setback area.
g. Upon termination of tenancy, no subsequent tenant will be able to store a recreational
vehicle in the front yard setback.
Parking and Loading D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-64
[Page intentionally left blank]
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-65
Chapter IV - Signs
Sections:
D3-42 - Purpose of Chapter
D3-43 - Criteria and Guidelines
D3-44 - Definitions
D3-45 - Exempt Signs - Signs Not Requiring a Permit
D3-46 - On- and Off-Site Sign Regulations and Guidelines
D3-47 - Specific Sign Regulations
D3-48 - Miscellaneous Signs
D3-49 - Illumination of Signs
D3-50 - Prohibited Locations, Sign Types, and Messages
D3-51 - Maintenance, Abandonment, and Removal
D3-52 - Master Sign Program Required
D3-53 - Off-Site Directional Signs
D3-54 - Approvals Required
D3-55 - Required Findings
D3-56 - Sign Permit Required
D3-57 - Owner's Consent Required
D3-58 - Sign Permit Applications
D3-59 - Building Permit Required
D3-60 - Required Inventory of Illegal or Abandoned Signs
D3-42 - Purpose of Chapter
A. Purpose of Chapter. The purpose of this Chapter is to provide minimum standards to promote
economic viability and enhance the community's appearance by regulating the design, illumination,
number, placement, and size of exterior signs and interior signs behind an exterior window(s) if the
sign is intended to be visible from the exterior.
B. Purpose of sign regulations. These sign regulations are established:
1. To encourage the effective use of signs as a means of communication within the City;
2. To enhance the community appearances by ensuring the highest standards of sign design and
construction and minimizing unnecessary visual clutter;
3. To encourage creativity in sign design while minimizing the overall number and size of signs to
achieve the desired need for identification and communication;
4. To promote and attract sources of economic development and growth by providing adequate
business identity from both vehicular and pedestrian accessways;
5. To protect pedestrian and traffic safety by minimizing confusing and distracting signs and
providing clear identity and direction to major office centers, shopping centers, and residential
neighborhoods;
6. To minimize the possible adverse visual effects of signs on adjoining residential areas and/or
public facilities; and
7. To enable the fair and consistent enforcement of these sign regulations.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-66
D3-43 - Criteria and Guidelines
The following criteria should be considered regarding the general location, placement, and design of
individual signs:
A. Signs shall be restrained and non-garish in character. Signs shall be restrained in character and
no larger than necessary for adequate identification.
B. Signs shall be limited in quantity. Signs shall be limited in quantity to that which is necessary for
adequate identification. Only one sign for each business or business frontage is encouraged;
however, an additional sign may be necessary for adequate visibility given the business location
within an office park or shopping center and/or the structure's distance from the adjoining
public/private streets;
C. Directory signs are encouraged within commercial centers. Directory signs are encouraged
within office park and shopping centers to provide direction and identity. They shall not be visible
from public streets and should not cause confusion or visual clutter;
D. Signs shall not compete with each other. Signs shall not excessively compete with each other for
the public's attention;
E. Signs shall serve to identify a name. Signs shall serve to identify a business or establishment’s
name. The primary activity or service being provided may also be included if it is necessary to
properly identify the business type;
F. Signs shall be in proportion and harmonious with the structures they serve. Signs shall be in
proportion with the building scale and harmonious with the building design in terms of colors,
materials, size, and textures;
G. Sign illumination shall be at the lowest level. Sign illumination shall be at the lowest level
consistent with adequate identification and readability, and all lighting sources shall be properly
shielded and directed onto the sign(s) to avoid glare in compliance with Section D3-49 (Illumination
of Signs), below;
H. Signs shall be of the highest professional standards. Sign design shall be of the highest
professional graphic standards and creativity related to colors, design, materials, size, and textures;
I. Free-standing or monument signs are allowed as an entry statement. Free-standing or
monument signs identifying one or two structure owners or "anchor" tenants are allowed as an entry
statement to an office park or shopping center;
J. Temporary signs shall not be larger than permanent signs. Temporary signs shall not be larger
in sign face area and/or height than permanent identification signs of a similar type and purpose. The
signs shall be incorporated into a monument sign and/or the building wall rather than constructed as
a free-standing sign;
K. Landscaping shall be protected and enhanced as a visual amenity. Landscaping surrounding
free-standing signs shall be protected and enhanced as a visual amenity; and
L. Window displays are encouraged. Window displays rather than window signs are encouraged
whenever possible.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-67
D3-44 - Definitions
A-frame sign. A sign structure built in the shape of a capital letter A,
usually designed to be moved easily (see Portable sign).
Abandoned sign. A sign which no longer identifies or advertises a bona
fide activity, business, lessor, owner, product, or service, and/or for which
no legal owner can be found.
Advertising/promotional signs. Temporary banners and flags without
advertising copy when placed on a structure’s exterior within an office or
shopping area or center to announce a "grand opening", "going out of
business", etc., or area/center sponsored special event.
Advertising/promotional window signs. Temporary signs which are installed only on the interior of a
window to advertise an event, product, sale, and/or services provided.
Animated sign. (see also and note difference from "Changeable sign") A sign or display using kinetic or
illusionary motion by electrical, manual, mechanical, natural, or other means. Animated signs include the
following types:
1. Electrically energized Illuminated signs whose motion or visual impression of motion is
caused by electrical means. Electrically energized animated signs are of two types:
a. Flashing signs. Signs with a repeating illumination from one or more sources and in
which the intensity of illumination varies from zero (off) to 100 percent (on) during the
programmed cycle.
b. Illusionary movement signs. Signs with the illusion of movement created by a repeating
action in which the sign is turned on or off to give the impression of blinking, chasing,
running, and/or twinkling light patterns.
2. Mechanically energized. Signs with a repeating physical movement activated by mechanical
means.
3. Naturally energized. Wind-driven signs include banners, flags, metallic disks, pennants,
spinners, streamers, or other similar devices designated to move in the wind.
Architectural Review Board. Referred to in this Chapter as the ARB. (See Section D6-22 [Architectural
Review]).
Awning. A shelter projecting from and supported by the exterior wall of a
structure constructed of non-rigid materials on a supporting framework.
Awning sign. A sign painted on, printed on, or attached flat against the
surface of an awning (See Canopy sign, below).
Back lit awning. (See Electric awning sign, below).
Banner sign. Any sign of lightweight fabric or similar material that is securely
mounted to a pole or a building wall by a permanent frame at one or more
edges. National flags, State or municipal flags, or the official flag of any
institution or business shall not be considered banners (See Pennants, below).
Billboard. A sign or advertising structure used as an outdoor display which is
securely affixed to the ground. (See Off-site sign, below).
A-frame Sign
Awning Sign
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-68
Blade sign. A sign, identifying single tenant within a shopping center, which typically projects perpendicular
from a building wall adjacent to the tenant entrance by a bracket no less than the required clearance above
grade. (See Projecting Sign).
Broker’s open house sign. A temporary real estate sign which announces that a real estate professional
is conducting an open house where interested individuals can visit and tour the premises.
Building. Any roofed structure supported by and enclosed by walls for the shelter or storage of persons
and/or, property. Referred to in this Chapter as structure. See the Uniform Building Code for definition.
Building Frontage. The distance that any individual building or tenant wall or site extends along a public
or private right-of-way on which it borders.
Canopy (structure). A rigid multi-sided structure covered with fabric, metal, or other material and
supported at a building wall at one or more points, and by columns or posts embedded in the ground at
other points. May be illuminated by means of internal or external sources. (See Electric awning sign and
theater marquee, below).
Canopy (free-standing). A rigid multi-sided structure covered with fabric, metal, or other material and
supported by columns or posts embedded in the ground. May be illuminated by means of internal or
external sources. (See Canopy, structure, above).
Canopy sign. A sign affixed or applied to the exterior facing surface(s) of a structure or free-standing
canopy. (See Awning sign, above).
Changeable sign. A sign whose informational content can be altered or changed by electric, electro-
mechanical, electronic, or manual means. Changeable signs include the following types:
1. Electrically activated. Signs whose alphabetic, pictographic, or symbolic informational
content can be altered or changed on a fixed display surface composed of electrically
illuminated or mechanically driven changeable segments. Includes the following two types:
a. Computer controlled variable message electronic signs. Signs whose informational
content can be altered or changed by means of computer-driven electronic impulses.
b. Fixed message electronic signs. Signs whose basic informational content has been
pre-programmed to include only certain types of information projection (e.g., predictable
traffic conditions, temperature, time, or other events subject to prior programming).
2. Manually activated. Signs whose alphabetic, pictographic, or symbolic informational content
can be altered or changed by manual means.
City. Unless the context clearly discloses a contrary intent, the word "City" shall mean the City of San
Ramon.
Clearance (of a sign). The smallest vertical distance between the grade of the adjacent highway, street,
or street curb and the lowest point of any sign, including framework and embellishments, extending over
that grade.
Commercial/retail center. Any nonresidential grouping of structures or uses occupied by three or more
tenants which are connected by architectural treatment, shared access roads, and/or a commonality of use.
Includes public/semi-public complexes. This use is typically neighborhood-serving in nature.
Commercial/retail area. A commercial/retail area either consisting of, or which has the potential for,
200,000 gross square feet or greater leasable tenant space via aggregation with adjoining commercial
centers and/or properties which have a distinct geographical identity within the City. These areas can be
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-69
either neighborhood serving and/or community serving in nature depending upon location, size, and
tenants, and have frontages on one or more arterial street(s).
Construction sign. A temporary sign identifying an architect, contractor, developer, and/or material
supplier participating in construction on the property on which the sign is located.
Copy. The graphic content of a sign surface in either permanent or removable letters, in alphabetic,
pictographic, or symbolic form.
Directional/information sign. An on-site incidental sign giving directions, instructions, or facility
information (e.g., entrance, exit, or parking signs).
Directory sign. A free-standing or wall sign intended to identify two or more tenants of a specific site, and
located to direct pedestrian circulation within an office park and/or commercial/retail center or area. The
signs are intended for pedestrian assistance and not for providing directional assistance to motorists, and
should not, therefore, be visible from the public street.
Double-faced sign. A sign with two faces, essentially back-to-back, or a "V" shaped sign structure. (See
Multiple-faced sign, below)
Electric awning sign. (Also known as back lit awning). An internally illuminated awning or canopy
structure which is constructed of a flexible, reinforced, and translucent covering, with graphics or copy
applied to the visible surface of the awning.
Facade. The entire building wall including the parapet.
Flashing sign. (See Animated sign, electrically energized, above)
Free-standing sign. A sign supported permanently upon the ground by braces or poles and not attached
to any structure. (See also Monument sign, below)
Garage Sale signs. Any sign pertaining to a garage sale or a community garage sale.
Gasoline price signs. Signs which are intended to advertise gasoline and other motor fuel prices in
compliance with the requirements of the State Business and Professions Code.
Government sign. Any sign erected and maintained by the City, County, State, or Federal government
for traffic direction or for designation of or direction to any historical site,
hospital, public service, or school, facility or property.
Height (of a sign). The vertical distance measured from the highest point
of the sign, excluding architectural embellishments (e.g., decorative
cornices, trim, etc.), to the grade of the adjacent street or the surface
grade beneath the sign, whichever is less. (See and compare Clearance,
above)
Illegal sign. A sign(s) which has been installed without the required City approvals, and/or which has not
received a nonconforming status.
Illuminated sign. A sign with an artificial light source incorporated internally or externally for the purpose
of illuminating the sign.
Incidental sign. A small decal, emblem, or sign informing the public of facilities, goods, or services
available on the premises (e.g., credit card sign or a sign indicating hours of business).
Lot. A parcel of land legally defined on a subdivision map recorded with the Assessment Department or
land registry office, or a parcel of land defined by a legal record or survey map.
Sign Height
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-70
Maintenance. For the purposes of this Chapter, the cleaning, painting, repair, or replacement of defective
parts of a sign in a manner that does not alter the basic copy, design, or structure of the sign.
Mansard. A sloped roof or roof-like facade architecturally comparable to a building wall.
Maximum allowable sign face area. The total area allowed for a single face of a sign. (See Table 3-13
[On-site and Off-site Maximum Sign Standards], below).
Monument sign. A free-standing sign mounted directly to the ground
on a solid base or pedestal or mounted to a wall which is not a building
wall (e.g., soundwall) which is intended to identify the name and/or logo
of a commercial office or shopping center or residential neighborhood.
The signs are intended to provide identification to motorists and may
therefore be visible from the public street.
Multiple-faced sign. A sign containing three or more faces, not
necessarily in back-to-back configuration. (See "V" sign, below)
Nonconforming sign.
1. A sign which was erected legally, but which does not comply with subsequently enacted sign
restrictions and regulations related to height, location, quantity, setbacks, sign face area, etc.
2. A sign which does not conform to these sign requirements, but for which a special permit has been
issued, or a Master Sign Program has authorized.
Occupancy. The portion of a structure or premises leased, owned, rented, or otherwise occupied for a
given use.
Off-site sign. Any sign structure (e.g., billboard) identifying a facility, use, product, or service which is not
located, sold, or manufactured on the same premise as the sign or which identifies a product, service, or
use by a brand name which, although sold or manufactured on the premise, does not constitute the principal
item for sale or manufactured on the premise.
Off-site directional sign. A sign which provides directional assistance to a commercial/retail area,
residential subdivision, or multi-family residential development of 100 units or more, and/or a business,
premises, or site not having direct frontage upon a public/private street.
On-site sign. A sign which pertains to the use of the premises and/or property on which it is located.
Outdoor advertising display. Advertising of a retail item with a sign and accompanying display (e.g.,
advertisement on a product dispenser, etc.)
Monument Sign
Calculation of Sign Face Area
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-71
Painted wall sign. Any sign which is applied with paint or similar substance on the surface of a wall.
Parapet. The extension of a false front or wall above a roof eave.
Pennant. Any light-weight fabric, plastic, or other material whether or not containing a message of any
kind, suspended from a rope, string, or wire, usually in series, designed to move in the wind. (See Banners,
above)
Penthouse sign. Any sign which is affixed to a roof-mounted mechanical equipment storage area.
Political sign. A temporary sign used in connection with a local, State, or national election or referendum.
Portable sign. Any sign designed to be moved easily and not permanently
affixed to the ground or to a structure (e.g., an A-frame sign).
Projecting sign. A sign, other than a flat wall sign, which is attached to and
projects from a building wall or other structure not specifically designed to
support the sign.
Public information sign. Any sign intended primarily to promote items of
general interest to the community (e.g., special community events) or traffic
control, including warning signs, which are erected by a governmental agency.
Real estate sign. A temporary sign advertising the real estate upon which the
sign is located as being for lease, rent, or sale. May also include "open house"
real estate signs.
Roofline. The top edge or ridge of a roof or building parapet, excluding chimneys, cupolas, or minor
projections.
Roof sign. Any sign mounted to a roof above a roof eave, but not projecting over the roofline of a structure.
(Compare with Mansard and Wall sign)
Rotating sign. (See Animated sign, mechanically energized, above.)
Sign. Any device, fixture, placard, or structure using graphics, symbols, and/or written copy and decorative
flags and pennants, without graphics, symbols, or written copy, for the primary purpose of identifying,
providing directions, or advertising any establishment, goods, products, or services.
Sign, area of.
1. Projecting and free-standing. The area of a free-standing or projecting sign shall have only
one side of any double- or multi-faced sign counted in calculating its area. The area of the
sign shall be measured as follows if the sign is composed of one or more individual cabinets
(see graphic at Maximum allowable sign face area, above):
A rectilinear line of not more than eight sides shall be drawn around and enclosing the perimeter
of each cabinet or module. The area shall then be summed and totaled to determine total area.
The perimeter of measurable area shall not include embellishments (e.g., decorative roofing,
framing, support structures, etc.); provided, there is no written advertising copy on the
embellishments.
2. Wall or window. The entire sign area shall be within a single, continuous perimeter composed
of any rectilinear line drawn around and enclosing the perimeter of the extreme limits of the
advertising message.
Projecting Sign
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-72
Sign Permit. All signs regulated by this Chapter shall be approved by issuance of a Sign Permit in
compliance with Section D3-56 (Sign Permit Required) before installation, unless specifically exempted
from permit requirements.
Special events sign. A temporary sign or banner placed on the exterior of a structure which is intended
to advertise seasonal events or special exhibitions which include agricultural sales, arts and crafts shows,
Christmas tree sales, circus/carnivals, and civic/community events.
Subdivision identification sign. Any free-standing or wall sign identifying a residential subdivision or
condominium complex, or multi-family residential development consisting of 100 or more units. (See also
Off-site directional signs)
Temporary sign. A sign not constructed or intended for long-term use. Typically constructed of lightweight
fabric or similar material (e.g., a banner).
Theatre marquee. A permanent roof-like structure or canopy of rigid materials supported by and extending
from the facade of a theatre building. (See Awning and
Canopy, above)
Theatre marquee sign. Any sign attached to or supported
by a theatre marquee structure.
Traffic safety visibility area. The area of a corner lot
closest to the intersection which is kept free of visual
impairment to allow full view of both pedestrian and
vehicular traffic. No sign in excess of 30 inches in height
nor support pole larger than 12 inches in diameter may be
installed in this area, unless approved by the Engineering
Services Director. Free-standing signs shall have at least
seven feet clearance to grade when located within a required traffic safety visibility area. (See Section D3-
6.E (Height limit at street corners.)
V-sign. A sign consisting of two essentially equal faces, positioned at an angle extending less than 179
degrees. (See also Multiple-faced signs, above)
Wall sign. A sign attached to and essentially parallel with the wall of a structure with no copy on the sides
or edges. This definition includes awning, cabinet, canopy, individual letter, and painted signs.
Window display. An arrangement of merchandise, pictures, products,
and/or symbols or combination thereof inside a window or structure
interior which is intended to be viewed from the exterior to communicate
information about the business, services, or special advertising or
events.
Window sign. A permanent sign inside a window which is intended to
be viewed from the exterior to identify a business establishment, hours
of operation, and/or services provided. Window signs may include
painted-on or wrap-on letters, scenes, pictures, symbols , opaque
materials, and/or window tint.
Traffic Safety Visibility Area
Window sign
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-73
D3-45 - Exempt Signs - Signs Not Requiring a Sign Permit
The following signs are exempted from ARB, the Zoning Administrator, and/or Commission review unless
otherwise noted, or unless authorized as part of a Master Sign Program in compliance with Section D3-52,
below:
A. Advertising/promotional window signs. Temporary advertising/promotional window signs or
displays when placed to announce an event and provided it is installed for a period not exceeding 21
consecutive calendar days within each calendar quarter. (See Subsection D3-47 M. [Temporary
advertisement/promotional window signs])
B. Blade signs. Blade signs and other similar non illuminated wall signs not over two square feet in
area, displaying the name and/or the address of the tenant located in close proximity to each tenant
space when authorized by a Master Sign Program (Section D3-52) or when identifying tenants within
a site having five or less nonresidential tenants. The signs shall be limited to one sign for each tenant.
C. California State Lottery signs. Signs for the California State Lottery, approved by the Lottery
Commission for display by Lottery Game Retailers.
D. Commemorative signs. Names of structures, dates of erection, and commemorative tablets, when
carved into concrete, stone, or similar material or made of aluminum, bronze, or other permanent type
material and made an integral part of the structure. The signs shall not exceed four square feet in
sign area and shall not be illuminated.
E. Commercial and industrial real estate signs. Temporary on-site commercial and industrial real
estate signs when authorized by a Master Sign Program (See Section D3-52), on a site with five or
less nonresidential tenants, and when limited to one sign for each site or structure. (See Section D3-
47 I. [Temporary on-site commercial real estate signs]). These signs shall comply with the street and
traffic safety visibility area and height requirements.
F. Construction signs. Temporary construction signs. (See Section D3-47 K. [Temporary construction
signs])
G. Directional/informational signs. Directional/informational onsite parking and other directional
signs, not exceeding one double faced sign for each entrance, or two square feet in sign area, with
letters or symbols not exceeding five inches in height. The signs shall not exceed a height of 42
inches, not be located within 10 feet of another freestanding sign, and shall be setback from the
driveway entrance at least five feet.
H. Garage sale sign. One on-site sign and a maximum of four off-site signs on private properties are
allowed on the days of the event from 7:00 a.m. to 4:00 p.m. The maximum size of a sign shall be 6
square feet, maximum 3 feet in height or width. The content on a sign shall be limited to the date,
the time, and the address of the event and a directional arrow.
I. Gasoline price signs. Gasoline and other motor fuel price signs in compliance with the State
Business and Professions Code.
J. Government flags. United States, State of California, or City government flags which shall be
mounted or flown (e.g., maximum pole height) no higher than the maximum structure height and shall
be setback a distance equivalent to the front or street side setback for the subject zone. While exempt
from a sign permit, the flag pole or other support shall be subject to the issuance of a Building Permit.
K. Holiday lights and devices. Holiday lights and similar devices not advertising a product or sale
erected no sooner than 45 calendar days before the holiday and removed within 14 calendar days
following the holiday.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-74
L. Incidental signs with no letters exceeding three inches. Incidental and window signs having no
letters or symbols exceeding three inches in height; provided, the maximum window coverage does
not exceed 20 percent of the overall window area, while maintaining a clear interior view for the lower
third of the window area for police and private security surveillance. These may be illuminated or non-
illuminated and indicate that a tenant is either "open" or "closed" for business, service offered, hours
of operation, and/or the address. (See Section D3-47 B. [Window signs])
M. Interior signs. Signs within the interior of a structure which are not readily visible from the exterior.
N. Mass produced product signs. Signs manufactured as a standard, integral part of a mass produced
product accessory to a commercial, public, or semipublic use, including automated teller machines
(ATMs), gasoline pumps, telephone booths, and vending machines.
O. Political signs. Temporary political signs when a letter of responsibility has been filed with the City
Clerk. (See Section D3-47 J. [Temporary political signs])
P. Public information signs. Public information and governmental signs erected by a public agency.
Q. Residential real estate signs. Temporary on-site residential real estate signs when limited to one
sign for each residential site or property. (See Section D3-47 F. [Temporary on-site residential real
estate signs])
R. Scoreboard changeable copy signs. Electronically activated or fixed message changeable copy
signs for scoreboards on public school properties.
S. Street address numbers. Street address numbers conforming to Title C, Division 2, (Building
Security) of the Municipal Code.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-75
D3-46 - On and Off-Site Sign Regulations and Guidelines
A. Applicability. Table 3-15 (On- and Off-Site Maximum Sign Standards) identifies the maximum
allowable sign face area, development standards, and guidelines applying to signs visible from a
public or private right of way for each zone. This Table is a summary of the regulations only and the
letters in parentheses in the last column reference specific regulations within Section D3-47 following
the table or located elsewhere in this Zoning Ordinance.
B. Exceptions. A Master Sign Program may supersede the regulations of this Chapter in compliance
with Section D3-52; and a Master Off-Site Directional Sign Program may supersede the regulations
of this Chapter in compliance with Section D3-53.
TABLE 3-15 - ON-SITE AND OFF-SITE MAXIMUM SIGN STANDARDS
Type of Sign AG; GC; M-1; M-
2; P; PD; PS; OS RR; RE; RS RM; RMH;
RH OA; MW
OL; CC; CCMU ;
MU-C CC-R; CR ;
CT; CS; MU
Specific Regs.
(D3-47)
ON-SITE
Wall Signs
0.75 sf per one
linear foot of bldg.
frontage, up to a
max. of 75 sq. ft.
of sign area.
Limited to only one
sign for each wall
(SAME)
(SAME)
(SAME)
(SAME)
A and PQ
Window Signs 20% of window
area (SAME) (SAME) (SAME) (SAME) B
Roof Signs Same as Wall
Signs (SAME) (SAME) (SAME) (SAME) C
Portable Signs Section D3-47 N. (SAME) (SAME) (SAME) (SAME) N
Office
Identification
Same as Wall Sign
(1 bldg.
identification sign
for each wall) (SAME)
(SAME)
(SAME)
(SAME)
Q
Free-Standing
(monument)
Per ARB 3.5' height
12 sf face
1 per site
frontage
1 per corner lot
5' height
12 sf face
(SAME)
(SAME)
12' height
30 sf face
(SAME)
(SAME)
8' height
30 sf face
(SAME)
(SAME)
D
Freeway-
Oriented
Building-
Mounted
Limited to 1 wall
sign per tenant on
a building wall
NONE
NONE
(SAME)
(SAME)
R
Freeway-
Oriented
Business Park
Identification Section D3-47 S.
NONE
NONE
(SAME)
(SAME)
S
Public Transit
Shelter Signs Section D3-47 T.
(SAME)
(SAME)
(SAME)
(SAME)
U
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-76
TABLE 3-15 - ON-SITE AND OFF-SITE MAXIMUM SIGN STANDARDS
Type of Sign
AG; GC; M-1;
M-2; P; PD; PS;
OS
RR; RE; RS RM; RMH; RH OA; MW
OL; CC; CCMU ;
MU-C ; CC-R ;
CR ; CT; CS; MU
Specific Regs.
(D3-47)
TEMPORARY
On-Site
Residential Real
Estate
4 sf face area
5 ft. height
1 per site
(SAME)
(SAME)
(SAME)
(SAME)
F
On-Site
Commercial Real
Estate
12 sf face area
5 ft. height
1 per site
(SAME)
(SAME)
(SAME)
(SAME)
I
Political 32 sf face area
8 ft. height
(SAME)
(SAME)
(SAME)
(SAME)
J
Construction 32 sf face area
10 ft. height
1 per site
(SAME)
(SAME)
(SAME)
(SAME)
K
Advertising/
Promotional and
Identification
12 ft. height
1 per tenant
(SAME)
(SAME)
(SAME)
(SAME)
L, M, and P
Special Events Per Special
Events Permit (SAME) (SAME) (SAME) (SAME) O
Off-Site Real
Estate Residential
and
Special Events
6 sf face area
3 ft. height
(SAME)
(SAME)
(SAME)
(SAME)
G
Off-Site
Subdivision
Directional
6 sf face area
3 ft. height
(SAME)
(SAME)
(SAME)
(SAME)
H
OFF-SITE
Off-Site
Directional
Section D3-53
(SAME)
(SAME)
(SAME)
(SAME) E
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-77
D3-47 - Specific Sign Regulations
All signs identified in this Section shall comply with the applicable sign standards and regulations identified
below. All non-exempt signs shall be reviewed in compliance Section D3-54 (Approvals required) below.
A. Wall signs shall be:
1. Located below a parapet or roofline.
2. Not project greater than 12 inches from the face of the structure, except for awning signs.
3. Allowed on spires, towers, or other architectural features as identified in this Chapter when the
sign is an integral part of the building design and does not project above a roofline. Any sign(s)
higher than the maximum structure height limit allowed in the subject zone, shall be subject to
approval by the Commission (or as part of a Master Sign Program). (See Section D3-52, below)
4. Limited to a maximum of 0.75 square feet for each one linear foot of building frontage (or each
building frontage if there is more than one frontage) up to a maximum of 75 square feet of total
sign face area. Limited to only one wall sign for each wall. Wall signs may exceed the maximum
allowed sign face area when the Planning Commission grants an exception in compliance with
the following:
a. The proposed exception conforms as closely as practical to the regulations governing
sign area limitations;
b. The proposed exception is consistent with the purposes and policies of these sign
regulations;
c. The strict adherence of the sign regulations does not allow adequate identification of the
subject site or structure because of the site's location, or because the proposed business
is obscured from view by adjacent structures or vegetation;
d. The sign is in proportion to the wall/window area; and
e. Wall signs shall be limited to one sign for each structure street frontage. One additional
wall sign may be allowed if the primary customer entrance is not on the wall facing the
street.
B. Window signs shall be:
1. Designed to ensure that the total area of all window signs, including exempt signs, shall be
limited to 20 percent of a tenant’s total window area for each wall.
2. Fabricated to the highest standards of sign design and construction.
3. Positioned in a fashion so that they do not obscure the vision of the indoor activities by law
enforcement personnel.
C. Roof signs shall be:
1. Located below a parapet or roofline. Theater marquee signs and/or signs on a sloped or pitched
roof (e.g., a gabled roof) may project above a roof eave, but shall be below a roofline. (See
also Theatre or cinema signs, Subsection D3-47 T. (Theatre or cinema signs) below)
2. Subject to the same sign area regulations identified for wall signs in Section D3-47 A. (Wall
signs) above.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-78
D. Free-standing or monument signs shall be:
1. Limited in height and total sign face area allowed in the subject zone (See Table 3-15 [On- and
Off-Site Maximum Sign Standards], above), and shall not be closer than 30 feet to another free-
standing and/or monument sign unless authorized by the Planning Commission.
2. Limited to one sign for each site frontage. Corner parcels, when not developed as part of a
contiguous commercial, office, and /or residential development, shall be limited to one free-
standing sign. Additional signs may be authorized by the Zoning Administrator when necessary
for proper identification.
3. Designed to include the structure/complex name, leasing information, address, and up to two
“anchor” tenants, unless additional tenant names are allowed under the Master Sign Program.
The leasing information shall be incorporated as part of the monument sign. The total number
of tenant names and other signs shall be determined in compliance with a Master Sign Program.
(See Section D3-52, below)
4. The directory style signs shall not be visible from a public street or right of way.
5. Designed to ensure that the sign(s) are not located over, or encroach into, a public right-of-way.
6. Placed within a required landscaped area. The Zoning Administrator may require supplemental
landscaping to enhance the sign and streetscape appearance.
7. In compliance with the requirements of Sections D3-37 (Driveways and Site Access).
8. Designed with creativity in mind, subject to the approval of the ARB and Zoning Administrator.
9. Subject to a Master Sign Program if required by this Chapter. (See Section D3-52, below)
E. Off-site signs shall be:
1. Off-site signs, as that term is defined in Section D3-44 (Definitions), above, advertising an
establishment, event, or product shall not be allowed except as specified by this Chapter. (See
Subsections G. [Temporary off-site residential real estate signs] and H. [Temporary off-site
subdivision directional signs], below)
2. The Planning Commission may authorize an off-site identification sign for a business, premise,
or property not having direct frontage or visibility upon a public/private street. (See Section D3-
54 B. [Planning Commission review and action], below)
F. Temporary on-site residential real estate signs shall be: Signs within any residential zone which
are intended to identify a residential "open house" or residential property for lease, rent, or sale shall
be:
1. Limited to four square feet in total sign face area and five feet in maximum height measured
from the top of the sign to the ground directly below it.
2. Limited to one sign for each residential property, unless additional signs are authorized by the
Zoning Administrator as necessary for proper identification.
3. Installed on the residential property to identify “for lease” or “sale”, and not located within any
public street right-of-way. The Zoning Administrator may authorize the placement of the sign
within the public street right-of-way only when there is no alternative location with ready
appearance from the public street right-of-way and then only when an Encroachment Permit is
authorized by the City Engineer.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-79
4. Displayed no longer than seven calendar days after the property is no longer offered for lease,
rent, or sale. "Lease/rent" shall mean occupancy by a tenant and "sale" shall mean close of
escrow.
5. Subject to a Master Sign Program if required by this Chapter. (See Section D3-52, below)
G. Temporary off-site residential real estate signs. Portable off-site residential real estate signs
within any residential zone which is intended to provide directional assistance for a broker's "open
house" shall be:
1. "A-frame" in design. "Stick signs" are strictly prohibited.
2. Limited to 48 inches in height and six square feet in total sign face area.
3. Allowed only on the weekends and removed no later than Sunday at sunset. However, the
signs may be used on Thursdays and Fridays between the hours of 9:30 a.m. to 2:00 p.m. for
broker's open house only, unless otherwise specified by the Zoning Administrator.
4. Placed behind the sidewalk, and shall not encroach within the public rights-of-way (e.g., bicycle
paths, medians, or sidewalks). Signs shall not be placed on fences, utility poles, or walls.
5. Allowed only for residential real estate developments that are located within the City of San
Ramon.
6. Limited to one sign for each direction at any intersection for each real estate company
regardless of the number of listings located in that direction.
7. Limited to a maximum combined total of eight temporary off-site residential real estate signs
and temporary off-site subdivision directional signs at major arterial/collector street
intersections; provided, motorist visibility is not obstructed. Signs on secondary or residential
street intersections shall be limited to a maximum combined total of four temporary off-site
residential real estate signs and temporary off-site subdivision directional signs; provided,
motorist visibility is not obstructed.
8. Designed to include directional arrows on each sign.
H. Temporary off-site subdivision directional signs. Portable off-site residential subdivision signs
which provide directional assistance only shall (See also Off-site directional signs - Section D3-53,
below) be:
1. "A-frame" in design. "Stick signs" are strictly prohibited.
2. Limited to 48 inches in height and six square feet in total sign face area.
3. Allowed only on weekends between Saturday at 9:30 a.m. and removed no later than Sunday
at sunset.
4. Placed behind the sidewalk, and shall not encroach within the public rights-of-way (e.g., bicycle
paths, medians, or sidewalks). Signs shall not be placed on fences, utility poles, or walls.
5. Allowed only for developments that are located within the City of San Ramon or the City's
Sphere of Influence.
6. Removed when the remaining, unsold units are turned over to brokers for disposal, or within a
90-day period following the approval of a Master Off-Site Directional Program in compliance
with Section D3-53, whichever first occurs.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-80
7. Not be visible from a freeway or along the freeway's on-/off-ramps.
8. Limited to:
a. One sign for each direction, at any intersection for each subdivision;
b. Eight signs for each subdivision, placed not less than 1,000 feet apart; and
c. A maximum combined total of eight temporary off-site residential real estate signs and
temporary off-site subdivision directional signs at major arterial/collector street
intersections; provided, motorist visibility is not obstructed. Signs on secondary or
residential street intersections shall be limited to a maximum combined total of four
temporary off-site residential real estate signs and temporary off-site subdivision
directional signs; provided, motorist visibility is not obstructed.
9. Designed to include directional arrows.
I. Temporary on-site commercial real estate signs. Temporary on-site commercial real estate signs
which are intended to identify a commercial, office, or industrial property for lease, rent, or sale shall
be: (See Subsection D3-45 E. [Commercial and industrial real estate signs], above)
1. A maximum of 12 square feet in total sign face area and five feet in maximum height measured
from the top of the sign to the ground directly below it. When situated within 30 feet of a
permanent monument sign, the maximum sign face area of the temporary sign shall be reduced
to 50 percent of the adjoining monument sign face area.
2. Limited to one sign for each site or structure, unless additional signs are authorized by the ARB
and Zoning Administrator when necessary for proper identification.
3. Located on the site it is identifying for lease, rent, or sale and not located within any public street
right-of-way.
4. Not be visible from a freeway or along the freeway's on-/off-ramps.
5. The Sign Permit shall clearly identify the specific suite, site, or structure for which the permit is
issued to ensure compliance with Subparagraph 6 below.
6. Removed no later than 30 days from the issuance of building occupancy unless authorized by
an approved Master Sign Program. (See Section D3-52, below)
7. Subject to a Master Sign Program if required by this Chapter before building occupancy. (See
Section D3-52, below)
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-81
J. Temporary political signs shall:
1. Pertain to a ballot measure, candidate, or issue to be voted upon within 90 calendar days of the
initial date of posting.
2. Be no larger than 32 square feet in total sign face area and have a maximum height of eight
feet measured from the top of the sign to the ground directly below it.
3. Not be placed within the public right-of-way or visible from a freeway or along the freeway's on-
/off-ramps.
4. Be removed within seven calendar days following the election.
5. Comply with the requirement that the party responsible for the sign's removal shall, before the
sign's installation, file a statement of responsibility with the City Clerk certifying that the
temporary political sign will be removed within the required time limits identified in this
Subsection.
K. Temporary construction signs shall be:
1. No larger than 32 square feet in total sign face area and maximum 10 feet in height measured
from the top of the sign to the ground directly below it.
2. Limited to one sign for each project and may identify only the name of the project and the
general contractor and/or development company sponsoring the work in-progress as well as
one telephone number for each sponsor.
3. Located on the same site as the construction work in progress.
4. Removed upon final certificate of building occupancy or as required by the Zoning
Administrator.
L. Temporary advertising/promotional signs. Advertising/promotional signs which are intended to
advertise or promote a tenant "grand opening", relocation, "going out of business", etc. or a special
event within and sponsored by a shopping center/area (e.g., a "sidewalk" sale) or special seasonal
sales event (e.g., "back to school" sale), shall be:
1. A banner, flag, pennant, or other similar device without advertising copy other than the tenant
and/or center name, and the announcement of the aforementioned allowed events and shall be
placed on the structure exterior and secured to or suspended from a building wall or flag pole.
The signs and/or flags shall not be affixed/attached to a fence, roof, screen wall, or tree.
Tethered balloons and inflatable signs are prohibited.
2. Limited to one sign for each tenant and a maximum of two commercial center-sponsored signs
for each commercial center or area.
3. Limited to a 21 consecutive day installation period for each event and a maximum of once each
calendar quarter.
4. Professionally designed and fabricated from durable and weatherproof materials.
5. Limited to 12 feet in height measured from the top of the sign to the ground directly below it.
6. Located to ensure that the sign does not block required pedestrian and/or vehicle accessways,
create safety hazards, and/or obstruct signs identifying adjoining establishments.
7. Subject to a Master Sign Program if required by this Chapter. (See Section D3-52, below)
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-82
M. Temporary advertisement/promotional window signs. Signs which are installed on a temporary
basis only on the interior of a window to advertise an event, product, sale, and/or services shall be:
1. Limited to 21 consecutive days within each calendar quarter, except they are allowed without
the 21-day time restriction between the day before Thanksgiving through January 2nd of the
following year.
2. Subject to the window coverage requirements of this Chapter. (See Subsection D3-47 B.
[Window signs], above)
3. Located to ensure that the sign does not block or impede the line-of-sight or surveillance as
required by Section D3-47 B. [Window signs], above.
4. Subject to a Master Sign Program if required by this Chapter. (See Section D3-52, below)
N. Portable signs. Portable signs which are intended to provide directional assistance to a tenant space
within a commercial zone shall be:
1. Located within proximity of the tenant's primary entrance, limited to one sign for each tenant,
and shall not be visible from a public street.
2. The maximum sign area shall not exceed 48 inches high by 30 inches wide.
3. Subject to a Master Sign Program if required by this Chapter. (See Section D3-52, below)
4. Prohibited within any location which would block and/or impede vehicular/pedestrian travelways
or walkways, obstruct signs identifying adjoining establishments, and/or placed within any
required setback or landscaped areas.
O. Temporary special event signs. Temporary special event signs, subject to the approval of the
Department, for temporary uses which are intended to advertise seasonal events or special
exhibitions (e.g., arts and crafts fairs circus/carnivals, etc.), as defined in Municipal Code Division B1,
Chapter IV (Special Events) may be authorized by a Special Events Permit when approved by the
Parks and Community Services Director. Seasonal events related to the sale of agricultural products
require a Special Events Permit issued by the Parks and Community Services Director. Sidewalk
sales and similar events related to permanent businesses require a Temporary Use Permit.
P. Temporary business identification signs. Temporary business identification signs, which are
intended to provide identification of a business before installation/placement of a permanent
identification sign, shall be:
1. Generally conforming to the temporary advertising/promotional sign locational regulations
identified in Section D3-47 M. [Temporary advertising/promotional signs], above and as
modified below.
2. Allowed for a maximum period of 90 consecutive days with the prior approval of the Zoning
Administrator.
3. Removed and replaced with a permanent business identification sign approved by the ARB
and/or the Zoning Administrator.
4. Temporary banner signs may be used in compliance with Subsection L. (Temporary
advertising/promotional signs), above.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-83
Q. Office structure identification sign(s) shall be:
1. Subject to the same sign area regulations identified for wall signs in Subsection D3-47 A. [Wall
signs], above.
2. Limited to one wall-mounted sign or logo which is intended to identify a structure complex name.
One sign shall be allowed for each structure elevation that fronts a public street or freeway.
3. Located below the roofline or parapet at a height and scale architecturally in harmony with the
structure unless an increased height is authorized by the Planning Commission. (See Section
D3-47 C. [Roof signs], above)
4. Constructed of individual channel letters or internally-illuminated letters and/or logo.
5. Subject to a Master Sign Program if required by this Chapter. (See Section D3-52 below).
R. Freeway-oriented building-mounted signs. Freeway-oriented building-mounted signs which are
intended to identify a structure name, address, a structure or corporate logo, and tenant names shall
be:
1. Prohibited on windows and/or as free-standing signs. Only allowed as “building-mounted”
freeway-oriented signs; no modification or waiver of this prohibition may be allowed.
2. Allowed for a commercial or office center consisting of six or more tenants, or a single-tenant
structure having a gross floor area of 50,000 square feet or more.
3. Limited to building walls having direct physical freeway frontage.
4. Limited to one wall sign for each tenant on a building wall physically located adjacent to and
visible from the freeway.
5. Subject to the same sign area regulations identified for wall signs in Subsection D3-47 A. [Wall
signs], above.
6. Constructed of individually illuminated channel letters rather than can-type signs.
7. Subject to a Master Sign Program if required by this Chapter. (See Section D3-52, below)
S. Freeway-oriented business park identification signs. Freeway-oriented business park
identification signs (i.e., free-standing signs, etc.) directly adjacent to Interstate 680 consisting of 100
acres or more are intended to identify a business park, address, tenants within a business park,
structure name, or a structure or corporate logo. Such signs shall be subject to a Master Sign
Program and/or MSP Amendment with Planning Commission approval. (See Section D3-52, below).
In addition to approval of a Master Sign Program, all signs visible from a State highway or freeway
shall be subject to the regulations contained in the California Outdoor Advertising Act, Chapter 2,
Division 3, of the Business and Professions Code.
T. Theatre or cinema signs shall be:
1. Subject to the Zoning Administrator’s approval if the signs deviate from the regulations of this
Chapter (e.g., brighter lights, increased sign area and height, etc.) and only if the modifications
are compatible with the structure design and character of the area. (See Subsection D3-47 C.
[Roof signs], below)
2. Limited to the name of the establishment and the changeable copy type of sign for the show
listings.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-84
U. Public transit shelter signs shall be:
1. Prohibited within any residential zone and limited to the commercial, industrial, office, and public
zones.
2. Authorized only on shelter structures approved by the Council as part of a Citywide master plan.
3. Subject to the sign area, design, and locational criteria established by the Citywide master plan.
4. Installed only by the vendor(s) authorized by the Citywide master plan.
5. Removed immediately when required by the Zoning Administrator based on non-compliance
with this Chapter or when in response to general public complaint(s).
6. Subject to the required findings established by the adopted Council policy for
advertisement/display standards in compliance with the following:
a. All advertisement shall adhere to decency in text and photography;
b. Advertisements on alcohol, political, religious, pornographic, tanning, or tobacco material
are prohibited;
c. Offensive language and colors (e.g., neon colors) are prohibited; and
d. Excessive violence and adult themes are prohibited.
D3-48 - Miscellaneous Signs
A. Noncommercial murals and displays. Noncommercial murals, large graphic designs, and statuary
are permissible with approval by the Zoning Administrator; provided, they do not contain advertising
messages, and further provided, the displays will not pose a hazard to public health, safety, or welfare.
B. Zoning Administrator and ARB approval required. The painting or decorating of a structure in a
manner designed to convey a message to viewers shall be considered a sign for the purposes of this
Zoning Ordinance and shall first require both Zoning Administrator and ARB review and approval.
D3-49 - Illumination of Signs
A. No exposed tubes or bulbs. Signs shall not have exposed fluorescent tubes or incandescent bulbs.
B. Shielding of light fixtures required. All fixtures shall be shielded and properly focused to minimize
glare and excessive nighttime illumination.
C. Limitation on illumination. Signs immediately contiguous to and adjoining with any residential zone
shall not be illuminated between the hours of 10:00 p.m. and 6:00 a.m. unless they identify an
establishment open for business during those hours, and further provided the lighting is subdued to
minimize potential impacts (e.g., glare).
D3-50 - Prohibited Locations, Sign Types, and Messages
The following locations and types of signs or advertising devices are prohibited within the City:
A. Banners, flags, pennants, and similar advertising devices. Banners, flags, pennants, and similar
advertising devices with advertising copy mounted to an exterior building wall or suspended from a
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-85
building wall, flag pole, or similar structure, except when authorized as part of a Master Sign Program
(See Section D3-52) or allowed as a temporary sign. (See Sections D3-47 L. [Temporary
advertising/promotional signs], M. [Temporary advertisement/ promotional window signs], O.
[Temporary special event signs], and P. [Temporary business identification signs])
B. Flashing, moving, or rotating signs. Flashing, moving, or rotating signs, except for barber poles
and changeable copy for theater and cinema marquee signs and scoreboards and reader boards on
public property.
C. Freeway exposed signs. Free-standing signs not within a business park, window signs, and "for
sale/rent/lease" signs of any type which are designed, oriented, or placed for freeway exposure and
which are visible from the freeway or a freeway on- and off-ramp.
D. Home occupations. Signs identifying a home occupation.
E. Off-site directional signs. Off-site signs or off-site directional signs, except signs allowed for a site
or business not fronting on a public or private street (See Subsection D3-47 E. [Off-site signs]), as a
temporary sign (See Subsections D3-47 G. [Temporary off-site residential real estate signs] and H.
[Temporary off-site subdivision directional signs]) or allowed by a Master Off-Site Directional Sign
Program (See Section D3-53).
F. Off-site signs. Off-site signs or billboards are prohibited anywhere within the City.
G. Outdoor advertising signs. Outdoor advertising signs, except as authorized as a temporary
advertising/ promotional sign or window sign, portable sign, or as allowed as a temporary special
event sign. (See Subsections D3-47 L. [Temporary advertising/promotional signs], M. [Temporary
advertisement/ promotional window signs], N. [Portable signs], and O. [Temporary special event
signs])
H. Penthouse signs. Penthouse signs and signs projecting above a roofline except as allowed as a
roof sign. (See Subsections D3-47 C. [Roof signs] and S. [Theatre or cinema signs])
I. References to obscene matter. Signs containing pictures, statements, words, or other
representations which are in reference to obscene matter which violate the California Penal Code,
Section 311 et. seq.
J. Searchlights. The use of outdoor searchlights when used for advertising or “attention-getting”
purposes, except when authorized with a Temporary Use Permit (See Section D6-27).
K. Signs on public transit shelters. Signs on public transit shelters when located within a residential
zone.
L. Signs on vehicles. Signs which are either painted-on, placed on, and/or attached to a vehicle parked
on a public or private street for a period exceeding 72 consecutive hours which is clearly intended to
provide advertisement and/or directional assistance.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-86
M. Signs within the public right-of-way. Signs located within the public right-of-way excluding
governmental signs and public information signs, except when authorized by an Encroachment
Permit and allowed as a temporary sign. (See Subsections D3-47 F. [Temporary on-site residential
real estate signs], G. [Temporary off-site residential real estate signs], and H. [Temporary off-site
subdivision directional signs])
N. Similar to traffic directional signs or devices. Signs with colors, design, lighting, or text that could
be confused with a public traffic directional sign or control device.
O. Tethered balloons or inflatable signs. Tethered balloons or inflatable signs.
P. Use of improper materials. Exterior signs made of materials which are impermanent and will not
stand exposure to weather.
Q. Window Signs with Opaque Materials/Window Tint. Window signs with opaque materials, and/or
window tint that are positioned in a fashion so that they obscure the vision of the indoor activities by
law enforcement personnel. Also prohibited are merchandise displays and similar signage that
functional obscure the minimum visibility indoor activities by law enforcement personnel. The
standard is not to prohibit all window tinting and display areas, but rather protect the minimum visibility
need to promote security.
D3-51 - Maintenance, Abandonment, and Removal
A. Maintenance required. All signs, including banners, flags, pennants, and awnings with signs, shall
be properly maintained in good repair and shall be cleaned, painted, or replaced as necessary to
present a neat appearance.
B. Removal following discontinuance. An on site sign advertising an activity, business, product, or
service shall be removed within 30 calendar days following the actual discontinuance of the activity,
business, or service.
D3-52 - Master Sign Program Required
A. Purpose. Regulations for Master Sign Programs are to:
1. Identify criteria for the construction, design, and placement of signs (including temporary
banners and flags) which are specific to a commercial or multi-family residential development
and which would be compatible with the site planning and structure design of the entire area.
2. Ensure the reasonable compatibility of signs within the development regarding sign color,
design theme, location, materials, number, and size.
3. Provide a coordinated approach to providing adequate directional signs and/or identification
within the development to ensure pedestrian and vehicle safety and to promote the economic
viability of the development.
B. Applicability/application processing.
1. Applicability. The following projects shall require a Master Sign Program or Master Sign
Program Amendment. A Master Sign Program shall be reviewed by the ARB with a
recommendation to the Zoning Administrator. A Master Sign Program Amendment shall be
reviewed by the Zoning Administrator unless otherwise identified in Section D3-47 Specific Sign
Regulations.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-87
a. Residential development. Any site occupied by a multi-family residential development
when more than one permanent sign (e.g., directory and directional signs) is proposed
on the site.
b. Nonresidential development.
(1) Any site having six or more nonresidential occupants/tenants.
(2) Projects involving the construction or renovation of more than 25,000 square feet
of gross floor structure area within a nonresidential zone.
2. Concurrent application processing required. A Master Sign Program shall be filed with and
processed concurrently with the application for any new development identified in
Subparagraph B. 1, above.
3. Effect of Master Sign Program. Approval of a Master Sign Program shall supersede the
regulations of this Chapter. Any aspect of the proposed signs not addressed by the Master
Sign Program shall be in compliance with this Chapter.
C. Required application materials. Applications for approval of a Master Sign Program shall include
the following minimum required information and materials.
1. It is recommended that the Master Sign Program be prepared by a design professional in
consultation with a retail/marketing consultant or analyst who will provide recommendations
regarding the specific sign locations, number, and sizes based on the major vehicular and/or
pedestrian traffic patterns serving the development. A letter or statement from the design
professional and retail/marketing consultant should accompany the application materials
verifying their review of the program.
2. A letter of application explaining how the proposal will modify any of the regulations or standards
of this Chapter, including explanations for how these would contribute to a superior site design,
structure appearance, and sign program than would otherwise result from the strict compliance
with Section D3-47 (Specific Sign Regulations), above.
3. A detailed and accurate site plan, drawn to scale, delineating the entire site showing the location
of all structures, on-site vehicular access, signs, banners and flags, adjoining streets, and/or
landscaping to be removed, to remain, and/or proposed for installation.
4. Drawings and/or sketches, drawn to scale and dimensioned, showing the proposed sign
dimensions and location on the building wall(s); the exterior surface details, and materials of
the building walls.
5. Drawings and/or sketches, drawn to scale and dimensioned, showing the proposed sign face
dimensions, lettering size and script style, materials, and colors.
6. Drawings showing the method of illumination, if any. Manufacturer specifications may be
submitted in lieu of detailed drawings.
7. Written provisions outlining the proposed sign criteria to include: the number of signs for each
building frontage; lettering size and style; sign colors; sign face area(s); sign materials; window
signs; method of illumination, and landscape treatments. Additionally, guidelines for individual
tenant window signs and center-sponsored temporary advertisement/promotional signs shall
be provided along with any other written provisions the Zoning Administrator may determine to
be necessary.
8. The Zoning Administrator may require additional information as necessary to properly describe
and analyze the application.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-88
D. Design guidelines. The following guidelines shall be considered when proposing sign location,
design, and construction. While compliance is not mandatory, adherence to the guidelines is always
strongly encouraged.
1. Deviation from identified standards. Sign face area and sign heights may deviate from
Section D3-47, above, based on the required findings contained in Subsection D3-52 E., below.
2. Directory signs for multi-tenant centers. For multi-tenant centers with six or more tenants,
directory signs are encouraged to direct internal pedestrian and vehicle circulation. However,
the directory signs shall not be so prominent as to call attention to themselves from the public
street.
3. Free-standing signs.
a. More than one free-standing sign may be allowed for each site frontage when the
requirements identified in Subsection D3-47 D. [Free-standing or monument signs],
above are met.
b. Free-standing signs should be designed to accommodate the structure name, address,
and/or anchor tenants, and leasing information.
4. Kiosks or bulletin boards. Kiosks or community bulletin boards should be provided and
properly located within the development.
5. Landscaping. Site landscaping shall be designed to minimize visual obstructions of the
structure and/or individual signs, while still enhancing the visual appearance of the structures
and signs.
6. Leasing information. Leasing information shall be designed as an integral part of the Master
Sign Program.
7. Portable signs. Uniform size, graphic, design, and materials for portable signs within a center
are strongly encouraged. (See Subsection D3-47 N. [Portable signs], above)
8. Single-tenant free-standing signs discouraged. Single-tenant free-standing signs within
multi-tenant centers are strongly discouraged. However, single-tenant free-standing signs may
be allowed:
a. If the requirements identified in Subsection D3-47 D. (Free-standing or monument signs),
above are met; and
b. More than one free-standing sign may be allowed for each site frontage when the
requirements identified in Subsection D3-47 D. [Free-standing or monument signs],
above are met.
c. When it can be demonstrated that the sign is necessary to provide business awareness
and enhance pedestrian and vehicle safety.
9. Sufficient wall or facade area to be provided. The structure should be designed so that
sufficient wall or facade area is provided for the structure name and logo (if any), as well as to
address tenant signs and/or leasing information.
10. Wall-mounted signs and/or logos. A maximum of one wall-mounted sign and/or logo for each
tenant for each building elevation is allowed which should be physically related to the tenant
entrance. The total number and locations of tenant signs on a wall or structure visible from the
freeway should be determined based on design considerations of scale and proportion, the
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-89
ability of the signs to provide identification and directional assistance, and the enhancements
to the structure's appearance.
E. Required findings. In approving a Master Sign Program, the ARB and/or the Zoning Administrator
shall first find that:
1. The plan's contribution to the design quality of the site and surrounding area will be superior to
the quality that would result under the regulations and standards identified in Sections D3-45
and D3-47, above; and
2. The plan is generally consistent with the criteria identified in Section D3-43 (Criteria and
Guidelines) and achieves the purposes identified in Subsection D3-52 A. (Purpose), above.
D3-53 - Off-Site Directional Signs
A. Purpose. The purpose of establishing regulations for the location and design of off-site directional
signs is to direct the public to major residential areas and major commercial retail shopping and office
areas thereby:
1. Promoting economic viability and community identity;
2. Ensuring traffic safety and traffic flow; and
3. Creating a unified sign program which contributes to the high quality image and character of
the City's streetscape.
B. Off-site directional signs defined. Off-site signs refer to a directional sign representing a major
residential subdivision, multi-family residential development, or major commercial retail shopping or
office area which is located on a site other than the one on which the sign is located. A sign structure
consists of multiple keyboard or identification sign panels which is permanently affixed to the ground
and sited in compliance with this Section.
C. Applicability. A Master Off-Site Directional Sign Program shall require ARB and Planning
Commission review for the following:
1. Major residential subdivisions and multi-family residential developments. Residential
subdivisions and multi-family residential developments consisting of 100 or more dwelling units.
2. Major commercial retail and/or office centers. Commercial retail and or office centers
consisting of 200,000 gross square feet or more of leasable tenant space. However,
commercial retail and/or office centers with less than 200,000 gross square feet of leasable
tenant space shall also be eligible for a Master Off-Site Directional Sign Program, but only when
all of the following findings can first be made:
a. Aggregation of the subject commercial retail and/or office centers with adjacent
commercial retail and /or office centers to achieve the minimum required 200,000 square
feet is not physically possible due to the surrounding development patterns and/or land
use classification(s);
b. The subject commercial retail and /or office center is located more than one-quarter mile
from a community-serving or neighborhood-serving commercial retail shopping center
within the San Ramon City limits;
c. The subject commercial retail and/or office center consists of no less than 95,000 gross
square feet of leasable tenant space; and
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-90
d. The identity of the commercial retail and/or office center does not interfere with the identity
of surrounding commercial retail and office centers.
D. Design standards.
1. The approved sign structure(s) shall be constructed and painted in a consistent color scheme.
2. Each sign structure, including the top of the logo, shall not exceed a height of 12 feet when
measured from the top of the sign to the ground directly below it.
3. The ground within a three-foot radius of the sign structure shall be landscaped or paved, and
maintained in a manner that prevents weed growth under the sign structure.
4. Individual keyboard for seven signs on the approved sign structures shall be no greater than 12
inches high by 48 inches long in size and feature a uniform background color. No more than
seven signs with a maximum of six-inch high letters shall be located on each sign structure and
the lowest sign shall be a minimum of two feet above grade.
5. Individual keyboard signs shall be allowed various compatible colors on a uniform background
and shall be consistent with the marketing colors used to advertise or identify the subdivision,
multi-family residential development, and/or commercial retail and/or office center.
6. A directional arrow measuring five inches high by 12 inches long shall be shown on each
individual sign, and shall be located on the side of the sign closest to the street right-of-way.
7. Each sign structure shall be designed to include the City of San Ramon’s logo at the top of the
sign structure, or as recommended by the ARB and approved by the Commission.
8. As determined by the Director, requests for modification(s) to the design of the off-site
directional sign(s) following review by the ARB and the review and approval of the Commission
shall require subsequent review and approval by the same review authorities.
E. Locations.
1. The general locations of the off-site directional signs shall be indicated on a master off-site
directional sign map approved as part of a Master Off-Site Directional Sign Program. The exact
sign structure locations shall be determined by the ARB and the Commission so that the sign
structures create an attractive streetscape.
2. The locations of the off-site directional signs shall be typically limited to the major arterial streets
within the City (as defined by the General Plan) and shall be located no closer than one-quarter
of a mile apart, unless an exception is necessary to properly identify a City or public facility.
The precise location of these structures shall comply with the "driveway visibility" requirements
in Section D3-37 (Driveways and Site Access).
3. Before installation of the off-site directional signs, all required permits shall be obtained from
affected public jurisdictions by the management company, including any City-issued
Encroachment Permits, in order to establish off-site directional sign structures within the public
rights-of-way.
F. Implementation.
1. The City shall license a management company to administer, implement, install, and maintain
the off-site directional signs. This provision does not preclude the City from acting as the
management company.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-91
2. Before the construction and installation of the approved off-site directional signs, the authorized
management company shall obtain City approval of a leasing program which will include a sign
keyboard rental price structure and the specific lease terms including on-going maintenance
responsibilities.
3. It shall be the responsibility of the authorized management company to ensure that all sign
structures under its control, as approved by the City, are well maintained and are not allowed
to become unsightly and/or hazardous. Noncompliance will be reported to the respective
management company for correction with 14 days and if the situation does not improve, the
City shall have the right to perform corrective actions at the management company's expense,
and may cancel the management company's license for good cause.
4. The City may require a refundable cash deposit in the amount to be determined by the City
Engineer for each sign installation in order to ensure the removal or replacement of the off-site
directional sign key blades for a residential subdivision within 14 days of the closing of the
subdivision model home complex. If the sign has not been completely removed/replaced within
the specified period, the City shall have the right to remove/replace the sign and deduct the
costs from the cash deposit(s). Additional costs shall be charged to the developer or the
management company.
5. Before the construction and installation of the approved off-site subdivision direction signs, the
approved management company shall demonstrate to the satisfaction of the City that lease
arrangements have been secured with development representatives to utilize keyboard or sign
blades for advertisement purposes. The City may delay the installation of one or more signs if
sufficient interest or lease(s) has not been secured by the management company.
6. Each approved sign structure shall require a City-issued Building Permit. The individual
keyboard signs shall be subject to City administrative review and approval before placement on
the individual sign structures to determine exact sign blade locations.
7. The written consent of the affected property owner(s) shall be provided to the City by the
authorized management company before sign construction and installation.
8. Individual keyboard signs shall not be modified to identify different subdivisions/developments
without first obtaining ARB approval from the City.
9. Individual keyboard signs shall be allowed on the approved sign structures until the model home
complex for the subdivision has been closed.
10. The approved off-site directional sign structures shall be allowed for a maximum period of five
years. After which, if additional time is required, the management company shall first apply for
and receive an extension of the program from the City.
11. Off-site directional sign structures identifying developments located outside of the City limits are
prohibited unless first authorized by the City, to provide direction to a regionally-serving cultural
facility or other public facility.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-92
D3-54 - Approvals Required
Non-exempt signs may be subject to ARB review and approval when required by the Zoning Administrator
or the Commission in compliance with this Section. At the discretion of the Zoning Administrator, any non-
exempt sign may be referred to the Commission.
A. Zoning Administrator review and action required. The Zoning Administrator shall review and take
action on the following types of signs, unless otherwise required by this Chapter.
1. All free-standing signs.
a. See Subsection D3-47 D. [Free-standing or monument signs], above.
b. Free-standing monument signs with less than 30 feet of separation from another free-
standing monument sign.
c. Free-standing monument signs exceeding more than one sign for each site frontage.
