HomeMy WebLinkAbout12-15-2005 DVOC AGENDA PACKETDOUGHERTY VALLEY OVERSIGHT COMMITTEE
Will meet on Friday, December 15, 2006 9:30 A.M.
At the Dougherty Station Community Center
2" Floor Conference Room
NOTELOCATION 17011 Bollinger Canyon Road, San Ramon
Voting Members
1.
Introductions
Supervisor Piepho
District III
2.
Public Comments
Newell Arnerich
Council Member
Town of Danville
3.
Changes to Agenda
Mike Shimansky,
Council Member
4.
Shapell Annual Compliance Report
Town of Danville
Scott Perkins
Council Member
5.
Windemere Annual Compliance Report
City of San Ramon
Dave Hudson,
6.
Status of San Ramon Valley Unified
Council Member
School District
City of San Ramon
7.
4 Years Level of Service Information
Non -Voting Members
8.
Report on Park -and -Ride Facilities
Dan Coleman,
Shapell Industries
9.
Set DVOC Meetings for Year 2007
Brian Olin
Lennar Communities
Mike Shimansky, Chair
Mike Shimansky, Chair
Mike Shimansky, Chair
Telma Moreira, Contra Costa
County
Aruna Bhat, Contra Costa County
Aruna Bhat, Contra Costa County
Aruna Bhat, Contra Costa County
Aruna Bhat Contra Costa County
Mike Shimansky, Chair
For additional information, please contact Debbie Sittser at (925) 335-1210
TO:
FROM:
DATE:
CONTRA COSTA COUNTY
COMMUNITY DEVELOPMENT DEPARTMENT
651 Pine Street, N. Wing - 4th Floor
- Martinez, CA 94553
Telephone:335-1210 Fax:335-1222
DVOC Members
Aruna Bhat, Principal Planner
December 15, 2006
Item 1: Introductions
Item 2: Public Comments
Item 3: Changes to Agenda
Items 4 & 5: Annual Compliance Reports
The Settlement Agreement requires each developer to submit an Annual Compliance
Report to the County by October 15th of each year. DVOC is directed to consider the
reports by December 15th of each year and the County is required to hold a public hearing
on this report prior to January 30th of next year.
The Settlement Agreement allows DVOC to "make comments" on these submittals. These
comments are required in order to be considered by the County at a noticed public hearing.
By tradition, that hearing is held before the County Zoning Administrator and that decision
is appealable within 10 days to the County Board of Supervisors.
Both Shapell Industries and Windemere BLC submitted their project year 2006 Annual
Compliance Reports. They are attached to this report.
The performance requirements found in Appendix G of the Settlement Agreement and the
Development Agreement requirements are both discussed in the annual compliance reports.
There are four separate Agreement Compliance discussions found in these two reports.
They are:
2
1� a
For Windemere:
Settlement Agreement
Development Agreement
For Shapell:
Settlement Agreement
Development Agreement
Shapell Compliance Report
1. Childcare
The Coyote Creek Elementary School facilities have been occupied since August
17, 2002. This facility has capacity to serve 125 children.
Shapell is discussing with the San Ramon Valley Unified School District plans to
expand the existing Coyote Creek Elementary School Facility with a new modular
building. This expansion should accommodate an additional 51 children for pre-
school and after school programs.
The Quail Run Elementary School opened in August of 2006. There is a free
standing childcare building onsite of approximately 5,180 square feet and sized to
accommodate 192 children in pre-school and after school programs.
The Cornerstone Apartment complex opened in August, 2005 with a childcare
facility onsite operated by the YMCA. The building can accommodate 74 children
in various programs.
The Canyon Creek Presbyterian Church on Bollinger Canyon Road anticipates
opening their "Little Bridges" pre-school immediately after their building final
occupancy. The facility is sized to accommodate 100 children. Shapell has
arranged with the church to reserve 20 spaces for infants for a minimum of 6 years
from the date of opening.
Should the infant spaces remain unfilled after 1 year, Canyon Creek has the ability
to utilize those spaces for toddlers and other children requiring child care.
In Gale Ranch Phase IV design development is underway to construct a 3,500
square foot childcare facility south of, and directly opposite of, the Quail Run
Elementary School. This facility will be operated by the YMCA. Twenty spaces of
the 74 total planned spaces will be reserved for infants. The facility will be
designed with a flexible floor plan so that if the infant care is not in demand, the
facility can be used for the maximum capacity while providing infant care for those
families that need that service.
3
Table I Child Care in Gale Ranch
Location
Opening
Infant
Pre-school
School Aged
Total
Coyote Creek Elementary School
Gale I
8/02
0
0
125
125
Coyote Creek Elementary Upgrade
Gale I
TBD
0
0
51
51
Presbyterian Church
Gale I
2006
20
80
0
100
Cornerstone Apartments
Gale H
9/05
0
74
74
Quail Run Elementary School
Gale III
8/06
0
0
192
192
Gale IV Childcare
Gale IV
TBD
20
54-74
0
74
Total
2040
208-228
1 368
616
2. School Facilities
The Coyote Creek Elementary School in Gale Ranch, Phase I, was completed on
August 17, 2002. The Quail Run Elementary School has been open since August
of 2006. The North Gale Middle School has been approved to be relocated from
Gale Ranch, Phase H to Phase III development. It is anticipated that construction
for the Middle School will start in Spring of 2007 and be open in Fall of 2008.
3. Service Center
Plans for the Corporation Yard were presented before DVOC in July of 2006. The
construction of this facility is anticipated to start in 2007 and to be finalized in
2008.
4. Staging Area for Open Space
The Specific Plan requires a staging area within the Gale Ranch, Phase IV. A
staging area is proposed (trail/parking) within Gale IV, and this is beyond the three-
year time frame of this Compliance Report.
5. Flood Control Facilities
All major flood control facilities have been constructed and operational for Phases I
through Phases IV.
6. Park and Ride Lot
The proposed park and ride facility will be built along the PG&E right-of-way south
of Bollinger Canyon Road. The developer has submitted new conceptual plans
which include a request to modify a portion of the park and ride lot into two small
dog parks. The applicant has been working with the City of San Ramon on this
new conceptual plan. A Final Development has yet to be submitted for review and
consideration of the Community Development Department.
4
7. Local Park Acreages
Following is the current status on local parks:
Construction Complete
Park Name
Acreage
Completion Date
Gale I Coyote Crossing Park
7.85
COMPLETE
East Park
0.82
COMPLETE
Windy Hills Park
1.19
COMPLETE
Windy Hills Park Addition
0.18
COMPLETE
Coyote Creek Elementary
7.61
COMPLETE
Gale 1 Total
17.65
COMPLETE
Gale 11 Hidden Crest Park (PA 0003) 2.34 COMPLETE
Valley View Park (PA 0009) 10.25 COMPLETE
Gale II Total 12.59
Total Complete
30.24
Construction In Process
Park Name
Acreage
Completion Date
Gale II
Monarch Park (PA 0008)
6.34
Fall 2007
I
Gate II
Creekside Park (PA 0010)
5.97
Spring 2007
Total In Process
12.31
Future Construction
Park Name
Acreage
First Completion
Gale I
Middle School
9
2008
Gale III
All Parks
24.30
2009
Gale IV
All Parks
33.80
2010
Future Construction acreages are
taken from the Gale 4 Addendum
dated August, 2004
8. Senior Center
The 2003 approved Village Center Neighborhood Plan identifies a 10,000 square
foot senior center. As part of the Gale IV application, the developer will be
conditioned to apply for a subsequent final development plan for their portion of the
5
Village Center, which will include the senior center. However, construction of the
senior center facility is not required until 8,607 units are built. Shapell has indicated
that they intend to start construction as early as 2007.
Windemere Compliance Report
1. School Facilities
The Windemere developers are working cooperatively with the San Ramon Valley
Unified School District to provide school facilities in a timely manner to meet
projections of school generation as executed in the Master School Impact
Mitigation Agreement.
Hidden Hills elementary school was completed and opened in August 2004.
Construction of the second elementary school (Live Oak) is in progress and is
anticipated to be open in August of 2007.
Windemere Ranch Middle School was completed and opened in August of 2005,
consistent with the timing requirements of the mitigation agreement with the San
Ramon Valley Unified School District.
Construction drawings for the Dougherty Valley High School were approved by the
School District. Phase I of the high school site development is complete and Phase
2 building construction is in progress. The High School is expected to be
completed and open in August of 2007 consistent with the mitigation agreement
with the San Ramon Valley Unified School District.
2. Communfty College Satellite Campus
The Community College facility is not required by the Settlement Agreement.
However, it is encouraged by the Specific Plan. The Community College in the
Village Center was completed and opened on November 1, 2006 for enrollment.
3. Village Center Community Facilities
The Settlement Agreement requires these facilities to be constructed and ready for
operation at the 3,6660' unit occupancy for all of Dougherty Valley. Consistent with
the Settlement Agreement the 11,600 square foot Library has been completed,
stocked with books and other resources and open to the public since September of
2005.
The Dougherty Valley Community Center and Police Substation have been
completed and operational as of September 2005.
rt
4. Childcare Facilities
The first childcare facility was operational with the opening of Hidden Hills
Elementary School in Windemere Phase II. This facility is sized to accommodate
approximately 150 children ages 6 to 12. This facility was dedicated to the San
Ramon Unified School District who entered into an agreement with The Growing
Room to provide the childcare services.
The second childcare facility, similar to Hidden Hills Elementary School, is
currently being planned for the second elementary school (Live Oak) in Windemere
Phase IV. The childcare facility and school are anticipated to be operational for
August of 2007. This facility has been expanded to accommodate up to 200
children depending upon future needs.
The third childcare facility is planned to be operational and constructed as part of
the Village Center. The amended Final Development Plan was approved by the
Contra Costa County Planning Commission on November 3, 2004 for a floor plan
that consists. of an 8,000 square foot facility to be operated by Acorn Learning
Center, a child care provider. The Center is estimated to accommodate 155
children, with the state mandated square footage requirement being met. This
facility was opened on October 30, 2006 and is fully operational.
In addition, Windemere BLC continues to utilize the services of the Contra Costa
Child Care Council to provide services to recruit, train, support, and monitor
licensed family care providers in Dougherty Valley. This program is focused on
providing quality in -home infant and toddler care to the residents of Windemere.
Previously, seven new licensed in -home childcare providers had been established
with the ability to serve as many as 60 children. Out of the seven new licensed in -
home care providers, presently five family care providers are caring for 44 children.
Presently, 13 in -home childcare providers have been established as a result of the
Childcare Council and its efforts to train and license individuals.
All of the above programs have been implemented to mitigate the child care,
toddler and infant care needs. Another element of the Village Center has been the
increase in use and multiple functions such as the teen center, a dance studio, and
the designated preschool/tiny tot room which consist of two half -day programs on
weekdays serving children between the ages of 3 and 5. The preschool runs from
September through June.
5. Fire Station
The San Ramon Valley Fire Protection District station #30 has been constructed
and operational since 2001.
s
7
6. Police Station
The construction of the 4,500 square foot police substation was completed in
September of 2005 and the facility is operational.
7. Satellite Post Office
The determination for the need of this facility has yet to be established with the post
master; however, it has been discussed that the post office may be accommodated in
the Village Center if it is needed.
8. Senior Center
The Senior Center is to be constructed by Shapell Industries by the 8,607'hbuilding
permit and in compliance with the approved amended Final Development Village
Center neighborhood plans processed in November of 2004 by the Contra Costa
County Community Development Department.
9. Corporation Yard
The corporation yard is to be constructed by Shapell Industries.
10. Staging Area for Open Space
A staging area along Windemere Parkway in Windemere Phase V has been planned
and construction drawings are underway for the facilities in the staging area. The
location of this staging area is identified in the Dougherty Valley Specific Plan and
will be constructed with the extension of Windemere Parkway to Camino Tassajara
in 2007.
11. Flood Control Facilities
The water quality ponds and storm water detention facilities necessary to treat the
storm water runoff from Phases III, IV, and V have been constructed and are fully
operational. All major flood control facilities are operational.
12. Park and Ride Lot
A park and ride site has been designated at the intersection of Bollinger Canyon
Road and Windemere Parkway. A park -and -ride study was performed by Korve
Engineering for Windemere BLC. Based on the report, County staff concluded that
park -and -ride lots would have very low usage.
13. Local Park Acreage
The Setflement Agreement states that 94 acres are required within Dougherty
Valley.
z _3
The four parks within Windemere Phase I totaling 17.9 acres have been completed.
The two parks in Windemere Phase H totaling 7.3 acres are completed. The 1.5
acre pocket park in Windemere Phase IV is completed. The seven parks listed
currently provide a total of 26.7 acres of developed parkland for Phases I, H, and IV.
In addition to the 26.7 acres of parks, Phase IV consists of the completion of a 15
acre community park on the Windemere Middle School site. The remaining eight
parks in Windemere Phases IV and V are anticipated to be complete by the summer
of 2007 and 2008 for a total of 94 acres of developed parkland. Windemere is
ahead of the developed parkland requirements of 6.5 acres per 1000 residents as
called out in the Dougherty Valley Specific Plan.
Item 6: San Ramon Valley Unified School District Report
DVOC member Mr. Americh requested information regarding the number of students
attending San Ramon Valley High School from the Dougherty Valley area. Tina Perault
from the School District has indicated that 25 students live in Dougherty Valley and attend
San Ramon Valley High School. Some other information about the transfers into San
Ramon Valley High School are as follows:
54 Cal High, 25 Dougherty Valley, 335 Monte Vista and 9 inter -district students are
attending San Ramon Valley High School.
Of the 423 students transferring into San Ramon Valley High School 112 are 91h
graders, 93 are 10'h graders, 114 are I 1 th graders and 104 are 12th graders.
Item 7: 4 Years Level of Service Information
Attached is information regarding the levels of service obtained from the Town of
Danville and City of San Ramon from 2003 to 2006.
Item 8: Report on Park -and -Ride Facilities
As requested by DVOC members, attached is information regarding Dougherty Valley
park -and -ride lots.
Item 9: Potential DVOC dates for the year 2007
March 12, 2007
July 16, 2007
September 8, 2007
December 10, 2007
X
GALE RANCH
COMPLIANCE REPORTS
Prepared By:
Shapell Homes
100 N. Milpitas Blvd.
Milpitas, CA 95035
408-946-1550
October 15, 2006
Revised - December 6, 2006
I
October 15, 2006
Ms. Telma Moreira
Community Development Department
Contra Costa County
651 Pine Street
2" d Floor, North Wing
Martinez, CA 94553
Re: 2006 Gale Ranch Annual Compliance Reports
Dear Ms. Moreira:
Please find enclosed the 2006 Compliance Report required for the Gale Ranch project. This
report has been developed in accordance with recommendations implemented in the 2000
through 2005 Annual Compliance Reports, as well as from comments received from the County
and City of San Ramon. Should you have any questions or comments, please feel free to call me
at your earliest convenience.
Sincerely,
Steven Savage
Shapell Homes
CC: Sam Worden
10
TABLE OF CONTENTS
SETTLEMENT AGREEMENT ANNUAL COMPLIANCE REPORT ................................. l
A.
REQUIREMENTS..............................................................................................................1
B.
SPECIFIC PROVISIONS OF THE COMPLIANCE REPORT ...................... 6...............
2
1.
Gale Ranch Phase 1..........................................6.............................. .............. 2
....................
2.
Gale Ranch Phase H......................................................................................................... 4
3.
Gale Ranch Phase III........................................................................................................ 9
4.
Gale Ranch Phase IV.......................................................................................................13
5.
Childcare Facilities.................................................................................6.......................
16
6.
Open Space Management................................................................................................
18
7.
Affordable Housing........................................................................................6.................
19
8.
Developed Parkland.........................................................................................................
21
GALE RANCH DEVELOPMENT AGREEMENT COMPLIANCE REPORT ................. 23
A. REQUIREMENTS........................................................................................................23
Section 3. Obligations of Developer and County.................................................................
23
Section 3.3
(a) Compliance with Settlement Agreements....................................................
24
Section 3.3
(b) Preliminary Development Plan...................................................................
25
Section 3.3
(c) Affordable Housing......................................................................................
26
Section 3.3
(d) Designation of Preferred Water Provider ...................................................
28
Section 3.3
(e) Design Program for Dougherty Valley Village Center ...............................
29
Section 3.3
(f) Coordination of On -Site Improvements.......................................................
30
Section 3.3
(g) Danville/San Ramon/County Traffic Mitigation .........................................
31
Section 3.3
(h) Pleasanton Traffic Mitigation....................................................................
34
Section 3.3
(i) Dublin Traffic Mitigation.............................................................................
35
Section 3.3
(j) Walnut Creek Traffic Mitigation..................................................................
36
Section 3.3
(k) Dougherty Road Improvements...................................................................
37
Section 3.3
(1) Mitigation Monitoring..................................................................................
38
Section 3.3
(m) Establishment of County Service Area ........................................................
39
COUNTRY CLUB AT GALE RANCH "THE BRIDGES AT GALE RANCH"
DEVELOPMENT AGREEMENT............................................................................................
40
A. REQUIREMENTS............................................................................................................
41
Section 3.1
Obligations of Developer and County..............................................................
41
Section3.1.
(a) Generally: ....................................................................................................
41
Section 3.1.
(b) Conditions to Current Approvals: ..............................................................
41
Section 3.1.
(c) Capital Facilities Fee.................................................................................
42
Section3.1.
(d) Parks Fee....................................................................................................
43
Section 3.1.
(e) Affordable Housing.....................................................................................
45
Section 3.1.
(1) Traffic Impact Mitigation............................................................................
46
Section 3.1
(g) County Regional Enhancement Contribution ..............................................
47
Section 3.1
(h) Compliance Monitoring...............................................................................
48
Section 3.1
(i) County Service Area.....................................................................................
49
Section 3.1
(j) Construction of Improvements.....................................................................
50
SUPPORTING
DOCUMENTS.................................................................................................
51
' i.
SETTLEMENT AGREEMENT ANNUAL COMPLIANCE REPORT
A. REQUIREMENTS
The Agreement to Settle Litigation Relating to the Dougherty Valley General Plan
Amendment, Specific Plan and Environmental Impact Report (the "Agreement") was entered
into on May 11, 1994. One provision of the Agreement (Exhibit G, Section W.A.) requires
the preparation of an annual compliance report.
Exhibit G, The Dougherty Valley Compliance Monitoring Program, Section IV. A. reads as
follows:
IV. PREPARATION AND CONSIDERATION OF ANNUAL COMPLIANCE REPORTS
"A. Preparation of Annual Compliance Reports. Acting through its planning and
public works staffs, the County will prepare an annual compliance report (an "Annual
Compliance Report") based on (i) the information produced by the Tracking System
and (ii) development "status reports" prepared by the Developers and submitted to
County staff on or before October 15 of each year. The status reports will outline
construction activities that have occurred during the previous year, work underway and
anticipated efforts for the following three years. The status reports will also include all
significant activity related to public and private infrastructure, and all significant
residential and commercial construction activity.
An Annual Compliance Report will be submitted by County Staff to the DVOC on or
before November 15 of each year during build out and will describe and evaluate,
among other things:
• The Project's compliance with the Performance Standards, and the causes of any
identified noncompliance.
• Progress made by the County, San Ramon, Danville, the Developers and others in
addressing any "Intermediate Steps" identified in Schedule 1 to this Exhibit G and
the probable need for additional consultations during the following three years.
• The extent to which Third Parties are acting consistently with the assumptions and
standards established under the Settlement Agreement and efforts to secure the
cooperation of those other parties."
B. SPECIFIC PROVISIONS OF THE COMPLIANCE REPORT
1. Gale Ranch Phase 1
A. Construction Activities (from October 2005 through September 2006)
(For reference to Phase I - See the map entitled "The Bridges at Gale Ranch (Gale Ranch
Phase 1) Site Exhibit" in the Supporting Documents section).
• To date, 100% or 1216 residential building permits have been issued in Phase I. See
Table A for a summary of building permits for Phase 1.
• Tract 8134 ("The Pointe"). Building permits for all 69 lots of the The Pointe have been
obtained. The Pointe will be completed in spring 2007.
Table A
Gale Ranch Ph. 1 — Final Map and Building Permit Status
Community
Identification
Lot Size
Subdivision
# Of
Homes
Final
Map
Building
Permits
Tract
Accept.
(Street)
Tract
Accept.
(Lndscp)
% w/ Building
permit
Fairway Bride
7,500
7796
42
X
42
X
X
100%
Fairway Bride
7,500
7980
25
X
25
X
X
100%
Fairway Bride
7,500
8027*
51
X
51
X
X
100%
Fairway Bride
7,500
8131
59
X
59
X
X
100%
Fairway Bride
7,500
8255
37
X
37
X
X
100%
Fairway Bride
7,500
8348
2
X
2
X
X
100%
Crest Bride
4,500
7979
79
X
79
X
X
100%
Crest Bride
4,500
8132*
81
X
81
X
X
100%
Crest Bride
4,500
8254
125
X
125
X
X
100%
Glen Bride
4,800
7981
45
X
45
X
X
100%
Glen Bride
4,800
8135
82
X
82
X
X
100%
Glen Bride
4,800
8256
97
X
97
X
X
100%
Cedar Bride
TH
8105
144
X
144
X
X
100%
Summit Bride
10,000
8133
22
X
22
X
X
100%
The Pointe
10,000
8134
69
X
69
(proj)
2006
(proj)
2006
100%
Falcon Bride
Apt.
