HomeMy WebLinkAboutOlive and Oak MemoPage 1 of 13 PLANNING SERVICES DEPARTMENT MEMORANDUM To: Lauren Barr, Zoning Administrator From: Katelyn Snodgrass, Associate Planner Date: October 30, 2026 Subject: Zoning Administrator Approval: Olive + Oak Residential Development (AR 2026- 0003; TRP 2026-0001); 3150 – 3180 Crow Canyon Place EXECUTIVE SUMMARY The Applicant has submitted development applications for the proposed Olive + Oak Residential Development project (the “Project,” as further described in Attachment C). The Project would demolish four existing office buildings and associated parking lot and landscape; construct 119 for-sale, multi-family townhome condominium units; construct a 45-unit 100% affordable rental apartment building (with one manager’s unit); and provide landscape improvements. Additionally, because the proposed Project provides 27% (44 units) of the total proposed 164 units for lower income households, the Project qualifies for a streamlined ministerial review process and a “use by-right” housing entitlement defined in California Government Code Section 65583.2(i) and allowed by San Ramon Municipal Code Division D2-3.B, which prohibits any discretionary local government review or approval. The project is also eligible for use of the State Density Bonus Law (SDBL) and includes requests for one (1) incentive/concession, twelve (12) waivers, and use of the SDBL parking ratios, as further described in the Applicant’s Project Narrative and Project Plans (Attachment C). The Project is subject to review under the State Housing Accountability Act (HAA) establishing limitations to a local government’s scope of review of a housing development project if the project is consistent with objective local development standards. In accordance with California Government Code Section 65589.5(f), the Zoning Administrator shall approve the application once the Applicant provides documentation that the project is compliant with the City’s applicable objective, quantifiable, written development standards, conditions, and policies, as analyzed in this memorandum. Page 2 of 13 INTRODUCTION Application: Description: AR 2026-0003 Architectural Review application to review the proposed building architectural design, site layout, and landscape improvements. TRP 2026-0001 Tree Removal Permit application to remove 72 trees on the subject property. Location: 3150 – 3180 Crow Canyon Place (APNs: 213-010-046, 213-010-047, 213-010-059, 213-010-060) (see Attachment A for Vicinity Map) Applicant: Property Owner: General Plan Designation: Zoning Designation: Site Description: The subject site is a 7.2-acre parcel with four existing commercial office buildings ranging from 16,000 to 23,000 square feet each, with associated parking lot and landscaping. The subject site is accessible from Crow Canyon Place and is surrounded by commercial office buildings to the north and east, a Kindergarten through 8th grade private school and Annabel Lane (Pepper Grove) Housing Development to the south, and Interstate 680 to the west. Environmental Review/California Environmental Quality Act (CEQA) The Project is statutorily exempt pursuant to Section 15268 (Ministerial Projects) of the Guidelines for the California Environmental Quality Act (CEQA) of 1970, as amended, because the proposed housing development is subject to a streamlined ministerial review process and a “use by-right” housing entitlement defined in California Government Code Section 65583.2(i) and allowed by the San Ramon Municipal Code Division D2-3.B, which prohibits any discretionary local government review or approval for owner occupied and rental multi-family residential developments that have 20% of the units reserved for lower-income households. The Project site is designated as a Housing Opportunity Site in the adopted San Ramon 2023-2031 Housing Element, and the Project proposes 44 Below Market Rate (BMR) rental apartment units, totaling 27% of the proposed overall unit count. Emily Boyd Brookfield Residential 12657 Alcosta Blvd. Suite 250 San Ramon, CA 94583 Cranbrook Realty Investment Fund, L.P. 4701 Sisk Rd. Suite 101 Modesto, CA 95350 Mixed Use Residential Emphasis (MUR) Mixed Use Residential Emphasis (MUR) Page 3 of 13 BACKGROUND The existing 7.2-acre project site and subsequent office buildings were approved on October 10, 1979, by the Contra Costa County San Ramon Valley Area Planning Commission. On February 27, 2026, the Applicant submitted a Preliminary Housing Development (PHD 2026- 0001) application for the proposed Olive + Oak Housing Development Project, establishing February 27, 2026 as the date applicable for all zoning, design, subdivision, and fee requirements. On June 10, 2026, prior to expiration of a 180-day vesting period of the PHD application, the Applicant submitted two projects for the proposed development: • Olive + Oak Housing Development Project (Architectural Review (AR 2026-0003) and Tree Removal Permit (TRP 2026-0001) applications), subject to a ministerial by-right approval process; and • Olive + Oak Vesting Tentative Map (Major Subdivision (MJ 2026-0001) application), subject to the review and discretion of the Planning Commission On July 7, 2026, prior to determining the completeness status of the formal Project applications, the Planning Commission held a Study Session and provided initial feedback to the Applicant and Staff early in the review process. The minutes and agenda packet for the Planning Commission Study Session are available at the following webpage link: https://sanramonca.portal.civicclerk.com/event/1336/files/agenda/1498 Upon resubmittal of revised Project plans and additional items by the Applicant, the Planning Services Division deemed the Project applications as complete for processing on September 18, 2026. The Olive + Oak Vesting Tentative Map (MJ 2026-0001) is being processed under a separate discretionary review pathway and is subject to the review of the Planning Commission, at a date to be determined. DISCUSSION/ANALYSIS Proposed Project The Olive + Oak Housing Development Project Plans (Attachment C) include the following and indicate a net density of 29.6 dwelling units per acre: • Demolish the four (4) existing office buildings • Construct 119 for-sale 3- and 4-bedroom multi-family townhome condominium units (3- stories) • Provide 16 optional accessory dwelling units (ADUs) within the townhomes • Construct a 45 unit, 100% affordable (including one manager’s unit) rental apartment building consisting of 1-, 2-, and 3-bedroom units (5-stories) • Provide 284 parking spaces on-site, including 238 townhome garage spaces, 4 townhome on-site surface spaces, 27 apartment-covered spaces, and 15 apartment on-site surface spaces • Construct an 8-foot-tall sound wall along Interstate 680 • Provide landscape improvements on-site and a private park accompanied by a play structure and picnic tables • Construct private roadways, including a through road to access the approved housing development project at Bishop Ranch 12 and Annabel Lane from Crow Canyon Place • Maintain an existing access easement between Crow Canyon Place and the adjacent Commons Office Park development to the east. The proposed illustrative Site Plan (Figure 1) incorporates primary access to the development at the existing Crow Canyon Place access point for all site circulation and Emergency Vehicle Access. Additionally, the proposed Site Plan incorporates a design for future vehicle and pedestrian access to the adjacent property to the south with the intent to connect to the Annabel Lane public Right-of-Way. The proposed multi-family, for-sale, condominium residential units identified in the Project plans include seven (7) Floor Plans with the following square feet, rooms, and parking designs: Floor Plan 1 (19 units): 2,033 sq. ft. (4 bed, 3.5 bath, 2-car garage) Floor Plan 2 (16 units): 2,081 sq. ft. (3 bed, 3.5 bath, 2-car garage) Floor Plan 3 (16 units): 2,270 sq. ft. (4 bed, 3.5 bath, 2-car garage) Floor Plan 4 (22 units): 1,288 sq. ft. (3 bed, 3 bath, 2-car tandem garage) Floor Plan 5 (22 units): 1,781 sq. ft. (3 bed, 3.5 bath, 2-car garage) Floor Plan 6 (7 units): 2,056 sq. ft. (3 bed, 3.5 bath, 2-car garage) Floor Plan 7 (17 units): 2,193 sq. ft. (3 bed, 3.5 bath, 2-car garage) The proposed multi-family, for-rent, below market rate apartment residential units identified in the Project plans include five (5) Floor Plans with the following square feet, rooms, with shared access to 42 parking stalls: Floor Plan A1 (13 units): 472 sq. ft. (1 bed, 1 bath) Floor Plan A2 (8 units): 674 sq. ft. (1 bed, 1 bath) Floor Plan B1 (4 units): 892 sq. ft. (2 bed, 1 bath) Floor Plan B2 (8 units): 888 sq. ft. (2 bed, 1 bath) Floor Plan C1 (12 units): 1,179 sq. ft. (3 bed, 2 bath) Figure 1: Proposed Illustrative Site Plan Affordable Housing In accordance with the City’s Inclusionary Housing Ordinance, all for-sale multi-family residential development projects constructing at least ten (10) dwelling units shall reserve a minimum of 15 percent of all for-sale units as affordable units to very-low, low, and moderate income households (Below Market Rate (BMR) units). The project proposes the construction of 119 for-sale multifamily units, requiring the project to provide 18 BMR units. Additionally, all rental residential development projects constructing at least ten (10) dwelling units shall reserve a minimum of 15 percent of all rental units as affordable units to very-low and low-income households. The project proposes the construction of 45 rental units, requiring the project to provide 7 BMR units. The Applicant proposes an alternative means of compliance method to increase the level of affordability for the Project by providing 44 BMR rental apartment units, totaling 27% of the proposed overall unit count with the affordability levels outlined in the table provided below (Table 1). The draft Conditions of Approval require the Applicant to, prior to issuance of a building permit, enter into an Affordable Housing Agreement with the City. Table 1: Proposed BMR Unit Allocation Proposed BMR Unit Household Income Category Units % Allocation Extremely Low Income (30% of Area Median Income) 4 10% Very Low Income (50% of Area Median Income) 5 11% Lower Income (60% of Area Median Income) 26 59% Low Income (80% of Area Median Income) 9 20% Total: 44 Architecture The proposed architecture incorporates a contemporary style with a variety of massing and material finishes as shown in the Project renderings (Figure 2). The proposed Project includes a gable roof design with integrated vertical elements to emphasize individual homes. Variation in door colors are proposed to provide visual interest at the pedestrian level. The building finishes include a combination of stucco panels, metal awnings, composition shingles, cementitious lap siding, and composite wood siding. Additional architectural accents include private decks with metal railings. The color palette is primarily earth tones, including beige, blue, grey, and brown colors on the building massing and garage doors, with grey and beige trim and railings colors, and rust, blue, and grey front doors accent colors. A color and material list has been provided within the Project plans. Figure 2: Proposed Front and Rear Elevation Example (7-Unit Building) Landscape Design and Lighting The Project plans identify 72 trees to be removed on site and to retain 41 existing trees throughout the Project Site and adjacent property. The Applicant has provided conceptual landscape plans (Figure 3) (Figure 4) that identifies the proposed plant palette in terms of trees and shrubs on the proposed site plan and in relation paths; the private community park, seating area, and shade structures; and bio-retention basins. The Applicant is proposing to provide landscaping to cover approximately 21.6-percent of the subject property. Figure 3: Conceptual Landscape Plan Figure 4: Proposing Planting Palette The Applicant will be required to demonstrate compliance prior to Building Permit issuance with State and local requirements under the Model Water Efficient Landscape Ordinance (MWELO) and Zoning Ordinance Section D3-21.B, landscape standards for plant materials, and the City’s lighting standards. The Applicant has provided a conceptual lighting plan and will be required prior to Building Permit issuance to submit a site-specific photometric plan in compliance with the City’s lighting standards. Land Use and Development Standards Land Use The Project site is within the Mixed-Use Residential Emphasis land use designation and is within the Mixed-Use Residential Emphasis zoning district. Additionally, the Project site is identified as a Housing Opportunity Site (HOS) in the 2023-2031 Housing Element and is therefore automatically eligible to be a 100% residential development. Development Standards As shown in Table 1, the Project complies with the applicable development standards, except where allowed with a SDBL concession, waiver, or parking limit. The project is also required to comply with the adopted City of San Ramon Objective Development and Design Standards (ODDS), except where allowed with a SDBL waiver. State Density Bonus Law Since the proposed Project provides 27% (44 units) of the total proposed 164 units for lower- income households, the Project qualifies for use of the State Density Bonus Law (SDBL), California Government Code Section 65915(d), which requires the City to grant up to three (3) incentive/concession, unlimited waivers, and limit City parking standards to the maximum SDBL parking ratios. The Applicant requested one (1) incentive/concession, twelve (12) waivers, and the use of the SDBL parking ratios which are identified in Table 2 (Project Development Standards Summary), further described in the