2. Freeway-oriented building-mounted signs. (See Subsection D3-47 R. [Freeway-oriented
signs], above)
3. Master Sign Programs. (See Section D3-52, above)
4. Amendments to Master Sign Programs.
5. Miscellaneous signs. (See Section D3-48 [Miscellaneous Signs], above)
6. Public transit shelter signs. Public transit shelter sign design, size, and location standards.
(See Subsection D3-47 U. [Public transit shelter signs], above)
7. Roof, wall, and window signs. (See Subsections D3-47 A. [Wall signs], B. [Window signs],
and C. [Roof signs], above)
8. Temporary signs. (See Subsections D3-47 F. [Temporary on-site residential real estate
signs], G. [Temporary off-site residential real estate signs], H. [Temporary off-site subdivision
directional signs], I. [Temporary on-site commercial real estate signs], L. [Temporary
advertising/promotional signs], N. [Portable signs], O. [Temporary special event signs],
and P. [Temporary business identification signs], above)
9. Theatre and cinema signs. (See Subsection D3-47 T. [Theatre or cinema signs], above)
B. Planning Commission review and action required. The Planning Commission shall review and
take action on the following types of signs, unless otherwise required by this Chapter.
1. Off-site signs. (See Subsection D3-47 E. [Off-site signs], above)
2. Off-site directional signs (Master Off-Site Directional Sign Program). (See Section D3-53,
above)
3. Wall signs exceeding a sign area of 0.75 square feet for each one linear foot of wall length.
(See Subsection D3-47 A. [Wall signs], above)
4. Wall/window signs higher than the allowed structure height. (See Subsection D3-47 A. [Wall
signs], above)
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-93
5. Freeway-oriented business park identification signs. (See Subsection D3-47 S. [Freeway-
oriented business park identification signs], above)
D3-55 - Required Findings
A. Master Sign Programs. In approving a Master Sign Program, the Zoning Administrator shall make
the required finding identified in Section D3-52, above.
B. Public transit shelter signs. In approving a public transit shelter sign, the Zoning Administrator shall
make the required finding identified in Subsection D3-47 U. [Public transit shelter signs], above.
C. Sign Permits. In approving a Sign Permit, the Zoning Administrator shall make the required findings
that the application is in general compliance with the criteria identified in Section D3-43 (Criteria and
Guidelines).
D3-56 - Sign Permit Required
No sign regulated by this Chapter shall be erected or displayed unless a Sign Permit is first approved by
the Zoning Administrator, unless otherwise required by this Chapter. Exempt signs shall not require a Sign
Permit.
A. Signs not in compliance with this Chapter. All legally erected/installed signs not in compliance
with this Chapter, existing on the date of adoption of this Zoning Ordinance, are allowed to remain in
use until there is a request to change the sign or an application for a new Sign Permit is submitted for
any sign related to the subject business or development. Sign Permits for new signs may be
conditioned upon removal of an existing sign(s) made nonconforming by this Chapter. Any other
signs not otherwise legal shall be removed.
B. Alteration or change to an existing sign face.
1. Any alteration to or change of an existing sign face shall be subject to the applicable provisions
of this Chapter.
2. The owner, or assigned agent, shall obtain a Sign Permit before making the alterations or
changes to an existing sign face.
3. No Sign Permit is required for repainting a sign the same color(s), cleaning, or other normal
maintenance or repair of a sign, as long as the sign is not structurally modified in any manner.
C. Signs granted an exception by the City. Any sign in existence on the date of adoption of this
Zoning Ordinance which has been granted an exception by the City, may undergo a change to the
sign face; provided, the factors justifying the original exception still apply.
D3-57 - Owner’s Consent Required
No sign shall be placed on a property without the written consent of the property owner.
Signs D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-94
D3-58 - Sign Permit Applications
A Sign Permit application form shall be filed with the Department. The application shall contain the name,
address, and telephone number of the applicant, signature or letter of authorization from the property owner,
and the location of the structure or property on which the proposed sign(s) is to be placed. Sign plans shall
be drawn to scale and shall be clear and legible and consistent with professional standards. The sign
application shall include the following:
A. Architectural details, site plan information and elevations. Architectural details, site plan
information, and elevations of the structure in context to the project architecture. The site plan shall
show the location of all sign(s) existing, proposed, and to be removed.
B. Other information required by the Zoning Administrator. The application shall include other
information, attachment details or exhibits, colors, and material samples as the Zoning Administrator
may require.
C. Application fee. The application shall be accompanied by an application fee in compliance with the
City's Fee Schedule.
D. Consistency with Master Sign Program materials. Consistency with the Master Sign Program
required application materials. (See Section D3-52, above)
D3-59 - Building Permit Required
All signs shall require a Building Permit, except for those signs identified in Section D3-45 (Exempt Signs -
Signs Not Requiring a Sign Permit) as determined by the Chief Building Official, above.
D3-60 - Required Inventory of Illegal or Abandoned Signs
A. Inventory required. In compliance with State Law, the Zoning Administrator shall compile an
inventory of all illegal or abandoned signs within the City.
B. Identify location of each illegal or abandoned sign. The inventory shall specifically identify the
location of each illegal or abandoned sign by lot and block number and by street address, the sign's
legal owner or leaseholder, and the specific standards that are violated or the approximate date of
abandonment, as the case may be.
C. Establishment of an initial date for amortization. This inventory shall be used to establish an initial
date for amortization of nonconforming signs under the provisions of this Chapter.
D. Inventory to be updated twice annually. The inventory shall be updated at least twice annually to
include additional illegal signs resulting from Zoning Map amendments and additional abandoned
signs, as needed.
D3-61 – Reserved
D3-62 – Reserved
D3-63 – Reserved
Portable Outdoor Storage Units D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-95
Chapter V – Portable Outdoor Storage Units
Sections:
D3-64 - Purpose of Chapter
D3-65 - Definitions
D3-66 - Number, Size, Duration, and Location
D3-67 - Signage
D3-68 - Maintenance and Prohibition of Hazardous Materials
D3-69 - Reserved
D3-70 - Reserved
D3-71 - Permits
D3-72 - Reserved
D3-73 - Reserved
D3-64 - Purpose of Chapter
A. Purpose of Chapter.
This Chapter provides standards and regulation for the use of portable outdoor storage units on
residential and non-residential properties.
D3-65 - Definitions
Portable outdoor storage unit. Any container designed for the transportation and/or storage which is
typically rented to owners or occupants of property for their temporary use and which is delivered and
removed by truck.
Volume. A volume of portable outdoor storage unit is calculated with exterior measurements of each unit.
Total Volume. A total volume is the sum of volumes of multiple portable outdoor storage units to be kept
on a site under a single temporary use permit.
D3-66 – Number, Size, Duration, and Location
A. Residential Properties.
There shall be no more than a total volume of 1,050 cubic feet of outdoor storage units, which shall
be no more than eight (8) feet in width and eight (8) feet six (6) inches in height, per site. No portable
outdoor storage units shall remain at a site in excess of 30 consecutive days in a 12-month period.
The Zoning Administrator may authorize the use of portable outdoor storage units up to 90
consecutive days as long as a building permit has been obtained and construction diligently
commenced or upon the findings that an unusual circumstance exist as determined by the Zoning
Administrator. A portable outdoor storage unit shall be placed in a driveway, on a paved surface, or
in the rear yard if alley access exists at the rear of the site, with a minimum setback of 1 foot from the
front property line and 3 feet from the side and rear property lines.
Portable Outdoor Storage Units D3
Division D3 – Site Planning and Project Design Standards – Effective February 28, 2020 3-96
B. Non-Residential Properties.
The allowed number and sizes of portable outdoor storage units shall be determined by the Zoning
Administrator. No portable outdoor storage unit shall be placed at any site in excess of fifteen (15)
consecutive days, and in excess of thirty (30) days in a 12-month period. Portable outdoor storage
units shall be placed only in the rear or side portion of a site. Under no circumstances shall a portable
outdoor storage unit be placed in an area fronting a street or road, or in the front parking lot of a
commercial establishment. The placement of portable storage units in fire lanes, passenger loading
zones, or commercial loading zones shall be strictly prohibited unless approved by the Zoning
Administrator.
Any portable outdoor storage unit(s) to be placed at any site in excess of fifteen (15) consecutive
days, and/or in excess of thirty (30) days in a 12-month period shall be subject to the provision of
Section D6-28 Minor Use Permit.
D3-67 – Signage
A portable outdoor storage unit shall have no signage other than the name, address, and telephone number
of the person or firm engaged in the business of renting or otherwise placing the portable outdoor storage
unit.
D3-68 – Maintenance and Prohibition of Hazardous Materials
The owner and operator of any site on which a portable outdoor storage unit is placed shall be responsible
to ensure that the portable outdoor storage unit is in good condition, free from evidence of deterioration,
weathering, discoloration, rust, ripping, tearing or other holes or breaks. When not in use, the portable
outdoor storage unit shall be kept locked. The owner and operator of any site on which a portable outdoor
storage unit is placed shall also be responsible that no hazardous substances, as defined in Section D3-5
of this Code, are stored or kept within the portable outdoor storage unit.
D3-69 – Reserved
D3-70 – Reserved
D3-71 – Permits
It shall be unlawful for any person to place, or permit the placement of, one or more portable outdoor storage
unit(s) on property which he or she owns, rents, occupies, or controls without first having obtained a
temporary use permit. Application for a temporary use permit shall be made to the Zoning Administrator in
accordance with Section D6-16 and Section D6-27 of this Code. The issuance of a permit shall allow the
applicant to place portable outdoor storage units on the property in conformance with the requirements of
this chapter. The permit shall be posted in plain view at the site.
D3-72 – Reserved
D3-73 – Reserved
City of San Ramon Zoning Ordinance D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-1
Division D4
Standards for Specific Land Uses
Chapter I - Adult Business Regulations ................................................................................................ 4-3
D4-1 - Purpose ............................................................................................................................... 4-3
D4-2 - Definitions ............................................................................................................................ 4-4
D4-3 - Permitted Areas and Minimum Proximity Requirements ..................................................... 4-4
D4-4 - Use Permit Required ........................................................................................................... 4-4
D4-5 - Application Requirements .................................................................................................... 4-5
D4-6 - Investigation and Action on Application ............................................................................... 4-6
D4-7 - Appeal .................................................................................................................................. 4-7
D4-8 - Judicial Review of Decision to Grant, Deny, or Revoke ...................................................... 4-7
D4-9 - Permit Expiration ................................................................................................................. 4-7
D4-10 - Findings ............................................................................................................................... 4-7
D4-11 - Registration of New Employees .......................................................................................... 4-8
D4-12 - Adult-Oriented Business Development Standards .............................................................. 4-9
D4-13 - Display of Permit ............................................................................................................... 4-13
D4-14 - Persons Under 18 Prohibited ............................................................................................ 4-13
D4-15 - Transfer of Adult-Oriented Business Regulatory Permits ................................................. 4-13
D4-16 - Permit Revocation ............................................................................................................. 4-13
D4-17 - Violations ........................................................................................................................... 4-15
D4-18 - Applicability to Other Regulations...................................................................................... 4-15
D4-19 - Conduct Constituting a Public Nuisance ........................................................................... 4-15
D4-20 - Inspections......................................................................................................................... 4-16
Chapter II - Alternative Energy Structures .......................................................................................... 4-17
D4-21 - Purpose ............................................................................................................................. 4-17
D4-22 - Solar Energy System ......................................................................................................... 4-17
D4-23 - Wind Energy Equipment .................................................................................................... 4-18
Chapter III - Standards for Specific Land Uses ................................................................................... 4-21
D4-24 - Purpose ............................................................................................................................. 4-21
D4-25 - Applicability ........................................................................................................................ 4-21
D4-26 - Accessory Structures ......................................................................................................... 4-22
D4-27 - Bed and Breakfast Inns and Short Term Rentals .............................................................. 4-24
D4-28 - Card Rooms....................................................................................................................... 4-28
D4-29 - Child Day Care Facilities ................................................................................................... 4-28
D4-30 - Commercial Entertainment Facilities ................................................................................. 4-29
D4-31 - Employee Eating Areas ..................................................................................................... 4-30
D4-32 - Heliports ............................................................................................................................. 4-30
D4-33 - Home Occupations ............................................................................................................ 4-32
D4-34 - Live Entertainment ............................................................................................................. 4-33
D4-35 - Outdoor Display, Storage, and Vending ............................................................................ 4-34
D4-36 - Mobile Homes and Mobile Home Parks ............................................................................ 4-37
D4-37 - Recycling Facilities ............................................................................................................ 4-39
D4-38 - Non-Retail Uses in Retail/Commercial Centers ................................................................ 4-44
D4-39 - Accessory Dwelling Units .................................................................................................. 4-45
D4-40 - Service Stations and Car Washes ..................................................................................... 4-47
City of San Ramon Zoning Ordinance D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-2
Chapter IV - Wireless Telecommunications Facilities ........................................................................ 4-49
D4-41 - Purpose ............................................................................................................................. 4-49
D4-42 - Process and Applicability ................................................................................................... 4-50
D4-43 - Development Standards .................................................................................................... 4-52
D4-44 - Permitting Requirements ................................................................................................... 4-53
D4-45 - Performance Standards and Maintenance ........................................................................ 4-57
D4-46 - Administration .................................................................................................................... 4-58
D4-47 - Reserved ........................................................................................................................... 4-60
D4-48 - Reserved ........................................................................................................................... 4-60
D4-49 - Reserved ........................................................................................................................... 4-60
D4-50 - Reserved ........................................................................................................................... 4-60
D4-51 - Reserved ........................................................................................................................... 4-60
D4-52 - Reserved ........................................................................................................................... 4-60
D4-53 - Reserved ........................................................................................................................... 4-60
D4-54 - Reserved ........................................................................................................................... 4-60
Chapter V – Homless Shelters .............................................................................................................. 4-61
D4-55 - Purpose ............................................................................................................................. 4-61
D4-56 - Permit Requirements......................................................................................................... 4-61
D4-57 - Homeless Shelter Standards ............................................................................................ 4-61
D4-58 - Post-Approval Procedures ................................................................................................ 4-62
D4-59 - Reserved ........................................................................................................................... 4-62
D4-60 - Reserved ........................................................................................................................... 4-62
D4-61 - Reserved ........................................................................................................................... 4-62
D4-62 - Reserved ........................................................................................................................... 4-62
D4-63 - Reserved ........................................................................................................................... 4-62
D4-64 - Reserved ........................................................................................................................... 4-62
D4-65 - Reserved ........................................................................................................................... 4-62
Chapter VI - Reasonable Accommodation for the Disabled .............................................................. 4-63
D4-66 - Purpose ............................................................................................................................. 4-63
D4-67 - Process and Applicability ................................................................................................... 4-63
D4-68 - Reserved ........................................................................................................................... 4-64
D4-69 - Reserved ........................................................................................................................... 4-64
D4-70 - Reserved ........................................................................................................................... 4-64
D4-71 - Reserved ........................................................................................................................... 4-64
Chapter VII - Raising of Chickens ........................................................................................................ 4-65
D4-72 - Purpose ............................................................................................................................. 4-65
D4-73 - Applicablity and Standards ................................................................................................ 4-65
D4-74 - Reserved ........................................................................................................................... 4-65
D4-75 - Reserved ........................................................................................................................... 4-65
Chapter VIII - Density Bonus ................................................................................................................. 4-67
D4-76 - Purpose ............................................................................................................................. 4-67
D4-77 - Definitions .......................................................................................................................... 4-67
D4-78 - Process and Applicability .................................................................................................. 4-67
D4-79 - Application Requirements ................................................................................................. 4-68
D4-80 - Density Bonus Housing Agreement .................................................................................. 4-68
D4-81 - Reserved ........................................................................................................................... 4-69
D4-82 - Reserved ........................................................................................................................... 4-69
D4-83 - Reserved ........................................................................................................................... 4-69
D4-84 - Reserved ........................................................................................................................... 4-69
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-3
Chapter I - Adult Business Regulations
Sections:
D4-1 - Purpose
D4-2 - Definitions
D4-3 - Permitted Areas and Minimum Proximity Requirements
D4-4 - Use Permit Required
D4-5 - Application Requirements
D4-6 - Investigation and Action on Application
D4-7 - Appeal
D4-8 - Judicial Review of Decision to Grant, Deny, or Revoke
D4-9 - Permit Expiration
D4-10 - Findings
D4-11 - Registration of New Employees
D4-12 - Adult-Oriented Business Development Standards
D4-13 - Display of Permit
D4-14 - Persons Under 18 Prohibited
D4-15 - Transfer of Adult-Oriented Business Regulatory Permits
D4-16 - Permit Revocation
D4-17 - Violations
D4-18 - Applicability to Other Regulations
D4-19 - Conduct Constituting a Public Nuisance
D4-20 - Inspection
D4-1 - Purpose
A. Intent. It is the intent of this Chapter to provide special design guidelines, standards, and
development regulations to regulate the time, place, and manner of the operation of Adult-Oriented
Businesses in order to minimize the negative secondary effects associated with these business
including, but not limited to, increased crime, decreased property values, and the deterioration of
neighborhoods which can be brought about by the concentration of Adult-Oriented Businesses in
close proximity to each other or proximity to other incompatible uses, including churches, parks,
playgrounds, schools, and residential zones or uses. The Council finds that it has been demonstrated
in various communities that the concentration of Adult-Oriented Businesses causes an increase in
the number of transients in the area, and an increase in crime, and in addition to the effects described
above can cause other businesses and residents to move elsewhere.
B. Purpose. It is, therefore, the purpose of this Chapter to:
1. Establish reasonable and uniform regulations to prevent the concentration of Adult-Oriented
Businesses or their close proximity to incompatible uses, while allowing the location of Adult-
Oriented Businesses in certain areas; and
2. Regulate Adult-Oriented Businesses in order to promote the health, safety, and general welfare
of the citizens of the City.
C. Not purpose, intent, or effect. The provisions of this Chapter have neither the purpose nor effect
of imposing a limitation or restriction on the content of any communicative materials, including adult-
oriented materials. Similarly, it is not the intent nor effect of this Chapter to restrict or deny access by
adults to adult-oriented materials protected by the First Amendment, or to deny access by the
distributors and exhibitors of adult-oriented entertainment to their intended market. Neither is it the
intent nor effect of this Chapter to condone or legitimize the distribution of obscene material.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-4
D4-2 - Definitions
Definitions of the technical terms and phrases used in this Chapter are under "Adult Oriented Business" in
Division D8 (Glossary).
D4-3 - Permitted Areas and Minimum Proximity Requirements
A. MW (Manufacturing/Warehousing) zone. Subject to the limitations set forth in this Chapter, Adult-
Oriented Businesses may be established in the MW (Manufacturing/Warehousing) zone.
B. Specified distance separation requirements. Notwithstanding the above, no Adult-Oriented
Business shall be established or located within certain distances of certain specified land uses or
zones as set forth below. No Adult-Oriented Business shall be established or located:
1. Within a 500-foot radius from: any existing residential zone or use. The distance between a
proposed Adult-Oriented Business use and a residential zone or use shall be measured from
the nearest exterior wall of the facility housing the Adult-Oriented Business use or proposed
Adult-Oriented Business use to the nearest property line included within a residential zone or
property in current residential use, along a straight line extended between the two points; or
2. Within 1,000 feet of any other Adult-Oriented Business as defined in this Chapter which is
located either inside or outside the jurisdiction of the City. The distance between the two Adult-
Oriented Business uses shall be measured between the nearest exterior wall of the facility
housing the Adult-Oriented Business use and proposed Adult-Oriented Business use along a
straight line extended between the two points; or
3. Within a 500-foot radius from any existing park, playground, religious facility, or school use or
property zoned Open Space (OS) Parks and Recreation (P), or Public and Semi-Public (PS).
The distance between a proposed Adult-Oriented Business use and park, playground, religious
facility or school uses or property zoned Open Space (OS), Parks and Recreation (P), or Public
and Semi-Public (PS), shall be measured from the nearest exterior wall of the facility housing
the Adult-Oriented Business use or proposed Adult-Oriented Business use to the nearest
property line where the park, playground, church or school use is located, or property zoned
Open Space (OS), Parks and Recreation (P), or Public and Semi-Public (PS) along a straight
line extended between the two points.
C. Separation requirements also apply to the General Plan. The above distance limitations shall
also apply to residential zones or uses and parks, playgrounds, schools, and religious uses or
property so designated in the General Plan Land Use Element of an adjacent jurisdiction.
D4-4 - Use Permit Required
A. Use Permit and Business License required. It shall be unlawful for any person to engage in,
conduct, establish, carry on, or to permit to be engaged in, conducted, established, or carried on, in
or upon any premises in the City, the operation of an Adult-Oriented Business unless the person first
obtains and continues to maintain in full force and effect both an Use Permit and a Business License
from the City.
B. Not allowed by right. No Adult-Oriented Business may be established within the City by right. All
persons wishing to establish an Adult-Oriented Business within the City shall first apply for and receive
a Use Permit in compliance with this Chapter.
C. Applicant to supply sufficient evidence. It is the burden of the applicant for an Use Permit to
supply sufficient evidence to justify the grant of an Use Permit.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-5
D4-5 - Application Requirements
A. Application submittal. A person desiring to operate or establish an Adult-Oriented Business within
the City shall file with the Department a Use Permit application on a standard application form
supplied by the Department.
B. Required information. All applications shall include the following information:
1. If the applicant is an individual, the individual shall state his or her legal name, including any
aliases, address, and submit satisfactory written proof that he or she is at least 18 years of age.
2. If the applicant is a partnership, the partners shall state the partnership's complete name,
address, the names and current addresses of all partners, whether the partnership is general
or limited, and attach a copy of the partnership agreement, if any.
3. If the applicant is a corporation, the corporation shall provide its complete name, the date of its
incorporation, evidence that the corporation is in good standing under the laws of California, the
names, addresses, and capacity of all officers and directors, the name of the registered
corporate agent and the address of the registered office for service of process.
4. The notarized signature of the property owner and proof of ownership via submittal of a Title
Report.
5. A non-refundable deposit or fee as set forth by the City’s Fee Schedule.
6. Signed statement by the applicant verifying that applicant intends to and will comply with all of
the adult-oriented business development standards of this Chapter.
7. A description of the Adult-Oriented Business for which the permit is requested and the proposed
address where the Adult-Oriented Business will operate, plus the names and addresses of all
the owners and lessors of the Adult-Oriented Business site.
8. The address to which notice of action on the application is to be mailed.
9. The names of all employees, independent contractors, and other persons who will perform/work
at the Adult-Oriented Business.
10. A floor plan showing the interior configuration of the premises, including a statement of the total
floor area occupied by the Adult-Oriented Business, and exterior premises lighting per D4-12.D.
The floor plan need not be professionally prepared, but shall be drawn to a designated scale or
drawn with marked dimensions of the interior of the premises to an accuracy of plus or minus
six inches.
11. A site plan prepared within 30 calendar days before application depicting the building and the
portion thereof to be occupied by the Adult-Oriented Business, and:
a. The property line of any residential zone or use within 1,000 feet of the nearest exterior
wall of the Adult-Oriented Business;
b. The property line of any other Adult-Oriented Business within 1,000 feet of the nearest
exterior wall of the Adult-Oriented Business for which a Business Permit is requested;
and
c. the property lines of any church, school, park, or playground within 1,000 feet of the
nearest exterior wall of the Adult-Oriented Business.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-6
12. A diagram of the off-street parking areas and premises entries of the Adult-Oriented Business
showing the location of the lighting system required by this Chapter.
C. Signature of applicant required. If the applicant is an individual, he or she shall sign the application.
If the applicant is other than an individual, an officer of the business entity or an individual with a 10
percent or greater interest in the business entity shall sign the application.
D. Fictitious name, if applicable. If the applicant intends to operate the Adult-Oriented Business under
a name other than that of the applicant, the applicant shall file the fictitious name of the Adult-Oriented
Business and show proof of registration of the fictitious name.
E. CEQA compliance. Each applicant for a Use Permit shall comply with the California Environmental
Quality Act (CEQA) as required by the City.
F. Director’s determination of completeness. The Director shall determine whether the application
contains all the information required by this Chapter. If it is determined that the application is not
complete, the applicant shall be notified, in writing, within 30 days of the date of receipt of the
application that the application is not complete and the reasons therefore, including any additional
information necessary to render the application complete. The applicant shall have 30 calendar days
to submit additional information to render the application complete. Failure to do so within the 30-day
period shall render the application automatically void. Within 30 days following the receipt of an
amended application or supplemental information, the Director shall again determine whether the
application is complete in compliance with the procedures set forth in this Subsection. Evaluation
and notification shall occur as provided above until the time the application is found to be complete.
All notices required by this Chapter shall be deemed given upon the date that they are either
deposited in the United States mail or the date upon which personal service of the notice is provided.
G. Other permits or licenses. The fact that an applicant possesses other types of State or City permits
or licenses does not exempt the applicant from the requirement of obtaining a Use Permit.
D4-6 - Investigation and Action on Application
A. Appropriate investigation and inspection. Upon the filing of a completed application, the
Commission shall cause to be made by its own members, or members of its staff, an appropriate
investigation, including consultation with the building, police, fire and health departments and
inspection of the premises as needed. Consultation is not grounds for the City to unilaterally delay in
reviewing a completed application.
B. Public hearing within 45 days. Within 45 days of receipt of the completed application, the
Commission shall hold a public hearing on the application for a Use Permit. Notice of the public
hearing shall be given in compliance with California Government Code Section 65091, as the same
may be amended from time to time.
C. Relevant evidence. In reaching a decision on an application for a Use Permit, the Commission shall
not be bound by the formal rules of evidence. Any relevant evidence may be admitted that is the sort
of evidence upon which reasonable persons are accustomed to rely in the conduct of serious affairs.
D. Commission’s decision within 60 days. The Commission shall grant, conditionally grant or deny
an application for a Use Permit ("permit"). The Commission shall render a written decision on the
application for a Use Permit within 60 days of receiving a completed application. The failure of the
Commission to render a decision within this time frame shall be deemed to constitute a denial of the
application. Any conditions imposed upon the permit shall be in keeping with the objective
development standards of this Chapter and the underlying zone in which the property is located.
E. Transmittal of decision to applicant. The Commission's decision shall be mailed to the applicant.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-7
D4-7 - Appeal
A. Appeal of Commission’s decision. Any interested person may appeal the decision of the
Commission to the Council in writing within 10 calendar days after the Commission's written decision.
In addition, within 10 calendar days after the Commission's written decision, any member of the
Council shall have the authority to direct that the Council review the decision of the Commission on
the grounds that the individual council member believes that the matter should be decided by the
Council.
B. De novo public hearing. Consideration of an appeal of the Commission's decision shall be at a de
novo public hearing which shall be noticed in the same manner as the public hearing of the
Commission and shall occur within 30 days of the filing of the appeal or initiation of review by the
Council.
C. Council’s action on appeal. The Council action on the appeal of the Commission's decision shall
be by a majority vote of the quorum, and upon the conclusion of the public hearing, the Council shall
grant, conditionally grant, or deny the application. The Council's decision shall be final and
conclusive.
D. Relevant evidence. In reaching its decision, the Council shall not be bound by the formal rules of
evidence. Any relevant evidence may be admitted that is the sort of evidence upon which reasonable
persons are accustomed to rely in the conduct of serious affairs.
D4-8 - Judicial Review of Decision to Grant, Deny, or Revoke
A. Court challenge. The time for court challenge to a decision by the Council to grant, deny, or revoke,
a Use Permit is governed by California Code of Civil Procedure Section 1094.6.
B. Transmittal of decision to applicant. Notice of the Council's decision and its findings shall be
mailed to the applicant and shall include citation to California Code of Civil Procedure Section 1094.6.
C. Prompt judicial review. The Petitioner may seek prompt judicial review of the Council's action in
compliance with California Code of Civil Procedure Section 1094.8.
D4-9 - Permit Expiration
Any Use Permit approved in compliance with this Chapter shall become null and void unless the proposed
use is established within 180 days of the date from the approval. As to facilities that are a reuse of existing
facilities, the Use Permit shall become null and void unless the proposed use is established within 180 days
from the date of approval, unless before the expiration date the permittee demonstrates to the satisfaction
of the Commission that the applicant has a good faith intent to presently commence the proposed use. The
extensions shall not exceed a total of two 180-day extensions.
D4-10 - Findings
A. Required findings. The Commission, or Council appeal shall approve or conditionally approve an
application for a Use Permit where the information submitted by the applicant substantiates all of the
following findings:
1. The applicant is over the age of 18 years;
2. The required application fee has been paid;
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-8
3. The proposed use complies with the development and design requirements of the underlying
zone in which it is located and with the applicable development standards of this Chapter;
4. The proposed site is not located within a 500-foot radius from any existing residential zone or
use. The distance between a proposed Adult-Oriented Business use and a residential zone or
use shall be measured from the nearest exterior wall of the facility housing the Adult-Oriented
Business use or proposed Adult-Oriented Business use to the nearest property line included
within a residential zone or property in current residential use, along a straight line extended
between the two points;
5. That the proposed site is not located within 1,000 feet of any other Adult-Oriented Business as
defined in this Chapter which is located either inside or outside the jurisdiction of the City. The
distance between the two Adult-Oriented Business uses shall be measured between the
nearest exterior wall of the facility housing the Adult-Oriented Business use and proposed Adult-
Oriented Business use along a straight line extended between the two points;
6. The proposed site is not located within 500 feet from any existing park, playground, religious
facility, or school uses or property zoned Open Space (OS) or Public Facilities (PF). The
distance between a proposed Adult-Oriented Business use and park, playground, church, or
school uses or property zoned Open Space (OS) or Public Facilities (PF), shall be measured
from the nearest exterior wall of the facility housing the Adult-Oriented Business use or
proposed Adult-Oriented Business use to the nearest property line where the park, playground,
church, or school use or property zoned Open Space (OS) or Public Facilities (PF) is located,
along a straight line extended between the two points;
7. The proposed site is not located within 500 feet of a residential zone or use or within 500 feet
of a park, playground, church, or school use located in or property so designated in the General
Plan Land Use Element of an adjacent jurisdiction; and
8. Neither the applicant, if an individual, or any of the officers or general partners, if a corporation
or partnership, have been found guilty or pleaded nolo contendere (no contest) within the past
four years of a misdemeanor or a felony classified by the State as a sex or sex-related offense.
B. Conditions imposed on the permit. Any conditions imposed upon the permit shall be in keeping
with the objective development standards of this Chapter and the underlying zone in which the
property is located.
D4-11 - Registration of New Employees
A. Employee registration required. As a further condition of approval of every Use Permit issued in
compliance with this Chapter, every owner or operator of an Adult-Oriented Business shall register
every employee with the Police Department within five business days of the commencement of the
employee's period of employment at the Adult-Oriented Business.
B. Color photographs and other information required. Each Employee shall be required to provide
two recent color passport-quality photographs and, at the discretion of the Police Chief, shall allow
himself or herself to be fingerprinted and subject to a background check by the Police Department for
purposes of identification. In addition, each new employee shall provide the following information in
a form provided by the Police Department:
1. Name, current resident address, and telephone number;
2. Date of birth;
3. Social Security number;
4. Height, weight, color of eyes and hair; and
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-9
5. Stage name, if applicable, and other aliases used within the previous two years.
C. Current employee register required. Each owner or operator of an Adult-Oriented Business shall
maintain a current register of the names of all employees currently employed by the Adult-Oriented
Business, and shall disclose the registration for inspection by any Police Officer for the purposes of
determining compliance with the requirements of this Section.
D. Failure to comply. Failure to register each new employee within five days of the commencement of
employment, or to maintain a current register of the names of all employees shall be deemed a
violation of the conditions of the Use Permit and may be considered grounds for suspension or
revocation of the permit in compliance with Section D4-16 (Permit Revocation).
D4-12 - Adult-Oriented Business Development Standards
A. Unlawful hours of operation. It shall be unlawful for any operator or employee of an Adult-Oriented
Business to allow the adult business to remain open for business, or to permit any employee to
engage in a performance, solicit a performance, make a sale, solicit a sale, provide a service, or
solicit a service, between the hours of 10:00 p.m. and 10:00 a.m. of any day.
B. Compliance with building and fire regulations. Maximum occupancy load, fire exits, aisles, and
fire equipment shall be regulated, designed, and provided in compliance with the Fire District and
building regulations and standards adopted by the City.
C. Observation of activities or materials outside prohibited. No Adult-Oriented Business shall be
operated in any manner that permits the observation of any material or activities depicting, describing,
or relating to specified sexual activities or specified anatomical areas from any public way or from any
location outside the building or area of the establishment. This provision shall apply to any display,
decoration, sign, show window, or other opening. No exterior door or window on the premises shall
be propped or kept open at any time while the business is open, and any exterior windows shall be
covered with opaque covering at all times.
D. Outdoor lighting level required. All off-street parking areas and other exterior areas of the Adult-
Oriented Business shall be illuminated from dusk to closing hours of operation with a lighting system
which provides an average maintained horizontal illumination of one foot candle of light evenly
distributed at ground level. The required lighting level is established in order to provide sufficient
illumination of the parking areas, walkways, and outdoor areas serving the Adult-Oriented Business
for the personal safety of patrons and employees and to reduce the incidence of vandalism and
criminal conduct. The lighting shall be shown on the required sketch or diagram of the premises; a
photometrics plan shall be submitted with the application.
E. All areas shall be readily accessible. The operator of an Adult-Oriented Business shall not permit
any doors on the premises to be locked during business hours and, in addition, the operator shall be
responsible to see that any room or area on the premises shall be readily accessible at all times and
shall be open to view in its entirety for inspection by any law enforcement official.
F. Posting of California Penal Code Section 314 required. The Adult Oriented Business shall post
in plain view inside the front portion of the business, a sign, in two-inch print which shall reference
California Penal Code Section 314 which shall read as follows:
1. Every person who willfully and lewdly either: (1) exposes his person, or the private parts
thereof, in any public place, or in any place where there are present other persons to be
offended or annoyed thereby; or (2) procures, counsels, or assists any person so as to expose
himself or take part in any model artist exhibition, or to make any other exhibition of himself to
public view or the view of any number of persons, which is offensive to decency, or is adapted
to excite to vicious or lewd thoughts or acts, is guilty of a misdemeanor.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-10
2. Upon the second and each subsequent conviction under Subparagraph 1., above, or upon a
first conviction under Subparagraph 1., above after a previous conviction under California
Penal Code Section 288, every person so convicted is guilty of a felony, and is punishable by
imprisonment in State prison. (California Penal Code Section 314.)
G. Open to view by management. All indoor areas of the Adult-Oriented Business within which patrons
are permitted, except rest rooms and customer changing rooms, if any, shall be open to view by the
management at all times.
H. Additional "Adult Arcade" provisions. Any adult-oriented business which is also an "Adult Arcade"
(see definition in Glossary), shall comply with the following additional provisions:
1. The interior of the premises shall be configured in so that there is an unobstructed view from a
manager's station of every area of the premises to which any patron is permitted access for any
purpose, excluding restrooms and customer changing rooms. Restrooms and customer
changing rooms may not contain video reproduction equipment. If the premises has two or
more manager's stations designated, then the interior of the premises shall be configured so
that there is an unobstructed view of each area of the premises to which any patron is permitted
access for any purpose from at least one of the manager's stations. The view required in this
Subparagraph shall be direct line of sight from the manager's station.
2. The view area specified in Subparagraph 1., above shall remain unobstructed by any doors,
walls, merchandise, display racks, or other materials at all times. No patron is permitted
access to any area of the premises which has been designated as an area in which patrons
will not be permitted.
3. No viewing room or changing room may be occupied by more than one person at any one time.
4. The walls or partitions between viewing rooms or booths, changing rooms, restrooms, and
stalls or spaces contained therein shall be maintained in good repair at all times, with no
openings in the walls between any two of the rooms that would allow viewing from one booth
or room into another or that would allow physical contact of any kind between the occupants of
any two of the booths or rooms.
5. Customers, patrons, or visitors who are not actively engaged in shopping for or reviewing the
products available on display for purchaser viewing, shall not be allowed to stand idly by in the
vicinity of any video booths, or to remain in the common area of the business, other than the
restrooms. Signs prohibiting loitering shall be posted in prominent places in and near the video
booths.
6. The floors, seats, walls, and other interior portions of all video booths shall be maintained clean
and free from waste and bodily secretions. Presence of human excrement, urine, semen, or
saliva in any of the booths shall be evidence of improper maintenance and inadequate sanitary
controls; instances of these conditions may justify suspension or revocation of the Use Permit.
I. Indoor lighting level required. All interior areas of the Adult-Oriented Business shall be illuminated
at a minimum of the following foot-candles, minimally maintained and evenly distributed at ground
level:
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-11
Location Minimum Illumination Level
(foot-candles)
Adult arcades 10
Bookstores and other retail
establishments
20
Modeling studios 20
Motels/hotels 20 in public areas
Theaters and cabarets 5, except that a minimum of 1.25
shall be required during
performances
J. Separate restrooms required. The Adult-Oriented Business shall provide and maintain separate
restrooms for male patrons and employees, and female patrons and employees. Male patrons and
employees shall be prohibited from using a restroom for females, and female patrons and employees
shall be prohibited from using a restroom for males, except to carry out duties of repair, maintenance,
and cleaning of the rest room facilities. The rest rooms shall be free from any Adult-Oriented Material.
Rest rooms shall not contain television monitors or other motion picture or video projection, recording,
or reproduction equipment. The foregoing provisions of this Subparagraph shall not apply to an Adult-
Oriented Business that deals exclusively with sale or rental of sexually oriented material or
merchandise that is not used or consumed on the premises and which does not provide rest room
facilities to its patrons or the general public.
K. Additional requirements for live entertainment. The following additional requirements shall pertain
to Adult-Oriented Businesses providing live entertainment depicting specified anatomical areas or
involving specified sexual activities, except for businesses regulated by the Alcoholic Beverage
Control Commission:
1. No employee, owner, operator, responsible managing employee, manager, or permittee of an
Adult-Oriented Businesses providing live entertainment shall allow any person below the age of
18 years upon the premises or within the confines of the business if no alcoholic beverage is
served, or under the age of 21 if alcoholic beverages are served.
2. No entertainer shall dance with or otherwise be within four feet of a patron while performing for
compensation or while on the Adult-Oriented Businesses premises. This four-foot separation
shall be marked by a railing or other physical barrier designed to obstruct any contact between
the entertainer and the patron(s).
3. No owner, operator, responsible managing employee, manager, or permittee shall permit or
allow at licensed premises any patron to approach within four feet of an entertainer, or permit
or allow an entertainer to approach within four feet of a patron.
4. All employees, other than entertainers while performing, shall, at a minimum while on or about
the licensed premises, wear an opaque covering which covers their specified anatomical areas.
5. The Adult-Oriented Business shall provide separate dressing room facilities for entertainers
which are exclusively dedicated to the entertainers' use.
6. The Adult-Oriented Business shall provide an entrance/exit for entertainers which is separate
from the entrance/exit used by patrons.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-12
7. The Adult-Oriented Business shall provide access for entertainers between the stage and the
dressing rooms which is completely separated from the patrons. If a separate access is not
physically feasible, the Adult-Oriented Business shall provide a minimum three-foot wide walk
aisle for entertainers between the dressing room area and the stage, with a railing, fence, or
other barrier separating the patrons and the entertainers capable of (and which actually results
in) preventing any physical contact between patrons and entertainers.
8. No entertainer, either before, during, or after performances, shall have physical contact with any
patron and no patron shall have physical contact with any entertainer either before, during, or
after performances by the entertainer. This Subparagraph shall only apply to physical contact
on the premises of the Adult-Oriented Business.
9. No patron shall directly pay or give any gratuity to any entertainer and no entertainer shall solicit
any pay or gratuity from any patron.
L. Security guards required. Adult-Oriented Businesses shall employ security guards in order to
maintain the public peace and safety, consistent with the following standards:
1. Adult-Oriented Businesses featuring live entertainment shall provide at least one security guard
at all times while the business is open. If the occupancy limit of the premises is greater than 35
persons, an additional security guard shall be on duty.
2. All Adult-Oriented Businesses shall have a responsible person who shall be at least 18 years of
age, or 21 years of age if serving alcohol, and shall be on the premises to act as manager at all
times during which the business is open. The individual designated as the on-site manager shall
be registered with the Police Chief by the owner to receive all complaints and be responsible
for all violations taking place on the premises.
3. All Adult-Oriented Businesses shall provide a security system that visually records and monitors
the exterior premises of the property including all parking lot areas, or in the alternative,
uniformed security guards to patrol and monitor the exterior premises of the property, including
the parking lot areas during all business hours. These recordings are to be kept available for
a minimum period of 72 hours. A sign indicating compliance with this provision shall be posted
on the premises. The sign shall not exceed two by three feet and shall at a minimum be one
foot by one and a half feet
4. Security guards shall be uniformed in a manner so as to be readily identifiable as a security
guard by the public and shall be duly licensed as a security guard as required by applicable
provisions of State law. No security guard required in compliance with this Subparagraph shall
act as a door person, ticket seller, ticket taker, admittance person, or sole occupant of the
manager's station while acting as a security guard.
M. X-rated movies or videos. The availability of X-rated movies or videos shall be restricted only to
persons over 18 years of age. If an establishment that is not otherwise prohibited from providing
access to persons under 18 years of age sells, rents, or displays videos or other motion picture media
that have been rated "X" or rated "NC-17" by the motion picture rating industry ("MPAA"), or which
have not been submitted to the MPAA for a rating, and which consist of images which are
distinguished or characterized by an emphasis on depicting or describing specified sexual activities
or specified anatomical areas, the videos shall be located in a specific Section of the establishment
where persons under the age of 18 shall be prohibited. All access to sexually oriented material or
merchandise shall be restricted to persons over 18 years of age.
N. Disposal in locked garbage receptacles only. Any and all sexually oriented materials or sexually
oriented merchandise discarded by an Adult-Oriented Business shall be fully contained within a locked
garbage receptacle at all times so that minors are not exposed to sexually oriented materials or
sexually oriented merchandise.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-13
The foregoing applicable requirements of this Section shall be deemed conditions of Use Permit
approvals, and failure to comply with every requirement shall be grounds for revocation of the permit
issued in compliance with these regulations.
D4-13 - Display of Permit
Each Adult-Oriented Business shall display at all times during business hours the Use Permit issued in
compliance with the provisions of this Chapter for an Adult-Oriented Business in a conspicuous place so
that the same may be readily seen by all persons entering the Adult-Oriented Business.
D4-14 - Persons Under 18 Prohibited
It shall be unlawful for any permittee, operator, or other person in charge of any Adult-Oriented Business
to employ, or provide any service for which it requires a Use Permit, to any person who is not at least 18
years of age.
D4-15 - Transfer of Adult-Oriented Business Regulatory Permits
A. Only at approved address. A permittee shall not operate an Adult-Oriented Business under the
authority of a Use Permit at any place other than the address of the Adult-Oriented Business stated
in the application for the Adult-Oriented Permit.
B. No transfer without permit amendment. A permittee shall not transfer ownership or control of an
Adult-Oriented Business or transfer a Use Permit to another person unless and until the transferee
obtains an amendment to the permit from the Commission stating that the transferee is now the
permittee. The amendment may be obtained only if the transferee files an application with the
Commission in compliance with Sections D4-4 (Use Permit Required) and D4-5 (Application
Requirements), above, accompanies the application with a transfer fee as set forth in the City’s Fee
Schedule, and the Commission determines in compliance with Sections D4-6 that the transferee
would be entitled to the issuance of an original Use Permit. The transfer fee shall be paid in lieu of
the filing fee required by Section D4-5.
C. No transfer when subject to suspension or revocation. No Use Permit may be transferred when
the permittee has been notified that the Use Permit has been or may be suspended or revoked.
D. No transfer in violation of this Section. Any attempt to transfer a Use Permit either directly or
indirectly in violation of this Section is hereby declared void, and the Use Permit shall be deemed
revoked.
D4-16 - Permit Revocation
A. Findings required for revocation. Any Use Permit issued in compliance with the provisions of this
Chapter may be revoked by the City on the basis of any of the following:
1. The business or activity has been conducted in a manner which violates one or more of the
conditions imposed upon the issuance of the permit or which fails to conform to the plans and
procedures described in the application, or which violates the occupant load limits for the
building in which the use is located set by the Fire Marshall;
2. The permittee has misrepresented a material fact in the application for permit or in any report
required to be filed with the City or has not answered each question in the application truthfully;
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-14
3. The permittee has failed to obtain or maintain all required City, County, and State licenses and
permits;
4. The permit is being used to conduct an activity different from that for which it was issued;
5. The building or structure in which the Adult-Oriented Business is conducted is hazardous to the
health or safety of the employees or patrons of the business or of the general public under the
standards set forth in the Uniform Building, Uniform Plumbing, or Uniform Fire Code;
6. The permitted business creates sound levels which violate the City's noise regulations (Section
D3-8);
7. The permittee, if an individual, or any of the officers or general partners, if a corporation or
partnership is found guilty or pleaded nolo contendere to a misdemeanor or felony classified by
the State as a sex or sex-related offense after the Adult-Oriented Business has commenced
operation;
8. The permittee, employee, agent, partner, director, stockholder, or manager of an Adult-Oriented
Business has knowingly allowed or permitted, and has failed to make a reasonable effort to
prevent the occurrence of any of the following on the premises of the Adult-Oriented Business:
a. Any act of unlawful sexual intercourse, sodomy, oral copulation, or masturbation;
b. Use of the Adult-Oriented Business site as a place where unlawful solicitations for sexual
intercourse, sodomy, oral copulation, or masturbation openly occur;
c. Any conduct constituting a criminal offence which requires registration under Section 290
of the California Penal Code;
d. The occurrence of acts of lewdness, assignation, or prostitution including any conduct
constituting violations of California Penal Code Sections 315, 316, 318, or 647(b);
e. Any act constituting a violation of provisions of the California Penal Code relating
to obscene matter or distribution of harmful matter to minors, including, but not
limited to, Sections 311 through 313.4; or
f. Any conduct prohibited by this Chapter.
9. Failure to abide by any action previously imposed by an appropriate City official; and
10. The use for which the approval was granted has ceased to exist or has been suspended for 180
days or more.
B. Transmittal of notice. Written notice of hearing on the proposed permit revocation, together with
written notification of the specific grounds of complaint against the permittee shall be sent by certified
mail to the permittee at least 10 days before the hearing.
C. Relevant evidence. The Commission shall hold a public hearing on the proposed revocation of the
permit. Notice of the public hearing shall be given in compliance with California Government Code
Section 65091, as the same may be amended from time to time. In reaching a decision on the
proposed revocation, the Commission shall not be bound by the formal rules of evidence. Any
relevant evidence may be admitted that is the sort of evidence upon which reasonable persons are
accustomed to rely in the conduct of serious affairs.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-15
D. Commission’s action. The Commission shall revoke, not revoke, or not revoke but add additional
conditions to, the permittee's Use Permit. Any additional conditions imposed upon the permit shall be
in keeping with the objective development standards of this Chapter and the underlying zone in which
the property is located.
E. Transmittal of Commission decision. The Commission's decision shall be in writing, and shall be
mailed to the applicant and all property owners within 300 feet of the use.
F. Decision within 30 days. The Commission shall make its final decision within 30 days of the public
hearing.
G. Appeal of Commission’s decision. Any interested person may appeal the decision of the
Commission to the Council in writing within 10 days after the Commission's written decision. In
addition, within 10 days after the Commission's written decision, any member of the Council shall
have the authority to direct that the Council review the decision of the Commission on the grounds
that the individual council member believes that the matter should be decided by the Council.
H. De novo public hearing. Consideration of an appeal of the Commission's decision shall be at a de
novo public hearing which shall be noticed in the same manner as the public hearing of the
Commission and shall occur within 30 days of the filing of the appeal or initiation of review by the
Council. In reaching its decision, the Council shall not be bound by the formal rules of evidence. Any
relevant evidence may be admitted that is the sort of evidence upon which reasonable persons are
accustomed to rely in the conduct of serious affairs.
I. Council’s action on appeal. The Council action on the appeal of the Commission's decision shall
be by a majority vote of the quorum, and upon the conclusion of the public hearing, the Council shall
revoke, not revoke, or not revoke but add additional conditions to, the permittee's Use Permit. Any
additional conditions imposed upon the permit shall be in keeping with the objective development
standards of this Chapter and the underlying zone in which the property is located. The Council's
decision shall be final and conclusive.
J. No new permit within 12 months after revocation. In the event a permit is revoked pursuant to
this Chapter, another adult use development permit to operate an adult business shall not be granted
to the permittee within 12 months after the date of the revocation.
D4-17 - Violations
Any person who violates any section of this Chapter shall be guilty of a misdemeanor and is subject to a
fine and/or imprisonment in compliance with the limits set forth in California Government Code Section
36901, as it may be amended from time to time, or any other legal remedy available to the City.
D4-18 - Applicability to Other Regulations
The provisions of this Chapter are not intended to provide exclusive regulation of the Adult-Oriented
Business uses. These uses shall comply with any and all applicable regulations imposed in other articles
of this Land Use Code, other City ordinances, and State and Federal law.
D4-19 - Conduct Constituting a Public Nuisance
The conduct of any business within the City in violation of any of the terms of this Chapter is hereby found
and declared to be a public nuisance, and the City Attorney or the District Attorney may, in addition or in
lieu of prosecuting a criminal action hereunder, commence an action or proceeding for the abatement,
removal, and enjoinment thereof, in the manner provided by law; and shall take other steps and shall apply
to other courts as may have jurisdiction to grant relief that will abate or remove the Adult-Oriented Business
and restrain and enjoin any person from conducting, operating, or maintaining an Adult-Oriented Business
contrary to the provisions of this Chapter.
Adult Business Regulations D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-16
D4-20 - Inspections
An applicant or permittee shall permit representatives of the Police Department, Health Department,
Planning Department, or other City Departments or Agencies to inspect the premises of an Adult-Oriented
Business for the purpose of ensuring compliance with the law and the development standards applicable
to Adult-Oriented Businesses, at any time it is occupied or opened for business. A person who operates
an Adult-Oriented Business or his or her agent or employee is in violation of the provisions of this Section
if he/she refuses to permit the lawful inspection of the premises at any time it is occupied or open for
business.
Alternative Energy Structures D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-17
Chapter II - Alternative Energy Structures
Sections:
D4-21 - Purpose
D4-22 - Solar Energy System
D4-23 - Wind Energy Equipment
D4-21 - Purpose
This Chapter provides regulations for alternative energy structures and equipment, including solar power
equipment and windmills (wind energy conversion systems), to assist residents and businesses in reducing
the consumption of electricity produced by sources outside of the community.
D4-22 - Solar Energy System
The provisions of this Section are intended to ensure that solar energy systems are protected from shading,
conform in appearance to the surrounding neighborhood, and to provide design guidelines and installation
standards.
A. Definitions.
Solar Energy System means either:
1) Any solar collector whose primary purpose is to provide for the collection, storage, and distribution
of solar energy for space heating, space cooling, electric generation, or water heating.
2) Any structural design feature of a building, whose primary purpose is to provide for the collection,
storage, and distribution of solar energy for electricity generation, space heating or cooling, or for
water heating.
(CA Civil Code Section 801.5)
Solar Collectors include:
1) Solar Photovoltaic (PV) System,
2) Building Integrated Photovoltaics (BIPV),
3) Solar Thermal Panels, and like systems; or
4) other solar energy device
Small Residential Rooftop Solar Energy System means all of the following:
1) A solar energy system that is no larger than 10 kilowatts alternating current nameplate rating or
30 kilowatts thermal.
2) A solar energy system that conforms to all applicable state fire, structural, electrical, and other
building codes as adopted or amended by the city, and meets all applicable safety and
performance standards established by the State.
3) A solar energy system installed on a single or duplex family dwelling unit
Alternative Energy Structures D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-18
4) A solar panel or module array that does not exceed the maximum legal building height as defined
by the authority having jurisdiction
B. Protection of solar access. A structure, fence, or wall shall not be constructed or modified in a
residential zone, and vegetation may not be placed or allowed to grow after the effective date of this
Chapter, so as to obstruct more than 10 percent of the absorption area of a solar energy system on a
neighboring parcel at any time.
C. Solar Energy System design and installation standards. Solar energy system, except Small
Residential Rooftop Solar Energy System, shall be designed and installed in compliance with the
following standards:
1. Solar collectors.
a. Roof-mounted collectors shall be placed in the location least visible from public streets
without reducing the operating efficiency of the collectors, unless they are integrated into
the design of the structure as an architectural element.
b. Wall-mounted and ground-mounted collectors shall be screened from public view.
c. Roof-mounted collectors shall be mounted at the same angle or as close as possible to
the pitch of the roof.
2. Appurtenant equipment. Equipment appurtenant to solar collectors, including plumbing,
and related fixtures, shall be installed within a structure on which the collectors are mounted,
where feasible, or shall be screened from public view. Appurtenant equipment outside of a
building shall comply with applicable setback requirements.
3. Accessory fixtures. Large accessory fixtures that generally require exposure (e.g., storage
tanks) shall be screened through architectural features that harmonize with other elements of
the structure.
4. Exterior finishes. Where feasible, exterior surfaces should have a matte finish and should
be color-coordinated to harmonize with roof materials or other dominant colors of the structure.
D4-23 - Wind Energy Equipment
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), a windmill proposed for the
generation of electricity, hereafter referred to as a "windmill," shall comply with the requirements of this
Section.
A. Application requirements. The Use Permit application shall include all information and materials
required by Section D6-16, and the following.
1. Standard drawings and an engineering analysis of the system's tower, showing compliance with
the Uniform Building Code (UBC), and certification by a California-licensed professional
mechanical, structural, or civil engineer. A "wet stamp" shall not be required on the drawings
and analysis if the application demonstrates that the system is designed to meet the most
stringent wind requirements (UBC wind exposure D), the requirements for the worst seismic
class (UBC Seismic 4), and the weakest soil class, with a soil strength of not more than 1,000
pounds per square foot.
2. Information demonstrating that the system will be used primarily to reduce on-site consumption
of electricity.
Alternative Energy Structures D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-19
3. Evidence that the provider of electric utility service to the site has been informed of the
applicant's intent to install an interconnected customer-owned electricity generator, unless the
applicant intends, and so states in the application, that the system will not be connected to the
electricity grid.
4. Evidence that the proposed height of the windmill tower does not exceed the height
recommended by the manufacturer or distributor of the system.
B. Minimum site area. A windmill shall only be located on a parcel of one acre or larger.
C. Limitations on location. No more than one windmill shall be approved on a single parcel, or closer
than 500 feet from another windmill.
D. Windmill design standards.
1. Setback requirements. A windmill shall not be located closer to a property line than the height
of the windmill (the distance from the ground to the topmost point of the windmill blades.
2. Height limit. A windmill tower shall not exceed the maximum height allowed by the applicable
zone.
3. Windmill turbine. The turbine proposed for the system shall have been approved by the
California Energy Commission (CEC) as qualifying under the Emerging Renewables Fund of
the CEC's Renewables Investment Plan, or certified by a national program recognized and
approved by the CEC.
E. Noise standards. A windmill shall be designed, installed, and operated so that noise generated by
the system shall not exceed the lesser of 60 decibels (dBA), or the maximum noise levels established
by the Noise Ordinance for the applicable zone, as measured at the property line, except during short-
term events including utility outages and severe wind storms.
F. Required findings for approval. The approval of a Use Permit for a windmill shall require that the
Review Authority first find that the location and design of the windmill will not produce excessive visual
impact or cause the windmill to be the dominant visual feature on a ridgeline when viewed from a
public right-of-way, in addition to the findings required for Use Permit approval by Section D6-28 (Use
Permits and Minor Use Permits).
Alternative Energy Structures D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-20
[Page intentionally left blank]
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-21
Chapter III - Standards for Specific Land Uses
Sections:
D4-24 - Purpose
D4-25 - Applicability
D4-26 - Accessory Structures
D4-27 - Bed and Breakfast Inns
D4-28 - Card Rooms
D4-29 - Child Day Care Facilities
D4-30 - Commercial Entertainment Facilities
D4-31 - Employee Eating Areas
D4-32 - Heliports
D4-33 - Home Occupations
D4-34 - Live Entertainment
D4-35 - Outdoor Display, Storage, and Vending
D4-36 - Mobile Homes and Mobile Home Parks
D4-37 - Recycling Facilities
D4-38 - Restaurants with Take-Out Service
D4-39 - Accessory Dwelling Units
D4-40 - Service Stations and Car Washes
D4-24 - Purpose
This Chapter provides site planning, development, and/or operating standards for certain land uses that
are allowed by Division D2 (Allowable Land Uses and Zoning Standards) within individual or multiple zones,
and for activities that require special standards to mitigate their potential adverse impacts.
D4-25 - Applicability
The land uses and activities covered by this Chapter shall comply with the provisions of each Section
applicable to the specific use, in addition to all other applicable provisions of this Zoning Ordinance.
A. Where allowed. Each use shall be located only where allowed by Division D2 (Allowable Land Uses
and Zoning Standards).
B. Planning permit requirements. Each use shall be authorized by the planning permit required by
Division D2, except where a planning permit requirement is established by this Chapter for the specific
use.
C. Development standards. The standards for specific uses in this Chapter supplement and are
required in addition to all other applicable provisions of this Zoning Ordinance (e.g., Divisions D2 and
D3, etc.).
1. The land use tables in Division D2 determine when the standards of this Chapter apply to a
specific land use.
2. In the event of any conflict between the requirements of this Chapter and those of Divisions D2
or D3, the requirements of this Chapter shall control.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-22
D4-26 - Accessory Structures
The purpose of this Section is to establish standards for usage, construction timing, projections into required
setbacks, siting, design, and lot coverage of accessory structures. Where allowed by Division D2 (Allowable
Land Uses and Zoning Standards), accessory structures shall comply with the requirements of this Section.
A. Requirements for all accessory structures.
1. Relationship to primary use. An accessory use and/or structure shall be incidental to the
primary use of the site, and shall not alter the character of the primary use.
2. Timing of installation. An accessory structure shall only be constructed concurrent with or
after the construction of the primary structure on the same site except that construction trailers
may be placed on a site at the time site clearance and grading begins, and may remain on the
site only for the duration of construction.
3. Allowed projections into setbacks. An architectural feature of an accessory structure may
extend into a required front, side or rear setback in compliance with Table 4-1.
TABLE 4-1
ALLOWED ACCESSORY STRUCTURE
PROJECTIONS INTO SETBACKS
Allowed Projection into Required Setback
Projecting Feature Front/Street
Side Setback
Interior
Side Setback Rear Setback
Awnings and canopies 6 ft 30 in (1) 6 ft (1)
Balcony, landing, porch, stairway -
Uncovered, unenclosed, and less
than 30 in. above grade
25% of setback
Balcony, landing, porch, stairway -
Covered and enclosed by roof and
walls
Not allowed in any setback
Balcony, landing, porch, stairway -
Covered but unenclosed 6 ft 30 in (1) 6 ft (1)
Bay window, or similar projecting
feature 30 in
The greater of
30 in or 20% of
setback (1) 30 in
Chimney/fireplace, 6 ft. or less in
breadth, media niche 24 in 24 in (1) 24 in (1)
Chimney/fireplace, more than 6 ft. in
breadth, media niche Not allowed 24 in (1) 24 in (1)
Cornice, eave, mechanical
equipment, roof overhang 24 in 24 in (1) 24 in (1)
Notes: (1) Feature may project an additional 6 inches if the minimum provided setback is
greater than 5 feet.
B. Exemptions - Decks. A deck shall be exempt from the provisions of section D4-26 only if constructed
with an approved Development Plan.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-23
C. CC, CT, CCMU, CR, CS, MU, OA, and OL zones. An accessory structure shall comply with the
following standards, in addition to those in Subsection A.
1. Setback requirements. An accessory structure shall not occupy a required front or corner side
setback, or project beyond the front building line of the primary structure on the site. In addition,
an accessory structure located to the rear of a primary structure shall be set back from the
interior side and rear property lines by a minimum of five feet, unless the accessory structure
complies with the height limit requirements of Subsection C.2.
2. Height limit. An accessory structure shall not exceed a maximum height of 16 feet, provided
that:
a. A structure placed at a property line shall not exceed six feet in height at the property
line, and shall not intercept an inclined daylight plane sloping inward from a point six feet
above the property line and rising one foot for each foot of distance from the property line.
D. MW, AG, OS, P, GC, M-1, and M-2 and PS zones. Accessory structures shall comply with all
regulations applicable to the principal primary structure. Off-site accessory uses may be allowed only
with a Minor Use Permit approval.
E. R zones. Each accessory structure within a residential zone shall comply with the following
requirements.
1. Maximum total floor area. The total floor area of all accessory structures on the site with a solid
roof over four feet in height and/or deck structures over four feet in height shall not exceed three
percent of the lot area. Common areas owned by homeowners’ associations are exempt from
the maximum floor area (i.e. pool house, etc.).
An accessory structure with operable louver roofing, which is capable of opening the roof to the
sky, is exempt from this total floor area limitation.
2. Height limit. An accessory structure shall not exceed the height limit as stated in Table 4-2.
See Section D3-6.D. (Height Limits and Exceptions) to determine how height is measured.