8189
256
X
256
X
X
100%
Total
1216
Total
1216
X
X
100%
Tract 8027 has 7 Crest Bridge homes
' Tract 8132 has 6 Fairway Bridge homes
• Canyon Creek Presbyterian Church. Site work was initiated in Spring 2005 and the
church should be complete in Fall 2006. The school and childcare facility in the church
will be operational in 2006. See section 5 for details on the childcare capacity for the
Church facility.
• All parks in Gale Ranch 1 have been completed — see Table L.
2
B. Work Underway (Fall 2006 to Fall 2007)
• There are 16 subdivisions in Phase I of Gale Ranch. Home construction is complete in
fifteen subdivisions. Building will continue in Tract 8134 through spring 2007.
• Street and landscape improvements for Tr. 8134 (The Pointe) should be accepted by the
County in late fall, 2006. See Table B for a complete status of Street & Landscape
Improvements for Gale Ranch Phase 1.
Table B
Gale Ranch Phase 1 — Street/Landscape Improvement Status
Item
Subdivisions
Street Improvements Complete
7796, 7979, 7980, 7981, 8027, 8105, 8131, 8132, 8133, 8135,
8189, 8348, 8254, 8255, 8256
Street Construction Complete in 2006
8134
Landscape Improvements Complete
7796, 7979, 7980, 7981, 8027, 8105, 8131, 8132, 8135
8254, 8255, 8256, 8133, 8189, 8348
Landscape Construction Complete in 2006
8134
C. Anticipated efforts for the next three years (Year 2007 through Year 2009)
• Complete any remaining "tract acceptance" work and transfer maintenance
responsibilities from developer to the City of San Ramon.
• Transfer all responsibilities for open space in Gale Ranch Phase I from the developer to
the West Branch Geologic Hazard Abatement District ("GHAD"), upon completion of
the DSRSD Water tank Reservoir 200B which is projected for 2008.
3
.f
2. Gale Ranch Phase II
A. Construction Activities (from October 2005 through September 2006)
(For reference to Phase II - See Map entitled "The Communities at Gale Ranch (Gale Ranch
Phase 2) Site Exhibit" in the Supporting Documents section).
• Horne construction occurred in neighborhoods 1, 2A, 2B, 4, 5, 6, 7, 12, 14 and 15. In -
tract civil improvements (pad grading, storm drain, water, sanitary sewer, and street
construction) occurred in neighborhood 13 only. (See Tables C and D for Gale II
Neighborhood information)
• South Wedgewood Road (RA 1125) was opened to public traffic in late 2005.
• Site work for the Commercial Center (Plaza at Gale Ranch) at the corner of Bollinger
Canyon Road and Dougherty Road continued. Work performed over the last year
includes installation of underground utilities, construction of the entry lanes on Bollinger
Canyon Road and Dougherty Road, and construction of the site parking lot.
• Repair of a knick-point in the West Branch of Alamo Creek within the DA 0014 area was
completed in October 2006.
• Construction of the Hidden Crest Park (PA 0003) and Valley View Park (PA 0009) were
completed accepted in late 2005.
• Construction continued on Creekside Park (PA 0010).
• Construction continued on Monarch Park (PA 0008).
• The Final Map for Neighborhoods 13 was recorded 11 /22/05.
• To date, 1380 building permits, or 73% of the 1884 units in Gale II have been obtained.
See Table C for a detailed summary of Final Map and Building Permit status in Gale II.
n
MA
Table C
Gale Ranch Phase II — Final Map and Building Permit Status
Neighborhood
Community Identification
Lot Size
Subdivision
# Of Homes
Final Map
Building
Permits
% w/
Building
Permit
1
Monarch
4,800
7984
191
10/28/2002
191
100%
2a
Gallery
7,725
8563
73
4/2/2003
73
100%
2b
Gallery
7,725
8688
33
6/1 /2004
33
100%
3
Coronado
4,000
8689
156
0
0%
4
Gallery
7,725
8690
43
6/15/04
43
100%
5
Belvedere
4,000
8699
165
12/20/04
28
17%
6
Veranda
Courtyard
8681
130
4/14/05
68
52%
7
Terravista
4,800
8682
78
4/14/05
52
67%
8
Coronado
4,000
8564
147
4/2/2003
147
100%
9
Villa aseo
Courtyard
8631
84
4/24/2003
84
100%
10
Renaissance
Townhome
8632
105
11 /14/2003
105
100%
11
Cornerstone
Apartment
8683
266
3/3/2004
266
100%
12
Wisteria
Townhome
8684
157
2/23/05
115
73%
13
Rose Garden
Carriage
8700
73
11/22/05
0
0%
14
Rose GardenNilla aseo
Carriage
8685
114
4/2/2004
106
93%
15
Rose GardenNilla aseo
1 Courtyard
1 8686
1 69
1 8/10/2004
1 69
1 100%
Totals 1884 1380 73%
• Trail construction occurred at the following locations:
• Wedgewood Trail (Trail #6) — on RA 1125 is complete. However an area of
erosion is being repaired and will be completed by 11/1/06.
(For further information, see the "Trail Completion at Gale Ranch" map in the Supporting
Documents section):
• All property within Gale Ranch II was annexed to the City of San Ramon as of October
13, 2005.
B. Work Underway (Fall 2006 to Fall 2007)
• Table D provides details for the build -out of remaining improvements for Gale Ranch
Phase II.
5
Table D
Development Schedule for Gale Ranch Phase II by Neighborhood
Neighborhood
Start In -tract Imprvmnts
Final Map
Recordation
Complete In -tract
Imprvmnts
Start In -tract
Housing
1
Started Summer 2002
October 28, 2002
Complete
Started Fall 2002
2A
Started Summer 2002
Aril 2, 2003
Complete
Started Spring 2003
213
Started Summer 2003
June 1, 2004
Complete
Started Summer
2004
3
Pro'. Spring 2008
Pro'. Fall2008
Pro'. Fall2008
Pro'. Spring 2009
4
Started Spring 2004
June 15, 2004
Complete
Started Fall 2004
5
Started Spring 2004
December 20, 2004
Complete
Started Spring 2005
6
Started Spring 2004
Aril 14, 2005
Complete
Started Spring 2005
7
Started Fall 2004
Aril 14, 2005
Complete
Started Summer
2005
8
Started Summer 2002
Aril 2, 2003
Complete
Started Winter 2002
9
Started Winter 2002
Aril 24, 2003
Complete
Started Winter 2002
10
Started Summer 2003
November 14, 2003
Complete
Started Fall 2003
11
Started Fall 2003
March 3, 2004
Complete
Started Spring 2004
12
Started Fall 2004
February 23, 2005
Complete
Started Winter 2004
13
Started Summer 2005
November 22, 2005
Complete
Pro'. Fall 2006
14
Started Fall 2003
Aril 2, 2004
Complete
Started Spring 2004
15 t
Started Spring 2004
August 3, 2004
Complete
Started Winter 2004
• Planned trail improvements are underway for the following trail segments: None
(For more information, see map entitled "Gale Ranch Trail Exhibit" in the
Supplemental Documents section.)
• Completion and acceptance of Creekside Park (PA 0010) should occur in Spring 2007
and for Monarch Park (PA 0008) in late Fall 2007. See Table L for a complete list of
projected park completion dates.
• Completion of the riparian planting on the Alamo Creek Main Branch (DA 0027 and DA
0030) will be completed and accepted summer 2007.
• Construction of the Commercial site (Plaza at Gale Ranch) will continue, with the
parking lot scheduled to be paved in late fall 2006, and building construction to start in
spring 2007.
• Shapell Homes currently has an application in to the County that entails re -planning
various areas within Gale Ranch Phases 2, 3, and 4. Within Phase 2, the application
includes Subdivision 9134, which includes a VTM, FDP, GPA and SPA to convert the
former Middle School site at the corner of Lilac Ridge Road and North Gale Ridge Roads
into 63 single family lots. County approval or denial of this process is expected in fall,
2006.
0
C. Anticipated efforts for the next three years (Year 2007 through Year 2009)
• Start and complete in -tract improvements and Final Map for Neighborhood 3.
• Continue Open Space fence installation and trail construction per the County approved
Fencing/Trail Plan.
• Open the commercial site in 2008.
• Begin transfer of property to the GHAD.
• Trail construction of the Redhawk Trail. (See the Gale Ranch Trail exhibit in the
Supporting Documents for the location of this trail).
• For a summary of key activities in Phase II, see Table E.
7
I r
Table E
GALE RANCH PHASE 2 PROJECTION (Proposed)
Year 1 Year 2 Year 3
10/06 — 9107 10/07 - 9108 10/08 — 9109
Mass grading Complete
Finish grade X
)rovements
North Monarch Road Extension Complete
Stoneleaf Road Extension Complete
Dougherty Road to Bollinger Road Complete
Bollinger Canyon Road (north side) Complete
Bollinger Canyon Road (south side) Complete
Sanitary Sewer
Potable Water
Reclaimed Water
Coyote Creek Elementary
North Gale Middle School
Coyote Creek Elementary
Canyon Creek Presbyterian Church
Cornerstone Apartments
Monarch Park
Creekside Park
"Bark and Ride" Park
DA 0014/0027/0030
Wedgewood Trail
Plaza at Gale Ranch
unity Facilities
Dougherty Sta./Police
Library
Service Center
Fire Station
Satellite P.O.
Senior Center
X
X
X
Complete
T.B.D.
Complete
X
Complete,
X X
X
X X
X
Complete
X X
See Windemere - Complete
See Windemere - Complete
See Ph. 4
See Windemere - Complete
See Ph. 4
See Ph. 4
F�
I .L
3. Gale Ranch Phase III
A. Construction Activities (from October 2005 through September 2006)
(For reference to Phase III - See the map entitled "Gale Ranch Phase III" in the Supporting
Documents section).
• Mass Grading was completed and approved by the County in late 2005.
• Home construction in Tr. 8914, Belvedere product, was completed in the Fall of 2006.
• Construction of civil improvement in Tract 8306 was completed in August 2006.
• Construction of civil improvements for Tract 8952 was started in August 2005. Work to
be completed in 2007.
• Quail Run Elementary School was completed and opened for school in August 2006.
• Trail construction occurred at the following locations:
• Basswood Trail (Trail #8) — completed Fall 2006.
• To date building permits for 29 of the 1423 units in Gale III have been obtained.
See Table F for a detailed summary of Final Map & Building Permit Status for
Gale III.
E
Table F
Gale Ranch Phase III — Final Map and Building Permit Status
Tract Community Identification Lot Size # Of Final Map Building % w/ Building Permit
Homes Permits
8914 Belvedere
50' x 80'
29
4/14/05
29
100%
8306 N-2 Triplex Mansion
76' x 92'
63
8/1 /06
0
0%
Is
N 8-1 SFD/Alley — I
42' x 107'
64
8/1 /06
0
0%
" N-10 SFD — II
60' x 80'
80
8/1/06
0
0%
" N-13 SFD — III
70' x 90'
120
8/1 /06
0
0%
8952 N-3 Triplex Mansion
76' x 92'
60
0
0%
" N-6 SFD —1
42' x 80'
121
0
0%
" N 8-2 SFD/Alley — I
42' x 100'
18
0
0%
" N-15 SFD/Alley —111
40' x 72'
59
0
0%
8969 N-5 Triplex Mansion
76' x 92'
63
0
0%
N-7 Courtyards
N/A
153
0
0%
N 9-2 SFD/Alley —1
42' x 100'
16
0
0%
N-16 SFD/Alle — III
40' x 72'
45
0
0%
8970 N-4 Triplex Mansion
76' x 92'
1 45
0
0%
N 9-1 SFD/Alley — I
42' x 107'
29
0
0%
N-11 SFD — II
60' x 80'
36
0
0%
8971 N-12 SFD/Alley 11
60' x 80'
57 1
1
0
0%
N/A Apartments
N/A
365
0
0%
Totals 1423 29 2%
B. Work Underway (Fall 2006 to Fall 2007)
• Complete civil improvements in Tract 8952 in summer 2007.
• Start construction on Main Branch Road (RA 1187) in summer 2007.
• Start construction on the Roseglenn Park (PA 0018) and pedestrian bridge to Windemere
in summer 2007. See Table L for a list of projected park completion dates.
• Initiate model home construction for several product lines within Tract 8306: 70'x 90'
product (Florentine) — start models 10/06; 60' x 80' product (Athena) — start models
10/06; 40' x 100' alley (Belmaison) — start models 10/06; Triplex Mansion (Abbington)
product — start models 10/06. Production for these product lines will start in Spring 2007.
• Initiate model home construction within Tract 8952 40' x 72' alley (Bianca) in 5/07.
• Shapell Homes currently has an application in to the County that entails re -planning
various areas within Gale Ranch Phases 2, 3, and 4. Within Phase 3, the application
includes both a GPA, SPA, and Minor Subdivision to convert roughly 15.5 acres of the
former apartment complex into a Middle School site at the corner of Bollinger Canyon
Road and South Main Branch Road, and a Minor Subdivision and FDP to provide a 165
10
apartment complex on roughly 6.4 acres south of the proposed Middle School. County
approval or denial of this process is expected in fall, 2006.
C. Anticipated efforts for the next three years (Year 2007 through Year 2009)
• Continue subdivision civil improvements. Preliminary schedules show construction of
Tract 8969 civil improvements in 2008, Tract 8970 civil improvements in late 2007/2008,
and Tract 8971 civil improvements in 2009.
• Initiate model home construction for several other product lines. In Tract 8952, the Iriana
product should have models starting in 4/09. In Tract 8969, the Fiorella product should
have models starting in 4/09. In Tract 8971, the Andora product should have models start
in 11 /09.
• For a summary of key activities in Phase III, please see Table G.
11
able G
i
Gale Ranch Phase 3 Projection (Proposed)
Year 1 Year 2 Year 3
(10106 — 9/07) (10107 — 9/08) (10/08 — 9/09)
Mass grading
Complete
Finish grade
X
X X
wovements
Stoneleaf Road
Complete
Ivyleaf Springs Road
Complete
South Monarch Road
Complete
Golden Bay Road
Complete
Main Branch Road
X
ension
Sanitary Sewer
X
X X
Potable Water
X
X X
Reclaimed Water
X
X X
;hildcare
Quail Run Elementary School
Complete
;reation (See Table U
Quail Run Elementary School Park
Complete
Linear Park
Beyond 3-year projection
Roseglenn Park (PA 0018)
X
X
"Bark and Ride" Park
See Ph. 2
kn Space/Flood Control
Basswood Trail/Trail (#8)
Complete Fall 2006
DA 0014/0027/0030
See Ph. 2
ial
See Ph. 2
Plaza at Gale Ranch
See Ph. 2
tv Facilities
Dougherty Sta./Police
See Windemere - Complete
Library
See Windemere — Complete
Service Center
See Ph. 4
Fire Station
See Windemere - Complete
Satellite P.O.
See Ph. 4
Senior Center
See Ph. 4
12
IN
4. Gale Ranch Phase IV
A. Construction Activities (from October 2005 through September 2006)
(For reference to Phase IV - See the map entitled "Subdivision 8856 - Phase 4" in the
Supporting Documents section)
• Mass grading was completed in Fall 2006, including mass grading for the Community
Park and City Service Center along future Dougherty Road.
• Installation on the storm drain facilities at the southern end of Gale IV (DA 0042) was
initiated in August 2005 and completed in Fall 2006.
• Paving of the Zone 2 DSRSD tank access road (RA 1190) was completed in Summer
2006. Construction was started by DSRSD on the tank in August, 2006.
• Construction of DA 0056 was completed in Fall 2006.
• Construction of DA 0046 was completed in Fall 2006.
• Construction was started on the bridges in RA 1208 and 1168, the North and South
Dougherty Road Bridges, along with associated creek improvements.
• Construction of Phase 1 of the Contra Costa Community College was completed.
(BLC/Windemere).
B. Work Underway (Fall 2006 to Fall 2007)
• DSRSD construction of the Zone 2 tank west of Gale Ranch Phase IV.
• Completion of the RA 1168 bridge at the southern intersection of Bollinger Canyon Road
and Dougherty Rd, along with street improvements up to the northern entrance into the
Community Park.
• The loop road within the Community Park is scheduled for construction in 2007.
• RA 1211, South Dougherty at Bollinger Canyon Road is scheduled for construction in
2007.
• Shapell Homes currently has an application in to the County that entails re -planning
various areas within Gale Ranch Phases 2, 3, and 4. Within Phase 4, the application
includes Subdivision 9136 which includes a VTM and a FDP for a 655 unit apartment
complex south of Ivyleaf Springs Road. County approval or denial of this process is
expected in fall, 2006.
13
C. Anticipated efforts for the next three years (Year 2007 through Year 2009)
• Complete the RA 1208 bridge at the northern intersection of Bollinger Canyon Road and
Dougherty Roads in the summer of 2008.
• Complete bridge and civil improvements for RA 1208.
• Initiate construction of the Community Park in spring 2008, complete in 2010 (Note:
DVOC approval was received in March 2006, Park Commission approval was received
in July 2006).
• Initiate construction on the middle section of Dougherty Road, RA 1210.
• Initiate construction of the City Service Center in late Fall 2007.
• Undergrounding of the existing overhead east/west utility line near the southern property
at the Community Park by 2008.
• Complete approvals and begin construction for the Gale Ranch Senior Center.
• For a summary of key activities in Phase IV, please see Table H.
14
Mass grading
Finish grade
GALE RANCH PHASE 4 PROJECTION (Proposed)
Year 1 Year 2 Year 3
(10106 — 9107) (10107 — 9/08) (10/08 — 9109)
Complete
Beyond 3-year projection
Dougherty Road - RA 1168
X
Dougherty Road - RA 1208
X
X
Dougherty Road - RA 1210
X X
Dougherty Road - RA 1211
X
Park Loop Road
X
ension
Sanitary Sewer
X
X X
Potable Water
X
X X
Reclaimed Water
X
X X
Gale IV Childcare
Community Park
Dougherty Valley Ridge Trail (#11)
Coyote Canyon Trail (#12)
Quail Run Trail (#15)
Jack Rabbit Ridge Trail (#4)
Dougherty Sta./Police
Library
Service Center
Fire Station
Satellite P.O.
Senior Center
Beyond 3-year projection
X X.
Beyond 3-year projection
Beyond 3-year projection
Beyond 3-year projection
Beyond 3-year projection
Beyond 3-year projection
See Windemere - Complete
See Windemere — Complete
X X
See Windemere - Complete,
Beyond 3-year projection _
X X
15
S. Childcare Facilities
• Shapell Industries has provided the San Ramon Valley Unified School District 3,200
square feet of childcare facilities on a one -acre site adjacent to Coyote Creek Elementary
School. Facilities were completed and the District approved plans and specifications on
August 15, 2002. The facilities were occupied on August 17, 2002. Included are a
playground area, and a play structure. This facility has capacity to serve 125 children.
• Shapell is discussing with the San Ramon Valley Unified School District plans to expand
the existing Coyote Creek Elementary School Facility with a new modular building. This
expansion should accommodate an additional 51 children for pre-school and after school
programs.
• The Quail Run Elementary School opened on time in August 2006. There is a free
standing Childcare building onsite of approximately 5,180 square feet and sized to
accommodate 192 children in pre-school; and after school programs.
• The Cornerstone Apartment complex opened in August, 2005 with a childcare facility
onsite operated by the YMCA. The building can accommodate 74 children in various
programs.
• The Canyon Creek Presbyterian Church on Bollinger Canyon Road should receive their
building final in the fall of 2006. The Church plans to open their "Little Bridges" pre-
school immediately thereafter. The facility is sized to accommodate 100 children.
Shapell has arranged with the church to reserve 20 spaces for infants for a minimum of 6
years from the date of opening.
Should the infant spaces remain unfilled after 1 year, Canyon Creek has the ability to
utilize those spaces for toddlers and other children requiring child care.
• In Gale Ranch Phase IV design development is underway to construct a 3,500 square foot
childcare facility south of, and directly opposite of, the Quail Run Elementary School.
This facility will be operated by the YMCA. Twenty spaces of the 74 total planned
spaces will be reserved for infants. The facility will be designed with a flexible floor
plan so that if the infant care is not in demand, the facility can be used for the maximum
capacity while providing infant care for those families that need that service.
Shapell is updating the Gale Ranch Childcare needs assessment and will submit it to the
Community Development Department under separate cover.