Applicant’s Project Narrative and Project Plans (Attachment C), and discussed in the Staff Report (Density Bonus Concessions and waivers) section. Additionally, the City’s Zoning Code requires 348 spaces; however, the Project includes a total of 284 parking spaces for residents and guests, which includes 168 spaces from the two-car garages for townhome units, 42 spaces for the apartment units, and 4 guest spaces associated with the Project. The proposed parking exceeds the minimum parking standards by the State Density Bonus; therefore, the Project is eligible for an automatic reduction in parking requirements as allowed under the State Density Bonus law. (see Table 2, Project Development Standards Summary). Table 2: Project Development Standards Summary Development Feature City Standard (MUR) Proposed Project Minimum lot size Determined through subdivision process Varies Setbacks Front Setback: 10-feet Side/Rear Setbacks: Determined through project review and approval, except that a 25-foot wide side and/or rear yard shall be required abutting a residential zone, and where a lot abuts the Interstate 680 right-of-way. Front: 15-feet Interior Sides: Varies I-680 Side: 10-feet 8-inches (State Density Bonus Waiver) Residential Density (net) 20 min. - 40 max. du/ac 29.6 units/net acre Sitewide Floor Area Ratio (FAR) 0.7 min. – 2.0 max. (0.5 Residential Minimum) 1.0 Height Limit 60 feet max., except as limited by Daylight Plane Requirements (D2-15.A) and Section D3-6 (Height Limits and Exceptions) Apartment Building: 60’-0” Townhomes: 38’-6” Daylight Plane Limitation Waived by SBDL (State Density Bonus Waiver) Landscaping Min. 15% lot 21.6% Parking 348 spaces (Zoning Ordinance) 271 spaces (SDBL) 284 Density Bonus Concessions and Waivers 1. Provisions of Affordable Rental Units (Concession): In accordance with SRMC § C4- 179(A)(1), where affordable units are required in a for-sale project by SRMC § C4-177, the applicant may provide rental units affordable to very low-, low-, and moderate income households, however the units shall be comparable in size and type to the market-rate units, including the number of bedrooms per unit. The Project requests a concession for the requirement of the affordable rental units comparable in size and type to the market-rate units. 2. Parking Spaces Provided (Waiver): The Project requests a waiver from SRMC § D3-28 for the minimum number of parking spaces required for the affordable rental units from 69 to 42, and from 41 total guest parking spaces to 4, as compliance with this development standard would make the construction of the Project physically infeasible. 3. Interstate 680 Setback (Waiver): The Project requests a waiver for the 25’ rear or side yard setback from Interstate 680 right of way, as required by SRMC § D2-14. The Applicant is proposing a minimum setback of 10’ – 8” as compliance with this development standard would make construction of the Project physically infeasible. 4. Exterior Trash Enclosure (Waiver): The Project requests a waiver from SRMC § D3-11(E), requiring all multi-family residential developments with shared refuse facilities to provide at least one exterior storage area. The Applicant is proposing one interior storage area, as compliance with the exterior requirement would require a further reduction to the amount of parking stalls provided. 5. Parking Space Width (Waiver): The Project requests a waiver from SRMC § D3-31(F)(1) for an increase in two (2) feet in width for each parking space adjoining a column, wall, or other obstruction higher than six (6) inches. The Applicant is proposing a parking stall width of nine (9) feet, as strict compliance would require a further reduction in the amount of parking stalls provided. 6. Driveway Aisle Width (Waiver): The Project requests a waiver from SRMC § D3- 37(C)(1) from a minimum width of 26 feet for two-way driveways. The Applicant proposes a 24-foot driveway for the apartment building garage and driveway widths for the proposed townhome units between 22 to 26 feet in width, as strict compliance would make the construction of the Project physically infeasible. 7. Daylight Plane (Waiver): The Project is consistent with the maximum building heights limits established by the MUR Zoning District, however, the Project does not conform to the daylight plane requirements set forth in SRMC § D2-15(A). The maximum height as required under the daylight plane requirements is 23’ – 3” where intersecting at a 30-degree angle from 6-feet off ground at the property line. The Applicant is proposing 35’ – 2”. The Applicant has therefore requested a waiver from the daylight plane standard, as strict compliance would constrain the building envelope to a degree that would make construction of the proposed development physically infeasible. 8. Screening Between Land Uses (Waiver): The Project requests a waiver from SRMC § D3- 4(D)(1) and SRMC § D3-4(F)(1) to remove screening requirements for the area along the property line north of the parking lot serving the proposed apartment building and the area along the property line south of Buildings 10, 11, 12, and 13. 9. Screening Area Landscape Standards (Waiver): The project requests a waiver from SRMC § D3-21(A)(7) to remove the minimum 10-foot wide landscape area on the residential side of a fence or wall provided as screening. The Applicant is requesting to waive this requirement for the area between the good neighbor fence along the northern property line and Buildings 1, 2, and 3, as well as the areas where the screening requirements were waived. The Applicant is requesting to waive the screening requirement as compliance with this standard would make the construction of the Project physically infeasible. 10. ODDS Location of Amenities: The Project requests a waiver from ODDS C.1.a.2.c., requiring the townhomes to provide an indoor amenity. The Applicant proposes two outdoor amenities for the proposed townhomes by providing a private community playground and shaded picnic area. Indoor amenities are provided within the apartment complex; however, the Applicant cannot guarantee at this time that those amenities may be accessed by the residents in the townhomes. The Applicant is requesting to waive the indoor amenity requirement for the townhomes as compliance with this standard would make the construction of the Project physically infeasible. 11. ODDS Façade Modulation: The Project request a waiver from ODDS C.2.a.2., requiring for a façade depth variation greater than two to three feet and for façade articulation at intervals greater than 20 to 30 feet along the apartment building frontage. The Applicant is requesting to waive the façade modulation requirement for the apartment building as compliance with this standard would make the construction of the Project physically infeasible. 12. ODDS Stepbacks, Recesses, and Additional Rear Yard Area: The Project requests a waiver from ODDS C.2.a.3., requiring one, minimum five-foot “stepback” on all floors above 35 feet in height. The Applicant is requesting to waive the stepback requirement as compliance with this standard would make the construction of the Project physically infeasible. 13. ODDS Roof Design (Waiver): The Project requests a waiver from ODDS C.2.c.1.a., requiring that rooflines shall be vertically articulated at least every 100 feet along street front under Structure Standards as compliance with this development standard would make construction of the Project physically infeasible. Parking As identified in Table 2, the Project includes a total of 284 parking spaces on-site, including 265 garage spaces, 19 uncovered spaces, and 4 guest parking surface spaces. The 284 parking spaces exceed the 270.5-parking space requirement under State Density Bonus Law, as demonstrated in the table below (Table 3). The Project also exceeds the Zoning Ordinance bicycle parking requirement. Table 3: Parking Standards Summary Category Number of Units by Bedroom Count Parking Spaces Required by Zoning Ordinance Parking Spaces Required by SDBL Proposed Parking Covered Uncovered Covered Uncovered Townhome 3 BR 84 84 84 126 168 0 Townhome 4 BR 35 35 35 87.5 70 0 Townhome Guest 1 space per every 4 units 0 30 0 0 4 Apartment 1 BR 21 21 0 21 13 7 Apartment 2 & 3 BR 24 24 24 36 14 8 Apartment Guest 1 space per every 4 units 0 11 0 0 0 Total: 348 270.5 284 Transportation Analysis The Applicant has provided a Trip Generation Analysis, prepared by Fehr & Peers, that analyzes the Project vehicle trip generation, and Vehicle Miles Traveled (VMT). The Analysis determined that with the proposed removal of the existing office building and construction of the proposed Project, there will be an overall net decrease in daily and peak hour vehicle trips. As a result, General Plan 2040 Policy 5.1-I-3 does not require a traffic impact study because the Project would not generate 50 or more net new peak hour vehicle trips. The City Traffic Engineer has reviewed the proposed Project and Trip Generation Analysis provided and supports the methodology and conclusions provided in the Analysis. ‘No Net Loss Law’ Findings The Project site area is identified in the adopted and State-certified 2023-2031 Housing Element Sites Inventory as a potential site for future affordable housing development to satisfy the City’s Regional Housing Needs Allocation (RHNA). The State’s ‘No Net Loss Law’ applies to the site and the findings identified in Government Code §65863(b) are required to be made. The ‘No Net Loss Law’ is intended to ensure that jurisdictions continue to have capacity at all times to accommodate the RHNA by income group throughout the planning period (i.e., 2023-2031) and requires jurisdictions conduct additional analysis of the remaining sites identified in the Housing Element Site Inventory if an included site is proposed to be developed at a different income category than what was assumed in the Housing Element. The No Net Loss Calculation Tables (Attachment D) identifies, based upon guidance by the State Housing and Community Development Department, that the City continues to have land suitable for residential development and the capacity in sites identified in the Housing Element Sites Inventor to meet the remaining share of the RHNA for each income category during the 2023- 2031 planning projection period (July 1, 2022 to January 31, 2031). The No Net Loss Calculations take into account changes to previously approved development project entitlements and/or building permits issued since the assumptions for the 2023-2031 Housing Element Sites Inventory were established. NEXT STEPS 1. Notice of Exemption to be filed with the County 2. Site development permits may be pursued upon the effective date of Zoning Administrator approval. ATTACHMENTS A. Vicinity Map B. Draft Conditions of Approval C. Applicant’s Project Narrative and Project Plans, date received October 2, 2026 D. No Net Loss Calculation Tables ATTACHMENT A CITY OF SAN RAMON PLANNING SERVICES Vicinity Map AR 2026-0003, MJ 2026-0001, and TRP 2026-0001 Olive + Oak Housing Development Project and Olive + Oak Vesting Tentative Map Project 3150 – 3180 Crow Canyon Place (APNs: 213-010-046, -047, -059, -060) Page 1 of 2 ATTACHMENT B CONDITIONS OF APPROVAL ARCHITECTURAL REVIEW (AR 2026-0003) AND TREE REMOVAL PERMIT (TRP 2026-0001) OLIVE AND OAK HOUSING DEVELOPMENT PROJECT 3150 – 3180 CROW CANYON PLACE (APN: 213-010-046, -047, -059, & -060) BROOKFIELD RESIDENTIAL (PROJECT APPLICANT) AND CRANBROOK REALTY INVESTMENT FUND (PROPERTY OWNER) Special Conditions: Planning Services Division: 1. The Project authorized with this action consisting of 164 residential units, including 119 for-sale multifamily attached townhomes and a 45-unit 100% affordable rental apartment complex (including one manager’s unit) and 284 total parking spaces proposed on an existing approximately 7.2 acre parcel located at 3150 – 3180 Crow Canyon Place (APNs 213-010-046, 213-010-047, 213-010-059, 213-010-060), shall be in substantial conformance with the project profile and plans dated “Received October 5, 2026” as approved by the Zoning Administrator on October 30, 2026. 2. The proposed project is subject to all applicable requirements associated with Federal, State, local regulations for new development including but not limited to: a. California Building Codes b. City of San Ramon Zoning Ordinance c. National Pollutant Discharge Elimination System (NPDES) (Contra Costa County Program and State General Permit Requirements) d. Migratory Bird Treaty Act (including construction activities initiated during the bird nesting season between February 1 – September 15) e. Department of Fish and Wildlife f. Native American Heritage Commission Preservation Standards/Health and Safety Codes g. Bay Area Air Quality Management District measures h. Waste Management provider(s) standards i. Local utility standards (power, water, and sewer, etc.) 3. To the extent allowable under applicable federal and state law, the Project may be subject to fees and other exactions otherwise authorized by law that are essential to provide Page 2 of 10 necessary public services and facilities to the housing development project. Funding mechanisms to satisfy this requirement, if applicable, may include, but are not limited to, an existing or new Community Facilities District (CFD), a Landscape and Lighting District, or other mechanism acceptable to the Applicant and City. This condition, if applicable, shall be satisfied prior to project occupancy for the rental apartment development and prior to Final Map for the for-sale development. 