Table 4-2
Maximum Accessory Structure Height
HR, RE-B, RS, RM,
RMH, RH and RVH RC, RE-A and RR
Accessory structure 12 feet 16 feet
Decks Floor plate of the top story of the
residence (1) (2) Floor plate of the top story
of the residence (1) (2)
Accessory structure
within front setback
3 feet, plus an additional 18
inches for decorative features or
lighting
3 feet, plus an additional 18
inches for decorative features
or lighting
Notes:
(1) Maximum railing/screen height shall be the minimum required under the Uniform Building
Code.
(2) Decks constructed with an approved Development Plan shall be exempt from height
regulations in Table 4-2.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-24
3. Setback requirements. Accessory structures shall comply with the following setback requirements.
a. Front setback. An accessory structure shall be set back from a front property line by a
minimum distance:
(1) As required by Subsection D.3.c for animal structures.
(2) An accessory structure in a required front yard setback shall comply with the
driveway visibility requirements of Section D3-10 (Setback Requirements and
Exceptions), and the site obstruction requirements of Section D3-37 (Driveways
and Site Access).
b. Side and rear setbacks. An accessory structure shall be set back from the side and
rear property line as follows.
(1) If the structure is of 18 inches or less in height, no setback is required;
(2) If the structure is greater than 18 inches but 6 feet or less in height, a three-foot
setback is required; and
(3) If the structure is greater than 6 feet in height, the setback shall be equal to the
height less three feet.
c. Setbacks for animal keeping structures.
(1) Small animal structures. The minimum setback for structures housing small
domestic animals shall be 60 feet from the front property line; and 40 feet from both
the side and rear property lines (small structures housing dogs are excluded from
this standard). For chicken coops, see Division D4, Chapter VII.
(2) Large animal structures. The minimum setback for barns, stables, and similar
accessory structures housing large animals shall be 100 feet from the front property
line; and 50 feet from both side and rear property lines.
F. PD zone. The size and location of accessory structures shall comply with the requirements of the
adopted PD or specific plan for the applicable PD zone. If the PD standards do not address standards
for accessory structures, then the requirements of R zone apply to residential developments and C
zone standards apply to commercial developments.
D4-27 - Bed and Breakfast Inns and Short-Term Rentals
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), Bed and Breakfast Inns and
Short-Term Rentals (internet based or otherwise), shall comply with the requirements of this Section.
A. Definitions. Except where the context otherwise requires, the following definitions are applicable to
this Section:
1. Short-term rental (STR). A dwelling that is leased or rented in full or in part for the purpose of
overnight lodging for less than thirty (30) consecutive day terms. Short-term rentals are not
considered home occupations for permitting and are treated separately.
2. Bed and Breakfast Inn (B&B). A residential structure with one or more bedrooms rented for
overnight lodging throughout the year, where meals may be provided subject to applicable
Environmental Health Department regulations.
3. Dwelling. Any structure, or any portion of any structure, which is occupied or intended or
designed for exclusively residential occupancy by transients for habitation, lodging or sleeping
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-25
purposes. Dwellings include single-family and multifamily uses, but do not include a hotel, motel
or boarding house.
4. Transient. Any person who exercises occupancy or is entitled to occupancy by reason of
concession, permit, right of access, license or other agreement for a period of twenty-nine (29)
consecutive calendar days or less, counting portions of calendar days as full days. Any such
person so occupying space in a short term rental shall be deemed a transient until the period of
twenty-nine (29) days has expired unless there is an agreement in writing between the operator
and the occupant providing for a longer period of occupancy.
5. Occupancy. The use or possession, or the right to the use or possession of any room or rooms
or portion thereof, in any dwelling for habitation, lodging or sleeping purposes.
6. Operator. The person who is proprietor of the bed and breakfast inn or short term rental,
whether in the capacity of owner, lessee, sub-lessee, mortgagee in possession, licensee, or any
other capacity. Where the operator performs his or her functions through a managing agent of
any type or character other than an employee, the managing agent shall also be deemed an
operator for the purposes of this chapter and shall have the same duties and liabilities as his or
her principal. Compliance with the provisions of this Chapter by either the principal or the
managing agent shall, however, be considered to be compliant by both.
7. Person. Any individual, firm, partnership, joint venture, association, social club, fraternal
organization, joint stock company, corporation, estate, trust, business trust, receiver, trustee,
syndicate, or any other group or combination acting as a unit.
8. Rent. The consideration charged, whether or not received, for the occupancy of space in a
short-term rental valued in money, whether to be received in cash, credits and property and
services of any kind or nature.
9. Hosted short-term rental. The renting of a room or portion in a dwelling in which the Operator
is living onsite and actively managing the activities that occur on the property.
10. Un-hosted short-term rental. The renting of a whole dwelling, room(s) or property in which
the Operator is not onsite to manage the activities that occur on the property, but has provided
a local contact to address potential issues.
B. Bed and Breakfast Inns.
1. Owner occupancy required. A bed and breakfast inn shall be operated by the property owner
living on the site. This requirement may be waived by the Planning Commission.
2. Limitation on number of guest rooms. A bed and breakfast inn shall be limited to a maximum
of six guest rooms for lodging.
3. Signs. Signs shall be limited to a single sign with a maximum area of six feet. The face of the
sign may be indirectly illuminated by an exterior light source entirely shielded from view, but no
internal illumination from an interior light source shall be permitted.
C. Short-Term Rentals
1. Registration Required. It is unlawful for any person to operate a short-term rental within any
residential district as defined by Division D2 (Allowable Land Uses and Zoning Standards) in the
City without first registering the short term rental pursuant to this section.
2. Registration Application Requirements. Each short-term rental shall be registered annually
with the City or by completing a City-provided registration form containing the following
information:
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-26
a. The physical address and type of the short-term rental (hosted or un-hosted).
b. The name, address, telephone number, and signature of the property owner of the short-
term rental for which the registration is sought.
c. The name, address, telephone number, and signature of the short-term rental operator (if
different than the property owner) who will be responsible for operating the rental.
d. The name and telephone number of local contact person(s) who can be available twenty-
four (24) hours a day to accept telephone calls and respond physically to the short-term
rental within thirty (30) minutes when the short-term rental is rented.
e. The number of bedrooms in the short-term rental which will be used to calculate the
occupancy limit for the short-term rental when it is being rented in full or in part.
f. Acknowledgement that the owner/operator shall include the City short-term rental
registration number provided with the proof of registration on any written advertisements
(whether in paper or electronic form) for use of the short-term rental.
g. Acknowledgement that all construction at the property containing the short-term rental was
conducted in compliance with building codes applicable at the time.
h. Acknowledgement that the short-term rental does and shall comply with all Terms of Use
requirements set forth in Subsection D below.
i. Proof of insurance that demonstrate that the property is insured for the use of a short-term
rental.
j. Acknowledgement of the requirement to hold harmless, indemnify and defend the City and
staff against claims and litigations arising from or related to the issuance of the short-term
rental registration.
D. Terms of Use/Conditions of Operation. In the registration filed with the City, the owner and Operator
(if different from the owner) shall acknowledge the following requirements and conditions:
1. When any portion of the short-term rental is rented, the total maximum occupancy of the
dwelling containing the short-term rental is limited to the maximum number specified on the
proof of registration. That maximum is calculated as follows: two (2) adults per bedroom.
2. The short-term rental shall not be rented for the purpose of holding special events such as
weddings, conferences, parties, etc.
3. All short-term rentals shall be associated with a habitable structure/dwelling. No tents, RVs or
camping shall be allowed as a short-term rental.
4. The owner/operator of a short-term rental on any given lot may only arrange for one rental
contract to take place at any given time on that property.
5. The short-term rental owner and operator are jointly responsible for ensuring the short-term
rental complies with all local, state and federal health and safety requirements, including those
regarding smoke detectors, fire alarms and fire extinguishers.
6. The short-term rental owner and operator are jointly responsible for compliance with all City
regulations including those regarding noise, property maintenance, trash and occupancy.
7. Parking for short-term rentals shall utilize the onsite parking (garage and driveway), as provided
for by the property design and layout. Street parking shall be utilized only after the onsite
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-27
options have been exhausted. No oversized vehicle shall be parked on the property associated
with a short-term rental and there shall be no parking on landscape areas.
8. No signage shall be permitted in association with short-term rentals.
9. The Operator shall register with the City for the collection and remittance of Transient
Occupancy Taxes (TOT) associated with the operation of the short-term rental. The Operator
shall be responsible for annual payments of TOT less any TOT payments collected by host
websites which are subject to a separate agreement with the City.
10. The short-term rental registration is non-transferable.
11. The Operator shall be responsible for providing the renter copies of the Terms of Use, any
additional house rules, and ensuring compliance with those standards.
12. The renting of un-hosted short-term rentals shall be limited to a maximum of 12 weeks per
year. Hosted short-term rentals, with onsite live-in Operators, are not subject to specific
limitations on the renting of rooms, etc.
13. No short-term rentals shall be allowed within a dwelling unit that is subject to an affordable
housing agreement which restricts the dwelling unit from being rented.
14. Any modification, improvements and conversions within the dwelling unit shall be made in
compliance with the Uniform Building Code and subject to the building permitting process.
E. Application Review. The Director (or designee), shall be responsible for reviewing the site
conditions and verifying the veracity of the information provided on the registration applications.
Based on that review, the Director shall have the authority to impose additional conditions on the
Terms of Use based on site conditions or other concerns that result from the application review. Any
additional conditions imposed by the Director may be appealed to the Planning Commission.
F. Registration and Renewal Fee Required. At the time of registration or renewal, the owner/operator
shall pay a registration fee in an amount set from time to time by Resolution of the City Council to
reimburse the City for the cost of processing the registration. Registration shall be initiated only upon
the successful payment of the registration fee and a complete registration packet. An annual renewal
application and fee shall be submitted 30 days prior to the expiration of the current short-term rental
registration. The registration and renewal fees are non-refundable.
G. Enforcement. Violations of this Section may be enforced pursuant to Title B of the Municipal Code.
Upon a determination of a violation of the short-term rental standards or the determination that the
operation of the short-term rental constitutes a public nuisance, a public hearing may be scheduled
by the Zoning Administrator to consider revocation of the registration and the ability to operate a
short-term rental at the subject property per Section D7-32 of the Zoning Ordinance. A revoked short-
term rental registration shall not be considered for re-issuance for a period of 12 months following
the effective date of the revocation.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-28
D4-28 - Card Rooms
Card rooms shall comply with the requirements of Municipal Code Division B1, Chapter I (Cardrooms).
D4-29 - Child Day Care Facilities
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), large family day care homes
shall comply with the requirements of this Section.
A. Purpose. The intent of these regulations is to prescribe reasonable standards for large family day
care homes in San Ramon.
B. Permit required. A Use Permit issued by the Zoning Administrator shall be required before operating
a large family day care home.
C. Hearing. If requested in writing after a 15-day notice from the City, a hearing will be held on the
application for a large family day care home.
D. Contents of application. An application for a Large Family Day Care Home Permit shall contain the
information as outlined by the Zoning Administrator with the General Submittal Requirement List.
E. Findings required. The Zoning Administrator shall issue a Use Permit only when the following
findings can be made:
1. The proposal adheres to all State of California Department of Social Services requirements for
large family day care homes; and
2. The large family day care home is not within 300 feet of any other legally established large
family day care home; and
3. The Fire and Building Departments approve clearance for use of the residential structure as a
large family day care home; and
4. The primary use of the structure is as a residence; and
5. Operation of the large family day care home at the proposed location will not result in hazardous
traffic circulation, traffic conditions, and parking; and
6. Operation of the large family day care home at the proposed location will be in compliance with
adopted noise standards applicable to the site.
F. Standards. All large family day care homes shall comply with all applicable State standards and
requirements for family day care homes. In addition, all large family day care homes shall comply
with the following standards:
1. Outdoor play area. Outdoor play areas shall be provided at all large family day care homes.
a. All outdoor play areas shall be enclosed by a natural barrier, wall, solid fence, or other
solid structure at least 6 feet in height.
b. All outdoor play areas shall be adequately separated from driveways, streets, and parking
areas.
2. Parking. Adequate parking shall be provided for employees of the large family day care home
and for pick-up and drop-off of children at the home in accordance with the following standards:
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-29
a. In addition to the off-street parking spaces required for the residential zone, one
additional off-street parking space shall be provided per employee, and can be within the
setback and/or in the driveway.
b. Adequate space shall be available for the safe pick-up and delivery of children to the
day care home. This space shall be off-street, and can be in the driveway or off-street
parking area.
1. Overconcentration. A large family day care home shall be a minimum of 300 feet from any
other legally established large family day care home. The 300-foot minimum distance shall be
measured from the subject site property lines to the property lines of any other legally
established large family day care home. Small family day care homes and day care centers are
not included when determining overconcentration.
2. Noise. The applicant shall address noise impacts on neighboring properties consistent with the
noise standards of the City.
C. Appeals. Decisions of the Zoning Administrator may be appealed to the Planning Commission in
accord with Chapter D7-II (Appeals and Calls for Review).
D4-30 - Commercial Entertainment Facilities
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), commercial entertainment
facilities shall comply with the requirements of this Section.
A. Purpose. The intent of these regulations is to control the location and hours of operation of game
centers so as not to allow school children to play the games during school hours nor to encourage
minors to congregate in areas close to commercial establishments that sell alcoholic beverages.
B. Permit required. A Use Permit shall be required to install, operate or maintain six or more games.
C. Duration and renewal of permit. Initially, the permit shall be valid only for one year; thereafter, the
Zoning Administrator may renew the permit for periods of not more than two years. The procedure
for renewal is the same as that for the initial application, and the same factors considered for the initial
application shall be considered for the renewal.
D. Adult manager. At least one adult manager (18 years of age, or 21 or over if serving alcohol) shall
be on the premises during the time a game center is open to the public.
E. Location criteria.
1. A game center shall not be permitted within 300 feet of a school site or the boundary of an R
zone, or within 500 feet of a liquor store, a cocktail lounge or bar. The distance shall be
measured in a straight line from the main public entrance to the game center to the property line
of the school site, the zone boundary, or the main public entrance of the liquor store or cocktail
lounge, as the case may be. Exits not limited to emergency use only shall generally be directed
away from an R zone adjoining the site.
2. Within the CC Zone, game centers with not more than five games shall be permitted, subject to
the restrictions that may be imposed pursuant to Subsection F below.
F. Restrictions. The Zoning Administrator may impose reasonable restrictions on the physical design,
location, and operation of a game center in order to minimize the effects of noise, congregation,
parking, and other nuisance factors that may be detrimental to the public health, safety and welfare
of the surrounding community.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-30
G. Appeals. Any person may appeal the decision of the Zoning Administrator on an application for an
initial permit or a renewal of a game center permit to the Planning Commission in accord with Chapter
D7-II (Appeals and Calls for Review)
D4-31 - Employee Eating Areas
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), outdoor employee eating
areas shall comply with the requirements of this Section.
A. Standards.
1. A minimum of 150 square feet of outdoor eating facilities shall be provided for office buildings
of 10,000 gross sq. ft. or greater, excluding warehouse and storage space. A larger outdoor
eating area shall be required for larger buildings in an amount to be determined by the Zoning
Administrator. Credit toward the required amount of square footage will be given for indoor
eating facilities as determined by the Zoning Administrator.
2. The area shall be easily accessible to employees and shall be located to offer a sense of
privacy.
3. The area shall be landscaped and provided with attractive outdoor furniture, i.e., metal, wood,
or concrete picnic tables, benches/chairs and trash receptacles.
4. A site plan showing the location, landscaping and facilities required above shall be submitted
to the Zoning Administrator for approval as part of the development application.
B. Exceptions. This Section shall not apply to industrial/office buildings that are located within 1,000
feet of an approved mini-park or a City park that include facilities for eating and are accessible by
walking as determined by the Zoning Administrator.
D4-32 - Heliports
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), heliports shall comply with
the requirements of this Section.
A. Purpose. These regulations establish location criteria and development standards for helicopter
takeoff and landing areas to protect the public health, safety and welfare, and to minimize land-use
conflicts, noise impacts, and operational hazards.
B. Permit required. A Use Permit shall be issued by the Planning Commission, for the construction and
operation of a heliport, helipad, or helistop upon finding that:
1. The helipad, heliport, or helistop conforms to the location criteria and standards established in
Subsections D. and E., and the requirements of the California Department of Transportation,
Division of Aeronautics;
2. The heliport, helipad, or helistop is compatible with the surrounding environment; and
3. The proposed operation of the helicopter facility does not pose a threat to public health, safety
or welfare.
The Planning Commission may impose conditions on approval of the Use Permit to prevent adverse
impacts on surrounding properties; if such impacts cannot be mitigated to an acceptable level, the
Use Permit application shall be denied.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-31
C. Location criteria.
1. Relation to transportation system. The heliport, helipad, or helistop shall be located within
3,000 feet of a freeway as designated on the General Plan.
2. Minimum separation. Minimum separation between heliports, helipads, and helistops shall be
1.5 miles, except for facilities specifically intended for emergency use, such as medical
evacuation, and temporary landing sites.
3. Protected areas. No heliport, helipad, or helistop shall be located within 1,000 feet of an R
zone or the site of a public or private school or within 500 feet of a park provided that heliports,
helipads or helistops specifically intended for emergency use may be within 500 feet of an R
zone, a park or a public or private school. Temporary landing sites within 1,000 feet of a public
or private school may be allowed with a temporary Use Permit subject to approval of: (a) the
City of San Ramon; (b) the San Ramon Valley Unified School District; and (c) the California
Department of Transportation.
D. Site development standards.
1. Approach and departure paths 65 feet wide shall be free of obstruction for a minimum distance
of 400 feet.
2. Setbacks from property lines shall be as follows:
a. Takeoff and landing area - 100 feet;
b. Helicopter maintenance facilities - 25 feet;
c. Administrative or operations building - 15 feet.
3. Any lighting used for nighttime operations shall be directed away from adjacent properties and
public rights-of-way.
4. A telephone shall be provided on or adjacent to the heliport, helipad or helistop.
5. Helipads, heliport or helistops intended for emergency use shall have a landing pad with a
standard landing area designated and the words "Emergency Only". The initial direction of the
departure routes shall be indicated on the takeoff and landing area.
E. Application requirements. The following additional information shall be submitted with a Use Perm it
application:
1. An area map, at a scale of 1" = 800' showing existing land use within a two-mile radius of the
facility site and the proposed flight paths.
2. A plot plan of the site and vicinity, including all land within a 400-foot radius of the takeoff and
landing area, that shows clearly the height of the takeoff and landing area; the height of existing,
approved and proposed structures and trees within 100 feet of the approach and takeoff flight
paths; and the maximum allowable building height under existing zoning.
3. A description of the proposed operations, including the type of use, names and descriptions of
helicopters expected to use the facility, and anticipated number and timing of daily flights.
4. A helicopter noise study including a map of the approach and departure flight paths at a scale
of 1" = 800' showing existing day/night average noise levels in decibels (LDN noise contours),
future day/night average noise levels with the proposed facility and anticipated flight operations,
and single-event maximum sound levels associated with the types of helicopters expected to
use the facility.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-32
F. Appeals. Decisions of the Commission may be appealed to the Council in compliance with Chapter
D7-II (Appeals and Calls for Review).
D4-33 - Home Occupations
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), home occupations and
Cottage Food Operations shall comply with the requirements of this Section.
A. Permit required. A home occupation or Cottage Food Operation in a residential zone shall require
a home occupation permit unless a minor use permit is required by subsection D4-33.D (Minor
Exceptions) or subsection D4-33.E (Cottage Food Operation). The Zoning Administrator shall issue
the permit upon determining that the proposed home occupation complies with the requirements of
this section.
B. Application contents. An application for a home occupation permit shall contain the information as
required by the Zoning Administrator.
C. Required conditions. Home occupations shall comply with the following regulations:
1. No clients may come to the home.
2. The use is incidental to the residential use of the dwelling.
3. The use shall be conducted entirely within a portion of the main building, not within any required
parking facility and shall not exceed 20 percent of the building's floor area, excluding garage
square footage. No outside storage shall be permitted.
4. No article shall be sold or offered for sale on the premises.
5. No person other than a resident of the dwelling shall be employed on-site or report to work at
the site in the conduct of the home occupation This prohibition also applies to independent
contractors.
6. The use will not generate vehicular or pedestrian traffic in excess of that which is normally
associated with residential uses in the same zone.
7. No parking space will be obstructed and no additional parking space will be required for the
home occupation.
8. There is no exterior indication of the home occupation, including signs.
9. The use will not create noise, odor, dust, fumes, vibration, smoke, electrical interference, or any
other interference with residential uses of adjacent property.
10. No motor vehicle repair shall be permitted at operator’s residence. Auto cleaning, detailing, and
minor replacement or repair of glass or accessory parts may be performed off-site.
11. No personal services shall be permitted on-site.
12. The address of the home occupation will not be advertised in any publication. Business cards
and letterhead are not included in this requirement.
D. Minor Exceptions. Any minor exception to a home occupation such as, but not limited to client visits,
outdoor uses, etc. shall require a Minor Use Permit in accordance with Chapter D6-28 (Use Permits
and Minor Use Permits). The Zoning Administrator may impose conditions as deemed necessary to
protect the best interests of the surrounding area for a home occupation requiring approval of a Minor
Use Permit.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-33
1. Factors to be considered. The Zoning Administrator may consider factors such as, but not
limited to the following during review of a home occupation requiring a Minor Use Permit:
a. Parking;
b. Traffic control;
c. Noise Control;
d. Operating characteristics;
e. Hours of operation;
E. Cottage Food Operation. A Cottage Food Operation with client visits and/or up to one non-resident
employee in a residential zone shall require a Minor Use Permit, in accordance with Chapter D6-28
(Use Permits and Minor Use Permits).
1. Standards. The Zoning Administrator may consider reasonable standards, restrictions, and
requirements related to the following:
a. Spacing and Concentration. A Cottage Food Operation with client visits and/or up to one
non-resident employee shall be a minimum of 300 feet from any other legally established
Cottage Food Operation with client visits and/or up to one non-resident employee. The 300
foot minimum distance shall be measured from the subject site property lines to the property
lines of any other legally established Cottage Food Operation with client visits and/or up to
one non-resident employee;
b. Traffic control;
c. Parking;
d. Noise Control
F. Discontinued Use. As determined by the Zoning Administrator, all permits issued pursuant to this
section may become null and void if the business license for a home occupation or Cottage Food
Operation is discontinued for a period of one year.
G. Revocation. A permit granted pursuant to this section may be revoked by the Zoning Administrator
pursuant to the procedures established by Zoning Ordinance Division D7, Chapter V (Enforcement).
H. Appeals. In accord with Chapter D7-II (Appeals and Calls for Review), decisions of the Zoning
Administrator may be appealed to the Planning Commission.
D4-34 - Live Entertainment
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), live entertainment shall
comply with the requirements of this Section.
A. Exits not limited to emergency use only shall generally be directed away from an R zone adjoining the
site.
B. A Use Permit shall establish conditions ensuring that no litter problem will exist.
C. A Use Permit for live entertainment shall apply only to the type of entertainment approved, and a
different type of entertainment shall require approval of a separate Use Permit.
D. Noise requirements and other limitations. Approval shall include conditions addressing:
1. Hours of operation;
2. Transferability; and
3. The temporary vs. permanent nature of the use.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-34
D4-35 - Outdoor Display, Storage, and Vending
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), outdoor display and sales
shall comply with the requirements of this Section.
A. Outdoor display and storage.
1. Where permitted. The outdoor storage and display of merchandise, materials, or equipment,
including display of merchandise, materials, and equipment for customer pick-up may occur
only where allowed by the allowable land use tables in Division D2 for the specific zone
applicable to the site.
2. Permit conditions, grounds for denial. A Minor Use Permit for outdoor storage, display, or
food service may require yards, screening, or planting areas necessary to prevent adverse
impacts on surrounding properties and the visual character of scenic areas as identified in the
General Plan. If these impacts cannot be prevented, the Zoning Administrator shall deny the
Minor Use Permit application.
3. Exceptions. Notwithstanding the provisions of Subsections A.1 and A.2 above, outdoor
storage and display shall be permitted in conjunction with plant nurseries in zones where plant
nurseries are allowed by Division D2, provided that the outdoor storage and display is limited
to plants only.
4. Screening. Except for the land uses excepted by Subsection A.3 above, each outdoor storage
and display area shall be screened from the view of streets by a solid fence or wall. The height
of merchandise, materials, and equipment stored or displayed in the MW zone shall not exceed
the height of the screening fence or wall. In other zones, screening shall be provided as
prescribed by the Minor Use Permit.
5. Coin-Operated Vending Machines. Each machine located in an R zone or within 300 feet of
an R zone, except for machines located on the site of a service station, shall be buffered from
view from public rights-of-way.
6. Outdoor eating areas. Sidewalk cafes and outdoor food service accessory to an Eating and
Drinking Establishment shall include no outdoor preparation of food or beverages.
7. Appeals. Decisions of the Zoning Administrator may be appealed to the Planning Commission
in compliance with Chapter D7-II (Appeals and Calls for Review).
B. Outdoor vending.
1. Purpose. To provide opportunities for outdoor vendors to operate in the MU, CCMU, CC, CS,
CR, CT, OA, and OL Zones and to ensure that such operations are properly regulated in such
a manner that their benefits to the City are realized and at the same time adverse impacts are
minimized.
2. Definitions.
a. Vendor. A person with a current business license who sells, or offers to sell any type of
merchandise, including food, beverages or edibles of any type whether hot, cold, fresh,
prepared or packaged, from a mobile food truck, or at an approved location other than
within a building or structure constructed on a permanent foundation that is rented, leased,
or owned by that person.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-35
b. Vending. Selling or offering to sell any type of merchandise, including food, beverages
or edibles of any type, at any location other than within a building or structure constructed
on a permanent foundation, which is rented, leased, or owned by the person selling or
offering to sell the merchandise.
c. Vending equipment. Includes, but is not limited to any materials, merchandise, tools,
vehicles, carts, tables, chairs, or other items owned by, in the possession of or associated
with a licensed vendor.
3. Permits required.
a. Minor Use Permit. A Minor Use Permit issued by the Zoning Administrator shall be
required for any vending locations in accordance with Chapter D6-28 (Use Permits and
Minor Use Permits).
b. Business License. Every vendor shall obtain a City Business License prior to operation.
c. County Health Department. If food and/or beverages are being sold, a valid permit from
the County Health Department is required.
d. Building and Fire Departments. All necessary permits and approvals from the Building
and Fire Departments shall be obtained prior to operation of a vending business.
e. Permit and license display. At all times while vending, a valid Business License and
Minor Use Permit shall be displayed at the vending site.
f. Adverse Impacts. The Zoning Administrator may impose conditions of approval on the
Minor Use Permit to prevent adverse impacts on surrounding uses.
4. Location criteria and hours of operation.
a. Hours. Hours of operation for vending businesses shall be as determined by the Minor
Use Permit.
b. Location. Vending shall be allowed with an approved Minor Use Permit on private
property in the MU (Mixed Use) and CCMU (City Center Mixed Use), C (Commercial) and
O (Office) zones only.
c. Vendors shall not operate:
(1) at a location where space for pedestrian passage will be reduced to less than four
feet;
(2) at a location which obstructs access to any entrance to any building or facility used
by the public, including but not limited to doors and emergency exits;
(3) within 10 feet of any handicap access ramp, pedestrian crosswalk, or fire hydrant;
(4) within any landscaped area;
(5) within the public right-of-way including streets and sidewalks;
(6) within 100 feet of the frontage of a store or restaurant selling food and/or beverages
for on-site consumption, in the case of a vendor selling food and/or beverages; or
within 100 feet of the frontage of a store selling a similar commodity, in the case of
a vendor selling commodities other than food and/or beverages;
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-36
(7) within a public park or recreation area, except when licensed by the City as a
concessionaire or when authorized by the City to vend at special events; and
(8) within 200 feet of another approved vending location.
5. Standards and design criteria.
a. Vendors shall maintain their immediate sales location in a clean and hazard free condition;
failure to so maintain and failure to clean the vending location of all waste shall be cause
for revocation of the Use Permit.
b. Vendors selling food and/or beverages shall maintain garbage container(s) immediately
adjacent to the vending location for use by customers.
c. No vendor shall use, play or employ any sound, outcry, amplifier, loudspeaker, radio or
any other instrument or device for the production of sound in connection with the
promotion of a vending operation.
d. No vendor shall sell any merchandise to any person who is in a motor vehicle at the time
of sale.
e. Every food vendor shall be required to have a written agreement giving the vendor the
right to use permanent sanitary facilities located no more than 200 feet from the approving
vending location.
f. No off-site signage advertising the vending operation is permitted.
g. The maximum sign area is eight square feet per vendor.
h. All signage shall be located on the vending equipment.
i. Vending equipment shall be easily moved and self-supporting; at no time shall vending
equipment be attached, tied, or locked to trees, hydrants, or other permanent vertical
structures or benches.
j. After the permitted hours of operation, all vending equipment shall be stored off-site or
within an enclosed structure on-site.
k. No vendor shall sell alcoholic beverages.
l. Vendors cooking food shall maintain a fire extinguisher at the vending location at all times.
m. Vendors operating within a parking lot shall not inhibit traffic circulation and shall maintain
the minimum required on-site parking stalls during operation.
6. Exceptions. The Zoning Administrator may grant minor exceptions to the regulations contained
in Subsections D. and E. above, provided that the Required Findings can still be made.
7. Contents of application. An application for a Minor Use Permit shall
contain the information as required by the Zoning Administrator in
compliance with Section D6-28 (Use Permits and Minor Use Permits).
8. Findings required. In addition to the required Findings for Use Permits and Minor Use Permits
contained in Section D6-28.F, the Zoning Administrator shall make the following additional
findings:
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-37
a. The proposed vendor operation will not adversely impact adjacent businesses including
the creation of unfair competition with merchants in fixed locations.
b. The vending equipment and operation will be aesthetically pleasing
c. The vending operation will not adversely impact automobile and pedestrian safety, and
will have minimal impacts on parking.
D4-36 - Mobile Homes and Mobile Home Parks
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), mobile homes and mobile
home parks shall comply with the requirements of this Section.
A. Purpose.
It is the intent of the City to provide opportunities for the placement of mobile homes in R zones
and to insure that such mobile homes are designed and located so as to be harmonious within the
context of the surrounding houses and neighborhood.
B. Definitions:
Mobile Home: A Mobile Home means a Manufactured Home as defined in the California Health
and Safety Code Section 18008, which is a structure that was constructed on or after June 15,
1976, is transportable in one or more sections, is eight feet or more in width, or 40 feet or more in
length, in the traveling mode, or, when erected on site, is 320 or more square feet, is built on a
permanent chassis and designed to be used as a single-family dwelling with or without a
foundation when connected to the required utilities, and includes the plumbing, heating, air
conditioning, and electrical systems contained therein. (Recreational Vehicles are not classified
as Mobile Homes.)
Tiny House: A Tiny House is considered as a Recreational Vehicle when it is designed and built
on a single chassis to be towed and used as a dwelling unit, provided that it contains less than
320 sq. ft. of interior living room area including wardrobe, closets, cabinets, kitchen fixtures, and
bath or toilet room (see Section D3-41 E.). If a Tiny House is designed and constructed on a
permanent foundation with a minimum floor area of 150 sq. ft. including a kitchen sink, cooking
appliance and refrigeration facilities, it is considered as an efficiency unit (see Section D4-39
Accessory Unit).
Mobile Home Park: A Mobile Home Park is a site planned and improved to accommodate two or
more mobile homes used for residential purposes, or on which two or more mobile home lots are
rented, leased, or held out for rent or lease, or were formerly held out for rent or lease and later
converted to a subdivision, cooperative, condominium, or other form of resident ownership, to
accommodate mobile homes used for residential purposes.
C. General Requirements
1. Mobile home parks are allowed by Division D2 (Allowable Land Uses and Zoning Standards)
and shall comply with the requirements of this Section, except:
a. On substandard lots that do not meet the dimensional standards of Division D2.; or
b. On lots with an average slope of more than 10 percent, or on any portion of a lot where
the slope exceeds 15 percent.
2. A mobile home may be used for residential purposes if:
a. Such a mobile home has been approved with an Architectural Review application as a
primary structure in an R zone; or
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-38
b. Such a mobile home has been approved with an applicable building permit as an
Accessory Dwelling Unit in an R zone; or
c. Such a mobile home has been approved with a Minor Use Permit by the Zoning
Administrator as caretaker housing for their locations in an AG zone, PS zone, or MW
zone.
3. Mobile homes may be used for temporary uses, subject to the requirements of a Temporary
Use Permit issued under Chapter D6-27 (Temporary Use Permits).
D. Design Criteria
The location and design of mobile homes for permanent installation shall comply with the following
criteria in order to protect neighborhood integrity, provide for harmonious relationship between
mobile homes and surrounding uses, and minimize problems that could occur as a result of
locating mobile homes on residential lots.
1. Installation of mobile homes shall be consistent with the same restrictions on density and to
the same property development standards and shall meet the following standards:
a. A mobile home must have been constructed on or after June 15, 1976, and must be
certified under the National Manufactured Home Construction and Safety Act of 1974;
b. A mobile home must be built on a permanent foundation approved by the Chief Building
Official;
c. The unit's skirting must extend to the finished grade;
d. Exterior siding must be compatible with adjacent residential structures, and shiny or
metallic finishes are prohibited;
e. The roof must have a pitch of not fewer than three inches vertical rise per 12 inches
horizontal distance; and
f. The roof must be concrete or asphalt tile, shakes or shingles complying with the most
recent edition of the Uniform Building Code fire rating.
2. For a mobile home park, or in a case where a mobile home is used as the primary structure
on a single-family residential property, mobile homes shall be compatible in design and
appearance with residential structures in the vicinity and shall meet the following standards:
a. Each mobile/manufactured home (once assembled) must be at least 24 feet wide;
b. The roof should have eaves or overhangs of not less than one foot, unless it would be
incompatible with the existing architectural characteristics of the community;
c. Required covered parking shall be compatible with the mobile home design and with
other buildings in the area.
3. If a mobile home is used as an Accessory Dwelling Unit, as per Section D4-39 of this division,
the location and the size shall be consistent with the applicable setback requirements for the
subject property and shall be compatible in design and appearance with the primary
residential structure on the subject property.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-39
E. Surrender of State Vehicle Registration
Whenever a mobile home is installed on a permanent foundation, any registration of said mobile
home with the State of California shall be surrendered, pursuant to California Health and Safety
Code Section 185519. Prior to issuance of any certificate of occupancy for the use of the mobile
home, the owner shall provide the Chief Building Official with an evidence showing that the state
registration of the mobile home has been or will be surrendered with certainty. If the mobile home
is new and has never been registered with the state, the owner shall provide the Chief Building
Inspector with a statement to that effect from the dealer selling the mobile home.
D4-37 - Recycling Facilities
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), recycling facilities shall
comply with the requirements of this Section.
A. Definitions.
1. Recyclable Material. Reusable material including, but not limited to metals, glass, plastic and
paper which are intended for reuse, remanufacture, or reconstitution for the purpose of using
the altered form. Recyclable Material may include electronic waste and universal waste
provided that it is collected, handled, transported and recycled in accordance with California
Universal Waste Regulations. Recyclable material does not include clothing and small goods
covered under D4-37(A)(5) or refuse or hazardous materials, but may include used motor oil
collected and transported in accordance with California Health and Safety Code Sections
25250.11 and 25143.2(b)(4).
2. Recycling Facility. A center for the collection and/or processing of recyclable materials.
3. A Certified Recycling Facility or Certified Processor. A recycling facility certified by the
California Department of Resources Recycling and Recovery (CalRecycle) as meeting the
requirements of the California Beverage Container Recycling and Litter Reduction Act of 1986.
a. Collection Facility. A center for the acceptance of donation, redemption, or purchase of
recyclable materials from the public.
(1) Small collection facilities occupy less than 500 square feet and may include:
- A mobile unit;
- Bulk reverse vending machines or a grouping of reverse vending machines
occupying more than 50 square feet;
- Kiosk-type units that may include permanent structures; or
- Unattended containers placed for the donation of recyclable materials.
(2) Large collection facilities occupy more than 500 square feet and may include
permanent structures as well as mobile units, bulk reverse vending machines,
Kiosk-type units.
b. Processing Facility. A building or enclosed space used for the collection and processing
of recyclable materials. Processing means the preparation of material for efficient
shipment, or to an end-user's specifications, by such means as baling, briquetting,
compacting, flattening, grinding, crushing, mechanical sorting, shredding, cleaning, and
remanufacturing.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-40
(1) A light-processing facility occupies less than 45,000 square feet and includes
equipment for baling, briquetting, crushing, compacting, grinding, shredding and
sorting of source-separated recyclable materials, except ferrous metals other
than food and beverage containers, and repairing of reusable materials.
(2) A heavy-processing facility is any processing facility larger than a light-
processing facility.
4. Reverse Vending Machine. An automated m echanical device that accepts at least one or
more types of empty containers including aluminum cans, glass and plastic bottles, and issues
a cash refund or a redeemable credit slip. A reverse vending machine may sort and process
containers mechanically, provided that the entire process is enclosed within the machine.
a. A single-feed revenue vending machine is designed to accept individual containers one
at a time.
b. A bulk reverse vending machine is designed to accept more than one container at a time
and to compute the refund or credit due on the basis of weight.
5. Mobile Recycling Unit. An automobile, truck, trailer, or van and appurtenant bins, boxes or
containers used for the collection of recyclable materials.
6. Unattended Donation and Collection Boxes. Unattended donation and collections box or bin
means any unattended container, receptacle, or similar device that is located on any lot within
the City and that is used for soliciting and collecting donations of clothing or other small scale
salvageable personal property. This term does not include recycle bins for the collection of
“recyclable material” as defined by Section D4-37 A. (1) or any unattended donation or collection
box located inside a building.
B. Permits required. No person shall place, construct, or operate any recycling facility without first
obtaining a permit as follows:
TABLE 4-3 - RECYCLING FACILITIES PERMITS REQUIRED
Type of Facility
Zones Permitted
Permit Required
Single-Feed Reverse
Vending Machine(s) MU, all C and MW Use Permit
Bulk Reverse Vending CC, CS, CT, and MW Use Permit
Small Collection CS, CT, MW, and PS Minor Use Permit
Large Collection CS, CT, MW, and PS Use Permit
Light Processing MW Use Permit
Heavy Processing MW Use Permit
Unattended Donation
and Collection Boxes MU, all C, PS, and MW Minor Use Permit
C. Permits for multiple sites.
1. A Use Permit or Minor Use Permit as indicated in Table 4-3 may be granted to allow more than
one reverse vending machine or small collection facility located on different sites under the
following conditions:
a. The operator of each of the proposed facilities is the same;
b. The proposed facilities are determined by the Zoning Administrator to be similar in nature,
size and intensity of activity; and
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-41
c. All the applicable criteria and standards set forth in this Chapter are met for each such
proposed facility.
2. Unattended Donation and Collection Boxes shall require a Minor Use Permit for each commercial
property or shopping center for which a box or boxes are located.
D. Design criteria and standards.
1. Reverse vending machines.
a. Each machine shall be located within 30 feet of the entrance to the primary commercial
use on the site and shall not obstruct pedestrian or vehicular circulation, not within a
landscaped area.
b. No required parking space for the development shall be used for the reverse vending
machine.
c. Each machine shall occupy no more than 50 square feet of space, including any protective
enclosure, and shall not exceed eight feet in height.
d. Each machine shall be clearly marked to identify the type of material to be deposited,
operating instructions, and the identity and phone number of the operator or responsible
person to call if the machine is inoperative.
e. The maximum sign area is four square feet per machine, exclusive of operating instructions
of Subsection D.1.d.
f. Adequate nighttime lighting shall be provided, if warranted.
2. Small collection facilities.
a. Small collection facilities shall be no larger than 500 square feet, shall be set back at least
10 feet from a front or side property line, and shall not obstruct pedestrian or vehicular
circulation.
b. No power-driven processing equipment shall be used except for reverse vending
machines.
c. All containers shall be constructed and maintained with durable waterproof and rustproof
material, covered when the site is not attended, secured from unauthorized entry or
removal of material, and of a capacity sufficient to accommodate materials collected.
d. All recyclable material shall be stored in containers or in a mobile unit vehicle.
e. Personnel attended facilities located within 100 feet of the boundary of an R zone shall
operate only between 7 a.m. and 7 p.m.
f. Containers for the 24-hour donation of materials shall be at least 100 feet from the
boundary of an R zone unless there is a recognized service corridor and acoustical
shielding between the containers and residential use.
g. Containers shall be clearly marked to identify the type of material that may be deposited;
the facility shall be clearly marked to identify the name and telephone number of the facility
operator and the hours of operation, and display a notice stating that no material shall be
left outside the recycling enclosure or containers.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-42
h. The maximum sign area shall be 16 square feet exclusive of informational requirements
and operational instruction of Subsection D.2.g. above. Directional signs bearing no
advertising message may be installed with the approval of the Zoning Administrator if
necessary to facilitate traffic circulation, or if the facility is not visible from the public right-
of-way.
i. No additional parking spaces will be required for customers of a small collection facility
located at the established parking lot of a host use. One space will be provided for the
attendant, if needed.
j. Mobile recycling units shall have an area clearly marked to prohibit other vehicular parking
during hours when the mobile unit is scheduled to be present.
k. No required parking spaces shall be occupied by the facility.
3. Large collection facilities.
a. A large collection facility shall be located at least 250 feet from an R zone.
b. Each facility shall be in an enclosed building or within an area enclosed by an opaque fence
at least six feet in height with landscaping.
c. Six parking spaces shall be for customers and one parking space shall be provided for
each commercial vehicle operated by the recycling facility.
d. Power-driven processing, including aluminum foil and can compacting, baling, plastic
shredding, or other light-processing activities necessary for efficient temporary storage and
shipment of material may be allowed if noise and other conditions are met.
4. Processing facilities.
a. Processors will operate in a wholly enclosed building except for incidental storage, or within
an area enclosed on all sides by an opaque fence or wall not less than eight feet in height
and landscaped on all street frontages located at least 250 feet from an R zone.
b. Power-driven processing shall be permitted provided all noise-level requirements are met.
Light-processing facilities are limited to baling, briquetting, crushing, compacting, grinding,
shredding and sorting of source-separated recyclable materials and repairing of reusable
materials.
c. If the facility is open to the public, space will be provided for a minimum of 10 customers
or the peak load, whichever is higher, except where the Zoning Administrator determines
that allowing overflow traffic is compatible with surrounding businesses and public safety.
d. One parking space will be provided for each commercial vehicle operated by the
processing center.
5. All collection and processing facilities.
a. No facility or storage area shall occupy a required front or corner side yard, and all
regulations applicable to the principal structure on the site shall apply to collection and
processing facilities except as provided in this section.
b. A large collector or processing facility may accept used motor oil for recycling from the
generator in compliance with California Health and Safety Code Section 25250.11.
c. All exterior storage of material shall be in sturdy containers or enclosures that are fully
covered, secured, and maintained in good condition. Storage containers for flammable
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-43
material shall be constructed of non-flammable material. No storage, excluding truck
trailers and overseas containers, will be visible above the height of the fencing.
d. Noise levels generated by the facility shall not exceed 60 dBA as measured at the
property line of an R zone or otherwise shall not exceed 70 dBA.
e. All facilities shall be administered by on-site personnel during hours the facility is open. If
a large collection or processing facility is located within 500 feet of an R zone, it shall not
be in operation between 7 p.m. and 7 a.m.
f. Any containers provided for after-hours donation of recyclable materials shall be of sturdy,
rustproof construction; shall have sufficient capacity to accommodate materials collected;
and shall be secure from unauthorized entry or removal of materials.
g. The site of the facility shall be kept free of litter and any other undesirable material.
Containers shall be clearly marked to identify the type of material that may be deposited.
The facility shall display a notice stating that no material shall be left outside the recycling
containers.
h. Sign regulations shall be those provided for the zone in which the facility is located. In
addition, each facility shall be clearly marked with the name and phone number of the
facility operator and the hours of operation.
i. No dust, fumes, smoke vibration or odor above ambient level may be detectable on
neighboring properties.
6. Unattended Donation and Collection Boxes.
a. No more than two (2) unattended donation and collection boxes shall be located on each
parcel of real property.
b. Unattended donation and collection boxes shall be no more than eighty-two (82) inches
high, fifty-six (56) inches wide and forty-nine (49) inches deep.
c. Unattended donation and collection boxes shall be located in a well-lit area that is visually
unobtrusive and minimizes any negative aesthetic and view impact to the property and
public right of way. Boxes should not be located in the front setback, unless no practical
alternative is available and findings are included as part of the approval.
d. No unattended donation and collection box shall be placed in required parking spaces,
required landscaping, ADA path of travel, stormwater detention area or the public right of
way.
e. Unattended donation and collection boxes shall be subordinate and accessory to the
principal use of the property.
f. Unattended donation and collection boxes shall be maintained in good condition and
appearance with no structural damage, holes, or visible rust, and shall be free of graffiti;
g. Unattended donation and collection boxes shall be locked or otherwise secured;
h. Unattended donation and collection boxes shall be marked clearly to identify the type of
material to be deposited.
i. Unattended donation and collection boxes shall contain the following contact information
in two (2") inch type visible from the front of each unattended donation box: the name,
address, and phone number of both the permittee and operator;
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-44
j. The front of every unattended donation and collection box shall display conspicuously a
statement in at least two-inch font that either reads, "This collection box is owned and
operated by a for-profit organization." or "This collection box is owned and operated by a
nonprofit organization." A commercial fundraiser shall be classified as a for-profit
organization.
k. Unattended donation and collection boxes shall be free of any advertising which is
unrelated to the business of the operator of the unattended donation and collection box.
l. Unattended donation and collection boxes shall be serviced and emptied as needed, but
not less than once every seven (7) days.
m. The permittee shall maintain or cause to be maintained the area surrounding the
unattended donation and collection box(es) free of any junk, debris or other material and
shall be responsible to the extent provided by law for the cost to abate any violation.
n. The Applicant for unattended donation and collection boxes shall provide and maintain a
$2,000 dollar per site maintenance or removal deposit should it become necessary for the
City or property owner to abate a maintenance violation. The Applicant will be refunded
the balance of the deposit provided upon removal of the box(es).
o. Unattended donation and collection boxes shall remain only in the exact location for which
they have been permitted and may not be relocated on the property without prior property
owner and City approval.
D4-38 – Non-Retail Uses within Retail/Commercial Centers
A. Non-retail uses. To ensure the ground floor of retail/commercial centers maintain an appropriate
balance of non-retail and retail uses, non-retail uses exceeding 25% gross ground floor area shall be
subject to review by a Minor Use Permit for retail/commercial centers with 50,000 or less gross ground
floor square feet. A Use Permit is required for retail/commercial centers greater than 50,000 gross
ground floor square feet. The following economic findings shall be considered as part of the Minor
Use Permit or Use Permit review:
1. The proposed non-retail use would fill a space in a center with existing high (15-20 percent)
overall vacancy rate.
2. The proposed non-retail use would generate a high volume (100+ trips per day) of potential
customer traffic to the retail center when retailers are open.
3. The proposed non-retail use will generate sales taxes (such as artists’ studio, optometrist, or
artisanal food or custom goods manufacturing).
4. The property owner can demonstrate and document they have made a good faith effort to
market the space to retailers at a reasonable retail rental rate but nonetheless has experienced
long-term vacancy of six-months or greater.
5. The proposed non-retail use will retain an active storefront display and support the flow of
pedestrian traffic from one shop to another in the center.
6. The property owner can document that denial of a Minor Use Permit or Use Permit would result
in material financial hardship.
Alternatively, a non-profit cultural or arts organization use may be authorized by a Minor Use Permit or Use
Permit if the proposed use will generate traffic to the center
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-45
D4-39 - Accessory Dwelling Units
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), accessory dwelling units shall
comply with the requirements of this Section. An accessory dwelling unit in compliance with this Section is
an accessory use or an accessory building and shall not be considered to exceed the allowable density for
the property upon which it is located. (Government Code 65852.2)
A. Definitions.
1. Attached dwelling unit. A dwelling unit that has one or more party walls in common with
another dwelling unit.
2. Detached dwelling unit. A dwelling unit that does not share any walls in common with another
dwelling unit.
3. Accessory dwelling unit. An attached or detached subordinate dwelling unit located on a lot
which contains a single-family or multi-family dwelling. An accessory dwelling unit shall include
provisions for living, eating, sleeping, cooking and sanitation. An accessory dwelling unit may
also include an efficiency unit, as defined in Section 17958.1 of Health and Safety Code or
manufactured home, as defined in Section 18007 of the Health and Safety Code. An accessory
unit is not considered an accessory building as defined in Division D2 and Division D8
(Glossary).
4. Junior accessory dwelling unit. A unit that is no more than 500 square feet in size and
contained entirely within an existing single-family structure. A junior accessory dwelling unit
may include separate sanitation facilities, or may share sanitation facilities with the existing
structure.
B. Applicability. Accessory dwelling units are permitted on lots with a single-family or multi-family
dwelling.
1. Single-family. Within a new or proposed single-family home, a maximum of one accessory
dwelling unit and one junior accessory dwelling unit is allowed per lot if the space has exterior
access from the proposed or existing single-family dwelling and meets required setbacks
sufficient for fire and safety.
2. Multi-family.
a. Within an existing multi-family dwelling structure, the number of accessory dwelling units
shall be limited to a maximum of 25% of the existing multi-family dwelling units; and
b. A lot with a multi-family dwelling structure is limited to a maximum of two detached
accessory dwelling units.
C. Design and development Standards
1. Unit size.
a. An accessory dwelling unit attached or constructed within an existing dwelling, shall
contain at least 150 square feet, but not more than 50 percent of the net floor area of the
existing dwelling, or 850 square feet, whichever is greater.
b. A detached accessory dwelling unit studio or one-bedroom unit shall contain at least 150
square feet and shall not exceed a maximum of 850 square feet. A detached accessory
dwelling unit with more than one bedroom shall contain at least 150 square feet and shall
not exceed a maximum of 1,000 square feet.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-46
c. The existing dwelling may be considered the accessory dwelling unit, and a new dwelling
unit built, if all applicable standards and requirements of this Zoning Ordinance are met.
2. Required setbacks.
a. In all R zones or a PD zone, an attached accessory dwelling unit must conform to the
setbacks generally applicable to residential development in the applicable zone.
No additional setback shall be required for the conversion of an existing structure into an
accessory dwelling unit and no more than four (4) feet from the side and rear property lines
for an accessory dwelling unit constructed above an existing garage (Second Story).
b. In all R or residential PD zones, a detached accessory dwelling unit shall be set back a
minimum of twenty (20) feet from the front property line, four (4) feet from the side property
lines, and four (4) feet from the rear property line.
3. Height.
a. The height of a detached accessory dwelling shall be limited to 16 feet.
b. The height of an attached accessory dwelling is based on the maximum height allowed for
residential construction in the applicable zone.
4. Parking. An accessory dwelling unit shall require that one covered or uncovered parking space
be provided in addition to the parking required for the primary unit. The additional space may
be located within a required setback on a compliant parking surface or as a tandem space on
an existing driveway. The use of mechanical lifts for additional parking shall also apply.
Exception: Additional parking shall not be required under any of the following conditions:
a. The accessory dwelling unit is located within one-half mile of public transit. (For the
purpose of this paragraph, public transit means any established bus stop associated with
the bus services available for general public, such as but not limited to County Connection).
b. The accessory dwelling unit is located within an architecturally and historically significant
historic district.
c. The accessory dwelling unit is part of the existing primary residence or an existing
accessory structure.
d. When on-street parking permits are required, but not offered to the occupant of the
accessory dwelling unit.
e. When there is a car share vehicle located within one block of the accessory dwelling unit.
(For the purpose of this paragraph, car share vehicle means a passenger vehicle available
at a designated location for general public by reservation and with a fee, such as but not
limited to vehicles managed by Zipcar.)
5. Design.
a. The exterior design shall be in harmony with the immediate neighborhood. Building form,
materials, colors and exterior finishes should reflect and be substantially the same as
those of the existing primary dwelling.
b. Outside access to the accessory unit shall not be in the front of the existing dwelling.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-47
c. Utility connections shall be required based on the service provider’s standards for
accessory dwelling units.
d. Accessory dwelling units shall be designed to minimize potential privacy issues with the
neighboring properties, and additional landscape screening may be required.
D. Occupancy. Rental of the primary or accessory dwelling unit shall not be for a term of 30 days or
less unless approved for “lodging uses” pursuant to the site zoning designation.
E. Non-conforming units. Where the existing dwelling unit constitutes a legal non-conforming unit, an
accessory unit may be constructed only if the non-conformity is not expanded and the accessory unit
meets all current applicable zoning standards.
F. Subdivision. No subdivision or land or air rights shall be allowed of the subject parcel. Accessory
units shall not be offered for separate sale from the primary residence but may be rented.
D4-40 - Service Stations and Car Washes
Where allowed by Division D2 (Allowable Land Uses and Zoning Standards), service stations and car
washes shall comply with the requirements of this Section.
A. Minimum separation. Minimum separation between site boundaries shall be 500 feet, except that
one such use may be located at each corner of a street intersection.
B. Site layout. Conditions of approval of a Use Permit may require buffering, screening, planting
areas, or hours of operation necessary to avoid adverse impacts on properties in the surrounding
area.
C. Planting areas. Perimeter planting areas shall be as required for parking lots by Chapter D-33
(Landscape Design Standards) and Chapter D-34 (Parking and Loading), except where a building
adjoins an interior property line. Required interior planting areas may adjoin perimeter planting
areas.
D. Storage of materials and equipment. The provisions of Section D4-35 (Outdoor Display, Storage,
and Vending) shall apply, except that a display rack for automobile products no more than 4 feet
wide may be maintained at each pump island of a service station. If display racks are not located
on pump islands, they shall be placed within three feet of the principal building, and shall be limited
to one per street frontage. The Storage of inoperative vehicles is prohibited. The location of display
racks and vending machines shall be specified by the Use Permit.
E. Hours of Operation. The provisions of Subsection D3-8 H. [Hours of operation] shall apply.
F. Unattended Service Stations. Operation of an unattended service station shall be prohibited,
except for the dispensing of Alternative Fuels (see Vehicle Fueling-Alternative Fuels) as approved
by a Land Use Permit. Unattended Service Stations dispensing Alternative Fuels, when specifically
approved as part of a Land Use Permit, shall consider the following factors/plans:
• Location on site, site circulation and relationship to adjacent properties and land uses,
• Hours- Primary facility and accessory fueling,
• Noise control,
• Hazardous materials storage and containment,
• Hazardous Material Business Plan,
• Security Plan- including daytime and afterhours contacts,
• Maintenance and Liter Control Plan,
• Other site specific conditions or programs, as applicable.
Standards for Specific Land Uses D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-48
Exceptions:
a. Electric Vehicle (EV) Charging Stations (Accessory) in existing commercial, office, mixed
use or multifamily developments.
b. Private and restricted access fueling stations (corporate yards and fleet vehicles) are not
subject to the Unattended Service Station standards.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-49
Chapter IV - Wireless Telecommunications Facilities
Sections:
D4-41 - Purpose
D4-42 - Process and Applicability
D4-43 - Development Standards
D4-44 - Permit Requirements
D4-45 - Performance Standards and Maintenance
D4-46 - Administration
D4-41 - Purpose
The purpose of this Section is to establish standards for siting, design, modifications and maintenance of
telecommunications facilities including, but not limited to, telecommunications antennas and related
facilities, and other above-ground structures used for the purposes of transmitting data wirelessly. The
standards contained in this Section are designed to promote the following:
A. Protect and promote public safety and community welfare;
B. Protect the visual character of the City of San Ramon and minimize potential adverse impacts of
wireless communications facilities development and installation;
C. Protect the environmental resources of San Ramon;
D. Ensure that a competitive, varied and high quality wireless communications service infrastructure is
provided to serve San Ramon’s residents and the business community;
E. Ensure that all telecommunications providers or carriers are treated equally, without unduly restricting
or discriminating among service providers of functionally equivalent services;
F. Streamline the permitting process, while ensuring compliance with Zoning and Building and Safety
regulations;
G. Encourage the managed development of wireless communication service infrastructure to secure
San Ramon’s role in the evolution of technology;
H. Retain local responsibility for management of the use of the public right-of-way;
I. Ensure a telecommunications network that will serve an effective role in San Ramon’s emergency
response system; and
J. Promote the economic vitality of the City of San Ramon.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-50
D4-42 - Process and Applicability
A. Applicability. Except for the exemptions listed under Subsection D, this ordinance shall apply to all
types of wireless telecommunications facilities and related structures within any zones, including the
PD zone. It shall include any structures used to transfer data wirelessly including, but not limited to,
utility data such as PG&E and AT&T cabinets, facilities built for transmittal of wireless digital television,
personal communications systems (PCS), and other wireless facilities specifically addressed in this
Chapter.
Above ground cabinets housing equipment for fiber optic cables or housing equipment for
telecommunications underground equipment shall also be subject to the provisions of this ordinance.
B. Permitting authority. Subject to the provisions of Division D7 (Zoning Ordinance Administration), of
the Zoning Ordinance, the Planning Commission and the Zoning Administrator are authorized to
approve, approve with conditions, or deny applications for telecommunications facilities. The review
process may be incorporated as part of a specific development project, provided that the process and
applicable standards are in accordance with the provisions of this Chapter.
C. General requirements. All telecommunications antenna facilities and related equipment in the City
of San Ramon shall conform to the following requirements:
1. Compliance with the General Plan and any other land use plan, policies and guidelines adopted
by the City of San Ramon including, but not limited to, the requirements of the Zoning Ordinance
and adopted Specific Plans;
2. Compliance with CEQA requirements;
3. Compliance with the requirements of any other governmental agency with jurisdiction over the
installation of a telecommunications facilities;
4. Compliance with Federal Aviation Administration (FAA) regulations and permit requirements;
5. Compliance with any applicable easements, restrictions or land use approvals restricting
development on any given parcel;
6. The telecommunications facility shall be an accessory use, secondary to the primary use on a
parcel, unless the parcel is zoned for Open Space or the parcel is vacant subject to future
development to include a primary use;
7. Compliance with radio frequency emission standards adopted by the Federal Communications
Commission (FCC), which shall include any combined radio frequency levels produced by
antennas located on the same parcel in addition to all antennas within 100 feet distance of the
proposed facility; and
8. Compliance with the Uniform Building Code and subject to the building permitting process.
D. Exemptions. The following telecommunications facilities are exempt from the discretionary review
described in this Section if located outside the public right-of-way. The Zoning Administrator may
require that application materials be submitted to the Planning Division and/or the City Attorney to
verify compliance with the requirements of this section. All exempt facilities are subject to review by
the Building & Safety Division and may require approval of a building permit.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-51
1. The facility is preempted from local regulations, by state or federal law. The owner of the
antenna shall provide the Planning Division and/or the City Attorney a copy of applicable
regulations, and if applicable, a current FCC or California Public Utility Commission (CPUC)
permit prior to installation of the exempt antenna. The City Attorney shall determine if a facility
is exempt from local regulations.
2. A single building-mounted receive-only radio or television antenna (excluding parabolic or
satellite antennas), not exceeding 15 feet above the roof, including mast, used solely by the
tenant of a residential or commercial property on which the structure is located.
3. A single ground or building-mounted Direct Broadcast Satellite (DBS) antenna, Multipoint
Distribution Services (MDS) antennas, Television Broadcast Service (TVBS) antennas or
substantially similar antennas, which are less than one meter (39 inches) in diameter are subject
to the following standards:
a. The dish/antenna is for the sole use of the occupant of a residential or commercial
property on which it is located;
b. It does not exceed the height of the roof ridge of the main structure on which it is located;
c. It is located outside of a required front yard setback.
4. Mobile temporary telecommunications facilities operating at various locations to provide public
information or coverage of news events. Mobile facilities providing public information of news
events may be setup on public property for 72 hours or less subject to City approval.
5. Temporary telecommunications facilities, including mobile facilities, for a period not to exceed
60 days, when deployed during a community-wide emergency or natural disaster as follows:
a. The Zoning Administrator shall determine whether an event qualifies as a community-
wide emergency or natural disaster;
b. The Zoning Administrator may grant an extension to the maximum 60-day time period on
a case-by-case basis.
6. Handheld and mobile personal wireless devices such as cell phones, personal digital
assistants, cordless phones, and similar devices as determined by the Zoning Administrator.
7. The facility is located entirely inside a building and serves only that building, including but not
limited to wireless and fiber-optic networks.
8. Satellite Earth Station (SES) antennas which are 2 meters (78 inches) or less in diameter if
located in a commercial or industrial zone and meeting setback requirements of accessory
structures. If mounted on a roof, these facilities shall be of a non-contrasting color preferably
closely matching the color of the roof.
9. A temporary testing facility to establish the necessary height of a permanent
telecommunications tower for a maximum of 48 hours per year per site upon notification of the
Planning Division.