16
For the current childcare summary, please see Table I.
Table I
Child Care in Gale Ranch
Location
Opening
Infant
Pre-school
School Aged
Total
Coyote Creek Elementary School
Gale 1
8/02
0
0
125
125
Coyote Creek Elementary Upgrade
Gale I
TBD
0
0
51
51
Presbyterian Church
Gale 1
2006
20
80
0
100
Cornerstone Apartments
Gale II
9/05
0
74
74
Quail Run Elementary School
Gale 111
8/06
0
0
192
192
Gale IV Childcare
Gale IV
TBD
20
54-74
0
74
Total
20-40
208-228
368
616
17
6. Open Space Manazement
• The development plan for Gale Ranch contains over 1,000 acres of open space. Most
open space is planned for dedication to the Geologic Hazard Abatement District 1990-01,
("GHAD"). Planned ownership, funding sources for mitigation activities in open space
and responsible managing and maintaining entities are listed in Table J below.
• Actual timing of Shapell's dedication of portion of open space in Gale Ranch Phase 1
was dedicated in summer 2006. Dedication of the remaining amount of open space has
yet to be determined. Open space parcels will not be dedicated until improvements
adjacent to or near open space are complete. The endowment to maintain mitigation
features listed under the title "Funding" in Table J is a phased contribution per the
Resource Agency Permits for Gale Ranch, which is being provided by Shapell.
Table J
Gale Ranch Phase 11, III, IV Facility Maintenance Matrix
Ownership Property Maintenance
Facility Entity Funding Entity
1. Public Streets
San Ramon
Property Tax / CSA Tax
San Ramon
. Private Streets
HOA
HOA
HOA
3. Open Space
A. Grassland
GHAD
CSA Tax / GHAD Assmnt
GHAD w/ Preserve Manager
B. Slopes
GHAD
GHAD Assessment
GHAD
C. West/Main Branch Corridor
GHAD
CSA Tax / GHAD Assmnt
GHAD/City (CSA) / Prsrve Mngr
D. Trails
GHAD
CSA Tax
City (CSA)
. Mitigation Features
A. Backwater Channels
GHAD
Endowment
Preserve Manager / GHAD / city
B. Seasonal Wetlands
GHAD
Endowment
Preserve Manager / GHAD / city
C. Seeps
GHAD
Endowment
Preserve Manager / GHAD / city
D. Ephemeral Channels
GHAD
Endowment
Preserve Manager / GHAD / city
E. Created Tributaries
GHAD
Endowment
Preserve Manager / GHAD / city
5. Wet Ponds
San Ramon
NPDES Tax
City of San Ramon
6. Fire Control
A. Grassland
GHAD
CSA Tax
San Ramon (with Fire District)
B. Fuel Transition Zone
GHAD
HOA Assessment
HOA (with Fire District)
7. Landscape
A. Public ROW
San Ramon
CSA /Property Tax
City of San Ramon
B. Parks
San Ramon
CSA /Property Tax
City of San Ramon
C. Riparian Corridor
GHAD
CSA
City of San Ramon
D. Fuel Transition
GHAD
HOA Assessment
HOA w/ Fire District
8. Detention Basin
San Ramon
CSA Tax
City of San Ramon
9. "Structures" Creek Corridors
GHAD
CSA Tax
San Ramon w/ Prsrve Mngr)
NPDES - Nat'l Pollutant Discharge Elimin. System HOA — Home Owners Association
GHAD - Geologic Hazard Abatement District CSA - County Service Area
on
7. Affordable Housing
• Shapell Industries is in compliance with the Dougherty Valley Affordable Housing
Program (See Table K below).
Gale Ranch Phase I
• Gale Ranch Phase I contains 256 units of moderate -income apartment homes. In
accordance with the amended DVAHP and the Contra Costa County Regulatory
Agreement that applies to the Falcon Bridge project, these units are available to
families in the moderate -income category for a period of 20 years. Additionally,
there are 12 moderate -income families that have qualified for home purchase on an
income basis. The total moderate -income unit count is 268 units, or 22% of Phase I.
It should be noted that all of the 268 moderate -income units provided to date have
received no government subsidized financing.
Gale Ranch Phase II
• Neighborhood 10, or Renaissance, construction is complete. Renaissance provides
105 for -sale moderate affordable housing units, and the lottery for all the homes
occurred in March of 2004. These homes were sold at a price consistent with the
affordable criteria for the year in which they are delivered to the market place. No
form of government subsidized financing has been used to create this neighborhood.
• Neighborhood 11, or Cornerstone, is a 266-unit rental community with 164 units
available in the very low and low-income categories. Cornerstone also contains
approximately 102 moderate -income apartments. This complex was completed in
2005 and is fully occupied. No government subsidized financing has been utilized.
• Neighborhood 12, or Wisteria, is a 157-unit complex in which 19 units have been
sold as affordable housing to buyers in the moderate -income category.
19
Table K
Affordable Housing Planned in Gale Ranch Phases 1 - IV
Lowery
Type Low Moderate Total
Phase I
Falcon Bridge
Rental
0
256
256
Phase II
SFD Homes
For -sale
0
12
12
Renaissance
For -sale
0
105
105
Cornerstone
Rental
164
102
266
Wisteria
For -sale
0
19
19
Phase III
Apartments
Rental
160
220
380
Phase IV
Apartments
Rental
186
233
419
Total 509 948 1,457
Gale Ranch Phase III
• The Final Development Plan and Vesting Tentative Map for Phase III was approved
by the County Planning Commission on October 28, 2003. Phase III contains an
apartment neighborhood that will contain a minimum of 160 very low and low
income rental units and 220 moderate income rentals. Construction is planned to
occur sometime between 2007 and 2010.
Gale Ranch Phase IV
• The Final Development Plan and Vesting Tentative Map for Gale Ranch Phase IV
was approved in January 2005. Phase IV will contain 233 moderate -income rental
apartments and 186 low/very low rental apartments. Construction is planned to occur
sometime between 2009 and 2012.
More affordable housing information may be found in the Gale Ranch Affordable Housing
Compliance Report submitted to the Contra Costa County Community Development Department
October 15, 2006. It should be noted that the San Ramon Valley Unified School District has
requested a relocation of the Gale Ranch Middle School site. Should this relocation have an
effect on the affordable housing program for Gale Ranch and addendum to the Gale Ranch
Affordable Housing Compliance Report will be submitted to the Community Development
Department.
20
8. Developed Parkland
• Gale Ranch Phase I. Construction of all parks in Phase I are complete and the parks
are operational. Coyote Crossing Park, East Park, and Windy Hills Park provide
10.04 acres of constructed park. The addition of the Coyote Creek School Park adds
an additional 7.61 acres, bringing the total to 17.65 acres.
Gale Ranch Phase II. Construction of the Hidden Crest Park (PA 0003) and Valley
view Park (PA 0009) are complete. This brings the total of completed park acreage
for Phase II to 12.59 acres, and the cumulative total for Gale I and Gale II to 30.24
acres (see Table L). Monarch Park (i.e. neighborhood 2B park) PA 0008 is under
construction and will be complete and accepted in late fall 2007. Creekside Park (i.e.
neighborhood 11 park) PA 0010 is under construction and will be complete and
accepted in Spring 2007.
21
Table L
PARK COMPLETION STATUS
Construction Complete
Park Name
Acreage
Completion Date
Gale I
Coyote Crossing Park
7.85
COMPLETE
East Park
0.82
COMPLETE
Windy Hills Park
1.19
COMPLETE
Windy Hills Park Addition
0.18
COMPLETE
Coyote Creek Elementary
7.61
COMPLETE
Gale I Total
17.65
COMPLETE
Gale II
Hidden Crest Park (PA 0003)
2.34
COMPLETE
Valley View Park (PA 0009)
10.25
COMPLETE
Gale II Total
12.59
Total Complete
30.24
Construction In Process
Park Name
Acreage
Completion Date
Gale II
Monarch Park (PA 0008)
6.34
Fall 2007
Gale II
Creekside Park (PA 0010)
5.97
Spring 2007
Total In Process
12.31
Future Construction
Park Name
Acreage
First Completion
Gale I
Middle School
9
2008
Gale II
"Bark and Ride"
3.5+/-
2008
Gale III
Quail Run School Park
8+/-
Completed
Rose Glenn Park
11.5+/-
2009
Linear Park
5+/-
2010
Gale IV
All parks
33.80
2010
Future Construction acreages are taken
from the Gale 4 Addendum dated August,
2004
22
GALE RANCH DEVELOPMENT AGREEMENT COMPLIANCE REPORT
The Development Agreement Between County of Contra Costa and Shapell Industries, Inc.
Relating to the Development Commonly Known as the Gale Ranch, effective April 8, 1996,
states in Section 3 the mutual obligations of the developer and county.
(This Development Agreement encompasses the area known as Gale Ranch Phases 2
through 4 — excluding Gale Ranch Phase 1— "The Bridges at Gale Ranch")
A. REQUIREMENTS
(Development Agreement)
Section 3. Obligations of Developer and County.
3.1 Obligations of Developer Generally. "The Parties acknowledge and agree that
County's agreement to perform and abide by the covenants and obligations of County set
forth herein is material consideration for Developer's agreement to perform and abide by the
covenants and obligations of Developer set forth herein."
3.2 Obligations of County Generally. "The Parties acknowledge and agree that
Developer's agreement to perform and abide by the covenants and obligations of Developer
set forth herein is material consideration for County's agreement to perform and abide by the
covenants and obligations of County set forth herein."
23
SPECIFIC REQUIREMENTS AND DEVELOPER RESPONSE
I.A. Development Agreement:
Section 3.3 (a) Compliance with Settlement Agareements.
"The terms and provisions of this Agreement are intended to be consistent with, and shall
not be deemed to modify, abrogate or limit compliance with or the implementation or
enforcement of, the terms and provisions of any of the Settlement Agreements. In the event
of any conflict between the terms and provisions of this Agreement and any Settlement
Agreement, the terms and provisions of such Settlement Agreement shall prevail to the
extent of such conflict. If and to the extent any obligation of any party under any of the
Settlement Agreements is terminated for any reason, including without limitation any
obligation under Section 3.3(j) (relating to the Interstate 680/24 Interchange), Section 3.3
(h) (relating to the payment of traffic fees to the City of Pleasanton), and Section 3.3 (e)
(relating to the design program for the Village Center), then such obligation shall not be
required to be satisfied hereunder."
I.B. Developer Response (Year 2006):
• To the best of our knowledge, Shapell Industries of Northern California is in
compliance with all settlement agreements affecting Dougherty Valley.
24
2.A. Development Agreement:
Section 3.3 (b) Preliminary Development Plan.
"Except as otherwise specifically agreed by County, Developer shall comply with all
conditions of approval to the Preliminary Development Plan."
2.13. Developer Response (Year 2006):
• Shapell is in compliance with all conditions of approval attached to the PDP (County
File No. R2922993)
25
3.A. Development Agreement:
Section 3.3 (c) Affordable Housing.
"Developer shall, in connection with its development of the Gale Ranch, implement the
terms and provisions of the Dougherty Valley Affordable Housing Program, updated and
adopted by the Board in 2002, pursuant to Board Order, (the "Affordable Housing
Program"), which requires that a minimum of twenty-five percent (25%) of all dwelling
units be developed as affordable to very low, low and moderate income households."
3.B. Developer Response (Year 2006):
• Shapell Industries is in compliance with the Dougherty Valley Affordable Housing
Program.
Gale Ranch Phase I
• Gale Ranch Phase I contains 256 units of moderate -income apartment homes. In
accordance with the amended DVAHP and the Contra Costa County Regulatory
Agreement that applies to the Falcon Bridge project, these units are available to
families in the moderate -income category for a period of 20 years. Additionally,
there are 12 moderate -income families that have qualified for home purchase on an
income basis. The total moderate -income unit count is 268 units, or 22% of Phase 1.
It should be noted that all of the 268 moderate -income units provided to date have
received no government subsidized financing.
Gale Ranch Phase II
• Neighborhood 10, or Renaissance, construction is complete. Renaissance provides
105 for -sale moderate affordable housing units, and the lottery for all the homes
occurred in March of 2004. These homes were sold at a price consistent with the
affordable criteria for the year in which they are delivered to the market place. No
form of government subsidized financing has been used to create this neighborhood.
• Neighborhood 11, or Cornerstone, is a 266-unit rental community with 164 units
available in the very low and low-income categories. Cornerstone also contains
approximately 102 moderate -income apartments. This complex was completed in
2005 and is fully occupied. No government subsidized financing has been utilized.
• Neighborhood 12, or Wisteria, is a 157-unit complex in which 19 units have been
sold as affordable housing to buyers in the moderate -income category.
Q�
Table K
Affordable Housing Planned in Gale Ranch Phases I - IV
Low/Very
Type Low Moderate Total
Phase I
Falcon Bridge
Rental
0
256
256
Phase II
SFD Homes
For -sale
0
12
12
Renaissance
For -sale
0
105
105
Cornerstone
Rental
164
102
266
Wisteria
For -sale
0
19
19
Phase III
Apartments
Rental
160
220
380
Phase IV
Apartments
Rental
186
233
419
Total 509 948 1,457
Gale Ranch Phase III
• The Final Development Plan and Vesting Tentative Map for Phase III was approved
by the County Planning Commission on October 28, 2003. Phase III contains an
apartment neighborhood that will contain a minimum of 160 very low and low
income rental units and 220 moderate income rentals. Construction is planned to
occur sometime between 2007 and 2010.
Gale Ranch Phase IV
• The Final Development Plan and Vesting Tentative Map for Gale Ranch Phase IV
was approved in January 2005. Phase IV will contain 233 moderate -income rental
apartments and 186 low/very low rental apartments. Construction is planned to occur
sometime between 2009 and 2012.
More affordable housing information may be found in the Gale Ranch Affordable Housing
Compliance Report submitted to the Contra Costa County Community Development Department
October 15, 2006. It should be noted that the San Ramon Valley Unified School District has
requested a relocation of the Gale Ranch Middle School site. Should this relocation have an
effect on the affordable housing program for Gale Ranch and addendum to the Gale Ranch
Affordable Housing Compliance Report will be submitted to the Community Development
Department.
27
4.A. Development Agreement:
Section 3.3 0 Desiknation of Preferred Water Provider.
"In consequence of the court -sanctioned EBMUD Settlement Agreement, Policy U-1 of the
Specific Plan which identifies alternative water suppliers shall be interpreted and applied
to the Gale Ranch development as follows: The Dublin San Ramon Services District
("DSRSD") is the preferred water provider for the Gale Ranch Site (except for one or two
school sites as provided in the EBMUD Settlement Agreement.) EBMUD is an alternative
water provider, but only pursuant to the terms and conditions set forth in the EBMUD
Settlement Agreement. Staff will support and diligently process an amendment which will
incorporate such language into the Specific Plan."
4.11. Developer Response (Year 2006):
• The 1996 General Plan Amendment and Specific Plan Amendment (Windemere
Phase I/Gale Ranch Phase 2) revised the Specific Plan to designate the Dublin San
Ramon Service District as the preferred water provider for the balance of Dougherty
Valley.
• Page 9-2 of the Dougherty Valley Specific Plan, November 1996 states: "The Dublin
San Ramon Services District (DSRSD) is to be the preferred provider of potable
water for Dougherty Valley under this Specific Plan."
28
S.A. Development Agreement:
Section 3.3 (e) Design Program for Dougherty Valley Village Center.
"Paragraphs 2, 3(a) and 3(b) of the NGO Settlement Agreement require certain actions to
be taken with respect to the design of Gale Ranch, including participation in the
development of a design program for the "Village Center" of the Dougherty Valley and
provision of approximately forty (40) acres of additional open space (provided that such
reconfiguration is physically feasible and permitted by law). Any obligation of Developer
or County under such provisions of the NGO Settlement Agreement shall be satisfied in
connection with any tentative map covering the area of the Gale Ranch Site affected by
such obligation, which tentative map will be approved together with any necessary general
plan amendment, specific plan amendment or rezoning."
S.B. Developer Response (Year 2006):
• A Master Plan for the Village Center was submitted by Shapell and Windemere with
the 1996 Specific Plan amendment. A Condition of Approval attached to the 1996
entitlements require a revision to the Master Plan prior to the issuance of the first
building permit in the Village Center.
• The County Planning Commission reviewed and approved the Village Center design
proposed by Windemere, Shapell and the County in December 2003. Construction is
complete on the community center, police substation and library. The buildings for
Phase 1 of the campus of the Contra Costa Community College District were
completed in 2006.
29
6.A. Development Agreement:
Section 3.3 M Coordination of On Site Improvements.
"County shall require that access or right-of-way for those certain roadway improvements
described on Exhibit B, attached hereto and incorporated herein by reference, as roadway
segments W-1 and W-2, offered for dedication as and at the times provided in the
conditions to the PDP; provided, however, that if the Windemere project generates the
need for access or right-of-way for roadway segments W-1 and/or W-2, prior to the time
such access or right-of-way is required for the Gale Ranch, then County shall ensure that
the provision of such access or right-of-way is subject to the following: In order to
accommodate Windemere's development schedule, Windemere may elect to assume
responsibility for constructing, without reimbursement from Shapell, roadway segments
W-1 and/or W-2 in which case Shapell shall dedicate or offer to dedicate, as required by
County, the necessary access or right of way to County upon satisfaction of the following
conditions: (a) Shapell will have reasonably reviewed and approved Bollinger Canyon
Road's horizontal and vertical alignment, grading and improvement plans; (b) Windemere
shall have provided to Shapell improvement agreements deemed acceptable by County and
executed by all parties, together with completion and payment bonds so that the
improvements shall be duly completed and no liens shall remain on Shapell's property; and
(c) Windemere shall have procured a policy of Comprehensive General Liability Insurance
in an amount and from an insurance company reasonably satisfactory to County naming
Shapell as an additional insured. Shapell shall have the right but not the obligation
reasonably to designate the source of cut/fill dirt (from the Gale Ranch Site) which shall be
used to the extent needed for roadway segments W-1 and/or W-2."
6.B. Developer Response (Year 2006):
• Shapell and Windemere have coordinated the extension of Bollinger Canyon Road at
the southern limit of the project and the extension of Bollinger Canyon Road from
existing Dougherty Road to the Windemere boundary. Both sections of Bollinger
Canyon Road are complete. However, future improvements to construct 2 (two) new
lanes will be required on Bollinger Canyon Road from Dougherty Road to the
Windemere property line per Condition of Approval for Gale Ranch Phase IV.
30
7.A. Development Agreement:
Section 3.3 60 DanvilleISan Ramon/County Traffic Mitization
11(1) Certain traffic improvements within the County, San Ramon and Danville are or may
be required to accommodate development under the Specific Plan (the "Project Traffic
Improvements"). The Project Traffic Improvements include (i) the on -site traffic
improvements described in the Specific Plan as the "Internal Circulation System" (the
"On -Site Traffic Improvements"), (ii) the off -site traffic improvements described on
Exhibit C-1, attached hereto and incorporated herein by reference (the "Initial Project
Traffic Improvements") and (iii) certain additional off -site traffic improvements described
on Exhibit C-2, attached hereto and incorporated herein by reference (the "Additional
Project Traffic Improvements"). The Initial Project Traffic Improvements and the
Additional Project Traffic Improvements are sometimes referred to collectively below as
the "Off -Site Traffic Improvements."
(2) Subject to the provisions of 3.3(g), Developer shall be responsible for the construction of
the On -Site Traffic Improvements made necessary by the Gale Ranch.
(3) Developer shall pay to County a per -unit traffic impact fee (the "Traffic Impact Fee")
in the amount necessary, but no more than the amount necessary, to fund Developer's fair
share of the cost of construction of the Off -Site Traffic Improvements; provided however,
that Windemere shall have responsibility for constructing roadway segments S-1 and S-2
as shown on Exhibit B to this Agreement. In calculating Developer's and Windemere's
respective obligations for the construction and/or funding of the Off -Site Traffic
Improvements, the costs of S-1, S-2 and W-3 shall be deducted from the aggregate total
cost of the Off -Site Traffic Improvements and not considered in making such calculations.
The amount of the Traffic Impact Fee shall be determined as set forth in subsection (4)
below, and shall apply to residential units developed on the Gale Ranch Site. The Traffic
Impact Fee applicable to a residential unit shall be paid when the building permit for such
unit is issued. The County will retain responsibility for the issuance of building permits
and collecting the fees notwithstanding the municipal annexation of any portion of the Gale
Ranch.