4. As applicable, under the California Department of Tax and Fee Administration (CDTFA) Compliance Policy and Procedures Manual Section 260.020, prior to the construction of any portion of the Project, the Applicant shall use commercially reasonable efforts to require that all qualifying contractors and subcontractors providing bulk lumber, concrete, structural steel, asphalt, and pre-fabricated building components such as roof trusses with a contract value of $5,000,000 or more, to exercise their option to obtain a Board of Equalization sub-permit for the jobsite and allocate all eligible use tax payments to the City of San Ramon. The Applicant shall use commercially reasonable efforts to require that any such contractor or subcontractor provide San Ramon with either a copy of their Board of Equalization account number and sub-permit (or such other documentation as is reasonably acceptable), or a statement that use tax does not apply to their portion of the Project. 5. The Applicant (including any assignee or successor-in-interest) shall defend, indemnify, and hold harmless the City of San Ramon (City) and its agents, elected officials, officers, and employees from any claim, action or proceeding against the City or its agents, elected officials, officers, and employees to attack, set aside, void or annul any part of the City’s approval of the Applicant’s project. The City will promptly notify the Applicant of any such claim, action or proceeding, and cooperate in the defense. 6. Unless determined to be infeasible by the Community Development Director, the Applicant shall utilize reclaimed water for grading and dust suppression and other construction activities appropriate for reclaimed water use, pursuant to San Ramon Municipal Code § D3-8(D). 7. Consistent with San Ramon Municipal Code § D3-21(C), the Applicant shall install reclaimed water infrastructure (i.e. purple pipe, etc.) capable of delivering reclaimed irrigation water if a reclaimed water main is available to the Project site. Potable water may be used for irrigation purposes until the reclaimed water service is available to the Project site. Irrigation plans shall be reviewed and approved by the City prior to the issuance of a Building Permit. 8. The project is approved with a parking reduction for 284 total parking spaces consistent with State Density Bonus provisions. Affordable Housing: Planning Services Division: 9. Prior to the issuance of the first residential unit building permit, the Applicant shall have a fully executed Density Bonus/Affordable Housing Agreement with the City demonstrating compliance with the Inclusionary Housing Ordinance, pursuant to San Ramon Municipal Code § C4-178(C). All affordable units must meet the State of California’s Department of Housing and Community Development requirements and count towards the City’s fair share housing production of the applicable very-low and low income units as assigned by the Association of Bay Area Governments (ABAG). Page 3 of 10 10. In conformance with Fair Housing laws and as part of the Affordable Housing Agreement, the Applicant shall work with the City to establish a priority access system for the rental of the affordable units to affordable households in-line with the goals of the City’s Housing Element and meeting State housing law requirements. 11. The affordability controls and minimum periods of affordability shall be binding upon the initial developer and operator(s) of the project. 12. As part of the Affordable Housing Agreement, develop a compliance monitoring system, with the cost of the monitoring borne by the Owner/Operator, to ensure that affordable units are rented to income-qualified households, pursuant to San Ramon Municipal Code § C4-178(G). 13. Interior features and finishes in affordable units shall be durable, of good quality, and consistent with contemporary standards for new housing. 14. The approval(s) authorized by this action shall be exercised through issuance of a building permit for residential unit construction within 3-1/2 years from the approval date which the project is eligible to apply for Building Permits. (Government Code 65589.5(o)(2)(D). General Conditions: Planning Services Division: 15. Prior to any site work and/or occupancy, the Applicant shall obtain all required permits from the Building and Safety Services Division, Engineering Services Division, and the San Ramon Valley Fire Protection District, pursuant to San Ramon Municipal Code § C4- 178(C). 16. All buildings and improvements shall conform to the approved project plans, unless authorized by this approval or the conditions herein. 17. Any changes to the operation, additional activities, and/or approved plans, other than those required in these conditions, require prior City review and approval. The Zoning Administrator shall determine the appropriate review authority for any revision or modification to the Project. Minor changes may be approved by the Zoning Administrator. 18. The Applicant shall pay all applicable project processing fees at time of permit filing, pursuant to San Ramon Municipal Code § D6-17. Deposit amounts are set at the average cost to provide various services. If costs exceed the deposit, the Applicant will be billed for the cost over runs. 19. Construction activity shall be limited to the hours between 7:30 AM and 5:00 PM Monday through Friday, 9:00 AM and 4:00 PM on Saturdays and Sundays. Construction shall be prohibited on federal holidays, pursuant to San Ramon Municipal Code § B6-100. 20. The Applicant shall designate a "Noise Disturbance Coordinator" to respond to any local complaints about construction noise and work closely with Planning Services Staff in resolving complaints, as reasonably feasible. A notice shall be sent to property owners and tenants/residents within a 500-foot radius of the site prior to start of grading and site development containing Coordinator contact information along with approved hours of construction. The City may impose more restrictive construction days/hours if reasonably determined to be necessary to protect the public well-being. 21. To the extent feasible, the site plan shall provide for utility meters, transformers, irrigation Page 4 of 10 control boxes, backflow devices, valves, etc. to be screened by buildings, fencing and/or landscaping so as to harmonize with building design and recognize setback requirements, pursuant to San Ramon Municipal Code § D3-4(F). 22. All rooftop equipment, which includes, but is not limited to, air conditioning, heating, refrigeration equipment, plumbing lines, and ductwork, shall be screened from views on all sides, pursuant to San Ramon Municipal Code § D3-4(F). 23. All proposed signage shall require a separate sign permit, in accordance with San Ramon Municipal Code § D3-56. Building permit applications are to be reviewed and approved by the Planning Services Division and Building Services Division. The Applicant shall submit detailed sign plans that comply with the regulations of the San Ramon Zoning Ordinance, including the appropriate review process. A Master Sign Program may be proposed for all site signage as appropriate. 24. The Applicant shall submit to the Planning Services Division a set of annotated Conditions of Approval elaborating on the compliance status of each Condition of Approval for the Project at the following benchmarks: a. Prior to site development permit issuance b. Prior to building permit issuance c. 72 hours prior to final building occupancy request Engineering Services Division: 25. The Project shall comply with all applicable standards in the current Engineering Design, Grading, and Procedures Manual. 26. The Project shall comply with the latest requirements of the Americans with Disabilities Act (ADA). 27. The Applicant shall obtain an encroachment permit for all work conducted within the public right-of-way or easement, pursuant to San Ramon Municipal Code § C6-4. 28. The Applicant shall obtain a grading permit and/or site development permit for all grading work, and all site improvements within the development area, including, but not limited to, drainage facilities, roadway, sidewalk and landscape improvements, pursuant to San Ramon Municipal Code § C7-12. 29. The Applicant shall provide all final studies, reports, agreements, and other project documents in PDF format. As-built plans shall be provided in PDF and AutoCAD format. 30. The Applicant shall coordinate and work closely with the existing property owners adjacent to the Project to provide adequate access during construction, and minimize dust, debris, and noise for the existing properties. San Ramon Valley Fire Protection District: 31. The Fire District will require public fire hydrants provided by East Bay Municipal Utility District (EBMUD) due to the proximity of this project to existing utility infrastructure. 32. Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet (9,144 mm), approved aerial fire apparatus access roads shall be provided. For purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. Page 5 of 10 33. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7,925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. 34. One or more of the required access routes meeting this condition shall be located not less than 15 feet (4,572 mm) and not greater than 30 feet (9,144 mm) from the building and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the Fire Code Official. 35. Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building. Other obstructions shall be permitted to be placed with the approval of the Fire Code Official. 36. All proposed vegetation, including trees, along aerial access roads shall be approved by the Fire District. 37. Current requirements for water supply and Fire Department access will be applied at the time of submittal for construction permits. 38. All emergency vehicle access (EVA) materials including barricades and driving surfaces shall be approved by the Fire District. 39. Fire lanes and parking restrictions shall be in accordance with Fire District Standards. 40. Fire apparatus access roads less than 28 feet wide shall be posted on both sides as a fire lane. Fire apparatus access roads 28 feet wide or greater, but less than 36 feet wide, shall be posted on one side of the road as a fire lane. 41. Approved roadways and fire water shall be installed and inspected prior to the delivery of combustible materials to the construction site. 42. The minimum fire flow required shall be determined as specified by the current adopted edition of the California Fire Code Appendix B with adopted Amendments. 43. Fire hydrant location shall be approved by the Fire District. 44. All sides of the proposed structures shall be within 150 feet of fire department access per CFC 503.1.1. With approval of the Fire Official, distance may be increased to 250 feet with installation of a sprinkler system per CFC. 45. Impact Mitigation Fees may be applied to the project. 46. Street names shall be submitted to the Fire District for approval. 47. Townhouse – Type A is eligible to use an NFPA 13D sprinkler design, Townhouse – Type B is eligible to use an NFPA 13D sprinkler design, and the Multi-Family Affordable Building requires a NFPA 13 sprinkler design. 48. The following submittals are required for Fire District approval. The list is not intended to be complete and is provided for planning purposes only: a. Site Apparatus Access and Site Improvement Plan (roadway and hydrant approvals) b. New Construction Plan c. Fire Department Water Supply Plan (underground for sprinkler systems) d. Fire Sprinkler Plan Page 6 of 10 e. Fire Alarm Plan (or sprinkler monitoring) f. Two-Way Radio Communication System Plan (for multi-family housing building) g. Emergency Responder Radio Coverage Plan (for multi-family housing building) h. Flammable and Combustible Liquids Plan (for generator fuel tank) i. Energy Storage System Plan Prior to Site Development/Grading Permit Issuance: Planning Services Division: 49. Prior to issuance of grading or building permit, whichever occurs first, the Applicant shall provide documentation to Planning Services demonstrating that any construction and grading activities shall incorporate dust control measures as recommended by the Bay Area Air Quality Management District (BAAQMD), such as: a. All exposed non-paved surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and access roads) shall be watered at least two times per day and/or non-toxic soil stabilizers shall be applied to exposed non-paved surfaces. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered and/or shall maintain at least 2 feet of freeboard. c. All visible mud or dirt tracked out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 miles per hour. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes, as required by the California Airborne Toxics Control Measure (ACTM) Title 13, Section 2485 of California Code of Regulations. Clear signage regarding idling restrictions shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. The prime construction contractor shall post a publicly visible sign with the telephone number and person to contact regarding dust complaints. The City and the construction contractor shall take corrective action within 48 hours. The BAAQMD’s phone number shall also be visible to ensure compliance with applicable regulations. 50. Prior to Site Development Permit issuance, the Final Landscape/Irrigation Plan shall be submitted to the Community Development Director for review and consistency with the City Standards, and with the State and local requirements of the Model Water Efficient Landscape Ordinance (MWELO), pursuant to San Ramon Municipal Code § D3-18. Page 7 of 10 Engineering Services Division: 51. The Project shall comply with all applicable requirements of the Municipal Code. 52. The Project shall comply with the current San Ramon Public Works Standards. 