10. Amateur radio antenna and supporting structures which meet the following standards:
a. Maximum height of 35 feet when fully extended. The use of retractable antennas is
encouraged. To the extent feasible, antennas shall remain retracted when not in use,
unless used for emergency related operations.
b. There shall be only one amateur radio tower on a single parcel.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-52
c. There shall be no portions of the amateur tower or antennas, when fully extended,
overhanging into the required setbacks for main structures within the applicable zone.
d. The maximum total width of the entire structure, including top mounted antennas shall not
exceed 30 ft. when fully extended.
e. The operator shall be licensed by the FCC as an amateur radio operator or shall be
permitted to operate as an amateur radio station in the United States by treaty or statute.
E. Small wireless facilities. Notwithstanding any other provision of this Chapter, all “small wireless
facilities” as defined by the FCC in 47 C.F.R. § 1.6002(l), as may be amended or superseded, shall
be exempt from the provisions in this Chapter and subject to permits and other requirements as
specified in the Small Cell Wireless Facilities Policy, which shall be adopted and may be amended
or repealed by City Council resolution. If the Small Cell Wireless Facilities Policy is repealed and not
replaced, an application for a small wireless facility shall be processed pursuant to this Chapter.
D4-43 - Development Standards
Unless otherwise specifically described in this Section, the following development standards shall apply to
all telecommunications facilities:
A. Location standards. Telecommunications structures are permitted in all zones, provided that the
standards listed under Sections B., C., and D. below are met:
B. Prohibited sites. Telecommunications structures are prohibited in the following locations:
1. Any areas specifically prohibited by the General Plan, any applicable specific plan, or other site-
specific discretionary planning approvals.
2. Properties listed, or eligible for listing, on the National Register of Historic Places, or properties
otherwise deemed of local historic significance by the Zoning Administrator, provided that the
visual impact of the proposed facility cannot be mitigated.
3. A site of archeological significance, including but not limited to Native-American religious sites,
if such facilities will cause a disturbance to the site.
4. An environmentally sensitive site providing habitat to a special status animal or plant species,
or containing wetlands, vernal pools, 100-year floodplains, etc., if such facilities will cause a
disturbance to the site.
5. Within a 100 ft. vertical distance of any major ridgeline and a 50 ft. vertical distance from any
minor ridgeline within the City and its sphere of influence, and provided that the
telecommunications tower does not extend above the ridgeline seen as a backdrop to the
facility, as seen from vantage points specified by the Zoning Administrator.
C. Preferred sites. The following is a list of preferred sites for locating telecommunications structures:
1. Any new facility co-located on an existing approved telecommunications structure or on a
building roof or facade already containing approved antennas, often broadcasting at different
frequencies and operated by different providers.
2. Any new facility located on an existing tall building or structure provided it is positioned
strategically and not visible from the public right-of-way and designed to fully mitigate its visual
impacts.
3. Located in properties zoned for Commercial, Office, Industrial, Medical, Public and Semi-Public
uses.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-53
4. Located on existing structures including, but not limited to, PG&E towers, light poles, water
tanks, bell towers, existing flagpoles, etc.
5. Located on a City-owned property used or designated for public/semi-public use as deemed
appropriate by the Zoning Administrator.
D. PG&E transmission line corridor. Telecommunications facilitates proposed within the PG&E
transmission line easement shall comply with the following minimum standards:
1. The proposal shall include design mitigation strategies to avoid an “antenna farm” effect and
reduce visual impacts to the adjoining neighborhoods. These strategies may include, but are
not limited to, strategically positioning of the antennas, placement of smaller antennas, limiting
the number of antennas per PG&E tower, stealth antenna design, decorative landscaping, etc.
In addition, the City may require participation in any existing master landscaping plan for the
PG&E corridor.
2. The proposal shall specify any new lighting, parking and/or noise associated with the project
and applicable mitigation measures submitted for the Zoning Administrator review.
3. All equipment shelters shall be screened from view. Screening methods may include a
combination of decorative landscaping and fencing.
4. The Zoning Administrator may require additional site improvements on the property or nearby
to further mitigate for the visual effects of the antennas. These mitigation measures may include,
but are not limited to landscaping improvements along the boundaries of PG&E property and
residential properties, decorative fencing, public art, etc.
D4-44 - Permit Requirements
All wireless telecommunications facilities not specifically exempted from these regulations in accordance to
this Ordinance are subject to one of the following permitting requirements:
A. Minor Use Permit. Telecommunications facilities meeting all the applicable standards of this
Subsection require Minor Use Permit approval.
A notice of application will be sent to all property owners within a minimum 300 foot radius of the
proposed site. Additional notification may be authorized by the Zoning Administrator consistent with
Chapter D6-28 (Use Permits and Minor Use Permits). If neighborhood interest is identified by
submittal of a written request for a public hearing, the zoning administrator shall require a Zoning
Administrator hearing.
1. The proposal meets the applicable "preferred sites" criteria in Section D4-43.C;
2. The proposal presents no visual impact, is completely hidden from right-of-way view, is built
below parapet line, or is fully screened and/or mitigated with a stealth design;
3. The proposal meets the setback and height limit requirements of the applicable zone;
4. The proposal meets all applicable design and development standards of this section; and
5. Proposals for utility cabinets (i.e. PG&E, phone company) containing a wireless component for
data transmittal if cabinets are placed underground or shielded from view as deemed
appropriate by the Zoning Administrator.
The Zoning Administrator may refer an application that meets these administrative review
requirements, to the Architectural Review Board or to the Planning Commission if it is determined
that the project may involve a significant design impact or policy issue.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-54
B. Design Review. Applications for telecommunications facilities meeting all of the applicable standards
of this Subsection are subject to design review and will be forwarded to the Architectural Review
Board.
A notice of application will be sent to all property owners within a minimum 300 foot radius of the
property. Additional notification may be authorized by the Zoning Administrator consistent with
Subsection A. If neighborhood interest is identified, the Zoning Administrator may require a Zoning
Administrator hearing.
Standards:
1. Telecommunications structures or building-mounted antennas extending above the maximum
allowed height of a zone by no more than 10 ft.
2. The proposed facility is architecturally integrated or stealth fully designed as seen from sensitive
areas such as residential areas, public right-of-way, scenic vistas and recreational areas;
3. The proposal includes artificial lighting;
4. The proposal meets all applicable design and development standards of this section;
5. Utility cabinets containing a wireless component (i.e. PG&E) proposed within a City right-of-
way;
6. Satellite dishes over one meter in diameter or exceeding the maximum allowed height in
residential zones;
7. Satellite dishes over two meters in diameter in commercial, industrial and office zones; and
8. Amateur radio antennas exceeding 35 feet, but less than 50 feet in height.
The Zoning Administrator may refer an application that meets the above design review requirements
to the Commission if it is determined that the project may involve a significant design impact, policy
issue, or deemed to be highly controversial.
C. Use Permit. A Use Permit application shall be required for all telecommunications facilities meeting
any applicable standards of this Subsection. The Commission shall be the decision-maker for the
Land Use Permit application.
The Zoning Administrator shall be responsible for determining whether a project subject to a Use
Permit shall also be reviewed by the Architectural Review Board for design recommendations.
Standards:
1. Telecommunications facilities projecting over 10 ft. above the maximum zone height;
2. New telecommunications structures, not meeting the co-location standards and without proper
justification as established in Subsection D.1;
3. Telecommunication facilities visible from the right-of-way which would require design
mitigation;
4. Telecommunications facilities located within residentially zoned properties;
5. Amateur radio antennas exceeding 50 ft. in height;
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-55
D. Modification to approved project. The following modification criteria streamline the process by
establishing an appropriate level of review for changes to plans, operating standards, and design of
previously approved telecommunications facilities.
The Zoning Administrator is responsible for making any interpretations required to determine which
level of modification is applicable, whether a modification application meets the intent of this Section
or if a new application is required.
1. Minor modification. Any proposed modifications deemed to be in substantial compliance with
the original project may be approved administratively if it meets the following applicable criteria:
a. Changes are consistent with the requirements of this Chapter; Ordinance;
b. The changes are part of standard maintenance, which could include equipment
replacement of substantially equal appearance provided it uses identical technologies. The
applicant would be responsible for providing a written statement by the appropriate
professional demonstrating compliance with this requirement;
c. Changes result in an insignificant revision to the floor plan, physical details or site layout
not affecting compliance with the original project approval and the provisions of this
Ordinance;
d. The changes are not noticeable or insubstantial such as:
(1) Minor color changes,
(2) Minor landscaping changes,
(3) Minor material specification or architectural detail changes, if of equal or greater
quality.
e. Changes comply with FCC requirements. The applicant would be responsible for
demonstrating compliance with this requirement;
f. Proposal does not reflect changes to a condition of project approval;
g. Changes do not involve issues of public policy and are not likely to generate neighborhood
interest or concern;
h. If there is an increase in the number of antennas proposed, not to exceed 25 percent the
original approval, provided the increase does not create a negative visual impact, and an
updated RF Emissions Evaluation Report is submitted specifically addressing the
proposed increase;
i. Proposal does not involve increase of more than 10 percent in antenna height;
j. Proposal does not reflect changes to an item specifically approved or discussed during the
original project hearing as reflected on meeting minutes or tapes; and
k. Changes meet the intent of original project approval and do not involve significantly
different design concepts. Any architectural or design changes shall maintain or upgrade
the quality of the original approval;
The Zoning Administrator shall be responsible for determining which of the submittal materials are
necessary for modification evaluation, other than those documents described in this Subsection, in
addition to plans demonstrating the proposed change.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-56
2. Major modification (ARB, ZA or PC). If an application does not meet the criteria to be
considered a minor modification as specified in this Section, then the proposal requires a new
application.
3. Modification findings. An approval of a modification to a facility shall adopt findings of fact to
include all findings listed in Section F. in addition to the following:
a. The proposed change is consistent with the original telecommunications facility and does
not require the complete redesign and submittal of a new project; and
b. That the proposed change does not result in lack of compliance with the development
standards approved with the original telecommunications facility project.
E. Variance. The applicant of a telecommunications facility proposal not meeting the standards
established in this Ordinance is entitled to request a Variance in compliance with Section D6-29
(Variances). The variance process is subject to the Zoning Administrator or Commission review and
may be approved, denied, or approved with conditions.
F. Findings for approval or denial. The decision maker, as determined by this ordinance, when
approving or denying an application for a telecommunications facility, shall adopt findings of fact.
1. Findings for approval shall include, but not be limited to:
a. That the proposed telecommunications facility complies with the intent of this Chapter and
shall not result in conditions that would be detrimental to the public health, safety or welfare
of the community;
b. That the facility was designed to protect the visual character of the City of San Ramon, and
any adverse visual impacts of development have been mitigated to a level of less than
significant;
c. That the proposal complies with the General Plan and any other land use plan, policies
and guidelines adopted by the City including, but not limited to, the Zoning Ordinance and
adopted Specific Plans;
d. That the proposed height of the facility is needed for adequate electromagnetic reception
and that a reduced height is not feasible;
e. That the site is suitable for the type and intensity of development proposed, and that the
location, size, design and operating characteristics of the proposed facility are compatible
with adjacent uses and natural resources; and
f. That the proposal complies with the requirements of any other governmental agency with
jurisdiction over the installation of a telecommunications facility including, but not limited
to, the Federal Communications Commission (FCC) regulations and permit requirements.
2. The decision-maker may deny an application for a telecommunications facility if it is not
consistent with the provisions of this Chapter. If the project is denied, findings for denial shall
be adopted.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-57
D4-45 - Performance Standards and Maintenance
A. Noise. All telecommunications facilities shall be constructed and operated in such a manner as to
minimize the amount of noise impacts to sensitive areas such as residences, schools, churches or
hospitals. The use of back-up generators shall be limited to during power outages and for the
purposes of maintenance and testing.
The Zoning Administrator may request a noise analysis to evaluate whether noise attenuation
measures are needed when a facility is located within 100 feet of a residence, school, church or
hospital, and generates noise levels, measured at the property lines, exceeding those established in
Section D3-8 (Performance Standards) as follows:
1. Maximum 60 dBA during daytime;
2. Maximum 55 dBA between the hours of 10:00 p.m. and 7:00 a.m. as measured at the closest
property line of a residential property; and
3. Sound levels shall be measured in decibels (dBA). Noise descriptors used for analysis shall be
in DNL (Day-Night Average Level) or CNEL (Community Noise Equivalent Level) consistent
with the Noise Element of the 2020 General Plan.
B. Interference. All telecommunications facilities, including HAM radio antennas, shall be operated in
compliance with Federal Communications Commission (FCC) regulations for signal interference,
including, but not limited to, interference with other telecommunications facilities and household
electronics (radios, phones, TV’s, etc.;).
When interference occurs, the Zoning Administrator may require that the carrier responsible for the
cell site in question submit an analysis/statement prepared by a licensed Electrical Engineer
containing scientific evidence whether the claimed interference is caused by the cell site. If
interference is proven to occur, the antenna owner/operator or service carrier shall be responsible for
mitigating the effects of the interference. If a reasonable good-faith effort is not made by the antenna
owner/operator toward resolving or mitigating the interference problems, revocation proceedings may
be initiated.
C. Maintenance & Safety. All telecommunication facilities shall be reviewed and comments provided
by the San Ramon Valley Fire Protection District, San Ramon Police Department, and must comply
with the Uniform Building Code (UBC) and any conditions imposed by the Building Official, Fire Chief,
Police Chief and the Zoning Administrator.
Telecommunications towers and antennas shall be designed to remain in operation during a disaster.
All possible measures to protect against fire, flood, earthquake, etc., shall be made.
Wireless communication facilities may be required to provide warning signs, fencing, anti-climbing
devices, or other techniques to control unauthorized access and vandalism and shall be maintained
graffiti free and in good condition. The design of any fencing and anti-climbing devices shall be subject
to the Zoning Administrator review and approval, who may at his/her discretion require a maintenance
agreement to address these issues.
D. RF Emission Monitoring. Telecommunication facilities, whether operating alone or in conjunction
with other facilities shall not generate radio frequency emissions in excess of the standards
established by the Federal Communications Commission (FCC) and in compliance with the standards
in this Chapter.
An annual RF exposure report may be required as a condition of approval for all wireless
telecommunications projects. The report shall be prepared by a certified NIER Professional and
submitted to the Zoning Administrator to ensure that no modifications to the site, surrounding
environment, or equipment wear and tear have caused an increase in RF exposure over the years.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-58
In the event an increase over accepted levels is detected, the applicant shall be responsible for
immediately making all necessary adjustments to comply with FCC standards; otherwise revocation
proceedings shall immediately begin.
An updated RF emission report may be required as part of an administrative ten-year life of approval
renewal and for every subsequent ten years required under Section D4-46.C.
E. Confirmation of Height. The Zoning Administrator may require, as a condition of project approval,
that a licensed surveyor verify the telecommunications facility height within 60 days of the
telecommunications tower, antenna or facility installation. If the height confirmation procedure is
requested, the applicant shall be responsible for coordinating the procedure and submit the licensed
surveyor’s statement of actual height.
F. Performance and Maintenance Agreement. The City may require, as a condition of project
approval, that the applicant for a telecommunications facility enter into a Performance and/or
Maintenance Agreement with the City of San Ramon prior to initiating construction.
The terms of the agreement may include items to ensure compliance with the provisions of this
section, as well as a requirement that the applicant post a financial security to ensure that the
approved facility is properly installed, maintained and to guarantee that the facility is dismantled and
removed in accordance to the provisions of this section.
The financial security may be a bond or letter of credit acceptable to the City of San Ramon. The
amount of the bond shall be based on a cost estimate equal to 125% of building permit evaluation
based on the amount needed to return the facility and surrounding area to its original condition.
G. Abandoned Sites. A telecommunication facility shall be removed and the site restored to its prior
condition if the business vacates or no longer operates the facility.
D4-46 - Administration
A. Notification. A minimum 10-day notice of public hearing shall be sent to all property owners within
a 300-foot radius of the parcel where the proposed facility is to be located. The Zoning Administrator
may also require noticing of projects subject to the administrative review process and/or extend the
minimum 300-foot radius to include geographic areas immediately outside the 300-foot radius and
potentially affected by the project.
B. Appeal. A decision of the Zoning Administrator may be appealed in compliance with Chapter D7-II
(Appeals and Calls for Review).
C. Duration of approval. Unless otherwise established in the project’s conditions of approval, all
approvals for telecommunications structures shall be valid unless revoked, abandoned or expired as
described below City may require an administrative review to verify compliance with original project
approval and all applicable provisions of this section to address any operational concerns associated
with an approved telecommunication site. Based on the nature of the review an updated RF
Emissions Report may be required. The RF Emissions Report shall be prepared by a NIER
Professional and submitted to verify compliance with current State and Federal standards.
D. Lapse of approval. The approval of any telecommunications administrative review, Land Use
Permit, Design Review or Modification application authorizing installation or changes to a
telecommunications structure and related facilities shall become null and void if any of the following
occurs:
1. The project is not implemented/constructed within one-year of its approval, or
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-59
2. The project is implemented/constructed, and its approval has expired, or an extension not
granted beyond the original life of project approval. If the facility is co-located with other carriers
approved at different dates, a separate expiration date will be applicable to each
carrier/applicant according to their original approval dates.
E. Expiration or abandonment of permits. Any discretionary planning approvals shall become null
and void if lease or rental agreements pertaining to the property on which the telecommunications
structure or related facility is located expires or is terminated, and if the facility is abandoned or use
is discontinued for more than six months. After this period, a new permit consistent with the provisions
of this ordinance would be required to re-instate the project.
F. Permit revocation. In the event of any breach of this Chapter, conditions of approval, or other
required agreements of the permit, the City shall notify the applicant and schedule a revocation
hearing in accordance with Division D6 (Planning Permit Procedures).
G. Removal of facilities and change of ownership. The applicant shall be responsible for notifying
the Zoning Administrator in writing upon temporary or permanent cessation of operation, or change
of ownership of any telecommunications facility. The applicant and/or property owner shall be
responsible for removal of all obsolete or unused facilities, or portions thereof, within six months of
termination of lease, cessation of operation, permit expiration or revocation. The site shall be restored
to its original condition to the satisfaction of the Zoning Administrator.
H. Pre-existing & non-conforming uses or structures. All telecommunications towers and antennas
legally approved prior to the date this Chapter was adopted shall be allowed to continue as they
presently exist and will be considered legal non-conforming uses and structures, provided that all
proper building permits were approved. Some facilities may be considered legal conforming uses and
structures depending on the original project approval. However, new construction, other than routine
maintenance (as determined by the Director) on the existing facilities, shall comply with the
requirements of this Chapter.
All previous discretionary planning approvals shall only remain in effect until its permit expires, is
abandoned or revoked in accordance to the provision of this Chapter.
I. Changes in Federal or State regulations. All telecommunications facilities shall meet current
standards and regulations of the Federal Communications Commission (FCC), California Public
Utilities Commission (CPUC), and any other agencies with authority to regulate wireless
telecommunications service providers. If existing standards or regulations are changed, the applicant
shall bring its facilities into compliance with the new standards within 90 days of the effective date of
such standards, unless the Federal or State agency mandates a more restrictive compliance
schedule. Changes to approved projects are subject to the Modification process in accordance with
this Chapter.
Failure to comply with adopted new State or Federal requirements shall trigger the revocation
procedure in accordance to Subsection F.
J. Map and list of locations. The City will maintain a map of telecommunications facilities within the
city and shall make the information readily available to the public. The facilities mapped shall include
those which were subject to the discretionary review process of this Chapter and were ultimately
approved and constructed.
Facilities approved and installed prior to the adoption of this Ordinance will be included in the map to
the best of staff’s knowledge. It is the responsibility of the telecommunications providers to inform the
City of their pre-existing facilities and any changes in the carrier’s status including name, ownership,
and whether the wireless business/facility has been discontinued.
Wireless Telecommunications Facilities D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-60
K. Indemnity and liability. The telecommunications service provider shall defend, indemnify and hold
harmless the City or any of its boards, commissions, agents, officers, and employees from any claim,
action, or proceedings against the City, its boards, commissions, agents, officers, and employees to
attack, set aside, void, or annul the approval of a project. The City shall notify the telecommunications
service provider of any such claim, action or proceeding. The City shall have the option of participating
in the defense, if the City bears its own attorney fees and costs, and the City defends the action in
good faith.
Telecommunications service providers shall be strictly liable for any and all sudden and accidental
pollution and gradual pollution from usage of their service/facilities within the City. This liability shall
include cleanup, injury or damage to persons or property. Additionally, telecommunications service
providers shall be responsible for any sanctions, fines, or other monetary costs imposed as a result
of release of pollutants from their operations.
Telecommunications service providers shall be strictly liable for any and all damages resulting from
electromagnetic waves or radio frequency emissions in excess of the Federal Communications
Commission (FCC) standards.
L. Severability. If any provision of this ordinance or the application thereof to any person or
circumstances is held invalid, such invalidity shall not affect other provisions or applications of the
ordinance which can be given effect without the invalid provisions or applications of the ordinance.
To this end, the provisions of this ordinance are severable. This City Council hereby declares that it
would have adopted this ordinance irrespective of the invalidity of any particular portion thereof.
D4-47 through D4-54 - Reserved
Homeless Shelters D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-61
Chapter V – Homeless Shelters
Sections:
D4-55 - Purpose
D4-56 - Permit Requirements
D4-57 - Homeless Shelter Standards
D4-58 - Post-Approval Procedures
D4-59 - Reserved
D4-60 - Reserved
D4-61 - Reserved
D4-62 - Reserved
D4-63 - Reserved
D4-64 - Reserved
D4-65 - Reserved
D4-55 – Purpose
The intent of these regulations is to establish a non-discretionary process for homeless shelters that will be
permitted within a zone district to meet the requirements of Senate Bill 2 enacted on October 13, 2007.
D4-56 – Permit Requirements
A. Permit required. Prior to operating a homeless shelter, a non-discretionary homeless shelter permit
shall be obtained and all other applicable local, State and federal laws, regulations and codes shall
be met. The approval shall be specific to a location and shall not be transferable to any other location.
The application shall be on a form prescribed for that purpose, and shall include the written consent
of the property owner on which the shelter is to be located.
B. Permit Review and Approval. Once an application has been accepted as complete, the Zoning
Administrator shall take action within thirty (30) days. The application shall meet all standards as
identified in D4-57 (Homeless Shelter Standards), below.
C. Contents of application. An application for a non-discretionary homeless shelter shall contain the
information as outlined by the Zoning Administrator with the General Submittal Requirement List.
D4-57 – Homeless Shelter Standards
All homeless shelters shall comply with all applicable State standards and requirements for homeless
shelters. In addition, all homeless shelters shall comply with the following standards:
A. Shelter Occupancy.
1. No more than 6 clients may be sheltered on the premises at any one time.
2. The maximum length of stay shall be no longer than that established by the California Health
and Safety Code for homeless shelters.
B. Parking. Adequate parking shall be provided for employees and clients of the homeless shelter in
accordance with the following standards:
Homeless Shelters D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-62
1. One off-street parking space shall be provided per employee (by shift).
2. One parking space for every three beds.
3. One bicycle parking stall for every three beds.
C. Site Design. The site shall be designed in accordance with the following standards:
1. The shelter shall conform to all property development standards of the subject zone.
2. New construction or exterior alterations shall be reviewed under the provisions of Division D6-
22 (Architectural Review).
3. The shelter shall provide at least 10 square feet per bed of public or communal gathering space,
not including hallways.
4. The entrance of the shelter shall be designed to discourage clients from loitering or
congregating in front of the building.
D. On-site Management. On-site management shall be present during shelter operating hours.
E. Overconcentration. A shelter shall be a minimum of 300 feet from any other legally established
shelter. The 300 foot minimum distance shall be measured from the subject site property lines to
the property lines of any other legally established homeless shelter.
F. Noise. The applicant shall address noise impacts on neighboring properties consistent with the
noise standards of the City.
G. Security and Lighting Plan.
1. Prior to operation of the shelter, a security and lighting plan must be submitted to the Zoning
Administrator for review and approval. The security plan shall include, but is not limited to:
hours of operation and intake period; must provide at least one employee/volunteer of same
sex as clients; alcohol, weapons, or illegal substances shall not be allowed; and the operator
must notify the Police Department of any crimes that are a threat to the safety of others or to
themselves.
2. The shelter shall provide outdoor lighting sufficient to provide illumination and clear visibility to
all outdoor areas, with minimal shadows or light leaving the property. The lighting shall be
stationary, directed away from adjacent properties and public rights-of-way, and of intensity
compatible with the neighborhood.
3. If shelter client is disruptive or is responsible for creating any type of nuisance to the
neighborhood or facility, the operator must discharge the client.
D4-58 – Post Approval Procedures
A. Appeals. Decisions of the Zoning Administrator may be appealed to the Planning Commission in
accord with Division D7, Chapter II (Appeals and Calls for Review).
B. Revocations/Modifications. A homeless shelter permit may be subject to revocation or modification
pursuant to Division D7 (Zoning Ordinance Administration).
D4-59 through D4-65 – Reserved
Reasonable Accommodation for the Disabled D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-63
Chapter VI – Reasonable Accommodation For The Disabled
Sections:
D4-66 – Purpose
D4-67 – Process and Applicability
D4-68 – Reserved
D4-69 – Reserved
D4-70 – Reserved
D4-71 – Reserved
D4-66 – Purpose
The purpose of this Section is to provide a procedure to request reasonable accommodation for persons
with disabilities seeking equal access to housing under the Federal Fair Housing Act and the California Fair
Employment and Housing Act (hereafter “fair housing laws”) in the application of zoning laws and other
land use regulations, policies, and procedures.
D4-67 – Process and Applicability
A. Applicability. To make specific housing available to an individual with a disability, any person may
request reasonable accommodation under this chapter when the application of a zoning or other land
use regulation, policy or practice under this title acts as a barrier to fair housing opportunities. A
request for reasonable accommodation shall be made by filing an application as described in
Subsection C.
A reasonable accommodation request may include a modification or exception to the rules, standards
and practices for the siting, development and use of housing or housing-related facilities that would
eliminate regulatory barriers and provide an individual with a disability equal opportunity for housing
of their choice.
B. Permitting authority. Subject to the provisions of Division D6 (Planning Permit Procedures), of the
Zoning Ordinance, the Zoning Administrator is authorized to approve, approve with conditions, or
deny applications for reasonable accommodations. An application for reasonable accommodation
submitted for concurrent review with another entitlement under this title shall be reviewed by the
authority reviewing the other entitlement.
C. Application requirement. An application for reasonable accommodation shall be submitted to the
Planning Services Division. The application shall be accompanied by the information identified in the
Department handout for reasonable accommodation applications. It is the responsibility of the
applicant to provide evidence in support of the findings required by Subsection E (Required findings),
below.
D. Review procedure. The Zoning Administrator, or his designee, shall, within 20 days of acceptance
of the application as complete, approve, approve with conditions, or deny an application for
reasonable accommodate in accordance with Subsection E (Required Findings),below. If the
application for reasonable accommodation is submitted for concurrent review with another
entitlement under this title, the decision shall be made by the authority taking action on the other
entitlement under this title in accordance with Subsection E (Required Findings), below.
E. Required findings. The Zoning Administrator may approve a reasonable accommodation
application, with or without conditions, only after first finding that:
Reasonable Accommodation for the Disabled D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-64
1. The housing will be used by a disabled individual(s) under fair housing law;
2. The request for reasonable accommodation is necessary to make specific housing available to
an individual with a disability under fair housing law;
3. The requested reasonable accommodation will not impose an undue financial or administrative
burden on the City;
4. The requested reasonable accommodation would not require a fundamental alteration in the
nature of a City program or law, including but not limited to land use and zoning;
5. No detrimental impact would result aesthetically;
6. No detrimental impacts to surrounding uses, properties, and/or structures; and
7. No practical alternative exists which may provide an equivalent level of benefit.
F. Conditions of approval. In granting a request for reasonable accommodation, the reviewing
authority may impose any conditions of approval deemed reasonable and necessary to ensure that
the reasonable accommodation would comply with the findings required in Subsection E, above.
G. Post decision procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division D6,
Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to appeals and
revocation/ modification located in Division D7 (Zoning Ordinance Administration), shall apply
following the decision on an application for reasonable accommodation.
D4-68 through D4-71 – Reserved
Raising of Chickens D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-65
Chapter VII – Raising of Chickens
Sections:
D4-72 – Purpose
D4-73 – Applicability and Standards
D4-74 – Reserved
D4-75 – Reserved
D4-72 – Purpose
This Chapter provides standards for the raising of chickens (hens only, roosters are prohibited) for personal
and non-commercial purposes within applicable residential properties. Standards for the raising of chickens
for commercial purposes are not included in this Chapter and are defined as “Animal Husbandry”.
D4-73 – Applicability and Standards
A. Permitted Areas. The raising of chickens is permitted within residential properties with a lot size of
6,000 square feet or greater and have direct access to a private yard.
B. Number of Hens. Up to five (5) hens may be allowed.
C. Chicken Coop. A chicken coop or a structure for housing
chickens shall meet the following standards:
1. A chicken coop shall be located in the backyard and
shall meet the minimum required setback of the
primary residence. See Figure 4-1 for an example
chicken coop area.
2. The maximum height of a chicken coop shall be no
taller than six (6) feet.
3. A chicken coop shall be:
a. Thoroughly ventilated and fully enclosed with a
solid roof; and
b. Designed and constructed in a manner that the
flock can be securely contained; and
4. If a chicken coop or a structure for housing chickens
is over four (4) feet in height, whether it is an
individual structure or an integral part of other structures, the floor area of such a structure for
housing chickens is subject to Zoning Ordinance section D4-26.E.1 (Maximum total floor area of
accessory structures).
D4-74 through D4-75 – Reserved
Figure 4-1 – Example Chicken
Coop Area
Raising of Chickens D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-66
[Page intentionally left blank]
Density Bonus D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-67
Chapter VIII – Density Bonus
Sections:
D4-76 – Purpose
D4-77 – Definitions
D4-78 – Process and Applicability
D4-79 – Application Requirements
D4-80 – Density Bonus Housing Agreement
D4-81 – Reserved
D4-82 – Reserved
D4-83 – Reserved
D4-84 – Reserved
D4-76 – Purpose
The purpose of this Section is to implement the requirements of Government Code 65915 et seq. (“State
Density Bonus Law”) by offering density bonuses, incentives, concessions or waivers for the development
of housing that is affordable to the types of households and qualifying residents identified in Government
Code Section 65915.
D4-77 – Definitions
Unless otherwise specified in this Chapter, the definitions found in State Density Bonus Law shall apply to
the terms contained herein.
D4-78 – Process and Applicability
A. Applicable Zones. This Chapter applies to all zoning districts that allow residential uses, including
mixed use zoning districts. This Chapter applies only to the residential component of a mixed use
project and shall not operate to increase the allowable density of the non-residential component of
any proposed project.
B. Density Bonus Qualifications. All proposed housing developments that qualify under State Density
Bonus Law for a density increase, and any qualified land transfer under State Density Bonus Law,
shall be eligible to apply for a density bonus (including incentives, concessions and/or waivers)
consistent with the requirements, provisions and obligations set forth in State Density Bonus Law, as
may be amended.
In accordance with State law, neither the granting of an incentive, concession, and/or waiver, nor the
granting of a density bonus shall be interpreted, in and of itself, to require a general plan amendment,
zoning amendment, variance, or other discretionary approval.
C. Permitting Authority. Subject to the provisions of Division D7 (Zoning Ordinance Administration),
of the Zoning Ordinance, application for a density bonus, incentive(s), concession(s), and/or waiver(s)
shall be considered by and acted upon by the decision-making body with authority to approve the
housing development.
Density Bonus D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-68
D. Severability. If any provision of this Chapter or the application thereof to any person or
circumstances is held invalid, such invalidity shall not affect other provisions or applications of the
Chapter which can be given effect without the invalid provisions or applications of the Chapter. To
this end, the provisions of this Chapter are severable. The City Council declares that it would have
adopted this Chapter irrespective of the invalidity of any particular portion thereof.
E. Conflict of Law. In the event that any provision of this Chapter is found to be in direct conflict with
State Density Bonus Law, the provisions of the State Density Bonus Law will apply.
D4-79 – Application Requirements
A. Written Application. Applicants requesting a density bonus, incentive(s), concession(s) and/or
waiver(s) shall provide the City with a written density bonus proposal. The proposal shall be
processed in conjunction with the underlying application(s) and reviewed for compliance with State
Density Bonus Law.
B. Submittal Requirements. The proposal for a density bonus, incentive(s), concession(s) and/or
waiver(s) pursuant to State Density Bonus Law shall include the following information:
1. Requested density bonus. A description of the requested density bonus including calculations
showing the maximum base density, the number/percentage of affordable units and identification
of the income level at which such units will be restricted pursuant to State Density Bonus Law.
2. Requested incentive(s) or concession(s). A description of the requested incentive(s) or
concession(s) including the number of incentive(s) or concession(s) allowed pursuant to State
Density Bonus Law. The request for particular incentive(s) may require a pro forma or other
report evidencing that the requested incentive(s) results in identifiable, financially sufficient and
actual cost reductions that are necessary to make the housing units economically feasible. The
report shall be sufficiently detailed to allow the City to verify its conclusions
3. Requested waiver(s). The written proposal shall include an explanation of the waiver(s) or
reduction of development standards requested and why they are necessary to make the
construction of the project physically possible.
4. Fee. Payment of the processing fee in an amount set by resolution of the City Council to
reimburse the City for staff time spent reviewing and processing the density bonus application
submitted pursuant to this Chapter.
D4-80 – Density Bonus Housing Agreement
A. Density Bonus Housing Agreement. For all housing projects receiving a density bonus,
incentive(s), concession(s) and/or waiver(s) under this Chapter, a density bonus housing
agreement shall be entered into by the City and applicant/property owner. The density bonus
housing agreement shall be made a condition of the discretionary planning permits for all housing
developments pursuant to this Chapter and shall be recorded as a deed restriction on any parcel
on which the residential units will be constructed.
B. Recording of Agreement. The density bonus housing agreement shall be recorded prior to the
final or parcel map approval, or, where a map is not being processed, prior to the issuance of a
building permit for any structure in the housing development.
The agreement shall run with the land and be binding on all future owners and successors.
C. Contents of Agreement. The density bonus housing agreement shall include, but is not limited to
the following:
Density Bonus D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-69
1. A description of the development, including the total number of units, the number of affordable
units, the tenure of the affordable units, the size in square footage and location of affordable
units;
2. The term of the agreement and the terms of affordability of the required units in accordance
with State Density Bonus Law;
3. A schedule for completion and occupancy of the affordable housing units in accordance with
State Density Bonus Law;
4. A description of any incentives, concessions, waivers, or modifications of development
standards being provided by the City;
5. Provisions to ensure each affordable unit be kept available only to members of the identified
income group at the maximum affordable rent or sales price during the term of the agreement;
and
6. Provisions to ensure implementation and compliance with this Chapter
D4-81 through D4-84 – Reserved
Density Bonus D4
Division D4 – Standards for Specific Land Uses – Effective February 28, 2020 4-70
[Page intentionally left blank]
City of San Ramon Zoning Ordinance D5
Division D5 – Resource Management – Effective February 28, 2020 5-1
DIVISION D5
Resource Management
Chapter I - Hillside, Creek, and Ridgeline Areas ................................................................................... 5-3
D5-1 - Purpose ................................................................................................................................ 5-3
D5-2 - Applicability ........................................................................................................................... 5-4
D5-3 - Exemptions ........................................................................................................................... 5-4
D5-4 - Hillside, Creek, and Ridgeline Area Development Standards .............................................. 5-4
D5-5 - Design Guidelines................................................................................................................. 5-7
D5-6 - Slope Methodology ............................................................................................................... 5-9
Chapter II - Tree Preservation and Protection..................................................................................... 5-11
D5-7 - Purpose .............................................................................................................................. 5-11
D5-8 - Applicability ......................................................................................................................... 5-11
D5-9 - Tree Removal Permit Application Requirements ............................................................... 5-12
D5-10 - Tree Planting and Replacement ....................................................................................... 5-13
D5-11 - Tree Permit Approval or Denial ........................................................................................ 5-15
D5-12 - Post Approval Procedures ................................................................................................ 5-17
Hillside, Creek, and Ridgeline Areas D5
Division D5 – Resource Management – Effective February 28, 2020 5-2
[Page intentionally left blank]
Hillside, Creek, and Ridgeline Areas D5
Division D5 – Resource Management – Effective February 28, 2020 5-3
Chapter I - Hillside, Creek, and Ridgeline Areas
Sections:
D5-1 - Purpose
D5-2 - Applicability
D5-3 - Exemptions
D5-4 - Hillside, Creek, Ridgeline Area Development Standards
D5-5 - Design Guidelines
D5-6 - Slope Methodology
D5-1 - Purpose
This Chapter provides standards for the protection and preservation of hillside, creek, and ridgeline areas.
The purpose of this Chapter is to:
1. Preserve significant features of hillsides, creeks, and ridgeline areas in essentially their natural
state;
2. Preserve existing vegetation, soils, geology, slopes, and drainage patterns;
3. Preserve the natural topography, including swales, canyons, knolls, ridgelines, and rock outcrops,
wherever feasible;
4. Minimize grading and cut and fill practices to retain the natural terrain and character of the
hillsides and ridgelines;
5. Avoid development that would result in unacceptable fire, flood, slide, or other safety hazards;
6. Avoid unwarranted, high maintenance costs for public facilities;
7. Provide a mechanism for flexible design of development projects so that development may be
clustered to allow environmentally sensitive areas to be preserved as open space;
8. Encourage design of street systems and driveways that blend with the natural contours and
minimize extensive grading; and
9. Provide adequate buffer areas between creek corridors and adjacent development, to retain the
creek corridors as valuable natural, scenic, and recreational amenities as appropriate.
Definitions of technical terms and phrases used in this Section may be found in Division D8 (Glossary)
under “Resource Management.”
Hillside, Creek, and Ridgeline Areas D5
Division D5 – Resource Management – Effective February 28, 2020 5-4
D5-2 - Applicability
The provisions of this Chapter apply to proposed development, other than Public W orks projects, on any
sites as identified below:
1. The Resource Management Area and Creeks as identified in General Plan
Figure 8-3 (Resource Management); or
2. All property over 500 feet in elevation; or
3. Property with a natural gradient in excess of 10 percent; or
4. Property within 1,000 feet of a major or minor ridgeline;
D5-3 - Exemptions
The provisions of this Chapter shall not apply to:
1. The Built Urban Land as identified in General Plan Figure 8-3 (Resource Management), except
for creek setback regulations.
D5-4 - Hillside, Creek, and Ridgeline Area Development Standards
A. Development standards. Development proposed within the Hillside, Creek, and Ridgeline Areas
shall comply with the development standards of the primary zone, except as follows.
1. Density. The density on all developable and undevelopable land shall be limited to the following
densities based upon the existing natural slope as determined by the method described in
Section D5-6 (Slope Methodology).
Note: (1) Densities may be averaged over the project site (Within
these density ranges, units may be transferred so as to create a
relatively even density gradient from higher density on 10 percent
slopes to lower density on 20 percent slopes, without increasing the
total number of units.)
Densities on undevelopable land may be exercised only upon transfer to developable land.
Undevelopable land is defined by Zoning Ordinance
Division D8 (Glossary) as:
a. Land with an existing, natural slope in excess of 20 percent with a minimum elevation
differential of 40 feet and a minimum contiguous area of three acres; or
b. Riparian corridors or associated vegetated areas of creeks, intermittent streams,
perennial streams, or lakes.
Slope Density
Greater than 20 percent 1 dwelling unit per 320 acres
15 to 20 percent 1 dwelling unit per 5 acres (1)
10 to 15 percent 1 dwelling unit per 1 acre (1)
Hillside, Creek, and Ridgeline Areas D5
Division D5 – Resource Management – Effective February 28, 2020 5-5
2. Height Limit. Structures shall be limited to 32 feet in height measured from the lowest to the
highest points of the structure which are above the ground. The review authority may allow up
to a 15 percent increase in height for multi-family development projects that incorporate
sustainable building and development practices similar to Leadership in Energy and
Environmental Design (LEED) Gold or Platinum certifications.
3. Building prohibited on “undevelopable land.” No building shall be allowed on undevelopable
land, as defined in Zoning Ordinance Division D8 (Glossary) under "Resource Management,"
and the land shall not be included in density calculations that establish the development potential
of a site. However, permanent open space dedication may include “undevelopable land” (see
General Plan Table 4-4). Streets, driveways, non-residential accessory structures, park and
recreation facilities and utilities may be constructed on undevelopable land. The review authority
may allow minor grading (three acres or less) with review to create buildable lots on otherwise
undevelopable land if a corresponding amount of contiguous land with slopes less than 20
percent is retained by deed restriction as permanent open space.
a. Exception: A single-family dwelling shall be permitted on a lot created prior to October
25, 2012, provided there is a suitable building site and all structures, driveways and
grading conform to the standards of this Section.
4. Ridgeline setback. No structure shall be located within 100 feet, measured vertically, of the
centerline of a major ridge, or within 50 feet, measured vertically, of the centerline of a minor
ridge. For purposes of this Section, the ridge centerlines shall be as identified in General Plan
Figure 8-3 (Resource Management), unless the review authority approves a more precise
delineation, based on a topographic map with a contour interval of not more than 10 feet.
a. Exception: Within pocket areas, as defined in Zoning Ordinance Division D8 (Glossary)
under "Resource Management," the vertical ridge setback may be reduced by up to 50
percent and buildings may project, measured vertically, up to 33 percent into the reduced
ridge setback area on not more than 25 percent of the lots upon making the following
special Variance findings in addition to the Variance findings in Zoning Ordinance Section
D6-29 (Variances):
i. The pocket development will not significantly impact visually, neighboring
communities; and
ii. The exception meets the intent of the Zoning Ordinance.
Where structures are proposed within 1,000 feet of a major ridge as identified in General Plan
Figure 8-3 (Resource Management), the building pad shall be graded and the building
designed so that the structure maintains a low-profile appearance and conforms to the natural
grade of the hillside, as determined by the review authority.
5. Street and driveway grades. Maximum street grades shall be 12 percent, and maximum
driveway grades shall be 15 percent. Special streets, including one-way streets, split-level
streets, and dead-end streets, and minor variations from the maximum grade standard, may be
allowed when the review authority determines that their use is justified by detailed engineering
and traffic circulation studies submitted by the applicant and approved by the City Engineer
finding that the streets are necessary to achieve the purposes of this Section.
Hillside, Creek, and Ridgeline Areas D5
Division D5 – Resource Management – Effective February 28, 2020 5-6
6. Creek setback. No habitable structure shall be
located within 100 feet of the centerline of a creek
or stream channel identified in General Plan Figure
8-3 (Resource Management) plus any additional
horizontal distance to be determined by an
approved drainage report; provided that no
habitable structure shall be located midslope or
within the 100 year flood plain plus one foot of free
board. Improvement within the setback areas shall
be limited to open space and recreation amenities
and access roads incidental to achieving effective
circulation patterns.
a. Exception: A required creek setback may be modified to avoid a “taking” of private
property if the review authority can make the following special Variance findings in addition
to the Variance findings in Zoning Ordinance Section D6-29 (Variances):
i. The modification is consistent with the General Plan;
ii. Riparian vegetation comprises less than 50 percent of the plant species within the
normal 100-foot setback area;
iii. There is no historical evidence that riparian vegetation could be easily
reestablished within a five-year period; and
iv. A reduced setback will not expose structures to bank erosion, or flooding damage,
increase downstream flooding, flood hazard or impair access to the creek or
stream channel for maintenance.
7. Creek Setback Development Standards. Development within a creek setback shall meet the
following development standards:
a. Alteration of natural features. No grading or filling, planting of exotic/non-native or non-
riparian plant species, or removal of native vegetation shall occur within a creek or
creekside setback area, except where authorized for flood control purposes and by the
proper permits issued by the California State Department of Fish and Game, all other
applicable State and Federal agencies having authority over the creek
b. Design of drainage improvements. Where drainage improvements are required, they
shall be placed in the least visible locations and in manners that achieve natural
appearance through the use of river rock, earthtone concrete, and landscaping with native
plant materials.
c. Use of permeable surfaces. The proposed development should incorporate permeable
surfaces (for example, wood decks, sand-joined bricks, and stone walkways) where
feasible, to minimize off-site flows and facilitate the absorption of water into the ground.
d. Creek bank stabilization. Development or land use changes that increase impervious
surfaces or sedimentation may result in channel erosion. This may require measures to
stabilize creek banks.
i. Creek rehabilitation is the preferred method of stabilization, with the objective of
maintaining the natural character of the creek and riparian area. Rehabilitation
may include enlarging the channel at points of obstruction, clearing obstructions at
points of constriction, limiting uses in areas of excessive erosion, and restoring
riparian vegetation.
ii. Concrete channels and other mechanical stabilization measures shall not be
allowed unless no other alternative exists.
Figure 5-1 – Creeks Setback for
Waterways as shown in
General Plan Figure 8-3
Hillside, Creek, and Ridgeline Areas D5
Division D5 – Resource Management – Effective February 28, 2020 5-7
iii. If bank stabilization requires other than rehabilitation or vegetative methods, hand-
placed stone or rock rip-rap are the preferred methods.
e. Physical and visual access. The following physical and visual access standards shall
apply unless a resource agency establishes a different standard for the project:
i. Public access and visibility to creeks should be provided through the use of single-
lane width frontage roads adjacent to creeks, but outside of the creek setback.
Structures or lots that back-up to creeks or creek frontage roads are discouraged.
ii. The provision of multipurpose creekside trails and public open space is
encouraged. Open space areas should include planting for riparian enhancement
with native shrubs and trees, paths and trails, lighting, benches, play and exercise
equipment, and trash receptacles outside of the riparian habitat area, where
appropriate.
iii. Where streets are not used, frequent access to creekside trails and public open
space should be provided at least every 300 feet, and may occur at the end of cul-
de-sacs.
D5-5 - Design Guidelines
A. Design Guidelines. Development proposed within the Hillside, Creek, and Ridgeline Areas shall
consider the following guidelines:
1. Natural terrain alteration. Alterations of existing natural or artificial contours of land shall be
minimized. Any natural contour altered by grading shall be rounded and shaped to simulate
natural terrain, unless on an individual site this would diminish open space or significant natural
features of the site. Grading shall follow the natural topographic contours as much as possible,
allowing for multi-level foundations to accommodate differences in grade.
2. Viewshed Criteria. Development within the Hillside, Creek, and Ridgeline Areas shall consider
the following viewshed criteria to promote architecture and designs that are compatible with the
natural hillside terrain and minimize visual impacts:
a. Retain a significant portion of natural on-site vegetation to naturally screen structures;
b. Design and install landscaping to substantially screen structures;
c. Design project and site lighting to minimize off-site visibility and glare;
d. Blend the exterior color and materials with the surrounding vegetation and landforms;
e. Use of non-reflective windows and trim; and
f. Design roof angles and composition to conform to existing landforms and landscape
Additional photosimulations, studies, and/or other submittal items may be required by the review
authority to determine compliance with the viewshed criteria.
3. Building and structure design standards. The following standards are intended to ensure that
the design of structures conform to the natural land form and enhance the character of the site.
a. The use of multi-level foundations (floor levels separated by a minimum of four feet) shall
be encouraged as the standard design for residential structures located on natural
Hillside, Creek, and Ridgeline Areas D5
Division D5 – Resource Management – Effective February 28, 2020 5-8
hillsides with slopes of 15 to 20 percent. This requirement does not apply to lots created
prior to October 25, 2012.
b. Roof lines shall relate to the surrounding slope and topography.
c. Second-story levels of structures shall incorporate a variety of bays, recesses, overhangs,
or setbacks, at the downhill side of the structure so that the appearance of vertical mass
and the visual impact on the surrounding area are reduced.
d. All fencing shall be designed and located to be compatible with existing and proposed
buildings and surrounding open space.
e. Exterior mechanical equipment shall be screened from public view. Equipment to be
screened includes heating, air conditioning, refrigeration equipment, plumbing lines,
ductwork, and transformers. Screening of the top of equipment may be required if
necessary to protect views from a Residential Zone.
f. Exterior structural supports and undersides of floors and decks not enclosed by walls or
otherwise screened and more than 12 feet high may be approved only if the Review
Authority finds that no alternative type of construction is feasible, and fire-safety and
design considerations have been adequately addressed.
g. A driveway serving three or more residences and that is not entirely visible from both ends
shall have passing turnouts. Each driveway shall comply with minimum widths prescribed
by the City Engineer.
h. A dwelling unit adjoining a street where parking is prohibited on both sides shall provide
adequate guest parking as required by the Zoning Ordinance.
Hillside, Creek, and Ridgeline Areas D5
Division D5 – Resource Management – Effective February 28, 2020 5-9
D5-6 - Slope Methodology
A. The purpose of this section is to establish slope methodology standards to achieve consistent
application of the Hillside, Creek, and Ridgeline Development Standards in Section D5-4.
1. Grid. On a subject property, apply a 200 ft. by 200 ft. grid. Grids shall be placed as close as
parallel as possible with the existing contour
lines. Contour lines shall be drawn with a
maximum interval of 10 ft. with 5 ft. intervals
preferable.
2. Slope. Determine the average slope of each
individual grid square. The average slope is
determined by taking three (3) slope
measurements within each grid square as
follows:
a. Along the left boundary;
b. Along the right boundary, and
c. Along the center.
Average slope is determined by dividing the sum
of the three measurements by three (3).
3. Allowed Density. Determine the allowed
density for all full grid squares and partial grid
squares based upon Section D5-4.A.1. The total
density shall equal the sum of the allowed
density for all full grid squares and partial grid
squares.
4. Net Developable Area. Determine the net developable area by deducting from the gross area
the following areas on which buildings and/or structures are prohibited:
a. Existing natural slopes greater than 20 percent;
b. Major and minor ridge and creek setback areas as identified in General Plan Figure 8-3
(Resource Management)
5. Net Density. Determine net density as the Allowed Density divided by the Net Developable Area.
6. General Plan Density. Compare the Net Density with the permitted General Plan density.
Average Slope Measurement:
= [(Slope of A-A) + (Slope of B-B) + (Slope of C-C)] / 3
= [(56/200) + (45/200) + (51/200)] / 3
= [(28.0%) + (22.5%) + (25.5%)] / 3
= 25.3%
Figure 5-2 – Example Average Slope
Calculation
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-10
[Page intentionally left blank]
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-11
Chapter II - Tree Preservation and Protection
Sections:
D5-7 - Purpose
D5-8 - Applicability
D5-9 - Tree Permit Application Requirements
D5-10 - Tree Planting and Replacement
D5-11 - Tree Permit Approval or Denial
D5-12 - Post Approval Procedures
D5-7 - Purpose
This Chapter provides regulations for the protection, preservation, maintenance, and replacement of:
A. Native oak trees;
B. The habitat values of oak woodlands;
C. Trees of historic or cultural significance;
D. Groves and stands of mature native trees; or
E. Mature trees and native habitat in general.
D5-8 - Applicability
A. Applicability to protected trees. The provisions of this Chapter shall apply in all zones to the
removal or relocation of any protected tree as defined below unless exempt as determined in
subsection C of this section. A protected tree is any of the following:
1. A native oak tree with a diameter of six or more inches as measured 54 inches above the ground.
2. A heritage, or landmark tree or grove identified by City Council Resolution.
3. Significant groves or stands of trees identified by City Council Resolution.
4. A tree required to be planted, relocated, or preserved that is specifically identified as a condition
of approval for a Tree Removal Permit or other discretionary permit, and/or as environmental
mitigation for a discretionary permit.
5. A tree within 100 feet of a perennial stream, or within 50 feet of a seasonal stream that is six
inches or more in diameter as measured at 54 inches above the ground.
6. A mature tree other than those listed in Subsections A.1 through A.4, that is eight inches or
more in diameter as measured at 54 inches above the ground that is not otherwise exempt from
the requirement of this Chapter.
B. Tree Removal Permit required.
1. Activities requiring a permit. A Tree Removal Permit shall be required prior to:
a. Relocation, removal, cutting-down, or other act that causes the destruction of a protected
tree;
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-12
b. Issuance of building or grading permits resulting in the removal of a protected tree; or
c. The approval of a, Development Plan, Use Permit, Minor Use Permit, Variance, or
subdivision map, hereafter referred to as "discretionary projects" resulting in the removal
of a protected tree.
C. Exceptions. The removal or relocation of a protected tree is exempt from the provisions of this
Chapter under the following circumstances and shall not require the issuance of a tree removal permit:
1. Trees exempt from a permit. In all zones a willow tree, fruit tree, eucalyptus tree, alder tree,
cottonwood tree, pine tree, redwood tree, or similar ornamental tree, as determined by the
Director, are not protected trees.
2. Existing trees on single-family residential property that cannot be further subdivided.
Within a RC, HR, RE, RS, RM and PD residential zones, the removal of an existing tree of the
type described in Subsection A.6 shall be exempt from a tree removal permit.
3. Nursery. Removal of trees planted, grown, or held for sale by a nursery, tree farm, or similar
commercial operation.
4. Orchards. Removal of orchards or fruit trees grown, planted, or held for sale for cash crop or
commercial purposes.
5. Dead trees. Any protected tree which is determined by the Director, or an arborist approved by
the Director, to be dead, has become hazardous or unsightly as a result, and provides limited
habitat value.
6. Emergency situation. Cases of emergency where the Director, City Engineer, a member of a
law enforcement agency, or the Fire Department determines that a protected tree poses an
imminent threat to the public safety, or general welfare such as but not limited to:
a. Traffic visibility obstructions. Removal or relocation of trees necessary to maintain
adequate line-of-sight distances as required by the Director, or City Engineer.
b. Public utility damage. Removal of trees for the protection of existing electrical power,
communication lines, or other utility facilities.
D. Enforcement. Any person who cuts, damages, or moves a protected tree in violation of this
Chapter shall be subject to the enforcement provisions of the Municipal Code.
D5-9 - Tree Removal Permit Application Requirements
A. Application contents. An application for a Tree Removal Permit shall contain the information as
required by the Director which may include submittal of studies such as an Arborist report or Arborist’s
statements disclosing the conditions of trees to be removed and reasons for the removal.
B. Application filing.
1. Discretionary Project: An application for a Tree Removal Permit involving a discretionary
project shall be included as part of the application for the discretionary project, and the review
authority for a discretionary project shall act upon the application.
2. Non-discretionary Project: An application for a Tree Removal Permit not associated with a
discretionary project shall be filed with the Planning Services Division, and the Director or
Director’s designee shall act upon the application.
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-13
D5-10 – Tree Planting and Replacement
The City's principal objective for the Tree Removal Permit process is the preservation and replacement of
protected trees. Where the review authority determines that preservation is infeasible, replacement
plantings or in-lieu fees may be required in compliance with this Section.
Replacement Trees for Existing Development
Removal of protected trees on already improved commercial or single-family residential property may be
subject to replacement trees as determined by the Director or an arborist’s recommendation approved by
the Director. The tree replacement ratio may depend on the ability of the property to accommodate
replacement trees, as determined by the Director or an arborist’s recommendation approved by the
Director.
Replacement Trees for Proposed Development
Subsection A through D are applicable to proposed subdivisions, new developments and/or other project
requiring discretionary approval.
A. Extent of replacement required. The review authority may condition any Tree Removal Permit for
the removal of a protected tree upon the replacement of trees in kind. The replacement requirement
shall be calculated as provided by Table 5-1. The review authority may reduce the required number
of replacement trees if it is determined that the subject site would not adequately support the total
number of required replacement trees. The review authority may approve a replacement program
using one of the methods identified in Subsections B. through D., or any combination of the methods.
TABLE 5-1 - REQUIRED REPLACEMENT TREES
Species of
Tree to be
Removed
Diameter of
Tree to be
Removed(1)
Mitigation Value
(required
number of
replacement
trees)
Required Size and
Species of
Replacement Trees
for Mitigation Value
Blue oak 6 to 9 inches
10 to 15 inches
16 to 25 inches
26 or more
inches
8
12
20
26
15-gallon blue oaks
Valley oak 6 to 9 inches
10 to 15 inches
16 to 25 inches
26 or more
inches
6
9
15
19
15-gallon valley oaks
Live oak 6 to 9 inches
10 to 15 inches
16 to 25 inches
26 or more
inches
4
6
10
13
15-gallon oaks
Other
protected tree
19 to 25 inches
26 or more
inches
12
15
15-gallon trees
Notes:
(1) Diameter shall measure at a point 54 inches above the ground at the base of the tree.
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-14
B. Location and specifications for replacement trees. The replacement trees required by Table 5-1
shall be planted on site (the City's preferred method of mitigation), except that the review authority
may authorize other areas within the City where maintenance to ensure survival of the trees will be
guaranteed.
1. All replacement trees shall be of the same native species as the trees being removed. In the
case where an approved tree replacement location is characterized as non-native habitat such
as an incompatible ornamental landscape, urban development, and/or narrow roadway median,
the replacement tree may be non-native species.
2. Up to 50 percent of the required replacement trees may have a 5-gallon container size, where
the review authority determines that long-term tree health and survival will be improved by
starting with a smaller container size, and that each tree with a container size less than 15
gallons will not be in a location where it will be more subject to damage while it is becoming
established than a larger tree.
3. Replacement trees shall be in addition to any trees required by provisions of this Zoning
Ordinance other than this Chapter (e.g., required parking lot landscaping or street trees).
C. Revegetation. The review authority may, instead of requiring replacement trees, require
implementation of a revegetation plan.
1. The Developer shall enter into a written agreement with the City obligating the developer to
comply with the requirements of the revegetation program.
2. A performance security or bond for 150 percent of the cost of the revegetation plan shall be
required to insure that the agreement is fulfilled.
3. The revegetation program shall propagate native oak trees from seed using currently accepted
methods, and shall identify the seed source of the trees to be propagated, the location of the
plots, and the methods to be used to ensure success of the revegetation program.
4. A revegetation program shall not be considered complete until the trees to be propagated have
survived in a healthy state for a minimum of 10 years, or the Commission has approved a
revegetation program which demonstrates the need for alternative success criteria and
achieves mitigation on an inch-for-inch basis.
D. In lieu mitigation fee. The review authority may determine that the remedies described above are
not feasible or desirable and may instead require the payment of an in-lieu fee for the cost of
purchasing, planting and irrigating the number of 15-gallon trees required by Table 5-1 and
maintaining for five years. The in-lieu fee shall be calculated based on the unit cost (materials and
labor) commonly used in estimating the landscape improvements at the time of the subject
applications are deemed to be complete. The in-lieu fee shall be deposited into one of the following
funds, as determined by the review authority:
1. Oak Tree Propagation Fund. This fund shall be used to propagate and protect native oak
trees. Uses of the fund include, but are not limited to, purchasing property to plant or protect
native oak trees, propagating native oak trees from seed or container stock and maintaining
existing native oak trees.
2. Non Native Tree Fund. This fund shall be used to purchase and plant non-native trees within
San Ramon. Uses of the fund include, but are not limited to, purchasing and propagating non-
native trees from seed or container stock and maintaining existing non-native trees.
E. Conditions for tree removal to accommodate agriculture. A Tree Removal Permit may be granted to
allow tree removal within the HR, RC, and RE, zones to accommodate a commercial agricultural use, which
is subject to a Minor Use Permit, without mitigation in compliance with Subsections A. through D., subject
to the following conditions:
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-15
1. The agricultural use, as proposed and ultimately established, shall be limited to crop production,
horticulture, orchards or vineyards, but shall not include grazing or other animal uses;
2. The Tree Permit shall be exercised within one year;
3. Once tree removal is commenced, the proposed replacement agricultural use shall be in place within
24 months of the removal of the first tree, or mitigation shall be required in compliance with
Subsections A. through E.;
4. Once the replacement agricultural use is established, it shall be maintained for a minimum of five
years. If the agricultural use is terminated before five years, and/or if a subdivision application for
non-agricultural development is filed with the City within that period, or mitigation shall be required in
compliance with Subsections A. through D.; and
5. The approved tree removal and subsequent agricultural use shall retain existing trees:
a. Around existing and proposed buildings;
b. Adjacent to parcel boundaries; and
c. In significant groves, as determined by the Director.
D5-11 – Tree Permit Approval or Denial
Each Tree Removal Permit application shall be reviewed, and approved or denied in compliance with this
Section.
A. Application evaluation criteria. The following criteria shall be used to support the findings required
by Subsection B. for the approval of a Tree Removal Permit.
1. General criteria.
a. The gross floor area of proposed buildings in relation to the "usable" size of the site and
the amount of usable space on the site that does not require the removal of protected
trees;
b. Design features in comparison with other existing or approved projects in the vicinity and
in the same zone that have or had protected trees on their sites;
c. Factors that are unique to the site, such as topographic constraints, lot configuration and
other physical limitations;
d. The overall health and structural condition of the potentially impacted protected trees;
e. The approximate age of each protected tree compared with the average life span for each
species;
f. The number of healthy protected trees that the site will support, with and without the
proposed development;
g. The effect of tree removal on soil stability/erosion, particularly near watercourses or on
steep slopes;
h. Whether there are any alternatives that would allow for the preservation of the protected
tree; and
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-16
i. Any other information the review authority finds pertinent to the decision, including any
information obtained at a public hearing.