(4) The amount of the Traffic Impact Fee shall be determined within six (6) months
following County's approval of this Agreement, but no later than the date upon which the
County first approves a tentative subdivision map showing individual residential lots for
any portion of the Dougherty Valley (other than for the Country Club Site), in the
following manner: County, Developer, Windemere and, as required by the San Ramon
Settlement Agreement, representatives of Danville and San Ramon, shall meet and confer
in good faith to determine (i) the estimated reasonable cost of the Off -Site Traffic
Improvements and (ii) the respective proportions of such cost that fairly should be borne
by Shapell and Windemere, (taking into account, among other things, development
planned for the Country Club Site and the fees being paid by Shapell with respect thereto)
and other projects or parties, if any, contribution to the need for such improvements and to
whom the Traffic Impact Fee will apply. In making such determinations, and establishing
31
the amount of the Traffic Impact Fee, it shall be recognized that (a) Developer's pro rate
contribution to the traffic improvements described on Exhibit C-3, attached hereto and
incorporated herein by reference, shall be no more than is specified in, and shall be paid as
described in, Exhibit C-3; and (b) Developer and Windemere shall, taken together, be
responsible for the entire cost of the Initial Project Traffic Improvements as set forth in the
San Ramon Settlement Agreement (although each shall be responsible only for its fair
share of the cost of such improvements). The costs and proportions so determined and
agreed upon by County and Developer shall be reflected, as appropriate, in the Traffic
Impact Fee. The amount of the Traffic Impact Fee shall be adjusted annually in
accordance with the construction cost index published in the Engineering News Record.
(5) County shall enter into such agreements with San Ramon and Danville as may be
necessary or appropriate to establish a joint exercise of powers agreement ("JEPA"), or
some other program or mechanism, to provide for (i) the collection of traffic impact fees
from development projects in San Ramon, Danville and Contra Costa County and within
the boundary of the JEPA or other program or mechanism that will contribute to the need
for the Additional Project Traffic Improvements, which fees shall be in amounts consistent
with the determinations made under Subsection (4) above, (ii) the establishment of an
account of accounts (the "Local TIF Account") to hold Traffic Impact Fees collected from
Developer and Windemere, and traffic impact fees collected from the developers of other
projects that will contribute to the need for the Additional Project Traffic Improvements
(collectively, the "Local TIF Funds"), and (iii) the transfer to San Ramon, Danville and
County of Local TIF Funds attributable to the Off -Site Traffic Improvements to be
developed within those jurisdictions (the "Local TIF Program").
(b) The timing of when an Off -Site Traffic Improvement is needed is determined by
Measure C and by any conditions of approval for subsequent subdivision maps. If the
Local TIF Program has not received sufficient developer fees to fund an improvement
when it is needed, then Developer will fund the difference, or construct the improvement,
to ensure the improvement is built on time. In such case, Developer shall enter into a
reimbursement agreement with County to credit or reimburse Developer the eligible
construction costs that were advanced to build the project. Any credit so provided shall be
applied in full against the Traffic Impact Fee for each residential unit that receives a
building permit following completion of the Off -Site Traffic Improvement by Developer
(rather than pro rata against the Traffic Impact Fee for all remaining residential units in
the Project) until such time as the full credit has been provided.
(7) County shall reimburse Developer, that portion of the costs to be incurred by Developer
in connection with the funding or construction of the On -Site Traffic Improvements and
the Off -Site Traffic Improvements that represents the extent to which such traffic
improvements will serve traffic generated by projects that are developed pursuant to
general plan amendments approved on or after the Effective Date.
(8) To the extent that any Project Traffic Improvement funded or constructed by
Developer is included on a project list under any Measure C Action Plan or CMP
Deficiency Plan, and provided such transportation improvement has sufficient priority
32
under such Action Plan or Deficiency Plan, Developer shall receive a credit against, or
reimbursement from, any regional traffic fee imposed upon Developer under Sections 3.3
(g)(11) and 3.30) of this Agreement.
(9) Some portion of the Traffic Impact Fee may be allocated to and collected from
commercial development (on a per -square -foot basis) to occur as part of Gale Ranch,
provided, however, that the total amount of Traffic Impact Fee to be collected from
residential development to occur as part of Gale Ranch (as determined above) shall be
reduced by the amount of funds to be so collected from commercial development.
(10) County shall make its final determination of compliance with the standards of the
Growth Management Element of the General Plan relating to traffic in conjunction with
the review and approval of tentative subdivision maps.
(11) County shall not impose on Developer any fee or other obligation with respect to roads
or traffic impacts other than as set forth in this Agreement, Section 4.4 of the San Ramon
Settlement Agreement (relating to assurance of compliance with traffic service objectives),
Paragraph 1 of the Walnut Creek Settlement Agreement or Paragraph 1 of the Pleasanton
Settlement Agreement (relating to Developer's payment of fees to Pleasanton).
Notwithstanding the foregoing, nothing in this Agreement shall prevent the County from (i)
applying to the Gale Ranch to any tentative maps any sub regional traffic impact fee
required by Measure C (1988) and adopted and applied consistently and on a uniform
basis throughout the Tri-Valley sub region by each of the seven jurisdictions that are now
signatories to the Tri-Valley Transportation Council joint powers authority which is
adopted prior to the vesting date of any tentative map (provided, however, that County
shall provide to Developer a credit against any such fee for traffic improvements
constructed and/or funded by Developer under this Agreement or the Settlement
Agreement) or (ii) imposing on the Gale Ranch reasonable requirements for the funding or
construction of additional minor traffic improvements made necessary by Gale Ranch and
identified through CEQA review of individual tentative map applications for Gale Ranch,
or (iii) imposing on the Gale Ranch a sub regional traffic fee developed by the JEPA
identified in Section 3.3(g)(5) to satisfy Measure C requirements and for the sole purpose of
funding a fair share contribution of the Alcosta ramp realignment project at I-680 and the
auxiliary lanes project on I-680 between Bollinger Canyon Road and Diablo Road."
7.B. Developer Response (Year 2006):
• Shapell Industries has satisfied this obligation by initiating and participating in the
formation of the South Contra Costa ("SCC") Area of Benefit Fee. All traffic
mitigation and roadway improvements cited in the Development. Agreement were
included in this comprehensive sub -regional fee program. A Joint Exercise of Powers
Authority ("JEPA") formed by the County, the Town of Danville and the City of San
Ramon administers the SCC fee program. Shapell pays the SCC fee of $5,132.00 at
the time of building permit issuance. This fee reflects cost of living adjustments to
date.
33
8.A. Development Agreement:
Section 3.3 W Pleasanton Traffic Mitigation.
"Separate and apart from the Traffic Impact fee, Developer shall pay to County $150 for
each residential unit developed on the Gale Ranch Site pursuant to the Project Approvals
("Pleasanton Traffic Fees"). The Pleasanton Traffic Fees will be collected by County upon
its issuance of the building permit for each such unit and delivered to Pleasanton for the
mitigation of traffic impacts on roadways located in its jurisdiction. If for any reason San
Ramon assumes the responsibility for issuing building permits for the Project (although the
parties anticipate that County will retain responsibility for the issuance of building permits
notwithstanding the municipal annexation of any portion of the Gale Ranch), San Ramon
shall collect and deliver the Pleasanton Traffic Fees as set forth above. As provided in
Paragraph 5(b) of the Pleasanton Settlement Agreement, Developer's obligations pursuant
to this Section 3.3(h) and Paragraph 1 of the Pleasanton Settlement Agreement shall cease
in the event that Pleasanton files any legal action challenging any use or approval or any
modification to any use or approval relating to Dougherty Valley."
8.11. Developer Response (Year 2006):
• The Pleasanton Traffic Mitigation Fee of $150.00 per unit is paid to the County at the
issuance of each building permit in Gale Ranch Phase II.
34
9.A. Development Agreement:
Section 3.3 M Dublin Traffic Mitization.
"County and Developer shall work with the City of Dublin to establish a mutually
acceptable fee to account for the cost of mitigating the traffic -related impacts of the Project
on roadways located in the City of Dublin net of the cost of mitigating the traffic -related
impacts of development projected to occur within the City of Dublin (including, without
limitation, the East Dublin project) on the On -Site and Off -Site Traffic Improvements, if
any. If County, Developer and the City of Dublin are unable to arrive at a mutually
acceptable fee within six (6) months following the Effective Date, then County and
Developer may themselves determine the amount of such fee, provided, however, that such
six-month period shall be extended for a period of time equal to the period of any undue
delay caused by Developer or County in establishing the amount of such fee. Any fee
imposed on the Project pursuant to this Section 3.3(i) shall be approved by the Board of
Supervisors and, except as otherwise agreed by County and Developer, remain fixed
throughout the term of this Agreement; provided, however, that such fee may be subject to
escalation in accordance with the "Construction Cost Index" published in Engineering
News Record. Such fee, if any, shall be paid upon the issuance of the building permit for
each residential unit in the Project and delivered to Dublin for the mitigation of traffic
impacts on roadways in its jurisdiction. If for any reason San Ramon assumes the
responsibility for issuing building permits for the Project (although the parties anticipate
that County will retain responsibility for the issuance of building permits notwithstanding
the municipal annexation of any portion of the Gale Ranch), San Ramon shall collect and
deliver the fees to Dublin as set forth above. If any regional traffic fee is established and
required to be paid by Developer under Section 3.3(g)(11) of this agreement and such
regional traffic fee provides funding for those improvements in Dublin included in
calculating the amount of the traffic fee to be paid to Dublin as set forth in this Section
3.3(i), then with respect to any residential unit upon which such regional traffic fee is
imposed, Developer shall be relieved of its obligation to pay such portion of the fee
described in this Section 3.3(i) that is attributable to those improvements in Dublin that are
funded by such regional fee."
9.B. Development Response (Year 2006):
• In June, 2000 the County Board of Supervisors approved a per dwelling unit fee to
mitigate impacts of Dougherty Valley Development on the City of Dublin. Shapell
paid the "Dublin Fee" of $1,870.00. Also, Phase 1 of Gale Ranch currently pays a
smaller "placeholder" fee of $245.00 with each building permit.
35
10.A. Development Agreement:
Section 3.3 (D Walnut Creek Traffic Mitigation.
"Notwithstanding any other provision contained herein, all future tentative subdivision
maps covering the Gale Ranch Site shall be subject to all standards and requirements
adopted by the County pursuant to Measure C (1988), including but not limited to the Tri-
Valley Action Plan or fees adopted thereunder, and all standards and requirements
adopted pursuant to Title 7, Division 1, Chapter 2.5 of the Government Code (Section
65080 et seq.), including but not limited to all congestion management plans and deficiency
plans adopted thereunder, provided that (a) such standards and requirements are designed
to mitigate congestion on the Interstate 680/Highway 24 interchange or streets within
Walnut Creek, (b) are applied to all other major residential projects within the member
jurisdictions of SWAT, TRANSPAC, and TRANSPLAN, and (c) are imposed by the
County or City only to the extent of the project's impacts on the interchange or streets
within Walnut Creek. Neither the foregoing provision nor any other provision of this
Agreement (other than the subsection of this Agreement relating to Traffic -Based
reductions in permitted development (Section 4.1) shall limit the authority of the County to
apply the standards and requirements described above adopted pursuant to Measure C
(1988), including but not limited to any Action plan or fees."
10.B. Developer Response (Year 2006):
• Shapell pays the current SCC Regional Fee of $1,023 at the time of building permit
issuance. Of this total, $942.00 is contributed to the "Walnut Creek Traffic Fee".
36
11.A. Development Agreement:
Section 3.3 W Dougherty Road Improvements.
"County shall not require, as a condition to any Planning Action or Subsequent Approval
or in any other manner, that Developer construct or cause to be constructed a realigned
Dougherty Road, as shown in the Specific PIan and Preliminary Development Plan, prior
to 10 years from the effective date of this Agreement. Prior to County imposing any
requirement involving a realigned Dougherty Road, County may require, as a condition to
a Subsequent Approval, that Developer improve existing Dougherty Road in a manner
acceptable to County."
ILB. Developer Response (Year 2006):
• In early 2005 Shapell opened RA 1157 to public traffic. This roadway connects
Bollinger Canyon Road at the southern portion of the project to Stoneleaf Road in
Gale Ranch Phase III. This roadway is in the approximate location of the former
Dougherty Road and provides an alternative to Bollinger Canyon Road through
Windemere to motorists who may want an alternative north -south connection through
the Dougherty Valley.
37
12.A. Development Agreement:
Section 3.3 (1) Mitigation Monitoring
"Developer shall fund development and operation of a system (the "Permit Tracking
System") to monitor compliance with the requirements of the San Ramon Settlement
Agreement regarding the provision of certain capital facilities, compliance with mitigation
measures in the Dougherty Valley EIR, and compliance with project conditions, through
the payment of a fee not to exceed $100 per residential unit developed on the Gale Ranch
Site, payable at recordation of the final map encompassing such unit. Developer shall, at
the time services are performed, pay the County staff costs of carrying out the County's
Mitigation Monitoring Program, as adopted by the Board on the First Approval Date, and
as it may be amended for the purposes of compliance with CEQA, which are attributable to
development of the Gale Ranch Site, on a time and materials basis, and shall pay the
reasonable costs of consultants as necessary to implement the Mitigation Monitoring
Program."
12.B. Developer Response (Year 2006):
• Shapell pays $100 per residential unit fee with issuance of each residential building
permit.
• Shapell pays the reasonable costs of staff and consultants to implement the Mitigation
Monitoring Program.
W
B.A. Development Agreement:
Section 3.3 W Establishment of County Service Area.
"(1) County and Developer shall cooperate in (1) the formation, as soon as reasonably
practicable but in any event prior to filing of the first final subdivision map in the
Dougherty Valley, of a County Service Area or other financing entity to receive certain
funds and provide certain services, including the operation and maintenance of facilities
and infrastructure, as described in Section 3.3 of the San Ramon Settlement Agreement
and (ii) the establishment, as soon as reasonably practicable but in any event prior to filing
of the first final subdivision map in the Dougherty Valley, of a mechanism and adequate to
fund the provision of such services as described in Section 3.3 of the San Ramon Settlement
Agreement.
(2) As described in Section 3.4 of the San Ramon Settlement Agreement, to ensure that the
Community Center, Senior Center, Library, Corporation Yard and Police Substation
described in the Specific Plan will be constructed on a timely basis and made available to
Dougherty Valley residents at the appropriate time, County shall (except to the extent some
other method for the financing or provision of such facilities is requested or established by
Developer or Windemere, as appropriate) assess against residential units to be developed in
the Dougherty Valley a fee, special tax or assessment in an amount sufficient to fund
Developer's and Windemere's obligation to contribute to the cost of such facilities (the
"Facilities Fee"). Funds so collected will be held in a separate account and made available
to Developer and Windemere, as appropriate, for the construction of such facilities. The
precise form, timing, and amount of such fee, tax, or assessment shall be in accordance
with the terms and provisions of Exhibit D attached hereto."
U.B. Developer Response (Year 2006):
• The Dougherty Valley County Service Area (CSA M-29) was approved by Contra
Costa LAFCO in March 1996. The CSA M-29 is perpetually funded through a tax
election held in February 1998. The County automatically adds the CSA tax to each
individual parcel in Dougherty Valley shortly after the building permit is issued.
• The only on -going activity required by Shapell is to participate with the County and
City of San Ramon to prepare an annual CSA budget and review reimbursement
invoices. To date, the County has reimbursed the City for expenditures completing
FY04-05. A permanent reimbursement agreement was negotiated and executed by
the City of San Ramon, Town of Danville, and Contra Costa County in 2005. All
reimbursements are up to date.
39
COUNTRY CLUB AT GALE RANCH "THE BRIDGES AT GALE RANCH"
DEVELOPMENT AGREEMENT
The Development Agreement Between County of Contra Costa and Shapell Industries, Inc.
Relating to the Development Commonly Known as Country Club at Gale Ranch, effective
January 11, 1995 states in Section 8.2 the requirement that the Developer provide an
annual report demonstrating the "good -faith compliance" with the terms of the agreement.
The specific obligation of the Developer and County are described in Section 3 of the
Agreement.
40
I
A. REQUIREMENTS
LA. Development Agreement:
Section 3.1 Oblizations of Developer and County.
Section 3.1. (a) Generally:
The Parties acknowledge and agree that County's agreement to perform and abide by the
covenants and obligations of County set forth herein is material consideration for
Developer's agreement to perform and abide by the covenants and obligations of Developer
set forth herein."
Section 3.1. (b) Conditions to Current Approvals:
"Except as otherwise specifically agreed to by County, Developer shall comply with all
conditions to the Current Approvals."
1.B. Developer Response (Year 2006):
• To the best of our knowledge, Shapell Industries has complied with all original or
revised conditions of approvals attached to "The Country Club At Gale Ranch"
Project, ("The Bridges at Gale Ranch").
41
2.A. Development Agreement:
Section 3.1. W Capital Facilities Fee.
"Certain facilities are identified in the Settlement Agreement as being necessary to serve
development in the Dougherty Valley. These facilities include a fire station or stations,
police or sheriffs substation, a community center, a senior center, a library and a
corporation yard (each, individually, a "Capital Facility" and collectively the "Capital
Facilities"). Developer shall pay a fee of $1,000 per residential unit developed on the
County Club at Gale Ranch Site, payable to County at building permit issuance, for the
purpose of funding construction of the Capital Facilities ("the "Capital Facilities Fee".).
The Capital facilities Fees so collected shall be held by County in a separate account and
made available to developer, with interest paid at the rate received by County on its
investments, for the construction of the Capital Facilities. The Capital Facilities Fee shall
be adjusted annually in accordance with the construction cost index for the San Francisco
Bay Area 91994+100) published in the Engineering News Record. This Section 3.1 (c)
constitutes compliance with section 3.4 of the Settlement Agreement with regard to County
Club at Gale Ranch. Developer's compliance with this Section 3.1 (c) shall constitute
compliance with Condition 122 of the Project Conditions. Developer shall have no
obligation relating to Country Club at Gale Ranch and the construction of the Capital
Facilities other than as described in this Section 3.1(c)."
2.B. Developer Response (Year 2006):
• The Capital Facilities Fee, currently designated as the "Community Facilities Fee" is
paid at issuance of every residential building permit. The current fee amount is
$1,869.46.
42
3.A. Development Agreement:
Section 3.1. 0 Parks Fee.
"Developer shall improve and dedicate 9.9 acres of parkland as shown on the Vesting
Tentative Map and as modified by the Project Conditions. In addition, beginning with the
545th residential unit developed on the County Club at Gale Ranch Site, Developer shall
pay to County a fee of $5,446 per unit (The "Parks Fee"), payable at building permit
issuance. The Parks Fees paid by Developer shall be kept by County in a separate account.
The Parks Fee shall be adjusted annually in accordance with the construction cost index
for the San Francisco Bay Area (1994=100) published in the Engineering News Record. If
Developer dedicates 12.2 acres of parkland in addition to the 9.9 acres described
immediately above (such 12.2 acres constituting the "Additional Parkland"), improved in a
manner comparable to the parkland developed on the County Club at Gale Ranch Site,
Developer shall receive a refund, with interest paid at the rate received by County on its
investments, of all Parks Fees paid. If Developer so improves and dedicates a portion of the
Additional Parkland, Developer shall receive a refund, with interest paid at the rate
received by County on its investments, of the Parks Fees paid, proportional to the number
of acres so improved and dedicated. Any Parks Fees to which Developer is not entitled to
a refund within seven years of first payment of a Parks Fee may be spent by County (or, in
the event that the County Club at Gale Ranch Site has been annexed to San Ramon, San
Ramon) for the purpose of providing parkland to serve County Club at Gale Ranch.
Developer's compliance with the section 3.1 (d) shall constitute compliance with Condition
51 of the Project Conditions and the applicable provision of the Settlement Agreement
regarding the dedication and improvement of parkland. Developer shall have no
obligation relating to Country Club at Gale Ranch and the provision of parkland other
than as described in this Section 3.1 (d)."
3.B. Developer Response (Year 2006):
• Gale Ranch Phase I. Construction of all parks in Phase I are complete and the parks
are operational. Coyote Crossing Park, East Park, and Windy Hills Park provide
10.04 acres of constructed park. The addition of the Coyote Creek School Park adds
an additional 7.61 acres, bringing the total to 17.65 acres.
Gale Ranch Phase II. Construction of the Neighborhood 1 and Neighborhood 9 parks
are complete. This brings the total of completed park acreage for Phase II to 12.59
acres, and the cumulative total for Gale I and Gale II to 30.24 acres (see Table L).
Monarch Park (i.e. neighborhood 2B park) PA 0008 is under construction and will be
complete and accepted in late fall 2007. Creekside Park (i.e. neighborhood 11 park)
PA 0010 is under construction and will be complete and accepted in Spring 2007.