53. The Applicant shall furnish proof to the City Engineer of the acquisition of all necessary rights-of-entry, permits and/or easements for construction of off-site and/or temporary drainage improvements. 54. In accordance with San Ramon Municipal Code § D3-13, the Applicant shall provide evidence of approvals from each of the following affected agencies: a. Contra Costa County Health Services Department Environmental Health Division; b. Central Contra Costa Sanitary District, or Dublin San Ramon Sanitary District; c. San Ramon Valley Fire Protection District; d. The East Bay Municipal Utility District (EBMUD), or Dublin-San Ramon Services District; and e. San Ramon Valley Unified School District 55. The Applicant shall pay applicable plan check, inspection, drainage mitigation, and creek study fees pursuant to the City’s current fee schedule. 56. The Applicant shall pay all peer review fees for consultant review of project documents as established by the City’s current fee schedule, pursuant to San Ramon Municipal Code § C7-36. 57. The Applicant shall provide surety in the amount and form approved by the City Engineer with the surety company licensed to do business in the State of California and acceptable to the City of San Ramon, pursuant to San Ramon Municipal Code § C7-55. Surety is applicable to public and private improvements (excluding buildings) associated with projects. 58. As applicable, the Applicant shall obtain all required permits and approvals from federal, state, and local agencies having jurisdiction over the project, including but not limited to, the United States Army Corps of Engineers, the Federal Emergency Management Agency, the California Department of Fish and Wildlife, the San Francisco Bay Regional Water Quality Control Board, and the East Bay Regional Parks District. Copies of these permits shall be provided to the Engineering Division. 59. The Applicant shall submit to the City Engineer for review and approval a final Stormwater Control Plan consistent with the requirements of the latest edition of the Contra Costa Clean Water Program Stormwater C.3 Guidebook, pursuant to San Ramon Municipal Code § B6-364. 60. The Applicant shall procure a General Construction Permit from the Regional Water Quality Control Board if the project will disturb one acre or more of land. 61. The Applicant shall install drainage markers on all on-site and off-site drainage inlets in accordance with City standards. These markers, if located on private property, shall be maintained by the Applicant or owner in a manner acceptable to the City, pursuant to City Ordinance. 62. The Applicant shall submit to the City Engineer for review and approval a Page 8 of 10 comprehensive hydrology study, subject to the requirements outlined in the San Ramon Public Works Standards. 63. The Applicant shall install drainage improvements to mitigate new development related run-off consistent with the requirements of the hydrology study. All storm water facilities shall accommodate a 25-year storm event, substantially equal to pre- development conditions. Runoff from the development shall not increase the 100-year peak flow in the City’s flood control channels. 64. The Project shall have all new utilities installed underground, pursuant to San Ramon Municipal Code § D3-13(D). This includes, but is not limited to, electrical, gas, telephone, and cable television services in accordance with City policies and ordinances. All utilities shall be located within public utility easements or public streets. 65. The Applicant shall install full trash capture devices (make and model to be approved by the City Engineer) on all new storm drain inlets. 66. The Applicant shall submit Operation and Maintenance (O&M) Plan for storm water control and water quality devices and features. Public Services Division: 67. The Applicant shall submit 1) Waste Management Plan (WMP) estimating all waste to be hauled away from the project site, and 2) Summary Report for review and approval by the Public Services Division. These shall be submitted to City via http://SanRamon.WasteTracking.com/ (Green Halo). 68. The Applicant shall reuse or recycle at least 65% (by weight) of the construction and demolition debris generated by the Project, as per CALGreen requirements (2017), pursuant to San Ramon Municipal Code § B6-32. The Applicant shall keep receipts from processors of all waste materials for submittal of WMP and Summary Report. Note: Mixed boxes of construction and demolition debris (C&D) can be separated by a 3rd party waste processor, as is commonly done. In such cases, Applicant should ensure that the selected waste processor has at least a 65% recycling rate, as the project/permit will be penalized for dropping below the required recycling rate. 69. All trees removed from the project shall be recycled as mulch, compost, or biomass fuel, and should be reported as part of the WMP, pursuant to San Ramon Municipal Code § B6-32 and § B6-34. 70. In accordance with San Ramon Municipal Code § B6-2, the Applicant shall submit a Waste Collection Plan (WCP) and demonstrate waste collection access by curbside collection trucks used by San Ramon’s current Franchised Waste Hauler. Applicants should plan for at least three (3) trucks per week to accommodate Trash, Recycling, and Organics collection, and anticipate that collection trucks are equipped with backup alarms. The WCP is subject to review and approval by the City’s Waste Hauler and the City. Transportation Services Division: 71. The Applicant shall include a clause in the Covenants, Conditions, and Restrictions for the HOA that requires garages to accommodate the vehicles associated with the household. The program may include, and is not limited to, HOA vehicle registration, sticker programs, guest permits for overnight stays, and periodic inspections to ensure that the available garage space is able to accommodate the vehicles associated with the Page 9 of 10 household. Prior to Building Permit Issuance: Planning Services Division: 72. The Applicant shall obtain approval from the Planning Services Division of an Address Assignment application to establish the street and unit numbering scheme for the proposed buildings. 73. Final conditions of approval shall be printed on the cover page of the building permit plan submittal. 74. Landscaping shall meet the requirements of landscaping, irrigation and hydroseeding of the City’s Zoning Ordinance, and the State Model Water Efficient Landscape Ordinance (MWELO) as applicable, pursuant to San Ramon Municipal Code § D3-21. 75. Prior to building permit issuance, a final lighting plan and photometrics shall be reviewed and approved by the Zoning Administrator, pursuant to San Ramon Municipal Code § D3- 7(C). These plans shall conform to the provisions of the City of San Ramon Zoning Ordinance and Security Ordinance. All lighting shall be shielded from abutting properties with cut-offs (shields) to limit nuisance or annoyance. No lighting shall be of the type or location such that it constitutes a hazard to vehicular traffic, either on private property or on abutting streets. The spacing and height of the standards and luminars shall be approved by the City Engineer and Zoning Administrator. Prior to Building Occupancy: Planning Services Division: 76. The Applicant shall submit to the Planning Services Division three (3) executed and notarized copies each of a Landscape Maintenance Agreement and/or Building Exteriors and Parking Lot Maintenance Agreement that shall be recorded as a deed restriction on all common areas for the affordable apartment building parcel (Lot 22). Engineering Services Division: 77. The Applicant shall complete adequate site improvements to provide access to areas which are impacted by occupancy. These improvements include, but are not limited to, paved roads, walkways, storm drains, street lighting, traffic improvements and frontage sidewalks along Crow Canyon Place. 78. The Applicant shall provide a letter from a Traffic Engineer verifying any approved changes that were made affecting the sight distance triangles within the Project development and that all traffic signal and roadway improvements/striping are complete and fully functioning. 79. The Applicant shall provide a letter from the project geotechnical engineer attesting that grading and foundations were constructed in accordance with their recommendations for the project. 80. The Applicant shall submit, for the review and approval of the City, a Stormwater Operation and Maintenance Plan consistent with the requirements set forth in the City’s current Stormwater C.3 Guidebook, and execute any agreements necessary for the Page 10 of 10 transfer of ownership and long-term maintenance of stormwater treatment and/or hydrograph modification facilities. 81. The Applicant shall perform roadway surface improvements, such as grind and overlay, slurry seal, and microsurface, on all adjacent public roads, as required by the City Engineer, in order to mitigate damage due to heavy construction traffic from civil and building improvements. 82. The Applicant shall submit as-built drawings to the City with each page stamped as such in an electronic format acceptable to City staff. 83. The Applicant shall provide a supplemental surety bond reflecting 150% of the full value of any on-site or off-site improvements not completed at issuance of the Certificate of Occupancy. Transportation Services Division: 84. The Applicant pays all applicable traffic impact fees as established by City Council Resolutions and Ordinances, including the following: a. San Ramon Traffic Impact Fee b. Southern Contra Costa Sub-Regional Fee c. Tri-Valley Transportation Development Fee. No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA OLIVE + OAK, CROW CANYON PLACE- SAN RAMON, CA APPLICANT: BROOKFIELD RESIDENTIAL Emily Boyd 12657 Alcosta Blvd Ste. 250 San Ramon, CA 94583 (925) 314-4030 emily.boyd@brookfieldrp.com PROJECT TEAM CIVIL ENGINEER: CBG | CIVIL ENGINEERS - SURVEYORS - PLANNERS Justin Joseph 2633 Camino Ramon, Suite 350 San Ramon, CA 94583 (925) 866-0322 jjoseph@cbandg.com ARCHITECT: KTGY GROUP INC. Jill Williams 1814 Franklin St, Suite 400 Oakland, CA 94612 (510) 463-2018 jwilliams@ktgy.com COVER SHEET A0.0.0 LANDSCAPE ARCHITECT: GATES-STUDIO Michael Freitag 1655 N Main St STE 365 Walnut Creek, CA 94596 (925) 360-8411 michael@gates-studio.com No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 PLANNING SUBMITTAL #3 OCTOBER 02, 2026SAN RAMON, CA SHEET INDEX A0.0.1 ARCHITECTURAL A0 PROJECT OVERVIEW A0.0.0 COVER SHEET A0.0.1 SHEET INDEX A0.0.2 VICINITY MAP A0.0.3 EXISTING CONTEXT A0.1.0 PROJECT DATA A0.1.1 PROJECT DATA A0.1.2 CODE ANALYSIS A0.2.0 ILLUSTRATIVE SITE PLAN - PRELIMINARY A0.3.0 CONCEPTUAL SITE RENDERINGS - VIEW 1 A0.3.1 CONCEPTUAL SITE RENDERINGS - VIEW 2 A0.3.2 CONCEPTUAL SITE RENDERINGS - VIEW 3 A1 : AFFORDABLE MULTI-FAMILY A1.1.0 MULTIFAMILY BUILDING PLAN - LEVEL 1-5 A1.2.0 MULTIFAMILY BUILDING SECTIONS A1.3.0 MULTIFAMILY BUILDING ELEVATIONS A1.3.1 MULTIFAMILY BUILDING ELEVATIONS A1.5.0 MULTIFAMILY COLOR AND MATERIAL BOARD A2 : 3 STORY TOWNHOUSE CONDOMINIUM "A" A2.1.0 BUILDING ELEVATIONS - 3 STORY CONDOMINIUM_6 PLEX A2.1.1 BUILDING ELEVATIONS - 3 STORY CONDOMINIUM_7 PLEX A2.2.0 BUILDING PLANS - 3 STORY CONDOMINIUM_6 PLEX A2.2.1 BUILDING PLANS - 3 STORY CONDOMINIUM_7 PLEX A2.2.2 BUILDING PLANS - 3 STORY CONDOMINIUM_7 PLEX A2.3.0 BUILDING SECTIONS - 3 STORY CONDOMINIUM A2.3.2 FIRE LADDER ACCESS - 3 STORY CONDOMINIUM A2.4.0 UNIT PLANS 1 - 3 STORY CONDOMINIUM A2.4.1 UNIT PLANS 2 - 3 STORY CONDOMINIUM A2.4.2 UNIT PLANS 3 - 3 STORY CONDOMINIUM A2.6.0 COLOR AND MATERIAL BOARD - 3 STORY CONDOMINIUM A3 : 3 STORY TOWNHOUSE CONDOMINIUM "B" A3.1.0 BUILDING ELEVATIONS - 3 STORY CONDOMINIUM_4 PLEX A3.1.1 BUILDING ELEVATIONS - 3 STORY CONDOMINIUM_5 PLEX A3.1.2 BUILDING ELEVATIONS - 3 STORY CONDOMINIUM_6 PLEX A3.2.0 BUILDING PLANS - 3 STORY CONDOMINIUM_4 PLEX A3.2.1 BUILDING PLANS - 3 STORY CONDOMINIUM_5 PLEX A3.2.2 BUILDING PLANS - 3 STORY CONDOMINIUM_6 PLEX A3.3.0 BUILDING SECTIONS - 3 STORY CONDOMINIUM A3.3.2 FIRE LADDER ACCESS EXHIBIT - 3 STORY CONDOMINIUM A3.4.0 UNIT PLANS - PLANS 4 & 5 - 3 STORY CONDOMINIUM A3.4.1 UNIT PLANS - PLANS 6 - 3 STORY CONDOMINIUM A3.4.2 UNIT PLANS - PLANS 7 - 3 STORY CONDOMINIUM A3.6.0 COLOR AND MATERIAL BOARD - 3 STORY CONDOMINIUM LANDSCAPE L-1 OVERALL SITEPLAN L-2 PARK ENLARGEMENT PLAN L-3 MATERIALS PALETTE L-4 FENCING PLAN L-5 MAILBOX REGIONS PLAN L-6 SITE LIGHTING PLAN L-7 LIGHTING PLAN - PHOTOMETRICS L-8 TREE DISPOSITION PLAN L-9 TREE PLAN L-10 PLANT PALETTE L-11 PLANT PALETTE L-12 SITE SIGNAGE ELECTRICAL E-1.00 ELECTRICAL SITE PLANS CIVIL TM-1 VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES TM-2 EXISTING CONDITIONS & TREE REMOVAL TM-3 PRELIMINARY SITE PLAN TM-4 PRELIMINARY GRADING AND DRAINAGE PLAN TM-5 PRELIMINARY UTILITY PLAN TM-6 PRELIMINARY STORMWATER MANAGEMENT PLAN TM-7 PRELIMINARY FIRE ACCESS SERVICE PLAN TM-8 PRELIMINARY WASTE COLLECTION ACCESS PLAN TM-9 PRELIMINARY EROSION CONTROL PLAN TM-10 SIGNING, STRIPING AND PEDESTRIAN ACCESS PLAN 680 HIGHWAYEXISTING COMMERCIAL CROW CANYON ROAD CAMINO RAMONNORRIS CANYON ROAD EXISTING SCHOOL EXISTING 24HR FITNESS EXISTING COMMERCIAL EXISTING OFFICE EXISTING COMMERCIAL EXISTING RESIDENTIAL SAN RAMON VALLEY BLVDIRON HORSE REGIONAL TRAILTWIN CREEK DRIVEPROJECT SITE CROW CANYON PLACE1/2 M i l e R a d i u s No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA 0 200 400100 VICINITY MAP A0.0.2 PROJECT SITE 680 HIGHWAYEXISTING COMMERCIAL EXISTING OFFICE SAN RAMON VALLEY BLVDNo. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA EXISTING CONTEXT A0.0.3 7 2 6 3 1 4 5 8 EXISTING SITE AERIAL VIEW 5VIEW 4 VIEW 6 VIEW 7 VIEW 1 VIEW 8 VIEW 3 VIEW 2 N OLIVE + OAK - SAN RAMON, CA OVERALL PROJECT DATA No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA PROJECT DATA A0.1.0 OLIVE + OAK - SAN RAMON, CA TOWNHOME PROJECT DATA No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA PROJECT DATA A0.1.1 MULTI-FAMILY AFFORDABLE PROJECT DATA 15 42 0.93 No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 PLANNING SUBMITTAL #3 OCTOBER 02, 2026SAN RAMON, CA CODE ANALYSIS A0.1.2 2025 CALIFORNIA BUILDING CODE (CBC) PART 2, VOLUMES 1 AND 2, TITLE 24 [BASED ON 2024 INTERNATIONAL BUILDING CODE] FHA DESIGN MANUAL 2025 CALIFORNIA ELECTRICAL CODE (CEC) PART 3, TITLE 24 [BASED ON 2023 NATIONAL ELECTRICAL CODE] 2025 CALIFORNIA MECHANICAL CODE (CMC) PART 4, TITLE 24 [BASED ON 2024 UNIFORM MECHANICAL CODE] 2025 CALIFORNIA PLUMBING CODE (CPC) PART 5, TITLE 24 [BASED ON 2024 UNIFORM PLUMBING CODE] 2025 CALIFORNIA ENERGY CODE PART 6, TITLE 24 2025 CALIFORNIA FIRE CODE (CFC) PART 9, TITLE 24 [BASED ON 2024 INTERNATIONAL FIRE CODE] 2025 CALIFORNIA GREEN BUILDING CODE (CAL GREEN) PART 11 EGRESS COMMON PATH OF TRAVEL (CBC SECTION 1006.2.1 + TABLE 1006.2.1) A 75'-0" B 100'-0" R-2 125'-0" ROOF ACCESS (CBC SECTION 1011.12) MIN. ONE STAIR TO THE ROOF PROVIDED ALLOWABLE OPENINGS (CBC TABLE 705.8) PER C.B.C. TABLE 705.8 APPLICABLE CODES: CODE ANALYSIS - 5 STORY (MULTI-FAMILY BUILDINGS) R2 NO EMERGENCY ESCAPE AND RESCUE OPENINGS REQUIRED PER CBC SECTION 1030-EXCEPTION 1 EXIT ACCESS TRAVEL DISTANCE (CBC TABLE 1017.2) A & R-2 OCCUPANCY WITH SPINKLER SYSTEM: 250'-0" B OCCUPANCY WITH SPINKLER SYSTEM: 300'-0" S-2 OCCUPANCY WITH SPINKLER SYSTEM: 400'-0" 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN-FOR AREAS OF PUBLIC ACCOMODATION 2022 NFPA 72 - FIRE ALARMS 2025 NFPA 13 - FIRE SPRINKLERS ALLOWABLE AREA (CBC TABLE 506.2) TYPE III-A: 85 FEET MAXIMUM R-2, TYPE III-A: 5 STORIES ALLOWABLE HEIGHT (CBC TABLE 504.3 & SEC. 504) ALLOWABLE STORIES: (CBC TABLE 504.4 & SEC. 504) PER CBC TABLE 506.2 FIRE SUPRESSION SYSTEMS CBC 903.3.1.1 & 905.3.1(EXEMPTIONS)) FIRE SPRINKLER: NFPA 13 R-2: 4 STORY RESIDENTIAL APARTMENTS S-2: 1 STORY ON GRADE PARKING GARAGE B: BUSINESS- OFFICE A-3: RESIDENTIAL AMENITIES USE & OCCUPANCY (CBC SECTION 310.4 & 312.1) 4-STORY TYPE III-A, OVER 1-STORY TYPE I-ACONSTRUCTION TYPE (CBC SECTION 602.5 & TABLE 504.4) (SEE A1 SERIES) No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA VIEW 1 CONCEPTUAL SITE RENDERING A0.3.0 No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA VIEW 2 CONCEPTUAL SITE RENDERING A0.3.1 No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA VIEW 3 CONCEPTUAL SITE RENDERING A0.3.2 UPDNUPDNUPDN PARKINGNOExerciseLobby/LoungeTrash25'-0"Trash Staging /LoadingBicycleRoomTransformer18'-3"ElectricalRoomGeneratorBatteryMPOEFanRoomFirePumpMaint.OfficeMulti-purposeRoomMove-in LoadingOfficeElev.Mech.Mail/ParcelKitchenetteUtil.GarageEntryUPDNUPDNH StreetB Street102'-0"173'-0"9'-0"19'-0"10'-0"10'-6"Computer Room /LoungeLaundryCourtyardUP DNB2(2bd / 1ba)B2(2bd / 1ba)C1(3bd / 2ba)C1(3bd / 2ba)UPDNC1(3bd / 2ba)A2(Jr.1bd / 1ba)A1(Jr.1bd / 1ba)B1(2bd / 1ba)30"x48"30"x48"28'-10 1/2"72'-8"38'-2"10'-0"76'-8"10'-0"38'-2" 173'-0" 66'-2"52'-0"54'-10"A2(Jr.1bd / 1ba)StorageLaundry30"x48"30"x48" UP DNB2(2bd / 1ba)B2(2bd / 1ba)C1(3bd / 2ba)C1(3bd / 2ba)UPDNC1(3bd / 2ba)A1(Jr.1bd / 1ba)A1(Jr.1bd / 1ba)A2(Jr.1bd / 1ba)A2(Jr.1bd / 1ba)A1(Jr.1bd / 1ba)A1(Jr.1bd / 1ba)B1(2bd / 1ba)72'-8"38'-2"10'-0"76'-8"10'-0"38'-2" 173'-0" 66'-2"52'-0"54'-10"POTENTIAL SOLAR3:123:123:123:123:123:12POTENTIAL SOLARPOTENTIAL SOLARPOTENTIAL SOLARPOTENTIAL SOLAR0.5:120.5:12LEVELS 1-5MULTIFAMILY BUILDING PLANSA1.1.0081632Scale: 1/16" = 1'-0"Scale: 1/16" = 1'-0"1. Level 1 Plan2. Level 2 Plan3. Level 3 to 5 Plan4. Roof PlanNo.888.456.5849 | ktgy.comOLIVE + OAK20250017PLANNING SUBMITTAL #3OCTOBER 02, 2026SAN RAMON, CA RESIDENTIAL COURTYARDRESIDENTIALPARKING GARAGE58'-0"37'-4"100'-0"Type VA ResidentialType IA ResidentialRESIDENTIALAMENITYLevel 2Level 112'-0"T.O.PlateLevel 3+/- 53'-0"60'-0" Maximum Midpoint of pitched roof10'-3"10'-3"10'-3"10'-3"Level 4Level 5UNITUNITUNITUNITUNITUNITUNITUNITComputer Room /LoungeLaundryCourtyardUP DNB2(2bd / 1ba)B2(2bd / 1ba)C1(3bd / 2ba)C1(3bd / 2ba)UPDNC1(3bd / 2ba)A2(Jr.1bd / 1ba)A1(Jr.1bd / 1ba)B1(2bd / 1ba)30"x48"30"x48"A2(Jr.1bd / 1ba)Storage1. Affordable Podium - Cross SectionNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CAMULTIFAMILY BUILDING SECTIONA1.2.004816-1Key Plan (NTS) Level 2Level 112'-0"T.O.PlateLevel 3+/- 53'-0"60'-0" Maximum Midpoint of pitched roof10'-3"10'-3"10'-3"10'-3"Level 4Level 5Level 2Level 112'-0"T.O.PlateLevel 3+/- 53'-0" 60'-0" Maximum Midpoint of pitched roof10'-3"10'-3"10'-3"10'-3"Level 4Level 5SOUTH ELEVATIONWEST ELEVATIONS1No.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CAM2M1P1COLOR & MATERIAL LEGEND*:S1Stucco 1S2Stucco 2W1Vinyl WindowW2 Metal WindowM1Perforated Metal RailingM2Metal AwningP1Cementitious Lap SidingP2Composite Wood Siding*Or approved equal.S1P1M1W1S2W2W1P2S2MULTIFAMILY APARTMENTSBUILDING ELEVATIONSA1.3.004816Scale 1" = 8'P2 Level 2Level 112'-0"T.O.PlateLevel 3+/- 53'-0"60'-0" Maximum Midpoint of pitched roof10'-3"10'-3"10'-3"10'-3"Level 4Level 5Level 2Level 112'-0"T.O.PlateLevel 3+/- 53'-0" 60'-0" Maximum Midpoint of pitched roof10'-3"10'-3"10'-3"10'-3"Level 4Level 5NORTH ELEVATIONEAST ELEVATIONS1No.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CAM1P1COLOR & MATERIAL LEGEND*:S1Stucco 1S2Stucco 2W1Vinyl WindowW2 Metal WindowM1Perforated Metal RailingM2Metal AwningP1Cementitious Lap SidingP2Composite Wood Siding*Or approved equal.S1M2W1S2W1S2P1S1M2M1W2MULTIFAMILY APARTMENTSBUILDING ELEVATIONSA1.3.104816Scale 1" = 8'P2P2 Midpoint of pitched roofMidpoint of pitched roof1. Affordable Podium - Front ElevationStucco 1SW 7009Pearly WhiteS1Stucco 2SW 7036Accessible BeigeS2P1Trim 1SW 7009Pearly WhiteT1CementitiousLap SidingSW 7675SealskinSide Entry DoorOak (or sim.)D2M1Trim 2SW 7675SealskinT2R1G1Metal Garage DoorSW 7675SealskinF1Fascia BoardSW 7674PeppercornVinyl WindowWhite (or sim.)W1Metal RoofStanding SeamNote: Or similar productNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CA2. Affordable Podium - Rear ElevationP1S1P2S2T1T2R1M2M1D2D1W1W2S1P1W1S2M2T1T2F1Entry Door FrameOak (or sim.)D1Vinyl WindowWhite (or sim.)W2S2PerforatedMetal PanelM2Metal Railing +AwningsSW 7069Iron OreMULTIFAMILY COLOR AND MATERIAL BOARDA1.5.0CompositeWood SidingFisher - Artisan WoodgrainScandinavian OakP2S2M1 Level 2Level 1T.O.PlateLevel 3T.O.Roof38'-6" 8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1varies T.O.PlateLevel 3T.O.Roof8'-6 3/4"9'-0 3/4"9'-0 3/4" 30'-0" Maximum ±38'-6"Level 2Level 1T.O.PlateLevel 3T.O.Roof38'-6"8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof38'-6"8'-6 3/4"9'-0 3/4"9'-0 3/4"REAR ELEVATIONRIGHT ELEVATION04816FRONT ELEVATIONLEFT ELEVATIONS1S1S2No.888.456.5849 | ktgy.comOLIVE + OAK20250017PLANNING SUBMITTAL #3OCTOBER 02, 2026SAN RAMON, CACOLOR & MATERIAL LEGEND*:S1Stucco 1S2Stucco 2S3Stucco 3W1Vinyl WindowM1Metal RailingM2Metal AwningB1Brick - BrownP1Cementitious SidingG1Metal Garage Door*Or approved equal.S2P1W1S3B1B1S1S2P1W1S3B1M2M1P1S3W1M1W1P1G1TOWNHOME A - 6-PLEXBUILDING ELEVATIONSA2.1.0 Level 2Level 1T.O.PlateLevel 3T.O.Roof38'-6" 8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1varies T.O.PlateLevel 3T.O.Roof8'-6 3/4"9'-0 3/4"9'-0 3/4" 30'-0" Maximum ±38'-6"Level 2Level 1T.O.PlateLevel 3T.O.Roof38'-6"8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof38'-6"8'-6 3/4"9'-0 3/4"9'-0 3/4"REAR ELEVATIONRIGHT ELEVATION04816FRONT ELEVATIONLEFT ELEVATIONS1S1S2No.888.456.5849 | ktgy.comOLIVE + OAK20250017PLANNING SUBMITTAL #3OCTOBER 02, 2026SAN RAMON, CACOLOR & MATERIAL LEGEND*:S1Stucco 1S2Stucco 2S3Stucco 3W1Vinyl WindowM1Metal RailingM2Metal AwningB1Brick - BrownP1Cementitious SidingG1Metal Garage Door*Or approved equal.S2P1W1S3B1B1S1S2P1W1S3B1M2M1P1S3W1M1W1P1G1S1TOWNHOME A 7-PLEXBUILDING ELEVATIONSA2.1.1 up 30" x 48"up 30" x 48"130'-10"50'-4"FIRST FLOOR P3 P1 P2R P2 P1R P3R dn updn upSECOND FLOOR P3 P1 P2P2R P1R P3R dndn THIRD FLOOR P3 P1 P2R P2 P1R P3R 6:12 6:126:12 3:12 3:12 3:12 6:12 6:12 6:12 6:12 3:12 3:12 6:126:12 3:12 6:12 3:12 3:12 3:12 3:12 ROOF PLAN POTENTIAL SOLAR REAR ROOF AREA 30' MAX. HEIGHT TO TOP OF FASCIA TO ALLOW FOR FIRE DEPARTMENT GROUND LADDER ROOF ACCESS PLEASE SECTION SHEET A2.3.0 TOWNHOME A - 6-PLEX BUILDING PLANS A2.2.0 0 4 8 16 Scale: 1/8" = 1'-0"No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 PLANNING SUBMITTAL #3 OCTOBER 02, 2026SAN RAMON, CA up 30" x 48" up 30" x 48"up 30" x 48"152'-0"50'-4"FIRST FLOOR P1 P1R P1RP3 P3RP2RP2 dn up dn updn upSECOND FLOOR P1 P1R P1RP3 P3RP2RP2 0 4 8 16 Scale: 1/8" = 1'-0"No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 PLANNING SUBMITTAL #3 OCTOBER 02, 2026SAN RAMON, CA TOWNHOME A - 7-PLEX BUILDING PLANS A2.2.1 dndndn THIRD FLOOR P1 P1R P1RP3 P3RP2RP2 6:12 6:126:12 3:12 3:12 3:12 6:12 6:12 6:12 6:12 3:12 3:12 3:12 3:12 3:12 3:12 6:126:12 3:12 6:12 ROOF PLAN POTENTIAL SOLAR REAR ROOF AREA 30' MAX. HEIGHT TO TOP OF FASCIA TO ALLOW FOR FIRE DEPARTMENT GROUND LADDER ROOF ACCESS PLEASE SECTION SHEET A2.3.0 0 4 8 16 Scale: 1/8" = 1'-0"No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 PLANNING SUBMITTAL #3 OCTOBER 02, 2026SAN RAMON, CA TOWNHOME A - 7-PLEX BUILDING PLANS A2.2.2 GARAGEKITCHENBEDROOM 2123GREAT ROOMPRIMARYBEDROOMBEDROOM 4123PRIMARYBATHDININGBATH 31'-6"MAX FF TO SPOT GRADE DROPTO ACHIEVE 30' BLDG HEIGHTTO TOP OF FASCIA @ EAVE.1430' Max30' MAX. HEIGHT TO TOP OF FASCIASO BUILDING DOES NOT REQUIRE AERIAL APPARATUS ACCESSPER FIRE DEPARTMENT REQUIREMENTST.O. PLT.T.O. PLT.T.O. FLR. SHTNG.T.O. FLR. SHTNG.1'-2"1"9'-0 3/4"1'-2"1/2"8'-6 3/4"T.O. PLT.9'-0 3/4"8'-6 3/4"9'-0 3/4"L 2L 1L 3T.O.PLATE34'-4"Midpoint of pitched roof9'-9 3/4"10'-3 3/4"varies9'-0 3/4"ATTICdnupdn up1. Cross SectionNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CATOWNHOME ABUILDING SECTIONA2.3.00248-1Key Plan (NTS) KITCHENPRIMARYBEDROOMBEDROOM 324'-4"23'-7"1476°FRONTGARAGEGREATROOMBEDROOM 21231425'-1"24'-4"73°REARGARAGEKITCHENBEDROOM 21231425'-1"24'-4"73°REARGREATROOMPRIMARYBEDROOMBEDROOM 421'-2"20'-5"1476°123FRONTGARAGEKITCHENBEDROOM 21425'-1"24'-4"72°REARGREAT ROOMPRIMARYBEDROOMBEDROOM 424'-4"23'-7"76°14FRONT(W)x(H) ≥ 5.7 s.f. Clear Opening3'-0"5'-0"W ≥ 20" Clear OpeningH ≥ 24" Clear Opening(W)x(H) ≥ 5.7 s.f. Clear Opening3'-0"5'-0"W ≥ 20" Clear OpeningH ≥ 24" Clear Opening1'-6"EMERGENCY ESCAPE AND RESCUE OPENINGS FOR TYPICAL EGRESS WINDOWPLAN 1PLAN 1PLAN 2PLAN 2PLAN 3PLAN 3No.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CATOWNHOME A FIRE LADDER ACCESSA2.3.204816Scale: 1/8" = 1'-0" up 30" x 48" First Floor 360 N.S.F.43'-0"21'-0"6'-6"Garage 20'-0" x 22'-0" clear Entry Porch Bedroom 4 11'-7" x 10'-0" Bath 3 drop zone WH compost trash recycle dn up Second Floor 795 N.S.F.39'-10"21'-0"6'-6"6'-0"3'-8"5'-3"8'-8"6'-3"Kitchen Pdr. coats Great Room 15'-7" x 26'-0" Deck 14'-6" x 6'-0" media wall Pantry dnThird Floor 878 N.S.F. 21'-0"45'-4"W.I.C. 19'-9" l.f. Primary Bedroom 12'-5" x 14'-3" Primary Bath Laund. Bedroom 2 10'-0" x 13'-0" Bedroom 3 10'-0" x 14'-0" Bath 2 Hall 4 BEDROOMS 3.5 BATHS 2,033 N.S.F. TOWNHOME A UNIT PLAN 1 A2.4.0 0 2 4 8 Scale: 1/4" = 1'-0"No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA First Floor340 N.S.F.42'-2"21'-0"7'-9"WHdropzonecomposttrashrecycleGarage20'-0" x 22'-0" clearcoatsPorchEntryBedroom 311'-0" x 10'-11"Bath3upSecond Floor839 N.S.F.21'-0"42'-2"6'-71 2"KitchenDeck15'-7" x 7'-6"Pdr.uppantrydnmediawallGreat Room20'-5" x 29'-0"6'-0"3'-7 1/2"6'-10"7'-9"4'-5"Third Floor902 N.S.F.21'-0"36'-10"12'-2"W.I.C.19'-7" l.f.PrimaryBedroom16'-5" x 13'-10"PrimaryBathdnLaund.Bedroom 212'-2" x 11'-0"Bath2linenHall3 BEDROOMS3.5 BATHS2,081 N.S.F.TOWNHOME AUNIT PLAN 2A2.4.10248Scale: 1/4" = 1'-0"No.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CA First Floor460 N.S.F.43'-6"21'-0"6'-10"WHdropzonecomposttrashrecycleGarage20'-0" x 22'-0" ClearcoatsBedroom 411'-6" x 11'-0"Bath3PorchEntryupSitting / Opt.ADU11'-6" x 6'-4"opt.kitchenetteopt.dr.Second Floor864 N.S.F.21'-0"47'-11"9"updnLaund.Deck14'-3" x 5'-8"walk-inpantryKitchen6'-0"4'-0"4'-3 1/2"8'-0"4'-0"Great Room15'-0" x 29'-0"mediawallPdr.Third Floor946 N.S.F.21'-0"47'-11"9"dnW.I.C.24'-0" l.f.PrimaryBedroom13'-9" x 16'-0"PrimaryBathlinenHallBedroom 210'-0" x 11'-0"Bedroom 310'-0" x 11'-0"Bath24 BEDROOMS3.5 BATHS2,270 N.S.F.TOWNHOME AUNIT PLAN 3A2.4.20248Scale: 1/4" = 1'-0"No.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CA CompositeShingle RoofDriftwood1. 6-Plex Town Home A Front ElevationStucco 1SW 7010White DuckS1Stucco 2SW7036Accessible BeigeS2Stucco 3SW 7033Brainstorm BronzeS3P1Trim 1SW7036Accessible BeigeT1Cementitious Lap Siding 1SW7580CarnelianEntry DoorSW 6257GibraltarD2M1Metal Railing +AwningsSW 7069Iron OreBrick VeneerEndicott- Thin BrickLight Grey BlendB1Trim 2SW7580CarnelianT2R1G1Metal GarageDoorSW 7674PeppercornF1Fascia BoardSW 7674PeppercornVinyl WindowWhite (or sim.)W1Note: Or similar productNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CA2. 