2. Criteria for removal.
a. The age of the protected tree with regard to whether its removal would encourage
healthier, more vigorous growth of younger similar trees in the area;
b. The number of existing protected trees in the area and the effect of removal upon public
health, safety and the general welfare of the area;
c. The potential for the protected tree to be a public nuisance or interfere with utility service,
as well as its proximity to existing structures; and
d. Present and future shade potential with regard to solar heating and cooling.
3. Criteria for encroachment. Whether the degree of encroachment is likely to result in the
subsequent decline of the affected protected tree or create a future risk to public safety or pose
a hazard to adjacent structures.
B. Required findings for approval. The approval of a Tree Permit shall require that the review authority
first make all the following findings:
1. The approval of the Tree Permit will not be detrimental to the public health, safety or welfare,
and approval of the Tree Permit is consistent with the provisions of this Chapter; and
2. Measures have been incorporated into the project or permit to mitigate impacts to remaining
trees or to replace the trees removed.
C. Considerations for denial of a Tree Permit. A Tree Removal Permit shall be denied if the review
authority finds that any one of the following situations exists.
1. Removal or damage of a healthy tree could be avoided by:
a. Reasonable redesign of the site plan;
b. Trimming, thinning, tree surgery, or other reasonable treatment, as determined by the
review authority.
2. Adequate provisions for drainage, erosion control, land stability, windscreen, buffers along the
road and between neighbors have not been made where these problems are anticipated as a
result of the removal.
3. The tree to be removed contains an active nest of a bird covered by the Migratory Bird Treaty
Act, that has been identified through the project environmental review process or that is
otherwise known to the review authority, and a qualified professional has determined that the
relocation of the nest without damage to the nestlings is not possible. In this case, tree removal
shall be delayed until nesting is complete.
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-17
D. Limitation on approved activities. A Tree Removal Permit shall not be issued for temporary
parking, or the storage of vehicles, trailers, equipment, construction materials, or temporary structures
within the protected zone of a protected tree.
E. Conditions of approval. The approval of a Tree Removal Permit shall include conditions of approval
as necessary to ensure compliance with Section D5-8 (Tree Planting and Replacement).
D5-12 – Post Approval Procedures
The following procedures apply after the approval of a Tree Removal Permit application.
A. Appeals. The decision of the review authority shall be final unless an appeal is filed in compliance
with Chapter D7-II (Appeals and Calls for Review).
B. Expiration/extension. Except where otherwise provided by this Chapter, a Tree Permit shall be
exercised within six months from the date of approval or other time limit established through a
concurrent land use permit approval. Time extensions, for up to a total of two additional years, may
be granted in compliance with Chapter D6-III (Permit Implementation, Time Limits, and Extensions).
A Tree Permit not exercised within its time limits shall expire in compliance with Chapter D6-III.
C. Performance guarantee. The review authority may require that a monetary security deposit be
posted and maintained where deemed necessary to ensure:
1. The preservation of protected trees during construction;
2. The completion of required mitigation measures; and
3. In the case of tree removal within the RC zone to accommodate an agricultural use, the
establishment of the proposed agricultural use.
The deposit shall be posted in a form approved by the City Attorney prior to any grading or movement
of heavy equipment onto the site or issuance of any permits. Each violation of any Tree Removal
Permit condition regarding tree preservation shall result in forfeiture of a portion or the entirety of the
deposit, at the discretion of the review authority, provided that this determination may be appealed in
compliance with Chapter D7-II.
D. Construction monitoring. Monitoring of tree protection and restoration measure specified as
conditions of approval shall be performed by site inspection conducted by the Director or the Director’s
designee.
E. Revocation. A Tree Removal Permit may be revoked or modified, as deemed necessary by the
Director, with any of the following findings that the tree removal, relocation, or protection activities:
1. Cannot support the original findings;
2. Resulted from misrepresentation or fraud;
3. Has not been implemented in a timely manner;
4. Has not met, or has violated any condition of approval;
5. Is in violation of any code, law, ordinance, or statute;
6. Is detrimental to public health, safety, or welfare; or
7. Constitutes a nuisance.
Tree Preservation and Protection D5
Division D5 – Resource Management – Effective February 28, 2020 5-18
F. Stop work orders. Whenever any construction or work is being performed contrary to the provisions
of this Chapter or applicable conditions of approval, the Director may issue a written notice to the
responsible party to stop work on the project on which the violation has occurred or upon which the
danger exists. The notice shall state the nature of the violation and the risk to the trees. No further
work shall be allowed until the violation has been corrected and approved by the Department.
City of San Ramon Zoning Ordinance D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-1
Division D6
Planning Permit Procedures
Chapter I - Permit Application Filing and Processing ......................................................................... .6-3
D6-13 - Purpose ............................................................................................................................... 6-3
D6-14 - Authority for Land Use and Zoning Decisions ..................................................................... 6-3
D6-15 - Multiple Permit Applications ................................................................................................ 6-5
D6-16 - Application Preparation and Filing ....................................................................................... 6-5
D6-17 - Application Fees .................................................................................................................. 6-6
D6-18 - Initial Application Review ..................................................................................................... 6-6
D6-19 - Environmental Assessment ................................................................................................. 6-8
D6-20 - Project Evaluation and Staff Reports................................................................................... 6-8
Chapter II - Permit Review and Decisions ............................................................................................. 6-9
D6-21 - Purpose ............................................................................................................................... 6-9
D6-22 - Architectural Review ............................................................................................................ 6-9
D6-23 - Development Plans............................................................................................................ 6-14
D6-24 - Minor Exceptions ............................................................................................................... 6-16
D6-25 - Planned Development Permits .......................................................................................... 6-19
D6-26 - Preliminary Plan Review .................................................................................................... 6-22
D6-27 - Temporary Use Permits ..................................................................................................... 6-24
D6-28 - Use Permits and Minor Use Permits ................................................................................. 6-28
D6-29 - Variances ........................................................................................................................... 6-30
D6-30 - Zoning Clearances............................................................................................................. 6-32
Chapter III - Permit Implementation, Time Limits, and Extensions .................................................. 6-33
D6-31 - Purpose ............................................................................................................................. 6-33
D6-32 - Effective Dates ................................................................................................................... 6-33
D6-33 - Performance Guarantees .................................................................................................. 6-33
D6-34 - Time Limits and Extensions ............................................................................................... 6-34
D6-35 - Changes to an Approved Project ....................................................................................... 6-35
D6-36 - Permits to Run with the Land ............................................................................................ 6-36
D6-37 - Resubmittals ...................................................................................................................... 6-36
D6-38 - Covenants of Easements .................................................................................................. 6-36
Chapter IV - Development Agreements ............................................................................................... 6-39
D6-39 - Purpose ............................................................................................................................. 6-39
D6-40 - Application Requirements .................................................................................................. 6-39
D6-41 - Pre-Application Process .................................................................................................... 6-40
D6-42 - Department Review and Recommendation ....................................................................... 6-40
D6-43 - Public Hearing Required .................................................................................................... 6-40
D6-44 - Commission Action ............................................................................................................ 6-41
D6-45 - Council Action .................................................................................................................... 6-41
D6-46 - Annual Review ................................................................................................................... 6-42
D6-47 - Application of Existing Rules, Regulations, and Policies ................................................... 6-43
D6-48 - Modification and Termination ............................................................................................ 6-43
D6-49 - Zoning Administrator’s Responsibilities ............................................................................. 6-43
Permit Application Filing and Processing D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-2
[Page intentionally left blank]
Permit Application Filing and Processing D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-3
Chapter I - Permit Application Filing and Processing
Sections:
D6-13 - Purpose
D6-14 - Authority for Land Use and Zoning Decisions
D6-15 - Multiple Permit Applications
D6-16 - Application Preparation and Filing
D6-17 - Application Fees
D6-18 - Initial Application Review
D6-19 - Environmental Assessment
D6-20 - Project Evaluation and Staff Reports
D6-13 - Purpose
This Chapter provides procedures and requirements for the preparation, filing, and initial processing of the
permit applications required by this Zoning Ordinance.
D6-14 - Authority for Land Use and Zoning Decisions
Table 6-1 (Review Authority), below identifies the review authority responsible for reviewing and making
decisions on each type of application required by this Zoning Ordinance.
Permit Application Filing and Processing D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-4
TABLE 6-1 - REVIEW AUTHORITY
Procedure
in Section
Role of Review Authority (1)
Type of Decision
Architectural
Review Board
(ARB) (2)
Zoning
Administrator
Planning
Commission
City
Council
Administrative and Legislative
Development
Agreement D6-IV – Recommend Recommend Decision
General Plan
Amendment D7-III – Recommend Recommend Decision
Interpretation D1-5 – Decision (3) Appeal Decision
Zoning Map
Amendment D7-III – Recommend Recommend Decision
Zoning Ordinance
Amendment D7-III – Recommend Recommend Decision
Specific Plan – – Recommend Recommend Decision
Planning Permit or Other Development Approval
Architectural Review D6-22 Recommend Decision (3) Appeal Appeal
Development Plan and
Amendments D6-23 – Decision (3) Appeal Appeal
Extensions D6-34 – Decision (3) Appeal Appeal
Fee Waiver D6-17 – Decision – Appeal
Home Occupation
Permit D4-33 – Decision Appeal Appeal
Master Sign Program D3-52 Recommend Decision (3) Appeal Appeal
Master Sign Program
Amendment D3-52 – Decision (4) Appeal Appeal
Minor Exception D6-24 – Decision (3) Appeal Appeal
Minor Use Permit D6-28 – Decision (3) Appeal Appeal
Modification to
condition of approval D6-35 – Decision Appeal Appeal
Planned Development
Permit D6-25 – Decision (3) Decision Appeal
Preliminary Plan
Review D6-26 – Decision (3) Decision Appeal
Reasonable
Accommodation D4-75 – Decision Appeal Appeal
Sign Permit D3-56 Recommend Decision (3) Appeal Appeal
Subdivision - Major – Recommend Recommend Decision Appeal
Subdivision - Minor – Recommend Decision (3) Appeal Appeal
Temporary Sign Permit D3-56 – Decision Appeal Appeal
Temporary Use Permit D6-27 – Decision Appeal Appeal
Tree Permit D5-II – Decision (3) (4) Appeal Appeal
Use Permit D6-28 – Recommend Decision Appeal
Variance D6-29 – Decision (3) Appeal Appeal
Zoning Clearance D6-30 – Decision (5) Appeal Appeal
[Notes on next page]
Permit Application Filing and Processing D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-5
Notes:
(1) "Recommend" means that the review authority makes a recommendation to a higher decision-
making body; "Decision" means that the review authority makes the final decision on the matter;
"Appeal" means that the review authority may consider and decide upon appeals to the decision of
an earlier decision-making body, in compliance with Chapter D7-II (Appeals and Calls for Review).
(2) The Architectural Review Board shall be hereafter referred to in this Zoning Ordinance as the ARB.
(3) The Zoning Administrator m ay defer action and refer the request to the Commission, so that the
Commission may instead make the decision.
(4) If the Zoning Administrator determines that the proposal may have a significant impact the item
may be referred to the ARB for review and a recommendation.
(5) The Zoning Administrator may require a Minor Use Permit pursuant to Section D6-30(C)
D6-15 - Multiple Permit Applications
A. Concurrent filing. When a single project incorporates different land uses or features so that this
Zoning Ordinance requires multiple land use permit applications, the Zoning Administrator may
determine that all of the applications shall be filed concurrently, and reviewed, and approved or
disapproved, by the highest level review authority assigned by Table 6-1 to any of the required
applications. (For example, a project that requires a Zoning Map amendment and a Use Permit may
be reviewed, and approved or disapproved by the Council (after a recommendation from the
Commission), where a Use Permit application by itself may be reviewed and acted upon by the Zoning
Administrator.)
B. Master application. The Zoning Administrator may authorize use of a single application form and
submittal materials for multiple land use applications required by this Zoning Ordinance.
D6-16 - Application Preparation and Filing
A. Pre-application conference. A prospective applicant is strongly encouraged to request a pre-
application conference with the Planning Division before completing and filing a planning permit
application.
1. The purpose of this conference is to generally:
a. Inform the applicant of City requirements as they apply to the proposed project;
b. Review the City's review process, possible project alternatives or modifications; and
c. Identify the information and materials the City will require with the application, and any
necessary technical studies and information relating to the environmental review of the
project.
2. Neither the pre-application review nor the provision of information and pertinent policies shall
be construed as either a recommendation for approval or disapproval of the application or
project by any City staff.
3. A failure by City staff to identify all required studies or all applicable requirements shall not
constitute a waiver of the requirements.
Permit Application Filing and Processing D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-6
B. Application contents. Each application for a permit, amendment, or other matter pertaining to this
Zoning Ordinance shall be filed with the Department on a City application form, together with required
fees and/or deposits, and all other information and materials required by the City's list of required
application contents, as identified in the Department handout for the specific type of application.
Applicants are encouraged to contact the Planning Division before submitting an application to verify
which materials are necessary for application filing.
C. Eligibility for filing. All land use permit and other applications required by this Zoning Ordinance
shall be filed with the Department. Applications may be made by:
1. The owner of the subject property; or
2. Any authorized agent or representative, with the written consent of the property owner.
D. Zoning Administrator’s determination. If the Zoning Administrator determines that the application
does not support a prima facie right to the granting of the application (e.g., a request for a Zoning
Map amendment or Tentative Map that could not be granted in absence of a required General Plan
amendment application, or a request for an Use Permit allowing a use that is not allowable in the
subject zone, etc.), the City shall not accept the application.
D6-17 - Application Fees
A. Fee schedule. The Council shall establish a schedule of fees for the processing of the applications
required by this Zoning Ordinance, hereafter referred to as the City's Fee Schedule.
B. Multiple applications. The City's processing fees are cumulative. For example, if a proposed project
requires the approval of both a Use Permit and a Variance, both fees will be charged. Large or
complex projects may be subject to an hourly rate in addition to the basic application fees, at the
discretion of the Zoning Administrator.
C. Timing of payment. No application shall be deemed complete, and processing shall not commence
on any application until all required fees/deposits have been paid.
D. Refunds and withdrawals.
1. The required application fees cover City costs for public hearings, mailings, staff time, and the
other activities involved in processing applications.
2. No refund due to a disapproval shall be allowed.
3. In the case of a withdrawal, the Zoning Administrator shall have the discretion to authorize a
partial refund based upon the pro-rated costs to-date and the status of the application at the
time of withdrawal.
D6-18 - Initial Application Review
A. Review for completeness. The Department shall review each application for completeness and
accuracy before it is accepted as being complete and officially filed. The Department’s determination
of completeness shall be based on the City's list of required application contents (see Section D6-
16.B - Application contents, above) and any additional instructions provided the applicant in any pre-
application conference.
Permit Application Filing and Processing D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-7
1. Notification of applicant. As required by State law (Government Code Section 65943), within
30 calendar days of application filing, the applicant shall be informed in writing, either that the
application is complete and has been accepted for processing, or that the application is
incomplete and that additional information, specified in the Department letter, shall be provided.
2. Appeal of determination. Where the Department has determined that an application is
incomplete, and the applicant believes that the application is complete and/or that the
information requested by the Department is not required, the applicant may appeal the
Department’s determination in compliance with Chapter D7-IIh (Appeals and Calls for Review).
3. Time for submittal of additional information. When an application is incomplete, the time
used by the applicant to submit the required additional information shall not be considered part
of the time within which the determination of completeness shall occur. The time available to
an applicant for submittal of additional information is limited by following Subsection A.4.
4. Expiration of application.
a. If an applicant fails to provide the additional information specified in the Department letter
within 30 days following the date of the letter regarding the incomplete application, the
application shall expire and be deemed withdrawn, without any further action by the City.
b. The Department may grant one or more 30-day extensions if the Department determines
that circumstances unique to the project justify each extension.
c. After the expiration of an application, future City consideration shall require the submittal
of a new, complete application and associated fees.
5. Environmental information. After an application has been accepted as complete, the
Department may require the applicant to submit additional information needed for the
environmental review of the project in compliance with Section D6-19 (Environmental
Assessment), below.
6. Violation on the site.
a. The Department shall not find an application complete, and shall not process or approve
the application, if conditions exist on the site in violation of this Zoning Ordinance or any
permit or other approval granted in compliance with this Zoning Ordinance, except for an
application for a permit, if any, needed to correct the violation.
b. The Department authority under this Subsection shall apply whether:
(1) The current applicant was the owner of the subject property at the time the violation
occurred; or
(2) The applicant is the current owner of the subject property with or without actual or
constructive knowledge of the violation at the time of acquisition of the subject
property.
c. The Department's decision may be appealed in compliance with Chapter D7-II (Appeals
and Calls for Review).
Permit Application Filing and Processing D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-8
B. Filing date. The filing date of an application shall be the date on which the Department receives the
last submission, map, plan, or other material required as a part of that application by Section D6-
16.B. (Application contents), above, and deemed complete by the Department in compliance with this
Section.
C. Revised materials.
1. Whenever an applicant desires/needs to file revised materials, the materials shall be submitted
at least 15 days before the scheduled public hearing on the application.
2. The Department may choose to accept revised materials after that time, upon determining that
there is sufficient time to review them before the scheduled hearing date.
3. The review authority may continue an application until the next available meeting date in order
to adequately evaluate materials received after the date of receipt of the application package.
D. Referral of application. At the discretion of the Department, or where otherwise required by this
Zoning Ordinance or State or Federal law, an application may be referred to any public agency that
may be affected by or have an interest in the proposed project.
D6-19 - Environmental Assessment
After acceptance of a complete application, the project shall be reviewed as required by the California
Environmental Quality Act (CEQA) and the City’s Environmental Guidelines.
D6-20 - Project Evaluation and Staff Reports
A. Staff evaluation. The Department shall review all discretionary applications filed in compliance with
this Division to determine whether they comply and are consistent with the provisions of this Zoning
Ordinance, other applicable provisions of the Municipal Code, the General Plan, and any applicable
specific plan.
B. Staff report. The Department shall provide a written recommendation to the Zoning Administrator,
Commission and/or Council (as applicable) on whether the application should be approved, approved
subject to conditions, or disapproved.
C. Report distribution. Each staff report shall be furnished to the applicant, after being provided to the
review authority, before the scheduled hearing on the application.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-9
Chapter II – Permit Review and Decisions
Sections:
D6-21 - Purpose
D6-22 - Architectural Reviews
D6-23 - Development Plans
D6-24 - Minor Exceptions
D6-25 - Planned Development Permits
D6-26 - Preliminary Plan Review
D6-27 - Temporary Use Permits
D6-28 - Use Permits and Minor Use Permits
D6-29 - Variances
D6-30 - Zoning Clearance Clearances
D6-21 - Purpose
A. Permit review procedures. This Chapter provides procedures for the final review, and approval or
disapproval of the planning permit applications established by this Zoning Ordinance.
B. Subdivision review procedures. Procedures and standards for the review and approval of
subdivision maps are found in Division C5 of the Municipal Code (Subdivision Regulations and
Procedures).
C. Application filing and initial processing. Where applicable, the procedures of this Chapter are
carried out after those described in Division D6, Chapter I (Permit Application Filing and Processing),
for each application.
D6-22 - Architectural Review
A. Purpose and applicability.
1. Purpose. The purpose of Architectural Review is to recognize the interdependence of land
values and aesthetics and to provide a method to promote sound land use development.
2. Objectives. Architectural Review is intended to accomplish the following objectives:
a. Ensure that siting and architectural design of structures, their materials, and colors are
visually harmonious with surrounding development and with the natural landforms and
vegetation of the areas in which they are proposed to be located;
b. Ensure that plans for the landscaped areas conform with the requirements of this Zoning
Ordinance and Ordinance No. 218 (Landscape Design Guidelines) and that they provide
a visually pleasing setting for structures on the site and on adjoining and nearby sites,
and blend harmoniously with the natural landscape; and
c. Prevent excessive and unsightly grading, including hillsides, and preserve natural
landforms and existing vegetation, where feasible.
3. Applicability. All building and site plans shall be subject to Architectural Review and Zoning
Administrator approval before issuance of a Zoning Clearance and a Building Permit in
compliance with this Section.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-10
B. Improvements subject to Architectural Review.
1. Zoning Administrator responsibilities. The Zoning Administrator and his/her designee shall
review and approve the design of each improvement for which a Building Permit, Zoning
Clearance, certificate, or other approval is required in compliance with Subsection C. (Zoning
Administrator responsibilities), below.
2. Architectural Review Board (ARB) responsibilities. The ARB shall review the design of
each improvement for which a Building Permit, Zoning Clearance, certificate, and provide
recommendation to the Zoning Administrator in compliance with Subsection D. (ARB
responsibilities), below.
3. Improvements exempt from Architectural Review. The following improvements are exempt
from Architectural Review:
a. Additions or repairs to any existing improvement if the exterior is not to be altered;
b. Appurtenances and accessory improvements, and repairs to detached single-family
residences;
c. Exempt signs, as identified in Section D3-45; and
d. Individual signs conforming to a Master Sign Program approved in compliance with
Section D3-52.
4. Improvement defined. The term "improvement" as used in this Section shall be liberally
interpreted, and shall include the alteration, construction, and repair of all structures and
facilities permanently affixed to real property and all appurtenances to these structures and
facilities.
5. Compliance with Architectural Review approval required. No improvement subject to
Architectural Review shall hereafter be altered, constructed, located, repaired, or thereafter
maintained, except in compliance with an Architectural Review approval granted in compliance
with this Section.
C. Zoning Administrator responsibilities. The following improvements shall be subject to
Architectural Review by the Zoning Administrator. All other residential and nonresidential
improvements shall be subject to the review and recommendation to the Zoning Administrator by the
ARB.
1. Residential. The following minor residential improvements and modifications to an existing
structure can be reviewed in association with a Building Permit plan check. If new construction,
improvements, or modifications are determined to result in a major change/modification, the
Zoning Administrator may require an administrative Architectural Review application and/or
refer the application to the ARB for review and a recommendation.
a. Additions to existing single-family dwellings.
(1) Single-story and second-story additions to existing single-story single-family
dwellings; and
(2) Second story additions to existing two-story single-family dwellings.
b. Architectural projections into yards (e.g., bay windows, fireplace chimneys, stairs or
landings, etc.);
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-11
c. Accessory structures (e.g., arbors, balconies, carports, decks, gazebos, greenhouses,
patio covers and enclosures, storage sheds, trellises, etc.);
d. Decorative mail boxes and columns located in front yards;
e. Exterior structure modifications and repairs (e.g., balconies, doors, exterior siding,
skylights, solar panels, windows, etc.);
f. Retaining walls; and
g. Good neighbor fence that is taller than six feet.
2. Nonresidential. An administrative Architectural Review application is required for the following
nonresidential new construction improvements or major changes/modifications to an existing
structure, unless, in the opinion of the Zoning Administrator, the item may have a significant
impact, in which case the item may be referred to the ARB for review and a recommendation.
If the improvement/structure is determined to be minor in nature and would not, in the opinion
of the Zoning Administrator, cause a significant impact, the review and decision may be
conducted by the Zoning Administrator in association with a Building Permit plan check.
a. Accessory structures;
b. Exterior structure and parking lot lighting;
c. Exterior structure modifications and storefront changes (e.g., doors, exterior siding,
windows, exterior paint change, etc.);
d. Fences and walls;
e. Landscape improvements or modification;
f. Master Sign Program Amendments;
g. Parking lot restriping and minor parking lot modifications;
h. Retaining walls;
i. Signs in compliance with an approved Master Sign Program;
j. Signs not regulated with an approved Master Sign Program;
k. Sign face copy changes; and
l. Trash and storage areas.
D. Architectural Review Board (ARB) responsibilities. The ARB shall be responsible for the review
and recommendation to the Zoning Administrator and/or the Commission on all other residential and
nonresidential improvements, as that term is defined in Subparagraph B.4. (Improvement defined)
above.
E. Initiation of Architectural Review.
1. Architectural Review shall be initiated by the property owner or an authorized agent by filing the
number of copies of all plans and materials identified in Subsection F. (Application
requirements), below, as required by the Department.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-12
2. Preliminary consultation between the project applicant and the Department to discuss
applicable standards and design guidelines may be initiated by requesting an appointment with
the Zoning Administrator.
F. Application requirements. An Architectural Review shall be filed in compliance with Division D6,
Chapter I (Permit Application Filling and Processing). The Architectural Review shall be accompanied
by the information identified in the Department handout for Architectural Reviews. It is the
responsibility of the applicant to provide evidence in support of the findings required by Subsection I.
(Required findings), below.
G. Factors to be considered during Architectural Review.
1. Advisory capacity. The ARB shall function in an advisory capacity to the Zoning Administrator
or Commission in compliance with this Section.
2. Factors to be considered. The review authority (e.g., the Zoning Administrator) shall review
the design of all improvements subject to the requirements of this Section in relation to the
following factors:
a. Area, bulk, and height of structures;
b. Colors and types of structures and installations;
c. The architectural and physical relationship with existing and proposed structures in the
area and to the site’s location within the City;
d. Location, orientation, and site layout of the structures, and their relationship with open
space areas, topography, and solar/energy efficiency;
e. Colors, height, materials, and variations in boundary fences, walls, or screen planting;
f. Location and type of landscaping including setback areas and the project’s off-street
parking areas;
g. Appropriateness of sign design and exterior lighting, and other building graphics; and
h. Second story additions to existing single-story homes.
3. Recommendations/actions of the ARB. Following review, the Summary of Action shall be
kept on file with the Department which duly note the ARB’s recommendations/actions and
conditions pertaining to the subject improvement.
4. Department to ensure conformance with approved plans.
a. Following plan approval, the Department shall review all final plans before issuance of a
Building Permit to ensure their conformance to the plans approved by the review
authority, and any conditions that were a part of that approval.
b. Procedures for this review are identified in Section D6-30 (Zoning Clearances).
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-13
H. Architectural Review and approval.
1. Time periods for review.
a. The review authority shall conduct a review of the plans and specifications submitted for
review within 45 days following the submittal of a complete application, unless the
applicant agrees to an alternative time schedule.
b. In the case of plans and specifications which are associated with an approved
Development Plan, Sign Permit, or subdivision previously reviewed and approved by the
Commission, the review authority shall conduct the review within 45 days of the
Commission’s decision, unless the applicant agrees to an alternative time schedule.
c. Following the decision of the review authority’s review, the Department shall mail notice
of the decision to the applicant.
2. Action required.
a. All decisions shall be consistent with the findings identified in Subsection I. (Required
findings), below.
b. Any conditions imposed shall be deemed reasonable and necessary and designed to
ensure attainment of the purposes and standards established by this Zoning Ordinance.
3. Appeals. All decisions of the review authority shall be appealable in compliance with Chapter
D7-II (Appeals and Calls for Review).
I. Required findings. The review authority may approve or disapprove an Architectural Review only
after first making all of the following findings:
1. The project’s design would be:
a. Consistent with the goals and objectives of the General Plan;
b. Consistent with the purposes of this Zoning Ordinance;
c. In compliance with Subparagraph G. 2. (Factors to be considered), above; and
d. In the best interest of the public health, safety, and general welfare of the community.
2. General site considerations, including site layout, open space and topography, orientation and
location of structures, circulation and parking, height, fences and walls, public safety, setbacks,
vehicular access, and similar elements have been designed to provide a desirable environment
for the subject development;
3. General architectural considerations, including the character, scale and quality of the design,
the architectural relationship with the site and other structures, building materials, colors,
exterior lighting and signs, screening of exterior appurtenances, and similar elements have
been incorporated into the design of the subject development in order to ensure the
compatibility of the development with its design concept and the character of adjacent
structures; and
4. General landscape considerations, including the location, color, coverage, size, texture, and
type of plant materials, provisions for irrigation, maintenance, and protection of landscaped
areas and similar elements have been considered to ensure visual relief, to complement
structures, and to provide an attractive environment for the enjoyment of the public.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-14
J. Post decision procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division D6,
Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to appeals and
revocation/ modification located in Division D7, Chapter V (Enforcement), shall apply following the
decision on an Architectural Review.
D6-23 - Development Plans
A. Purpose. This Section provides the flexibility in application of land use and development regulations
necessary to achieve the purposes of this Zoning Ordinance by establishing procedures for approval,
conditional approval, or disapproval of Development Plan or Development Plan Amendment
applications.
B. Applicability.
1. Development Plans or Development Plan Amendments are required for all new development
and additions to existing structures, unless the Zoning Administrator finds that the addition is
non-controversial, minor, and does not involve a substantial alteration to the existing structure.
2. Development Plans or Development Plan Amendments are not required for the construction or
alteration of a single-family dwelling unit.
C. Review authority – Zoning Administrator. The Zoning Administrator shall approve, conditionally
approve, or disapprove applications for Development Plans and Development Plan Amendments.
The Zoning Administrator may defer action and refer the request to the Commission, so that the
Commission may instead make the decision.
D. Consistency with the General Plan required. All approvals or conditional approvals shall be
consistent with the General Plan and subject to the general purposes of this Zoning Ordinance, the
specific purposes of the base or overlay zone in which a development site is located, and the
provisions of this Section.
E. Application requirements.
1. An application for a planning permit approval shall be filed in compliance with Division D6,
Chapter I (Permit Application Filling and Processing). The application shall be accompanied
by the information identified in the Department handout for the specific permit.
2. For applicants for a housing development project as defined by Government Code Section
65598.5, the application shall be deemed to have been submitted upon submittal of an
application form, providing all of the information required by Government Code Section
65941.1, and upon payment of the permit processing fee. It is the responsibility of the applicant
to provide evidence in support of the findings required by Subsection H. (Required findings),
below.
F. Project Review, notice and public hearing. Each application shall be reviewed by the Zoning
Administrator to ensure that the proposal complies with all applicable requirements of this Zoning
Ordinance. Before a decision on a Development Plan or Development Plan Amendment, the City
shall provide notice as follows:
Development Plan
1. A public hearing shall be required for the Zoning Administrator’s consideration of a
Development Plan application.
2. Notice of the public hearing shall be provided, and the hearing shall be conducted in compliance
with Chapter D7-IV (Public Hearings).
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-15
3. When an application for a Development Plan is submitted concurrently with a Use Permit or
Variance application on the same site, the Zoning Administrator shall schedule a combined
public hearing.
Development Plan Amendment
1. A public notice shall be required prior to the Zoning Administrator’s decision. The public notice
shall state that the Zoning Administrator will decide whether to approve or disapprove the
Development Plan Amendment application on a date specified in the notice, and that a public
hearing will be held only if requested in writing by any interested person before the specified
date for the decision.
2. When a public hearing is requested, notice of the hearing shall be provided in compliance with
Chapter D7-IV, and the Zoning Administrator shall conduct the public hearing before a decision
on the application in compliance with Chapter D7-IV (Public Hearings).
G. Duties of the Review Authority.
1. The Zoning Administrator shall conduct a public hearing, if required in subsection F above, and
hear testimony for and against the application.
2. Within 30 working days of the conclusion of the public hearing, the Review Authority shall
approve, conditionally approve, or disapprove the application.
3. Notice of the decision shall be mailed to the applicant, and any other party requesting notice,
after the decision is rendered.
H. Required findings. The Zoning Administrator shall approve an application for a Development Plan
or Development Plan Amendment as it was applied for, or in modified form as required by the Zoning
Administrator if, on the basis of the application, materials, plans, and testimony submitted, the Zoning
Administrator first finds that the proposed development:
1. Will not be detrimental to the health, safety, and general welfare of persons residing or working
in the neighborhood of the proposed development;
2. Will not be injurious or detrimental to property or improvements in the neighborhood;
3. Will not be injurious or detrimental to the general welfare of the City;
4. Will not be inconsistent with the policies and goals of the General Plan or any applicable specific
plan; and
5. Is architecturally compatible with other developments in the same vicinity, both inside and
outside of the subject zone.
I. Conditions of approval.
1. In approving a Development Plan or Development Plan Amendment the Zoning Administrator
may impose conditions that are deemed reasonable and necessary to:
a. Achieve the general purposes of this Zoning Ordinance or the specific purposes of the
subject zone, or to make it consistent with the General Plan or any applicable specific
plan;
b. Protect the public health, safety, and general welfare; or
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-16
c. Ensure operation and maintenance of the use in a manner compatible with existing and
potential uses on adjoining properties or in the surrounding area.
2. The conditions of approval shall not include bulk, density, height, loading, open space, parking,
sign, or use requirements that are less restrictive than those identified by the applicable zone
regulations, unless a variance to these regulations is granted.
J. Post decision procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division D6,
Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to appeals and
revocation/ modification located in Division D7, Chapter V (Enforcement), shall apply following the
decision on an application for a Development Plan or Development Plan Amendment.
Development Plan Concept Review – Planning Commission Review
Purpose: The Conceptual Review process is intended to serve as an initial screening of a project concept
and not a detailed review of a development proposal. The value of the process is in the feedback provided
by the Planning Commission and Staff that allows the applicant to make an informed decision regarding
potential revisions to their project based on the comments received. The Planning Commission’s feedback
is non‐binding and no formal or final decisions are issued for a Conceptual Review.
Submittal Requirements: An application for a Concept Review shall be filed in compliance with Division
D6, Chapter I (Permit Application Filling and Processing). The application shall be accompanied by the
information identified in the Department handout for the specific permit. The specific submittal requirements
will be based on the nature of the project for which a Concept Review is being sought.
Public Notice: Notice of the Planning Commission’s consideration of a Concept Review Application will
be sent to property owners within 300 feet of the subject property. The purpose of providing public notice
on a non-action item is to solicit public input in advance of formal applications and give the potential project
applicant a better understanding of public opinion regarding their potential project.
D6-24 - Minor Exceptions
The Zoning Administrator may grant a Minor Exception from specified regulations contained in this Zoning
Ordinance in compliance with this Section.
A. Purpose. The purposes of this Chapter are to:
1. Allow the Zoning Administrator to grant a Minor Exception from specified zone or development
standards required by this Zoning Ordinance.
2. Provide an appropriate process to enable the Zoning Administrator to grant a requested Minor
Exception.
3. Provide appropriate and reasonable findings to allow the Zoning Administrator to grant a
requested Minor Exception.
B. Applicability. A Minor Exception application shall be approved for any item identified in Table 6-2,
below, if in the opinion of the Zoning Administrator the findings identified in Subsection E. (Required
findings), below can be made.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-17
TABLE 6 -2 - ALLOWABLE MINOR EXCEPTIONS
Types of Minor Exceptions Allowed Maximum
Adjustment
1. Area requirements. A decrease in the minimum area requirements. (Not
including minimum parcel area requirements - See number 6. below.)
15 percent
2. Fence or wall height. An increase in the maximum allowable height of a
fence or wall, in compliance with Section D3-4 (Fences, Hedges, and Walls).
Up to a 1 foot
increase
3. Floor Area Ratio (FAR). An increase in the maximum allowable FAR. 10 percent
4. Landscaping area. A decrease in the minimum landscaping area
requirements.
20 percent
5. Loading. A decrease in the number of required loading spaces, but not
exceeding two spaces.
30 percent
6. Parcel area. A decrease in the minimum required parcel area. 10 percent
7. Parcel coverage. An increase in the maximum allowable parcel coverage. 10 percent
8. Parcel depth or width. A decrease in the minimum required parcel depth or
width, only when the total parcel area requirements are met.
10 percent
9. Parking. A decrease in the number of required parking spaces. 15 percent
10. Projections. An increase in the allowable projection of canopies, cornices,
eaves, fireplaces, landings, masonry chimneys, overhangs, raised porches,
stairways, and steps into a required setback areas, but no closer than 3 feet
to any property line.
25 percent
11. Setback areas. A decrease in the required setbacks.
Front setback: But no closer to the front property line than 15 feet. 25 percent
Side setbacks: But no closer to the side property lines than 3 feet. 25 percent
Rear setback: But no closer to the rear property line than 5 feet. 25 percent
12. Signs. An increase in the maximum allowable sign area or height. 25 percent
13. Structure height. An increase in the maximum allowable structure height,
but not to exceed an increase of five feet.
25 percent
14. 10-year parking restriction. 10-Year Restriction on Off-Site Parking Facility
Case by case
15. Eating areas. Employee Eating Areas Case by case
16. Satellite antennas. Rear Roof Mounting of Satellite Antennas Case by case
17. Screening Requirements. Screening Requirement for refuse storage areas
in the IG zone
Case by case
18. Wall requirements. Wall requirement - residential abutting nonresidential Case by case
19. Other standards. The Zoning Administrator shall also be allowed to vary
other standards including minor operational/performance standards relating
to dust, glare, hours of operation, landscaping, light, noise, etc.
Case by case
20. Required Variance. A request that exceeds the limitations identified in this Section shall require
the approval of a Variance in compliance with Section D6-29.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-18
C. Application requirements. An application for a Minor Exception shall be filed in compliance with
Division D6, Chapter I (Permit Application Filling and Processing). The application shall be
accompanied by the information identified in the Department handout for Minor Exception
applications. It is the responsibility of the applicant to provide evidence in support of the findings
required by Subsection E. (Required findings), below.
D. Project review, notice, and hearing. Each application shall be reviewed by the Zoning
Administrator to ensure that the proposal complies with all applicable requirements of this Zoning
Ordinance. Before a decision on a Minor Exception, the City shall provide notice in compliance with
Chapter D7-IV (Public Hearings).
1. Public notice. The notice shall state that the Zoning Administrator will decide whether to
approve or disapprove the Minor Exception application on a date specified in the notice, and
that a public hearing will be held only if requested in writing by any interested person before the
specified date for the decision.
2. Requested hearing. When a hearing is requested, notice of the hearing shall be provided in
compliance with Chapter D7-IV, and the Zoning Administrator shall conduct the public hearing
before a decision on the application in compliance with Chapter D7-IV (Public Hearings).
E. Required findings.
1. General findings. The Zoning Administrator may approve a Minor Exception application, with
or without conditions, only after first finding that:
a. No practical alternative exists;
b. The purpose of the subject zone would not be compromised;
c. No detrimental impact would result aesthetically; and
d. The proposed construction project would otherwise be in compliance with all applicable
Zoning Ordinance standards and requirements.
In the event the Zoning Administrator cannot make the above findings, the Minor Exception
shall be denied and the applicant may instead apply for a variance.
F. Letter to the applicant required. Any Minor Exception granted shall be in writing, with a letter sent
to the applicant stating the reasons for the Minor Exception along with the supporting findings and
any necessary conditions of approval in compliance with Subsection E. (Required findings), above.
G. Post decision procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division D6,
Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to appeals and
revocation/ modification located in Division D7, Chapter V (Enforcement), shall apply following the
decision on an application for a Minor Exception.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-19
D6-25 - Planned Development Permits
A. Purpose. Planned Development Permits are intended to promote and encourage quality
development within the City’s residential, commercial, industrial, and other zones, while protecting
the public health, safety, general welfare, integrity, and character of the City, and ensuring
conformance with the General Plan and any applicable specific plan.
1. Comprehensive development. Planned Development Permits are encouraged and expected
to produce comprehensive development incorporating more enhanced environmental and
architectural excellence than would normally be possible under more standard zone
development requirements.
2. Project review. The Review Authority shall determine whether the Planned Development
Permit should be approved by weighing the public need for, and the positive benefits to be
derived from, the proposed project against any of the potential unavoidable negative effects it
may cause.
B. Applicability. An application for a Planned Development Permit shall be required before the
issuance of any nondiscretionary building, grading, or other required permits. For a major project that
also requires other discretionary permits, these permits shall be processed concurrently.
1. Minimum site area. A Planned Development Permit application may be approved only for a
site of 10 acres or larger.
2. Allowable land use. A Planned Development Permit may only authorize a land use that is
allowed in the applicable zone by Division D2 (Allowable Land Uses and Zoning Standards).
3. General Plan conformance required. Conformance with the goals, policies, and objectives
of the General Plan and the purpose and intent of any applicable specific plan shall be required.
4. Modify standards.
a. A Planned Development Permit may adjust or modify, where necessary and justifiable,
all applicable development standards (e.g., building envelope [coverage, height, and
setbacks], fence and wall heights, landscaping, off-street parking and loading [design and
ratios], open space, street layout, etc.) identified in this Zoning Ordinance, with the
exception of an increase in the applicable density or intensity provisions.
b. A Planned Development Permit may allow for the density to be averaged on parcels
divided by two or more zones.
c. Residential development projects with increased density standards may only be approved
in compliance with the City’s density bonus procedure in the Municipal Code.
C. Application filing and processing. An application for a Planned Development Permit shall be
completed, filed, and processed in compliance with Division D6, Chapter I (Permit Application Filing
and Processing), and any requirements of the applicable zone. The application shall be accompanied
by the information identified in the Department handout for Planned Development Permit applications.
It is the responsibility of the applicant to provide evidence in support of the findings required by
Subsection G. (Findings and decision), below.
D. Review authority. Planned Development Permits may be granted by the Commission.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-20
E. Criteria for approval. The review authority may approve a Planned Development Permit only when
the following criteria are met:
1. The site shall be a minimum of 10 acres, unless the Commission reduces this requirement in
lieu of a substantial public benefit received.
2. The proposed development shall be in conformance with the General Plan and any applicable
specific plan, and shall result in a comprehensive development incorporating a more enhanced
environment and architectural excellence than would normally be possible under more standard
zone development requirements.
3. The various elements of the proposed plan, including structures, grounds, and open space,
shall relate to one another in a manner that forms a comprehensive plan of sufficient unity to
justify exceptions, if any, to the standard zone development requirements identified in this
Zoning Ordinance.
4. The proposed development shall not adversely affect adjacent properties.
F. Project review, notice, and hearing. Each application shall be reviewed by the Zoning
Administrator to ensure that the proposal is consistent with the purpose and intent of this Section.
1. (Major) Planned Development Permit. The Commission shall conduct a public hearing on an
application for a (Major) Planned Development Permit before a decision on the application.
Notice of the public hearing shall be provided, and the hearing shall be conducted in compliance
with Chapter D7-IV (Public Hearings).
2. (Minor) Planned Development Permit. Before a decision on a (Minor) Planned Development
Permit, the City shall provide notice in compliance with Chapter D7-IV (Public Hearings).
a. Public notice. The notice shall state that the Zoning Administrator will decide whether
to approve or disapprove the (Minor) Planned Development Permit application on a date
specified in the notice, and that a public hearing will be held only if requested in writing
by any interested person before the specified date for the decision.
b. If hearing is requested. If a public hearing is requested, the Zoning Administrator shall
refer the application to the Commission for a hearing and decision to be conducted in
compliance with Chapter D7-IV (Public Hearings).
c. If no hearing is requested. If no public hearing is requested, the Zoning Administrator
shall render a decision on the date specified in the notice referred to in Subparagraph 2.a,
above.
G. Findings and decision. The review authority may approve or disapprove an application for a
Planned Development Permit only after first making all of the following findings:
1. The proposed development is:
a. Allowed within the subject zone;
b. In conformance with the:
(1) Criteria identified in Subsection E. (Review authority criteria), above;
(2) General Plan and any applicable specific plan; and
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-21
(3) Applicable provisions of this Zoning Ordinance relating to both on and off site
improvements that are necessary to accommodate flexibility in site planning and
property development and to carry out the purpose and intent of the subject zone.
2. The proposed project would produce a comprehensive development incorporating a more
enhanced environment and architectural excellence (e.g., appropriate variety of structure
placement and orientation opportunities, appropriate mix of structure sizes, high quality
architectural design, increased amounts of landscaping and open space, improved solutions to
the design and placement of parking facilities, etc.) than would normally be possible under more
standard zone development requirements;
3. The design, location, shape, size, operating characteristics, and the provision of public and
emergency vehicle access and public services and utilities (e.g., drainage, fire protection,
sewers, water, etc.), would ensure that the proposed development would not endanger,
jeopardize, or otherwise constitute a hazard to the public health, safety, or general welfare, or
injurious to the property or improvements in the vicinity and zone in which the property is
located;
4. The site is:
a. Physically suitable for the type and density/intensity of development being proposed;
b. Adequate in shape and size to accommodate the proposed development; and
c. Served by streets of adequate capacity to carry the quantity and type of traffic expected
to be generated by the proposed development.
5. The public need for, and the positive benefits to be derived from, the proposed project clearly
outweigh any of the potential unavoidable negative effects it may cause.
H. Conditions of approval. In approving a Planned Development Permit, the review authority may
impose any conditions deemed reasonable and necessary to:
1. Ensure that the approval will comply with the findings required by Subsection G. (Findings and
decision), above;
2. Ensure compliance with applicable requirements of this Zoning Ordinance (e.g., allowable land
uses and density/intensity) to ensure compatibility with surrounding properties);
3. Accommodate flexibility in site planning and property development;
4. Mitigate all project related adverse effects, unless a statement of overriding considerations is
adopted in compliance with Public Resources Code Section 15093; and
5. Protect the public health, safety, and general welfare.
I. Post decision procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division D6,
Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to appeals and
revocation/modification located in Division D7, Chapter V (Enforcement), shall apply following the
decision on an application for a Planned Development Permit.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-22
D6-26 - Preliminary Plan Review
A. Purposes. The purposes of Preliminary Plan Review are to:
1. Familiarize project applicants, not exempt from CEQA, with City regulations and the concerns
of City departments before expenditure for the preparation of the required application materials.
2. Familiarize City department representatives with proposed projects and provide an opportunity
for an exchange of views on project characteristics that may be of mutual concern.
3. Enable the Zoning Administrator to discuss project impacts with representatives of other City
departments before making an environmental determination and determining responsible
trustee agencies in compliance with CEQA.
4. Allow City departmental representatives to discuss potentially significant environmental
impacts, the nature of mitigation measures, and the need for background studies to be
submitted with the project application.
B. Applicability.
1. When required. Preliminary Plan Review shall be required for:
a. Projects requiring a General Plan amendment, specific plan approval, or Zoning Map
amendment;
b. Projects involving construction and/or modification of 50,000 square feet or more of gross
floor area and not considered a housing development as defined by Government Code
Section 65598.5. For housing developments, see Section D6-23 E (Development Plan),
above; and
c. Projects deemed necessary by the Zoning Administrator.
2. Waiver of Preliminary Plan Review. The Zoning Administrator may waive Preliminary Plan
Review upon determining that neither the applicant nor the City staff would benefit from the
review due to the minimal impact of the proposed project.
3. Changing requirements and procedures. Information and comments provided to an
applicant through the Preliminary Plan Review process are subject to change in the event that
environmental conditions, applicable laws, or other requirements change prior to a formal permit
application being deemed complete.
C. Initiation of Preliminary Plan Review. Preliminary Plan Review shall be initiated by filing the
following items with the Department.
1. A completed "pre-application" request for Preliminary Plan Review, stating that the applicant is
the property owner or the authorized agent of the owner.
2. A completed Environmental Questionnaire.
3. Five copies of all required plans and materials identified in Subsection D. (Application
requirements), below.
4. The required application fee in compliance with the City’s Fee Schedule.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-23
D. Application requirements. An application for a Preliminary Plan Review shall be filed in compliance
with Division D6, Chapter I (Permit Application Filling and Processing). The application shall be
accompanied by the information identified in the Department handout for Preliminary Plan Review
applications.
E. Duties of the Zoning Administrator.
1. The Zoning Administrator shall:
a. Make a preliminary determination as to whether the project requires a Negative
Declaration (ND), Mitigated Negative Declaration (MND), or an Environmental Impact
Report (EIR) and, if so, shall recommend the appropriate lead agency;
b. State identified concerns based on the preliminary review of the project plans and
materials.
c. Ask questions of the applicant to clarify understanding of the applicant’s intent.
d. Discuss potentially significant impacts, the nature of any mitigation measures, and any
background studies that may be required with the application.
2. Following Preliminary Plan Review, the Zoning Administrator shall mail the comments to the
applicant and a statement outlining the type and sequence of approvals necessary before the
issuance of a Zoning Clearance and any other permits or approvals required by this Zoning
Ordinance.
F. Post review procedures.
1. Related procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division
D6, Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to
appeals and revocation/modification located in Division D7, Chapter V (Enforcement), shall
apply following the decision on an application for a Preliminary Plan Review.
2. Duration. Administrative decisions on the approval process made during the Preliminary Plan
Review process shall be valid for a period of 180 days from their effective date.
3. Application for a Zoning Clearance. An application for Zoning Clearance review shall be
submitted before expiration of this 180-day period.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-24
D6-27 - Temporary Use Permits
A. Purpose. This Section establishes procedures for the granting of Temporary Use Permits that allow
short-term activities to be conducted on private property and that may not meet the normal
development or use standards of the applicable zone, but may be acceptable because of their
temporary nature.
B. Applicability. Temporary land uses shall not be established, operated, or conducted in any manner
without the approval and maintenance of a valid Temporary Use Permit granted in compliance with
this Section. The following two categories of temporary uses identify the level of permit required, if
any, based on the proposed duration, size, and type of use:
1. Exempt temporary uses are identified in Subsection C. (Exempt temporary uses), below; or
2. Temporary Use Permits are identified in Subsection D. (Allowed temporary uses), below.
C. Exempt temporary uses. The following minor and limited duration temporary uses are exempt from
the requirement for a Temporary Use Permit. Uses that do not fall within the categories defined below
shall comply with Subsection D. (Allowed temporary uses), below.
1. Construction yards – On-site. On-site contractors' construction yards, including temporary
trailers and storage of equipment, in conjunction with an approved construction project on the
same site. The construction yard shall be removed immediately upon completion of the
construction project, or the expiration of the companion Building Permit authorizing the
construction project, whichever first occurs.
2. Emergency facilities. Emergency public health and safety needs/land use activities.
3. Garage sales. Garage sales are exempt from the requirement for a Temporary Use Permit;
provided, the sales occur no more often than three (3) times per year per residence, for a
maximum of two (2) consecutive days each. Garage sales or community garage sales are
allowed on Saturday, Sunday, and any National Holidays.
Conduct of garage sales shall require registration with the Planning Services Division.
Community garage sales requesting public street closure are subject to a Special Event Permit,
which is managed by the Parks and Community Services Department.
4. Temporary model home. Temporary model homes and related facilities within the area of an
approved residential subdivision project, solely for the first sale of homes, approved as part of
the overall project.
5. Temporary real estate sales office. A temporary real estate sales office within the area of an
approved development project, solely for the first sale of homes, approved as part of the overall
project.
D. Allowed temporary uses. The following temporary uses may be allowed, subject to the issuance of
a Temporary Use Permit by the Zoning Administrator. Uses that do not fall within the categories
defined below shall comply with the use and development regulations and land use permit review
provisions that otherwise apply to the property.
1. Commercial filming. The temporary use of an approved site for the filming of commercials,
movies, videos, etc. The Zoning Administrator shall make an additional finding: the approval
would not result in a frequency of uses likely to create incompatibility between the temporary
filming activity and the surrounding neighborhood.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-25
2. Construction yards – Off-site. Off-site contractors' construction yards, in conjunction with an
approved construction project. The permit shall expire and the construction yard shall be
removed immediately upon completion of the construction project, or the expiration of the
companion Building Permit authorizing the construction project, whichever first occurs. (See
also Subsection D.8, below, regarding temporary work trailers.)
3. Events. Events on nonresidential property including the following:
a. Amusement rides, arts and crafts shows, auctions, carnivals, circuses, civic and
community events, concerts, fairs, farmers' markets, festivals, flea markets, food events,
live entertainment, outdoor entertainment/sporting events, recreation events, rodeos,
rummage sales, second hand sales, street fairs, swap meets, and tent revivals for no
more than 15 days total within a 12-month period. On-going/annual events may be
permitted through a Minor Use Permit/Use Permit based on the allowable land use tables
in Division D2 for the specific zone applicable to the site.
b. Outdoor meetings or group activities for seven consecutive days or less, within a 90-day
period.
4. Outdoor display/sales. The temporary outdoor display/sales of merchandise (e.g., parking lot
and sidewalk sales), in compliance with Section D4-35 (Outdoor Display, Storage, and Vending)
shall be allowed only if the merchandise displayed is otherwise sold within a building on the
same site. These activities shall be located immediately adjacent to the structure, and their
duration shall not exceed five consecutive days within a 90-day period. On-going/annual events
may be permitted through a Minor Use Permit/Use Permit based on the allowable land use
tables in Division D2 for the specific zone applicable to the site. Any sales activity proposed
within a public right-of-way shall require a Special Events Permit in compliance with the
Municipal Code.
5. Residence. A mobile home as a temporary residence of the property owner when a valid
Building Permit for a new single-family dwelling is in force, or for temporary caretaker quarters
during the construction of a subdivision, multi-family, or nonresidential project. The permit may
be approved for a specified duration, or upon expiration of the Building Permit, whichever first
occurs.
6. Seasonal sales lot. Halloween pumpkin sales and Christmas tree sale lots by businesses
holding a valid Business License; provided, the activity may only be held from October 1st
through October 31st, of the same year for the Halloween pumpkin sales, and from the day
after Thanksgiving through December 26th, of the same year for Christmas tree sales. A five
day period before and after the event may be used for set-up and clean-up.
7. Searchlights. The use of outdoor searchlights when used for advertising or “attention-getting”
purposes.
8. Temporary structure. A temporary classroom, office, or similar portable structure, including a
manufactured or mobile unit, may be approved, for a maximum time period of 12 months, as
an accessory use or as the first phase of a development project, in the commercial and industrial
zones.
9. Temporary work trailer.
a. A trailer or mobile home may be used as a temporary work site for employees of a
business:
(1) During construction of a subdivision or other development project when a valid
Building Permit is in force; or
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-26
(2) Upon demonstration by the applicant that the temporary work site is a short-term
necessity, while a permanent work site is being obtained.
b. A permit for temporary work trailers may be granted for up to 12 months.
10. Similar temporary use. Similar temporary uses which, in the opinion of the Zoning
Administrator, are compatible with the zone and surrounding land uses, and are necessary
because of unusual or unique circumstances beyond the control of the applicant.
E. Application filing, processing, and review. An application for a Temporary Use Permit shall be
filed with the Department and processed in the following manner.
1. Application contents. An application for a Temporary Use Permit shall be completed, filed,
and processed in compliance with Division D6, Chapter I (Permit Application Filing and
Processing). The application shall be accompanied by the information identified in the
Department handout for Temporary Use Permit applications. It is the responsibility of the
applicant to provide evidence in support of the findings required by Subsection G. (Findings
and decision), below.
2. Time for filing. An application for a Temporary Use Permit shall be submitted for approval at
least 10 days before the date that the proposed use is scheduled to take place.
3. Public hearing not required. A public hearing shall not be required for the Zoning
Administrator’s decision on a Temporary Use Permit unless determined by the Zoning
Administrator.
4. Effective date. An approved Temporary Use Permit shall be effective on the date of its
approval.
F. Standards. Standards for floor areas, heights, landscaping, parking, setbacks, and other structure
and property development standards that apply to the category of use or the zone of the subject site
shall be used as a guide for determining the appropriate development standards for temporary uses.
1. Adjustment of standards. The Zoning Administrator may authorize an adjustment from the
specific standards deemed necessary or appropriate consistent with the temporary nature of
the use.
2. Removal of materials and structures associated with the temporary use. All materials and
structures associated with the temporary use shall be removed within 10 days from the actual
termination of operations, or after the expiration of the Temporary Use Permit, whichever first
occurs.
3. 30-day interval before new permit. A minimum of 30 days shall pass between the issuance
of a new Temporary Use Permit and the expiration of a similar Temporary Use Permit for the
same property, or the actual removal of the materials and structures associated with the former
use, whichever last occurs.
4. Other permits required. Temporary uses may be subject to additional licenses, inspections,
or permits required by applicable local, State, or Federal requirements.
5. Issue only four times per year for the same activity (rug sales).
G. Findings and decision.
1. A Temporary Use Permit may be approved, modified, conditioned, or disapproved by the Zoning
Administrator.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-27
2. The Zoning Administrator may defer action and refer the application to the Commission for
review and decision at a scheduled public hearing.
3. The review authority may approve or conditionally approve a Temporary Use Permit application,
only after first finding that:
a. The establishment, maintenance, or operation of the use would not, under the
circumstances of the particular case, be detrimental to the health, safety, or general
welfare of persons residing or working in the neighborhood of the proposed use;
b. The use, as described and conditionally approved, would not be detrimental or injurious
to property and improvements in the neighborhood or to the general welfare of the City;
and
c. Approved measures for the removal of the use and site restoration have been required to
ensure that no changes to the site would limit the range of possible future land uses
otherwise allowed by this Zoning Ordinance.
H. Conditions of approval. In approving a Temporary Use Permit, the Zoning Administrator may
impose conditions (e.g., buffers, hours of operation, landscaping and maintenance, lighting, off-site
improvements, parking, performance guarantees, property maintenance, signs, surfacing, time limits,
traffic circulation, etc.) deemed reasonable and necessary to ensure that the approval would be in
compliance with the findings required by Subsection G. (Findings and decision), above.
I. Condition of site following temporary use. Each site occupied by a temporary use shall be cleaned
of debris, litter, or any other evidence of the temporary use upon completion or removal of the use,
and shall thereafter be used in compliance with the applicable provisions of this Zoning Ordinance.
The Zoning Administrator may require appropriate security before initiation of the use to ensure
proper cleanup after the use is finished.
J. Post decision procedures.
1. Related procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division
D6, Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to
appeals located in Division D7, Chapter V (Enforcement) shall apply following the decision on
an application for a Temporary Use Permit.
2. Revocation/modification. A Temporary Use Permit may be revoked or modified by the Zoning
Administrator effective immediately upon verbal or written notice for violation of the terms of the
permit.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-28
D6-28 - Use Permits and Minor Use Permits
A. Purpose. A Use Permit or Minor Use Permit provides a process for reviewing uses and activities
that may be appropriate in the applicable zone, but whose effects on a site and surroundings cannot
be determined before being proposed for a specific site.
B. Applicability. A Use Permit or Minor Use Permit is required to authorize proposed land uses
identified by Division D2 (Allowable Land Uses and Zoning Standards) as being allowable in the
applicable zone subject to the approval of a Use Permit or Minor Use Permit, respectively.
C. Review authority.
1. Use Permit – By the Commission. The Commission may approve, conditionally approve, or
disapprove applications for Use Permits in compliance with Division D2 (Allowable Land Uses
and Zoning Standards) and other applicable sections of this Zoning Ordinance.
2. Minor Use Permits – By the Zoning Administrator.
a. The Zoning Administrator may approve, conditionally approve, or disapprove applications
for Minor Use Permits in compliance with Division D2 (Allowable Land Uses and Zoning
Standards) and other applicable sections of this Zoning Ordinance.
b. The Zoning Administrator may instead refer any Minor Use Permit application to the
Commission for a public hearing and decision.
D. Application filing and processing. An application for a Use Permit or Minor Use Permit shall be
filed and processed in compliance with Division D6, Chapter I (Permit Application Filing and
Processing). The application shall be accompanied by detailed and fully dimensioned plans,
architectural drawings and sketches, and data/materials identified in the Department handout for Use
Permits. It is the responsibility of the applicant to provide evidence in support of the findings required
by Subsection F. (Findings and decision), below.
E. Project review, notice, and hearing. Each application shall be reviewed by the Zoning
Administrator to ensure that the proposal complies with all applicable requirements of this Zoning
Ordinance.
1. Use Permits.
a. Public hearing required. A Use Permit application shall be reviewed, and approved or
disapproved by the Commission at a public hearing.
b. Notice and conduct of hearing. Notice of the public hearing shall be provided, and the
hearing shall be conducted in compliance with Chapter D7-IV (Public Hearings).
2. Minor Use Permits. Before a decision on a Minor Use Permit, the City shall provide notice in
compliance with Chapter D7-IV (Public Hearings).
a. Public notice. The notice shall state that the Zoning Administrator will decide whether
to approve or disapprove the Minor Use Permit application on a date specified in the
notice, and that a public hearing will be held only if requested in writing by any interested
person before the specified date for the decision.
b. Requested hearing. When a hearing is requested, notice of the hearing shall be
provided in compliance with Chapter D7-IV, and the Zoning Administrator shall conduct
the public hearing before a decision on the application in compliance with Chapter D7-IV.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-29
F. Findings and decision. The review authority may approve a Use Permit or Minor Use Permit
application only after first making all of the following findings:
1. The proposed use is allowed within the applicable zone and complies with all other applicable
provisions of this Zoning Ordinance and the Municipal Code;
2. The proposed use is consistent with the General Plan and any applicable specific plan;
3. The design, location, size, and operating characteristics of the proposed activity are compatible
with the existing and future land uses in the vicinity;
4. The site is physically suitable for the type, density, and intensity of use being proposed,
including access, utilities, and the absence of physical constraints; and
5. Granting the permit would not be detrimental to the public health, safety, or welfare of the
persons residing or working in the subject neighborhood, or materially detrimental or injurious
to property or improvements in the vicinity and zone in which the property is located.