43
Table L
PARK COMPLETION STATUS
Construction Complete
Park Name
Acreage
Completion Date
Gale I
Coyote Crossing Park
7.85
COMPLETE
East Park
0.82
COMPLETE
Windy Hills Park
1.19
COMPLETE
Windy Hills Park Addition
0.18
COMPLETE
Coyote Creek Elementary
7.61
COMPLETE
Gale I Total
17.65
COMPLETE
Gale II
Hidden Crest Park (PA 0003)
2.34
COMPLETE
Valley View Park (PA 0009)
10.25
COMPLETE
Gale II Total
12.59
Total Complete
30.24
Construction In Process
Park Name
Acreage
Completion Date
Gale II
Monarch Park (PA 0008)
6.34
Fall 2007
Gale 11
Creekside Park (PA 0010)
5.97
Spring 2007
Total In Process
12.31
Future Construction
Park Name
Acreage
First Completion
Gale I
Middle School
9
2008
Gale III
Quail Run School Park
8+/-
Complete
Rose Glenn Park
11.5+/-
2009
Linear Park
5+/-
2010
Gale IV
All parks
33.80
2010
Future Construction acreages are taken
from the Gale 4 Addendum dated August,
2004
44
4
4.A. Development Agreement:
Section 3.1. W Affordable Housing.
"Developer shall, in connection with its development of Country Club at Gale Ranch,
implement the terms and provisions of the Affordable Housing Program updated and
adopted by the Board on March 24, 1994, as such Affordable Housing Program
notwithstanding any County regulations to the contrary, may be amended from time to
time, by mutual agreement of the Parties, regarding its application to the County Club at
Gale Ranch Site (the "Affordable Housing Program")."
4.B. Developer Response (Year 2006):
To the best of our knowledge, Shapell is in conformance with the terms and
provisions of the Affordable Housing Program. See the DVAHP Compliance Report
for additional information.
45
5.A. Development Agreement:
Section 3.1. () Trafric Impact Mitigation.
"Developer's obligations regarding traffic impact mitigation shall be limited to those
established by the Project Conditions and County shall impose no additional traffic impact
fee or mitigation of any kind. Developer's compliance with the Project Conditions relating
to traffic impact mitigation constitutes compliance with the requirements of the Settlement
Agreement regarding traffic impact mitigation for the County Club at Gale Ranch. All
funds paid by Developer to County for traffic impact mitigation pursuant to the Project
Conditions may be spent by County only for the specific purposes for which collected."
5.B. Developer Response (Year 2006):
• The Conditions of Approval for The County Club at Gale Ranch ("The Bridges at
Gale Ranch") specify the amount and allocation of the traffic fees collected. All fees
are paid at issuance of individual building permits. The current fee amount, adjusted
for inflation, is $5,081.00 per single-family dwelling unit.
46
6.A. Development Agreement:
Section 3.1 W County Regional Enhancement Contribution.
"Developer shall pay to County a contribution of $1,000 per residential unit (the `County
Regional Enhancement Contribution"), payable at building permit issuance, which,
regardless of any annexation and notwithstanding any other provision of this Agreement,
County, and not any annexing city, shall receive and spend for one or any number of the
following purposes and in those locations determined by the Board: transit improvements,
other transportation improvements, assistance with the provision of affordable housing,
and economic development activities. The County Regional Enhancement Contribution
shall be adjusted annually in accordance with the construction cost index for the San
Francisco Bay Area (1994=100) published in the Engineering News Record."
6.B. Developer Response (Year 2006):
• The County Regional Enhancement Contribution is collected at the issuance of each
residential building permit for The Bridges. The current fee, adjusted for inflation is
$1,270.25 per unit.
47
7.A. Development Agreement:
Section 3.1 W Compliance Monitoring.
"Developer shall fund development and operation of a system (the "Permit Tracking
System") to monitor compliance with (i) the requirements of the Settlement Agreement
regarding the provision of certain capital facilities, (ii) the mitigation measures in the
County Club at Gale Ranch EIR, and (iii) the other Project Conditions, through the
payment of a fee not to exceed $100 per residential unit developed on the County Club at
Gale Ranch Site, payable at recordation of the final map encompassing such unit (the
"Permit Tracking System Fee"). Developer shall, at the time services are performed, pay
the County staff costs of the County's Mitigation Monitoring Program for Country Club at
Gale Ranch as adopted by the board on December 20, 1994, and as it may hereafter be
amended for the purposes of compliance with CEQA (the "Mitigation Monitoring
Program"), on a time and materials basis and shall pay the reasonable costs of consultants
as necessary to implement the Mitigation Monitoring Program."
7.B. Developer Response (Year 2006):
• Shapell pays the $100 per residential unit fee with issuance of each residential
building permit.
8.A. Development Agreement:
Section 3.1 W County Service Area.
"As more fully described in Section 3.2. (b) of this Agreement, Developer shall cooperate in
establishment of a County Service Area or other financing entity necessary for the
provision of services and operation and maintenance described in Section 3.2(b)."
S.B. Developer Response (Year 2006):
• County Service Area (CSA M-29) for the Dougherty Valley was formed by LAFCO
in March 1996. CSA M-29 was funded by a tax election in February 1998. The
issuance of a building permit triggers the addition of the CSA tax to each individual
parcel.
49
9.A. Development Agreement:
Section 3.1 (i) Construction O mprovements.
"Developer shall have the option of construction, rather than funding construction of, any
of the public improvements related to Country Club at Gale Ranch including, but not
limited to, all of the parkland described in Section 3.1 (d) of this Agreement, those portions
of the Capital Facilities that have been established as Developer's responsibility to provide,
and the traffic impact mitigation improvements described in Section 3.1 (f) of this
Agreement. Subject to the provisions of Sections 3.1 (c) and 3.1 (d) of this Agreement, if
Developer has paid a fee or otherwise provided County with funds to finance construction
of any such public improvement and Developer subsequently constructs such public
improvement, County shall refund to the Developer, with interest paid at the rate received
by County on its investments, the fees and other funds paid by County that are associated
with the public."
9.B. Developer Response (Year 2006):
• Shapell has constructed, or will construct all the public improvements, including
public park land in the Project.
50
SUPPORTING DOCUMENTS
51
ANNUAL COMPLIANCE
REPORTS
WINDEMERE
CONTRA COSTA
COUNTY
OCTOBER 15, 2006
TABLE OF CONTENTS
SECTION 1— Settlement Agreement
Page
A. Construction Activities that have occurred during the previous year ........... 3
B. Work Underway........................................................................................... 3
C. Anticipated Efforts Over the Next Three Years ............................................ 4
D. Performance Requirements — Exhibit G...................................................... 5
a.
Schools.................................................................................................. 5
b.
Childcare............................................................................................... 5
c.
Dougherty Station Community Center / Police Substation ..................... 6
d.
Dougherty Station Library ....................................................................... 7
e.
Developed Parkland.............................................................................. 7
f.
Corporation Yard................................................................................... 7
g.
Fire Station............................................................................................ 7
h.
Flood Control Facilities.......................................................................... 7
i.
Staging Area for Open Space................................................................ 7
j.
Park and Ride Sites................................................................................ 7
k.
Satellite Post Office................................................................................ 7
I.
Senior Center......................................................................................... 7
SECTION 2 — Development Agreement
3.03
Compliance with Settlement Agreements....................................................
10
3.04
Preliminary Development Plan....................................................................
10
3.05
Affordable Housing.....................................................................................
11
3.06
Designation of Preferred Water Provider .....................................................
11
3.07
Design Issues..............................................................................................
12
3.08
Coordination of On -Site Improvements........................................................
12
3.09
Danville San Ramon / County Traffic Mitigation ..........................................
13
3.10
Pleasanton Traffic Mitigation.......................................................................
15
3.11
Dublin Traffic Mitigation...............................................................................
16
3.12
Walnut Creek Traffic Mitigation....................................................................
17
3.13
Processing — Fees.......................................................................................
17
3.14
Mitigation Monitoring Program.....................................................................
18
3.15
Other Financing Requirements....................................................................
18
EXHIBITS and TABLES
Conceptual Neighborhood Plan
Exhibit A
Windemere Facility Maintenance Matrix
Table 1
Windemere Homebuilding Status Table
Table 2
Windemere Developed Parkland Table
Table 3
Windemere Affordable Housing Program Schedule of Deliveries
Table 4
ii
SECTION 1
Annual Compliance Report
Agreement to Settle Litigation Relating to the Dougherty
Valley General Plan Amendment, Specific Plan and
Environmental Impact Report, May 11, 1994
Annual Report — Settlement Agreement
That Agreement to Settle Litigation Relating to the Dougherty Valley General Plan
Amendment, Specific Plan and Environmental Impact Report dated May 11, 1994,
(Settlement Agreement) requires the developers of the Dougherty Valley to submit a status
t
report to Contra Costa County on or before October 15 of each year. This status report
requires the following:
PREPARATION AND CONSIDERATION OF ANNUAL COMPLIANCE REPORTS
A. Preparation of Annual Compliance Reports. Acting through its planning and
public works staffs, the County will prepare an annual compliance report (an
"Annual Compliance Report') based on (i) the information produced by the Tracking
System and (ii) development "status reports" prepared by the Developers and
submitted to County staff on or before October 15. of each year. The status reports
will outline construction activities that have occurred during the previous year, work
underway and anticipated efforts for the following three years. The status reports
will also include all significant activity related to public and private infrastructure, and
all significant residential and commercial construction activity.
An Annual Compliance Report will be submitted by County Staff to the DVOC on or
before December 15 of each year during buildout and will describe and evaluate,
among other things:
• The Project's compliance with the Perfonnance Standards, and the causes of
any identified noncompliance.
• Progress made by the County, San Ramon, Danville, the Developers and others
in addressing any "Intermediate Steps" identified in Schedule 1 to this Exhibit G
and the probable need for additional consultations during the following three
years.
• The extent to which Third Parties are acting consistently with the assumptions
and standards established under the Settlement Agreement and efforts to secure
the cooperation of those other parties."
2
Windemere BLC Land Company LLC, the owner/developer of the Windemere community,
is providing the following information in compliance with the Settlement Agreement:
A. Construction Activities That Have Occurred During The Previous Year (2006)
1. Grading for homesites and streets within and adjacent to Village 28 through 31 in
Phase 3 and Villages 46 through 49 in Phase 5C were completed. (See attached
Exhibit A for reference)
2. Riparian restoration landscape maintenance within mitigation creeks in Phases 3, 4,
and 5 have been completed consistent with regulatory agency approvals.
3. Underground improvements including, but not limited to, potable water lines, storm
drain lines and dry utility structures were extended in Windemere Parkway to
provide connection to Camino Tassajara Road.
4. Recordation of the final subdivision maps covering Phase 3 and 5C occurred in
September and October 2006 respectively.
5. Home construction continued in Phases 2, 4, 5A, and 5B.
6. Construction of trails in Phases 1, 21 4, and 5 have been completed. This includes
the Main Branch Trail, the East Branch Trail, the Tassajara Valley Ridge Trail, the
Hidden Valley Ridge Trail, and the Windemere Ridge Trail.
7. Phases 5A and 5B were annexed to the City of San Ramon on September 13,
2006.
8. Windemere Ranch Middle School was opened in the fall of 2005.
9. Phase 1 of the 64,000 square foot Community College in the Village Center opened
November 1, 2006.
10. The Acorn Early Childhood Center in the Village Center opened October 30, 2006.
B. Work Underway
1. Paving operations for the villages in Phase 3 and Phase 5C are underway and
anticipated to be completed by November 2006.
2. Park 9 (Tiffany Roberts Sports Park), the 15 acre Community Park in Phase 4 is
under construction. Park 13 (Arlington Park), a 4 acre park in Phase 5A, and Park
14 (Fire Truck Park), a 1-acre park in Phase 5B, are also under construction.
3. Habitat enhancement, construction and monitoring as required under that Final
Mitigation and Monitoring Plan dated May 3, 2000 continues as required by the
respective resource agencies.
3
4. Construction of the trails in the Phase 3 area is underway and will provide
connections to the existing Phase 1, 2 and 4 trail systems. Construction is
anticipated to be completed in 2007.
5. Acceptance procedures for streets, utilities, landscaping and parks in phases 1, 2
and 4 are underway and maintenance responsibilities for these facilities will
continue to be transferred to the City of San Ramon over the next year.
6. The Japonica Bridge in Phase 3 is nearing completion and is anticipated to be open
in late 2006
7. The Windemere Parkway bridge over Tassajara Creek is under construction and is
anticipated to be open by spring 2007
8. The Dougherty Valley High School is under construction. It is anticipated to be open
in August 2007.
9. The Camino Tassajara Road widening project continues. The new signalized
intersection at Windemere Parkway is anticipated to be open in winter 2006/2007.
10. The second elementary school, Live Oak Elementary School, located in Phase 4 is
under construction and anticipated to be open August 2007.
FOR OWNERSHIP AND MAINTENANCE RESPONSIBILITY, PLEASE SEE
"WINDEMERE FACILITY MAINTENANCE MATRIX" ATTACHED AS TABLE 1.
C. Anticipated Efforts Over the Next Three Years:
1. Additional model home centers will be constructed to service each new village as
they come online in Phases 3 and 5C.
2. Construction of the single family homes, townhomes, condominiums, and affordable
income apartments will continue.
3. Cooperation with Shapell Industries and the San Ramon Valley Unified School
District for the development of the High School will continue for the anticipated 2007
opening of the High School.
4. The second elementary school, Live Oak Elementary School, located in Phase 4
will be completed in August 2007.
5. City and County acceptance of improvements including parks, streets, and
landscaping will continue in Phases 1, 2, 31 4, and 5.
4
6. Land development improvements including, but not limited to, construction of
streets, underground utilities, parks, and landscaping in phase 3 and the remainder
of phase 5 will continue through the end of 2006 and continue through 2007.
7. The plans for the remaining affordable homes in Phase 3 are underway. Final
approvals are anticipated in 2007.
8. Phase 3 and Phase 5C are anticipated to be annexed to the City of San Ramon in
2007.
PLEASE SEE "WINDEMERE HOMEBUILDING STATUS TABLE" ATTACHED AS TABLE
2.
D. Following is a discussion of the performance requirements in Exhibit G of the
Agreement:
a. Schools: As presented in the annual report, in May 2001, Windemere BLC and San
Ramon Valley Unified School District executed a comprehensive Master School
Impact Mitigation Agreement for the entire Windemere property. Consistent with
the requirements of this agreement, the following steps have been taken to ensure
ongoing compliance.
In August 2004, the first Windemere elementary school, Hidden Hills Elementary,
was completed and opened for the first enrollment of students.
In August 2005 construction of the Windemere Ranch Middle School was
completed. This construction allowed for the opening of the middle school in
August 2005, consistent with the timing requirements of the mitigation agreement
with the SRVUSD.
Construction drawings for Dougherty Valley High School were approved by the
District to allow for the commencement of construction. Phase 1 of the high school
construction which includes site development is complete. Phase 2 building
construction is underway. The High School is anticipated to be completed in August
2007, consistent with the'mitigation agreement with the SRVUSD.
Construction of the 21d Elementary School (Live Oak) on the Windemere property is
underway. It is estimated that the 2"d elementary school in Windemere will be
opened in August 2007.
b. Childcare:. 2004 saw the opening of the first childcare facility to come online in
Windemere with the opening of the new Hidden Hills Elementary School. This
facility, which was dedicated to the SRVUSD, is sized to accommodate
approximately 150 children ages 6 to 12. The SRVUSD has entered into an
agreement with The Growing Room to provide the childcare services at this new
facility.
E
The second facility planned to come online was planned as a part of the Village
Center. In November of 2003, Contra Costa County approved an amendment to
the Final Development Plan for Windemere and Gale Ranch which laid out the
Neighborhood Plan for the future uses of the Village Center. Within this plan, a
childcare facility of approximately 8000 square feet was approved within the
Windemere portion of this property. Since the date of that approval, Windemere
BLC selected the Acorn Learning Center, a local distinguished child care provider,
to move ahead with the program for this facility. The center opened October 30,
2006 and is estimated to accommodate childcare for approximately 155 children
with the required state mandated square footage requirements being met.
An additional childcare facility, which would mirror the facility provided at Hidden
Hills elementary school, is planned for Live Oak elementary school within
Windemere. Construction of this facility continues in concert with the construction
of the second elementary school. Completion of these facilities is anticipated for
August 2007. In an effort to ensure more children are able to be accommodated in
this facility, this facility has been expanded to accommodate up to approximately
200 children, to allow for maximum flexibility for future needs.
Another element of the Village Center providing support to children is the Dougherty
Station Community Center. This center serves multiple functions under one roof
including a 90-seat performing arts theater, a police substation, two conference
rooms, a dance studio, a demonstration kitchen and cooking classroom, an art
room, a concession area, a teen center and a Tiny Tot room. The Tiny Tot room is
a designated preschool room. Currently, there are two half -day programs on
weekdays serving children between the ages of 3 '/2 and 5. The preschool runs
from September through June. Additional enrichment classes and camps are made
available during the summer months as well to expand the services offered to
parents for their children on a year-round basis.
In addition to these programmatic facilities, Windemere BLC is utilizing the services
of the Contra Costa Child Care Council (the Council) to provide services to recruit,
train, support and monitor licensed family care providers in the Dougherty Valley.
This program is intended to focus a great deal of effort on providing quality in -home
infant and toddler care to the residents of Windemere. To -date thirteen in -home
childcare providers have been established as a result of the Childcare Council
efforts. Establishment included training, individual site visits, and licensing.
These child care facilities, along with the in -home infant and toddler care facilities
within Windemere have been programmed to mitigate all of the child care impacts
within Windemere.
C. Community Center/Police Substation: Consistent with the Settlement Agreement
for the Dougherty Valley, the 4,500 square foot Dougherty Station Community
Center/Police Substation was completed September, 2005 and is currently
operational.
d. Library: Consistent with the Settlement Agreement for the Dougherty Valley, the
11,600 square foot Dougherty Station Library was completed and stocked with
books and resource materials in September, 2005.
e. Developed Parkland: All four parks within Phase 1 of Windemere totaling 17.9
acres have been completed. The two parks in Phase 2, totaling 7.3 acres are
completed. The 1.5 acre pocket park in Phase 4 is completed. These seven parks
will provide 26.7 acres of developed parkland for Phases 1, 2 and 4 of Windemere.
In addition to these parks, construction of the park on the Windemere Ranch Middle
School site is complete. Moreover, two of the six parks under construction in Phase
5 provide 5.2 additional acres of parkland. Windemere developed parkland
requirement is 6.5 acres per 1000 residents as called out in the Dougherty Valley
Specific Plan. With the completion of the parks to date and the upcoming
construction of the remainder of the parks, Windemere will continue to remain in
compliance with its obligations under the Development Agreement.
PLEASE SEE DEVELOPED PARKLAND CHART ATTACHED AS TABLE 3.
f. Corporation Yard: The corporation yard is being planned between Shapell
Industries and the City of San Ramon.
g. Fire Station: San Ramon Valley Fire Protection District Station #30 has been
constructed by Windemere BLC and was open and operational as of 2001.
h. Flood Control Facilities: All major flood control facilities required for the current
development have been constructed and are fully operational.
i. Staging Area for Open Space: A staging area along Windemere Parkway in Phase
5 has been planned and construction drawings for the facilities in the staging area
are in design. This staging area is consistent with the location identified in the
Dougherty Valley Specific Plan and will be constructed in 2007.
j. Park and Ride Sites: A park and ride site has been designated at the intersection of
Bollinger Canyon Road and Windemere Parkway. The need for this site is to be
determined by Contra Costa County.
k. Satellite Post Office: The determination for the need of this facility has yet to be
established however it has been discussed that the post office may be
accommodated in the Village Center if it is needed.
I. Senior Center: The senior center is planned to be in the Village Center as approved
on the Conceptual Neighborhood Plan Processed through Contra Costa County in
November 2003. The Senior Center will be constructed by Shapell Industries.
7
As indicated in the foregoing section, certain milestones are anticipated to be encountered in
the next three years that are critical to the continued development of the Dougherty Valley
and specifically to Windemere. As discussed in the previous section, construction of each of
these facilities has been scheduled and shall be completed in advance of the schedule required
under the Settlement Agreement.
8
SECTION 2
Annual Review of Development Agreement by and between
The County of Contra Costa and Windemere Ranch
Partners, January 18, 1996.
6
Annual Report - Development Agreement
Section 8.02 of that Development Agreement by and between the County of Contra Costa
and Windemere Ranch Partners dated January 18, 1996 (Development Agreement)
requires the developer of Windemere, Windemere BLC Land Company, LLC (Windemere
BLC) to submit an Annual Report illustrating good faith compliance with those Developer's
Obligations set forth in Section 3 of the Development Agreement.
Following are the Developer's Obligations as provided in the Development Agreement
followed by Windemere BLC's responses. The Developer Obligations commence with
Section 3.03 of the Development Agreement.
Section 3.03. Compliance with Settlement Agreements.
The terms and provisions of this Agreement are intended to be consistent with and not to
modify, and shall not be deemed to abrogate or limit compliance with or the
implementation or enforcement of, the terms and provisions of any of the Settlement
Agreements. In the event of any conflict between the terms and provisions of this
Agreement and any Settlement Agreement, the terms and provisions of such Settlement
Agreement shall prevail to the extent of such conflict. if and to the extent any obligation of
any party under any of the Settlement Agreements is terminated for any reason, including,
without limitations any obligation under Section 3.12 (relating to the Interstate 680/Highway
24 interchange), Section 3.07 (relating to Design Issues), Section 3.10 (relating to the
payment of traffic fees to the City of Pleasanton), then such obligation shall not be required
to be satisfied hereunder.