6-Plex Town Home A Rear ElevationTrim 3SW 7674PeppercornT3S1T3P1T2M1M1B1D1T3S2F1F1P1T2T1G1S3M1R1R1D2W1Entry DoorSW 9100Umber RustD1TOWNHOUSE ACOLOR AND MATERIAL BOARD A2.6.0 Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8" 8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8"8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8"8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8" 8'-6 3/4"9'-0 3/4"9'-0 3/4" ±30'-0" Maximumvaries S1REAR ELEVATIONRIGHT ELEVATION04816FRONT ELEVATIONLEFT ELEVATIONNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CACOLOR & MATERIAL LEGEND*:S1Stucco 1S2Stucco 2S3Stucco 3W1Vinyl WindowM1Metal RailingM2Metal AwningP1Cementitious SidingP2Composite Wood SidingG1Metal Garage Door*Or approved equal.S1S2S3G1M1P1M1W1W1S1P1M1W1S3S3W1S3S1P1M1P2TOWNHOME B - 4 PLEXBUILDING ELEVATIONSA3.1.0 Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8" 8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8"8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8"8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8" 8'-6 3/4"9'-0 3/4"9'-0 3/4" ±30'-0" Maximumvaries S1REAR ELEVATIONRIGHT ELEVATION04816FRONT ELEVATIONLEFT ELEVATIONNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CACOLOR & MATERIAL LEGEND*:S1Stucco 1S2Stucco 2S3Stucco 3W1Vinyl WindowM1Metal RailingM2Metal AwningP1Cementitious SidingP2Composite Wood SidingG1Metal Garage Door*Or approved equal.S1S2S3G1M1P1M1W1W1S1P1W1S3S3W1S3S1P1M1P2M2TOWNHOME B - 5 PLEXBUILDING ELEVATIONSA3.1.1 Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8" 8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8"8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8"8'-6 3/4"9'-0 3/4"9'-0 3/4"Level 2Level 1T.O.PlateLevel 3T.O.Roof36'-8" 8'-6 3/4"9'-0 3/4"9'-0 3/4" ±30'-0" Maximumvaries S1REAR ELEVATIONRIGHT ELEVATION04816FRONT ELEVATIONLEFT ELEVATIONNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CACOLOR & MATERIAL LEGEND*:S1Stucco 1S2Stucco 2S3Stucco 3W1Vinyl WindowM1Metal RailingM2Metal AwningP1Cementitious SidingP2Composite Wood SidingG1Metal Garage Door*Or approved equal.S1S2S3G1M1P1M1W1W1S1P1W1S3S3W1S3S1P1M1P2M2TOWNHOME B - 6 PLEXBUILDING ELEVATIONSA3.1.2 FIRST FLOOR 81'-5"46'-9"P7P7P4P5 SECOND FLOOR P7P7P4P5 THIRD FLOOR P7P7P4P5 4:12 3:12 ROOF LEVEL 3:12 3:123:12 3:12 4:12 4:12 4:12 RIDGE 3:12 3:12 POTENTIAL SOLAR REAR ROOF AREA 30' MAX. HEIGHT TO TOP OF FASCIA TO ALLOW FOR FIRE DEPARTMENT GROUND LADDER ROOF ACCESS PLEASE SECTION SHEET A3.3.0 No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 PLANNING SUBMITTAL #3 OCTOBER 02, 2026SAN RAMON, CA TOWNHOME B - 4-PLEX BUILDING PLANS A3.2.0 0 4 8 16 Scale: 1/8" = 1'-0" FIRST FLOOR 92'-0"46'-9"P7P4P5P4P5 SECOND FLOOR P7P4P5P4P5 THIRD FLOOR P7P4P5P4P5 4:12 3:12 ROOF LEVEL 3:12 3:12 3:12 4:12 4:12 4:12 3:12 3:12 3:12 POTENTIAL SOLAR REAR ROOF AREA 30' MAX. HEIGHT TO TOP OF FASCIA TO ALLOW FOR FIRE DEPARTMENT GROUND LADDER ROOF ACCESS PLEASE SECTION SHEET A3.3.0 TOWNHOME B - 5-PLEX BUILDING PLANS A3.2.1 0 4 8 16 Scale: 1/8" = 1'-0"No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 PLANNING SUBMITTAL #3 OCTOBER 02, 2026SAN RAMON, CA FIRST FLOOR 113'-2"47'-4"P7P6P4P5P4P5 SECOND FLOOR P7P6P4P5P4P5 42" x 60"DN17RlowlinenTHIRD FLOOR P7P6P4P5P4P5 4:12 3:12 ROOF LEVEL 3:12 3:12 3:12 3:12 4:124:12 4:12 4:12 3:12 3:12 3:12 3:12 POTENTIAL SOLAR REAR ROOF AREA 30' MAX. HEIGHT TO TOP OF FASCIA TO ALLOW FOR FIRE DEPARTMENT GROUND LADDER ROOF ACCESS PLEASE SECTION SHEET A3.3.0 TOWNHOME B- 6-PLEX BUILDING PLANS A3.2.2 0 4 8 16 Scale: 1/8" = 1'-0"No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 PLANNING SUBMITTAL #3 OCTOBER 02, 2026SAN RAMON, CA GARAGEGREAT ROOMDININGKITCHENPRIMARYBEDROOMPRIMARYBATHBEDROOM 21'-6"MAX FF TO SPOT GRADE DROPTO ACHIEVE 30' BLDG HEIGHTTO TOP OF FASCIA @ EAVE.8'-6 3/4"9'-0 3/4"L 2L 1L 3T.O.PLATE1231241430'30' MAX. HEIGHT TO TOP OF FASCIASO BUILDING DOES NOT REQUIRE AERIAL APPARATUS ACCESSPER FIRE DEPARTMENT REQUIREMENTSBEDROOM 3W.I.C.T.O. PLT.T.O. PLT.T.O. FLR. SHTNG.T.O. FLR. SHTNG.1'-2"1"9'-0 3/4"1'-2"1/2"8'-6 3/4"T.O. PLT.34'-6"Midpoint of pitched roof9'-9 3/4"10'-3 3/4"variesBATH 39'-0 3/4"8'-6 1/4"9'-0 3/4"ATTIC1. Cross SectionNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CATOWNHOME BBUILDING SECTIONA3.3.00248-1Key Plan (NTS) KITCHENPRIMARYBEDROOM126BEDROOM 324'-8"23'-11"76°14FRONTGARAGEGREATROOMBEDROOM 21231425'-1"24'-4"72°REAR(W)x(H) ≥ 5.7 s.f. Clear Opening3'-0"5'-0"W ≥ 20" Clear OpeningH ≥ 24" Clear Opening(W)x(H) ≥ 5.7 s.f. Clear Opening3'-0"5'-0"W ≥ 20" Clear OpeningH ≥ 24" Clear OpeningGARAGEPRIMARYBEDROOM1231425'-1"24'-4"73°BEDROOM 3REARKITCHENBEDROOM 2BEDROOM 324'-4"23'-7"1476°126FRONTGARAGEBEDROOM 21231425'-1"24'-4"73°KITCHENREARGREATROOMPRIMARYBEDROOMBEDROOM 324'-4"23'-7"1476°126FRONTGARAGEBEDROOM 21231425'-1"24'-4"73°KITCHENREARGREATROOMPRIMARYBEDROOMBEDROOM 324'-4"23'-7"1476°126FRONTEMERGENCY ESCAPE AND RESCUE OPENINGS FOR TYPICAL EGRESS WINDOWPLAN 4PLAN 4PLAN 5PLAN 5PLAN 6PLAN 6No.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CATOWNHOME BFIRE LADDER ACCESSA3.3.204816Scale: 1/8" = 1'-0"PLAN 6PLAN 6 13'-2"20'-9"46'-9"34'-1" 34'-1" 17'-0" PLAN 5 16'-11" PLAN 447'-9"2'-0"45'-9"Bedroom 3 10'-3" x 10'-0" Bath 3recycletrash compostWH WH recycle trash compost Garage 20'-0" x 22'-0" Clear Garage 10'-0" x 40'-0" Clear UP 17R UP 17R First Floor Plan 4: 65 N.S.F. Plan 5: 295 N.S.F. 2x6 bike parking 200 cubic ft. of StorageGreat Room 12'-3" x 12'-8" Kitchen 34'-1" 15'-9"2"13'-2" Deck 10'-10" x 6'-7" Pdr Office 47'-9"46'-9"1'-0"47'-9"2'-0"45'-9"34'-1" 17'-0" PLAN 5 2"16'-11" PLAN 4 Dining Room 12'-4" x 12'- 6" Great Room 15'-0" x 12'-9" Kitchen Deck 15'- 0" x 6'- 6" W.I. Pantry Office 6'-0"3'-4"7'-1"6'-0"4'-4"5'-0"6'-2"6'-0"5'-0"2'-0" Bedroom 3 10'- 3" x 10'- 0" Bath 3 Second Floor Plan 4: 597 N.S.F. Plan 5: 709 N.S.F. DN 17R UP 17R DN 17R UP 17R46'-9"34'-1" 15'-9"2"13'-2"45'-9"34'-1" 17'-0" PLAN 5 2"16'-11" PLAN 446'-9"1'-0"W.I.C. 16'-3" l.f. Primary Bedroom 16'-5" x 12'-9" Primary Bath Laund. Bedroom 2 13'-5" x 11'-8" Bath 2 8' CLG. Primary Bath Primary Bedroom 12'- 7" x 13'- 0" Bedroom 2 11'- 0" x 9'- 10" Bath 2 5'-0" Laund. Third Floor Plan 4: 626 N.S.F. Plan 5: 777 N.S.F.DN17RDN 17R low linen low linen 42" x 60" 42" x 60" No. 888.456.5849 | ktgy.com OLIVE + OAK 20250017 SAN RAMON, CA PLAN 5 3 BEDROOMS 3.5 BATHS 1,781 N.S.F. TOWNHOME B UNIT PLANS - PLAN 4&5 A3.4.0 0 2 4 8 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" PLAN 4 3 BEDROOMS 3 BATHS 1,288 N.S.F. 21'-0"45'-3" 39'-8"13'-4"recycletrashcompostWHBedroom 312'-7" x 12'- 3"Bath 37'-9"5'-7" 47'-9"Garage20'-0" x 22'-0" ClearUP17RFirst Floor377 N.S.F.21'-1"2x6 bike parkingPdrKitchen6'-8"DN17R17RUPSecond Floor809 SQ. FT.Dining RoomGreat Room16'-4" x 22'-9"Deck12'- 7" x 6'- 6"W.I.Pantry6'-0"15'-9"42'-6"21'-3"13'-4"7'-11"1'-6"1'-0"5'-4"21'-0"6'-0"3'-8"5'-4"42" x 60"DN17R lowlinenThird Floor870 N.S.F.W.I.C.20'- 8" l.f.PrimaryBedroom12'- 7" x 16'- 7"HIGH FLAT CLG.PrimaryBathLaund.Bedroom 214'-7" x 11'- 2"Bath 28' CLG.21'-0"45'-9" 45'-9"15'-9"5'-3"1'-0"42'-6"13'-4"7'-8"21'-0"2'-3"No.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CA3 BEDROOMS3.5 BATHS2,021 N.S.F.TOWNHOME BUNIT PLANS - PLAN 6A3.4.10248Scale: 1/4" = 1'-0"Scale: 1/4" = 1'-0" 45'-0" 45'-0"23'-6"23'-6"recycletrash compostWHBedroom 412'-4" x 12'- 9"Bath 3Garage20'-0" x 22'-0" ClearFirst Floor413 N.S.F.UP17RFlushThreshold3' doorFlushThreshold3' door 3' door 3' door 3' door 30" x 48"Second Floor860 SQ. FT.DN17R17RUPPdrDining RoomGreat Room18'-8" x 25'-0"KitchenDeck15'- 0" x 6'- 6"W.I.Pantry6'-0"3'-8"18'-2"14'-8" 42'-6"23'-6"15'-7"7'-11"1'-6"1'-0" 11'-2"12'-7" 45'-0"5'-4"23'-6"6'-6"6'-0"7'-3"4'-3"18'-2"16'-4" 42'-6"23'-6"W.I.C.19'- 9" l.f.PrimaryBedroom14'- 8" x 15'- 5"HIGH FLAT CLG.Bath 2Bedroom 211'-3" x 11'- 8"PrimaryBathLaund.Bedroom 311'-3" x 10'- 7"15'-7"7'-11"1'-6"1'-0" 16'-1"12'-7"45'-0"5'-4"23'-6"Third Floor920 N.S.F.DN17R42" x 60"No.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CA4 BEDROOMS3.5 BATHS2,193 N.S.F.TOWNHOME BUNIT PLANS - PLAN 7A3.4.20248Scale: 1/4" = 1'-0"Scale: 1/4" = 1'-0" CompositeShingle RoofPewter Gray1. 6-Plex Town Home B Front ElevationStucco 1SW 7042Shoji WhiteS1P1T1CementitiousLap Siding 2SW6243DistanceEntry DoorSW 6257GibraltarD2M1Metal Railing +AwningsSW 7069Iron OreCompositeWood SidingFisher - Artisan WoodgrainScandinavian OakP2T2R1G1Metal GarageDoorSW7074SoftwareTrim 3SW 7036Accessible BeigeStucco 2SW6243DistanceS3Note: Or similar productNo.888.456.5849 | ktgy.comOLIVE + OAK20250017SAN RAMON, CA2. 6-Plex Town Home B Rear ElevationT3P1P2M1S3S1R1S2T2M1D1D2T2F1S3G2W1T1S1T3G1Entry DoorSW 9100Umber RustD1G2Metal GarageDoorSW 7675SealskinStucco 3SW7074SoftwareS2Trim 1SW 7042Shoji WhiteTrim 2SW 7674PeppercornF1Vinyl WindowWhite (or sim.)W1T3Fascia BoardSW 7674PeppercornF1R1TOWNHOME BCOLOR AND MATERIAL BOARDA3.6.0 OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-1OVERALL SITE PLAN OCTOBER 2, 2026 ENTRY MONUMENT (SEE L-12) PARK (SEE L-2) STORMWATER TREATMENT AREA PERIMETER WALL AND FENCE (SEE L-4) STAMPED AC PAVING VISION TRIANGLE DROP-OFF AFFORDABLE HOUSING APARTMENTS PARKING EXISTING TREES TO REMAIN DECORATIVE PAVEMENT LANDSCAPE PLANTING STORMWATER PLANTING CONCRETE PAVING VISION TRIANGLE NOTE: Conform to Zoning Ordinance Section D3-6 F 2: Height limit No structure, sign, or landscape element shall exceed 30 inches in height within the traffic safety visibility area, unless approved by the Engineering Services Director. This limitation shall not apply to existing public utility poles, traffic signs and signals, trees with their canopy trimmed to a minimum of seven feet above grade, or corners where the contour of the land itself prevents visibility. LAYOUT LEGEND HIGHWAY 6803 10 2 1 7 8 6 9 9 5 5 30’60’0’ SCALE: 1” = 30’-0” 15’ 1 6 2 7 3 8 4 9 10 11 5 CROW CANYON PLACEC STREETB STREETE STREETA STR E E T H ALLEY I ALLEY K ALLEY G STREETF STREET D STREETJ ALLEY 3 3 3 3 4 11 OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-2PARK ENLARGEMENT PLAN OCTOBER 2, 2026 LANDSCAPE WALL CONCRETE PAVING PLAY STRUCTURE WITH PLAY SURFACING SYNTHETIC TURF CONCRETE PAVERS PICNIC TABLES SHADE STRUCTURE (16’-6”x 24’-6”) BENCH LOW FENCE LITTER RECEPTACLE BIKE RACK LAYOUT LEGEND 6 11 10 7 3 2 4 9 8 1 4’8’0’ SCALE: 1/4” = 1’-0” 2’ 1 6 2 7 3 8 4 9 5 10 11 KEY MAP 5 C STREETG STREET OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-3MATERIALS PALETTE OCTOBER 2, 2026 PAVING SITE FURNISHING FENCE, WALL AND STRUCTURE CONCRETE PAVING CONCRETE PAVERS LITTER RECEPTACLE BIKE RACKPICNIC TABLEBENCH LOW FENCE LANDSCAPE WALL SHADE STRUCTURE STAMPED AC PAVING SYNTHETIC TURF PLAY SURFACING OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-4FENCING PLAN OCTOBER 2, 2026 30’60’0’ SCALE: 1” = 30’-0” 15’CROW CANYON PLACEFENCE & WALL LEGEND 8’H CMU SOUND WALL 8’H GOOD NEIGHBOR FENCE 42”H LOW FENCE C STREETB STREETE STREETA STR E E T H ALLEY I ALLEY K ALLEY G STREETF STREET D STREETJ ALLEYHIGHWAY 680 OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-5MAILBOX REGIONS PLAN OCTOBER 2, 2026 30’60’0’ SCALE: 1” = 30’-0” 15’CROW CANYON PLACEC STREETB STREETE STREETA ST R E E T H ALLEY I ALLEY K ALLEY G STREETF STREET D STREETJ ALLEYHIGHWAY 68026 UNITS, 6 PARCELS (2) (13) SLOT BOXES, (1) PARCEL (1) 4 PARCEL LOCKER 16 UNITS, 4 PARCELS (1) (16) SLOT BOXES, (2) PARCEL (1) 2 PARCEL LOCKER 29 UNITS, 6 PARCELS (1) (16) SLOT BOXES, (2) PARCEL (1) (13) SLOT BOXES , (1) PARCEL (1) 4 PARCEL LOCKER 22 UNITS, 5 PARCELS (2) (12) SLOT BOXES, (1) PARCEL (1) 4 PARCEL LOCKER 26 UNITS, 6 PARCELS (2) (13) SLOT BOXES, (1) PARCEL (1) 4 PARCEL LOCKER LEGEND MAILBOX NOTE: 1. Mailbox locations, quantities, and unit types subject to changes pending approval from USPS OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-6SITE LIGHTING PLAN POLE LIGHT Mounting Height: 15’ BOLLARD LIGHT Mounting Height: 3’ WALL PACK Mounting Height: 8’ NOTE: Refer to L-7 for all site lighting specifications and photometric plan. OCTOBER 2, 2026 30’60’0’ SCALE: 1” = 30’-0” 15’CROW CANYON PLACESITE LIGHTING LEGEND C STREETB STREETE STREETA STR E E T H ALLEY I ALLEY K ALLEY G STREETF STREET D STREETJ ALLEYHIGHWAY 680 OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-7LIGHTING PLAN - PHOTOMETRICS OCTOBER 2, 2026 SCALE: NTS OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-8TREE DISPOSITION PLAN 63 64 65 66 67 68 69 70 71 72 73 74 75 76 776261 605756 55 5453 52 5051 103 96 95 94 x 79 78 104 49 48 47 46 45 44 43 105 106 107 108 97 98 99 100101 102 42 41 40 39 38 109 110 111 113112 37 36 35 32 34 31 33 30 x29 28 27 25 24 23 22 21 20 19 18 1716 151413 12 11 10 9 8 xx 7 6 5 4 3 1 2 x 93 x 92 91 90 86 85 83 82 81 80 x 8788 89 26 # # # # 63 64 65 66 67 68 69 70 71 72 73 74 75 76 776261 605756 55 5453 52 5051 103 96 95 94 x 79 78 104 49 48 47 46 45 44 43 105 106 107 108 97 98 99 100101 102 42 41 40 39 38 109 110 111 113112 37 36 35 32 34 31 33 30 x29 28 27 25 24 23 22 21 20 19 18 1716 151413 12 11 109 8 xx 7 6 5 4 3 1 2 x 93 x 92 91 90 86 85 83 82 81 80 x 8788 89 26 # # # # 63 64 65 66 67 68 69 70 71 72 73 74 75 76 776261 605756 55 5453 52 5051 103 96 95 94 x 79 78 104 49 48 47 46 45 44 43 105 106 107 108 97 98 99 100101 102 42 41 40 39 38 109 110 111 113112 37 36 35 32 34 31 33 30 x29 28 27 25 24 23 22 21 20 19 18 1716 151413 12 11 109 8 xx 7 6 5 4 3 1 2 x 93 x 92 91 90 86 85 83 82 81 80 x 8788 89 26 # # # # 63 64 65 66 67 68 69 70 71 72 73 74 75 76 776261 605756 55 5453 52 5051 103 96 95 94 x 79 78 104 49 48 47 46 45 44 43 105 106 107 108 97 98 99 100101 102 42 41 40 39 38 109 110 111 113112 37 36 35 32 34 31 33 30 x29 28 27 25 24 23 22 21 20 19 18 1716 151413 12 11 109 8 xx 7 6 5 4 3 1 2 x 93 x 92 91 90 86 85 83 82 81 80 x 8788 89 26 # # # # 63 64 65 66 67 68 69 70 71 72 73 74 75 76 776261 605756 55 5453 52 5051 103 96 95 94 x 79 78 104 49 48 47 46 45 44 43 105 106 107 108 97 98 99 100101 102 42 41 40 39 38 109 110 111 113112 37 36 35 32 34 31 33 30 x29 28 27 25 24 23 22 21 20 19 18 1716 151413 12 11 109 8 xx 7 6 5 4 3 1 2 x 93 x 92 91 90 86 85 83 82 81 80 x 8788 89 26 # # # # 63 64 65 66 67 68 69 70 71 72 73 74 75 76 776261 605756 55 5453 52 5051 103 96 95 94 x 79 78 104 49 48 47 46 45 44 43 105 106 107 108 97 98 99 100101 102 42 41 40 39 38 109 110 111 1131123736353234313330x2928272524 23 22 21 2019 18 1716 151413 1211109 8 xx7 6 5 4 3 1 2 x 93 x 92 91 90 86 85 83 82 81 80 x 8788 89 26 #### OCTOBER 2, 2026 30’60’0’ SCALE: 1” = 30’-0” 15’CROW CANYON PLACELEGEND C STREETB STREETE STREETA STR E E T H ALLEY I ALLEY K ALLEY G STREETF STREET D STREETJ ALLEY (36) PROTECTED TREES TO BE REMOVED (37) UNPROTECTED TREES TO BE REMOVED (13) PROTECTED TREES TO REMAIN (31) UNPROTECTED TREES TO REMAIN EXISTING TREE DRIPLINE NOTE: Refer to the Arborist Report prepared by HortScience | Bartlett Consulting dated July 24, 2025 for additional existing tree information, inventory, and disposition table.HIGHWAY 680 OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-9TREE PLAN OCTOBER 2, 2026 TREE LEGEND ENTRY TREE Olea europea ‘Swan Hill’ Swan Hill Olive ENTRY DROP-OFF TREE Acer rubrum x ‘Armstrong’ Armstrong Red Maple Acer rubrum x ‘October Glory’ October Glory Red Maple ACCENT TREE Arbutus undeo ‘Marina’ Marina Strawberry Tree Cercis canadensis ‘Oklahoma’ Oklahoma Redbud Cercis occidentalis Western Redbud Lagerstroemia ‘Tonto’ Tonto Crape Myrtle Laurus x ‘Saratoga’ Saratoga Laurel Magnolia ‘Little Gem’ Marina Strawberry Tree SPECIMEN TREE Quercus spp. Oak STREET TREE Lagerstroemia x ‘Natchez’ Natchez Crape Myrtle Ulmus parvifolia ‘Drake’ Drake Elm Ulmus parvifolia ‘Frontier’ Frontier Elm STORMWATER TREE Cercis occidentalis Western Redbud Laurus x ‘Saratoga’ Saratoga Laurel Platanus ‘Columbia’ Columbia London Plane Tree Note: All trees within vision triangles must have their canopy trimmed above a minimum of seven feet above grade. CROW CANYON PLACE30’60’0’ SCALE: 1” = 30’-0” 15’C STREETB STREETE STREETA STR E E T H ALLEY I ALLEY K ALLEY G STREETF STREET D STREETJ ALLEYHIGHWAY 680 OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-10PLANT PALETTE CODE BOTANICAL NAME COMMON NAME SIZE WATER USE MATURE HEIGHT MATURE WIDTH TREES ARA ACER RUBRUM 'ARMSTRONG'ARMSTRONG RED MAPLE 24" BOX M 40'15' AOG ACER RUBRUM 'OCTOBER GLORY'OCTOBER GLORY RED MAPLE 24" BOX M 40'35' ARB ARBUTUS X 'MARINA'MARINA STRAWBERRY TREE 24" BOX L 25'20' CTO CERCIS CANADENSIS TEXENSIS 'OKLAHOMA'OKLAHOMA TEXAS REDBUD 24" BOX M 15'20' COO CERCIS OCCIDENTALIS WESTERN REDBUD 24" BOX L 20'15' LAN LAGERSTROEMIA INDICA X FAURIEI 'NATCHEZ'NATCHEZ CRAPE MYRTLE 24" BOX L 25'15' LTO LAGERSTROEMIA INDICA X FAURIEI 'TONTO'TONTO CRAPE MYRTLE 24" BOX L 15'10' LAS LAURUS X `SARATOGA`SARATOGA HYBRID LAUREL 24"BOX L 20'20' MLG MAGNOLIA GRANDIFLORA 'LITTLE GEM'LITTLE GEM DWARF SOUTHERN MAGNOLIA 24" BOX M 20'10' OLE OLEA EUROPAEA 'SWAN HILL'SWAN HILL FRUITLESS OLIVE 24"BOX L 25'20' PLC PLATANUS X ACERIFOLIA 'COLUMBIA'COLUMBIA LONDON PLANE TREE 24"BOX M 40'30' QUL QUERCUS LOBATA VALLEY OAK 24"BOX L 40'35' QUS QUERCUS SUBER CORK OAK 24"BOX L 40'35' QUV QUERCUS VIRGINIANA SOUTHERN LIVE OAK 24"BOX M 40'35' ULD ULMUS PARVIFOLIA 'DRAKE'DRAKE LACEBARK ELM 24" BOX L 30'30' ULF ULMUS PARVIFOLIA `NEW FRONTIER`NEW FRONTIER ELM 24"BOX L 30'20' CODE BOTANICAL NAME COMMON NAME SIZE WATER USE MATURE HEIGHT NATIVE SHRUBS AI ACACIA COGNATA 'COUSIN ITT'COUSIN ITT ACACIA 1 GAL M 60"48" AH ACHILLEA MILLEFOLIUM 'SUMMER PASTELS'SUMMER PASTELS MIX COMMON YARROW 1 GAL L 24"36" AM ACHILLEA X 'MOONSHINE'MOONSHINE YARROW 1 GAL L 24"24" AN AEONIUM SPP.AEONIUM 5 GAL L 36"24" AV AGAVE SPP.AGAVE 1 GAL L 36"36" AL ALOE STRIATA CORAL ALOE 1 GAL L 36"24" AB ALOE X 'BLUE ELF'BLUE ELF ALOE 1 GAL L 24"24" AR ARBUTUS UNEDO 'COMPACTA'COMPACT STRAWBERRY TREE 5 GAL L 72"48" AD ASPARAGUS DENSIFLORUS 'MYERS'MYERS ASPARAGUS FERN 1 GAL M 48"36" BB BOUTELOUA GRACILIS 'BLONDE AMBITION'BLONDE AMBITION BLUE GRAMA 1 GAL L 30"24" CS CALANDRINIA SPECTABILIS 'SHINING PINK'SHINING PINK CALANDRINIA 1 GAL L 24"36" CE CHONDROPETALUM ELEPHANTINUM LARGE CAPE RUSH 1 GAL L 48"60" CT CHONDROPETALUM TECTORUM 'EL CAMPO'EL CAMPO CAPE RUSH 1 GAL L 36"36" CK COPROSMA X KIRKII 'HAGLEY GREEN'HAGLEY GREEN TAUPATA 1 GAL L 72"48" DL DIANELLA REVOLUTA 'DR5000'LITTLE REV™ FLAX LILY 1 GAL L 36"36" DR DIANELLA REVOLUTA 'DTN03'BABY BLISS™ FLAX LILY 1 GAL L 24"24" DT DIANELLA TASMANICA 'VARIEGATA'VARIEGATED FLAX LILY 1 GAL L 48"48" DB DIETES BICOLOR FORTNIGHT LILY 1 GAL L 36"36" DG DIETES VEGETA AFRICAN IRIS 1 GAL L 36"36" EC EPILOBIUM CANUM 'CATALINA'CATALINA CALIFORNIA FUCHSIA 1 GAL L 30"24" FM FESTUCA MAIREI ATLAS FESCUE 1 GAL L 36"36" GF GALVEZIA SPECIOSA 'FIRECRACKER'FIRECRACKER ISLAND SNAPDRAGON 1 GAL L 36"42" GC GREVILLEA LANIGERA 'COASTAL GEM'COASTAL GEM GREVILLEA 1 GAL L 60"48" HP HESPERALOE PARVIFLORA RED YUCCA 5 GAL L 36"42" HB HESPERALOE PARVIFLORA 'PERPA'BRAKELIGHTS® RED YUCCA 5 GAL L 36"24" HA HETEROMELES ARBUTIFOLIA TOYON 1 GAL L 72"60" KU KNIPHOFIA UVARIA RED HOT POKER 1 GAL L 24"24" LB LOMANDRA LONGIFOLIA 'LM300'BREEZE™ MAT RUSH 1 GAL L 42"42" MX MAHONIA X 'SOFT CARESS'SOFT CARESS MAHONIA 1 GAL L 36"30" MR MUHLENBERGIA RIGENS DEER GRASS 1 GAL L 48"60" NW NEPETA X FAASSENII 'WALKER'S LOW'WALKER'S LOW CATMINT 1 GAL L 18"36" PS PENNISETUM SPATHIOLATUM SLENDER VELDT GRASS 1 GAL L 24"48" PO PITTOSPORUM TOBIRA 'CREME DE MINT'CREME DE MINT PITTOSPORUM 1 GAL L 36"36" PV PITTOSPORUM TOBIRA 'VARIEGATA'VARIEGATED JAPANESE PITTOSPORUM 5 GAL L 72"72" PW PITTOSPORUM TOBIRA 'WHEELER'S DWARF'WHEELER'S DWARF PITTOSPORUM 1 GAL L 36"54" PE PODOCARPUS ELONGATUS 'MONMAL'ICEE BLUE® YELLOW WOOD 5 GAL M 72"60" RM RHAMNUS CALIFORNICA 'MOUND SAN BRUNO'MOUND SAN BRUNO COFFEEBERRY 5 GAL L 48"60" RV RIBES VIBURNIFOLIUM EVERGREEN CURRANT 1 GAL L 60"60" RH ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET'HUNTINGTON CARPET ROSEMARY 5 GAL L 18"72" RU RUSSELIA EQUISETIFORMIS FIRECRACKER PLANT 5 GAL L 48"48" SC SALVIA CLEVELANDII CLEVELAND SAGE 5 GAL L 48"72" SB SALVIA LEUCANTHA 'SANTA BARBARA'SANTA BARBARA MEXICAN BUSH SAGE 1 GAL L 36"54" SP SALVIA LEUCOPHYLLA PURPLE SAGE 5 GAL L 36"60" SH SALVIA MICROPHYLLA 'HOT LIPS'HOT LIPS GRAHAM SAGE 1 GAL L 36"54" SS SENECIO SERPENS BLUE CHALKSTICKS 5 GAL L 12"36" TP TEUCRIUM CHAMAEDRYS 'PROSTRATUM'PROSTRATE GERMANDER 1 GAL L 12"36" TC TEUCRIUM FRUTICANS 'COMPACTUM'COMPACT BUSH GERMANDER 1 GAL L 36"36" VL VERBENA LILACINA 'DE LA MINA'DE LA MINA LILAC VERBENA 1 GAL L 48"36" WB WESTRINGIA FRUTICOSA 'GREY BOX'DWARF COAST ROSEMARY 1 GAL L 24"24" WA WESTRINGIA FRUTICOSA 'MUNDI'COAST ROSEMARY 1 GAL L 60"48" WL WESTRINGIA FRUTICOSA 'WES06'LOW HORIZON™ COAST ROSEMARY 1 GAL L 12"48" 1.THE PLANT LIST IS PRELIMINARY IN NATURE. SPECIES SHALL BE ADDED AND SUBTRACTED TO FULFILL THE DESIGN AND HORTICULTURAL REQUIREMENTS AS NECESSARY. 2.THE IRRIGATION SYSTEM SHALL BE DESIGNED WITH WATER CONSERVATION IN MIND WHILE ACHIEVING THE GOAL OF EFFECTIVELY AND EFFICIENTLY IRRIGATING THE LANDSCAPE. 3.A STATE-OF-THE-ART IRRIGATION CONTROLLER SHALL BE SPECIFIED FOR THIS PROJECT TO CONTROL THE WATER ALLOCATED TO EACH VALVE GROUPED PER INDIVIDUAL HYDROZONE (BASED ON PLANT TYPE AND EXPOSURE). "I WILL COMPLY WITH THE CRITERIA OF THE ORDINANCE AND APPLY THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLAN." SIGNATURE DATE CODE BOTANICAL NAME COMMON NAME SIZE WATER USE MATURE HEIGHT MATURE WIDTH TREES ARA ACER RUBRUM 'ARMSTRONG'ARMSTRONG RED MAPLE 24" BOX M 40'15' AOG ACER RUBRUM 'OCTOBER GLORY'OCTOBER GLORY RED MAPLE 24" BOX M 40'35' ARB ARBUTUS X 'MARINA'MARINA STRAWBERRY TREE 24" BOX L 25'20' CTO CERCIS CANADENSIS TEXENSIS 'OKLAHOMA'OKLAHOMA TEXAS REDBUD 24" BOX M 15'20' COO CERCIS OCCIDENTALIS WESTERN REDBUD 24" BOX L 20'15' LAN LAGERSTROEMIA INDICA X FAURIEI 'NATCHEZ'NATCHEZ CRAPE MYRTLE 24" BOX L 25'15' LTO LAGERSTROEMIA INDICA X FAURIEI 'TONTO'TONTO CRAPE MYRTLE 24" BOX L 15'10' LAS LAURUS X `SARATOGA`SARATOGA HYBRID LAUREL 24"BOX L 20'20' MLG MAGNOLIA GRANDIFLORA 'LITTLE GEM'LITTLE GEM DWARF SOUTHERN MAGNOLIA 24" BOX M 20'10' OLE OLEA EUROPAEA 'SWAN HILL'SWAN HILL FRUITLESS OLIVE 24"BOX L 25'20' PLC PLATANUS X ACERIFOLIA 'COLUMBIA'COLUMBIA LONDON PLANE TREE 24"BOX M 40'30' QUL QUERCUS LOBATA VALLEY OAK 24"BOX L 40'35' QUS QUERCUS SUBER CORK OAK 24"BOX L 40'35' QUV QUERCUS VIRGINIANA SOUTHERN LIVE OAK 24"BOX M 40'35' ULD ULMUS PARVIFOLIA 'DRAKE'DRAKE LACEBARK ELM 24" BOX L 30'30' ULF ULMUS PARVIFOLIA `NEW FRONTIER`NEW FRONTIER ELM 24"BOX L 30'20' CODE BOTANICAL NAME COMMON NAME SIZE WATER USE MATURE HEIGHT NATIVE SHRUBS AI ACACIA COGNATA 'COUSIN ITT'COUSIN ITT ACACIA 1 GAL M 60"48" AH ACHILLEA MILLEFOLIUM 'SUMMER PASTELS'SUMMER PASTELS MIX COMMON YARROW 1 GAL L 24"36" AM ACHILLEA X 'MOONSHINE'MOONSHINE YARROW 1 GAL L 24"24" AN AEONIUM SPP.AEONIUM 5 GAL L 36"24" AV AGAVE SPP.AGAVE 1 GAL L 36"36" AL ALOE STRIATA CORAL ALOE 1 GAL L 36"24" AB ALOE X 'BLUE ELF'BLUE ELF ALOE 1 GAL L 24"24" AR ARBUTUS UNEDO 'COMPACTA'COMPACT STRAWBERRY TREE 5 GAL L 72"48" AD ASPARAGUS DENSIFLORUS 'MYERS'MYERS ASPARAGUS FERN 1 GAL M 48"36" BB BOUTELOUA GRACILIS 'BLONDE AMBITION'BLONDE AMBITION BLUE GRAMA 1 GAL L 30"24" CS CALANDRINIA SPECTABILIS 'SHINING PINK'SHINING PINK CALANDRINIA 1 GAL L 24"36" CE CHONDROPETALUM ELEPHANTINUM LARGE CAPE RUSH 1 GAL L 48"60" CT CHONDROPETALUM TECTORUM 'EL CAMPO'EL CAMPO CAPE RUSH 1 GAL L 36"36" CK COPROSMA X KIRKII 'HAGLEY GREEN'HAGLEY GREEN TAUPATA 1 GAL L 72"48" DL DIANELLA REVOLUTA 'DR5000'LITTLE REV™ FLAX LILY 1 GAL L 36"36" DR DIANELLA REVOLUTA 'DTN03'BABY BLISS™ FLAX LILY 1 GAL L 24"24" DT DIANELLA TASMANICA 'VARIEGATA'VARIEGATED FLAX LILY 1 GAL L 48"48" DB DIETES BICOLOR FORTNIGHT LILY 1 GAL L 36"36" DG DIETES VEGETA AFRICAN IRIS 1 GAL L 36"36" EC EPILOBIUM CANUM 'CATALINA'CATALINA CALIFORNIA FUCHSIA 1 GAL L 30"24" FM FESTUCA MAIREI ATLAS FESCUE 1 GAL L 36"36" GF GALVEZIA SPECIOSA 'FIRECRACKER'FIRECRACKER ISLAND SNAPDRAGON 1 GAL L 36"42" GC GREVILLEA LANIGERA 'COASTAL GEM'COASTAL GEM GREVILLEA 1 GAL L 60"48" HP HESPERALOE PARVIFLORA RED YUCCA 5 GAL L 36"42" HB HESPERALOE PARVIFLORA 'PERPA'BRAKELIGHTS® RED YUCCA 5 GAL L 36"24" HA HETEROMELES ARBUTIFOLIA TOYON 1 GAL L 72"60" KU KNIPHOFIA UVARIA RED HOT POKER 1 GAL L 24"24" LB LOMANDRA LONGIFOLIA 'LM300'BREEZE™ MAT RUSH 1 GAL L 42"42" MX MAHONIA X 'SOFT CARESS'SOFT CARESS MAHONIA 1 GAL L 36"30" MR MUHLENBERGIA RIGENS DEER GRASS 1 GAL L 48"60" NW NEPETA X FAASSENII 'WALKER'S LOW'WALKER'S LOW CATMINT 1 GAL L 18"36" PS PENNISETUM SPATHIOLATUM SLENDER VELDT GRASS 1 GAL L 24"48" PO PITTOSPORUM TOBIRA 'CREME DE MINT'CREME DE MINT PITTOSPORUM 1 GAL L 36"36" PV PITTOSPORUM TOBIRA 'VARIEGATA'VARIEGATED JAPANESE PITTOSPORUM 5 GAL L 72"72" PW PITTOSPORUM TOBIRA 'WHEELER'S DWARF'WHEELER'S DWARF PITTOSPORUM 1 GAL L 36"54" PE PODOCARPUS ELONGATUS 'MONMAL'ICEE BLUE® YELLOW WOOD 5 GAL M 72"60" RM RHAMNUS CALIFORNICA 'MOUND SAN BRUNO'MOUND SAN BRUNO COFFEEBERRY 5 GAL L 48"60" RV RIBES VIBURNIFOLIUM EVERGREEN CURRANT 1 GAL L 60"60" RH ROSMARINUS OFFICINALIS 'HUNTINGTON CARPET'HUNTINGTON CARPET ROSEMARY 5 GAL L 18"72" RU RUSSELIA EQUISETIFORMIS FIRECRACKER PLANT 5 GAL L 48"48" SC SALVIA CLEVELANDII CLEVELAND SAGE 5 GAL L 48"72" SB SALVIA LEUCANTHA 'SANTA BARBARA'SANTA BARBARA MEXICAN BUSH SAGE 1 GAL L 36"54" SP SALVIA LEUCOPHYLLA PURPLE SAGE 5 GAL L 36"60" SH SALVIA MICROPHYLLA 'HOT LIPS'HOT LIPS GRAHAM SAGE 1 GAL L 36"54" SS SENECIO SERPENS BLUE CHALKSTICKS 5 GAL L 12"36" TP TEUCRIUM CHAMAEDRYS 'PROSTRATUM'PROSTRATE GERMANDER 1 GAL L 12"36" TC TEUCRIUM FRUTICANS 'COMPACTUM'COMPACT BUSH GERMANDER 1 GAL L 36"36" VL VERBENA LILACINA 'DE LA MINA'DE LA MINA LILAC VERBENA 1 GAL L 48"36" WB WESTRINGIA FRUTICOSA 'GREY BOX'DWARF COAST ROSEMARY 1 GAL L 24"24" WA WESTRINGIA FRUTICOSA 'MUNDI'COAST ROSEMARY 1 GAL L 60"48" WL WESTRINGIA FRUTICOSA 'WES06'LOW HORIZON™ COAST ROSEMARY 1 GAL L 12"48" 1.THE PLANT LIST IS PRELIMINARY IN NATURE. SPECIES SHALL BE ADDED AND SUBTRACTED TO FULFILL THE DESIGN AND HORTICULTURAL REQUIREMENTS AS NECESSARY. 2.THE IRRIGATION SYSTEM SHALL BE DESIGNED WITH WATER CONSERVATION IN MIND WHILE ACHIEVING THE GOAL OF EFFECTIVELY AND EFFICIENTLY IRRIGATING THE LANDSCAPE. 3.A STATE-OF-THE-ART IRRIGATION CONTROLLER SHALL BE SPECIFIED FOR THIS PROJECT TO CONTROL THE WATER ALLOCATED TO EACH VALVE GROUPED PER INDIVIDUAL HYDROZONE (BASED ON PLANT TYPE AND EXPOSURE). "I WILL COMPLY WITH THE CRITERIA OF THE ORDINANCE AND APPLY THEM FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLAN." SIGNATURE DATE OCTOBER 2, 2026 TREES PLANT SCHEDULE WATER CONSERVATION STATEMENT Arbutus x ‘Marina’Acer rubrum ‘Cultivar’ Laurus nobilis ‘Saratoga’ Cercis canadensis ‘Oklahoma’Cercis occidentalis Lagerstroemai x ‘Natchez’Lagerstroemai x ‘Tonto’Olea europea ‘Swan Hill’ Marina Strawberry TreeRed Maple Saratoga Bay Laurel Oklahoma Redbud Western Redbud Natchez Crape Myrtle Tonto Crape Myrtle Swan Hill Olive Tree Platanus x acerifolia ‘Columbia’Magnolia grandifora ‘Little Gem’Quercus spp. Ulmus spp. Columbia Plane TreeLittle Gem Dward Magnolia Oak Elm 08/14/2026 OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-11PLANT PALETTE OCTOBER 2, 2026 Acacia cognata ‘Cousin Itt’Asparagus densiflorus ‘Myeri’Arbutus unedo ‘Compacta’Agave spp. Chondropetalum tectorum ‘El Campo’ Aloe spp. Coprosma kirkii Cotyledon orbiculata var. oblanga Achillea spp.Aeonium spp,Bouteloua gracilis ‘Blonde Ambition’Calandrinia spectabilis Cousin Itt Acacia Foxtail FernDwarf Strawberry TreeAgave El Campo Cape Rush Aloe Creeping Mirror Plant Silver Crown Yarrow Aeonium Blue Grama Grass Rock Purslane Dianella spp. Flax Lily Dietes bicolor African Iris Epilobium ssp. California Fuchsia Festuca mairei Frangula ssp. Atlas Fescue Coffeeberry Grevillea lanigera Mimulus aurantiacus Galvezia speciosa ‘Firecracker’ Mahonia ‘Soft Caress’Kniphofia spp. Pennisetum spathiolatum Leymus condensatus ‘Canyon Prince’ Pittosporum spp. Lomandra longifolia ‘Breeze’Hesperaloe parvifolia Muhlenbergia spp.Heteromeles arbutifolia Nepeta x faassenii ‘Walker’s Low’ Wooly Grevillea Monkey Flower Firecracker Island Snapdragon Soft Caress MahoniaRed Hot Poker Slender Veldt Grass Canyon Prince Wild Rye Pittosporum Breeze Dwarf Mat RushRed Yucca MuhlyToyon Walker’s Low Catmint Podocarpus ‘Icee Blue’Rosmarinus spp.Ribes vibernifolium Icee Blue Yellow-Wood RosemaryCatalina Currant Russelia equisetiformis Verbena lilacina ‘De La Mina’ Salvia leucanthaSavlia clevelandii Salvia leucophylla Salvia mircophylla Senecio serpens Teucrium chamaedrys Coral Fountain De La Mina Verbena Santa Barbara SageCleveland Sage Santa Barbara Sage Sage Blue Chalksticks Wall Germander Wesitringia spp. Coast Rosemary SHRUBS OLIVE + OAK SAN RAMON, CA ENTITLEMENT SUBMITTAL APRIL 10, 2026 L-12SITE SIGNAGE OCTOBER 2, 2026 SECTION ELEVATION A-A’: ENTRY MONUMENT PLAN SCALE: 3/8” = 1’-0” KEY MAP A’ A’ A A CONCRETE WALL FINISH: BOARDFORM ALUMINUM STANDOFF LETTERS DECORATIVE POT ENTRY MONUMENT UP DNUP DN1.2 1.1 1.1 3.3 1.1 1.20.9 6.0 0.3 0.5 0.5 0.2 0.4 0.9 0.8 0.3 0.1 0.1 0.1 0.1 0.2 0.2 0.5 0.9 0.6 0.3 0.1 0.8 0.6 0.4 0.3 0.1 0.1 0.2 0.6 4.1 5.4 0.9 0.3 0.1 0.1 0.1 0.1 0.3 0.9 5.3 3.9 0.6 0.2 0.1 0.1 0.1 0.1 0.3 1.9 5.7 2.5 0.4 0.2 1.3 1.5 1.9 1.9 2.1 2.0 1.9 1.8 1.6 1.6 1.5 1.4 4.4 1.9 2.4 2.2 1.3 1.0 1.0 1.2 1.3 0.0 0.0 0.0 0.0 6.9 3.10.5 5.0 3.8 0.80.6 4.5 0.5 0.5 0.5 0.5 1.0 0.9 0.8 1.1 1.3 1.1 0.9 0.8 0.7 0.5 1.5 0.9 1.1 1.4 1.3 1.0 0.9 0.9 0.9 0.7 1.5 1.2 1.2 1.2 1.1 0.9 0.9 1.1 1.3 0.8 1.5 1.1 1.0 0.9 0.8 0.8 0.9 1.1 1.4 0.6 1.2 0.9 0.8 0.7 0.7 0.7 0.8 1.1 1.3 0.7 1.2 0.8 0.6 0.6 0.6 0.6 0.8 0.9 1.1 0.8 0.6 0.6 0.6 0.7 0.8 0.8 0.6 0.6 0.6 0.7 0.8 0.8 0.7 0.5 1.9 1.5 1.1 0.8 0.7 0.7 0.7 0.8 0.8 0.8 0.6 1.7 1.3 1.0 0.9 0.8 0.8 0.8 0.9 1.0 0.8 2.0 1.6 1.4 1.4 1.2 1.0 0.9 0.9 1.1 1.3 0.9 1.6 1.2 1.1 1.4 1.4 1.2 1.0 1.0 1.2 1.4 0.7 1.5 1.3 1.0 1.0 1.2 1.4 0.9 0.8 1.0 1.0 0.9 1.0 1.1 0.8 0.3 0.6 0.6 0.7 0.7 0.7 0.5 0.3 0.4 0.4 0.1 0.1 2.