G. Conditions of approval. In approving a Use Permit or Minor Use Permit, the review authority may
impose conditions (e.g., the placement, height, nature and extent of the use; buffers, landscaping and
maintenance, off-site improvements, performance guarantees, screening, surfacing, time limits, etc.),
including conditions which establish standards for development that are more restrictive than the
applicable requirements of this Zoning Ordinance, deemed reasonable and necessary to ensure that
the approval will comply with the findings required by Subsection F. (Findings and decision), above.
H. Post decision procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division D6,
Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to appeals and
revocation/ modification located in Division D7, Chapter V (Enforcement), shall apply following the
decision on an application for a Use Permit or Minor Use Permit.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-30
D6-29 - Variances
A. Purpose. This Section allows Variances from the development standards of this Zoning Ordinance
only when, because of special circumstances applicable to the subject property, including location,
shape, size, surroundings, topography, or other physical conditions, the strict application of the
standards denies the property owner privileges enjoyed by other property owners in the vicinity and
in the same zone.
B. Applicability.
1. Waive or modify development standards. A Variance may be granted to waive or modify
any development standard of this Zoning Ordinance except for those requirements identified in
Subparagraphs 2, 3, and 4, immediately below.
2. No special privileges. A Variance shall not be granted that would have the effect of granting
a special privilege not shared by other property owners in the vicinity and in the same zone.
3. Does not extend to uses. The power to grant Variances does not extend to allowable land
uses. In no case shall a Variance be granted to allow a use of land or structure not otherwise
allowed in the zone in which the subject property is located.
4. Does not extend to procedures. A Variance shall not be granted to allow an adjustment to
the procedural requirements of this Zoning Ordinance.
C. Review authority.
1. A Variance application shall be reviewed, and approved or disapproved by the Zoning
Administrator.
2. The Zoning Administrator may instead refer any Variance application to the Commission for a
hearing and decision.
D. Application filing and processing. An application for a Variance shall be completed, filed, and
processed in compliance with Division D6, Chapter I (Permit Application Filing and Processing). The
application shall be accompanied by the information identified in the Department handout for Variance
applications. It is the responsibility of the applicant to provide evidence in support of the findings, as
required by Subsection F. (Findings and decision), below.
E. Project review, notice, and hearing. Each application shall be reviewed by the Zoning
Administrator to ensure that the proposal complies with all applicable requirements of this Zoning
Ordinance.
1. Public notice. Before a decision on a Variance, the City shall provide notice in compliance with
Chapter D7-IV (Public Hearings). The notice shall state that the Zoning Administrator will decide
whether to approve or disapprove the Variance application on a date specified in the notice, and
that a public hearing will be held only if requested in writing by any interested person before the
specified date for the decision.
2. Requested hearing. When a hearing is requested, a notice of the hearing shall be provided in
compliance with Chapter D7-IV, and the Zoning Administrator shall conduct the hearing before a
decision on the application in compliance with Chapter D7-IV.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-31
F. Findings and decision. The Zoning Administrator may approve a Variance application only after
first making all of the following findings, as applicable to the application.
1. General findings.
a. There are special circumstances applicable to the subject property (e.g., location, shape,
size, surroundings, topography, or other conditions), so that the strict application of this
Zoning Ordinance denies the property owner privileges enjoyed by other property owners
in the vicinity and within the same zone;
b. Granting the application is necessary for the preservation and enjoyment of substantial
property rights enjoyed by other property owners in the same vicinity and zone and denied
to the property owner for which the application is sought; and
c. The application is consistent with the General Plan and any applicable specific plan.
2. Findings for off-street parking Variance. For a nonresidential development proposing to
locate a portion of the required off-street parking on a different site, or to provide fees or facilities
in lieu of the required parking spaces, the Zoning Administrator shall first make both of the
following findings, as required by Government Code Section 65906.5, instead of those required
by Subparagraph F.1., above.
a. The Variance would be an incentive to, and a benefit for, the subject nonresidential
development; and
b. The Variance would facilitate access to the subject nonresidential development by
patrons of public transit facilities.
G. Conditions of approval. In approving a Variance, the Zoning Administrator:
1. Shall impose conditions to ensure that the Variance does not grant special privileges
inconsistent with the limitations on other properties in the vicinity and zone in which the subject
property is located; and
2. May impose conditions (e.g., the placement, height, nature and extent of the use; buffers,
landscaping and maintenance, off-site improvements, performance guarantees, screening,
surfacing, etc.) deemed reasonable and necessary to ensure that the approval complies with
the findings required by Subsection F. (Findings and decision), above.
H. Post decision procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division D6,
Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to appeals and
revocation/ modification located in Division D7, Chapter V (Enforcement), shall apply following the
decision on an application for a Variance.
Permit Review and Decisions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-32
D6-30 - Zoning Clearances
A. Purpose. Zoning Clearance is the procedure used by the City to verify that a proposed structure or
land use complies with the allowed list of activities allowed in the applicable zone, and the
development and performance standards applicable to the use.
B. Applicability.
1. Where Division D2 (Allowable Land Uses and Zoning Standards) or other provisions of this
Zoning Ordinance requires a Zoning Clearance as a prerequisite to establishing a new or
modified land use or structure.
2. A Zoning Clearance shall be required where a land use is determined to be consistent with a
(P) permitted use in Division D2 (Allowable Land Uses and Zoning Standards), but the
proposed business operation or activity is not clearly associated with the definition of such land
use.
3. A Zoning Clearance shall be required before any structure may be altered, constructed,
erected, moved, or repaired or before any vacant land may be used or changed in use.
4. A Zoning Clearance shall be required at the time of Department review of any building, grading
or other construction permit required by this Zoning Ordinance for the proposed land use or
structure.
5. A new Zoning Clearance shall be required if changes are proposed to a land use for which a
Zoning Clearance has been previously issued.
C. Applicable authority. The Zoning Administrator shall be the applicable authority for issuing Zoning
Clearances.
In the event that a proposed use that is subject to the Zone Clearance process and which may be
generally consistent with a zone, but whose effects on a site and surrounding properties cannot be
readily determined, the Zoning Administrator may require a Minor Use Permit pursuant to section D6-
28. Additionally, the Zoning Administrator may refer any Minor Use Permit application to the Planning
Commission for a public hearing and decision.
D. Review and form of approval.
1. Zoning Administrator review. The Zoning Administrator shall issue the Zoning Clearance
only after first determining that the request complies with all Zoning Ordinance provisions
applicable to the proposed use or structure.
2. Form of approval. A Zoning Clearance may be a stamp, City staff signature, or other official
notation on approved plans, a letter to the applicant, or other certification, at the discretion of
the Zoning Administrator.
E. Post decision procedures. The procedures and requirements relating to changes to approved
plans, effective dates, lapse of approval and extensions, and transferability located in Division D6,
Chapter III (Permit Implementation, Time Limits, and Extensions), and those related to appeals and
revocation/ modification located in Division D7, Chapter V (Enforcement), shall apply following the
decision on an application for a Zoning Clearance.
Permit Implementation, Time Limits, and Extensions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-33
Chapter III – Permit Implementation, Time Limits, and Extensions
Sections:
D6-31 - Purpose
D6-32 - Effective Dates of Permits
D6-33 - Performance Guarantees
D6-34 - Time Limits and Extensions
D6-35 - Changes to an Approved Project
D6-36 - Permits to Run with the Land
D6-37 - Resubmittals
D6-38 - Covenants for Easement
D6-31 - Purpose
This Chapter provides requirements for the implementation or “exercising” of the permits required by this
Zoning Ordinance, including time limits, and procedures for extensions of time.
D6-32 - Effective Dates
The approval of a land use permit (e.g., Architectural Review, Development Plan, Planned Development
Permit, Temporary Use Permit, Use Permit, or Variance) shall become effective on the 11th calendar day
following the date of application approval by the appropriate review authority, where no appeal of the review
authority's action has been filed in compliance with Chapter D7-II (Appeals and Calls for Review).
D6-33 - Performance Guarantees
A permit applicant may be required by conditions of approval or by action of the Zoning Administrator to
provide adequate security to guarantee the faithful performance and proper completion of any approved
work, and/or compliance with conditions of approval imposed by the review authority. The provisions of
this Section apply to performance guarantees for projects authorized by any land use permits required by
this Zoning Ordinance.
A. Form and amount of security. The required security shall be in a form approved by the Zoning
Administrator, upon recommendation of the City Attorney. The amount of security shall be as
determined by the Zoning Administrator to be necessary to ensure proper completion of the work
and/or compliance with conditions of approval.
B. Security for maintenance. In addition to any improvement security required to guarantee proper
completion of work, the Zoning Administrator may require security for maintenance of the work, in an
amount determined by the Zoning Administrator to be sufficient to ensure the proper maintenance
and functioning of the improvements.
C. Duration of security.
1. Improvement security. Required improvement security shall remain in effect until final
inspections have been made and all work has been accepted by the Zoning Administrator, or
until any warranty period required by the Zoning Administrator has lapsed.
Permit Implementation, Time Limits, and Extensions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-34
2. Maintenance security. Maintenance security shall remain in effect for at least 12 months after
the date of final inspection.
D. Release or forfeit of security.
1. Upon satisfactory completion of work and the approval of a final inspection (or after the end of
the required time for maintenance security), the improvement and/or maintenance deposits or
bonds shall be released.
2. Upon a determination by the Zoning Administrator that the responsible parties have failed,
within a required time or an otherwise reasonable time period, to complete the work, to comply
with all of the terms of any applicable permit, or in the event of a failure of the completed
improvements to function properly, the City may do the required work or cause it to be done,
and collect from the permittee or surety all the costs incurred by the City, including the costs of
the work, and all administrative and inspection costs.
3. Any unused portion of the security shall be refunded to the funding source after deduction of
the cost of the work by the City.
D6-34 - Time Limits and Extensions
A. Time limits.
1. Any planning permit or approval granted in compliance with Division D6, Chapter II (Permit
Review and Decisions) that is not exercised within 12 months of its approval shall expire and
become void, after being given notice and a hearing unless one of the following are met: a) the
conditions of approval or other provisions of this Zoning Ordinance establish a different time
limit; b) the property owner or applicant applied for all permits relating to project improvements
and is working diligently to complete such improvements; or c) the property owner or applicant
provided substantial evidence of use in progress to the satisfaction of the Community
Development Director demonstrating that the property owner or applicant is working diligently
and in good faith to complete any necessary improvements and commence upon the proposed
use. The property owner or applicant may apply for an extension of time in compliance with
Subsection B. (Extensions), below.
2. The planning permit shall not be deemed "exercised" until:
a. A Building Permit has been issued and actual construction diligently commenced thereon
and has not expired; or
b. A Certificate of Occupancy has been issued; or
c. The use is established (in operation on the site).
3. For the purposes of this Zoning Ordinance, actual construction shall mean the placing of
construction materials in a permanent manner or demolition of existing structures preparatory
to rebuilding; provided, that in all cases construction work shall be diligently pursued until
completion of the subject structures.
4. The planning permit or approval shall remain valid after it has been exercised as long as a
Building Permit is active for the project, or a final building inspection or Certificate of Occupancy
has been issued.
5. If a project is to be developed in pre-approved phases, each subsequent phase shall be
exercised within 12 months from the date that the previous phase was exercised, unless
otherwise specified in the planning permit, or the planning permit shall expire and be deemed
void. If the project also involves the approval of a Tentative Map, the phasing shall be
Permit Implementation, Time Limits, and Extensions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-35
consistent with the Tentative Map and the planning permit or approval shall be exercised before
the expiration of the Tentative Map, or the planning permit or approval shall expire and be
deemed void.
B. Extensions. Upon request by the applicant, the Zoning Administrator may extend the time for an
approved planning permit to be exercised in the following manner.
1. The permittee shall file a written request for each extension of time with the Planning Services
Division at least 10 days before the expiration of the permit, together with the filing fee required
by the City’s Fee Schedule.
2. The burden of proof is on the permittee to establish with substantial evidence that the permit
should not expire. If the Zoning Administrator determines that the permittee has proceeded in
good faith and has exercised due diligence in complying with the conditions in a timely manner,
the Zoning Administrator may grant a time extension to extend the permit, provided that the
Zoning Administrator first finds that:
a. The requested extension is consistent with the General Plan, and any applicable specific
plan, and the overall project remains consistent with those plans as they exist at the time
the extension request is being considered;
b. The findings required by the original approval remain valid; and
c. There are adequate provisions for public services and utilities (e.g., access, drainage, fire
protection, sewers, water, etc.), to ensure that the requested extension would not
endanger, jeopardize, or otherwise constitute a hazard to the public health, safety, or
general welfare, or be injurious to the property or improvements in the vicinity and
applicable zone.
3. Upon making the findings in subsection B.2., above, the Zoning Administrator may grant a
maximum of three, 12-month time extensions from the effective date of an approved planning
permit.
C. Hearing on expiration. The review authority shall hold a noticed hearing on any proposed expiration
of a planning permit, in compliance with Chapter D7-IV (Public Hearings).
D6-35 - Changes to an Approved Project
A new development project or land use authorized through a permit granted in compliance with this Zoning
Ordinance shall be established only as approved by the review authority and subject to any conditions of
approval, except where changes to the project, including conditions of approval, are approved in
compliance with this Section.
A. Request for change.
1. An applicant shall request desired changes in writing, and shall also furnish appropriate
supporting materials and an explanation of the reasons for the request.
2. Changes may be requested either before or after construction or establishment and operation
of the approved use.
B. Minor changes. The Zoning Administrator may approve changes to an approved site plan,
architecture, or the nature of the approved use if the changes:
1. Are consistent with all applicable provisions of this Zoning Ordinance;
Permit Implementation, Time Limits, and Extensions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-36
2. Do not involve a feature of the project that was specifically addressed in, or was a basis for
findings in a Negative Declaration (ND), Mitigated Negative Declaration (MND), or
Environmental Impact Report (EIR) for the project;
3. Do not involve a feature of the project that was specifically addressed in, or was a basis for
conditions of approval for the project or that was a specific consideration by the review authority
in the original approval of the permit; and
4. Do not expand the approved floor area or any outdoor activity area by 10 percent or more over
the life of the project.
C. Other changes. Changes to the project that are not included in Subsection B. (Minor changes),
above, shall be reviewed by the Zoning Administrator to determine the appropriate process of review.
D6-36 - Permits to Run with the Land
A land use permit (e.g., Architectural Review, Development Plan, Minor Use Permit, Planned Development
Permit, Temporary Use Permit, Use Permit, or Variance) granted in compliance with Division D6, Chapter
II (Permit Review and Decisions) shall continue to be valid upon a change of ownership (e.g., of the site,
structure, or use that was the subject of the permit application), provided that the use remains in compliance
with all applicable provisions of this Zoning Ordinance and any conditions of approval.
D6-37 - Resubmittals
A. Resubmittals prohibited within 12 months. For a period of 12 months following the disapproval or
revocation/modification of a discretionary land use permit, entitlement, or amendment decided in
compliance with this Zoning Ordinance, no application for the same or substantially similar
discretionary permit, entitlement, or amendment for the same site shall be submitted, unless the
disapproval is made without prejudice, and so stated in the record.
B. Zoning Administrator’s determination. The Zoning Administrator shall determine whether the new
application is for a discretionary land use permit or other approval which is the same or substantially
similar to the previously disapproved or revoked permit, entitlement, or amendment.
C. Appeal. The determination of the Zoning Administrator may be appealed to the Commission, in
compliance with Chapter D7-II (Appeals and Calls for Review).
D. Council waiver. The Council may waive the prohibition in Subsection A., above if the Council first
finds that by reason of changed legal, physical, or sociological circumstances, reconsideration would
be in the best interests of the City.
D6-38 - Covenants of Easements
A. Applicability. When necessary to achieve the land use goals of the City, the City may require a
property owner holding property in common ownership to execute and record a Covenant of
Easement in favor of the City, in compliance with State law (Government Code Sections 65870 et
seq.)
1. A Covenant of Easement may be required to provide for emergency access, access to an on-
site public art feature for maintenance, landscaping, light and air access, ingress and egress,
parking, solar access, or for open space.
2. The Covenant of Easement may be imposed as a condition of approval by the review authority.
Permit Implementation, Time Limits, and Extensions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-37
B. Form of covenant. The form of the Covenant shall be approved by the City Attorney, and the
Covenant of Easement shall:
1. Describe the real property to be subject to the easement;
2. Describe the real property to be benefitted by the easement;
3. Identify the City approval or permit granted which relied on or required the Covenant; and
4. Identify the purposes of the easement.
C. Recordation. The Covenant of Easement shall be recorded in the County Recorder’s Office.
D. Effect of covenant. From and after the time of its recordation, the Covenant of Easement shall:
1. Act as an easement in compliance with Civil Code Section 801 et seq., except that it shall not
merge into any other interest in the real property. Civil Code Section 1104 shall be applicable
to the conveyance of the affected real property; and
2. Impart notice to all persons to the extent afforded by the recording laws of the State. Upon
recordation, the burdens of the Covenant shall be binding on, and the Covenant shall benefit,
all successors-in-interest to the real property.
E. Enforceability of covenant. The Covenant of Easement shall be enforceable by the successors-in-
interest to the real property benefited by the Covenant and the City. Nothing in this Section creates
standing in any person, other than the City, and any owner of the real property burdened or benefited
by the Covenant, to enforce or to challenge the Covenant or any requested amendment or release.
F. Release of covenant. The release of the Covenant of Easement may be effected by the
Commission, or the Council on appeal, following a noticed public hearing in compliance with Chapter
D7-IV (Public Hearings).
1. The Covenant of Easement may be released by the City, at the request of any person, including
the City or an affected property owner, on a finding that the Covenant, on the subject property,
is no longer necessary to achieve the land use goals of the City.
2. A notice of the release of the Covenant of Easement shall be recorded by the Zoning
Administrator with the County Recorder's Office.
G. Fees. The City shall impose fees to recover the City's reasonable cost of processing a request for a
release. Fees for the processing shall be established by the City’s Fee Schedule.
Permit Implementation, Time Limits, and Extensions D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-38
[Page intentionally left blank]
Development Agreements D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-39
Chapter IV – Development Agreements
Sections:
D6-39 - Purpose
D6-40 - Application Requirements
D6-41 - Pre-Application Process
D6-42 - Department Review and Recommendation
D6-43 - Public Hearing Required
D6-44 - Commission Action
D6-45 - Council Action
D6-46 - Annual Review
D6-47 - Application of Existing Rules, Regulations, and Policies
D6-48 - Modification and Termination
D6-49 - Zoning Administrator Responsibilities
D6-39 - Purpose
A. Authorization of development agreements. In order to strengthen the public planning process,
encourage private participation in comprehensive planning, and reduce the economic cost of
development, the Legislature of the State of California adopted Government Code Section 65864 et
seq., authorizing local governments to enter into development agreements with applicants for
development projects.
B. Objective. The objective of an agreement is to provide assurances that, upon approval of the project,
the applicant may proceed with the project in compliance with existing policies, rules, and regulations,
subject to the conditions of approval, thus vesting certain development rights in the subject property.
C. Purpose. The purpose of this Chapter is to establish procedures and requirements for consideration
of development agreements by the City consistent with State law.
D6-40 - Application Requirements
A. Compliance with State law required. An applicant may propose that the City consider entering into
a development agreement in compliance with Government Code Section 65864 et seq., by filing an
application with the Department.
B. Application requirements. An application for a development agreement shall be filed in compliance
with Division D6, Chapter I (Permit Application Filling and Processing). The application shall be
accompanied by the information identified in the Department handout for development agreement
applications. It is the responsibility of the applicant to provide evidence in support of the findings
required by Subsection D6-45 E. (Required findings), below.
Development Agreements D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-40
D6-41 - Pre-Application Process
A. Authorization by the Council following pre-application process. Unless otherwise directed by
the Zoning Administrator, City staff shall not begin to negotiate with the applicant until the Council has
so authorized staff, following completion of the pre-application process identified below.
B. Review and preparation of Council recommendation. The Zoning Administrator shall review the
proposal, consult with all City departments, obtain the additional information from the applicant as
may be deemed necessary by the Zoning Administrator, and shall, within 45 calendar days of receipt
of the proposal, prepare a report containing the Zoning Administrator’s recommendation to the
Council.
C. The written recommendation shall consist of the following:
1. A statement of the potential public benefits accruing to the City if the agreement were entered
into, as identified by the Zoning Administrator;
2. A recommendation whether the City should negotiate further with the applicant, with supporting
arguments;
3. A statement of issues for further research and investigation, and issues that should be
addressed in the development agreement;
4. A statement of those documents, applications, and other items required by the Zoning
Administrator in order to further process the application or negotiate with the applicant.
D. The Council shall either:
1. Direct City staff to continue negotiating with the applicant, and to prepare a proposed
development agreement for Commission review; or
2. Determine that no further negotiations are desirable and reject the application.
D6-42 - Department Review and Recommendation
Unless the project is categorically exempt, the Department shall, at the applicant's expense and in
compliance with City procedures for implementation of CEQA, undertake environmental review and, upon
completion of the review, transmit the application, together with the Zoning Administrator's
recommendations to the Commission.
D6-43 - Public Hearing Required
A. Determination of compliance with the General Plan. Upon receipt of an application, the results of
the environmental review, and the recommendations of the Department, the Commission shall
schedule a public hearing to determine whether the proposal conforms to the General Plan.
B. Scheduling of Commission hearing. The Commission hearing shall be scheduled within 180 days
following Council authorization to staff to negotiate with the applicant, unless the City and the
applicant mutually agree to a later date.
C. Compliance with State law. Notice of intention to consider the application shall be given in
compliance with State law (Government Code Sections 65090 and 65091) and Chapter D7-IV (Public
Hearings).
Development Agreements D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-41
D. Compliance with notice for companion development project. If the development agreement
application is being processed together with the development project, notice of the intention shall be
given as required for consideration of the companion development project.
D6-44 - Commission Action
A. Commission’s recommendation. After the public hearing is closed, the Commission shall
recommend either approval, modification, or disapproval of the proposed development agreement.
B. Transmittal of recommendation within 30 days. The Commission shall transmit its
recommendation to the Council and applicant within 30 calendar days following the Commission’s
date of action.
D6-45 - Council Action
A. Scheduling of Council hearing. Upon receipt of the application, the results of the environmental
review, and the recommendations of the Department and the Commission, the Council shall schedule
a public hearing on the application.
B. Notice in compliance with State law. Notice of intention to consider the application shall be given
in compliance with Subsection D6-43 C. (Compliance with State law), above.
C. Hearing may be held concurrently with companion project. If the application is being processed
together with the development project, the public hearing on the application may be held concurrently
with the hearing on the companion development project.
D. Council’s action. After the public hearing is closed, the Council shall approve, modify, or disapprove
the proposed development agreement.
E. Required findings. An agreement shall not be approved unless the Council makes the following
findings:
1. The agreement is consistent with the General Plan and with any applicable specific plan;
2. The agreement is consistent with all provisions of this Zoning Ordinance, the Municipal Code,
and the State Subdivision Map Act;
3. The agreement will not be detrimental to the health, safety, and general welfare and will not
adversely affect the orderly development of property or the preservation of property values;
4. The Council has considered the effect of the development agreement on the housing needs of
the region in which the City is situated and has balanced these needs against the public service
needs of its residents and available fiscal and environmental resources.
F. Approval by ordinance. Any approval of a proposed agreement shall be made by ordinance, which
shall authorize the Mayor and the City Manager to sign the agreement on behalf of the City, and shall
become effective after 30 calendar days following the second reading, unless a referendum is filed
within that time in compliance with State law.
G. Signatures of owner and applicant required. The agreement shall not be signed by the Mayor and
the City Manager until it has been duly signed by the applicant and owner, if the applicant is not the
owner.
Development Agreements D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-42
H. Failure to sign within 30 days – withdrawal of application. If the applicant has not signed and
returned the approved agreement to the Mayor and the City Manager for signing within 30 calendar
days of Council approval, the application shall be deemed withdrawn by applicant.
I. Recordation of agreement. Within 10 calendar days after the Mayor and the City Manager sign a
development agreement and the ordinance becomes effective, the City Clerk shall cause a copy
thereof to be recorded.
J. Modification or suspension in compliance with State law. All agreement provisions are subject
to modification or suspension in compliance with State law (Government Code Section 65864 et seq.)
D6-46 - Annual Review
Each development agreement shall be reviewed by the Planning Director at least once every 12 months,
unless the agreement provides for more frequent review, in which case the agreement shall prevail.
A. Maximum term of agreement. A development agreement shall be limited in its term to a maximum
of 15 years from the effective date of the adopted ordinance.
B. Extension of term of agreement. The City may specify in the agreement options to extend the
agreement.
C. Purpose of the review. The purpose of the review shall be to inquire into the good faith compliance
of the applicant with the terms and conditions of the agreement and for any other purpose specified
in the agreement.
D. Preparation of report. Before each review, the Department shall prepare a report relative to all
development that has occurred under the agreement subsequent to the last past review and any other
matters the Department wishes to bring to the City Manager's attention.
E. Compliance with all terms and conditions – no further review required. If the Department review
determines that all terms and conditions of the agreement have been met, and the Planning Director
concurs in writing, no further review shall be required.
F. Recommendation for modification or termination – Commission hearing first required. If the
Department report recommends modification or termination of the agreement, or if the Zoning
Administrator proposes to make a recommendation to the Council, a public hearing before the
Commission shall first be scheduled and conducted.
G. Notice in compliance with State law. Notice of the Commission’s intention to modify or terminate
the agreement shall be given in compliance with Subsection D6-43 C. (Compliance with State law),
above.
H. Applicant’s responsibility during hearing. At the hearing the applicant shall have the burden of
demonstrating good faith compliance with the terms and conditions of the agreement.
I. Commission’s recommendation. After closing the public hearing, the Commission shall determine
whether to recommend that the agreement be terminated, modified, or confirmed as is.
J. Scheduling of Council hearing. Upon receipt of the Zoning Administrator's or Commission's
recommendation, the Council shall schedule a public hearing.
K. Notice in compliance with State law. Notice of the Council’s intention to modify or terminate the
agreement shall be given in compliance with Subsection D6-43 C. (Compliance with State law),
above.
Development Agreements D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-43
L. Council’s action to modify or terminate the agreement. If, after the public hearing is closed, the
Council finds and determines on the basis of substantial evidence that the applicant or its successor-
in-interest has not complied in good faith with the terms and conditions of the agreement, the Council
may modify or terminate the agreement.
M. Compliance with Section D6-48 required. Any modification or termination shall be in compliance
with Section D6-48 (Modification and Termination), below.
D6-47 - Application of Existing Rules, Regulations, and Policies
A. Applicable policies, regulations, and rules. Unless otherwise provided by the development
agreement, the official policies, regulations, and rules applicable to development of the property
subject to a development agreement, shall be those official policies, regulations, and rules in force at
the time of execution of the agreement.
B. Vesting only in compliance with agreement. No rights shall be deemed to vest in the applicant,
or any other person, under any development agreement, except as expressly identified in the
development agreement.
D6-48 - Modification and Termination
A. Amendment, cancellation, modification, or termination of agreement. Any development
agreement may be amended, or canceled in whole or in part, by mutual consent of the applicant (or
its successor-in-interest) and the City, or it may be modified or terminated in compliance with this
Section and Section D6-46 (Annual Review), above.
B. Notice of intention to take action.
1. Notice of intention to take any action shall be given in compliance with Subsection D6-43 C.
(Compliance with State law), above.
2. The parties may identify an alternative notice procedure in the agreement for processing
insubstantial amendments.
C. Compliance with State law required. Any significant amendment shall be subject to the provisions
of State law (Government Code Section 65867.5).
D6-49 - Zoning Administrator Responsibilities
The Zoning Administrator shall prepare and adopt application forms, check-lists, and other documents as
considered necessary and desirable to implement the procedures and requirements identified in this
Chapter.
Development Agreements D6
Division D6 – Planning Permit Procedures – Effective February 28, 2020 6-44
[Page intentionally left blank]
City of San Ramon Zoning Ordinance D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-1
Division D7
Zoning Ordinance Administration
Chapter I - Nonconforming Uses, Structures, and Parcels ................................................................. 7-3
D7-1 - Purpose ................................................................................................................................. 7-3
D7-2 - Nonconforming Uses ............................................................................................................. 7-3
D7-3 - Nonconforming Structures ..................................................................................................... 7-4
D7-4 - Nonconforming Parcels ......................................................................................................... 7-6
D7-5 - Exemptions ............................................................................................................................ 7-6
D7-6 - Unlawful Uses and Structures ............................................................................................... 7-8
D7-7 - Nuisance Abatement ............................................................................................................. 7-9
Chapter II - Appeals and Calls for Review ........................................................................................... 7-11
D7-8 - Purpose ............................................................................................................................... 7-11
D7-9 - Rights of Appeal .................................................................................................................. 7-11
D7-10 - Time Limits for Appeals and Calls for Review ................................................................... 7-11
D7-11 - Initiation of Appeals and Calls for Review ......................................................................... 7-12
D7-12 - Procedures for Appeals and Calls for Review ................................................................... 7-12
D7-13 - Effective Dates .................................................................................................................. 7-13
D7-14 - New Appeal ....................................................................................................................... 7-13
Chapter III - Amendments ...................................................................................................................... 7-15
D7-15 - Purpose ............................................................................................................................. 7-15
D7-16 - Initiation of Amendments ................................................................................................... 7-15
D7-17 - Application Requirements .................................................................................................. 7-16
D7-18 - Public Hearing Scope and Notice ...................................................................................... 7-16
D7-19 - Duties of the Commission .................................................................................................. 7-16
D7-20 - Duties of the Council ......................................................................................................... 7-17
D7-21 - Revisions of Proposed Amendments ................................................................................ 7-17
D7-22 - Post Decision Procedures ................................................................................................. 7-18
Chapter IV - Public Hearings ................................................................................................................. 7-19
D7-23 - Purpose ............................................................................................................................. 7-19
D7-24 - Notice of Hearing ............................................................................................................... 7-19
D7-25 - Scheduling of Hearing ....................................................................................................... 7-20
D7-26 - Hearing Procedures ........................................................................................................... 7-21
D7-27 - Review Authority Decision and Notice .............................................................................. 7-21
D7-28 - Recommendation by Commission ..................................................................................... 7-21
D7-29 - Effective Dates of Decision ................................................................................................ 7-22
Chapter V - Enforcement ....................................................................................................................... 7-23
D7-30 - Purpose ............................................................................................................................. 7-23
D7-31 - Enforcement Responsiblities ............................................................................................. 7-23
D7-32 - Revocation or Modification of Discretionary Permits ......................................................... 7-23
D7-33 - Violations ........................................................................................................................... 7-24
D7-34 - Penalties ............................................................................................................................ 7-24
City of San Ramon Zoning Ordinance D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-2
[Page intentionally left blank]
Nonconforming Uses, Structures, and Parcels D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-3
Chapter I - Nonconforming Uses, Structures, and Parcels
Sections:
D7-1 - Purpose
D7-2 - Nonconforming Uses
D7-3 - Nonconforming Structures
D7-4 - Nonconforming Parcels
D7-5 - Exemptions
D7-6 - Unlawful Uses and Structures
D7-7 - Nuisance Abatement
D7-1 - Purpose
A. Purpose. This Chapter provides regulations for nonconforming uses, structures, and parcels that
were lawful before the adoption, or amendment of this Zoning Ordinance, but which would be
prohibited, regulated, or restricted differently under the current terms of this Zoning Ordinance, or
future amendments.
B. Intent. It is generally the intent of this Chapter to discourage the long-term continuance of
nonconformities, providing for their eventual elimination, while allowing them to exist under the limited
conditions identified in this Chapter.
C. Detrimental to orderly development. The continuance of a nonconforming use or structure is
generally detrimental to the orderly development of the City and the general welfare of its residents
and is particularly detrimental to the welfare of persons and property in the vicinity of any
nonconformity.
D. Illegal use or structure. Any use or structure which was established or constructed in violation of
the applicable zoning regulations in effect at the time of establishment or construction and which is
not in conformity with the applicable regulations of this Zoning Ordinance, is not a nonconforming use
or structure, and the use or structure is in violation of this Zoning Ordinance.
D7-2 - Nonconforming Uses
A. Continued, transferred, or sold. Nonconforming uses may be continued, transferred, or sold, but
only in compliance with the provisions of this Chapter.
B. Replacing nonconforming uses with similar uses.
1. A nonconforming use may be changed to another nonconforming use of a similar or more
restricted classification or nature; provided, the proposed new nonconforming use would not
increase the degree or intensity of the nonconformity.
2. The replacement nonconforming use shall serve as the "new bench mark" in terms of
establishing the acceptable level of nonconformity.
3. Where a nonconforming use is changed to another nonconforming use of a more restrictive
classification, it shall not thereafter be changed to a use of a less restrictive classification.
Nonconforming Uses, Structures, and Parcels D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-4
C. Enlargement or expansion of use not allowed.
1. Nonconforming use of land. A nonconforming use of land which does not involve any
structure, except accessory structures, shall not be enlarged or expanded in size or capacity,
or extended to occupy a greater area, or increased in intensity. "Accessory structures," as used
in this Subsection, include driveways, fences, parking areas, signs, walls, or minor structures
less than 400 square feet in area.
2. Nonconforming use of a structure. Changes to a nonconforming use of a structure by
addition, enlargement, extension, reconstruction, or relocation, may be allowed only if the
changes comply with all of the regulations of the subject zone and the following provisions:
a. A nonconforming use of a structure may only be expanded or enlarged in size or capacity,
or extended to occupy a greater area, or increased in intensity through the approval of a
Minor Use Permit granted in compliance with Section D6-28.
b. In approving the Minor Use Permit, the Zoning Administrator shall make the following
finding, in addition to those identified in Section D6-28: The enlargement, expansion,
extension, or increase would not increase the degree or the detrimental effects of the
nonconformity.
D. Loss of nonconforming status.
1. If a nonconforming use of land, or a nonconforming use of a conforming structure, is
discontinued for a continuous period of at least 180 calendar days, the rights to legal
nonconforming status shall terminate.
2. The nonconforming use shall not be resumed once the use has ceased for at least 180 days.
3. A nonconforming use shall be deemed to have ceased when it has been discontinued, either
temporarily or permanently, whether or not the discontinuance was with the intent to abandon
the use.
4. The Zoning Administrator shall base a determination of discontinuance on evidence including
the removal of equipment, furniture, machinery, structures, or other components of the
nonconforming use, disconnected or discontinued utilities, or no business receipts/records to
document continued operation.
5. Without further action by the City, any further use of the site shall comply with all of the
regulations of the subject zone and all other applicable provisions of this Zoning Ordinance.
D7-3 - Nonconforming Structures
A. Continued, transferred, or sold. Nonconforming structures may be continued, transferred, or sold,
but only in compliance with the provisions of this Chapter.
B. Nonconforming status. Except as provided by Section D7-5.D (Nonconforming single- and multi-
family dwelling units), below, the nonconforming status shall terminate if a nonconforming structure
is involuntarily damaged or destroyed by earthquake, explosion, fire, flood, riot, war, wind, or other
calamity or act of Nature; provided, the structure may be repaired and reoccupied only in the following
manner:
1. When damage equals 50 percent or less. A nonconforming structure involuntarily damaged
to 50 percent or less of its current market value (as defined in Subsection B.5.b., below) may
be reconstructed, repaired, restored, and used as before; provided, the restoration is initiated
Nonconforming Uses, Structures, and Parcels D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-5
(as defined in Subsection B.5.a., below) within 180 days, and is substantially completed within
12 months from the date of application for the required Building Permit.
2. When damage equals greater than 50 percent. A nonconforming structure involuntarily
damaged to greater than 50 percent of its current market value (as defined in Subsection B.5.b.,
below) shall not be reconstructed, repaired, or restored, except in conformity with the applicable
requirements of the subject zone.
3. Ordinary repair and maintenance allowed. The ordinary and normal repair and maintenance
work that may be required to keep a nonconforming structure in sound condition may be made
in compliance with this Subparagraph; provided, no structural alterations or repairs shall be
made, except those required by law or may be authorized under Subsection B.1., above. A
nonconforming structure may undergo ordinary and normal repair and maintenance only in the
following manner:
a. Minor. Minor normal repair and maintenance may be made to a nonconforming structure:
(1) Provided, no structural alterations are made (exception: see following
Subparagraph a (2)), and the work does not exceed 50 percent of the current
market value of the structure during any calendar year period;
(2) When required structural alteration work is greater than 50 percent of the current
market value of the structure, the work shall be subject to Minor Use Permit approval
in compliance with Section D6-28; and
(3) For purpose of this Subparagraph the cost of any required foundation work shall
not be counted within the 50 percent limitation.
b. Major. Major repair to a nonconforming structure, when the cost of repairing or replacing
the damaged portion of the structure exceeds 50 percent of the current market value of
the structure, before damage or destruction, may be made only in compliance with
Subparagraphs B.2 and B.3.a(2), above.
4. Other modifications allowed. The addition, enlargement, extension, reconstruction, or
structural alteration of a nonconforming structure may be allowed; provided, the modification is
necessary to secure added safety or to reduce the fire hazard and/or to secure aesthetic
advantages through the alignment, architecture, or closer conformity to surrounding allowed
structures in the immediate neighborhood, and only in compliance with Subparagraphs B.2 and
B.3a (2), above.
5. Definitions.
a. Restoration is initiated. As used in this Subsection, “restoration is initiated” requires
that, at a minimum, a complete Building Permit application has been filed.
b. Current market value.
(1) As used in this Subsection, “current market value” is the market value of the
structure immediately before the occurrence of the damage.
(2) For purposes of administering the provisions of this Subsection, the applicant shall
submit an appraisal from a licensed appraiser and the City's Building Official shall
verify the appraiser’s determination of the current market value of the damaged
structure, which determination shall be final, unless appealed in compliance with
Division D7, Chapter II (Appeals and Calls for Review).
Nonconforming Uses, Structures, and Parcels D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-6
D7-4 - Nonconforming Parcels
A. Legal building site. A nonconforming parcel that does not comply with the applicable area or width
or depth requirements of this Zoning Ordinance shall be considered a legal building site if it meets at
least one of the following criteria, as documented to the satisfaction of the Zoning Administrator by
evidence furnished by the applicant.
1. Approved subdivision. The parcel was created by a recorded subdivision;
2. Individual parcel legally created by deed. The parcel is under one ownership and of record,
and was legally created by a recorded deed before the effective date of the zoning amendment
that made the parcel nonconforming;
3. Variance or lot line adjustment. The parcel was approved through the Variance procedure
or resulted from a lot line adjustment;
4. Partial government acquisition. The parcel was created in compliance with the provisions of
this Zoning Ordinance, but was made nonconforming when a portion was acquired by a
governmental entity so that the parcel size is decreased not more than 20 percent and the yard
facing a public right-of-way was decreased not more than 50 percent, or
B. Subdivision or lot line adjustment of a nonconforming parcel. No subdivision or lot line
adjustment shall be approved that would increase the nonconformity of an existing parcel or any
nonconforming use on the parcel.
D7-5 - Exemptions
A. Historic structures. Nonconforming structures of historical significance may be altered or enlarged
with Minor Use Permit approval granted in compliance with Section D6-28, without conforming to
current setback provisions; provided, the historic structure is:
1. Included in a San Ramon Landmark District;
2. Listed as an historic resource;
3. Has been certified to be an historic resource by the City, County, or State, or in the Federal
Register of Historic Places; and
4. To be altered or enlarged as an authentic replica of the original structure(s).
B. Height of single-family dwellings. An existing single family dwelling that is nonconforming only
because it exceeds the height limit of the applicable zone, shall not be required to comply with the
provisions of this Chapter.
C. Single-family residences and detached residential accessory structures. Where a single family
residence, or its detached accessory structure(s), is nonconforming only by reason of substandard
setbacks, the provisions of this Section shall not apply; provided, any structural alteration of a
nonconforming structure shall not increase the degree of nonconformity, and any enlargements shall
comply with the setback requirements of the subject zone.
D. Nonconforming single- and multi-family dwelling units.
1. Nonconforming single- and multi-family dwelling units that have been involuntarily damaged or
destroyed by earthquake, explosion, fire, flood, riot, war, wind, or other calamity or act of Nature,
Nonconforming Uses, Structures, and Parcels D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-7
may be reconstructed or replaced with a new structure using the same development standards
applied to the damaged or destroyed structure (e.g., building footprint, building height, density
standards, number of dwelling units, setbacks, and square footage); provided:
a. The applicant provides documentation, satisfactory to the Zoning Administrator,
supporting the claim that the damage or destruction occurred involuntarily;
b. No expansion of the gross floor area or number of dwelling units occurs;
c. The replacement structure:
(1) Complies with the Building Code; and
(2) Will not be detrimental to the public health, safety, or welfare or materially injurious
to the properties or improvements in the immediate vicinity of the replacement
structure.
d. A Building Permit is issued no later than 12 months after the date of destruction, and
construction is diligently pursued to completion.
2. If the preceding requirements are not met, the replacement structure shall comply with all of the
regulations of the subject zone in effect on the date of application for the required Building
Permit.
E. Seismic retrofitting.
1. Alterations, reconstruction, or repairs otherwise required by law (e.g., City adopted Building,
Electrical, Plumbing Codes) shall be allowed.
2. Reconstruction required to reinforce unreinforced masonry structures or to comply with Building
Code requirements shall be allowed without cost limitations; provided, the retrofitting and Code
compliance are limited exclusively to compliance with earthquake safety standards and other
applicable Building Code requirements.
F. Nonconforming upon annexation. Nonconforming uses or structures, or both, which are lawfully
existing at the time the property on which they are located is annexed to the City, and which do not
conform to the regulations of the subject zone following annexation, shall be deemed nonconforming
uses or structures, or both, and shall, upon annexation, be subject to the provisions of this Chapter.
G. Nonconforming due to a lack of a Minor Use Permit or Use Permit.
1. Conformity of uses requiring Minor Use Permit or Use Permits. A use lawfully existing
without a Minor Use Permit or Use Permit that would be required by this Zoning Ordinance to
have Minor Use Permit or Use Permit approval, in compliance with Section D6-28, shall be
deemed conforming, but only to the extent that it previously existed (e.g., maintain the same
site area boundaries, hours of operation, etc.)
2. Previous Minor Use Permits or Use Permits in effect. A use that was authorized by a Minor
Use Permit or Use Permit but is not allowed by this Zoning Ordinance in its current location may
continue, but only in compliance with the original Minor Use Permit or Use Permit (e.g., if the
original Minor Use Permit or Use Permit specified a termination date, then the use shall
terminate in compliance with the requirements of the Minor Use Permit or Use Permit.)
Nonconforming Uses, Structures, and Parcels D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-8
H. Previous permits.
1. A use or structure which does not conform to the current regulations of the subject zone, but
for which a Building Permit, or a permit or entitlement approved in compliance with this Zoning
Ordinance, was issued and exercised before the applicability of this Zoning Ordinance, may be
completed; provided, the work is diligently pursued to completion.
2. Upon completion, these uses or structures, or parts thereof, shall be deemed to be
nonconforming and shall thereafter be subject to the provisions of this Chapter.
3. For the purposes of this Subsection, the provisions of Section D-6-34 (Time Limits and
Extensions) shall govern the determination of whether the permit or entitlement has been
exercised in a timely manner.
I. Public utilities. The provisions of this Chapter, concerning the required removal of nonconforming
uses and structures, and the reconstruction of nonconforming structures partially destroyed, shall not
apply to public utility structures when the structures pertain directly to the rendering of the service of
distribution of a utility (e.g., electric distribution and transmission substations, gas storage, metering,
and valve control stations, steam electric generating stations, water wells and pumps, etc.); nor shall
any provision of this Chapter be construed to prevent the expansion, modernization, or replacement
of the public utility structures, equipment, and features, that are used directly for the delivery of or
distribution of the service.
J. Public acquisition.
1. Nonconforming due to public acquisition. Whenever any structure or parcel is rendered
nonconforming within the meaning of this Chapter by reason of a reduction in a required parcel
area, reduction of off-street parking facilities, or setbacks occurring solely by reason of
dedication to, or purchase by, the City for any public purpose, or eminent domain proceedings,
which result in the acquisition by the City or any agency authorized for the eminent domain
proceedings of a portion of the property, the same shall not be deemed nonconforming within
the meaning of this Chapter.
2. Required reconstruction, remodeling, or repair. Any required reconstruction, remodeling,
or repair shall be limited to that necessary to render the structure reasonably safe for continued
use; provided, all reconstruction, remodeling, or repair work shall be substantially completed
within 12 months from the date of application for the required Building Permit.
D7-6 - Unlawful Uses and Structures
A. Unlawful uses and structures are in violation. Uses and structures which did not comply with the
applicable provisions of this Zoning Ordinance or prior planning and zoning regulations when
established are violations of this Zoning Ordinance and are subject to the regulations of the Municipal
Code.
B. No right to continue occupancy. This Chapter does not grant any right to continue occupancy of
property containing an illegal use or structure.
C. Can’t continue without required permits. The activity shall not be lawfully allowed to continue
unless/until permits or entitlements required by this Zoning Ordinance and the Municipal Code are
first obtained.
Nonconforming Uses, Structures, and Parcels D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-9
D7-7 - Nuisance Abatement
A. Not applicable to public nuisances. The provisions of this Chapter shall not apply to a use or a
structure which is, or which becomes, a public nuisance.
B. Continuance of public nuisances prohibited. The provisions of this Chapter do not allow, and
shall not be interpreted to allow, the continuation of a use or structure which is deemed a public
nuisance or which is prohibited or otherwise made unlawful, in whole or in part, by the Municipal Code
(including the Building Code, Fire Code, Zoning Ordinance, etc.) or by laws enacted by the State or
Federal government which are applicable to this City.
C. Enforcement actions. In the event that a nonconforming use or structure is found to constitute a
public nuisance, appropriate action shall be taken by the City, in compliance with the Municipal Code.
A violation of the Zoning Ordinance can be deemed to be evidence of a public nuisance.
Nonconforming Uses, Structures, and Parcels D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-10
[Page intentionally left blank]
Appeals and Calls for Review D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-11
Chapter II - Appeals and Calls for Review
Sections:
D7-8 - Purpose
D7-9 - Right of Appeal
D7-10 - Time Limits for Appeals and Calls for Review
D7-11 - Initiation of Appeals and Calls for Review
D7-12 - Procedures for Appeals and Calls for Review
D7-13 - Effective Dates
D7-14 - New Appeal
D7-8 - Purpose
A. Appeals. To avoid results inconsistent with the purposes of this Zoning Ordinance, any decision
made in compliance with this Zoning Ordinance:
1. Zoning Administrator. Decisions made by the Zoning Administrator may be appealed to the
Commission; and
2. Commission. Decisions made by the Commission may be appealed to the Council.
B. Calls for Review. As an additional safeguard to avoid results inconsistent with the purposes of this
Zoning Ordinance, any decision of:
1. Zoning Administrator. The Zoning Administrator may be called up for review by the
Commission; and
2. Commission. The Commission may be called up for review by the
Council.
D7-9 - Right of Appeal
An appeal may be initiated by the applicant or any interested person.
D7-10 - Time Limits for Appeals and Calls for Review
A. Appeals by applicant or other interested parties. An appeal of a decision by an applicant or other
interested party shall be initiated within 10 calendar days of the date of the decision.
B. Time limits. When the appeal period ends on a weekend or holiday, the time limits shall be extended
to the next working day.
C. Calls for Review. Calls for Review shall be initiated before the end of the appeal periods identified
in Subsections A. and B., above, which is the effective date of the decision to be reviewed.
Appeals and Calls for Review D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-12
D7-11 - Initiation of Appeals and Calls for Review
A. Filing of an appeal. An appeal accompanied by the fee identified in the City’s Fee Schedule shall
be filed with the City Clerk on a form provided and shall state specifically the following information:
1. The specific determination or interpretation that is claimed to be not in compliance with the
purposes of this Zoning Ordinance;
2. The specific facts that are claimed to be in error or an abuse of discretion;
3. The specific facts of the record which are claimed to be inaccurate; or
4. The specific decision that is claimed to be unsupported by the record.
B. Calls for Review. A Call for Review shall be filed by a member of the Commission or the Council
with the Zoning Administrator stating the reasons for the review before the effective date of the
decision to be reviewed in compliance with Section D7-8 (Purpose and Authorization for Appeals and
Calls for Review), above.
C. Effect on decisions. The timely filing of an appeal or a Call for Review shall cause a stay (e.g., shall
temporarily vacate all proceedings associated with the matter subject to the appeal) in the effective
date of the action or decision from which the appeal or a Call for Review has been taken until a final
decision on the matter has been rendered by the appropriate review authority.
D7-12 - Procedures for Appeals and Calls for Review
A. Hearing date. An appeal or Call for Review shall be scheduled for a hearing before the appellate
body within 60 calendar days of the City's receipt of an appeal unless both the applicant and appellant
consent to a later date.
B. Notice and public hearing.
1. An appeal or Call for Review hearing shall be a public hearing only if the decision being
appealed or reviewed required a public hearing.
2. Notice of the public hearing shall be given in the same manner required for the decision being
appealed or reviewed in compliance with Division D7, Chapter IV (Public Hearings).
C. Plans and materials.
1. At an appeal or Call for Review hearing, the appellate body shall conduct a hearing “de novo”
and may consider new materials and testimony in addition to the same application, plans, and
related project materials that were the subject of the original decision.
2. The City Clerk shall advise the appellate body as to compliance with this provision.
D. Hearing. At the hearing, the appellate body shall review the record of the decision and hear testimony
of the appellant, the applicant, and any other interested party.
E. Decision and notice.
1. After the hearing, the appellate body shall affirm, modify, or reverse the original decision.
Appeals and Calls for Review D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-13
2. The appellate body’s decision shall be supported by the weight of the evidence presented at
the hearing.
3. Decisions on appeals or Calls for Review shall be rendered within 30 calendar days of the close
of the hearing.
4. The notice shall be mailed within five working days after the date of the decision to the applicant,
the appellant, and any other party requesting notice.
F. Failure to act. Failure of the appellate body to act within the time limits identified in Subsections A.
and E., above shall be deemed affirmation of the original decision.
D7-13 - Effective Dates
A. Commission decision. A decision by the Commission regarding an appeal or Call for Review shall
become final 10 calendar days after the effective date of the decision, unless appealed to the Council
in compliance with this Chapter.
B. Council decision. A decision by the Council regarding an appeal or Call for Review shall become
final on the effective date of the decision.
D7-14 - New Appeal
Following disapproval of an appeal or certification of a decision called for review, any matter that is the
same or substantially the same shall not be considered by the same appellate body within the following 12-
month period, unless the disapproval or certification was made without prejudice, and so stated in the
record.
Appeals and Calls for Review D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-14
[Page intentionally left blank]
Amendments D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-15
Chapter III - Amendments
Sections:
D7-15 - Purpose
D7-16 - Initiation of Amendment
D7-17 - Application Requirements
D7-18 - Public Hearing Scope and Notice
D7-19 - Duties of the Commission
D7-20 - Duties of the Council
D7-21 - Revisions of Proposed Amendments
D7-22 - Post Decision Procedures
D7-15 - Purpose
This Chapter provides procedures for the amendment of the General Plan, the Zoning Map, or this Zoning
Ordinance whenever it is determined public necessity and general welfare require an amendment.
A. General Plan. A General Plan amendment may include revisions to text or diagrams.
B. Zoning Map. A Zoning Map amendment has the effect of rezoning property from one zone to
another.
C. Zoning Ordinance. A Zoning Ordinance amendment may modify a standard, requirement, or
procedure applicable to land use or development within the City.
D7-16 - Initiation of Amendment
A. General Plan or Zoning Map.
1. Methods of initiation. Amendments to the General Plan or Zoning Map shall be initiated in
compliance with the following:
a. Motion of the Council;
b. Motion of the Commission;
c. Action of the Zoning Administrator; or
d. A petition of the owner or authorized agent of property for which the amendment is sought.
2. If under multiple ownership. If property that is the subject of a petition is under more than
one ownership, all of the owners or their authorized agents shall join in filing the petition.
B. Zoning Ordinance. Amendments to this Zoning Ordinance shall be initiated in compliance with the
following:
1. Motion of the Council;
2. Motion of the Commission;
Amendments D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-16
3. Action of the Zoning Administrator; or
4. A petition of any resident, property owner, or business owner in the City.
D7-17 - Application Requirements
A property owner or an authorized agent of the owner, initiated amendment application shall be filed in
compliance with Chapter D6-1 (Permit Application Filing and Processing). The application shall be
accompanied by the information identified in the Department handout for amendment applications. It is the
responsibility of the applicant to provide evidence in support of the findings required by Section D7-19.B
(Recommendation to Council), below.
D7-18 - Public Hearing Scope and Notice
A. Scope.
1. The Zoning Administrator shall set a date, time, and place for the public hearing and prepare a
report to the Commission on an application of a property owner for a General Plan or Zoning
Map amendment, or a petition for an amendment to this Zoning Ordinance. It should be noted
that Amendments to the General Plan are governed by Measure G adopted by the voters of
San Ramon on March 5, 2002.
2. The report shall describe the area or subject to be considered for change and, if warranted,
proposing alternative amendments.
B. Notice of the hearing. Notice of the public hearing shall be provided, and the hearing shall be
conducted in compliance with Division D7, Chapter IV (Public Hearings).
C. Multiple applications. The Commission may schedule a combined public hearing on multiple
applications for General Plan, Zoning Map, or Zoning Ordinance amendments.
D7-19 - Duties of the Commission
A. Public hearing. At the time and place set for the public hearing, the Commission shall consider the
report of the Zoning Administrator and shall hear evidence for and against the proposed amendment.
The Commission may continue the public hearing to a definite date and time without additional notice.
The Commission shall hold a minimum of three public hearings for each General Plan amendment.
Pursuant to Measure G, for amendments to the General Plan, a recommendation to the City Council
shall require a 4/5th vote of the Commission.
B. Recommendation to Council. Following its final public hearing, the Commission shall make specific
findings as to whether the proposed zoning regulation or General Plan or Zoning Map amendment is
consistent with the General Plan and this Zoning Ordinance, and shall recommend approval,
conditional approval, or disapproval of the proposed amendment as submitted or in a modified form.
Amendments D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-17
D7-20 - Duties of the Council
A. Hearing date and notice.
1. Council shall set a date and time.
a. Zoning Map and Zoning Ordinance amendments. Upon receipt of the Commission’s
recommendation for an amendment to the Zoning Map or this Zoning Ordinance, the
Council shall set a date and time for a public hearing to consider the proposed
amendment.
b. General Plan amendments. Upon receipt of the Commission’s recommendation for an
amendment to the General Plan, the Council shall set dates and times for, and conduct a
minimum of three public hearings for each General Plan amendment.
2. Time for hearings. The required hearings shall be held within 60 calendar days of the date of
filing of the Commission’s recommendation.
3. Notice required. Notice of the public hearings shall be provided, and the hearing shall be
conducted in compliance with Division D7, Chapter IV (Public Hearings).
B. Public hearing. At the time and place set for the public hearing, the Council shall hear evidence for
and against the proposed amendment. The Council may continue the public hearing to a definite
date and time without additional notice.
C. Council decision.
1. Council action on amendment. After the public hearing the Council shall approve, modify, or
reject the Commission recommendation; provided, a modification not previously considered by
the Commission shall be referred to the Commission for a report before adoption of an
ordinance approving the amendment.
2. Failure of the Commission to report back to the Council. Failure of the Commission to
report within 40 calendar days after referral, or a longer period designated by the Council, shall
be deemed recommending approval of the proposed modification.
3. Required findings. Pursuant to Measure G, amendments to the General Plan require a 4/5th
vote of the Council substantially consistent with the 4/5th recommendation of the Commission.
Before adoption of an ordinance (or resolution in the case of a General Plan amendment), the
Council shall make findings that the proposed amendment is consistent with the policies of the
General Plan and the notice and hearing provisions of this Zoning Ordinance.
D7-21 - Revisions of Proposed Amendments
At or after a public hearing, the Commission or the Council may determine that the public interest would be
served by:
1. Revise General Plan or Zoning Map amendment. Revising the boundaries of an area proposed for
a General Plan or Zoning Map amendment;
2. Consider other General Plan or Zoning Map designations. Considering General Plan or Zoning Map
designations not originally presented in a motion, petition, or Commission recommendation; or
Amendments D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-18
3. Consider other amendments to this Zoning Ordinance. Considering Zoning Ordinance amendments
not originally presented in a motion, petition, or Commission consideration.
D7-22 - Post Decision Procedures
The procedures and requirements in Chapters D-64 (Permit Implementation, Time Limits, and Extensions)
including resubmittals, and D-72 (Appeals and Calls for Review), and those in this Division shall apply
following the decision on an application for an amendment to the General Plan, Zoning Map, or this Zoning
Ordinance.
Public Hearings D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-19
Chapter IV - Public Hearings
Sections:
D7-23 - Purpose
D7-24 - Notice of Hearing
D7-25 - Scheduling of Hearing
D7-26 - Hearing Procedures
D7-27 - Review Authority Decision and Notice
D7-28 - Recommendation by Commission
D7-29 - Effective Date of Decision
D7-23 - Purpose
This Chapter establishes procedures for public hearings before the Zoning Administrator, Commission, and
Council.
D7-24 - Notice of Hearing
When a land use permit, or other matter requires a public hearing, the public shall be provided notice of the
hearing in compliance with Government Code Sections 65090, 65091, 65094, and 66451.3, and Public
Resources Code 21000 et seq., and as required by this Chapter.
A. Contents of notice. Notice of a public hearing shall include:
1. Hearing information. The date, time, and place of the hearing and the name of the review
authority; a brief description of the City's general procedure concerning the conduct of hearings
and decisions (e.g., the public’ right to appear and be heard); and the phone number and street
address of the Department, where an interested person could call or visit to obtain additional
information;
2. Project information. The date of filing of the application and the name of the applicant; the
City's file number assigned to the application; a general explanation of the matter to be
considered; and a general description, in text and/or by diagram, of the location of the property
that is the subject of the hearing; and
3. Statement on environmental document. If a proposed Negative Declaration or final
Environmental Impact Report has been prepared for the project in compliance with the
provisions of the California Environmental Quality Act (CEQA) and the City’ Environmental
Guidelines, the hearing notice shall include a statement that the review authority will also
consider approval of the proposed Negative Declaration or certification of the final
Environmental Impact Report.
B. Method of notice distribution. Notice of a public hearing required by this Chapter for a land use
permit, amendment, or appeal shall be given as follows, as required by State law (Government Code
Sections 65090 and 65091).
1. Mailed notice.
a. Who shall receive notice. Notice shall be mailed or delivered at least 10 calendar days
before the scheduled hearing to the following:
Public Hearings D7
Division D7 - Zoning Ordinance Administration – Effective February 28, 2020 7-20
(1) Owners of proposed site. The owners of the property being considered in the
application, or the owners' agent, and the applicant.
(2) Local agencies. Each local agency expected to provide schools, water, or other
essential facilities or services to the project, whose ability to provide the facilities
and services may be significantly affected.
(3) Property owners. All owners of the real property shown on the latest equalized
assessment roll within a radius of 300 feet of the exterior boundaries of the parcel
that is the subject of the hearing.
(4) Persons requesting notice. Any person who has filed a written request for notice
with the Zoning Administrator and has paid the fee established by the City’ Fee
Schedule for the notice.
2. Additional notice required. If the notice is mailed as required in Subparagraph B.1, above,
the notice shall also either be:
a. Published. Published at least once in a newspaper of general circulation in the City at
least 10 days before the scheduled hearing; or
b. Posted. Posted at the Department and at two other public locations in the City at least
10 days before the scheduled hearing.
3. Alternative to mailed notice. If the number of property owners to whom notice would be
mailed in compliance with Subsection B.1, above is more than 1,000, the Zoning Administrator
may choose to provide the alternative notice allowed by Government Code Section 65091(a)(3).
4. Additional optional notice. In addition to the types of notice required by this Subsection, the
Zoning Administrator may provide additional notice with content or using a distribution method
as the Zoning Administrator determines is necessary or desirable (e.g., use of a greater radius
for notice, use of the Internet, etc).
C. Notice for continued public hearing items. As determined by the Zoning Administrator, in
combination with the sensitivity of the proposed project, notice for continued public hearing items may
occur in the following manner:
1. Announcement at previous public hearing. Items continued to a date, time and location
certain at the previous public hearing shall constitute the required notification for the future
public hearing.
2. Mailed notice. See subsection D7-24.B.1 above.
3. Posted notice. Notice may also be provided in accordance with subsection D7-24.B.2 and B.3
above.
D7-25 - Scheduling of Hearing
After the completion of environmental documents required by the California Environmental Quality Act
(CEQA) and the City’s Environmental Guidelines, the matter shall be scheduled for public hearing on a
Zoning Administrator, Commission, or Council agenda (as applicable).
Public Hearings D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-21
D7-26 - Hearing Procedure
A. Conduct of hearing. A hearing shall be held at the date, time, and place for which notice was given.
B. Testimony. The review authority shall hear testimony regarding the subject application from any
interested party.