Developer Response:
Windemere BLC, to the best of its knowledge, is in compliance with all
Settlement Agreements resulting from litigation to the 1992 Specific Plan and
EIR.
Section 3.04. Preliminary Development Plan.
Except as otherwise specifically agreed by County, Developer shall comply with all
conditions of approval to the Preliminary Development Plan.
Developer Response:
To the best of its knowledge, Windemere BLC is in compliance with all
Conditions of Approval applicable to the Preliminary Development Plan.
10
Section 3.05. Affordable Housing,
Developer shall, in connection with its development of Windemere Ranch, implement the
terms and provisions of the Affordable Housing Program as adopted by the Board of
Supervisors on March 22, 1994 pursuant to board order (the "Affordable Housing
Program'% which requires that a minimum of twenty-tive percent (2596) of all dwelling units
be developed as affordable to low, very low and moderate income households.
Developer Response:
As required under the Dougherty Valley Affordable Housing Program,
Windemere BLC has provided its plan for meeting Windemere's Affordable
Housing obligation through the full buildout of all 5170 homes in Windemere.
Windemere BLC has transferred title of property approved for the
construction of 650 moderate, 250 low, and 100 very low income units. This
property was transferred to Fairfield Residential and Regulatory Agreements
restricting the use of this property for affordable housing only have been
executed. The entitlements and necessary funding have been secured by
Fairfield Residential and construction of the affordable housing has been
completed and apartments are being occupied. These 1000 affordable
homes will put Windemere BLC well ahead of the affordable housing
timelines required by the Affordable Housing Program. In addition to these
1000 affordable home opportunities an additional site has been designated in
Phase 3 to accommodate the remaining 293 affordable apartments required
for the full buildout of Windemere. Mass grading for this site has been
completed and planning processes for the future development for the site are
underway.
PLEASE SEE WINDEMERE AFFORDABLE HOUSING PROGRAM
SCHEDULE OF DELIVERIES ATTACHED AS TABLE 4.
Section 3.06. Designation of Preferred Water Provider.
In consequence of the court sanctioned EBMUD Settlement Agreement Policy U- 1
of the Specific Plan which identifies alternative water suppliers shall be interpreted
and applied to Windemere Ranch as follows: Dublin San Ramon Services District is
the preferred water provider for the Windemere Site. EBMUD is an alternative water
provider, but only pursuant to the terms and conditions set forth in the EBMUD
Settlement Agreement. County staff will support and diligently process an
amendment which will incorporate such language into the Specific Plan.
Developer Response:
As previously reported, Dublin San Ramon Services District has been
designated as the water provider for Windemere. The annexation of
Windemere to Dublin San Ramon Services District has been completed.
11
Section 3.07. Design Issues.
Paragraphs 2, 3(a) and 3(b) of the NGO Settlement Agreement require certain actions to
be taken with respect to the design of Windemere Ranch, including participation in the
development of a design program for the "Village Center" of the Dougherty Valley,
provision of approximately eighty (80) acres of additional open space (provided that such
reconfiguration is physically feasible and permitted by law); and relocation of the high
school site proposed for the Dougherty Valley. Any obligation of Developer or County
under such provisions of the NGO Settlement Agreement shall be satisfied in connection
with any tentative map covering the area of the Windemere Site affected by such
obligation, which tentative map will be approved together with any necessary general plan
amendment, specific plan amendment or rezoning.
Developer Response:
At'this time, Windemere BLC, to the best of its knowledge, is in compliance with the
requirements pertaining to design issues.
Section 3.08. Coordination of On -Site Improvements.
County shall require that access or right-of-way for those certain road improvements
described on Exhibit B attached hereto and incorporated herein by reference, as roadway
segments W-1 and W-2, be offered for dedication as and at the times provided in the
conditions of approval of Shapell's preliminary development plan for the Gale Ranch Site
(as approved by the Board on the Second Approval Date pursuant to Ord. 95-62) and the
conditions of approval for the preliminary development plan for the Country Club Site (as
approved by the Board on December 20, 1994 pursuant to Ord. 94-649.); provided,
however, that if Developer's project generates the need for access or right-of-way for
roadway segments W-1 and/or W-2 over the Shapell Site prior to the time such access or
right-of-way is required for Shapell's project, then County shall ensure that the provision of
such access or right-of-way is subject to the following:
In order to accommodate Developer's development schedule, Developer may elect to
assume responsibility for constructing, without reimbursement from Shapell, roadway
segments W-I and/or W-2 in which case Shapefi shall dedicate or offer to dedicate, as
required by County, the necessary right-of-way to County upon satisfaction of the following
conditions: (i) Shapell will have reasonably reviewed and approved Bollinger Canyon
Road's horizontal and vertical alignment, grading and improvement plans; (ii) Developer
shall have provided to Shapell improvement agreements deemed acceptable by County
and executed by all parties, together with completion and payments bonds so that the
improvements shall be duly completed and no liens shall remain on Shapell's property;
and (iii) Developer shall have procured a policy of Comprehensive General Liability
Insurance in an amount and from an insurance company reasonably satisfactory to County
naming Shapell as an additional insured. Shapell shall have the right but not the obligation
reasonably to designate the source of cull dirt from the Gale Ranch Site which shall be
used to the extent needed for roadway segments W-I and/or W-2.
12
Developer Response:
Windemere BLC and Shapell Industries have executed an agreement which
sets forth the process and obligations of the respective parties to fully comply
with and complete the obligations contained within Section 3.08 of the
Development Agreement and these roadways have been constructed.
Section 3.09. Danville San Ramon/County Traffic Mitigation.
(1) Certain traffic improvements within the County, San Ramon and Danville are or
may be required to accommodate development under the Specific Plan (the "Project
Traffic Improvements'). The Project Traffic Improvements include (i) the on -site traffic
improvements described in the Specific Plan as the "Internal Circulation System" (the "On -
Site Traffic Improvements'), (ii) the off -site traffic improvements described on Exhibit C-1,
attached hereto and incorporated herein by reference (the "Initial Project Traffic
Improvements'} and (iii) certain additional off -site traffic improvements described on
Exhibit C-2, attached hereto and incorporated herein by reference (the "Additional Project
Traffic Improvements'). The Initial Project Traffic Improvements and the Additional Project
Traffic improvements are sometimes referred to collectively below as the "Off -Site Traffic
Improvements. it
(2) Subject to the provisions of Section -3.08 above, Developer shall be responsible
for the construction of those On -Site Traffic Improvements made necessary by Windemere
Ranch.
(3) Developer shall pay to County a per -unit traffic impact fee (the "Traffic Impact
Fee') in the amount necessary, but no more than the amount necessary, to fund
Developer's fair share of the cost of construction of the Off -Site Traffic Improvements;
provided, however, that Developer shall have responsibility for constructing roadway
segment W-3 as shown on attached Exhibit B and Shapell shall have responsibility for
constructing roadway segments S-1 and S-2 as shown on attached Exhibit B. In
calculating Developer's and Shapell`s respective obligations for the construction and/or
funding of the Off -Site Traffic Improvements, the costs of roadway segments S-1, S-2 and
W-3 shall be deducted from the aggregate total cost of the Off -Site Traffic Improvements
and not considered in making such calculations. The amount of the Traffic Impact Fee
shall be determined as set forth in subsection (4) below, and shall apply to residential units
developed on the Windemere Site. The Traffic impact Fee applicable to a residential unit
shall be paid when the building permit for such unit is issued.
(4) The amount of the Traffic Impact Fee shall be determined within six (6) months
following County's approval of this Agreement, but no later than the date upon which the
County first approves a tentative subdivision map showing individual residential lots for any
portion of the Dougherty Valley (other than for the Country Club Site), in the following
manner.- County, Developer, Shapell and, as required by the San Ramon Settlement
Agreement, representatives of Danville and San Ramon, shall meet and confer in good
faith to determine (i) the estimated reasonable cost of the Off -Site Traffic Improvements
and (ii) the respective proportions of such cost that fairly should be borne by Windemere
and Shapell (taking into account, among other things, development planned for the
Country Club Site and the fees being paid by Shapell with respect thereto) and other
projects or parties, if any, contributing to the need for such improvements and to whom the
13
Traffic Impact Fee will apply. In making such determinations and establishing the amount
of the Traffic Impact Fee, it shall be recognized that (a) Developer`s Toro rata contribution to
the traffic improvements described on Exhibit C-3, attached hereto and incorporated herein
by reference, shall be no more than is specified in, and shall be paid as described in,
Exhibit C-3; and (b) Developer and Shapell shall, taken together, be responsible for the
entire cost of the Initial Project Traffic Improvements as set forth in the San Ramon
Settlement Agreement (although each shall be responsible only for its fair sham of the cost
of such improvements). The costs and proportions so determined and agreed -upon by
County and Developer shall be reflected, as appropriate, in the Traffic Impact Fee. The
amount of the Traffic Impact Fee shall be adjusted annually in accordance with the
construction cost index published in the Engineering News Record.
(5) County shall enter into such agreements with San Ramon and Danville as
may be necessary or appropriate to establish a joint exercise of powers agreement (the
"JEPA') or some other program or mechanism to provide for (i) the collection of traffic
impact fees from development projects in San Ramon, Danville and Contra Costa County
and within the boundary of the JEPA or other program or mechanism that will contribute to
the need for the Additional Project Traffic improvements, which fees shall be in amounts
consistent with the determinations made under Subsection (4) above, (ii) the establishment
of an account or accounts (the "Local TIF Account') to hold Traffic Impact Fees collected
from Developer and Shapell, and traffic impact fees collected from the developers of other
projects that will contribute to the need for the Additional Project Traffic Improvements
(collectively, the "Local TiF Funds'); and (iii) the transfer to San Ramon, Danville and
County of Local TIF Funds attributable to the Off -Site Traffic improvements to be
developed within those jurisdictions (the "Local TiF Program').
(6) The timing of when an Off -Site Traffic Improvement is needed will be
determined by Measure C (1988) and any conditions of approval for subdivision maps. If
the Local TIF Program has not received sufficient developer fees to fund such an
improvement when it is needed, then Developer may be required to fund the difference, or
construct the improvement, to ensure the improvement is built on time. In such case,
Developer shall enter into a reimbursement agreement with County to credit or reimburse
Developer the eligible construction costs that were advanced to build the project. Any
credit so provided shall be applied in full against the Traffic Impact Fee for each residential
unit that receives a building permit following completion of the Off -Site Traffic Improvement
by Developer (rather than pro rata against the Traffic Impact Fee for all remaining
residential units in the Project) until such time as the full credit has been provided.
(7) County shall establish and implement a mechanism to reimburse Developer, and
shall reimburse Developer, that portion of the costs to be incurred by Developer in
connection with the funding or construction of the On -Site Traffic Improvements and the
Off -Site- Traffic Improvements that represents the extent to which such traffic
improvements will serve traffic generated by projects that are developed pursuant to
general plan amendments approved on or after the Effective Date.
(8) To the extent that any Project Traffic Improvement funded or constructed by
Developer is included on a project list under any Measure C Action Plan or CHIP
Deficiency Plan, and provided such transportation improvement has sufficient priority
under such Action Plan or Deficiency Plan, Developer shall receive a credit against, or
reimbursement from, any traffic fee imposed upon Developer under Section 3.09(11) or
Section 3.12 of this Agreement.
14
(9) Some portion of the Traffic Impact Fee may be allocated to and collected from
commercial development (on a per -square -foot basis) to occur as a part of Windemere
Ranch; provided, however, that the total amount of Trafi<c Impact Fee to be collected from
residential development to occur as a part of Windemere Ranch (as determined above)
shall be reduced by the amount of funds to be so collected from commercial development.
(10) County shall make its final determination of compliance with the standards of
the Growth Management Element of the General Plan relating to traffic in conjunction with
the review and approval of tentative subdivision maps.
(11) County shall not impose on Developer any fee or other obligation with respect
to roads or traffic impacts other than as specifically set forth in this Agreement, Section 4.4
of the San Ramon Settlement Agreement (relating to assurance of compliance with traffic
service objectives), Paragraph 1 of the Walnut Creek Settlement Agreement or Paragraph
1 of the Pleasanton Settlement Agreement (relating to Developer's payment of fees to
Pleasanton). Notwithstanding the foregoing, nothing in this Agreement shall prevent the
County from (i) applying to Windemere Ranch any subregional traffic impact fee required
by Measure C (1988) and adopted and applied consistently and on a uniform basis
throughout the Tri-Valley subregion by each of the seven jurisdictions that are now
signatories to the Tri-Valley Transportation Council joint powers agreement which is
adopted prior to the vesting date of any tentative map (provided, however, that County
shall provide to Developer a credit against any such fee for traffic improvements
constructed and/or funded by Developer under this Agreement or the San Ramon
Settlement Agreement), (ii) imposing on Windemere Ranch reasonable requirements for
the funding or construction of additional minor traffic improvements made necessary by
Windemere Ranch and identified through CEQA review of individual tentative map
applications for Windemere Ranch, or (iii) imposing on the Windemere Ranch a
subregional traffic fee developed by the JEPA identified in Section 3.09(5) to satisfy
Measure C requirements and for the sole purpose of funding a fair share contribution of
the Alcosta ramp realignment project at IG-680 and the auxiliary lanes project on 1-680
between Bollinger Canyon Road and Diablo Road.
Developer Response:
Windemere BLC has satisfied this obligation by initiating and participating in
the formation of the SCC (South Contra Costa) Area of Benefit Fee. All
traffic mitigation and roadway improvements cited in the Development
Agreement were included in this comprehensive sub -regional fee program.
The SCC fee program is administered by a Joint Exercise of Powers
Authority (JEPA) formed by the County, the Town of Danville and the City of
San Ramon. Windemere BLC and its successors and assigns are paying this
fee at the issuance of building permits by the County.
Section 3. 10 Pleasanton Traffic Mitigation.
Separate and apart from the Traffic impact Fee, Developer shall pay to County $150 for
each residential unit developed pursuant to the Project Approvals ("Pleasanton Traffic
Fees'). The Pleasanton Traffic Fees will be collected by County upon its issuance of the
building permit for each such unit and delivered to Pleasanton for the Mitigation of traffic
15
impacts on roadways located in its jurisdiction. If for any reason San Ramon assumes the
responsibility for issuing building permits for the Project (although the parties anticipate
that County will retain responsibility for the issuance of building permits notwithstanding
the municipal annexation of any portion of Windemere Ranch), San Ramon shall collect
and deliver the Pleasanton Traffic Fees as set forth above. As provided in Paragraph 5(b)
of the Pleasanton Settlement Agreement, Developers obligations pursuant to this Section
3.10 and Paragraph 1 of the Pleasanton Settlement Agreement shall cease in the event
that Pleasanton files any legal action challenging any use or approval or any modification
to any use or approval relating to the Dougherty Valley.
Developer Response
Windemere BLC and its successors and assigns are paying this fee at the
issuance of building permits by the County.
Section 3.11 Dublin Traffic Mitigation.
County and Developer shall work with the City of Dublin to establish a mutually
acceptable fee to account for the cost of mitigating the traffic -related impacts of the
Project on roadways located in the City of Dublin net of the cost of mitigating the traffic -
related impacts of development projected to occur within the City of Dublin (including,
without limitation, the East Dublin project) on the On -Site and Off -Site Traffic
Improvements, if any. Such fee, if any, will be collected by County upon its issuance of the
building permit for each residential unit in the Project and delivered to Dublin for the
Mitigation of traffic impacts on roadways in its jurisdiction. If for any reason San Ramon
assumes the ability for issuing building permits for the Project (although the parties
anticipate that response County will retain responsibility for the issuance of building
permits notwithstanding the municipal annexation of any portion of Windemere Ranch),
San Ramon shall collect and deliver the such traffic fees as set forth above. If County,
Developer and the City Dublin are unable to atfive at a mutually acceptable fee within six
(6) months following the Effective Date, then County and Developer may themselves
determine the amount of such fee, provided, however, that such six- month period shall
be extended for a period of time equal to the period of any undue delay caused by
Developer or County in establishing the amount of such fee. Any fee imposed on the
Project pursuant to this Section 3.11 shall be approved by the Board of Supervisors and,
except as otherwise agreed by County and Developer, remain fixed throughout the term
of this Agreement, provided, however, that such fee may be subject to escalation in
accordance with the Construction Cost Index" published in Engineering News Record. If
any regional traffic fee is established and required to be paid by Developer under Section
3.09(11) of this Agreement, and such regional traffic fee provides funding for those
improvements in Dublin included in calculating the amount of the traffic fee to be paid to
Dublin as set forth above then, with respect to any residential unit upon which such
regional traffic fee is imposed, Developer shall be relieved of its obligation to pay such
portion of the fee described in this Section 3.11 that is attributable to those improvements
in Dublin that are funded by such regional fee.
Developer Response:
16
In June 2000 the County Board of Supervisors approved a per dwelling unit
fee to mitigate impacts of Dougherty Valley Development on the City of
Dublin. Windemere BLC and its successors and assigns are paying this fee
at the issuance of building permits by the County. The County administrates
the Dublin Joint Exercise of Powers Agreement (Dublin JEPA).
Section 3.12. Walnut Creek Traffic Mitigation.
Notwithstanding any other provision contained herein, all future tentative subdivision maps
covering the Windemere Site shall be subject to all standards and requirements adopted
by the County pursuant to Measure C (1988), including but not limited to the Tri-Valley
Action Plan or fees adopted thereunder, and all standards and requirements adopted
pursuant to Title 7, Division 1, Chapter 2.5 of the Govemment Code (Section 65080 et
seq.), including but not limited to all congestion management plans and deficiency plans
adopted thereunder, provided that such standards and requirements are designed to
mitigate congestion on the Interstate 6801Highway 24 interchange or streets within Walnut
Creek, are applied to all other major residential projects within the member jurisdictions of
SWAT, TRANSPAC and TRANSPLAN, and are imposed by the County or City only to the
extent of the project's impacts on the interchange or streets within Walnut Creek. Neither
the foregoing provision nor any other provision of this Agreement (other than the section of
this Agreement relating to traffic -based reductions in permitted development (Section
4.01)) shall limit the authority of the County to apply the standards and requirements
described above adopted pursuant to Measure C (1988), including but not limited to, any
Action Plan or fees.
Developer Response:
Windemere BLC and its successors and assigns are paying this fee at the issuance
of building permits by the County. The County collects this fee at issuance of each
individual residential building permit.
Section 3.13 Processing- Fees.
Fees charged by County which solely represent the reasonable costs to County for County
staff time and resources spent reviewing and processing Project Approvals are referred to
in this Agreement as "Processing Fees. " County may charge Developer any applicable
Processing Fee that is operative and in force and effect on a Countywide basis at the time
such Processing Fee ordinarily is collected.
Developer Response:
Fees are collected by the County as applications are submitted for
processing.
17
Section 3.14 Mitigation Monitoring Program.
Developer shall fund development and operation of a system (the "Permit Tracking
System') to monitor compliance with the requirements of the San Ramon Settlement
Agreement regarding the provision of certain capital facilities, compliance with mitigation
measures and compliance with project conditions, through the payment of a fee not to
exceed $100 per residential unit developed on the Windemere Site, payable at recordation
of the final map encompassing such unit. Developer shall, at the time services are
performed, pay the County staff costs of carrying out the County's Mitigation Monitoring
Program, as adopted by the Board on the First Approval Date, and as it may be amended
for the purposes of compliance with CEQA (the "Mitigation Monitoring Program'), which
are attributable to development of the Windemere Site, on a time and materials basis, and
shall pay the reasonable costs of consultants as necessary to implement the Mitigation
Monitoring Program.
Developer Response:
The County collects this fee at issuance of building permit.
Section-3.15 Other Financing Requirements.
(1) County and Developer shall cooperate in (i) the fonnation, as soon as
reasonably practicable but in any event prior to the filing of the first final subdivision map
for any portion of the Dougherty Valley, of a County Service Area or other financing entity
to receive certain funds and provide certain services, including the operation and
maintenance of facilities and infrastructure, as described in Section 3.3 of the San Ramon
Settlement Agreement and (ii) the establishment, as soon as reasonably practicable but in
any event prior to the filing of the first final subdivision map for any portion of the
Dougherty Valley, of a mechanism adequate to fund the provision of such services as
described in Section 3.3 of the San Ramon Settlement Agreement.
(2) As described in Section 3.4 of the San Ramon Settlement Agreement, to ensure
that the Community Center, Senior Center, Library, and Police Substation described in the
Specific Plan will be constructed on a timely basis and made available to Dougherty Valley
residents at the appropriate time, County shall (except to the extent some other method for
the financing or provision of such facilities is requested or established by Developer or
Shapell, as appropriate) assess against residential units to be developed in the Dougherty
Valley a fee, special tax or assessment in an amount sufficient to fund Developer's and
Shapell's obligation to contribute to the cost of such facilities. Funds so collected will be
held in a separate account and made available to Developer or Shapell, as appropriate, for
the construction of such facilities. The precise form, timing and amount of such fee, tax or
assessment shall be in accordance with the terms and provisions of Exhibit D, attached
hereto.