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2 PRELIMINARYProject:26PAC05208.288.2181 CROW CANYON PLACEPAR C E L A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 19 20 21 22 16 PARCEL BPARCEL CPARCEL D PARCEL E PARCEL F PARCEL G PARCEL H PARCEL I PARCEL J PARCEL L PARCEL M PARCEL K 12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA SITE VICINITY MAP CONTACTS: DESCRIPTIONPROPOSED LEGEND SHEET INDEX SHEET NO DESCRIPTION GENERAL NOTES: TM-1VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES 15 17 19 25 27 30 31 32 3637 39 40 41 42 43 46 48 49 50 52 54 55 60 61 62 63 64 65 66 70 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 89 90 93 92 91 9897 100101 102 109 110 111 112113 105 106 107 108 103104 96 95 94CROW CANYON PLACE99 59 12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA ABBREVIATIONS LEGEND 15 TM-2EXISTING CONDITIONS & TREE REMOVAL UPDNUPDN UP DN PARKINGNO PARKINGNOI ALLEY BLDG 1 BLDG 2 BLDG 3 H ALLEY A ST R E E T CROW CANYON PLACEAFFORDABLE HOUSING J ALLEY BLDG 4 BLDG 5 BLDG 6 BLDG 7 BLDG 8 BLDG 9 BLDG 10 BLDG 18 B STREETBLDG 10 BLDG 11 BLDG 21 BLDG 12 BLDG 14 BLDG 13 D STREET E STREETBLDG 20 BLDG 19 K ALLEY C STREETBLDG 15 BLDG 16 BLDG 17 F STREET 123 456 789 101112 131415 161718 19 20 21 22 23242526 27 28 29 30 31 3233343536 37 38 39 40 41 42 434445464748 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 767778798081 82 83 84 85 86 87 899091 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 108109110111112113 114 115 116 117 118 119 G STREET107 ADP ADP ADP ADP ADP ADP ADP ADP ADP ADP ADP ADP 88 'C STREET' SECTION TYPICAL 22' WIDE STREET & ALLEY SECTION 'E STREET' SECTION 'F STREET' SECTION 'G' STREET' SECTION 'B STREET' SECTION EVA SECTION 12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA PROVIDED PARKING SUMMARY PARKING STALLS PROVIDED ABBREVIATIONS LEGEND BLDG 1 TM-3PRELIMINARY SITE PLAN ADP UPDNUPDNUPDNPARKINGNO PARKINGNOBLDG 1 BLDG 2 BLDG 3 FF 485.3 CROW CANYON PLACEAFFORDABLE HOUSING BLDG 4 FF 484.8 BLDG 5 FF 485.9 BLDG 6 FF 486.1 BLDG 7 FF 486.9 BLDG 8 FF 487.1 BLDG 9 FF 486.3 BLDG 18 FF 485.9 BLDG 10 FF 486.6 BLDG 11 FF 486.1 BLDG 21 FF 485.9 BLDG 12 FF 483.4 BLDG 14 FF 483.2 BLDG 13 FF 482.7 BLDG 20 FF 484.9 BLDG 19 FF 484.7 FF 481.3 BLDG 15 FF 483.9 BLDG 16 FF 483.7 BLDG 17 FF 484.3 FF 484.9 FF 483.6 A B C D I ALLEY H ALLEY A ST R E E T J ALLEY B STREETD STREET E STREETK ALLEY C STREETF STREETG STREETTSM 479.7TSM 482.7TSM 484.2TSM 484.8 TSM 483.8H F G E SECTION A SECTION B SECTION C CROW CANYON PLACE SECTION D SECTION E SECTION F SECTION G SECTION H C STREET 12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA LEGEND ROUGH GRADING EARTHWORK SUMMARY DESCRIPTION CUT (CY)FILL (CY) ABBREVIATIONS P TM-4PRELIMINARY GRADING AND DRAINAGE PLAN UPDNUPDN UP DN PARKING NO PARKINGNOBLDG 1 BLDG 2 BLDG 3 CROW CANYON PLACEAFFORDABLE HOUSING BLDG 4 BLDG 5 BLDG 6 BLDG 7 BLDG 8 BLDG 9 BLDG 10 BLDG 18 BLDG 10 BLDG 11 BLDG 21 BLDG 12 BLDG 14 BLDG 13 BLDG 20 BLDG 19 BLDG 15 BLDG 16 BLDG 17 I ALLEY H ALLEY A ST R E E T J ALLEY D STREET E STREETK ALLEY F STREETG STREETC STREETB STREETP A B C D E F G H I J 12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA LEGEND ABBREVIATIONS P TYPICAL WATER LATERAL TRENCH JOINT WATER LATERAL TRENCH TM-5PRELIMINARY UTILITY PLAN UP DNUP DNUP DN PARKINGNO PARKINGNOBLDG 1 BLDG 2 BLDG 3 CROW CANYON PLACEAFFORDABLE HOUSING BLDG 4 BLDG 5 BLDG 6 BLDG 7 BLDG 8 BLDG 9 BLDG 10 BLDG 18 BLDG 10 BLDG 11 BLDG 21 BLDG 12 BLDG 14 BLDG 13 BLDG 20 BLDG 19 BLDG 15 BLDG 16 BLDG 17 DMA 4 DMA 3 DMA 2 DMA 1 DMA 5 DMA 6A P I ALLEY H ALLEY A ST R E E T J ALLEY B STREETD STREET E STREETK ALLEY F STREETG STREETC STREETDMA 6BSUMP PUMP (FOR TREATMENT FLOW) DETAIL 12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA LEGEND P C.3. TREATMENT SUMMARY DMA DMA AREA (SF)IMPERVIOUS AREA (SF) PERVIOUS AREA (SF) EFFECTIVE AREA (SF) TREATMENT AREA REQUIRED (SF) USING 4% TREATMENT AREA PROVIDED (SF) TREATMENT TYPE DMA 1 BIO-RETENTION AREA DETAIL BLDG 1 TM-6PRELIMINARY STORMWATER MANAGEMENT PLAN ≥ SPECIAL PROJECT NON-LID TREATMENT REDUCTION CREDITS C.3 TREATMENT SUMMARY (MEDIA FILTER) DMA TREATMENT TYPE SIZING METHOD TREATMENT DEVICE DESIGNATION TOTAL DMA AREA (SF)IMPERVIOUS AREA (SF) PERVIOUS AREA (SF) RUNOFF FACTOR - IMPERVIOUS RUNOFF FACTOR - PERVIOUS COMPOSITE RUNOFF FACTOR "C" INTENSITY (I) (IN/HR) MIN REQUIRED TREATMENT FLOW (CxIxA) (CFS) UPDNUPDNUPDNPARKINGNO PARKINGNOBLDG 1 BLDG 2 BLDG 3 AFFORDABLE HOUSING BLDG 4 BLDG 5 BLDG 6 BLDG 7 BLDG 8 BLDG 9 BLDG 10 BLDG 18 BLDG 10 BLDG 11 BLDG 21 BLDG 12 BLDG 14 BLDG 13 BLDG 20 BLDG 19 BLDG 15 BLDG 16 BLDG 17 SAN RAMON FIRE TRUCK SAN RAMON FIRE TRUCK SAN RAMON FIRE TRUCK SAN RAMON F I R E T R U C K I ALLEY H ALLEY A ST R E E T J ALLEY B STREETD STREET E STREETK ALLEY F STREETG STREETC STREETCROW CANYON PLACE12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA LEGEND ABBREVIATIONS SAN RAMON FIRE TRUCK SAN RAMON FIRE TRUCK TURNING TEMPLATE TM-7PRELIMINARY FIRE ACCESS SERVICE PLAN UPDNUPDN UP DN PARKING NO PARKINGNOTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROT R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R OTROTROTROTROTROTROTROTRO TROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROTROT R O T R O T R O T R O T R O T R O T R O T R OTROTROTROTRO T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R OTRO T R OTROTRO T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O T R O SAN RAMON GARBAGE TRUCK (ASSUMED) SAN RAMON GARBAGE TRUCK (ASSUMED) SAN RAMON GARBAGE TRUCK (ASSUMED)SAN RAMON GARBAGE TRUCK (ASSUMED) SAN RAMON G A R B A G E T R U C K ( A S S U M E D ) SAN RAMON GARBAGE TRUCK (ASSUMED) SAN RAMON GARBAGE TRUCK (ASSUMED)SAN RAMON GARBAGE TRUCK (ASSUMED)SAN RAMON GARBAGE TRUCK (ASSUMED) BLDG 1 BLDG 2 BLDG 3 CROW CANYON PLACEAFFORDABLE HOUSING BLDG 4 BLDG 5 BLDG 6 BLDG 7 BLDG 8 BLDG 9 BLDG 10 BLDG 18 BLDG 10 BLDG 11 BLDG 21 BLDG 12 BLDG 14 BLDG 13 BLDG 20 BLDG 19 BLDG 15 BLDG 16 BLDG 17 I ALLEY H ALLEY A ST R E E T J ALLEY B STREETD STREET E STREETK ALLEY C STREETF STREETG STREETTRASHAFFORDABLETRASH PICKUPT R O TROTROOTROTROTROT R OTROTROTRO 12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA LEGEND BLDG 1 T R O SAN RAMON GARBAGE TRUCK TURNING TEMPLATE SAN RAMON GARBAGE TRUCK (ASSUMED) TYPICAL 22' WIDE ALLEY (TOWNHOME SECTION) TYPICAL CART LAYOUT TM-8PRELIMINARY WASTE COLLECTION ACCESS PLAN PARKING NO PARKINGNOCROW CANYON PLACEI ALLEY H ALLEY A ST R E E T J ALLEY B STREETD STREET E STREETK ALLEY F STREETG STREETC STREET12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA LEGEND TM-9PRELIMINARY EROSION CONTROL PLAN UPDNUPDNUPDNPARKINGNO PARKINGNOBLDG 1 BLDG 2 BLDG 3 CROW CANYON PLACEAFFORDABLE HOUSING BLDG 4 BLDG 5 BLDG 6 BLDG 7 BLDG 8 BLDG 9 BLDG 18 BLDG 10 BLDG 11 BLDG 21 BLDG 12 BLDG 14 BLDG 13 BLDG 20 BLDG 19 BLDG 15 BLDG 16 BLDG 17 I ALLEY H ALLEY A ST R E E T J ALLEY B STREETD STREET E STREETK ALLEY C STREETF STREETG STREETADP ADP ADP ADP ADP ADP ADP ADP ADP ADP ADP ADP NOPARKING12080400CIVIL ENGINEERS SURVEYORS PLANNERS SAN RAMON WWW.CBANDG.COM ROSEVILLE (925) 866-0322 (916) 788-4456 OLIVE + OAK PLANNING SUBMITTAL SEPTEMBER 30, 2026SAN RAMON, CA TM-10SIGNING,STRIPING AND PEDESTRIAN ACCESS PLAN ACCESSIBLE PARKING STALL SIGN DETAIL ACCESSIBLE PERSONS PARKING SYMBOL DETAIL FIRE LANE SIGN DETAIL LEGEND & ABBREVIATIONS GENERAL NOTES ADP Very-Low Income Low Income Moderate Income Above Moderate Income Totals Notes 2023-2031 RHNA 1,497 862 767 1,985 5,111 Year Reported ADU Progress for Period (7/1/2022 to 1/31/2031) 2022 Reported ADUs (Projection Period 7/1/2022 to 1/30/2023)-6 62023 Reported ADUs -7 -2 -2 11 2024 Reported ADUs -5 -1 -3 -1 10 2025 Reported ADUs -6 -6 -6 18 Project Name (APN)Projects Approved/Entitled, anticipated to pull building permits or obtain Cert. of Occupancy for Period (7/1/2022 to 1/31/2031)The Promenade at the Preserve (Twin Oaks) (208880001)-162 162 Cert. of Occupancy anticipated in Projection Period Aspen Wood Senior Apts. (210520031)-26 -96 -1 123 BP issued 7/14/2022 and Cert. of Occupancy anticipated in Projection Period TTLC Townhomes (208260054)-3 -2 -4 -48 57 Windflower Fields (208250091)-47 47 Includes 47 SF Windflower Fields (208250091) ADUs -5 -5 -4 -2 16 Windflower ADUsDeer Creek South (222270058)-185 185 Cert. of Occupancy anticipated in Projection PeriodCity Village (Summerhill) (213133048)-4 -6 -10 -384 404 2481 Deerwood - Trumark Townhomes (208640003)-3 -2 -4 -52 61 Marketplace (213701002)-40 40 Includes 40 SF Marketplace (213701002) ADUs -2 -1 -1 4 Marketplace ADUs47 Paddock Ln. - Bierwith Lot Split (209750012) (Not a HOS)-1 1 City Walk Master Plan - BR 1A:1 (Related Apts.) (21312036)-29 -28 -326 383 Iron Horse Village (213020046 and 213020037)-1 -3 -2 -111 117 2233 San Ramon Valley Blvd. (Bella Village) (208260036 and 208260052)-65 -65 -1 131100 Henry Ln. - Pathak Urban Lot Split (211020027) (Not a HOS)-2 2 18 Crow Canyon Ct. (Woodside Canyon) (208490010)-3 -1 -4 -46 54 2453 Camino Ramon - Camino Ramon Apartments (Eden Housing) (APN: 213-133-053) (Not a HOS)-153 -45 -2 200 2301 Camino Ramon - BR 11 Residential Developemnt (APN: 213-131-003)-195 195City Walk Master Plan - BR 3A:1 (Avalon Apts.) (213133102, formerly 213133099)-456 456 2527 Camino Ramon - Bartlett (BR7) Residential Development (213133078)-190 190 2 Annabel Ln. - Annabel (BR 12) Residential Development (portion of existing 213131001) (Not a HOS)-3 -2 -5 -54 64 Includes 64 MF 2 Annabel Ln. (BR 12) ADUs (Not a HOS)-3 -3 -2 -1 9 9 BR 12 ADUsOrchards Neighborhood -18 -17 -17 -6 58 ADUs; Breakdown: 30% v. low, low and mod, 10% above mod. Orchards Multi-family -14 -22 -36 72 Assuming 1/3 of 1,465 units or 483 constructed this cycle, 15% 483=73 Orchards Affordable Apts. (213120008) (Not a HOS)-25 -74 -1 100 2600 Camino Ramon (NW 1) -32 -47 -79 158 525 units from NW 1; 30% = 158 (157.5)2600 Camino Ramon (NW 2) -18 -27 -45 90 299 units from NW 2; 30% = 90 (89.7)2600 Camino Ramon (NW 3) -16 -25 -41 82 273 units from NW 3; 30% = 82 (81.9) 2600 Camino Ramon (NW 4)-18 -27 -45 90 301 units from NW 4; 30% = 90 (90.3) 3000-5000 Executive Pkwy Canopy (BR 8) Residential Development (213133067; -068; -069)-70 -90 -256 416 Includes 15 extremely low and 55 very low in very low category 3000-5000 Executive Pkwy Canopy (BR 8) Residential Development (213133067; -068; -069) ADUs -39 -38 -38 -13 128 128 BR 8 ADUs Remaining RHNA to Date 929 229 234 (421) 971Project Name (APN)Proposed Project RHNA Olive + Oak Residential Development (213-010-046; -047; -059; -060)-9 -35 -120 164 Includes 4 at 30% AMI and 5 at 50% AMI in very low categoryIncludes 26 at 60% AMI and 9 at 80% AMI in low category Olive + Oak Residential Development ADUs (213-010-046; -047; -059; - 060)-5 -5 -5 -1 16 16 Olive + Oak approved ADUs Remaining RHNA with Proposed Development 915 189 229 (542) 791 Remaining RHNA (2023-2031) As of October 15, 2026 Table 1 of 3 Very-Low Income Low Income Moderate Income Above Moderate Income Totals Notes Total Site Capacity 1,779 1,001 874 4,951 8,605 Capacity from ADUs 21 21 21 7 70 Project Name (APN)Sites Inventory RHNA from Approved/Entitled or Permitted Project The Promenade at the Preserve (Twin Oaks) (208880001)-162 162 Aspen Wood Senior Apts. (210520031)-26 -96 -1 123 TTLC Townhomes (208260054)-3 -2 -4 -48 57 Windflower Fields (208250091)-6 -6 -4 -47 63 Includes 47 SF and 16 ADUs Deer Creek South (222270058)-185 185 City Village (Summerhill) (213133048)-4 -6 -10 -384 404 2481 Deerwood - Trumark Townhomes (208640003)-3 -2 -4 -52 61 Marketplace (213701002)-44 44 Includes 40 SF and 4 ADUs Iron Horse Village (213020046 and 213020037)-8 -8 -16 -133 165 City Walk Master Plan - BR 1A:1 (Related Apts.) (21312036)-29 -29 -323 381 2233 San Ramon Valley Blvd. (Deerwood & Omega Workforce Housing) (208260036 and 208260052)-30 -30 -8 -19 87 18 Crow Canyon Ct. (Woodside Canyon) (208490010)-32 -16 -6 -11 65 2301 Camino Ramon - BR 11 Residential Developemnt (APN: 213-131-003)-49 -25 -49 -376 499 City Walk Master Plan - BR 3A:1 (Avalon Apts.) (213133102, formerly 213133099)-41 -41 -461 543 2527 Camino Ramon - Bartlett (BR7) Residential Development (213133078)-57 -28 -56 -427 568 3000-5000 Executive Pkwy Canopy (BR 8) Residential Development (213133067; -068; -069)-512 -249 -100 -156 1,017 Remaining Sites Inventory Capacity To Date 1,000 484 453 2,314 4,251 Project Name (APN)Sites Inventory Capacity from Proposed Development Olive + Oak Residential Development (213-010-046; - 047; -059; -060)-82 -41 -15 -30 168 Remaining Sites Inventory Capacity with Proposed Development 918 443 438 2,284 4,083 Remaining Capacity (2023-2031) As of October 15, 2026 Table 2 of 3 Very-Low Income Low Income Moderate Income Above Moderate Income Totals Remaining Capacity 918 443 438 2,284 4,083 Remaining RHNA 915 189 229 (542) 791 No Net Loss Calculation 3 254 209 2,826 3,292 No Net Loss Calculation (2023-2031) As October 15, 2026 Table 3 of 3