C. Continuance. A hearing may be continued from time-to-time without further notice; provided, the
chair of the review authority announces the date, time, and place to which the hearing will be
continued before the adjournment or recess of the hearing.
D. Deferral of final decision. The review authority may announce a tentative decision, and defer their
action on a final decision until appropriate findings and/or conditions of approval have been prepared.
D7-27 - Review Authority Decision and Notice
A. Decision. The review authority (Zoning Administrator, Commission, or Council, as applicable) shall
announce and record their decision on the matter being considered at the conclusion of a scheduled
hearing, or defer action and continue the matter to a later meeting agenda in compliance with Section
D7-26 (Hearing Procedures), above.
B. Action of Zoning Administrator. The Zoning Administrator may take appropriate action or instead
refer the matter to the Commission for a determination. A referral will require a new noticed hearing
before the Commission in compliance with this Chapter.
C. Decision of Council is final. The decision of the Council on any matter shall be final.
D. Notice of decision.
1. Provision of notice. Within 10 calendar days of a final decision on an application for a permit
or other approval required by this Zoning Ordinance, the City shall provide notice of its final
decision to the applicant and to any person who specifically requested notice of the City’s final
action.
2. Contents of notice. The notice of the final decision shall contain applicable findings, conditions
of approval, reporting/monitoring requirements deemed necessary to mitigate any impacts and
protect the public convenience, health, interest, safety, or general welfare of the City, and the
procedures for appeal.
D7-28 - Recommendation by Commission
A. At the conclusion of a public hearing on an amendment (e.g., General Plan, Zoning Map, or Zoning
Ordinance), a development agreement, or a specific plan, the Commission shall forward a written
recommendation, including all required findings, to the Council for final action.
B. Following the hearing, a copy of the Commission's recommendation shall be mailed to the applicant
at the address shown on the application.
Public Hearings D7
Division D7 - Zoning Ordinance Administration – Effective February 28, 2020 7-22
D7-29 - Effective Date of Decision
A. Zoning Administrator or Commission decision. The decision of the Zoning Administrator or
Commission is final and effective on the 11th calendar day following the date the decision is rendered,
unless an appeal is filed in compliance with Division D7, Chapter II (Appeals and Calls for Review).
B. Council decision.
1. Permit or appeal. A permit application or appeal shall become effective immediately on the
date the final decision is rendered by the Council.
2. General Plan amendment. A General Plan amendment shall become effective immediately
upon the adoption of a resolution by the Council.
3. Zoning Map or Zoning Ordinance amendment. A Zoning Map or Zoning Ordinance
amendment shall become effective on the 31st day following the adoption of an ordinance by
the Council.
Enforcement D7
Division D7 – Zoning Ordinance Administration – Effective February 28, 2020 7-23
Chapter V - Enforcement
Sections:
D7-30 - Purpose
D7-31 - Enforcement Responsibilities
D7-32 - Revocation or Modification of Discretionary Permits
D7-33 - Violations
D7-34 - Penalties
D7-30 - Purpose
This Chapter establishes procedures for enforcement of the provisions of the Zoning Ordinance. These
enforcement procedures are intended to assure due process of law in the abatement or correction of
nuisances and violations of this Ordinance.
D7-31 - Enforcement Responsibilities
The Zoning Administrator shall enforce all provisions of this Ordinance related to discretionary permits and
shall have responsibility for revocation of discretionary permits, as provided in Section D7-32. The Chief
Building Official shall enforce the provisions of this Ordinance pertaining to the erection, construction,
reconstruction, moving, conversion, alteration, or addition to any building or structure. All other officers of
the City shall enforce provisions related to their areas of responsibility.
D7-32 - Revocation or Modification of Discretionary Permits
A. Duties of Zoning Administrator. Upon determination by the Zoning Administrator that there are
reasonable grounds for revocation or modification of any permit, variance, or other discretionary
approval authorized by this Ordinance, a revocation hearing shall be set by the Zoning Administrator,
the Planning Commission, or the City Council, whichever took final previous action on the permit,
except for appeals.
B. Notice and Public Hearing. Notice shall be given in the same manner required for a public hearing
to consider approval. If no notice is required for the permit, none shall be required for the revocation
or modification hearing, provided that notice shall be mailed to the property owner and owner of the
use or structure for which the permit was granted at least 10 calendar days prior to the hearing.
Contents of any notice shall be as prescribed by Division D7, Chapter IV (Public Hearings).
C. Public Hearing. The person or body conducting the hearing shall hear testimony of City staff,
property owner, and the owner of the use or structure for which the permit was granted, if present.
At a public hearing, the testimony of any other interested person shall also be heard.
D. Required Findings. The person or body conducting the hearing shall revoke or modify the permit
upon making one or more of the following findings:
1. That the permit was issued on the basis of erroneous or misleading information or
misrepresentation;
2. That the terms or condition(s) of approval of the permit have been violated or that other laws
or regulations have been violated;
Enforcement D7
Division D7 - Zoning Ordinance Administration – Effective February 28, 2020 7-24
3. That there has been a discontinuance of the exercise of the entitlement granted by the permit
for three consecutive months;
4. That the use is being conducted contrary to the public’s health, safety, and welfare; and/or
5. That circumstances or conditions related to the site or use have changed necessitating a
modification to the permit.
E. Decision and Notice. W ithin 10 calendar days of the conclusion of the hearing, the person or body
that conducted the hearing shall render a decision, and shall mail notice of the decision to the property
owner and owner of the use or structure for which the permit was revoked and to any other person
who has filed a written request for such notice.
F. Effective Date: Appeals. A decision to revoke a discretionary permit shall become final and
effective on the 11th day following the date the decision is rendered, unless appealed.
G. Cumulative Right. The City’s right to revoke a discretionary permit, as provided in this Chapter,
shall be cumulative to any other remedy allowed by law.
D7-33 - Violations
Any person violating any other provision of this ordinance, including failure to secure a zoning permit or
comply with any condition of approval, shall be guilty of an infraction, and each day or portion thereof that
such violation is in existence shall be a new and separate offense. In these cases, the fourth and any
additional violations within one year shall each constitute a misdemeanor. In addition, the City Attorney
shall, upon order of the City Council, commence action or proceedings for the abatement, removal, and
enjoinment of any violation in the manner provided by law.
D7-34 - Penalties
Any person who violates any provision of this ordinance and is convicted of an infraction shall be punished
by fines as prescribed in Government Code Section 36900. Any person who violates any provision of this
ordinance and who is convicted of a misdemeanor shall be punishable by fines as prescribed by
Government Code 36900. Payment of any fine or penalty shall not relieve a person, firm or corporation
from the responsibility of correcting the condition consisting of the violation.
City of San Ramon Zoning Ordinance D8
Division D8 – Glossary – Effective February 28, 2020 8-1
Division D8
Glossary
Chapter I - Definitions .............................................................................................................................. 8-3
D8-1 - Purpose....................................................................................................................................... 8-3
D8-2 - Definitions of Specialized Terms and Phrases ........................................................................... 8-4
City of San Ramon Zoning Ordinance D8
Division D8 – Glossary – February 28, 2020 8-2
[Page intentionally left blank]
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-3
Chapter I - Definitions
Sections:
D8-1 - Purpose
D8-2 - Definitions of Specialized Terms and Phrases
D8-1 - Purpose
This Chapter provides definitions of terms and phrases used in this Zoning Ordinance that are technical or
specialized, or that may not reflect common usage. If a definition in this Chapter conflicts with a definition
in another provision of the Municipal Code, these definitions shall control for the purposes of this Zoning
Ordinance. If a word is not defined in this Chapter, or in other provisions of the City of San Ramon Municipal
Code, the Director shall determine the correct definition, giving deference to common usage. If a property
condition exists that meets two or more categorical definitions found in this Chapter, then such property
condition must comply with each and every applicable definition to comply with this Zoning Ordinance. Any
ambiguities will be resolved under the Rules of Interpretation set forth in Section D1-5 of this Zoning
Ordinance.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-4
D8-2 - Definitions of Specialized Terms and Phrases
As used in this Zoning Ordinance, the following terms and phrases shall have the meaning ascribed to them
in this Section, unless the context in which they are used clearly requires otherwise.
A. Definitions, "A."
Abut. Having property lines, street lines, and/or zoning boundaries in common.
Accessory Retail or Services. The limited retail sale of various products, or the provision of certain
personal services within a health care, hotel, office, or industrial complex, to employees or customers
of, or visitors to the primary use. Examples of these uses include pharmacies, gift shops, and food
service establishments within hospitals; convenience stores and food service establishments within
hotel, office and industrial complexes; bank tellers in grocery stores; food marts in gas stations; and
barber and beauty shops within residential care facilities.
Access Drive. A private roadway that provides vehicle access from an off-street parking area to a
public street.
Accessory Dwelling Unit (ADU). A permanent dwelling that is accessory to a primary dwelling on
the same property. An ADU provides complete, independent living facilities for one or more persons,
including permanent provisions for living, sleeping, eating, cooking, sanitation, and parking, and if
attached to the primary dwelling, is provided exterior access separate from the primary dwelling. An
ADU may also be located on an upper floor above the detached garage of a single-family dwelling.
Accessory Structure. Any residential or non-residential structure that is secondary and incidental
to a primary structure on the same parcel. This definition includes, but is not limited to, the following
attached or detached accessory structures.
An Accessory Structure does not include:
Accessory Use. A use customarily incidental to, related and clearly subordinate to a primary use on
the same parcel, which does not alter the primary use nor serve property other than the parcel where
the primary use is located.
- arbors
- balconies (with ground posts)
- barbeques
- barns
- corrals
- coops
- decks
- garages
- gazebos
- greenhouses (non-commercial)
- large water fountains, greater than 6’ high
- outdoor fireplaces
- patio covers
- spas and hot tubs
- storage sheds
- studios
- recreation area, see “recreation area”
definition
- workshops
- accessory dwelling unit (ADU),
- balconies (without ground posts),
- attached sunrooms which are
enclosed,
- attached sunrooms integrated with
the primary residence (attached
rooms enclosed with walls/windows
by more than 50 percent),
- basketball hoops (portable),
- barbeques (portable),
- play equipment (permanent or portable),
- mechanical equipment (e.g. air conditioning
units).
- recreation area, dual use (e.g. basketball hoop
which is “dual use” and permanent, see
“recreation area” definition)
- home satellite dish and other receiving
antennas for earth-based TV and radio
- broadcasts (see "Telecommunications
Facilities")
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-5
Adult Day Care. See "Day Care."
Adult Oriented Business. The following terms and phrases are defined for the purposes of Division
D4, Chapter I (Adult Oriented Business Regulations).
1. Adult Arcade. Any business establishment or concern containing one or more coin or slug
operated or manually or electronically controlled still or motion picture projectors, video
machines, projector or similar image-producing devices, that are maintained to display images
to an individual or group of individuals when those images are distinguished or characterized
by an emphasis on matter depicting, describing, or relating to specified sexual activities or
specified anatomical areas.
2. Adult Bookstore. Any establishment which as a regular and substantial course of conduct,
displays and/or distributes sexually oriented merchandise, sexually oriented material, books,
periodicals, magazines, or other printed materials, or photographs, drawings, sculptures, films,
motion pictures, videos, discs, cassettes, slides, tapes, records, or other form of visual or audio
representations which are distinguished or characterized by their emphasis on matter
depicting, describing, or relating to specified sexual activities and/or specified anatomical areas
(See “adult-oriented business” for definition of regular and substantial course of conduct.)
3. Adult Cabaret. A nightclub, bar, lounge, restaurant, or similar business establishment or
concern which features as a regular and substantial course of conduct, any type of live
entertainment, films, motion pictures, computer generated images, videos, discs, slides, or
other photographic reproductions, or other oral, written or visual representations which are
distinguished or characterized by an emphasis upon matter depicting, describing, or relating to
specified sexual activities or specified anatomical areas.
4. Adult Dance Studio. Any business establishment or concern which provides for members of
the public a partner for dance where the partner, or the dance is distinguished or characterized
by an emphasis upon matter depicting, describing, or relating to specified sexual activities or
specified anatomical areas.
5. Adult Hotel/Motel. A hotel, motel, or other similar business establishment or concern offering
public accommodations for any form of consideration which as a regular and substantial course
of conduct provides to its patrons, through the provision of rooms equipped with closed-circuit
television, films, computer generated images, motion pictures, videos, discs, slides, other
photographic reproductions, or other medium, material which is distinguished or characterized
by an emphasis on matter depicting, describing, or relating to specified sexual activities or
specified anatomical areas and which rents, leases, or lets any room for less than a 12-hour
period, or rents, leases, or lets any single room more than once in a 24-hour period.
6. Adult Modeling Studio. Any business or premises where there is furnished, provided, or
procured, a figure model or models who pose in any manner which is characterized by its
emphasis on matter depicting, describing, or relating to specified sexual activities or specified
anatomical areas where the model(s) is being observed or viewed by any person for the
purpose of being sketched, photographed, painted, drawn, sculpted, filmed, or videotaped or
otherwise depicted for a fee, compensation, gratuity, or other thing of value as consideration
for the right or opportunity to so observe the model or to remain on the premises. “Adult
Modeling Studio” does not include any live art class or any studio or classroom which is
operated by any public agency, or any private educational institution authorized to issue and
confer a diploma or degree in compliance with standards set by the State Board of Education.
7. Adult-Oriented Business. Any business establishment or concern which as a regular and
substantial course of conduct operates as an adult arcade, adult bookstore, adult cabaret, adult
dance studio, adult hotel/motel, adult modeling studio, adult theater; any business
establishment or concern which as a regular and substantial course of conduct sells or
distributes or offers for sale or distribution sexually oriented merchandise or sexually oriented
Definitions D8
Division D8 – Glossary – February 28, 2020 8-6
material; or any other business establishment or concern which as a regular and substantial
course of conduct offers to its patrons products, merchandise, services, or entertainment
characterized by an emphasis on matters depicting, describing, or relating to specified sexual
activities or specified anatomical areas. “Adult-oriented business” does not include those uses
or activities, the regulation of which is preempted by State law. For the purposes of this Section,
a business establishment or concern has established the provision of products, merchandise,
services, or entertainment characterized by an emphasis on matters depicting describing, or
relating to specified sexual activities or specified anatomical areas as a regular and substantial
course of conduct when one or more of the following conditions exist:
a. The area devoted to adult merchandise and/or sexually oriented material exceeds more
than 20 percent of the total display or floor space area open to the public;
b. The business establishment or concern presents any type of live entertainment which is
characterized by an emphasis on specified sexual activity or specified anatomical areas;
c. The regular and substantial course of conduct of the business consists of or involves the
sale, trade, display, or presentation of services, products, or entertainment which are
characterized by an emphasis on matter depicting, describing, or relating to specified
sexual activities or specified anatomical areas.
8. Adult Theater. A business establishment or concern which, as a regular and substantial
course of conduct, presents live entertainment performances, motion pictures, videos,
computer images, slide photographs, or other pictures or visual representations or
reproductions which are distinguished or characterized by their emphasis on matter depicting,
describing, or relating to specified sexual activities or specified anatomical areas.
9. Adult-Oriented Business Operator. A person, who supervises, manages, inspects, directs,
organizes, controls, or in any other way is responsible for or in charge of the premises of an
Adult-Oriented Business or the conduct or activities occurring on the premises thereof. This
term shall hereinafter be referred to as “operator.”
10. Applicant. A person who is required to file an application for a permit under this Chapter,
including an individual owner, managing partner, officer of a corporation, or any other operator,
manager, employee, or agent of an Adult-Oriented Business.
11. Bar. Any commercial establishment licensed by the State Department of Alcoholic Beverage
Control to serve any alcoholic beverages on the premises.
12. Distinguished or characterized by an emphasis upon. Shall mean and refer to the
dominant or essential theme of the object described by the phrase. For instance, when the
phrase refers to films “which are distinguished or characterized by an emphasis upon” the
depiction or description of specified sexual activities or specified anatomical areas, the films so
described are those whose dominant or predominant character or theme are the depiction of
the enumerated sexual activities or anatomical areas. See Pringle v. City of Covina (1981) 115
Cal.App.3d 151.
13. Entertainer. Any person who dances, models, entertains, and/or performs specified sexual
activities or displays specified anatomical areas in an Adult-Oriented Business.
14. Establishment of an Adult-Oriented Business. Shall mean and include any of the following:
a. The opening or commencement of any Adult-Oriented Business as a new business;
b. The conversion of an existing business, whether or not an Adult-Oriented Business, to
any Adult-Oriented Business defined herein;
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-7
c. The addition of any of the Adult-Oriented Businesses defined herein to any other existing
Adult-Oriented Business; or
d. The relocation of any Adult-Oriented Business.
15. Figure Model. Any person who, for pecuniary compensation, consideration, hire, or reward,
poses in a modeling studio to be observed, sketched, painted, drawn, sculptured,
photographed, or otherwise depicted.
16. Live Art Class. Any premises on which all of the following occur: there is conducted a program
of instruction involving the drawing, photographing, or sculpting of live models exposing
specified anatomical areas; instruction is offered in a series of at least two classes; the
instruction is offered indoors; an instructor is present in the classroom while any participants
are present; and preregistration is required at least 24 hours in advance of participation in the
class.
17. Nudity or a state of nudity. The showing of the human male or female genitals, pubic area,
or buttocks with less than a fully opaque covering, the showing of the female breast with less
than a fully opaque covering of any part of the areola.
18. Operate an Adult-Oriented Business. The supervising, managing, inspecting, directing,
organizing, controlling, or in any way being responsible for or in charge of the conduct of
activities of an Adult-Oriented Business or activities within an Adult-Oriented Business.
19. Permittee. The person to whom an Adult-Oriented Business Permit is issued.
20. Person. Any individual, partnership, co-partnership, firm, association, joint stock company,
corporation, or combination of the above in whatever form or character.
21. Semi-nude. A state of dress in which clothing covers only the genitals, pubic region, buttocks,
areola of the female breast, as well as portions of the body covered by supporting straps or
devices.
22. Sexual Encounter Center. Any business, agency, or person who, for any form of
consideration or gratuity, provides a place where three or more persons, not all members of
the same family, may congregate, assemble, or associate for the purpose of engaging in
specified sexual activities or exposing specified anatomical areas.
23. Sexually Oriented Material. Any element of sexually oriented merchandise, or any book,
periodical, magazine, photograph, drawing, sculpture, motion picture film, video, disc,
computer generated image, or other written, oral or visual representation which, for purposes
of sexual arousal, provides depictions which are characterized by an emphasis on matter
depicting, describing, or relating to specified sexual activities or specified anatomical areas.
24. Sexually Oriented Merchandise. Sexually oriented implements and paraphernalia,
including, but not limited to, dildos, auto sucks, sexually oriented vibrators, edible underwear,
benwa balls, inflatable orifices, anatomical balloons with orifices, simulated and battery or
electrically operated vaginas or penises, and similar sexually oriented devices which are
designed or marketed primarily for the stimulation of human genital organs or sado-masochistic
activity or which are distinguished or characterized by their emphasis on matter depicting,
describing, or relating to specified sexual activities or specified anatomical areas.
25. Specified Anatomical Areas. Shall mean and include any of the following:
a. Less than completely and opaquely covered human (1) genitals or pubic region; (2)
buttocks; and\or (3) female breast below a point immediately above the top of the areola;
or
Definitions D8
Division D8 – Glossary – February 28, 2020 8-8
b. Hum an male genitals in a discernibly turgid state, even if completely and opaquely
covered; or
c. Any device, costume, or covering that simulates any of the body parts included in
Subparagraphs a. or b., above.
26. Specified Sexual Activities. Shall mean and include any of the following, whether performed
directly or indirectly through clothing or other covering;
a. Actual or simulated sexual intercourse, oral copulation, anal intercourse, oral-anal
copulation, bestiality, direct physical stimulation of genitals, flagellation or torture in the
context of a sexual relationship, or the use of excretory function in the context of a sexual
relationship, any of the following depicted sexually oriented acts or conduct: analingus,
bestiality, buggery, coprophagy, coprophilia, cunnilingus, fellatio, necrophilia, pederasty,
pedophilia, piquerism, sapphism, zooerastia; or
b. Clearly depicted human genitals in a state of sexual stimulation, arousal, or tumescence;
or
c. Use of human or animal ejaculation, sodomy, oral copulation, coitus, or masturbation; or
d. Fondling, or touching of nude human genitals, pubic region, buttocks, or female breast;
or
e. Masochism, erotic, or sexually oriented torture, beating, or the infliction of pain; or
f. Erotic or lewd touching, fondling, or other sexually oriented contact with an animal by a
human being; or human excretion, urination, menstruation, vaginal, or anal irrigation; or
g. The presence of any person who performs, or appears in a state of nudity or semi nude.
Affordable Rent. Monthly housing expenses, including a reasonable allowance for utilities, for rental
units reserved for very low or low income households, not exceeding the following calculations:
1. Low Income: 80 percent of median income as defined by State law (Health and Safety Code
Section 500105) and the HUD income limits.
2. Very Low Income: 50 percent of median income as defined by State law (Health and Safety
Code Section 50105) and the HUD income limits.
Affordable Sales Price. A sales price at which households at income levels specified by the City's
affordable housing programs can qualify for the purchase of designated dwelling units, calculated on
the basis of underwriting standards of mortgage financing available for the development.
Agent. A person authorized in writing by the property owner to represent and act for a property
owner in contacts with City employees, committees, Commissions, and the Council, regarding
matters regulated by this Zoning Ordinance.
Agricultural Product Processing. The processing of harvested crops to prepare them for on-site
marketing or processing and packaging elsewhere. Examples of this land use include the following:
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-9
Does not include wineries, which are separately defined.
Alcoholic Beverage Manufacturing, beer. An alcoholic beverage obtained by the fermentation of
any infusion or decoction of barley, malt, hops, or any other similar product, or any combination
thereof in water, and includes ale, porter, brown, stout, lager beer, small beer, and strong beer but
does not include sake, known as Japanese rice wine. (Section 23006 Business and Professions
Code)
Alcoholic Beverage Manufacturing, Brewery. A facility that manufactures beer with a capacity
generally greater than 15,000 barrels per year. May also include a tasting room on-site.
Alcoholic Beverage Manufacturing, Brew Pub. An Eating and Drinking Establishment with a
micro-brewery as an accessory use where the beer it produces is sold in draft form at its own
premises. This operation may sell other supplier's beer, including other hand-crafted or micro-brewed
beers as well as wine to patrons for consumption on its premises. The premises are defined as a
"bona fide public eating place" by the State of California Department of Alcoholic Beverage Control.
The ABC specific operational requirements are dictated by a Type 75 license.
Alcoholic Beverage Manufacturing, distilled spirts. An alcoholic beverage obtained by the
distillation of fermented agricultural products, and includes alcohol for beverage use, spirits of wine,
whiskey, rum, brandy, and gin, including all dilutions and mixtures thereof. (Section 23005 Business
and Professions Code).
Alcoholic Beverage Manufacturing, Distillery. A facility which manufactures distilled spirits. May
also include a tasting room on-site.
Alcoholic Beverage Manufacturing, Micro-Brewery. A small-scale brewery facility that generally
produces 15,000 barrels of beer per year or less. Its beer products are primarily intended for local
and/or regional consumption. These facilities are typically dedicated to the production of specialty or
craft beers. May also include a tasting room on-site and off –sale of alcoholic beverages is limited to
beers brewed on site. The ABC specific operational requirements are dictated by a Type 23 license.
Alcoholic Beverage Manufacturing, wine. An alcoholic beverage obtained from normal alcoholic
fermentation of the juice of sound ripe grapes or other agricultural products containing natural or
added sugar or any such alcoholic beverage to which is added grape brandy, fruit brandy, or spirits
of wine, which is distilled from the particular agricultural product or products of which the wine is made
and other rectified wine products and by whatever name and which does not contain more than 15
percent added flavoring, coloring, and blending material and which contains not more than 24 percent
of alcohol by volume, and includes vermouth and sake, known as Japanese rice wine. (Section 23007
Business and Professions Code)
Alley. A public or private roadway that provides vehicle access to the rear or side of parcels having
other public street frontage that is not intended for general traffic circulation.
Allowed (Allowed Use). A land use identified by Division D2 (Allowable Land Uses and Zoning
Standards)) as a permitted or conditional use that may be established with planning permit and,
where applicable, Design Review and/or Building Permit approval, subject to compliance with all
applicable provisions of this Zoning Ordinance.
- alfalfa cubing
- corn shelling
- custom grist mills
- custom milling of flour, feed and grain
- dairies (but not feedlots, see instead
"Livestock Operations, Sales Yards,
Feedlots, Stockyards")
- drying of corn, rice, hay, fruits and
vegetables
- grain cleaning and custom grinding
- hay baling and cubing
- pre cooling and packaging of fresh or farm
dried fruits and vegetables
- sorting, grading and packing of fruits and
vegetables
- tree nut hulling and shelling
Definitions D8
Division D8 – Glossary – February 28, 2020 8-10
Altered. Physical change in the internal arrangement of rooms or the supporting members of a
structure, or a change in the external appearance of any structure, not including painting.
Animal - Domestic. Any animal customarily kept by humans, including but not limited to dogs, cats,
birds, rabbits, hamsters, fish, mice, turtles, and other animals as determined by the Zoning
Administrator, incidental to a residential use. Does not include roosters, which are separately defined
under “Animal Husbandry”; hens which are separately defined under “Chickens, raising of”; and
honey bees which are separately defined under “Beek eeping – Apiary”.
Animal – Wild or Exotic. Any animal as defined in the San Ramon Municipal Code section B2-18.
Animal Husbandry. The raising and keeping of farm animals (e.g., cows, goats, sheep, chickens
including roosters, honey bees, etc.) for commercial purposes within allowable zoning district as listed
in the Land Use Tables in Division D2.
Animal Husbandry, Grazing Only. The raising and keeping of farm animals on undeveloped
property where the primary food source consists of the grasses on the site.
Animal Services, Boarding/Training. A commercial establishment that provides overnight animal
boarding, kenneling, and/or trains animals as a paid service.
Animal Services, Grooming. A commercial establishment that provides household pet grooming
services.
Animal Services, Veterinary Clinic/Animal Hospital. Office and indoor medical treatment facilities
used by veterinarians, including large and small animal veterinary clinics, and animal hospitals.
Antique or Collectible Store. A retail store that sells antiques, curios, gifts and souvenirs, and
collectible items including sports cards and comic books. A store that primarily sells books is included
under "Retail, general." Does not include stores selling other types of second hand items (e.g.,
clothing), which are instead included in the definition of "Second Hand Store."
Antenna. See "Telecommunications Facilities."
Apartment. See "Multi-Family Housing."
Applicant. Any person who is filing an application requesting an action who is:
1. The owner or lessee of property;
2. A party who has contracted to purchase, rent, or lease property contingent upon that party's
ability to acquire the necessary approvals required for that action in compliance with this Zoning
Ordinance, and who presents written authorization from the property owner to file an application
with the City; or
3. The agent of either of the above who presents written authorization from the property owner to
file an application with the City.
Approval. Includes both approval and approval with conditions.
Arborist. 1) A person currently certified by the Western Chapter of the International Society of
Arboriculture as an expert on the care of trees; 2) a consulting arborist who satisfies the requirements
of the American Society of Consulting Arborists; or 3) other qualified professional who the Director
determines has gained through experience the qualifications to identify, remove, or replace trees.
Architectural Feature. An exterior building feature including roof, windows, doors, porches, etc.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-11
Artisan/Craft Product Manufacturing. An establishment that manufactures and/or assembles
small products primarily by hand, including jewelry, pottery and other ceramics, as well as small glass
and metal art and craft products, where any retail sales are incidental to the manufacturing activity.
Artisan Shop. A retail store selling art glass, ceramics, jewelry, paintings, sculpture, and other
handcrafted items, where the store includes an area for the crafting of the items being sold, but where
the crafting activity occupies less area within the building than retail sales. Does not include
commercial art galleries, which are instead defined under "Retail, general."
Assessed Value. The value of a structure as shown in the records of the County Assessor.
Attic. The area located between the uppermost plate and the roof or ridge of a structure.
Auto and Vehicle Sales/Rental. A retail or wholesale establishment selling and/or renting
automobiles, trucks and vans, trailers, and motorcycles. Vehicles for sale may be displayed outdoors
or indoors, as authorized by the required Use Permit. A wholesale establishment with no on-site
storage or display of vehicles (office space only) are classified under “Office -
Professional/Administrative.”
May also include repair shops and the sales of parts and accessories, incidental to vehicle
dealerships. Does not include: the sale of auto parts/accessories separate from a vehicle dealership
(see "Auto Parts Sales"); mobile home, recreational vehicle, or watercraft sales (see "Mobile Home,
RV and Boat Sales"); tire recapping establishments (see "Vehicle Services"); businesses dealing
exclusively in used parts, (see "Recycling - Scrap and Dismantling Yards"); or "Service Stations,"
which are separately defined.
Auto Parts Sales. Stores that sell new automobile parts, tires, and accessories. Establishments
that provide installation services are instead included under "Vehicle Services - Repair and
Maintenance - Minor." Does not include tire recapping, which is found under "Vehicle Services" or
businesses dealing exclusively in used parts, which are included under "Recycling - Scrap and
Dismantling Yards."
Auto Repair. See "Vehicle Services."
Automated Teller Machine (ATM). A computerized, self-service machine used by banking
customers for financial transactions, including deposits, withdrawals and fund transfers, without face-
to-face contact with financial institution personnel. The machines may be located at or within banks,
or in other locations, including independent machines in convenience stores. Does not include drive-
up ATMs; see "Drive-Through Services."
Definitions D8
Division D8 – Glossary – February 28, 2020 8-12
B. Definitions, "B."
Bank, Financial Services. Financial institutions including:
See also, "Automated Teller Machine." Does not include check cashing stores, which are instead
defined under "Personal Services - Restricted."
Balcony. A platform that projects from and is supported by the wall of a building rather than columns
or other supports below the platform, and is enclosed by a parapet or railing.
Bed and Breakfast Inn (B&B). See "Lodging."
Beekeeping – Apiary. A place in which a colony or colonies of honey bees are kept in beehives.
(As a hobby for personal purposes, an apiary shall consist of no more than ten (10) hives, and for
commercial purposes, an apiary may consist of over ten (10) hives.)
Broadcasting Studio. Commercial and public communications uses including radio and television
broadcasting and receiving stations and studios, with facilities entirely within buildings. Does not
include transmission and receiving apparatus, including antennas and towers, which are instead
defined under "Telecommunications Facilities".
Build-to Line. A line parallel to a property line where a structure is required to be located.
Building and Landscape Materials Sales. A primarily indoor (showroom only, no on-site delivery
or bulk inventory storage) or primarily outdoor retail establishment selling hardware, tools,
appliances, lumber and other building materials, plants and other landscaping materials. Includes
paint, wallpaper, flooring, glass, fixtures, and similar products. Includes these types of stores selling
to the general public, even if contractor sales account for a major proportion of total sales.
Establishments primarily selling electrical, plumbing, heating, and air conditioning equipment and
supplies are classified in "Wholesaling and Distribution."
Building Frontage. A building wall adjacent to
a parcel boundary that abuts a public right-of-
way. A primary building frontage provides the
main pedestrian entrance to the building. A
secondary building frontage abuts a side street,
rear entrance, or has an entrance from other
than a public right-of-way.
Building Height. See Section D3-6 (Height
Limits and Exceptions).
- banks and trust companies
- credit agencies
- holding (but not primarily operating)
companies
- lending and thrift institutions
- other investment companies
- securities/commodity contract brokers
and dealers
- security and commodity exchanges
- vehicle finance (equity) leasing
agencies
Figure 8-1 Building Frontage
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-13
Business Park. An area that has been built to accommodate a coordinated development including,
but not limited to offices, warehouses, industrial buildings, mixed-use development, etc.
Business Support Service. An establishment within a building that provides services to other
businesses. Examples of these services include:
C. Definitions, "C."
Cabinet Shop. See "Furniture, Furnishings and Appliance Store."
California Environmental Quality Act (CEQA). State law (California Public Resources Code
Sections 21000 et seq.) requiring public agencies to document and consider the environmental
effects of a proposed action, prior to allowing the action to occur.
California Public Utilities Commission (CPUC). The governmental agency that regulates the
terms and conditions of public utilities in the State.
Caretaker Quarters. A permanent residence that is secondary or accessory to the primary use of
the property, and used for housing a caretaker on the site of a nonresidential use where needed for
security purposes or to provide 24- hour care or monitoring of people, plants, animals, equipment, or
other conditions on the site. Does not include residential "accessory dwelling units (ADU)," which
are separately defined.
Catering Service. A business that prepares food for consumption on the premises of a client.
Change of Use. The replacement of an existing use on a lot or parcel, or any portion thereof, by a
new use, or a change in the nature of an existing use; but does not include a change of ownership,
tenancy, or management associated with a use for which the previous nature of the use will remain
substantially unchanged.
Chickens, raising of. Raising of hens (roosters prohibited) for personal and non-commercial
purposes as a hobby or household pets within applicable residential properties.
Child Day Care Center. See "Day Care."
City. The City of San Ramon, State of California, referred to in this Zoning Ordinance as the "City."
City Council. The San Ramon City Council, referred to in this Zoning Ordinance as the "Council."
Clustering. A subdivision design that concentrates allowable residential development on parcels
that are located within a larger parcel that remains in permanent open space.
Cogeneration Facilities. Facilities and equipment for the conversion of waste heat from
manufacturing or other on-site processes to electricity, for on-site consumption or sale to a public
utility.
Co-Location. The placement of two or more wireless communications facilities on a single support
structure or otherwise sharing a common location. Co-Location shall also include the placement of
wireless communications facilities on buildings, water tanks, light poles, electricity towers, or other
existing facilities and/or structures.
- blueprinting
- computer-related services (rental, repair) (see also
"Maintenance Service - Client Site Services")
- copying and quick printing services
- film processing and photofinishing (retail)
- mailing and mail box services
Definitions D8
Division D8 – Glossary – February 28, 2020 8-14
Commercial Recreation Facility - Indoor. Establishments providing indoor amusement and
entertainment services for a fee or admission charge, including:
- bowling alleys
- coin-operated amusement arcades
- dance halls, clubs and ballrooms
- electronic game arcades (video games, pinball, etc.)
- ice skating and roller skating
- parties/play centers for children
- pool and billiard rooms as primary uses
This use does not include adult oriented businesses, which are separately defined. Four or more
electronic games or coin operated amusements in any establishment, or a premises where 50
percent or more of the floor area is occupied by amusement devices are considered an electronic
game arcade as described above; three or fewer machines are not considered a land use separate
from the primary use of the site.
Commercial Recreation Facility - Outdoor. A facility for various outdoor recreational activities,
where a fee is charged for use. Examples include:
- amusement and theme parks
- go-cart tracks
- golf driving ranges
- miniature golf courses
- skating parks
- water slides
May also include commercial facilities customarily associated with the above outdoor commercial
recreational uses, including bars and restaurants, video game arcades, etc.
Communications Facility. See "Telecommunications Facilities."
Community Center. A multi-purpose meeting and recreational facility typically consisting of one or
more meeting or multi-purpose rooms, kitchen and/or outdoor barbecue facilities, that are available
for use by various groups for such activities as meetings, parties, receptions, dances, etc.
Community Garden. A site used for growing plants for food, fiber, herbs, flowers, and others, which
is shared and maintained by community residents.
Condominium. As defined by Civil Code Section 1715, a development where undivided interest in
common in a portion of real property is coupled with a separate interest in space called a unit, the
boundaries of which are described on a recorded final map or parcel map.
Conference/Convention Facility. One or more structures accommodating multiple assembly,
meeting, and/or exhibit rooms, and related support facilities (e.g., kitchens, offices, etc.).
Congregate Care. See "Medical Services – Extended Care," and "Residential Care."
Construction Contractor. Office, and indoor and/or outdoor storage facilities operated by, or on
behalf of a contractor licensed by the State of California for storage of large equipment, vehicles,
and/or other materials commonly used in the individual contractor's type of business; storage of scrap
materials used for repair and maintenance of contractor's own equipment and vehicles; and buildings
or structures for uses such as repair facilities.
Construction and Heavy Equipment Sales and Rental. Retail establishments selling or renting
construction, farm, or other heavy equipment. Examples include cranes, earth moving equipment,
tractors, combines, heavy trucks, etc.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-15
Convenience Store. A neighborhood serving retail store of 3,500 square feet or less in gross floor
area, which carries a range of merchandise oriented to daily convenience shopping needs. A
convenience store that is larger than 3,500 square feet is allowed only as "Food and Beverage Sales."
A convenience store may be part of a service station or may be an independent land use.
Conveyance, or Convey. Any transfer, sale, lease, rent, or disposition of or act to transfer, sale,
lease, rent, or dispose of any affordable unit and include, but are not limited to, transfer of title or any
interest therein by nonjudicial or judicial foreclosure and sale; but does not include transfer by gift,
devise, or inheritance to the unit owner's spouse or issue, taking of title by surviving joint tenant,
transfer of title to a spouse as part of divorce or dissolution proceedings, or acquisition of title or
interest therein in conjunction with marriage.
Cottage Food Operation. Use of a residential dwelling as defined by State Health and Safety Code
Section 113758.
Council. See "City Council."
County. The County of Contra Costa, State of California.
Crop Production, Horticulture, Orchard, Vineyard. Commercial agricultural production field and
orchard uses, including the production of the following, primarily in the soil on the site and not in
containers, other than for initial propagation prior to planting in the soil on the site:
- field crops
- flowers and seeds
- fruits
- grains
- melons
- ornamental crops
- tree nuts
- trees and sod
- vegetables
- wine and table grapes
Also includes associated crop preparation services and harvesting activities, such as mechanical soil
preparation, irrigation system construction, spraying, crop processing and retail sales in the field, not
including sales sheds, which are instead defined under "Produce Stand." Does not include
greenhouses which are instead defined under "Plant Nursery," and "Residential Accessory Use or
Structure," or containerized crop production, which is instead defined under "Plant Nursery." Does
not include non-commercial home gardening, which is allowed as an accessory use in all zones
without City approval.
D. Definitions, "D."
Day Care, Adult. A state-licensed facility that provides nonmedical care and supervision for adult
clients for periods of less than 24 hours for any client.
Day Care, Child. Facilities that provide non-medical care and supervision of minor children for
periods of less than 24 hours. These facilities include the following, all of which are required to be
licensed by the California State Department of Social Services.
1. Day Care Center. Commercial or non-profit child day care facilities designed and approved to
accommodate 15 or more children. Includes infant centers, preschools, sick-child centers, and
school-age day care facilities. These may be operated in conjunction with a school or church
facility, or as an independent land use.
2. Family Day Care Home. As defined by Health and Safety Code Section 1596.78, a home that
regularly provides care, protection, and supervision for 14 or fewer children, in the provider's
own home, for periods of less than 24 hours per day, while the parents or guardians are away,
and is either a large family day care home or a small family day care home.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-16
3. Large Family Day Care Home. As defined by Health and Safety Code Section 1596.78, a
day care facility in a single-family dwelling where an occupant of the residence provides family
day care for seven to 14 children, inclusive, including children under the age of 10 years who
reside in the home.
4. Small Family Day Care Home. As defined by Health and Safety Code Section 1596.78, a
day care facility in a single-family residence where an occupant of the residence provides family
day care for six or fewer children, including children under the age of 10 years who reside in
the home.
Dead-End Street. A length of street where a vehicle may exit to another street only from the same
point as it entered the street.
Deck. A platform providing outdoor living area that may be roofed, but is without walls on at least
two sides, and which includes railings where required by the Building Code. See also "Balcony."
Density. The number of housing units per gross acre, unless otherwise stated, for residential uses.
Density Bonus. As defined by State law (Government Code Section 65915 et seq.), an increase in
density over the maximum density otherwise allowed by the applicable zone, that is granted to the
owner/developer of a housing project who agrees to construct a prescribed percentage of dwelling
units that are affordable to households of very low and/or low income. When determining the number
of dwelling units that shall be affordable, the units authorized by the density bonus shall not be
included in the calculation.
Department. The City of San Ramon Planning/Community Development Department, referred to in
this Zoning Ordinance as the "Department."
Design Review. See Section D6-22 (Architectural Review).
Development. On land, in or under water, the placement or erection of any solid material or
structure; discharge or disposal of any dredged material or of any gaseous, liquid, solid, or thermal
waste; grading, removing, dredging, mining, or extraction of any materials; change in the density or
intensity of use of land, including subdivision in compliance with the Map Act; change in the intensity
of use of water, or of access thereto; construction, reconstruction, demolition, or alteration of the size
of any structure; and the removal or harvesting of major vegetation other than for agricultural
purposes.
Development Agreement. A contract between the City and an applicant for a development project,
in compliance with the Municipal Code, and Government Code Sections 65864 et seq.
Diameter of a Tree. Trunk diameter measured at 4.5 feet above the ground (also known as
"Diameter at Breast Height," or "DBH).
Director. The City of San Ramon Planning/Community Development Department Director or
designee of the Director.
Discretionary Permit. A City land use review and entitlement process where the Review Authority
exercises discretion in deciding to approve or disapprove the permit. Includes Minor Use Permits,
Use Permits, Minor Exceptions, Variances, Architectural Review, Development Plans, Planned
Development Permits, and Subdivision Maps.
Diseased Tree. A tree afflicted by, but not limited to, any of the following: insect infestation, heart
rot, exfoliation, slime flux, crown rot, leaf scorch, root fungus, structural defects or weaknesses.
District. See "Zone."
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-17
Drip line. A line that may be drawn on the ground around a tree directly under its outermost branch
tips and which identifies that location where rainwater tends to drip from the trees. When depicted
on a map, the drip line will appear as an irregular shaped circle that follows the contour of the tree’s
branches as seen from overhead.
Drive-Through Retail or Service. A facility where food or other products may be purchased, or
where services may be obtained by motorists without leaving their vehicles. Examples of drive-
through sales facilities include fast-food restaurants, drive-through coffee, dairy product, photo stores,
pharmacies, etc. Examples of drive-through service facilities include drive-through bank teller
windows, dry cleaners, etc., but do not include automated teller machines (ATMs), gas stations or
other vehicle services, which are separately defined.
Duplex. See "Multi-Family Housing."
Dwelling, Dwelling Unit, or Housing Unit. A room or group of internally connected rooms that have
sleeping, cooking, eating, and sanitation facilities, but not more than one kitchen, which constitute an
independent housekeeping unit, occupied by or intended for one household on a long-term basis.
1. Attached dwelling unit. A dwelling unit which has one or more party walls in common with
another dwelling unit.
2. Detached dwelling unit. A dwelling unit that does not share any walls in common with another
dwelling unit.
E. Definitions, "E."
Easement. A grant of one or more of the property rights by the property owner to and/or for the use
by the public, a corporation or another person or entity.
Eating and Drinking Establishment. A retail business selling ready-to-eat food and/or beverages
for on- or off-premise consumption. These include eating establishments where customers are
served from a walk-up ordering counter for either on- or off-premise consumption ("counter service");
and establishments where customers are served food at their tables for on-premise consumption
("table service"), that may also provide food for take-out. Eating and drinking establishments include
the following types:
1. With drive through service. Sells food and beverage products to motorists who remain in
their vehicles during the sales transaction;
2. With full alcoholic beverages. Sells distilled spirits for on-site consumption. May also sell
wine and/or beer for on-site consumption. Includes tasting rooms for wine, beer, and/or distilled
spirits;
3. With live entertainment. Also may provide live music, karaoke, dancing to live or recorded
music, and/or comedy or theatrical performances for its patrons. Includes uses such as a “Night
Club”;
4. With outdoor seating. Serves food and beverage products to patrons seated at outdoor
tables;
5. With take-out service. Provides prepared and packaged food for consumption off the
premises; and
6. With wine and beer. Sells wine and/or beer, but not distilled spirits for on-site consumption.
Includes tasting rooms for wine and beer only.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-18
Electric Vehicle (EV) Charging Stations (Accessory) consist of EV charging stations located in
existing commercial, mixed use, office or multifamily developments that are available for use by the
public. They are typically associated with existing parking spaces where the number of charging
stations does not to exceed 5% of the total number of onsite parking spaces. Where the proposed
installation of EV charging stations is greater than 5% of the total number of spaces, a Minor Use
Permit is required unless the higher EV charging station percentage is required by the State
(California Green Building Standards) or local code.
Emergency Shelter. A facility for the temporary shelter and feeding of persons, operated by a public
or non-profit agency during emergency operations as defined in Municipal Code Division A8, Chapter
I (Emergency Organization and Disaster Council).
Environmental Impact Report (EIR). An informational document used to assess the physical
characteristics of an area and to determine what effects will result if the area is altered by a proposed
action, prepared in compliance with the California Environmental Quality Act (CEQA).
Equestrian Facility. A commercial facility for horses, donkeys, and/or mules, examples of which
include horse ranches, boarding stables, riding schools and academies, horse exhibition facilities (for
shows or other competitive events), and barns, stables, corrals and paddocks accessory and
incidental to these uses. Does not include the simple pasturing of horses, donkeys, and/or mules,
which is instead included in the definition of “Animal Husbandry."
Equipment Rental. A service establishment that may offer a wide variety of household and business
equipment, furniture, and materials for rental. Does not include "Construction and Heavy Equipment
Rental," which is separately defined.
Extended Hour Retail. A business that is open to the public between the hours of 10:00 p.m. and
7:00 a.m . within 100 feet of a residential zone.
F. Definitions, "F."
Farm Animal Keeping. The keeping and raising of animals common to farms (e.g., beekeeping –
apiary, cows, goats, horses, etc.) for personal use.
Farm Supply and Feed Store. A retail business selling supplies for use in soil preparation and
maintenance, the planting and harvesting of crops, the keeping and raising of farm animals, and other
operations and processes pertaining to farming and ranching. Includes the sale of small animals
such as chicks and/or other animals authorized by Use Permit approval. Does not include the sale,
rental, or repair of farm machinery and equipment, which is instead included in the definition of
"Construction and Heavy Equipment Sales and Rental."
Farmers Market. The temporary use of a site for the outdoor sales of food and farm produce items,
in compliance with California Food and Agriculture Code Section 1392 et seq.
Feasible. Capable of being accomplished in a successful manner within a reasonable period of time,
taking into account economic, environmental, social, and technological factors.
Fence. A constructed, un-roofed barrier of wood, metal, masonry, or other material as allowed by
this Zoning Ordinance, that is intended to enclose, separate, define, secure, protect, and/or screen
one or more areas of a site. Includes masonry walls.
1. Open Wire Fence. A fence through which fenced areas remain visible because of the wire
mesh used for the fence. Includes chain link fencing, deer fencing, etc.
2. Safety Fence. A fence constructed to prevent access to a hazard or hazardous area.
3. Razor or Concertina Wire. Sharp fencing materials that are designed to lacerate animals or
unauthorized persons attempting to climb or cross the fence through other than a gate.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-19
Fire District. The San Ramon Valley Fire Protection District.
Fitness/Health Facility. A fitness center,
gymnasium, health and athletic club, which
may include any of the following: sauna, spa
or hot tub facilities; locker rooms and/or
showers; indoor tennis, handball, racquetball,
archery and shooting ranges and other indoor
sports activities. Does not include adult
entertainment businesses.
Floor area, gross. The sum of the areas of all
floors of a building, measured from the exterior
faces of exterior walls or from the center lines
of walls separating two buildings. Gross floor
area shall not include:
- interior parking spaces,
- loading space for motor vehicles,
- porches,
- exterior balconies/decks.
Floor area, net. The sum of the areas of all
floors of a building, measured from the exterior
faces of exterior walls or from the center lines
of walls separating two buildings. Net floor
area shall not include:
- interior parking spaces,
- loading space for motor vehicles,
- porches,
- exterior balconies/decks,
- areas for vertical circulation,
- elevators shafts,
- stairwells,
- halls,
- Lobbies,
- mechanical, electrical, and
technical equipment rooms,
- janitorial rooms,
- restrooms,
- storage areas (adjoining loading
docks),
- loading and garbage areas,
- penthouses
Floor Area Ratio (FAR). The ratio of net floor area of all structures on a project site to total project
site area. See Figure 8-2.
Food and Beverage, Chain Grocery. A retail business where the majority of the floor area open to
the public is occupied by food products packaged for preparation and consumption away from the
store. Chain groceries are food markets operated by retail chains that carry a full range of food and
household products and have three or more store locations. Includes retail bakeries, where any on-
site baking is only for on-site sales. (See also "Catering Service".)
Food and Beverage Sales. A retail business where the majority of the floor area open to the public
is occupied by food products packaged for preparation and consumption away from the store.
Includes retail bakeries, where any on-site baking is only for on-site sales. Includes the "Chain
Grocery" type, and the "Specialty Food" type, which carries a more limited and focused range of food
products (e.g., a cheese store, or gourmet meat store, etc.). See also "Catering Service."
Fuel Dealer. A retail trade establishment that sells fuel oil, butane, propane and liquefied petroleum
gas (LPG), bottled or in bulk, to consumers.
Figure 8-2 - Floor Area Ratio (FAR)
Definitions D8
Division D8 – Glossary – February 28, 2020 8-20
Furniture and Appliance Store. A store that primarily sells furniture and appliances with on-site
delivery and bulk inventory storage, that may also provide incidental repair services. A store with only
a showroom and no on-site delivery or bulk inventory storage is classified under “Retail, general.”
G. Definitions, "G."
Garage or Carport. Parking space and shelter for automobiles or other vehicles, where the size of
the parking space complies with the provisions of Division D3, Chapter III (Parking and Loading).
1. A garage is a completely enclosed attached or detached accessory structure, with an
operational door.
2. A carport is an attached or detached accessory structure enclosed on no more than two sides.
Garage Sale. The temporary sale of used and recycled household or personal articles held on the
seller’s own residential premises, also referred to as a yard sale, rummage sale, or any similar
designation.
Garage Sale, Community. An organized garage sale by more than three residents within 300 feet
from each other on the same day.
General Plan. The City of San Ramon General Plan, including all its elements and all amendments
thereto, as adopted by the City Council in compliance with Government Code Section 65300 et seq.,
and referred to in this Zoning Ordinance as the "General Plan."
Golf Course/Country Club. Golf courses, and accessory facilities and uses including: clubhouses
with bar and restaurant, locker and shower facilities; driving ranges; "pro shops" for on-site sales of
golfing equipment; and golf cart storage and sales facilities.
Grade. The ground surface immediately adjacent to the exterior base of a structure, typically used
as the basis for measuring the height of the structure.
Graywater. Untreated wastewater that has not been contaminated by any toilet discharge, has not
been affected by infectious, contaminated, or unhealthy bodily wastes, and does not present a threat
from contamination by unhealthful processing, manufacturing, or operating wastes. Graywater
includes, but is not limited to, wastewater from bathtubs, showers, bathroom washbasins, clothes
washing machines, and laundry tubs, but does not include wastewater from kitchen sinks or
dishwashers. Recycled water and reclaimed water are separately defined under "Recycled water”.
Gross Lot Area. See "Lot Area."
Guest House. A detached structure accessory to a single-family dwelling, accommodating
living/sleeping quarters, but without kitchen or cooking facilities.
H. Definitions, "H."
Habitable Space. Space within a dwelling unit for living, sleeping, eating, cooking, bathing.
Height. See Section D3-6 (Height Limits and Exceptions).
Heliport. An area, either at ground level or elevated on a structure, that is used or intended to be
used for the takeoff and landing of helicopters, and includes some or all the various facilities useful
to helicopter operations, including helicopter parking, waiting room, fueling and maintenance
equipment.
1. Approach-Departure Path. The flight track of the helicopter as it approaches or departs from
a designated takeoff and landing area, including a heliport, helipad, or helistop.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-21
2. Helipad or Helistop. A heliport without auxiliary facilities such as waiting room, helicopter
parking, fueling and maintenance equipment.
3. Takeoff and Landing Area. The area of a helicopter facility where the helicopter actually
lands and takes off, and includes the touchdown area.
Homeless Shelter. A facility providing minimal supportive services for persons that is limited to
occupancy of six months or less by a homeless person. No individual or household may be denied
shelter because of an inability to pay.
Home Occupation. The conduct of a business within a dwelling unit or residential site, with the
business activity being subordinate to the residential use of the property.
Horticulture. See "Crop Production, Horticulture, Orchard, Vineyard."
Hotel or Motel. See "Lodging."
Housing Unit. See “Dwelling, Dwelling Unit, or Housing Unit.”
I. Definitions, "I."
Industry, Custom. An establishment primarily engaged in on-site production of goods by hand
manufacturing involving the use of hand tools and small-scale equipment. Limited custom industry
includes mechanical equipment not exceeding two horsepower or a single kiln not exceeding eight
kilowatts and the incidental direct sale to consumers of only those goods produced on-site. Typical
uses include custom bookbinding, ceramic studios, candle-making shops, and custom jewelry
manufacture.
Industry, General. Manufacturing of products, primarily from extracted or raw materials or bulk
storage and handling of such products and materials. Uses in this classification typically involve a
high incidence of truck or rail traffic, and/or outdoor storage of products, materials, equipment, or bulk
fuel. This classification includes food processing and packaging, laundry and dry cleaning plants,
stonework and concrete products manufacture (including concrete ready-mix plants), and power
generation. No industrial uses such as asphalt and chemical manufacture, hot-mix plants, rendering,
and tanneries are excluded from this classification.
Industry, Limited. Manufacturing of finished parts or products, primarily from previously prepared
materials; and provision of industrial services; both within and enclosed building. This classification
includes processing, fabrication, assembly, treatment, and packaging, but excludes basic industrial
processing from raw materials, food processing, and Vehicle/Equipment Services. Small-scale
limited industry occupies a maximum gross floor area of 5,000 square feet.
Intensification of Use. A change in the use of a structure or site that generates more traffic or other
level of activity on the site, for example: where the new use is required by this Zoning Ordinance to
have more off-street parking spaces than the former use; or a change in the operating characteristics
of a use (for example, hours of operation).
Interior Property Line. See "Lot Features."
J. Definitions, "J."
No specialized terms beginning with the letter "J" are defined at this time.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-22
K. Definitions, "K."
Key Lot. See "Lot, or Parcel - Key Lot."
Kitchen. A room or space within a building used or intended to be used for the cooking or preparation
of food, which includes any of the following: stove, oven, range top, dishwasher, kitchen sink.
L. Definitions, "L."
Laboratory - Non-Medical. A facility for testing, analysis, and/or research. Examples of this use
include soils and materials testing labs, and forensic labs. Does not include medical laboratories
(see “Medical Service – Clinic, Laboratory, and Urgent Care”).
Land Use. The purpose for which land or a structure is designed, arranged, intended, occupied, or
maintained.
Landing. The level portion of a stairway.
Landmark. The following terms are defined for the purposes of Section D2-31 (Landmark (-L)
Overlay Zone).
1. Alteration. Any change or modification, through public or private actions, of any landmark or
historical site or of any property located within a landmark district including, but not limited to,
changes to or modification of structure, architectural details or visual characteristics such as
paint color and surface texture, grading, surface paving, new structures, cutting or removal of
trees and other landscape features, disturbance of archaeological sites or areas, and the
placement or removal of any objects such as signs, plaques, light fixtures, street furniture,
walls, fences, steps, plantings and landscape features affecting the visual qualities of the
property.
2. Architectural Feature. The architectural elements embodying style, design, proportions,
general arrangement and components of all surfaces of an improvement, including but not
limited to, the kind, color or texture of the building materials and the type and style of all
windows, doors, lights, signs and other fixtures appurtenant to such improvement.
3. Improvement. Any building, structure, place, work of art or other object constituting a physical
betterment of real property or any part of the betterment.
4. Object. A material thing of functional, aesthetic, cultural, symbolic or scientific value, usually
by design or nature moveable.
5. Ordinary Repairs and Maintenance.
a. Work done on any improvement or landscape feature for which a permit is not needed
in compliance with Section D2-31.
b. Replacement of any part of an improvement or landscape feature; for which a permit
issued by the Chief Building Inspector is not required by law or by this Zoning Ordinance,
where the purpose and effect of the work or replacement is to correct any deterioration
or decay of or damage to the improvement or landscape feature or any part thereof and
to restore the improvement or feature, as nearly as may be practicable, to its condition
prior to the deterioration, decay or damage.
6. Preservation. The identification, study, protection, restoration, rehabilitation or enhancement
of a landmark or historic site.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-23
Landscape and Tree Preservation. The following terms are defined for the purposes of Division
D3, Chapter II (Landscape Design Standards), and Division V, Chapter II (Tree Preservation and
Protection).
1. Drought resistant cool season grass. Cool season grasses that can tolerate drought stress.
These grasses usually require high water use irrigation scheduling to stay green and vital, but
will survive under limited water (e.g., turf type tall fescues, Medallion, and Rebel).
2. Functional need (for turf). Turf planting which serves a functional or practical need rather
than purely aesthetic purpose. Examples include: athletic fields and pedestrian circulation
areas.
3. High water use plantings. Annuals, container plantings, and plants recognized as high water
use (e.g., Rhododendrons or Birch) or plants documented as having a plant factor greater than
0.6.
4. Hydrozone. A landscape area having plants with similar water needs. Typically, a hydrozone
is served by a valve or set of valves with the same type of irrigation hardware and schedule.
5. Irrigation circuit. A section of an irrigation system, including the piping and sprinkler heads
or emitters, that is operated by a single remote control valve.
6. Low water use plants. Plants which are recognized as drought resistant or low water use
when established, or plants documented as having a plant factor less than or equal to 0.6.
7. Microclimate. A section of a landscaped site with unique climatic conditions that affect the
amount of water plants within the area use (e.g., courtyards, tree understory areas, and median
islands).
8. Non mechanically compacted soil. Soil which has not undergone engineered compaction
procedures.
9. Organic amendment. Any fully organic material added to the soil to improve soil structure,
and other physical properties of the soil (e.g., compost, composted sawdust, peat moss, and
redwood soil conditioner).
10. Overspray. Water which is discharged from an overhead irrigation system outside the desired
planting area, especially water which wets adjacent hard surfaces (e.g., patios, sidewalks, and
streets).
11. Plant factor. A number which represents the portion of reference evapotranspiration used by
a particular plant. For example, a shrub with a plant factor of 0.5 uses 50 percent of reference
evapotranspiration; a tree with a plant factor of 1.2 uses 120 percent of reference
evapotranspiration.
12. Porous mulch. A loose material applied to the soil surface to reduce evaporation and retard
weed growth (e.g., compost, decomposed granite, straw, wood chips).
13. Rain shut off device. A device which automatically shuts the irrigation system off when a
measurable amount of rain occurs.
14. Runoff. Water which is not absorbed by the soil to which it is applied and runs off onto other
areas. Runoff usually occurs when water is applied at a rate greater than the infiltration rate of
the soil, and is especially problematic on slopes and on heavy clay soils.
15. Water feature. Ornamental or functional body of water (e.g., a fountain, pool, or pond).
Definitions D8
Division D8 – Glossary – February 28, 2020 8-24
16. Water saving techniques (to mitigate runoff from slopes). Landscape design techniques
which either allows irrigation to be applied at a rate close to the infiltration rate of the soil or
which captures and recycles runoff.
Landscape Area. An area set aside from structures and parking/driveway uses which are developed
with Hardscape and Softscape elements. Does not include materials such as turf block when used
for parking and/or driveways. See also “Landscape Area – Hardscape” and “Landscape Area –
Softscape”. See also “Paved Area”.
Landscape Area – Hardscape. An area comprised of inanimate elements, including but not limited
to paving materials (not used for parking), walls, fences, walkways, water features, concrete or brick
patios, tile paths, and turf block (not used for parking/driveways uses). Porous materials such as
synthetic turf is separately defined under “Landscape Area – Softscape”.
Landscape Area – Softscape. An area comprised of living elements, including but not limited to
lawns, trees, shrubs, vines, hedges, and bedding plants. Includes porous materials such as synthetic
turf.
Large Family Day Care Home. See "Day Care."
Laundry, Dry Cleaning Plant. A service establishment engaged primarily in high volume laundry
and garment services, including: carpet and upholstery cleaners; diaper services; dry cleaning and
garment pressing; commercial laundries; linen supply. These facilities may include accessory
customer pick-up facilities. These facilities do not include coin operated laundries or laundry/dry
cleaning pick up stores without cleaning/processing equipment, which are instead under "Personal
Services."
Library, Museum, Gallery. A public or quasi-public facility, examples of which include: aquariums,
arboretums, art galleries and exhibitions, botanical gardens, historic sites and exhibits, libraries,
museums, planetariums, and zoos. May also include accessory retail uses such as a gift/book shop,
restaurant, etc.
Live/Work Unit. An integrated housing unit and working space, occupied and utilized by a single
household in a structure, either single-family or multi-family, that has been designed or structurally
modified to accommodate joint residential occupancy and work activity, and which includes:
1. Complete kitchen space and sanitary facilities in compliance with the Building Code; and
2. Working space reserved for and regularly used by one or more occupants of the unit.
Lodging.
1. Short term rental. A dwelling that is leased or rented in full or in part for the purpose of
overnight lodging for less than thirty (30) consecutive day terms. Short term rentals are not
considered home occupations for permitting and are treated separately.