18
Developer Response:
County Service Area M-29 has been formed. To the best of its knowledge,
Windemere BLC is in compliance with all the requirements of this section.
With the foregoing, Windemere BLC, to the best of its knowledge, is in full compliance with
its obligations under the Development Agreement.
19
ir-A
TABLE 1 - 2006 WINDEMERE ANNUAL COMPLIANCE REPORT
Windemere Facility Maintenance Matrix
Ownership Propertv Maintenance
Facility
Entity
Funding
Entity
1. Public Streets
San Ramon
Property Tax / CSA Tax
City of San Ramon
2. Private Streets
HOA
HOA
HOA
3. Open Space
A. Grassland
GHAD
CSA Tax / GHAD Assmnt
GHAD - coord. w/CNLM
B. Slopes
GHAD
GHAD Assmnt
GHAD
C. East/Main Branch Corridor
GHAD
CSA Tax / GHAD Assmnt
GHAD-Structures/ Creek bank stability
CSA-Landscape
D. Trails
GHAD
CSA Tax
City CSA
4. Mitigation Features
A. Seasonal Wetlands
GHAD
Endowment
CNLM coord. w/ GHAD / City
B. Sees
GHAD
Endowment
CNLM coord. w/ GHAD / City
C. Ephemeral Channels
GHAD
Endowment
CNLM coord. w/ GHAD / City
D. Created Tributaries
GHAD
Endowment
CNLM coord. w/ GHAD / City
5. Water Quality Ponds
San Ramon
NPDES Tax
City of San Ramon
6. Fire Control
A. Grassland
GHAD
CSA Tax
GHAD coord. w/ City of San Ramon
with Fire District
B. Fuel Transition Zone
GHAD
CSA Tax
-City of San Ramon
7. Landscape
A. Public ROW
San Ramon
CSA / Property Tax
City of San Ramon
B. Entry Features/Walls
San Ramon
CSA / Property Tax
City of San Ramon
C. Parks
San Ramon
CSA / Property Tax
City of San Ramon
D. Fuel Transition
GHAD
CSA Tax
GHAD coord. w/ City of San Ramon
8. Detention Basin
San Ramon
CSA Tax
City of San Ramon
NPDES - Nafl Pollutant Discharge Elimination System HOA - Home Owners Association
GHAD - Geologic Hazard Abatement District CSA - County Service Area
CNLM - Center for Natural Lands Management (Open Space Manager for Windemere
s
TABLE 2 - WINDEMERE 2006 ANNUAL COMPLIANCE REPORT
WINDEMERE HOMEBUILDING STATUS TABLE
TOTAL # Building
OF Permits PERCENT OF
BUILDER TRACT NUMBER VILLAGE Homes Issued TOTAL
WINDEMERE PHASE 1 (Homes Under Construction)
Lennar Homes
8150
11A
68
68
100%
Lennar Homes
8152
13
115
115
100%
Lennar Homes
8154
15
96
96
100%
Lennar Homes
8153
14
107
107
100%
Centex Homes
8149
10
138
138
100%
Centex Homes
8155
18
64
64
100%
Centex Homes
8158
19
101
101
100%
Centex Homes
8156
17
78
78
100%
Centex Homes
8618
11 B
10
10
100%
Brookfield Homes
8151
12
47
47
100%
Brookfield Homes
8619
12B
16
16
100%
Brookfield Homes
8155
16
90
90
100%
Brookfield Homes
Townhomes
160
160
100%
Western Pacific Housing
Condominiums
142
142
100%
Fairfield Branch Creek Place
Moderate Income
Apartments
250
250
100%
Fairfield Branch Creek Vista
Moderate Income
Apartments
400
400
100%
Fairfield Creekview
LowNery Low Income
Apartments
350
350
100%
Phase 1 Subtotal
2232
2232
100%
WINDEMERE PHASE 2 (Homes under Construction)
Lennar Homes
8713
21
55
55
100%
Lennar Homes
8717
25
103
103
100%
Centex Homes
8712
20
76
76
100%
Centex Homes
8715
23
77
77
100%
Brookfield Homes
8714
22
69
69
100%
Brookfield Homes
8716
24
68
68
100%
Phase 2 Subtotal
1
1 448
1 448
1 100%
WINDEMERE PHASE 3 (Homes Construction to begin late 2006)
Apartments
Moderate Income
26
191
0
0%
Apartments
Low Income
26
73
0
0%
Apartments
Very Low Income
26
29
0
0%
Centex Homes
8508
27
179
0
0%
Brookfield Homes
9020
28
82
0
0%
Lennar Homes
9021
29
100
0
0%
Centex Homes
9022
30
99
0
0%
Brookfield Homes
9023
31
103
0
0%
Phase 3 Subtotal
856
0
0%
BUILDER TRACT NUMBER VILLAGE
WINDEMERE PHASE 4 (Homes under Construction)
TOTAL # Building
OF Permits
Homes Issued
i
PERCENT OF
TOTAL
Lennar Homes
8777
36
79
79
100%
Lennar Homes
8778
37
75
75
100%
Lennar Homes
8780
39
91
91
100%
Centex Homes
8773
32
103
103
100%
Centex Homes
8774
33
97
97
100%
Centex Homes
8779*
38
141
141
100%
Brookfield Homes
8775
34
94
94
100%
Brookfield Homes
8776
35
78
78
100%
Phase 4 Subtotal
758
758
100%
Kepresents vi nomes tieing duet in zl nundmgs.
WINDEMERE PHASE 5A & 5B (Home under Construction)
Centex Homes
8924
40
96
49
51 %
Brookfield Homes
8925
41
114
64
56%
Lennar Homes
8926
42
98
60
61 %
Brookfield Homes
8927
43
84
58
69%
Lennar Homes
8928
44
89
62
70%
Centex Homes
8929
45
80
44
55%
Phase 5A/13 Subtotal
I
1
1 561
337
1 60%
WINDEMERE PHASE 5C (Home Construction to begin late 2006)
Centex Homes
8930
46
39
0
0%
Lennar Homes
9142
47
83
0
0%
Lennar Homes
9143
48
92
0
0%
Brookfield Homes
9144
49
101
0
0%
Phase 5C Subtotal
315
0
0%
GRAND TOTALS 1 5170 1 3775 1 73%
TABLE 3 - 2006 WINDEMERE ANNUAL COMPLIANCE REPORT
WINDEMERE DEVELOPED PARKLAND TABLE
PARK STATUS/SCHEDULED
NUMBER PARK NAME ACREAGE OPENING
PHASE 1
Phase 2
1
Souyen Park
2.4
COMPLETE
2
East Branch Park
5.1
COMPLETE
3
Bellingham Square
4.1
COMPLETE
4
Hidden Hills School Park
6.3
COMPLETE
8
High School Park
17.2
Est. - August 2007
r-12
Middle School Park
12.4
COMPLETE
Phase 9 Subtotal 47.5
5
Hidden Valley Park
4.5
COMPLETE
6
Limerick Park
1 2.8
COMPLETE
Phase 2 Subtotal 7.3
Phase 3 7 Piccadilly Square Park 4.1 Est. - Spring 2008
Phase 3 Subtotal 4.1
Phase 4
Phase 5
9
Tiffany Roberts Sports Park
15
Est. Spring 2007
11
Live Oak School Park
5
Est. -Aug2007
10
Sherwood Park
1.5
COMPLETE
Phase 4 Subtotal 21.5
13
Arlington Park
4.1
Est. - Summer 2007
14
Fire Truck Park
1.1
Est. - Summer 2007
15
Six Pillars Park
2.5
Est. - Summer 2008
16
Ramona Park
4
Est. - Summer 2008
17
Pocket Park
1.4
Est. - Summer 2008
18
Tassajara RidgeTrail
Staging Area
0.5
Est. - Spring 2008
Phase 5 Subtotal 13.6
Total Developed Parkland Phases 1-5 94
Parks with est- are estimated dates and the timing of completion is subject to the future pace of home construction
v
TABLE 4- 2006 WINDEVIERE ANNUAL COMPLIANCE REPORT
WINDEMERE AFFORDABLE HOUSING PROGRAM
SCHEDULE OF DELIVERIES
Phase 1- Affordable Apartments
Moderate Income Total Complete Actively Leasing
650 650
Low Income Total
Complete Actively Leasing
250
250
Very Low Income Total
Complete Actively Leasing
100
100
All Phase 1 Moderate / Low / Very Low Income Apartments were completed in 2006.
Phase 3 - Affordable Apartments (191 Moderate / 73 Low / 29 Very Low)
Submittals Anticipated Total
in Early 2007 293
Total Number of Affordable
Homes to be provided. 1293
25% Total Affordable Housing
Requirement 1293
San Ramon Level of Service Information
I
y
z /
... ...
:.. v <,...., , .....-. .. ... a., r- ,t '�.x. ., >,•:.. »,.:>S<.:r> ,..,..>,C-.. .Y.:. r ,.M ,.M . .x.id,,. X
' ♦ ):: ... :....
::: ...
xt
.. :... .- ...... ,.. '... ... <r: .<. ., -t ,:. ....-.x . . .-. ..sr ,X'.f ,, ., ., ai' ..C.S.. .:Y::
: :.::. , >.,. ,..... , ,.. .: ,:. ,x ::.. , vat :: .. : _ <. ,. x,. T% YS6 .,. ✓ {...
.. r
,
'. .... :�
.;...;.
.. ..;.
.<>..�yt<.
•fa':-,`'l_:.
: .: - t < .. x a+: a.., x,. .. a.;,,,...« :.:.[.,,x,ad }.�'...... x•
.. :. ,.:. ... .:. x •..#a..< i',. < .r. . �r
�xG���D)UGHEFTY 1A L
).:.
I.
. .
,
,
tit
,
ZJ ji
FALLS
�� �\IV�
ai'II�y,.� ii
1'ii"'�C�BER��O�
SEtii:��{tiQii�,
7 it
-
>
,
, .•.� �
> . ::
anttgisaty �d.lCr�w cy�, Rd
0:43 O;S :
7
0.33 0:68 .
Or41:t1;69
a:90
a
AL�,�� BI:>I�'3�d.Riar�cls Rti:.:1
.� 1.
;_
Q.52 0.4� ., ..
; ,
. NA: ; I�,A...
0.29 _ _ Q,�B .:
0.2$ 0:32
4.28 � 0�27 ._
�
:. • 27 .
>,a
''
.. -
A.l�osta�l�Cmw.C{��:. ice;. � -.
Q.4L. � - 4.bb..:
;
;.. ,043.. � , . ':0:5� :�.:
, , ; 8 .
�,: 0 3b:.. Os$ ::
,0:3� OG$ .:
- .. _....> .....
- 0.39: ° .. 0:67
_.. ....,, _.. .::. _.
. � .0:38i 0:61" '
,.:._ ..
' 4 �2. "<' 067
.......
. �.::<.:._ _.
B � �ltn - :.Rd�
O.SI , 049 .
;.:..b.63 0.57.
.
, , ,.,
I! bl;:.. t;.f4;
.:
;;I..:0.6D . :U�6b ..
' q.6ti. ;, 0.63:.. -
. _ t1.75: , 0:81
: _.
`f}.7.I
, .
i
_
0.62 0.45:• :.
;:.0 613.. 0.34.
; _ fl {3 0.4$ :::.
ti.S2 0.5Q .
_ .. 0.45 .. 050
4 5S 0 52
' ::0 S9 - fl $4
- . __
Q'�?II :Diiraw C : R+�.: x
.:oso aa8.
.�
,4�...
_ _.
,.__.0.5.� .._.:_ _0.53
7� .._ :- A•b6
t
t
i
} :
_ f
<
a
•
,
i ,.
,.
.,.-
-.
...
.. .:
.. ,:...
a..
, .. . ...- .. ..... .. .:.. .... ::. > .... ,ar. _, ...3,. f:.. .r.w......., <.,.,.,... r.n ,.2...;. ......, 1. „GS F x
... < ..... :. >.. _. ...... ,. f. ". «, r._.. 3 ,, x.,. _,,. a - .r, ,., ...,.. <v ..,... .,..:. .., .•: _. ,3. YS r� .x3w
�,,a,� n ,� t >. ..< rx. "... S .,x.. .. ., x<N"v.. >: a 4 . >, < �>: •. c •fx & u..,:<e., 3. >:,s.:::,, -,3j t .., t., -tiA : 9,. C... ,<ia,<.
r < ,..¢. ,e ..,. ,. ... FL`3.:�.., �{ e.:i... �. ,i;x .., .. E,e ''�... Yt .< > ..., » .. �s3 ..>.:.. 1�if-.� % e< >•,,,. ..<. .. f.. '.
-'(:�- -; <S .,. X•"^.}...>.. .,B.,R. s..� , a- < ..,.->L...x..,S� ,..... ., .,, :s <,>,... .,d.a .. x2-i.?_'F,.. ..�". 3> II F
.,. ,... ."". ,.,,, ,.,.. .,s .. ,,, -., , , i1<i iS1.." } i' :, ...x <,tr",.s i�, .>. ..,,. � Y,E, 8,.�ra-..'{,o. Ce , x9... �. - ... ,...> ... � :, ,.^e .. ,,.,.�,,.. i.. >.Y. ._..... , 'N,°,�...: .Lr, ...< _FSJ r•_3..3^. �._ G.
l
DY MC31�1`t RIp PL'�/
r
L� CIF
:h
5���'1�►� --
ne on
..... ..-..
�_ ��L�'��0��:�•iWs:, :.
;.,:. ..�s��:,
:: :: :: A
F
...:_.:.
S
:.'
�443
�.3b :
,..
.._.. 0.39 ,
r
_ .:. 0.3
. b.3�•'
�� 0.��
-.
Alcb9t�:5f;l$b eir :: -di
t
: o•S;I
0 (5
'zap" ...;..
0 6I
i.60
.... .,
1-680 SB OfFCto* Gyn. Rd.
_ 0.62
0 f 1
0.63
41.62 .
0,4 ..
0.55
;. 0.59
I-680 NB OYCraw : R1:
0:60
0:58
0.61
0.51'
0.52 .
0.54
0.53
I-680 SB OfMollffi— Gyn Rd.
0.49
0.51
o:55- ,
0:54
0.53`
0.56
" 0.52
1-680 NB OfFBoitinger Cyn:.Rd.
0.75
0.75
0.7b
0.72
0.76
0:8.4,
0.72
Dougherty Rd,/Crow Cyn. Rd.
' 6°
=lw Alcosta BL/O1d Ranch Rd.
Alcasta BL/Crow CyrL Rd.
Alcusta BL/Bollinger Cym. Rai.
'
I-680 SB OfMtow Cyn. PA
I-680 NB Of l7Crow Cyrl. Rd.
1-680 SB OE Bo ' er Rd
1-680 NB O�'Bollin Rii:
C3_n=
JDV LOS Mornitoring S-Yr Graph 10-24-M
1Q115/Z.006
-'
e
f
fi 4. t 7 � £1 .
;s
ao�waiu
J
It
.
•.
ii
F
i+ A
IN
E
tip � ;" •'
F is.5
Z
2�
�y
1 .
rn
it
7+
7
9
-
L � .
4
_6
l
tO
i
Y
X
t Y
r
-
-- F,
Sheet 4 of 4
Dougherty/Crow Canyon AM PEAK LOS
0.50
0.45 - -- --- �-- '"
0.40 - --- -
0.35
0.30 -- - --- --- -
- Dougherty Rd./Crow
0.25 -- 1 Cvn. Rd.
0.20
0.15 -�--
0.10
0.05-- - - —
0.00 ---
2000 2001 2002 2003 2004 2005 2006
Alcosta Boulevard Intersections AM PEAK LOS
Alcosta BL/Old Ranch
Rd.
Alcosta BI./Crow Cyn.
Rd.
Alcosta BI./Bollinger
Cyn. Rd.
2000 2001 2002 2003 2004 2005 2006
0.90
0.80
i
0.70
--
1-680
SB
Off/Crow Cyn.
O.fiO
Rd.
0.50
-- -- --
1-680
NB
Off/Crow
Cyn.
Rd.
0.40
--1-680
SB
Off/Bollinger
0.30
_— -��__------------_._.__ _r___
Cyn.
Rd.
—1-680
NB
Off/Bollinger
0.20
Cyn.
Rd.
0.10
-- --
0.00
2000 2001 2002 2003 2004 2005 2006
Dougherty/Crow Canyon PM PEAK LOS
0.80 _.
0.70
0.60
0.50 ---
0.40
0.30
0.20 -- -
0.10 —
0.00
2000 2001 2002 2003 2004 2005 2006
Dougherty Rd./Crow
Cvn. Rd.
Alcosta Boulevard Intersections PM PEAK LOS
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
Danville Level of Service Information
MEMORANDUM
DATE: October 24, 2003
TO: Aruna Bhat, Contra Costa County Community Developme Department
FROM: Tai Williams, Transportation Services Manager'
SUBJECT: Dougherty Valley Traffic Level -of -Service (LOS) Monitoring Report
Pursuant to the terms of the Dougherty Valley Settlement Agreement (DV SA), we are hereby
transmitting traffic level -of -service data for the Camino Tassajara/Crow Canyon intersection
within the Town of Danville.
The LOS calculations are based on counts taken by the Town of Danville in October 2002. The
traffic LOS is calculated using Contra Costa Transportation Authority's CCTALOS program,
and is consistent with the methodology used to evaluate the Town's compliance with the
Authority's Growth Management Program requirements.
Intersection AM Peak LOS PM Peak LOS
Camino Tassajara/Crow Canyon 0.70/B 0.77/C
UATransportation\Agencies & COmmittres\DVOCIDVOC Traffic Monitoring Report 2003.doc
MEMORANDUM
DATE: November 17, 2004
TO: Aruna Bhat, Contra Costa County Community Development Department
FROM: Tai Williams, Transportation Services Manager
SUBJECT: Dougherty Valley Traffic Leve;-of-Service (LOS) Monitoring Report
Pursuant to the terms of the Dougherty Valley Settlement Agreement (DVSA), we are hereby
transmitting traffic level -of -service data for the Camino Tassajara/Crow Canyon intersection
within the Town of Danville.
The LOS calculations are based on counts taken by the Town of Danville in May 2004. The
traffic LOS is calculated using Contra Costa Transportation Authority's CCTALOS program,
and is consistent with the methodoloCr
.N, used to evaluate the Town's compliance with the
Authority's Growth Management Program requirements.
Intersecti on
AM Peak LOS PM Peak LOS
Camino Tassajara/Crow Canyon 0.58/A
U:'Ji-ansnortanomAeencies & ( omrntttees\DV0C\nV0C' Traffic Monitoring, kenort 2004.dor
0.63/B
MEMORANDUM
DATE: November 28, 2005
TO: Aruna Bhat, Contra Costa County Community Development Department
FROM: Tai Williams, Transportation Services Manager
SUBJECT: Dougherty Valley Traffic Level -of -Service (LOS) Monitoring Report
Pursuant to the terms of the Dougherty Valley Settlement Agreement (DVSA), we are hereby
transmitting traffic level -of -service data for the Camino Tassajara/Crow Canyon intersection
within the Town of Danville.
The LOS calculations are based on counts taken in March 2005. The traffic LOS is calculated
using Contra Costa Transportation Authority's CCTALOS program, and is consistent with the
methodology used to evaluate the Town's compliance with the Authority's Growth Management
Program requirements.
Intersection
AM Peak LOS PM Peak LOS
Camino Tassajara/Crow Canyon 0.59/A
UATransportation\Agencies & CommitteesOVOCOVOC Traffic Monitoring Report 2005.doc
m . n:
Shapell and Windemere
Park -and -Ride Lots
H IKAM TVANSP.0HATI-Oh (ONSUITANTS, I K.
Memorandum
Date: July 7, 2006
To: Steve Savage
From: At van den Hout
Subject: Dougherty Valley Park & Ride Lots
Gale Ranch Phase III Conditions of Approval Items 176-F and 211
Gale Ranch Phase II Conditions of Approval Item 247-I
[Tracking Number: 04.06.24]
This memo report is an addendum our July 22, 2004 memorandum, which is included as Attachment A,
regarding the planned Park and Ride lot near the Bollinger Canyon Road / Stoneleaf Road intersection.
Items 176-F and 211 of the Gale Ranch Phase III and item 247-I of the Gale Ranch Phase II Conditions of
Approval relate to the need for Park and Ride facilities in the Dougherty Valley area. These conditions state
the following:
CoA 176-F states: Provide park and ride lots in conformance with the Dougherty Valley Specific Plan,
including a facility with a minimum of 100 parking spaces in the vicinity of the Dougherty Road /Bollinger
Canyon Road intersection, when needed. jE1R Mitigation Measure 4.6-131
CoA 211 states: The applicant shall submit a study evaluating the need for construction and phasing for the
park and ride lot or parking spaces subject to the review and approval of the Public Works Department.
When needed, the applicant shall submit improvement plans for the park and ride lot, which can be phased,
to the Public Works Department for review and approval.
One of the conclusions of the July 22, 2004 memo was that there would be adequate remaining capacity at
three other park -and -ride lots in the general Dougherty Valley area to accommodate potential future demand
when the Dougherty Valley is fully developed with 11,000 homes. This July 2004 study was based on future
travel projections and parking occupancy counts at the three park -and -ride lots. The park -and -ride lots were
also counted in 2006 and the data showed a 28% increase in parking demand compared to the 2004 counts as
is shown in the table below. Despite the increase in use, only 30% of the available spaces were occupied in
2006.
Park -and -Ride Vehicle Count
Spaces Spaces Occupied
Park and Ride Lot Available June 2004 June 2006
1-680 / Sycamore Interchange 210
1-680 / Bollinger Canyon Interchange 110
San Ramon Transit Center 54
47
22%
72
34%
34
31 %
33
30%
7
13%
8
15%
374 88 24% 113 30%
Percent
Increase
53%
-3%
14%
28%
Shapell Industries has developed a plan to construct a dog park at the southwest corner of the intersection of
Bollinger Canyon Road and Stoneleaf Road, which will include at total of approximately 50 parking spaces.
The intent is to make parking available to visitors of the dog park as well as to potential park -and -ride users.
Although empirical data on the use of dog parks is not available, it is believed that most of its use occurs
during after -work hours on weekdays and on weekends and it is not anticipated that many of the 50 spaces
would be occupied by dog park visitors during work hours on weekdays. Based on the observed data, the
estimated use of the park -and -ride lots in the future, and the anticipated use of the combined dog park, a100-
space park -and -ride lot could be replaced with the proposed plan of a combined dog park / park -and -ride lot.
ATTACHMENT A
Memorandum
Date: July 28, 2004
To: Tom Simonson
CC: Sam Worden
Steve Savage
John Zenner
From: At van den Hout
Subject: Dougherty Valley Park & Ride Lots [Conditions of Approval Items 176-F and 211]
[Tracking Number: 04.06.24]
This memo report is in response to items 176-F and 211 of the Gale Ranch Phase 3 Conditions of Approval
[CoA]. These conditions relate to the need for Park and Ride facilities in the Dougherty Valley area.
CoA 176-F states: Provide park and ride lots in conformance with the Dougherty Valley Specific Plan,
including a facility with a minimum of 100 parking spaces in the vicinity of the Dougherty Road / Bollinger
Canyon Road intersection, when needed. [EIR Mitigation Measure 4.6-13]
CoA 211 states: The applicant shall submit a study evaluating the need for construction and phasing for the
park and ride lot or parking spaces subject to the review and approval of the Public Works Department.
When needed, the applicant shall submit improvement plans for the park and ride lot, which can be phased,
to the Public Works Department for review and approval.
Introduction
Park and ride lots can help make transit and carpooling viable commuting alternatives to single
occupancy vehicles. Benefits include lower vehicle emissions, reduced travel costs for individuals, and
less congestion on roadways. Park and ride lots are often located along major travel corridors (primarily
freeways) and at major transit centers. Carpool park and ride lots are mostly found near freeway
interchanges where single drivers meet and carpools are formed by two or more persons. The commuters
continue their trip in one vehicle, leaving other vehicle(s) behind, to reduce their travel time (carpool
lanes) and/or travel cost (gasoline, tolls, parking charges). There are numerous carpool lots throughout
the San Francisco Metropolitan area. Two of those parking lots are along the I-680 corridor in the Tri-
Valley area. A 210-space parking and ride lot is located at the interchange of I-680 and Sycamore Valley
Road. A second park and ride lot with approximately 110 spaces is situated at the Bollinger Canyon
Road interchange with I-680.
Park and ride lots at transit centers or along major transit routes are intended to provide parking for
commuters who use transit as their primary mode of transportation. In the Tri-Valley, the park and ride
lot at the Pleasanton BART station provides about 2,600 parking spaces for commuters. In addition, a
54-space parking lot that is open to carpool or transit commuters is located at the San Ramon Transit
Center at the corner of Executive Parkway and Camino Ramon.
Inventory and Utilization of Existing Park and Ride Lots in the Tri-Valley Area
As mentioned earlier, there are several park and ride lots in operation that serve Tri-Valley commuters.
During the month of June, two parking occupancy counts were conducted at the park and ride lots along
the I-680 corridor and at the San Ramon Transit Center. The sites were visited on Tuesday, June 22 and
Wednesday June 30 around 9:30 in the morning. The table below shows the capacity and average
utilization of those park and ride lots. Both park and ride lots along I-680 are also served by CCCTA's
bus transit lines.
Number of Parking Spaces
Park and Ride Lot Available Occupied
1-680 / Sycamore Interchange 210 47
1-680 / Bollinger Canyon Road Interchange 110 34
San Ramon Transit Center 54 7
374
88
The results of the field investigation shows that the park and ride lots are currently greatly under utilized.
Only about 24% of the available spaces are occupied. The three park -and -ride lots combined have an
unutilized capacity of approximately 284 spaces.
Policy C-6 of the Dougherty Valley Specific Plan states that Park and ride locations along the arterial
street network should be provided to serve transit stops and to serve as meeting points for ridesharing.
The goal of the proposed Dougherty Valley park and ride lots mirrors the purpose of the existing park
and ride facilities; i.e. provide parking to encourage ridesharing and transit use. Given the location of the
proposed Bollinger Canyon/Dougherty Road park and ride lot, the "demand" would primarily come from
Dougherty Valley residents.
Future Travel Patterns
In order to determine the future travel patterns of Dougherty Valley residents, and therefore the potential
of park and ride and shared ride demand, the Tri-Valley Transportation Model was used. The land uses
and transportation improvements assuming build out of the Dougherty Valley were included in the
assumptions and the model was run to estimate the work destinations of Dougherty Valley residents and
major travel corridors that would serve the commute traffic. The results of the model forecasts of future
travel patterns are summarized in the table below.
Distribution of Dougherty Valley Home -Based Work Trip Productions
Travel Corridor
Destination Areas
Trips
%
1-680 Northbound
Central Contra Costa County
1,600
13%
1-680 Souhbound
Santa Clara County
1,600
13%
1-580 Westbound
Hayward/Oakland/San Francisco
2,000
16%
1-580 Eastbound
Livermore/Altamont Pass
500
4%
Local Arterials
Tri-Valley Area
7,000
55%
12,700
100%
The table shows that about 55% of the work trips would have a destination within the Tri-Valley area.
These trips are relatively short and are unlikely to use park and ride. Travel along the freeway corridors
is primarily oriented to the north, west, and south of the Dougherty Valley. Only about 4% of the
commuter trips would travel to the east via the I-580 corridor. Assuming that the park and ride demand
for trips with destinations within the Tri-Valley is insignificant (no cost or time savings) and the majority
of the longer commute trips would be made along the I-680 and I-580 (west) freeways, the most logical
locations for park and ride facilities would be near interchanges along these freeways. In fact, the existing
park and ride lots along I-680 at Bollinger Canyon Road and at Sycamore Valley Road are conveniently
located in these high -demand commuter corridors. Since these park and ride lots are greatly underutilized,
and the demand for park and ride facilities for the future Dougherty Valley residents would be near the I-
680 corridor (see table on previous page), it is premature at this time to plan and construct a new park
and ride facility along Bollinger Canyon Road within the Dougherty Valley urban area.
Although the Tri-Valley model is not capable of estimating the number of people that would ride share
(park -and -ride and carpool), the model can be use to estimate the potential for park and ride to transit.
The Tri-Valley transportation model was used to estimate travel market and the potential use of the
proposed park and ride lot along Bollinger Canyon Road. The Tri-Valley model is the Tri-Valley
Transportation Council's (TVTC) adopted travel demand forecasting tool for the past ten years. The
model has been widely used to evaluate numerous land use and transportation project with in the Tri-
Valley area, including the Tri-Valley Transportation Plan. The model assumes build out of the Dougherty
Valley and includes bus transit service along Dougherty Road and Bollinger Canyon Road serving
Dougherty Valley residents. The various bus routes assumed in the model are shown in the table below.
Peak Transit Bus Service through the Dougherty Valley
Name Service Routing
Headway
ccca
Bishop Ranch - Pleasanton BART
Local
Bollinger Canyon Loop - Dougherty Road
20 min.
cccb
Bishop Ranch - Pleasanton BART
Local
Crow Canyon Road - Dougherty Road
20 min.
cccd
Bishop Ranch - Pleasanton BART
Local
Windemere - Tassajara - Dublin Blvd
20 min.
ccccx
Walnut Creek - Pleasanton BART
Express
1-680 - Bollinger Canyon - Dougherty Road
20 min.
The model estimated that only about 10 commuters would park at the proposed Bollinger Canyon park
and ride lot and continue their trip on transit.
Summary
• Compared to the proposed park and ride facility within the Dougherty Valley, the existing park and
ride lots along I-680 and at the San Ramon Transit Center are strategically better located — near a
major freeway and transit center - within a short driving distance from the Dougherty Valley.
• The existing park and ride lots are greatly underutilized (about 24% occupancy) and have a
remaining capacity of about 285 spaces.
• The proposed park and ride lot along Bollinger Canyon Road is centrally located within the
Dougherty Valley. It would be equally or more convenient for a local carpool driver to pickup a local
carpool passenger at home rather than at the proposed park and ride lot. In addition, this would leave
the vehicle of the carpool passenger at the home and the vehicle could be used by another member of
the household.
• The Tri-Valley transportation model was used to estimate travel market and the potential use of the
proposed park and ride lot along Bollinger Canyon Road. The model assumed buildout of the
Dougherty Valley and includes bus transit service along Dougherty Road and Bollinger Canyon
Road serving Dougherty Road residents. The estimated demand for parking is about 10 spaces.
• The Dougherty Valley is currently not serviced by transit and the type, routing and frequency of
potential future transit service are uncertain at this time. There is currently no planned transit service
for through the Dougherty Valley.
Recommendations
• Reserve property in Dougherty Valley for potential future park and ride lot.
• Monitor annually the utilization of the three existing park and ride lots.
• If existing park and ride lots approach capacity, evaluate the need for park and ride facility within
Dougherty Valley
3130 Crow Canyon Place, #310, Son Ramon, California 94583 — (925) 242-0811
WINDEMERE PARK -AND -RIDE STUDY
Introduction
The purpose of this report is to review and evaluate the need for park-and-ridefacilities in
conjunction with the Windemere residential development project. This analysis reviews the .
need for park -and -ride facilities and ,the most :practicable means of providing such facilities.
This report concludes with a recommendation on how. park -and -ride facilities can best -be .
provided to serve the area.
The development of the Windemere,project is, governed by the Dougherty Valley Specific Plan,
adopted by the Contra Costa County Board of Supervisors on November 19,. 1996. The
Specific Plan provided a general blue'print.of how:the project should be developed. Within the
Circulation chapter, the Specific Plan_ addressed`` the location of park -and -ride lots. Specific.Plan
Policy C-6 states "Provide. parkland -ride locations along the arterial street network, to serve
transit stops and to serve as meeting ,points,for. ridesharing."
The Windemere Conditions of Approval also 'addressed park -and -ride facilities along Bollinger
Canyon Road. Condition of Approval 151 J for` Windemere Phase 2 states: "In conformance
with the Dougherty Valley Specific'Plan, ceserve`right of way along Bollinger .Canyon Road -and
in the Village Center to provide for Park-and=Ride lots within the Windemere project -for .a..
minimum of 100 parking -spaces along Bollinger Canyon Road near the planned .commercial
sites. Locations for Parkaand-Ride, spaces -include . the west side of the Bollinger Canyon
-.
Road/Windemere Parkway intersection and within the :planned parking facilities at the high:
school and Village Center; and shall be subject to the review and approval of the Zonn
g 1 Pp 9
Administrator. With each phase of the project, the applicant shall review the need .for the,Park
and -Ride spaces and construct them °as necessary, subject to the review and approval of the
'Public Works Department." In . addition; Condition of Approval 197 for Windemere Phases: 3.. .
through 5 states: "In conjunction with=EIR Mitigation'Measure 4.6-13, the applicant shall submit .
a park -and -ride lot study forthe entire "Dougherty Valley area that identifies site location, parking
capacity, and connectivity to the public transportation system such as roadways, publicaransit,
and freeways. The study shall -be reviewed :and 'approved prior to the first small Iot'fina! map<for..
any phase. Once finalized, the applicant a
shll reserve right of way and construct; °as necessary, -
all identified park and ride lot sites :within their development, subject to the review and approval
of the Public Works Department."
Characteristics of Park-and=RideUsage
Park -and -ride lots are areas where motorists can park their vehicle, usually for free, and either
board a transit vehicle or join -a carpool or vanpool. Use of park -and -ride lots is generally
between the 6 am to 7 pm time period. The following are characteristics of park -and -ride usage.
➢ Park -and -ride lots are: not used for trips. The delay in accessing the park -and
ride lot and waiting for a transit vehicle is too great to overcome for a short trip.
Ko rve
Engineering
October 20, 2004
Windemere
• Park..and=Ride Facilities
➢ Park'-and=ride Jots are not used for a connection to local transit service or shuttles.
Residents .find it faster to `drive to the high capacity transit stations' and park heir car
there, rather rthan use a local park -and -ride lot and connect to the hi' h` capacity
transitline via'a shuttle.
➢ Local .;park -and -ride lots connected to express bus service .that make --limited stops
will. be:.more.readily;.used because of the faster transit service, however,-this..requires
leaving a vehicle unused in the park -and -ride throughout most:.of the day.
➢ '-Loca :park-and-ride'1ots may receive limited usage from .local carpools antl uanpools:
However,�,most.. participants :in ridesharing will find it just as convenient #o collect
passengers at'thelr home, if the home is within reasonable distance .of'the park -and -
ride `lot.
➢ Successful -carpools and vanpools usually require a large zatchrnen# area o match
the- participants- :with . common destinations. Therefore, regional -park-and.'ride lots
locate&af<freeway interchanges are better locations to serve these -modes of #ravel:
Dougherty 1/aflley Transit `Study
One of the conditions of approval for the Windemere and Gale Ranch'developments .in .
Dougherty Valley ,is the requirement to develop transit recommendations for.the :area KORVE
prepared the Dougherty Valley Transit Study in March, 2004, to meet that- condition -of approval..
Several alternative types of transit service and routes were developed and analyzed in --the
transit study. The service types included local service between Windemere and Gale"R. dnch -to
Pleasanton BART, express .service from Pleasanton BART to Walnut .Creek-.BART, : and:.-- local'
service from .Pleasanton 'BART toWindemere, Gale Ranch and the surrounding :cammunit�es of
San Ramon and Danville.
The transit study recommended . a route from Pleasanton BART aloe Dou he Road 'to
9. g rtY
Bollinger Canyon <Road where pit would serve Windemere and Gale Ranch before continuing ,on
Bollinger Canyon -Road. to the San Ramon Transit Center. This route would.,* local transit
access to the main local transit hubs, Pleasanton BART and the San Ram6h Transit :Center:
However, asnotedabove .in the characteristics of park and ride use,' this :route and.>type of
service would' not `be: .expected to generate a significant amount of :park and -ride demand:
Residents that live too:far from'the transit stops to walk will find it easier to drive to'BART rather
than drive to a park -and -ride lot and board a local transit bus, which in turn connects to BART
Dougherty Valley Specific Plan
The Dougherty Valley Specific Plan was adopted by the Contra Costa Board of Supervisors on
November 1.9, 1996. The Specific Plan noted the conceptual location of Iwo ;park -and -ride
facilities. These locations are schematically shown on Figure 1. Location 1 is at the intersection
Korve
Engineering 2 Oct6ber`20,20Q4
Windemere
Park:and=Ride Facilities:
of . Windemere Parkway and Bollinger Canyon Road The `Specific, Plan indicated,1hat this 1ot
.:should have 50 � spaces. 50 parking spaces .can .'be provided: in .approximately Q.40 acres.
Location 2 'is :in the'.Village Center site at East Branch Parkway :and. Bollinger Canyon 'Road.
The . Specific Plan indicated that these spaces would : be a' ' shared use with parking spaces
provided as part of the Village Center. To the degree that excess parking spaces are available
Within the Village Center, park -and -ride can be provided. The`Specifrc Plan also noted potential
light rail stations at these two park -and -ride lots.
The Specific Plan. also noted the need for transit facilities Within DoughertyUalley' Specific Plan
Policy C-5'::states "Provide rights -of -way for #uture aransit aystems:. The rights -of -way for
Bollinger Canyon Road and Dougherty Road at the southern:end of the valley will be reserved
for the potential installation of a rail transit system. The -right 'of -way will, provide a minimum of
4.0 feet -for: transit tracks and structures, with an add itional,:eight feet. of width at nail stations.
Ultimately, such :a transit system should be connected lo,.the East ,-Dublin/Pleasanton BART
:Station."
Figure 2 :is a typical section along Bollinger Canyon ..Road from the.:Specfic Plan with
modifications -by KORVE to locate the park -and -ride spaces 'between :the tracks and Bollinger
'Canon and to provide a circulation aisle. Figure 2 shows 45 :degree parking on one side
of the tracks with a one way circulation aisle. Vehicles could - turninto ahe aisle from Bollinger
.Canyon and access a parking space. Figure 3 shows a plan view of this 'parking concept. At
light rail platforms, the tracks would widen out for a center_platform. At stations, ufficient right -
of way would not be available to accommodate parking. Howeiver,:-.parkingw could be provided at
both -.ends -of the station, connected to the platform by a` pedestrian walkway, The .pedestrian
walkway. is noted in the section on Figure 2. Either 45 degree or:80 degree parking would be
the most efficient. Figure 4 shows the number of= vehicles`thaCcould'be parked within a specific
linear distance. With: 30-degree parking, one space can :be,:provided ,in` every1.7 feet. With 45
degree parking: one space can be provided in every 1:2 ;feef' The 50 :parking space noted in
Figure 1. at Bollinger CanyonMindemere Parkway could-,-beprovided]n a linear distance 300
feet north and 300 feet south of the light rail platform with 45-degree parking.
Conclusion
Park-and-ridelots in Dougherty Valley would be expected to. have very ;low- usage. Park -and -
ride :lots -, are best located adjacent to higher speed transit facilities. No :high speed transit
facilities are currently programmed in Dougherty Valley. Park -and -ride facilities are also best
used when they serve a large catchment area. Locations in the 'Tri-Valley that have a large
catchment area are around the freeway interchanges,for example. These locations are
convenient to a diverse set of users and provide access) the` high-speed, long -haul segment of
the trip on :the freeway. Therefore, with the currently planned transit facilities in Dougherty
Valley, park -and -ride demand would be negligible.
:Park -and -ride would be desirable if a light rail system is constructed :along Bollinger Canyon
Road. Light rail would provide the necessary capacity and travel speed to warrant park -and -ride
�, -- Ko rve
Engineering
3
October 20, 2004
Q Korve
Engineering 4 October20, 2004
•
1 Korve
Pnninaorinn
WINDEMERE PROJECT
Figure 1
PARK -AND -RIDE LOTS PER SPECIFIC PLAN
I FA
' ��►i�. �" ref � � ,� � � ♦' � f► � ��i� ar '� i �»' ♦ � � a-
��'t
Korve WINDEMERE PROJECT
1'W Engineering Figure 2
BOLLINGER CANYON ROAD CROSS SECTION
456Parking
a
A
MIS
'. ..
CQ
3
-
°
ro
a
12'
a-
One -Way. Parking Atsie �
w
LRT Tracks
t3
1 Engineering Figure 3
PLAN VIEW OF LINEAR PARK -AND -RIDE LOTS
.�A ti
MEMORANDUM
DATE: November 16, 2006
TO: Aruna Bhat, Contra Costa County Community Development Department
FROM: Tai Williams, Transportation Services Director
SUBJECT: Dougherty Valley Traffic Level -of -Service (LOS) Monitoring Report
Pursuant to the terms of the Dougherty Valley Settlement Agreement (DVSA), we are hereby
transmitting traffic level -of -service data for the Camino Tassajara/Crow Canyon intersection
within the Town of Danville.
The LOS calculations are based on counts taken in May 2006. The traffic LOS is calculated
using Contra Costa Transportation Authority's CCTALOS program, and is consistent with the
methodology used to evaluate the Town's compliance with the Authority's Growth Management
Program requirements.
Intersection
AM Peak LOS PM Peak LOS
Camino Tassajara/Crow Canyon 0.64/B 0.64/B
UATransportation\Agencies & CommitteeADVOC\DVOC Traffic Monitoring Report 2005.doc