2. Bed and Breakfast Inn (B&B). A residential structure with one or more bedrooms rented for
overnight lodging throughout the year, where meals may be provided subject to applicable
Environmental Health Department regulations.
3. Hotel or Motel. A facility with guest rooms or suites, with or without kitchen facilities, rented
to the general public for transient lodging. Hotels typically include a variety of services in
addition to lodging; for example, restaurants, meeting facilities, personal services, etc. Also
includes accessory guest facilities such as swimming pools, tennis courts, indoor athletic
facilities, accessory retail uses, etc.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-25
Lot or Parcel. A recorded lot or
parcel of real property under single
ownership, lawfully created as
required by applicable Subdivision
Map Act and City ordinance
requirements, including this Zoning
Ordinance. Types of lots include
the following. See Figure 8-3 (Lot
Types).
1. Corner Lot. A lot located at
the intersection of two or
more streets, where they
intersect at an interior angle
of not more than 175
degrees. If the intersection
angle is more than 175
degrees, the lot is
considered an interior lot.
2. Double-Frontage Lot. A lot with frontage on two generally parallel streets.
3. Flag Lot. A lot having access from the building site to a public street by means of private right-
of-way strip that is owned in fee.
4. Interior Lot. A lot abutting
only one street.
5. Key Lot. An interior lot, the
front of which adjoins the side
property line of a corner lot.
6. Reverse Corner Lot. A
corner lot with its longest
definition oriented
perpendicular to the other lots
on the longest block face, the
rear of which abuts a key lot.
Lot Area. See Figure 8-4 (Lot
Features).
1. Gross area. Gross lot area is
the total area included within
the lot lines of a lot, exclusive
of adjacent dedicated street rights of way.
2 Net area. Net lot area is the gross lot area, not including easements that are not for the
exclusive use of the lot on which the easement is located.
Lot Coverage. The percentage of the total area of a lot divided by the area that is occupied by
structures over 18 inches in height (including balconies and decks). The area of a structure is
measured from the exterior wall to exterior wall. Parking areas, driveways, swimming pools, retaining
walls, and other impervious surfaces are not counted towards lot coverage.
Figure 8-4 - Lot Features
Figure 8-3 - Lot Types
Definitions D8
Division D8 – Glossary – February 28, 2020 8-26
Lot Depth. The average linear distance between the front and the rear lot lines or the intersection
of the two side lot lines if there is no rear line. See Figure 8-4 (Lot Features). The Director shall
determine lot depth for parcels of irregular configuration.
Lot Frontage. The boundary of a lot adjacent to a public street right-of-way. See Figure 8-4.
Lot Line or Property Line. Any recorded boundary of a lot. Types of lot lines are as follows (see
Figure 8-4 (Lot Features)):
1. Front Lot Line. On an interior lot, the property line separating the parcel from the street.
a. The front lot line on a corner lot is the line with the shortest frontage. If the street-fronting
lot lines of a corner lot are equal in length, the front lot line shall be determined by the
Director.
b. On a double-frontage lot, both lot lines are front lot lines and the lot is considered to have
no rear lot line.
2. Interior Lot Line. Any lot line not abutting a street.
3. Rear Lot Line. A property line that does not intersect the front lot line, which is most distant
from and most closely parallel to the front lot line.
4. Side Lot Line. Any lot line that is not a front or rear lot line.
Lot Width. The horizontal distance between the side lot lines, measured at right angles to the lot
depth at a point midway between the front and rear lot lines. See Figure 8-3 (Lot Features). The
Director shall determine lot width for parcels of irregular shape.
M. Definitions, "M."
Maintenance. See "Repair and Maintenance."
Maintenance and Service Facility. A facility providing maintenance and repair services for fleet
vehicles, and accommodating equipment and materials storage areas. This use includes corporation
yards, equipment service centers, and similar facilities.
Maintenance and Repair Service. Base facilities for various businesses that provide services on
the premises of their clients. Includes gardening, janitorial, pest control, water and smoke damage
recovery, and similar services; and appliance, computer, electronics, elevator, equipment, HVAC,
instrument, plumbing, security systems, and other maintenance and repair services not operating
from a retail establishment that sells the products being maintained or repaired. When these services
operate from a retail establishment that sells the products being maintained or repaired, they are
instead considered part of the retail use.
Map Act. See "Subdivision Map Act."
Media Production. Facilities for motion picture, television, video, sound, computer, and other
communications media production.
Median Income. The annual, area median income applicable to the County, adjusted for family size
in compliance with adjustment factors adopted by the United States Department of Housing and
Urban Development (HUD). In the event that HUD no longer establishes median income levels at
the time of conveyance of a unit, the City will determine by resolution, by any other recognized method
of computing median income, the median income for purposes of this Chapter. The determination
by the City shall be final and non-appealable.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-27
Medical Services - Clinic, Laboratory, Urgent Care. A facility other than a hospital where medical,
mental health, surgical and other personal health services are provided on an outpatient basis.
Examples of these uses include:
These facilities may also include medical laboratories. Counseling services by other than medical
doctors or psychiatrists are included under "Offices - Professional/Administrative."
Medical Services - Doctor Office. A facility, other than a hospital where medical, dental, mental
health, surgical, acupuncture, massage therapy, and/or other personal health care services are
provided on an outpatient basis, and that accommodates no more than four licensed primary
practitioners (for example, chiropractors, medical doctors, psychiatrists, etc., other than nursing staff)
within an individual office suite. These facilities may also include incidental medical laboratories. A
facility with five or more licensed practitioners is instead classified under "Medical Services - Clinic,
Laboratory, and Urgent Care." Counseling services by other than medical doctors or psychiatrists in
locations other than in the offices of other medical doctors or psychiatrists are included under "Offices
- Professional/Administrative." Does not include palm readers, hypnotists, card readers, psychics,
and similar services, which are instead included under "Personal Services – Restricted."
Medical Services - Extended Care. Residential facilities providing nursing and health-related care
as a primary use with in-patient beds. Examples of these uses include: board and care homes;
convalescent and rest homes; extended care facilities; and skilled nursing facilities. Long term
personal care facilities that do not emphasize medical treatment are included under "Residential
Care."
Medical Services - Hospital. Hospitals and similar facilities engaged primarily in providing
diagnostic services, and extensive medical treatment, including surgical and other hospital services.
These establishments have an organized medical staff, inpatient beds, and equipment and facilities
to provide complete health care. May include on-site accessory clinics and laboratories, accessory
retail uses (see the separate definition of "Accessory Retail Uses"), and on-site ambulance dispatch
facilities.
Meeting Facility, Public or Private. A facility for public or private meetings, including community
centers, religious assembly facilities (e.g., churches, mosques, synagogues, etc.), civic and private
auditoriums, Grange halls, union halls, meeting halls for clubs and other membership organizations,
etc. Also includes functionally related internal facilities such as kitchens, multi-purpose rooms, and
storage. Does not include conference and meeting rooms accessory and incidental to another
primary use that are typically used only by on-site employees and clients, and occupy less floor area
on the site than the offices they support (see "Offices"). Does not include: sports or other commercial
entertainment facilities (see "Theater," and "Sports and Entertainment Assembly"); or convention
centers (see "Conference/Convention Facility"). Related on-site facilities such as day care centers
and schools are separately defined, and separately regulated by Division D2 (Allowable Land Uses
and Zoning Standards).
Minor Exception. See Section D6-24 (Minor Exceptions).
Minor Use Permit. See Section D6-28 (Use Permits and Minor Use Permits).
Mixed-Use Project. A project that combines both non-residential and residential uses on the same
site. See Division D2, Chapter III (Mixed Use Zones).
- medical offices with five or more licensed
practitioners and/or medical specialties
- out patient care facilities
- urgent care facilities
- other allied health services
Definitions D8
Division D8 – Glossary – February 28, 2020 8-28
Mobile Home. A trailer, transportable in one or more sections, that is certified under the National
Manufactured Housing Construction and Safety Standards Act of 1974, which is over eight feet in
width and 40 feet in length, with or without a permanent foundation and not including recreational
vehicle, commercial coach or factory built housing. A mobile home on a permanent foundation is
included under the definition of "Single-Family Dwellings."
Mobile Home, Boat, or RV Sales. The retail sale of mobile homes, and/or various vehicles and
watercraft for recreational uses. Includes the sales of boats, campers and camper shells, jet skis,
motor homes, and travel trailers.
Mobile Home Park. Any site that is planned and improved to accommodate two or more mobile
homes used for residential purposes, or on which two or more mobile home lots are rented, leased,
or held out for rent or lease, or were formerly held out for rent or lease and later converted to a
subdivision, cooperative, condominium, or other form of resident ownership, to accommodate mobile
homes used for residential purposes.
Mortuary, Funeral Home. Funeral homes and parlors, where deceased are prepared for burial or
cremation, and funeral services may be conducted. Full-service mortuaries include facilities for the
preparation of the deceased, and for cremation. Partial service facilities include only chapels and similar rooms for
viewing, religious services, wakes, and similar activities, together with accessory office facilities.
Motel. See "Lodging."
Multi-Family Housing. A structure containing two or more dwelling units. Multi-family dwellings
include: duplexes, triplexes, fourplexes (buildings under one ownership with two, three or four
dwelling units, respectively, in the same structure); apartments (five or more units under one
ownership in a single building); townhouse development (three or more attached dwellings where no
unit is located over another unit); rowhouses; and other building types containing multiple dwelling
units (for example, condominiums, courtyard housing, stacked flats, etc.).
N. Definitions, "N."
Natural, or Existing Grade. The contour of the ground surface before grading.
Negative Declaration. A Negative Declaration as defined by the California Environmental Quality
Act (CEQA).
Net Lot Area. See "Lot Area."
Night Club. A facility that stays open late at night providing entertainment such as live music and/or
dancing, comedy, etc. Does not include "Adult Oriented Business." See “Eating and Drinking
Establishment with live entertainment” for businesses primarily providing food service in association
with live entertainment.
Nonconforming Parcel. A parcel that was legally created prior to the adoption of this Zoning
Ordinance or amendment, but does not comply with the current area, width, depth, or other applicable
requirements of this Zoning Ordinance.
Nonconforming Sign. A sign that lawfully existed prior to the effective date of this Zoning Ordinance
or amendment, but does not comply with the current sign regulations of this Zoning Ordinance.
Nonconforming Structure. A structure that was legally constructed prior to the adoption or
amendment of this Zoning Ordinance, but does not comply with the current setback, height limit,
and/or other applicable requirements of this Zoning Ordinance.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-29
Nonconforming Use. A use of land and/or a structure (either conforming or nonconforming) that
was legally established and maintained prior to the adoption of this Zoning Ordinance or amendment,
but does not conform to the current Zoning Ordinance requirements for allowable land uses within
the applicable zone.
Non-Residential Use. A commercial, industrial, public, or other land use type that does not contain
or involve one or more dwelling units.
O. Definitions, "O."
Off-Sale Liquor Establishment. Any establishment at which alcohol is sold, served, or given to
patrons, to be consumed off-site, except food markets, supermarkets, drugstores, and other retail
establishments in which the sale of alcohol for off-site use constitutes less than 20 percent of the total
sales.
Off-Site. An activity or accessory use that is related to a specific primary use, but is not located on
the same site as the primary use.
Office. This Zoning Ordinance distinguishes between the following types of offices. These do not
include medical offices (see "Medical Service - Clinic, Laboratory, Urgent Care," and "Medical Service
- Doctor Office.")
1. Accessory. An office facility for administration, and/or on-site business and operations
management that are incidental and accessory to another business, sales, and/or service
activity that is the primary use. For example, a business office within a grocery store.
2. Business/Service. Establishments providing direct services to consumers. Examples of
these uses include employment agencies, insurance agent offices, real estate offices, travel
agencies, utility company offices, elected official satellite offices, etc. This use does not
include “Bank, Financial Services,” which are separately defined.
3. Government. Administrative, clerical, or public contact and/or service offices of a local, state,
or federal government agency or service facilities. Includes post offices, but not bulk mailing
distribution centers, which are under "Truck or Freight Terminal."
4. Processing. Office-type facilities characterized by high employee densities, and occupied by
businesses engaged in information processing, and other computer-dependent and/or
telecommunications-based activities. Examples of these uses include:
- airline, lodging chain, and rental car company reservation
centers
- data processing services
- mail order and electronic commerce transaction
processing
- telemarketing
Definitions D8
Division D8 – Glossary – February 28, 2020 8-30
5. Professional/Administrative. Office-type facilities occupied by businesses that provide
professional services, or are engaged in the production of intellectual property. Examples of
these uses include:
- accounting, auditing and bookkeeping services
- advertising agencies
- attorneys
- auto and vehicle sales/rental - wholesale establishment with no on-
site storage or display of vehicles (office space only)
- business associations, chambers of commerce
- commercial art and design services
- construction contractors (office facilities only)
- counseling services
- court reporting services
- detective agencies and similar services
- design services including architecture, engineering, landscape
architecture, urban planning
- educational, scientific and research organizations
- financial management and investment counseling
- literary and talent agencies
- management and public relations services
- media postproduction services
- news services
- photographers and photography studios
- political campaign headquarters
- psychologists
- secretarial, stenographic, word processing, and temporary clerical
employee services
- security and commodity brokers
- writers and artists offices
6. Temporary. A mobile home, recreational vehicle or modular unit used as a temporary office
facility. Temporary Offices may include: construction supervision offices on a construction site
or off-site construction yard; a temporary on site real estate office for a development project; or
a temporary business office in advance of permanent facility construction.
7. Temporary Real Estate. The temporary use of a dwelling unit within a residential development
project as a sales office for the units on the same site, which is converted to residential use at
the conclusion of its office use.
On-Site. An activity or accessory use that is related to a specific primary use, which is located on
the same site as the primary use.
Open Fencing. A fence constructed of rails, pickets, wrought iron, or wire, with the materials spaced
so that at least 50 percent of the surface area is open, allowing visibility through the fence.
Ordinary Maintenance and Repair. Work for which a Building Permit is not required, the purpose
and effect of which is to correct deterioration of, or damage to a structure, and to restore the structure
to its condition before the deterioration or damage.
Organizational House. A residential lodging facility operated by a membership organization for its
members and not open to the general public. Includes fraternity and sorority houses, student
dormitories, convents, monasteries, and religious residential retreats.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-31
Outdoor Display and Sales. The permanent outdoor display of merchandise incidental to an
adjacent indoor retail use, and certain independent outdoor retail sales facilities. Includes news and
flower stands, and outdoor dining areas. Does not include the sale of automobiles and recreational
vehicles ("Auto and Vehicle Sales and Rental"), mobile homes ("Mobile Home, Boat, or RV Sales"),
or building or landscape materials ("Building and Landscape Materials Sales - Outdoor). Outdoor
display and sales shall comply with the standards for "Outdoor Displays, Storage and Vending" in
Section D4-35.
Outdoor Storage. See "Storage - Outdoor."
Outdoor Vendor. A person with a current business license who sells, or offers to sell any type of
merchandise, including food, beverages or edibles of any type whether hot, cold, fresh, prepared or
packaged, from a mobile food truck, or at an approved location other than within a building or structure
constructed on a permanent foundation that is rented, leased, or owned by that person.
1. Vending. Selling or offering to sell any type of merchandise, including food, beverages or
edibles of any type, at any location other than within a building or structure constructed on a
permanent foundation, which is rented, leased, or owned by the person selling or offering to
sell the merchandise.
2. Vending Equipment. Includes any materials, merchandise, tools, vehicles, carts, tables,
chairs or other items owned by, in the possession of or associated with a licensed vendor.
P. Definitions, "P."
Parcel. See "Lot, or Parcel."
Park and Recreation Facility. An outdoor recreation facility that may provide a variety of
recreational opportunities including playground equipment, open space areas for passive recreation
and picnicking, and sport and active recreation facilities.
Parking Facility - Public or Commercial. Parking lots or structures operated by the City, or a private
entity providing parking for a fee. Does not include towing impound and storage facilities, which are
instead defined under "Storage - Outdoor."
Paved Area. An area comprised of but not limited to materials providing a hard or semi-hard (turf
block) surface used for parking and/or driveway uses. Does not include elements such as walkways,
concrete or brick patios, and tile paths. See also “Landscape Area.”
Permit. Authorization by the Planning Department to establish a land use. Does not include building
permits, electrical permits, plumbing permits, etc. which may also be required to establish a land use.
Playground. An area occupied by children's play equipment, including climbing equipment,
sandboxes, slides, swings, and/or similar equipment.
Pedestrian Orientation. A physical structure or place with design qualities and elements that
contribute to an active, inviting and pleasant place for pedestrians that typically includes most of the
following elements:
1. Building facades that are highly articulated at the street level, with interesting uses of material,
color, and architectural detailing, located directly behind the sidewalk;
2. Visibility into buildings at the street level;
3. A continuous sidewalk, with a minimum of intrusions into pedestrian right-of-way;
Definitions D8
Division D8 – Glossary – February 28, 2020 8-32
4. Continuity of building facades along the street with few interruptions in the progression of
buildings and stores;
5. Signs oriented and scaled to the pedestrian rather than the motorist.
Pedestrian orientation may also include: design amenities related to the street level, such as
awnings, paseos, and arcades; landscaping and street furniture.
Pedestrian Oriented Use. A land use that is intended to encourage walk-in customers and that
generally does not limit the number of customers by requiring appointments or otherwise excluding
the general public. A pedestrian oriented use provides spontaneous draw from sidewalk and street
due to visual interest, high customer turnover, and/or social interaction.
Permit. Authorization by the Department to establish a land use. Does not include building permits,
electrical permits, plumbing permits, etc., which may also be required to establish a land use.
Person. Any individual, firm, partnership, corporation, company, association, joint stock association;
city, county, state, or district; and includes any trustee, receiver, assignee, or other similar
representative thereof.
Personal Services. Establishments providing non-medical services to individuals as a primary use.
Examples of these uses include:
- barber and beauty shops
- clothing rental
- dry cleaning/laundry pick up
- stores with limited equipment (no
on-site plant)
- home electronics and small
appliance repair
- laundromats (self service laundries)
- locksmiths
- massage (licensed, therapeutic, non-sexual)
- pet grooming with no boarding
- shoe repair shops
- tailors
- tanning salons
These uses may also include accessory retail sales of products related to the services provided.
Personal Services - Restricted. Personal services that may tend to have a blighting and/or
deteriorating effect upon surrounding areas and which may need to be dispersed to minimize their
adverse impacts. Examples of these uses include:
- check cashing stores
- fortune tellers
- palm and card readers
- pawnshops
- psychics
- spas and hot tubs for hourly rental
- tattoo and body piercing services
Pharmacy, Medical Supplies. A retail store that sells prescription drugs, and/or other medical
supplies.
Planning Commission. The City of San Ramon Planning Commission, appointed by the San
Ramon City Council in compliance with Government Code Section 65101, referred to throughout this
Zoning Ordinance as the "Commission."
Planning Permit. Authority granted by the City to use a specified site for a particular purpose.
"Planning Permit" includes Use Permits, Minor Use Permits, Limited Term Permits, Variances, Minor
Variances, Design Review, Master Development Plans, and Zoning Clearances, as established by
Division D6 (Planning Permit Procedures) of this Zoning Ordinance.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-33
Plant Nursery. A commercial agricultural establishment engaged in the production of ornamental
plants and other nursery products, grown under cover either in containers or in the soil on the site, or
outdoors in containers. The outdoor production of ornamental plants in the soil on the site is instead
included under "Crop Production, Horticulture, Orchard, and Vineyard." Also includes establishments
engaged in the sale of these products (e.g., wholesale and retail nurseries) and commercial-scale
greenhouses (home greenhouses are included under "Residential Accessory Use or Structure"). The
sale of house plants or other nursery products entirely within a building is also included under "Retail,
general."
Porch. A covered but otherwise open platform that provides a transition between the interior of a
building and the public space of the street.
Portable Outdoor Storage Unit. Any container designed for the transportation and/or storage of
personal property which is typically rented to owners or occupants of property for their temporary use
which is delivered and removed by truck.
Primary Structure. A structure that accommodates the primary use of the site.
Primary Use. The main purpose for which a site is developed and occupied.
Printing and Publishing. An establishment engaged in printing by letterpress, lithography, gravure,
screen, offset, or electrostatic (xerographic) copying; and other establishments serving the printing
trade such as bookbinding, typesetting, engraving, photoengraving and electrotyping. This use also
includes establishments that publish newspapers, books and periodicals; establishments
manufacturing business forms and binding devices. "Quick printing" services are included in the
definition of "Business Support Services."
Private Residential Recreation Facility. A privately-owned, non-commercial outdoor recreation
facility provided for residential project or neighborhood residents, including swimming pools, swim
and tennis clubs, sport court facilities. Does not include golf courses and country clubs,
which are separately defined.
Produce Stand. A temporary business established and operated for a specific time, selling raw,
unprocessed fruits, vegetables, nuts, and other produce in its raw or natural state, and that is
accessory to an on-site or adjacent agricultural operation.
Property Line. See "Lot Line or Property Line."
Proposed Project. A proposed new structure, new addition to an existing structure, or area of other
new site development; these do not include the alteration of any portion of an existing structure other
than an addition.
Protected Zone of a Tree. For the purposes of Division D5, Chapter II (Tree Preservation and
Protection), the protected zone of a tree is determined by following method that protects the largest
ground area:
1. The maximum extent of the drip line of the tree plus five feet, projected in a circle around the
tree, with the trunk at the center of the circle; or
2. A circle equal to the trunk diameter in inches converted to feet. (For example, the radius of the
protected zone of a tree with a trunk diameter of six inches is six feet.) Trunk diameter is
measured at 54 inches above the ground. In the case of a trunk that is divided into limbs at a
point below 54 inches, the trunk diameter shall be measured at the narrowest diameter of the
trunk between the base of the tree and 54 inches above the ground.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-34
Public Right-of-Way (ROW). Public streets and utility easements owned by the City or other public
entity, but only to the extent of the City or public entity’s right, title, interest or authority to grant a
license to occupy and use such streets and easements for wireless communication facilitates.
Public Safety Facility. A facility operated by a public agency including fire stations, other fire
prevention and firefighting facilities, police and sheriff substations and headquarters, including interim
incarceration facilities. May include ambulance dispatch facilities on the same site.
Q. Definitions, "Q."
Qualifying Resident. A senior citizen or other person eligible to reside in senior citizen housing (for
example, a senior citizen's spouse who is less than 55 years of age.
R. Definitions, "R."
Recreation Area. An area that is primarily designed or intended to be used solely for a sport, athletic
or game activity, such as but not limited to tennis, handball, volleyball, basketball, shuffleboard, and
ball batting. A Recreation Area encompasses such elements as fencing, lighting, overhead enclosure,
netting, equipment, and other structures designed, used or intended to be used in an activity
conducted on a recreation area. A Recreation Area does not include “dual use” recreation areas
which combines a primary use such as a driveway and/or patio with an alternative use such as a
permanent sport, athletic, or game structure (e.g. a permanent basketball hoop on a driveway). See
also “Accessory Structure”.
Recreational Vehicle (RV). A motor home, travel trailer, truck camper, carryall, or camp trailer,
house car, with or without motive power, typically designed for human habitation for recreational,
emergency, or other occupancy, which:
1. Contains less than 320 square feet of internal living room area, excluding built-in equipment,
including wardrobe, closets, cabinets, kitchen units or fixtures, and bath or toilet rooms; and
2. Contains 400 square feet or less of gross area measured at maximum horizontal projections;
and
3. Is built on a single chassis; and
4. Is either self-propelled, truck-mounted, or permanently towable on the highways without a
towing permit.
Also includes vehicles for non-habitation recreational and work purposes such as boats, boat trailers,
off-road vehicles, other types of trailers, golf carts, and busses.
Also See “Trailer” definition
Recreational Vehicle Park. A site where one or more lots are used, or are intended to be used, by
campers with recreational vehicles or tents. Recreational vehicle parks may include public restrooms,
water, sewer, and electric hookups to each lot and are intended as a higher density, more intensively
developed use than campgrounds. May include accessory retail uses where they are clearly
incidental and intended to serve RV park patrons only.
Recycled Water. Treated or recycled waste water of quality suitable for non-potable uses such as
landscape irrigation and water features. It is not intended for human consumption. Recycled water
also includes reclaimed water. Graywater is separately defined under "Graywater”.
Recycling Facility. A center for the collection and/or processing of recyclable materials. A "certified"
recycling or processing facility is certified by the California Department of Conservation as meeting
the requirements of the California Beverage Container Recycling and Litter Reduction Act of 1986.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-35
1. Small Collection Facility. A center where the public may donate, redeem or sell recyclable
materials. Small collection facilities which occupy an area of 500 square feet or less and may
include a mobile unit;
2. Large Collection Facility. Large collection facilities which occupy an area of more than 500
square feet and/or include permanent structures.
3. Mobile Recycling Unit. An automobile, truck, trailer, or van used for the collection of
recyclable materials, carrying bins, boxes, or other containers.
4. Processing Facility. A structure or enclosed space used for the collection and processing of
recyclable materials for shipment, or to an end-user's specifications, by such means as baling,
briquetting, cleaning, compacting, crushing, flattening, grinding, mechanical sorting, re-
manufacturing and shredding. Processing facilities include the following types, both of which
are included under the definition of "Scrap and Dismantling Yards," below:
a. Light processing facility occupies an area of under 45,000 square feet of collection,
processing and storage area, and averages two outbound truck shipments each day.
Light processing facilities are limited to baling, briquetting, compacting, crushing,
grinding, shredding and sorting of source separated recyclable materials sufficient to
qualify as a certified processing facility. A light processing facility shall not shred,
compact, or bale ferrous metals other than food and beverage containers; and
b. A heavy processing facility is any processing facility other than a light processing facility.
5. Recycling or Recyclable Material. See Section D 4-37(A)
6. Reverse Vending Machine. An automated mechanical device which accepts at least one or
more types of empty beverage containers and issues a cash refund or a redeemable credit slip
with a value not less than the container's redemption value, as determined by State law. These
vending machines may accept aluminum cans, glass and plastic bottles, and other containers.
A bulk reverse vending machine is a reverse vending machine that is larger than 50 square
feet, is designed to accept more than one container at a time, and issues a cash refund based
on total weight instead of by container.
7. Unattended Donation and Collection Boxes. Unattended donation and collections box or bin
means any unattended container, receptacle, or similar device that is located on any lot within
the City and that is used for soliciting and collecting donations of clothing or other small scale
salvageable personal property. This term does not include recycle bins for the collection of
“recyclable material” as defined by Section D4-37 A. (1) or any unattended donation or collection
box located inside a building.
8. Scrap and Dismantling Yard. Outdoor establishments primarily engaged in assembling,
breaking up, sorting, and the temporary storage and distribution of recyclable or reusable scrap
and waste materials, including auto wreckers engaged in dismantling automobiles for scrap,
and the incidental wholesale or retail sales of parts from those vehicles. Includes light and
heavy processing facilities for recycling (see the definitions above). Does not include: pawn
shops, and other secondhand stores; the sale of operative used cars; or landfills or other waste
disposal sites.
Related Equipment. The term “related equipment” shall mean all equipment ancillary to the
transmission and reception of data via radio frequencies. It includes, but is not limited to equipment
pads, equipment shelters, cabinets, buildings and access ladders.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-36
Repair Service - Equipment, Large Appliances, etc. A service facility where various types of
electrical, electronic, and mechanical equipment, and home and business appliances are repaired
and/or maintained away from the site of the equipment owner. Does not include vehicle repair or
maintenance, which is included under "Vehicle Services", the repair of small home appliances and
electronic equipment, which is included under "Personal Services", maintenance and repair activities
that occur on the client's site, which are included under "Maintenance Service - Client Site Services,"
or repair services provided on the site of a retail use that sells the products for which repair services
are offered, which are incidental to the on-site sales.
Repair and Maintenance. For the purposes of Section D2-4 (Exemptions from Land Use Permit
Requirements) and Division D7, Chapter I (Nonconforming Uses, Structures, and Parcels), repair
and maintenance includes work on a building or other structure involving: cleaning; interior and
exterior painting; re-roofing; the patching of cracks, holes, and other damage to interior and exterior
walls; the replacement or repair of electrical or plumbing fixtures and lines; but does not include
changes to any structural member.
Research and Development, General. A facility for scientific research, and the design,
development and testing of electrical, electronic, magnetic, optical and computer and
telecommunications components in advance of product manufacturing, and the assembly of related
products from parts produced off-site, where the manufacturing activity is secondary to the research
and development activities, and where no more than 30 percent of the total floor area is office.
Includes pharmaceutical, chemical and biotechnology research and development. Does not include
soils and other materials testing laboratories (see "Laboratory – Non-Medical"), or medical
laboratories (see "Medical Service - Clinic, Laboratory, Urgent Care").
Research and Development, Limited. A facility for scientific research, and the design, development
and testing of electrical, electronic, magnetic, optical and computer and telecommunications
components in advance of product manufacturing where the primary floor area use is professional
office-based. Includes limited assembly of related products from parts produced off-site, storage,
and warehousing associated with principle office use. Includes pharmaceutical, chemical and
biotechnology research and development. Does not include soils and other materials testing
laboratories (see "Laboratory – Non-Medical"), or medical laboratories (see "Medical Service - Clinic,
Laboratory, Urgent Care").
Residential Care. A single-family dwelling or multi-unit facility licensed or supervised by a Federal,
State, or local health/welfare agency that provides 24-hour non-medical or medical (RCFE) care of
unrelated persons who are handicapped and in need of personal services, supervision, or assistance
essential for sustaining the activities of daily living or for the protection of the individual in a family-
like environment. Does not include day care facilities, which are separately defined under “Day Care.”
Residential Care Facility for the Elderly (RCFE). A housing arrangement chosen voluntarily by
the residents, or the residents’ guardians, conservators or other responsible persons; where 75
percent of the residents are at least 62 years of age, or, if younger, have needs compatible with other
residents; and where varying levels of care and supervision are provided, as agreed to at the time of
admission or as determined necessary at subsequent times of reappraisal (definition from California
Code of Regulations Title 22, Division 6, Chapter 6, Residential Care Facilities for the Elderly). RCFE
projects may include basic services and community space.
RCFE projects include assisted living facilities (board and care homes), congregate housing,
independent living centers/senior apartments, and life care facilities as defined below.
1. Assisted Living Facility. A residential building or buildings that also provide housing,
personal and health care, as permitted by the Department of Social Services, designed to
respond to the daily, individual needs of the residents. Assisted Living Facilities may include
kitchenettes (small refrigerator, sink and/or microwave oven) within individual rooms. Assisted
Living Facilities are required to be licensed by the California Department of Social Services,
and do not include skilled nursing services.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-37
2. Independent Living Center/Senior Apartment. Independent living centers and senior
apartments are multi-family residential projects reserved for senior citizens, where common
facilities may be provided (for example, recreation areas), but where each dwelling unit has
individual living, sleeping, bathing, and kitchen facilities.
3. Life Care Facility. Sometimes called Continuing Care Retirement Communities, or Senior
Continuum of Care Complex, these facilities provide a wide range of care and supervision, and
also provide health care (skilled nursing) so that residents can receive medical care without
leaving the facility. Residents can expect to remain, even if they become physically
incapacitated later in life. Life Care Facilities require multiple licensing from the State
Department of Social Services, the State Department of Health Services, and the State
Department of Insurance.
Residential Component of Mixed Use Project. See "Mixed Use Project."
Resource Management. The following terms and phrases are defined for the purposes of Division
D5 Chapter 1 (Hillside, Creek, and Ridgeline Areas).
1. Creek. A watercourse as shown in General Plan 2030 Figure 8-3 (Resource Management).
2. Hillside. A part of a hill between the summit and the foot with slopes of 10 percent or more.
3. Hilltop. The highest elevation at the crest of a hill.
4. Pocket Area. Land located between any parallel ridges which are separated by less than
1,500 feet measured horizontally.
5. Ridge. An elongated crest or series of crests of a hill. Major Ridges and Minor Ridges are
designated as shown in the General Plan 2030 Figure 8-3 (Resource Management).
6. Ridgeline. A ground line located at the highest elevation of and running parallel to the long
axis of a ridge.
7. Riparian Vegetation. Vegetation associated with a watercourse which requires or tolerates
moisture in excess of that available in adjacent uplands.
8. Undevelopable Land.
a. Land with an existing, natural slope in excess of 20 percent with a minimum elevation
differential of 40 feet and a minimum contiguous area of three acres; or
b. Riparian corridors or associated vegetated areas of creeks, intermittent streams,
perennial streams, or lakes.
Review Authority. The individual or official City body (the Planning Director, Zoning Administrator,
Architectural Review Board, Planning Commission, or City Council) identified by this Zoning
Ordinance as having the responsibility and authority to review, and approve or disapprove the permit
applications described in Division D6 (Planning Permit Procedures).
Retail, general. Stores, showrooms and shops selling a variety of retail merchandise not specifically
listed under another defined use.
Does not include adult oriented businesses, antique or collectible stores, furniture and appliance
stores, or second hand stores, which are separately defined.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-38
Rooming or Boarding House. A dwelling or part of a dwelling where rooms may be rented for
occupancy by no more than four persons who are not members of a single housekeeping unit, with
no more than four bedrooms rented in each dwelling. Does not include fraternities, sororities,
convents, or monasteries, which are separately defined under "Organizational House."
Rowhouse. Two-story dwellings fronting a sidewalk that occupy the entire width of their parcels,
without side setbacks.
S. Definitions, "S."
School. An institution of learning for minors, whether public or private, offering instruction in those
courses of study required by the California Education Code and maintained in compliance with
standards set by the State Board of Education. This definition includes a kindergarten, elementary
school, middle or junior high school, senior high school, or any special institution of education or an
institution of higher education, including a community or junior college, college, or university, but it
does not include a vocational institution. Includes the following facilities.
1. Elementary, Middle, Secondary. A public or private academic educational institution,
including elementary (kindergarten through 6th grade), middle and junior high schools (7th and
8th grades), secondary and high schools (9th through 12th grades). May also include any of
these schools that also provide room and board.
2. Specialized Education/Training. A school that provides education and/or training, typically
accommodating more than 25 students at a time, including vocational training, in limited
subjects. Examples of these schools include:
- art school
- ballet and other dance school
- business, secretarial, and
vocational school
- computers and electronics
school
- drama school
- driver education school
- establishments providing courses by mail
- language school
- martial arts
- music school
- professional school (law, medicine, etc.)
- seminaries/religious ministry training facility
Does not include pre-schools and child day care facilities (see "Day Care"). See also the
definition of "Studio - Art, Dance, Martial Arts, Music, etc." for smaller-scale facilities offering
specialized instruction.
Second Hand Store. A retail store that buys and sells used products, including clothing, furniture
and household goods, jewelry, appliances, musical instruments, business machines and office
equipment, tools, motors, machines, instruments, or any similar secondhand articles or objects. Does
not include bookstores (“Retail, general”); secondhand farm and construction equipment
(“Construction, Farm, and Heavy Equipment Sales and Rental”); junk dealers, or scrap/dismantling
yards (Recycling Facilities - Scrap and Dismantling Yards”); the sale of antiques and collectibles
(“Antique or Collectible Store"); the sale of cars and other used vehicles ("Auto and Vehicle Sales
and Rental"); or pawnshops ("Personal Services - Restricted").
Second Unit. See “Accessory Dwelling Unit (ADU).”
Senior Housing. The following terms are defined for the purposes of Section D2-33 (Senior Housing
(-SH) Overlay Zone).
1. Senior Housing Development. A residential project of at least 35 dwelling units that are
developed for, or substantially rehabilitated or renovated for senior citizens.
2. Senior citizen. A person 55 years of age or older.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-39
3. Households of very low income levels. A person or family whose income does not exceed
50 percent of the area median income, adjusted for family size and revised annually.
4. Households of low income levels. A person or family whose income does not exceed 80
percent of the area median income, adjusted for family size and revised annually.
Separately Accessible Storage Unit. A personal storage unit provided as part of a multi-family
residential use that is fully enclosed, but separately accessible from the out-of-doors, as opposed to
indoor storage units that are individually accessible but only from within the enclosed structure.
Service Station. See "Vehicle Services – Service Station."
Setback. The distance by which a structure, parking area or other development feature must be
separated from a lot line, other structure or development feature, or street centerline. See also
"Yard," and Section D3-10 (Setback Requirements and Exceptions).
Sign. The City of San Ramon Sign Ordinance is in Division D3, Chapter IV of this Zoning Ordinance.
Definitions of the technical and specialized terms and phrases used in the Sign Ordinance are in
Section D3-44 (Definitions).
Single Family Dwelling. A building designed for and/or occupied exclusively by one family. Also
includes factory built, modular housing units, constructed in compliance with the Uniform Building
Code (UBC), and mobile homes/manufactured housing units that comply with the National
Manufactured Housing Construction and Safety Standards Act of 1974, placed on permanent
foundation systems.
Single-Room Occupancy (SRO) Unit. One-room dwelling unit intended for occupancy by a single
individual. They are distinct from a studio or efficiency unit, in that a studio is a one-room dwelling
unit that must contain a kitchen and bathroom. Although SRO units are not required to have a kitchen
or bathroom, many SROs have one or the other.
Site. A parcel or adjoining parcels under single ownership or single control, considered a unit for the
purposes of development or other use.
Small Family Day Care Home. See "Day Care."
Solid Waste Transfer Station. A facility that receives primarily solid waste materials, from
commercial vehicles for the purpose of storing and handling prior to transferring to another facility.
Social Service Organization. A public or quasi-public establishment providing social and/or
rehabilitation services, serving persons with social or personal problems requiring special services,
the handicapped, and the otherwise disadvantaged. Examples of this land use include: counseling
centers, welfare offices, job counseling and training centers, or vocational rehabilitation agencies.
Includes organizations soliciting funds to be used directly for these and related services, and
establishments engaged in community improvement and neighborhood development. Does not
include day care services, emergency shelters, transitional and supportive housing, or "Residential
Care," which are separately defined.
Specific Plan. A plan that details land use and development regulations, planned infrastructure and
public improvements, financing measures, and other topics, in compliance with Government Code
Section 65450 et seq.
Sport Court. See "Recreation Area."
Sports and Entertainment Assembly. A large-scale indoor or outdoor facility accommodating
spectator-oriented sports, concerts, and other entertainment activities. Examples of this land use
include amphitheaters, race tracks, stadiums and coliseums.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-40
Sports and Active Recreation Facility. Public and private facilities for various outdoor sports and
other types of recreation, where the facilities are oriented more toward participants than spectators.
Examples include:
- athletic/sport fields (e.g., baseball, football,
softball, soccer)
- health and athletic club outdoor facilities
- skateboard parks
- swimming pools
- tennis and other sport courts (e.g., handball,
squash)
Storage - Accessory. The indoor storage of materials accessory and incidental to a primary use is
not considered a land use separate from the primary use.
Storage - Outdoor. The storage of various materials outside of a structure other than fencing, either
as an accessory or primary use.
Storage - Personal Storage Facility. Structures containing generally small, individual,
compartmentalized stalls or lockers rented as individual storage spaces and characterized by low
parking demand.
Storage - Vehicle. See "Vehicle Storage."
Storage - Warehouse, Indoor Storage. Facilities for the storage of furniture, household goods, or
other commercial goods of any nature. Includes cold storage. Does not include: warehouse, storage
or mini storage facilities offered for rent or lease to the general public ("Storage - Personal Storage
Facility"); warehouse facilities primarily used for wholesaling and distribution (see "Wholesaling and
Distribution"); or terminal facilities for handling freight (see "Truck or Freight Terminal").
Story. The portion of a building included between the surface of any floor and the surface of the next
floor above it, or if there is no floor above, the space between the floor and the ceiling above. Parking
structures, basements and other usable space that are 4 feet or less above average existing grade
(prior to construction) to the floor above, are not considered a story, but shall be included in the overall
height calculation for the structure.
Street. A public thoroughfare accepted by the City, which affords principal means of access to
abutting property, including avenue, place, way, drive, lane, boulevard, highway, road, and any other
thoroughfare except an alley, which is separately defined.
Structure. Anything constructed or erected, the use of which requires attachment to the ground or
attachment to something located on the ground. For the purposes of this Zoning Ordinance, the term
"structure" includes "buildings," but does not include swimming pools.
Structure Ridgeline. The line along the top of a structure, including existing parapets, penthouses,
or mechanical equipment screens.
Studio - Art, Dance, Martial Arts, Music, etc. Small scale facilities, typically accommodating one
group of 25 students or fewer at a time, in no more than one instructional space. Larger facilities
accommodating more than 25 students are included under the definition of "Schools - Specialized
education and training." Examples of these facilities include: small-scale tutoring centers; individual
and group instruction and training in the arts; production rehearsal; photography, and the processing
of photographs produced only by users of the studio facilities; martial arts training studios; gymnastics
instruction, and aerobics and gymnastics studios with no other fitness facilities or equipment. Also
includes production studios for individual musicians, painters, sculptors, photographers, and other
artists. Individual photographer studios are also included in the definition of "Office –
Professional/Administrative."
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-41
Studio Unit. A residential unit where living and sleeping space is combined in a single room.
Subdivision. The division, by any subdivider, of any unit or portion of land shown on the latest
equalized Contra Costa County assessment roll as a unit or contiguous units, for the purpose of sale,
lease or financing, whether immediate or future. Property shall be considered as contiguous units,
even if it is separated by roads, streets, utility easement or railroad rights of way. Subdivision includes
the following, as defined in Civil Code Section 1715: a condominium project; a community apartment
project; or the conversion of five or more existing dwelling units to a stock cooperative.
Supportive Housing. Housing with no limit on length of stay, that is occupied by the target
population, and that is linked to onsite or offsite services that assist the supportive housing resident
in retaining the housing, improving his or her health status, and maximizing his or her ability to live
and, when possible, work in the community.
Surface Mining. All or any part of the process involved in the mining of minerals on mined lands by
removing overburden and mining directly from the mineral deposits, open pit mining of minerals
naturally exposed, mining by the auger method, dredging, and quarrying, or surface work incidental
to an underground mine. Surface mining operations include: inplace distillation, leaching, or
retorting; the production and disposal of mining wastes; and prospecting and exploratory activities.
Surface mining operations also include the creation of borrow pits, segregation, streambed skimming,
and the stockpiling and recovery of mined materials.
T. Definitions, "T."
Temporary Structure. A structure without any foundation or footings, and which is removed when
the designated time period, activity, or use for which the temporary structure was erected has ceased.
Temporary Use. A land use that is designed, operated and occupies a site for a limited time, typically
less than 12 months.
Temporary Use Permit. See Section D6-27 (Temporary Use Permit).
Theater. An indoor facility for group entertainment, other than sporting events. Examples of these
facilities include:
- civic theaters, and facilities for "live" theater and concerts
- movie theaters
See also "Sports and Entertainment Assembly."
Top of Creek Bank. The uppermost ground elevation paralleling a creek or watercourse where the
gradient changes from a more defined vertical component to more horizontal.
Trailer. A vehicle designed for carrying persons or property on its own structure and for being drawn
by a motor vehicle. Examples include, but are not limited to: boat trailers, cargo and utility trailers,
work trailers, car and motorcycle trailers, livestock trailers, camping and travel trailers (See RV
Definition)
"Trailer" also includes semitrailers (no front trailer axle) and a semitrailer when used in conjunction
with an auxiliary dolly, if the auxiliary dolly is of a type constructed to replace the function of the
drawbar and the front axle or axles of a trailer.
Transit Station or Terminal. A passenger station for vehicular, and rail mass transit systems; also
terminal facilities providing maintenance and service for the vehicles operated in the transit system.
Includes buses terminals, taxi stands, railway stations, etc.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-42
Transitional Housing. A residence that provides housing for up to two years. Residents of
transitional housing are usually connected to supportive services designed to assist the homeless in
achieving greater economic independence and a permanent, stable living situation.
Transportation Service Dispatch Facility. A base facility where taxis and/or limousines are stored
until dispatched, and/or where ambulance vehicles and crews not based at a hospital or fire
department stand by for emergency calls. Does not include dispatch services that have no on-site
vehicle storage, which are instead included under "Office - Professional/Administrative."
Truck or Freight Terminal. A transportation facility furnishing services incidental to air, motor
freight, and rail transportation. Examples include:
- freight forwarding services
- freight terminal facilities
- joint terminal and service facilities
- overnight mail processing facilities
- packing, crating, inspection and weighing services
- postal service bulk mailing distribution centers
- transportation arrangement services
- trucking facilities, including transfer and storage
U. Definitions, "U."
Un-Serviced Area. An area that is not provided City services.
Unit Owner, or Owner. The holder(s) of record fee title to a unit. "Unit owner" includes a contract
purchaser ("vendee") under an installment land contract.
Use. See "Land Use."
Use Permit. See Section D6-28 (Use Permit and Minor Use Permit).
Use, Primary. See "Primary Use."
Utility Facility. A fixed base structure or facility serving as a junction point for transferring electric
utility services from one transmission voltage to another or to local distribution and service voltages,
and similar facilities for water supply and natural gas distribution. These uses include any of the
following facilities that are not exempted from land use permit requirements by Government Code
Section 53091:
- electrical substations and switching stations
- natural gas regulating and distribution facilities
- public water system wells, treatment plants and storage
tanks
- telephone switching facilities
- wastewater treatment plants, settling ponds and disposal
fields
These uses do not include office or customer service centers (classified in "Offices").
Utility Infrastructure. Pipelines for water, natural gas, and sewage collection and disposal; and
facilities for the transmission of electrical energy for sale, including transmission lines for a public
utility company. Also includes telephone, telegraph, cable television and other communications
transmission facilities utilizing direct physical conduits. Does not include offices or service centers
(see "Offices - Business and Service"), or distribution substations (see "Utility Facility").
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-43
V. Definitions, "V."
Variance. See Section D6-29 (Variances).
Vehicle Fueling-Alternative Fuels. Alternative vehicle fuels include a range of fuel sources beyond
traditional gasoline and diesel options. Common examples include compressed natural gas (CNG),
bio-diesel, electricity and hydrogen. Facilities that specialize in the retail sales of these fuels are
subject to the Service Station requirements. Accessory fueling stations must be accessed on the
specifics of the proposal and degree of retail and public availability.
Vehicle Services. The repair, servicing, alteration, restoration, towing, painting, cleaning, or finishing
of automobiles, trucks, recreational vehicles, boats and other vehicles as a primary use, including the
incidental wholesale and retail sale of vehicle parts as an accessory use. This use includes the
following categories.
1. Major Repair/Body Work. These establishments include towing, collision repair, other body
work, and painting services; muffler and radiator shops; tire recapping.
2. Minor Maintenance/Repair. Minor facilities providing limited repair and maintenance
services. Examples include: attended and self-service car washes; detailing services; quick-
lube services; tire and battery sales and installation (not including recapping).
3. Service Station. A retail business selling gasoline and/or other motor vehicle fuels, and related
products. May include a convenience store, minor maintenance/repair facilities and services.
A service station does not include Electric Vehicle Charging Stations (Accessory) or private
fueling facilities (corporate yards, etc.) not available to the general public.
4. Service Station- Unattended. A service station (Fueling Station) that does not have an onsite
attendant during the hours that fuel or related services are available to the general public. An
unattended service station will have automated systems for safety, security and payment.
5. Towing and Storage. An establishment that dispatches tow trucks and that may include the
temporary outdoor storage of wrecked and other inoperable vehicles.
6. Washing, Attended. A commercial facility for washing cars where washing or drying is done
by employees of the facility.
7. Washing, Unattended. A commercial facility for washing cars where the car operator washes
the vehicle using on-site equipment, or drives through an automated car washing and drying
facility.
Does not include automobile parking (see "Parking Facilities"), repair shops that are part of a vehicle
dealership on the same site (see "Auto and Vehicle Sales and Rental," and "Mobile Home, RV, and
Boat Sales and Rental"); gas stations, which are separately defined; or dismantling yards, which are
included under "Recycling - Scrap and Dismantling Yards."
Vehicle Storage. A facility for the storage of operative cars and other fleet vehicles, trucks, buses,
recreational vehicles, and other motor vehicles. Includes facilities for the storage and/or servicing of
fleet vehicles. Also includes the parking of a vehicle on private property for more than 72 hours
without operation. Does not include commercial parking lots, or dismantling yards (classified in
"Recycling - Scrap and Dismantling Yards").
Video Rental. See "Retail, general" and "Adult Oriented Business."
Definitions D8
Division D8 – Glossary – February 28, 2020 8-44
W. Definitions, "W."
Warehouse. See "Storage - Warehouse, Indoor Storage."
Warehouse Retail. A retail store that emphasizes the packaging and sale of products in large
quantities or volumes, some at discounted prices, where products are typically displayed in their
original shipping containers. Sites and buildings are usually large and industrial in character. Patrons
may be required to pay membership fees.
Watercourse. A creek, stream, or other waterway.
Wholesaling and Distribution. An establishment engaged in selling merchandise to retailers; to
contractors, industrial, commercial, institutional, farm, or professional business users; to other
wholesalers; or acting as agents or brokers in buying merchandise for or selling merchandise to such
persons or companies. Small scale facilities shall be an establishment up to a maximum of gross
floor area of 5,000 square feet. Examples of these establishments include:
- agents, merchandise or commodity brokers, and commission
merchants
- assemblers, buyers and associations engaged in the
cooperative marketing of farm products
- merchant wholesalers
- stores primarily selling electrical, plumbing, heating and air
conditioning supplies and equipment.
Also includes storage, processing, packaging, and shipping facilities for mail order and electronic
commerce retail establishments.
Windmill. A tower and propeller assembly used to transform wind energy into mechanical energy
for generating electricity or pumping water.
Wine Tasting. A facility, or area within a winery where wine and related products are offered for
retail sale, where wine may be tasted for a fee, or without charge.
Winery. A manufacturing facility where wine grapes are crushed, and their juice is fermented, aged,
bottled, and sold at wholesale as finished wine. May include tasting and accessory retail sales of
wine produced on site.
Wireless Telecommunications Facilities. A facility that transmits and/or receives electromagnetic
signals, including antennas, microwave dishes, parabolic antennas, directional antennas and other
types of equipment for the transmission or reception of such signals, including towers or similar
structures supporting the equipment such as equipment buildings, shelters, cabinets, parking areas
and other accessory development related to the main facility.
1. Antenna. A system of poles, panels, rods, reflecting discs, wires or similar devices used for
the transmission or reception of electromagnetic signals, including but not limited to radio
waves and microwaves. The antenna does not include its support system it is mounted on.
See also "Telecommunications Facilities."
2. Antenna, Array. A structure attached to a telecommunications tower that supports the
antennas.
3. Antenna, Directional or Panel. An antenna which transmits and/or receives radio frequency
signals in a directional pattern of less than 360 degrees.
4. Antenna, Amateur Radio (HAM). A ground, building, or tower-mounted antenna operated by
a federally licensed amateur radio operator as part of the Amateur Radio Service and as
designated by the Federal Communications Commission (FCC).
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-45
5. Antenna, Facade Mounted. An antenna which is directly attached or affixed to the elevation
of a building, tank, tower, or other structure.
6. Antenna, Farm. The term “antenna farm” is used to describe the negative visual impact
associated with the placement of a number of antenna facilities in close proximity to each other.
7. Antenna, Ground Mounted. An antenna which base is a single pole or multiple poles or posts,
placed directly on the ground or a mast that is less than 15 ft. tall.
8. Antenna, Omni-Directional or Whip. An antenna, which transmits and/or receives radio
frequency signals in a 360-degree radial pattern.
9. Antenna, Parabolic or Satellite. An antenna which is any device incorporating a reflective
surface that is solid, open mesh, or a bar configuration that is a shallow dish, cone, horn, bowl
or cornucopia shaped and is used to transmit and/or receive electromagnetic or radio frequency
communication signals in a specific directional pattern.
10. Antenna, Portable. An antenna which is any device used to transmit and/or receive
electromagnetic or radio frequency communications signals in a specific directional pattern,
located on a portable or moveable base designed to be placed either for temporary or long-
term use at a given site.
11. Antenna, Roof-Mounted. An antenna which is directly attached or affixed to the roof of an
existing structure which transmits or receives electromagnetic signals.
12. Antenna, Television Broadcast Service (TVBS). An antenna designed to receive only
television signals directly to and/or from a satellite.
13. Co-location. The placement of two or more wireless communications facilities on a single
support structure or otherwise sharing a common location. Co-location shall also include the
placement of wireless communications facilities on buildings, water tanks, light poles, electricity
towers, or other existing facilities and/or structures.
14. Communication Facility. An unstaffed facility, generally consisting of antennas, and
equipment cabinet or structure, and related equipment, which receives and/or transmits
electromagnetic waves, light waves, radio frequencies or other types of signals.
15. Direct Broadcast Satellite Service (DBS). A system in which signals are transmitted directly
from a satellite to a small receiving dish whose diameter is less than one meter (39 inches) in
a residential property and two meters (78 inches) in a commercial property.
16. Electromagnetic Radiation (EMR). A type of non-ionizing electromagnetic radiation (radio
frequency within the electromagnetic spectrum), including radio, TV signals and microwaves.
Other forms of this radiation include visible light, and infrared radiation that is sensed as heat.
17. Emission. The electromagnetic energy propagated from a source by radiation or conduction.
18. Equipment Building, Shelter or Cabinet. A cabinet, building or shelter at the
telecommunications facility site used to house equipment which supports the
telecommunications system, or equipment associated with a wireless, hard wire, or cable
communication facility.
19. Lattice Tower. A self-supporting structure erected from the ground, which consists of metal
cross-strips or bars to support antennas and related equipment.
Definitions D8
Division D8 – Glossary – February 28, 2020 8-46
20. Monopole. A wireless communication facility which consists of a single-pole structure or spire,
exceeding 15 feet, erected on the ground to support wireless communication antennas and
related hardware pieces.
21. Multipoint Distribution Service. A microwave communication service that delivers video
programming, data and/or voice communication directly to subscribers, including multi-channel
multipoint distribution series, instructional television fixed services, and local multipoint
distribution services, or as defined by the Section 207 of the Telecommunications Act of 1996,
Section 1.4000 of Title 47 of the Code of Federal Regulations and any interpretative decisions
thereof issued by the Federal Communications Commission.
22. NIER (Non-Ionizing Electromagnetic Radiation) Professional. A certified professional,
usually an Electrical Engineer, health physicist or other technical expert with an understanding
of electromagnetic radiation and its health effects. A NIER professional must have substantial
professional experience performing environmental measurements of radio frequency (RF)
exposure and preparing RF environmental evaluation reports for a variety of entities.
23. Radio Frequency (RF). Electromagnetic energy with wavelengths between the audio range
and the light range. Electromagnetic waves transmitted are usually between 500 kHz (kilohertz
– one thousand hertz) and 300 GHz (gigahertz – one billion cycles per second).
24. Satellite Dish or Antenna. A device incorporating a reflective surface that is solid, open mesh,
or bar configured to form a shallow dish, cone, horn, or cornucopia used to transmit and/or
receive electromagnetic signals. This definition includes antennas that are sometimes called
“SES”, “TVBS”, and “DBS”.
25. Satellite Earth Station. A facility consisting of more than a single satellite dish or parabolic
antenna that transmits and/or receives signals from an orbiting satellite.
26. Service Provider. Any authorized provider of telecommunications services.
27. Stealth Facility. A communications facility designed to blend into the surrounding
environment, and be visually unobtrusive. Examples include architecturally screened roof-
mounted antennas; building-mounted antennas painted and treated as architectural elements
to blend with the existing building, or antennas built into the structure itself. Also known as
concealed telecommunications facilities. The Zoning Administrator shall determine if a facility
is a stealth facility.
28. Stealth Pole. A monopole that is disguised or camouflaged as vegetation, a flag pole, public
art, clock tower, rock outcropping, etc. A slim pole with antennas that are flush with the
structure is not considered a stealth pole. The Zoning Administrator shall determine if a facility
is a stealth pole.
29. Tower (Wireless Communication Tower). A mast, pole, monopole, lattice tower, or other
structure designed and primarily used to support antennas and other wireless equipment. A
ground or building mounted mast greater than 15 feet tall supporting one or more antenna,
dishes, arrays, etc.; shall be considered a wireless communications tower.
30. Power Transmission Towers. Other utility structures and building/site architectural features
with approved wireless equipment are not considered wireless towers, but rather an ancillary
use subject to the requirements of Division 4 Chapter 4 “Wireless Telecommunication
Facilities” of the Zoning Ordinance.
Workforce Housing. Affordable housing that is rented in compliance with the definition of
"Affordable Rent" in this Article.
Definitions D8
Division D8 – Glossary – Effective February 28, 2020 8-47
X. Definitions, "X."
No specialized terms beginning with the letter "X" are defined at this time.
Y. Definitions, "Y."
Yard. An area between a lot line and a structure, unobstructed and unoccupied from the ground
upward, except as otherwise permitted by this Zoning Ordinance. A yard area includes any setback
required by the applicable zone. See also "Setback," and Section D3-10 (Setback Requirements and
Exceptions).
1. Front Yard. An area extending across the full width of the lot between the front lot line and the
primary structure.
2. Rear Yard. An area extending the full width of the lot between a rear lot line and the primary
structure.
3. Side Yard. An area between a side lot line and the primary structure extending between the
front and rear yards.
Z. Definitions, "Z."
Zero Lot Line. The location of a building on a lot in such a manner that one or more building sides
rests directly on a lot line.
Zone. A zone established by Section D1-7 (Zoning Map and Zones), within which certain land uses
are allowed or prohibited, and certain site planning and development standards are established (e.g.,
setbacks, height limits, site coverage requirements, etc.).
Zoning Administrator. The individual designated as Zoning Administrator by the City Manager.
Zoning Clearance. See Section D6-30 (Zoning Clearances).
Zoning Ordinance. The City of San Ramon Zoning Ordinance, Title D of the San Ramon Municipal
Code, referred to here as "this Zoning Ordinance."
Definitions D8
Division D8 – Glossary – February 28, 2020 8-48
[Page intentionally left blank]
City of San Ramon Zoning Ordinance D9
Appendix A - Mixed Use Zone Redevelopment Guidelines - Effective February 28, 2020 9-1
Appendix A
Mixed Use Zone Redevelopment Guidelines
The following guidelines illustrate a methodology for the redevelopment of existing commercial strip centers
into pedestrian-oriented districts where applicable. The City will use these guidelines in reviewing proposals
to change existing shopping centers in the MU zone.
Purpose. In order to illustrate the potential for redevelopment of commercial properties into vibrant, mixed-
use centers, a hypothetical “strip mall” was created at the intersection of two arterial streets. This 10-acre
property accommodates approximately 115,000 gross square feet (gsf) of commercial space and includes
a 60,000 gsf retail anchor. It is served by approximately 815 surface parking spaces (a standard 8:1 ratio).
The following pages illustrate a series of design principles that may guide the redevelopment of similar
properties, as well as a strategy for successful phasing such a project.
City of San Ramon Zoning Ordinance D9
Appendix A - Mixed Use Zone Redevelopment Guidelines - Effective February 28, 2020 9-2
Above: Existing conditions.
Principle One: Subdivide the property into an interconnected network of pedestrian-scaled streets and
blocks.
Principle Two: Parking should be located along streets and in lots and garages oriented behind buildings.
City of San Ramon Zoning Ordinance D9
Appendix A - Mixed Use Zone Redevelopment Guidelines - Effective February 28, 2020 9-3
Principle Three: New buildings should be oriented towards streets and provide a scale and interest that
is pedestrian friendly.
Principle Four: A comprehensive network of parks and open space should provide the community with a
series of public places.
Principle Five: Built frameworks should provide pedestrian-friendly connections to neighboring properties
and future redevelopment sites.
City of San Ramon Zoning Ordinance D9
Appendix A - Mixed Use Zone Redevelopment Guidelines - Effective February 28, 2020 9-4
Above: Existing conditions within suburban context.
Phase I: A portion of the strip mall is demolished and redeveloped as a mixed-use “main street” fronting a
linear park. A parking structure is built to accommodate lost parking and new residential uses. The existing
anchor use is renovated to appropriately terminate this new axis.
Phase II: A second mixed-use address is introduced along with a parking structure serving new retail and
residential uses, creating a nascent town center district.
City of San Ramon Zoning Ordinance D9
Appendix A - Mixed Use Zone Redevelopment Guidelines - Effective February 28, 2020 9-5
Phase III: The remainder of the property is redeveloped with the addition of street-facing buildings along
the site’s perimeter, as the arterial streets gradually evolve into avenues and boulevards that are more
pedestrian-friendly.
The above drawing illustrates one way in which such a site could be redeveloped, integrating new and
renovated commercial uses, residential uses in a variety of forms, and civic and open space. The
redevelopment of one property can spur the redevelopment of adjacent underutilized sites, creating the
long-term potential for the creation of a vibrant, mixed-use, pedestrian-friendly quarter.
City of San Ramon Zoning Ordinance D9
Appendix A - Mixed Use Zone Redevelopment Guidelines - Effective February 28, 2020 9-6
[Page intentionally left blank]